Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Interim Australian/New Zealand Standard: Lightning Protection

Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

AS/NZS 1768(Int):2003

AS/NZS 1768(Int)

Interim
Australian/New Zealand Standard

Lightning protection
This is a free 8 page sample. Access the full version online.
AS/NZS 1768(Int):2003
This Interim Joint Australian/New Zealand Standard was prepared by Joint
Technical Committee EL-024, Protection Against Lightning. It was approved on
behalf of the Council of Standards Australia on 27 November 2003 and on behalf of
the Council of Standards New Zealand on 19 November 2003. It was published on
31 December 2003.

The following are represented on Committee EL-024:


Australasian Corrosion Association
Australasian Railway Association
Australian Chamber of Commerce and Industry
Australian Electrical and Electronic Manufacturers Association
Australian Institute of Petroleum
Bureau of Meteorology
CSIRO Telecommunications and Industrial Physics
Department of Defence
Department of Mines and Energy (QLD)
Electricity Supply Association of Australia
ITU NSG5
Institution of Engineers Australia
Master Builders Australia
Ministry of Economic Development (New Zealand)
National Electrical and Communications Association
Telstra Corporation
The Association of Consulting Engineers Australia
The University of Queensland
Transpower New Zealand

Keeping Standards up-to-date


Standards are living documents which reflect progress in science, technology and
systems. To maintain their currency, all Standards are periodically reviewed, and
new editions are published. Between editions, amendments may be issued.
Standards may also be withdrawn. It is important that readers assure themselves
they are using a current Standard, which should include any amendments which
may have been published since the Standard was purchased.
Detailed information about joint Australian/New Zealand Standards can be found by
visiting the Standards Australia web site at www.standards.com.au or Standards
This is a free 8 page sample. Access the full version online.

New Zealand web site at www.standards.co.nz and looking up the relevant Standard
in the on-line catalogue.
Alternatively, both organizations publish an annual printed Catalogue with full
details of all current Standards. For more frequent listings or notification of
revisions, amendments and withdrawals, Standards Australia and Standards New
Zealand offer a number of update options. For information about these services,
users should contact their respective national Standards organization.
We also welcome suggestions for improvement in our Standards, and especially
encourage readers to notify us immediately of any apparent inaccuracies or
ambiguities. Please address your comments to the Chief Executive of either
Standards Australia International or Standards New Zealand at the address shown
on the back cover.

This Standard was issued in draft form for comment as DR 02359.


AS/NZS 1768(Int):2003

Australian/New Zealand Standard

Lightning protection

Originated in Australia as MC11969.


Originated in New Zealand as NZS/AS 1768:1991.
Previous Australian edition AS 17681991.
This is a free 8 page sample. Access the full version online.

AS 17681991 and NZS/AS 17681991 jointly revised and


designated as AS/NZS 1768(Int):2003.

COPYRIGHT
Standards Australia/Standards New Zealand
All rights are reserved. No part of this work may be reproduced or copied in any form or by any
means, electronic or mechanical, including photocopying, without the written permission of the
publisher.
Jointly published by Standards Australia International Ltd, GPO Box 5420, Sydney, NSW 2001
and Standards New Zealand, Private Bag 2439, Wellington 6020
ISBN 0 7337 5635 2
AS/NZS 1768(Int):2003 2

PREFACE
This Interim Standard was prepared by the Joint Standards Australia/Standards New
Zealand Committee EL-024 on Protection against Lightning to supersede AS 17681991
(NZS/AS 17681991) Lightning protection.
This Interim Standard is intended to provide authoritative guidance on the principles and
practices of lightning protection for a wide range of structures and systems. It is not
intended for mandatory application but, if called up in a contractual situation, compliance
with this Standard requires compliance with all relevant clauses of the Standard such that
the level of protection will be sufficient to achieve a tolerable level of risk as determined by
the risk calculation.
In general, it is not economically possible to provide total protection against all the possible
damaging effects of lightning, but the recommendations in this Standard will reduce the
probability of damage to a calculated acceptable level, and will minimize any lightning
damage that does occur. Guidance is given on methods of enhancing the level of protection
against lightning damage, if this is required in a particular situation.
Several important changes and additions have been made to this Interim Standard following
a review of submissions relating to AS 17681991 (NZS/AS 17681991) and of the
International Electrotechnical Commission (IEC) Technical Committee TC 81 documents
on Lightning Protection.
(a) The four IEC recommended protection levels (PL I to IV).
(b) The risk index approach to assessing the need for lightning protection has been
replaced by a quantitative risk management approach based on the IEC
methodology and software is provided, in the form of an Excel spreadsheet, to
calculate the risk for particular situations.
(c) The thunderday maps for Australia and New Zealand have been revised.
(d) A comprehensive set of design rules has been added as guidance for the provision of
minimum requirements for air terminals, downconductors, equipotential bonding and
earth terminations.
(e) The rolling sphere method has been extended to include the four protection levels
and a modification has been introduced to allow a larger radius sphere when
considering large flat surfaces.
(f) Table 4.6 Typical section dimensions of main current-carrying components has been
This is a free 8 page sample. Access the full version online.

updated to reflect current technology (This was Table 4.4 in AS 17681991


(NZS/AS 17681991)).
Where a new structure is to be erected, the matter of lightning protection should be
considered in the planning stage, as the necessary measures can often be affected in the
architectural features without detracting from the appearance of the building. In addition to
the aesthetic considerations, it is usually less expensive to install a lightning protection
system during construction than afterwards.
The decision to provide lightning protection may be taken without carrying out a risk
assessment or regardless of the outcome of any risk assessment, for example, where there is
a desire that there be no avoidable risk. Any decision not to provide lightning protection
should only be made after considering the advice provided in this Standard. Where doubt
exists as to the need for lightning protection, further advice should be sought from a
lightning protection designer or installer.
3 AS/NZS 1768(Int):2003

Unless it has been specified that lightning protection must be provided, the first decision to
make is whether the lightning protection is needed. Section 2 provides guidance to assist in
this decision. Section 3 provides advice on the protection of persons from lightning, mainly
relating to the behaviour of persons when not inside substantial buildings. Once a decision
is made that lightning protection is necessary, Section 4 provides details on interception
lightning protection for the building or structure. This includes information on the size,
material, and form of conductors, the positioning of air terminals and downconductors, and
the requirements for earth terminations. Persons and equipment within buildings can be at
risk from the indirect effects of lightning and Section 5 gives recommendations on the
protective measures that may need to be applied.
Section 6 describes methods of lightning protection of various items not covered in earlier
sections, such as communications aerials, chimneys, boats, fences, and trees. A clause is
included on methods for protecting domestic dwellings and assorted structures in public
places, where a complete protection system may not be justified, but some protection is
considered desirable.
Section 7 sets out recommendations for the protection of structures with explosive or highly
flammable contents. Section 8 gives advice on precautions to be taken during installation,
inspecting, testing, and maintaining lightning protection systems.
A number of appendices are included that provide additional information and advice. The
appendices form an integral part of this Interim Standard unless specifically stated
otherwise. i.e. appendices identified as informative only provide supportive or background
information and are therefore not an integral part of this Standard.
This Interim Standard will have a currency of three years from its date of publication. At
the conclusion of that period, it will either be superseded by another Standard, confirmed as
an Interim Standard in its present form for a further two year period or be withdrawn. The
decision will take into account experience with its application in Australia and New
Zealand and any new information on lightning protection available from the international
community of experts and technical committees such as IEC TC 81.
It should be noted that IEC TC 81 is currently restructuring its suite of lightning protection
Standards, to bring all of its different Standards and Technical Reports under one numerical
reference (IEC 62305). The applicability of this integrated IEC Standard will be carefully
examined when revising this Interim Standard.
This is a free 8 page sample. Access the full version online.
AS/NZS 1768(Int):2003 4

CONTENTS

Page

SECTION 1 SCOPE AND GENERAL


1.1 SCOPE......................................................................................................................... 6
1.2 APPLICATION ........................................................................................................... 6
1.3 INTRODUCTION ....................................................................................................... 6
1.4 REFERENCED DOCUMENTS................................................................................... 7
1.5 DEFINITIONS............................................................................................................. 7

SECTION 2 ASSESSMENT AND MANAGEMENT OF RISK DUE TO LIGHTNING


ANALYSIS OF NEED FOR PROTECTION
2.1 INTRODUCTION ..................................................................................................... 12
2.2 SCOPE OF SECTION ............................................................................................... 12
2.3 CONCEPT OF RISK ................................................................................................. 12
2.4 DAMAGE DUE TO LIGHTNING ............................................................................ 14
2.5 RISKS DUE TO LIGHTNING .................................................................................. 17
2.6 PROCEDURE FOR RISK ASSESSMENT AND MANAGEMENT ......................... 20
2.7 RISK MANAGEMENT CALCULATION TOOL ..................................................... 22

SECTION 3 PRECAUTIONS FOR PERSONAL SAFETY


3.1 SCOPE OF SECTION ............................................................................................... 28
3.2 NEED FOR PERSONAL PROTECTION.................................................................. 28
3.3 PERSONAL CONDUCT ........................................................................................... 28
3.4 EFFECT ON PERSONS AND TREATMENT FOR INJURY BY LIGHTNING ...... 30

SECTION 4 PROTECTION OF STRUCTURES


4.1 SCOPE OF SECTION ............................................................................................... 31
4.2 PROTECTION LEVEL ............................................................................................. 31
4.3 LPS DESIGN RULES................................................................................................ 31
4.4 ZONES OF PROTECTION FOR LIGHTING INTERCEPTION .............................. 33
4.5 METHODS OF PROTECTION ................................................................................. 41
4.6 MATTERS TO BE CONSIDERED WHEN PLANNING PROTECTION................. 43
4.7 MATERIALS............................................................................................................. 47
4.8 FORM AND SIZE OF CONDUCTORS .................................................................... 51
4.9 JOINTS...................................................................................................................... 52
This is a free 8 page sample. Access the full version online.

4.10 FASTENERS ............................................................................................................. 52


4.11 AIR TERMINALS..................................................................................................... 53
4.12 DOWNCONDUCTORS ............................................................................................ 55
4.13 TEST LINKS ............................................................................................................. 56
4.14 EARTH TERMINATIONS........................................................................................ 57
4.15 EARTHING ELECTRODES ..................................................................................... 60
4.16 METAL IN AND ON A STRUCTURE ..................................................................... 61

SECTION 5 PROTECTION OF PERSONS AND EQUIPMENT WITHIN BUILDINGS


5.1 SCOPE OF SECTION ............................................................................................... 66
5.2 NEED FOR PROTECTION....................................................................................... 66
5.3 MODES OF ENTRY OF LIGHTNING IMPULSES ................................................. 66
5.4 GENERAL CONSIDERATIONS FOR PROTECTION ............................................ 69
5.5 PROTECTION OF PERSONS WITHIN BUILDINGS.............................................. 70
5.6 PROTECTION OF EQUIPMENT ............................................................................. 73
5 AS/NZS 1768(Int):2003

Page

SECTION 6 PROTECTION OF MISCELLANEOUS STRUCTURES AND PROPERTY


6.1 SCOPE OF SECTION ............................................................................................... 80
6.2 STRUCTURES WITH RADIO AND TELEVISION AERIALS ............................... 80
6.3 STRUCTURES NEAR TREES.................................................................................. 80
6.4 PROTECTION OF TREES........................................................................................ 81
6.5 CHIMNEYS, METAL GUY-WIRES OR WIRE ROPES .......................................... 81
6.6 PROTECTION OF MINES........................................................................................ 82
6.7 PROTECTION OF BOATS ....................................................................................... 84
6.8 FENCES .................................................................................................................... 87
6.9 MISCELLANEOUS STRUCTURES......................................................................... 88
6.10 PROTECTION OF HOUSES AND SMALL BUILDINGS ....................................... 89
6.11 PROTECTION OF METALLIC PIPELINES ............................................................ 90

SECTION 7 PROTECTION OF
STRUCTURES WITH EXPLOSIVE OR HIGHLY-FLAMMABLE CONTENTS
7.1 SCOPE OF SECTION ............................................................................................... 91
7.2 GENERAL CONSIDERATIONS .............................................................................. 91
7.3 AREAS OF APPLICATION...................................................................................... 91
7.4 EQUIPMENT APPLICATION .................................................................................. 92
7.5 SPECIFIC OCCUPANCIES ...................................................................................... 93

SECTION 8 INSTALLATION AND MAINTENANCE PRACTICE


8.1 WORK ON SITE ....................................................................................................... 99
8.2 INSPECTION ............................................................................................................ 99
8.3 TESTING................................................................................................................... 99
8.4 RECORDS............................................................................................................... 100
8.5 MAINTENANCE .................................................................................................... 100

APPENDICES
A EXAMPLES OF LIGHTNING RISK CALCULATIONS ...................................... 101
B THE NATURE OF LIGHTNING AND THE PRINCIPLES OF LIGHTNING
PROTECTION......................................................................................................... 123
C NOTES ON EARTHING ELECTRODES AND MEASUREMENT OF EARTH
IMPEDANCE .......................................................................................................... 134
D THE CALCULATION OF LIGHTNING DISCHARGE VOLTAGES AND
This is a free 8 page sample. Access the full version online.

REQUISITE SEPARATION DISTANCES FOR ISOLATION OF A LIGHTNING


PROTECTION SYSTEM ........................................................................................ 151
E EARTHING AND BONDING................................................................................. 160
F WAVESHAPES FOR ASSESSING THE SUSCEPTIBILITY OF EQUIPMENT TO
TRANSIENT OVERVOLTAGES DUE TO LIGHTNING...................................... 165
G REFERENCED DOCUMENTS............................................................................... 169
AS/NZS 1768(Int):2003 6

STANDARDS AUSTRALIA/STANDARDS NEW ZEALAND

Australian/New Zealand Interim Standard


Lightning protection

SECT ION 1 SCOPE AND GENERA L

1.1 SCOPE
This Standard sets out guidelines for the protection of persons and property from hazards
arising from exposure to lightning. The recommendations specifically cover the following
applications:
(a) The protection of persons, both outdoors, where they may be at risk from the direct
effects of a lightning strike, and indoors, where they may be at risk indirectly as a
consequence of lightning currents being conducted into the building.
(b) The protection of a variety of buildings or structures, including those with explosive or
highly-flammable contents, and mines.
(c) The protection of sensitive electronic equipment (e.g. facsimile machines, modems,
computers) from overvoltages resulting from a lightning strike to the building or its
associated services.
The nature of lightning and the principles of lightning protection are discussed and
guidance is given to assist in a determination of whether protective measures should be
taken.
This Standard is applicable to conventional lightning protection systems (LPSs) that
comprise air terminals, downconductors, earth termination networks and surge protective
devices (SPDs). Nothing contained within this Standard neither endorses nor implies the
endorsement of non-conventional LPSs that comprise special air terminals or special
downconductors that claim enhanced performance or enhanced screening over conventional
systems.
The performance of such systems is outside the scope of this Standard. Irrespective of
claimed performance, air terminals shall be placed in accordance with Section 4 to comply
with this Standard.
This is a free 8 page sample. Access the full version online.

1.2 APPLICATION
This Standard does not override any statutory requirements but may be used in conjunction
with such requirements.
Compliance with the recommendations of this Standard will not necessarily prevent damage
or personal injury due to lightning but will reduce the probability of such damage or injury
occurring.

1.3 INTRODUCTION
Thunderstorms are natural phenomena and there are no proven devices and methods capable
of preventing lightning flashes. Direct and nearby cloud-to-ground lightning discharges can
be hazardous to persons, structures, installations and many other things in or on them.
Consideration should always be given to the application of lightning protection measures.

COPYRIGHT
AS/NZS 1768(Int):2003 Lightning protection
This is a free 8 page sample. Access the full version online.

The remainder of this document


is available for purchase online at
www.saiglobal.com/shop

SAI Global also carries a wide range of publications from a wide variety of Standards Publishers:

Click on the logos to search the database online.

You might also like