B125676001pa PDF
B125676001pa PDF
B125676001pa PDF
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REVISION SHEET
M. C.
01506-001
DATE JO/EWO
B-10-
20/04/2015
REV.
NO.
A
DISCIPLINE
ENGINEER
G. CONTARDI
20/04/2015
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
M. CALLEGARO
20/04/2015
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
VERIFICATION
CONTROL NUMBER
EDSD
DATE:
BY:
REVISION CERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Notes :
THIS INDICATES THAT REV. NO.__________
OF THIS DRAWING IS COVERED, FOR ALL
ISS FOR DWG. TYPE PLANT NO. INDE DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
M. C.
2. Vendor to define maximum and minimum flowrates through analyser and relative pressure drops.
ISSUE FOR REVIEW
DESCRIPTION
01506-001
JO/EWO
B-10-
20/04/2015
REV.
NO. DATE
A
DISCIPLINE
ENGINEER
G. CONTARDI
DATE: 20/04/2015
PROJECT
ENGINEER
DATE:
CERTIFIED
M. CALLEGARO
20/04/2015
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE
BY:
REVISION CERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
ISS FOR GENERAL NOTES DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
M. C.
3 MANUFACTURER
4 MODEL NUMBER*
G. C.
9 CLASS, DIVISION, GROUP CL1- ZONE 1-IIB CL1- ZONE 1-IIB ---- CL1- ZONE 1-IIB
10 GENERAL PURPOSE
11 CSA OR OTHER APPROVAL IECEx Exd IIB T3
12 "T" RATING T3 T3 T3
ISSUE FOR REVIEW
DESCRIPTION
49 OTHER STREAM DATA (SG. VISCOSITY) SPECIFIC GRAVITY = 0,810 - 0,811 / VISCOSITY = 3,02 - 3,05 cP
REVISION CERTIFICATION
51
NOTES:
for notes see sheet 3
ISS FOR B85-AIT-3522 DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
M. C.
75
76
20/04/2015
REV.
NO. DATE
A
NOTES:
DISCIPLINE
ENGINEER 1. PROGRAMMER/CONTROL UNIT ARE BUILT-IN WITH THE ANALYZER.
G. CONTARDI 2. ANALYZER SUITABLE FOR INSTALLATION IN THE SPECIFIED AREA CLASSIFICATION.
DATE: 20/04/2015 3. ANALYZER COMMON FAULT & CALIB/MAINT ALARMS
PROJECT
ENGINEER 4. REFER TO PROJECT SPECIFICATION FOR ANALYZER SAMPLE SYSTEMS.
DATE:
20/04/2015 8. MAXIMUM PRESSURE DROP THRUGH THE ANALYZER IS 15 PSI
CONSTRUCTION 9. PROVIDE SAMPLE RECOVERY SYSTEM
AGENCY
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISION CERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
OF THIS DRAWING IS COVERED, FOR ALL
ISS FOR B85-AIT-3522 DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
M. C.
FORMATION WATER
Ions (mg/L):
ISSUE FOR REVIEW
CO3 - - - - -
20/04/2015
DATE
Total Dissolved
REV.
NO.
Solids (TDS)
DISCIPLINE
ENGINEER Specific Gravity 1,0173 1,0430 1,0478 1,0860 1,1486
20/04/2015
DATE:
PROJECT
ENGINEER 2. TYPICAL COMPOSITION OF OVERALL STREAM (Mol. Fract.):
20% WC Summer 36% WC Winter
ISS FOR B85-AIT-3522 DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.