Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Tender Notice

Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

TENDER NOTICE FOR ELECTRICAL WORKS FOR AC & UPS WIRING AT

SBLC,VIZIANAGARAM

NIT No: 22 /2014-15


Name of work Estimated cost EMD amount
Electrical works for Class rooms at SBLC Rs8.46 lacs Rs8,500/-

EMD to be enclosed with the (without EMD, Tender will be rejected)


tender. DD/BC drawn in favour
Assistant General Manager(P&E),
State Bank of India, Local Head
Office, Hyderabad
Eligibility of Contractor Electrical Works: All Panel
Contractors above 5 lacs category
are eligible for Electrical works.

Issue of tender uploaded in 12.07.14 to 26.07.14


website
Completion Time 45 days from the day of issue of order.
Time is the essence of the Contract.
Delay will be penalized suitably @1/2 %
per week of delay.
Date of submission of tender 28.07.14 by 1500 hrs
Date & time of opening of tender 28.07.14 at 1530hrs
Tender to be submitted to The Asst. General Manager (P&E)
Premises & Estate
State Bank of India
Local Head Office
Bank Street, Koti
Hyderabad 500 095
For any clarification and drawings Asst.General Manager:23466340
please contact Ms Reshmi : 8008412020
All the terms and conditions, BOQ, price bid shall be signed, stamped by the
tenderers and submitted to us. The contractors who are having more than
three works are not eligible to participate in the tender.

EMPLOYER CONTRACTOR
1. Limited and sealed tenders are hereby invited by State Bank of India, Premises
and Estate Department, Local Head Office, Hyderabad for the above works. The
estimated cost of the work is given.

2. Only the contractors empanelled with State Bank of India, Local Head Office
Hyderabad in the are eligible to apply.

3. The tender documents can be downloaded from the bank's website www.sbi.co.in
under the link Procurement news as per the notice.

4. The tender documents duly completed and signed and stamped in all pages shall
be submitted in an sealed envelope superscribed on top as TENDER FOR
ELECTRICAL WORKS FOR AC & UPS WIRING AT SBLC,VIZIANAGARAM
and addressed to the undersigned and dropped in the tender box kept at the
following address on or before 3.00 p.m. as per scheduled date:
Assistant General Manager,
Premises and Estate Department,
State Bank of India,
Local Head Office, Bank Street,
Koti, Hyderabad.500 195

5. The tender will be opened in the office of the Assistant General Manager,
Premises and Estate Department, Local Head Office, State Bank of India,
Hyderabad at 3.30 p.m. on the same day in the presence of tenderers who may
wish to be present.

6.EARNEST MONEY DEPOSIT (EMD): The Earnest Money Deposit should be


submitted in separate envelope in the form of a DD/BC drawn in favour of the
Asst. General Manager, Premises and Estate Department, State Bank of India,
Hyderabad. (Those who have not submitted the EMD will be rejected). Bank is not
liable to pay any interest on Earnest Money. The EMD for unsuccessful tenderer
shall be refunded to them without any interest after the decision to award the work
is taken. The EMD of the successful tenderer shall be retained as part of Security
Deposit and for the due fulfillment of the contract. If the successful tenderer
refuses to take up the work/does not start the work in time the EMD will be
forfeited and the work order will be cancelled.
.
7. COMPLETION PERIOD : 45 DAYS
Time is the essence of the contract. The entire work shall be completed by the
Contractor in stipulated period from the date of receipt of letter of intent issued by
the Bank. The date of commencement of work at site shall be within three days
from the date of receipt of letter of intent or the date of handing over of the site.
The contractor should strictly adhere to the completion time schedule.

8. LIQUIDATED DAMAGES: If the work is not completed in the specified time, the
contractor will be levied liquidated damages @ % per week subject to a
maximum of 5% of the contract amount.

9. The tenderer must obtain for himself in his own responsibility and at his own
expenses all the information necessary for the purpose of filling the tender and
to enter into a contract with the Bank, he must examine the drawings,

EMPLOYER CONTRACTOR
specifications, conditions etc., and must inspect the site of work and must
acquaint himself with all the local conditions and matters pertaining thereto. The
tenderer shall also bear all expenses in connection with the preparation and
submission of this tender.

10. The tenderer whose tender is accepted is bound to execute a formal


agreement with the Bank which will include the duly completed form of tender,
specifications conditions, other papers therein, special conditions, all drawings
etc., but his liability will commence from the date of the written acceptance of
the tender whether the formal agreement is drawn or not. The contractor shall
bear all expenses in connection with the execution of the said agreement
including fees for stamps and registration of documents as required.

11. The quantities indicated in the BOQ are only probable quantities and are
liable to alteration by omission, reduction or addition. Payment shall be made
on the basis of actual quantities of work done at the accepted rates. No
alterations which are made by the tenderer in the drawings, specifications or in
probable quantities accompanying the tender will be recognized and the tender is
likely to be invalidated. Remarks and explanations should be given in a separate
cover along with EMD and will become binding only if specially accepted in
writing by the Bank at the time of acceptance of tender.

12. INITIAL SECURITY DEPOSIT (ISD) : The successful tenderer has to deposit with
the Bank an amount equal to 2% of the tender amount minus EMD in the form
of DD/BC within two weeks of award of the work as part of the security deposit.

13. SECURITY DEPOSIT (SD): Apart from EMD and ISD as mentioned above,
Security Deposit shall be deducted from bills of the contractor @ 5% of the
gross value which includes the initial security deposit and EMD subject to a
maximum of 5% of the tender amount / amount of work done. Security deposit
shall not bear any interest.

14. TENDER VALIDITY: The tenders submitted shall remain valid for acceptance for
a period of sixty days from the date of their opening. Should any tenderer
withdraw his tender the tender before the expiry of the said period of makes any
modifications to his tender, the tender shall be treated as having been rejected or
abandoned and his EMD will be forfeited.

15. The Bank does not bind itself to accept the lowest tender and reserves to
itself the right to reject any or all the tenders received without assigning of
reasons thereof. Further, the bank reserves the right to award any portion of the
work to different tenderers or to award the entire work to one tenderer.

16. The compensation or other sums of money payable by the contractor to the
Bank under the terms of contract may be deducted from his EMD/SD if the
amount so permits and the contractor shall unless such deposits become
otherwise payable within ten days, after such deductions, make good in cash the
amount so deducted.

17. The work shall be carried out under the directions and supervision of and
subject to the approval in all respects by the Banks Engineer.

EMPLOYER CONTRACTOR
18. On acceptance of the tender the contractor shall in writing inform the
Bank the consultant the names of his accredited representatives who will be
responsible to take instructions from the Bank.

19. The work or any part of it shall not be transferred assigned or subject
without the consent of the Bank.

20. The contractor shall be required to co-operate and work in accordance with
an afford reasonable facilities for such other agencies / specialists as may be
employed by the Bank on other work/sub works in connection with the work.

21. The contractor is required to comply with all acts of Government relating to
labour and the rules and regulations made there under from time to time and
submit at the proper times all particulars and statements required to be
furnished to the labour authorities.

22. In carrying out the work, the contractor shall comply with the provisions of
the safety code. The rates shall be inclusive of taxes, cost of materials, labour,
scaffolding, ladders, lifting of the materials etc.

23. Bank will not take any responsibility to provide any material including
water / electricity. However, contractor may use the available water /power
supply without causing any inconvenience to the Bank functioning by paying
consumption charges as per the prevailing rates.

24. IT & WCT and any other taxes as applicable from time to time will be
deducted at source as per the rates prevalent at the time of payment of bill.

25. The employer is entitled to deduct all taxes and rates as per existing laws
and rules, from any moneys due or that may become due to the contractor. The
contractor shall indemnify the employer from and against all claims, demands,
proceedings, damages cost and expenses which may be brought or made against
the employer or to which it may be put by reason of the contractor not
conforming to or complying with any of the provisions or requirements of any act
or sections, Central or State rules and regulations Bye laws of local authorities
Panchayat, Collector of any other companies relating to or in water, light or
amenities at the site.

26. Responsibility for safety of building : The contractor shall be responsible the
safety of the works (including the materials temporary buildings and plants)
until they are taken over by the employer and they shall stand at their risk and
be in the sole charge of the contractor who shall be responsible for and must
with all possible speed make good all damage from whatever cause. All the debris
shall be removed and transported to remote place outside the premises.

27. The contractor shall provide at his own cost all materials (except such
materials if any, as may in accordance with the contract be supplied by the
employer) machinery, plant tools, appliances, implements, ladders, cordage,
tackle, scaffolding, in fact everything necessary or proper for the proper
execution of work, whether the same may or may not be particularly shown or
inferred there from and if the contractor finds any discrepancy in the drawings
or between the drawings, schedule of quantities and specifications he shall

EMPLOYER CONTRACTOR
immediately and in writing refer to the Bank who shall decide which is to be
followed.

28. Payment will be released only after completion of the work to the
satisfaction of the Bank.

29. The contractor has to undertake repairs / rectifying the defects whatsoever
during the defects liability period.

30. The costs of the tests and of the materials and labour and equipment,
involved in the testing operations shall be borne by the contractor.

31. The tender form must be filled in English and all entries must be made by
hand and written in ink. The tenders must be submitted in the prescribed
format only. The tenderer must quote the rates and amount in the Bill of
Quantities. The rates should be written both in words and figures without any
erasures and alterations.

a. However, if errors are made, the wrong figures or words must be neatly
scored out under full signature of the tenderer and the correct figures and
words neatly rewritten. Over writing is not permitted.

b. Errors in the Bill of Quantities (BOQ), rates and amount shall be dealt with
in the following manner :

i) In the event of a discrepancy between the rates quoted in words and the
rates in figures, the quotient of the total amount divided by the quantity
shall be taken into consideration.

ii) In the event of an error occurring in the amount columns as a result of


wrong multiplication and extension of unit rate and quantities, the unit
shall be regarded as firm and the amount shall be amended
accordingly.

iii) All errors in totaling the amount column and in carrying forward, the
totals shall be corrected.

EMPLOYER CONTRACTOR
UNDERTAKING TO BE SUBMITTED BY TENDERER

To
The Asst. General Manager,
Premises & Estate Department,
State Bank of India,
Local Head Office,
HYDERABAD.

Dear Sir,

ELECTRICAL WORKS FOR AC & UPS WIRING AT SBLC,VIZIANAGARAM

Having duly examined the tender document including the drawings, specifications,
designs, Bill of Quantities relating to the works specified in the under written
memorandum and having visited the site of the said work and having acquired all
the requisite information relating thereto as affecting this tender. I / We hereby
offer to execute the works specified in the under written memorandum within the
time specified therein at the rates specified in the schedule of quantities and in
accordance, in all respects with specifications, designs, drawings and instructions
in writing referred to in the conditions of the tender, the Articles of Agreement,
special conditions of the contract and with such materials as are specified by and in
all other respects in accordance with such conditions in the schedule of quantities
and conditions of contract as applicable.

1. Should this tender be accepted, in whole or in part, I / We hereby agree (i) to


abide by and fulfill all the terms and provisions of the said conditions, if the
contract annexed hereto and the conditions of the tender s applicable or in
default thereof to forfeit and to State Bank of India, Local Head Office,
Hyderabad the sum of money mentioned in the said conditions.

2. I / We agree (i) that should I / We fail to commence the work specified in the
above mentioned memorandum the Bank shall without prejudice to any other
right or remedy be at liberty to forfeit the Earnest Money otherwise the said
Earnest Money shall be retained by Bank towards, security deposit mentioned in
the above memorandum (ii) to execute all the works referred to therein and to
carry out authorized variations as directed by the Bank and as per said
conditions of the contract.

EMPLOYER CONTRACTOR
SPECIAL CONDITIONS OF CONTRACT

The contractor shall be deemed to have satisfied himself before tendering as to


the correctness and sufficiency of his tender for the works and the rates and
amounts stated in the schedule of quantities and / or the schedule of rates and
amount which rates and amounts shall expect as otherwise provided cover all
his obligations under the contract and all matters and this necessary for the
proper completion of the works.

The contractor shall indemnify the employer against all claims in respect of
patent rights and shall defend all actions arising from such claims and shall
himself pay all royalties, license fee, damage, cost and charges of all and every
sort that may legitimately be incurred in respect thereof.

Work not to be sublet : The whole of the works included in the contract shall be
executed by the contractor who shall not directly or indirectly transfer, assign or
mutilate the contract or any part thereof or interest therein without the written
consent of the employer and no undertaking shall relieve the contractor from the
full and entire responsibility of the contract or from active superintendence of
the works during their progress.

The contractor, in case of re building or reinstatement after fire or other such


usual risk shall be entitled to such extension of time for completion as decided
by the Bank.

EMPLOYER CONTRACTOR
APPENDIX TO CONDITIONS OF CONTRACT

1. Name of the work : ELECTRICAL FOR AC & UPS WIRING AT


SBLC,VIZIANAGARAM
2. Date of commencement : Within 3 days from the date or
acceptance of tender / date of handing
over of the site
3. Period of completion : 45 days
4 Retention money / security deposit : 5% of the bill amount including the EMD
subject to a maximum of the final bill
amount
5 Defect liability period : 6 months from the date of completion
6 Refund of security deposit : After the expiry of defect liability period

7 Liquidated damages : % per week subject to maximum of 5%


of the value of work done
8 Deduction of income tax and ST works : As per Central / State Government rules
contract tax etc.,

EMPLOYER CONTRACTOR
ACCEPTED MAKES OF MATERIALS FOR ELECTRICAL WORKS

S.No ITEMS BRAND NAME

1 MCCB ABB/MERLIN GERIN/SIEMENS/L&T/LEGRAND

2 HT/LT CABLES CCI/ UNIVERSAL / POLYCAB / NICCO /HAVELLS

3 CABLE GLANDS SUNIL/HMI/BRACO/COMET

4 CABLE LUGS DOWELL/3D

5 HRC FUSES/BASE GE/ OR APPROVED MAKE

6 SWITCH FUSE UNITS HPL/L&T/C&S

7 CHANGE OVER SWITCH HPL/L&T/C&S

8 INDICATING METERS AE/IMP/MECO/ENERCON

9 RELAYS GE/TELEMECANIQUE/PROK DEVICES/

10 CT'S RESIN-CAST KAPPA/IMP/AE/KALPA

11 SELECTOR SWITCHES L&T/SIEMENS/KAYCEE

12 MCB/MCB DISTRIBUTION LEGRAND / MERLIN GERIN/ HONEYWELL/SIEMENS

13 LIGHT FITTINGS PHILIPS / CROMPTON/ WIPRO / GE / BAJAJ

14 INDUSTRIAL EXHAUST FANS CROMPTON/ GEC/ARMONALD

15 CEILING/EXHAUST FANS CROMPTON/ BAJAJ

16 FRLS WIRES-1100V GRADE RR KABEL /FINOLEX/ L&T / POLYCAB

17 LIGHT SWITCHES LEGRAND/ MK-NOVAR / CRABTREE/ TOYOMA

18 PVC CONDUITS VIP/PRECISION/ATUL

20 BUS BAR TAPING BOX SIEMENS/SCHNEIDER /ABB

21 M S CONDUITS BHARAT / ZINDAL

22 CASING / CAPPING CLASSIC/ MODI

Place : Signature
Date : (Name and Address of the Contractor with Seal

EMPLOYER CONTRACTOR

You might also like