Chetan Infratech Consultants Pvt. LTD
Chetan Infratech Consultants Pvt. LTD
Chetan Infratech Consultants Pvt. LTD
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
NOTES: THIS DRAWING INCLUDING ITS DESIGN AND THIS DRAWING INCLUDING ITS DESIGN AND DETAILING PROJECT:
THE RESPONSIBILITY OF CONTROL, CHECK & VERIFICATION OF ACCURACY, CORRECTNESS, COMPLETENESS, DETAILING HAS BEEN PROOF CHECKED HAS BEEN PROOF CHECKED/REVIEWED AND FOUND NAGPUR METRO RAIL PROJECT
INTEGRATION & FULL COMPLIANCE OF THE CONTRACT PROVISIONS IN RESPECT OF DESIGN, ANALYSIS AND INDEPENDENTLY AND FOUND SUITABLE FOR
DRAWINGS RESTS WITH THE DETAILED DESIGN CONSULTANT / DETAILED DESIGN CONSULTANT & CONTRACTOR. SUITABLE FOR THE EXECUTION PURPOSE AND ISSUED Metro House, 28/2, CK Naidu Marg, Anand Nagar,
K THE EXECUTION PURPOSE AND IS AS `GOOD FOR CONSTRUCTION'/BEING GIVEN NO OBJECTION Civil Lines, Nagpur - 440 001
RECOMMENDED FOR GFC / NO OBJECTION'. Phone No: 07122554217
DETAILED DESIGN CONSULTANTS CONTRACTOR APPROVAL BY NMRCL
STRUCTURE
SIGN: SIGN: SIGN: SIGN: NOT APPLICABLE PROOF CONSULTANTS GENERAL CONSULTANTS TO NMRCL NMRCL
DATE: 06.04.17 DATE: 06.04.17 DATE: 06.04.17 DATE: 06.04.17 SIGN: SIGN:
CLIENT: MAHARASHTRA METRO RAIL CORPORATION LTD.
NAME: RAMAN NAME: V.TORAVI NAME: KUSHAL NAME: AKS DATE: NOT APPLICABLE DATE: LOCATION: R1-VIADUCT POCKET TRACK
DRAWN BY DESIGN BY CHECKED BY APPROVED BY ACCEPTED BY NAME: NAME:
TITLE: BEARING DETAILS
L CHETAN INFRATECH CONSULTANTS PVT. LTD. SCALE: AS SHOWN DATE: 06-04-2017 STATUS: FOR APPROVAL REVISION NO: