This document is a bill of quantities for electrical installation works. It lists 6 categories of work with various line items and specifications. The categories include lighting points, distribution boards and panels, wiring devices, isolators, guest room management and fire alarm systems, and testing. Quantities, units, rates, and amounts are provided for each line item. The document provides a detailed breakdown of materials, equipment, and labor needed for the electrical works.
This document is a bill of quantities for electrical installation works. It lists 6 categories of work with various line items and specifications. The categories include lighting points, distribution boards and panels, wiring devices, isolators, guest room management and fire alarm systems, and testing. Quantities, units, rates, and amounts are provided for each line item. The document provides a detailed breakdown of materials, equipment, and labor needed for the electrical works.
This document is a bill of quantities for electrical installation works. It lists 6 categories of work with various line items and specifications. The categories include lighting points, distribution boards and panels, wiring devices, isolators, guest room management and fire alarm systems, and testing. Quantities, units, rates, and amounts are provided for each line item. The document provides a detailed breakdown of materials, equipment, and labor needed for the electrical works.
This document is a bill of quantities for electrical installation works. It lists 6 categories of work with various line items and specifications. The categories include lighting points, distribution boards and panels, wiring devices, isolators, guest room management and fire alarm systems, and testing. Quantities, units, rates, and amounts are provided for each line item. The document provides a detailed breakdown of materials, equipment, and labor needed for the electrical works.
1 Fixing of Switch Plates and all required accessories as per approved shop drawings etc., General luminaire lighting point - Conduit, Chipping & 1.1 1 Nos - Wiring
1.2 General luminaire lighting point - Wiring Only 1 Nos -
1.3 General luminaire Spot Light -Each Circuit Wiring Only 1 Circuit
1.4 Emergency lighting point 1 Nos -
Install and connect the following Main /Sub-main
Distribution Boards, GRMS Panel with all necessary accessories, inter-connections, Tray & Trunking 2 Fixing, Dressing & Termination etc. all as shown on the drawings, as specified and as required for proper operation:-
Complete Electrical Closet Room Including MDB, DB's
2.1 and GRMs Panels located Ground & First Floor c/w all 1 Job - the works inside the Room.
Install and connect the Wiring Devices including
wiring and conduit and all required accessories etc., 3 all as shown on the drawings as specified and as required for proper operation:-
13A 3Pin Single/Twin Switched Socket Outlet @ high
3.1 1 Nos - level, Above False Ceiling, Universal Type,W/proof etc.
3.2 Shaver Socket Outlet 1 Nos -
3.3 Cooker Control Unit And Cooker Connection Unit 1 No -
3.4 20A Switched Spur Unit 1 Nos -
ISOLATORS Includes Conatinment Tray/Trunking,
4 Cabling and Installation of Isolator as per site Requirement
4.1 16A,20A,32A,40A,63A TPN - weatherproof 1 Nos -
Install and connect the Points for GRMS/ELV
System complete with all necessary accessories, 5 wiring, conduits, inter-connections, etc., all as shown on the drawings, as specified and as required for proper operation:- Guest Room Management System - 5.1 1 Nos - Containment, Wiring & Back Boxes Fire Alarm System - 5.2 1 Nos - Containment, Wiring & Back Boxes 5.3 ELV Containment Only 1 Nos - Testing for the above items shall be to the approval 6 and satisfaction of the Engineer and the Owner 1 Item Included Repesentative.