Centrifugal Pump Piping - 2 PDF
Centrifugal Pump Piping - 2 PDF
Centrifugal Pump Piping - 2 PDF
: 29040-PI-UPS-1005
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) PIPING Page : 1
CONTENTS
Page
List of drawings 2
1.0 General 3
2.0 Location 3
Applicable Revision:
Prepared: Checked: Approved:
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) PIPING Page : 2
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) PIPING Page : 3
1.0 GENERAL
The design of a piping system can have an important effect on the successful operation of a
centrifugal pump. Such items as sump design, suction piping design, suction and discharge pipe
size and pipe supports must all be carefully considered. A typical horizontal centrifugal pump
installation is illustrated in Fig.CPP1, CPP2, CPP3.
Selection of the discharge pipe size is primarily a matter of economics. The cost of various pipe
sizes must be compared to the pump size and power cost required to overcome the resulting
friction head.
1.1 The suction piping size and design is far more important. Many centrifugal pump troubles are
caused by poor suction conditions.
1.2 The suction pipe should never be smaller than the suction nozzle of the pump and in most cases it
should be at least one size larger. Suction pipes should be as short and as straight as possible.
Suction pipe velocities should be in the 1.0 - 1.5 metre per second range, unless suction conditions
are unusually good. Higher velocities will increase the friction loss and can result in trouble some
air and vapour separation. This is further complicated when elbows or tees are located adjacent to
the pump suction nozzle. In that case uneven flow patterns or vapour separation keeps the liquid
from evenly filling the impeller. This upsets hydraulic balance leading to noise, vibration, possible
cavitation and excessive shaft deflection. Cavitation, erosion damage, shaft breakage or
permature bearing failure etc. may result.
1.3 On pump installations involving suction lift, air pockets in the suction line can be a source of
trouble. The suction pipe should be exactly horizontal or with a uniform slope upward from the
sump to the pump as illustrated in Fig.CPP7. There should be no high spots where air can collect
and cause the pump to lose its prime. Eccentric rather than concentric reducers with flat side top
should always be used.
1.4 If an elbow is required at the suction of a double suction pump, it should be in a vertical position if
at all possible. Where it is necessary for some reason to use a horizontal elbow, it should be a
long radius elbow and there should be a minimum of five diameters of straight pipe between elbow
and the pump suction as illustrated in Fig.CPP9.
2.0 LOCATION
2.1 Common location of pumps in chemical and petrochemical plant is under the piperack at grade.
Pumps are to be placed close to and below the vessels from which they take their suction in order
to have net-positive suction head (NPSH) required by the pump.
2.2 Any reduction in suction line size required at pumps should be made with eccentric reducers, with
flat side up to avoid accumulation of vapour pocket. Changes in direction of suction lines should
be at least 600mm away from the pump suction.
2.3 Pumps should be arranged in line with drivers facing the access gangway. Clearances and piping
should provide free access to one side of the driver and pump. There must be good access to
gland / seal and coupling where most of the maintenance and adjustments are done.
TRAINING MANUAL- PIPING DOC No. : 29040-PI-UPS-1005
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) PIPING Page : 4
2.4 With normal piperack column spacing of 6m, it is generally found that only two pumps of average
size can be arranged between the columns, with a preferred clearance of 1m between the pumps.
The clearance between any structure / steel work and the pump discharge line shall be 0.75m
minimum. For small pumps upto 18 KW, clearance between pumps should be 0.9m minimum. A
space of 2 - 2.5 m should be provided for working aisle.
2.5 Means of lifting should be provided for pumps or motor weighing more than 25Kg.
Step 2 : Study the pump data sheet and collect the similar (capacity / head) pump dimensions /
nozzle position.
Step 3 : Analyse the location and the space provided in the unit plot plan w.r.t. suction and
discharge line routing.
Step 4 : Review the maintenance / operation space around and lifting facility.
Step 5 : Locate the control station, Electrical push button station, Electrical-trench, process fluid
drain, flushing / cooling connection as required for the pump model.
Step 6 : Check elevations of all valve handwheels on suction as well as discharge line and provide
common platform for valve operation, if required.
Step 7 : Make Iso sketch for suction and discharge line with all the items as per P&ID and
discuss with process engineer for any change.
Step 8 : Finalise supports of the line and issue for stress analysis, if required.
Step 9 : Get the stress analysis report for Nozzle loads. Compare the allowable loads with the
actual load for any change & finalisation.
Step 10 : Finalise location of pump / drain or trench / Electrical cable route and issue civil
information to civil for foundation design.
Step 11 : Keep necessary insert plate on the foundation block for support of push button switch,
small lines for flushing / cooling manifold.
A typical horizontal centrifugal pump suction and discharge piping arrangements is illustrated in
Fig.CPP7.
4.2 Pump suction piping shall be as short as possible and shall be arranged so that vapour pockets
are avoided.
4.3 Reducers immediately connected to the pump suction shall be eccentric type flat side up to avoid
accummulation of gas pocket.
TRAINING MANUAL- PIPING DOC No. : 29040-PI-UPS-1005
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) PIPING Page : 5
4.4 For end suction pumps, elbows shall not be directly connected to the suction flange. A straight
piece 3 times the line size shall have to be provided at the suction nozzle. This is illustrated in
Fig.CPP8.
4.5 For top suction, pump elbow shall not be directly connected to suction flange. A straight piece of
minimum 5 times the nozzle size shall have to be provided at the suction nozzle.
4.6 T-type strainers are to be used for permanent as well as temporary to avoid disassembly of suction
piping for strainer cleaning.
4.7 Piping shall be so arranged that forces and moments imposed on the pump nozzles do not exceed
the allowable values specified by the vendor.
4.8 When a suction vessel operates under vacuum the vent connection of the pump has to be
permanently connected to vapour space of the suction vessel to allow possible filling of the pump
with liquid before it is started.
4.9 For pumps handling hot fluid, the first factor concerns the support of pump piping which often
includes large expansion loops for flexibility. When the pumps are located below the piperack (to
reduce possibility of hydrogen leakage over motor), support becomes easy otherwise the designer
should consult stress engineer for best location of stops and hanger. With the optimum layout and
support, it is to be ensured that the loadings on the pump nozzles are not exceeded beyond the
allowable limits.
4.10 Piping configuration for a group of pumps of similar size shall follow identical pattern and the stress
analysis of one pump piping should be applicable to the other pumps.
The auxilliary piping are usually cooling water to mechanical seals, bearings, stuffing boxes, gland
quench and lantern rring flush.
When pump fluid is used, a line is attached to the vent connection on the pump case. The
circulated seal fluid has to be sent back to pump stream or referred through the seal to pump
internal clearances.
In viscous or high temperature hydrocarbon liquids, the seal fluid medium circulates from external
source through connections on the pump seal.
Various auxilliary piping plan is recommended in API 610 for proper selection according to design
requirements.
4.12 Pump vendors usually supply the auxilliary piping and the neat arrangements of these piping and
its support are to be ensured by the designer while reviewing the vendor document. Fig.CPP10
illustrates one typical auxilliary pipig arrangement on the pump base plate.
4.13 A typical arrangement for piping and valves operation is illustrated in Fig.CPP11 with maintenance
and operation access.
4.14 A typical suction and discharge piping arrangement with common platform for operation of valves
connected to two adjacent pumps is illustrated in Fig.CPP12 and CPP13.
TRAINING MANUAL- PIPING DOC No. : 29040-PI-UPS-1005
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) PIPING Page : 6
5.2 The flow of fluid to the suction bell should be even, smooth and stream lined without any vortices.
5.3 A typical sump with the components and relative dimensions of clearance and submergence is
illustrated in Fig.CPP15.
5.4 For multiple pump installations with high capacity pumps, the analysis of a proposed intake design
are often made by use of a scale model of the intake basin with all parts such as baffles, screens,
gates, separating walls etc.
The large basin is required to ensure low inlet velocity (approx. 2 ft. per sec.) and to eliminate
vortexing at the bell mouth.
5.5 A typical sump pit with pump is illustrated in Fig CPP16. This sump is the collection pit of waste
material coming thru a pipeline. A screen at the mouth of the pump avoids choking / fouling of the
pump during operation. The discharge of the pump may go to a slope tank / pond / waste-removal
tanker.
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1005
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) Page : 1 OF 1
DWG. NO. : CPP1
CENTRIFUGAL PUMP
DISCHARGE
(LIQUID OUTLET)
IMPELLER
COUPLING SUCTION
(LIQUID INLET)
CASING
CASING DRAIN
ELEVATION
CL DISCHARGE
BASE PLATE
CL MOTOR C
CL PUMP L SUCTION
AUXILLIARY
PIPING C
L BASE PLATE
DRAIN
PLAN
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1005
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) Page : 1 OF 1
DWG. NO. : CPP2
SEALING AREA
DISCHARGE
GLAND
SHAFT
SUCTION EYE
CASING
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) Page : 1 OF 1
DWG. NO. : CPP3
DISCHARGE
CASING
IMPELLER VANES
SUCTION EYE
IMPELLER
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1005
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) Page : 1 OF 1
DWG. NO. : CPP4
EQUIPMENT LINE
3A
3B
4A
4B
1A
1B
2A
2B
C
L OF DISCHARGE
NOZZLE
750 750
C
L OF PIPERACK
COLUMN
C
L OF DISCHARGE
NOZZLE
CL OF PIPERACK
COLUMN
CL PUMPS
(IN LINE)
10C
10A
10B
9C
9A
9B
C
L OF DISCHARGE
NOZZLE
5A
5B
6A
6B
EQUIPMENT LINE
7A 8A
8B
7B
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1005
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) Page : 1 OF 1
DWG. NO. : CPP5
TYPICAL ACCESS FOR MAINTENANCE
BUNDLE
PULSATION DAMPENER LENGTH
C
L
ALLOW ADEQUATE ACCESS TO MOTOR
EXCHANGERS
CL
COMPRESSOR HOUSE
CL CHANNEL
NOZZLES
CABLE TRAYS (TYP)
AIR FIN. COOLER
CL KO DRUM
C TOWER
6000
L
DROP OUT
AREA
DROP OUT
AREA
C TOWER
L
CL TOWER
C
L PUMP
(TYP)
NO PERMANENT STRUCTURE
FOR BUNDLE REMOVAL
C
L DRUM
L
UP
(TYP)
ACCESS STAIRWAY
MIN. CLEARANCE OF
CL DRUM
ALL OBSTRUCTIONS
C
L TANK
EQUIPMENT ALIGNED
ON COMMON TAN LINE
C ROADWAY
L
C
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) Page : 1 OF 1
DWG. NO. : CPP6
AIR COOLER
3000
750 750
3000
PUMP (TYP)
ACCESS WAY
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) Page : 1 OF 1
DWG. NO. : CPP7
CHECK VALVE
GATE VALVE
ECCENTRIC
REDUCER(FST)
LONG RADIUS
ELBOW
(1a) CORRECT
FOOT VALVE
(IF USED)
STRAINER
CHECK VALVE
GATE VALVE
ECCENTRIC
REDUCER
SUCTION PIPE SLOPES
UPWARDS FROM SOURCE
OF SUPPLY
LONG RADIUS
ELBOW
SLOPE
(1b) CORRECT
FOOT VALVE
(IF USED)
STRAINER
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1005
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) Page : 1 OF 1
DWG. NO. : CPP8
TYPICAL PUMP SUCTION AND DISCHARGE PIPING
4
4
PI
6 PI
6
1
5 TEMP SUCTION
TEMP SUCT. STRAINER
STRAINER
5
1
1
MOTOR
CL PUMP
CL PUMP
MOTOR
PLAN VIEW
(END SUCTION-TOP DISCHARGE)
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1005
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) Page : 1 OF 1
DWG. NO. : CPP9
ECCENTRIC REDUCER-
WITH TOP HORIZONTAL
MUST BE MIN.
5D
ELBOW MUST BE
VERTICAL WHEN
NEXT TO PUMP
(2b) WRONG
(2a) PERMISSIBLE
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) Page : 1 OF 1
DWG. NO. : CPP10
CASING VENT
CASE DRAIN
ELEVATION END
BASE PLATE
DRAIN
PLAN
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1005
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) Page : 1 OF 1
DWG. NO. : CPP11
PUMP PLOT
AREA
PLAN
ELEVATION
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1005
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) Page : 1 OF 1
DWG. NO. : CPP12
C PUMP
L
FO
FO
CL PUMP
PLAN
CL PUMP SUCTION
EL. VARIES
ELEVATION B
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1005
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) Page : 1 OF 1
DWG. NO. : CPP13
CL DISCHARGE
CL MIN. FLOW
CL HC DRAIN
CL SUCTION
PI
C SUCTION
CL SUCTION
L
1750 2500
(TYP)
6000
(TYP)
FRONT VIEW
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1005
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) Page : 1 OF 1
DWG. NO. : CPP14
B D
ALT.
W
D A
RECOMMENDED A NOT RECOMMENDED
B NOT RECOMMENDED
RECOMMENDED
D A
Max. = 15 A
Preferred = 10 2
Y
RECOMMENDED C NOT RECOMMENDED
Y D
V1
Z
P
V
Z
D U Y
Baffles, grating or strainer should be introduced across inlet NOT RECOMMENDED UNLESS :
channel at beginning of maximum width section
Z = 2.5W or more (W = As per Figure 2.26) or
Z/P 1.0 1.5 2.5 4.0 10.0 V 1= 0.2 lps or less and
Y = Same as chart to left
Y 2W 3W 4.5W 5.5W 9W W = (refer to figure CPP15) U = Is greater than 40
V 1 2 4 5 6 RECOMMENDED D
NOT RECOMMENDED
V = 2 lps
Min. 2F
V up to 8 lps
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) Page : 1 OF 1
DWG. NO. : CPP15
PUMP
W/2
SINGLE PUMP
W
FLOW
W/2
W
TRASH RACK
SCREEN
MULTIPLE SUMP
W
FLOW
B Y
A SCREEN
B Y
TRASH RACK
AT SCREEN LOCATION
SHOWN. 15 MAX. WITH
VELOCITY REDUCED TO 0.5 FT./SEC
D
W = 2D WHERE
Y > 5D S - INCHES
A > 5D Q - FLOW (GPM)
C = 0.3D TO 0.5D D - INCHES
B = 0.75D
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1005
Rev. : R0
PIPING STUDY
Uhde India Limited PUMP (CENTRIFUGAL) Page : 1 OF 1
DWG. NO. : CPP16
MOTOR
DISCHARGE NOZZLE
FLOAT
DRAIN OR
COLLECTION LINE