Übergabeprotokoll English1
Übergabeprotokoll English1
Übergabeprotokoll English1
T 4. Location of all relevant machines components T 11. Service and maintenance intervals according to
shown. operating instructions pointed out.
T 5. Electric control, locking, fuses and emergency T 12. Extras explained, i.e. EAS system,
switch explained. concrete leaking stop, etc.:
By signing this document the customer/operator certifies that the a.m. machine has been handed over properly.
Notes:
The handover is made despite any failures. The supplier guarantees a prompt touching up.