1 Pearl Compliance
This tool provides a simple means of demonstrating compliance with the Prescriptive requirements of the Pearl Building Rating System, RE-R1: Minimum Energy Performa
This tool forms part of the submittal requirements for the PBRS RE-R1 Prescriptive Method.
Building Footprint, m2
Building Project Overall Status: Pass
ponsible
ue
Engineer
Engineer
lth Engineer
Input Cells
PBRS.PrescEnergy@upc.gov.ae Next
Building Envelope
The following building envelope elements must satisfy the minimum performance requirements where applicable. The quoted Design Value should be an area
weighted average of all relevant element types within the project.
Design Value
Envelope Element Construction Type Included? Target Requirement
Achieved
Roof
Attic and other Yes 0.17 0.17
U-value, W/m.K
Opaque Elements
Previous
esign Value should be an area
Pass / Fail?
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS Yes
Next
HVAC Systems & Controls
The following tables consider the performance of various HVAC system components. Compliance must be demonstrated for all mandatory requirements relating to effic
0.00
Condensing Units
System Efficiency
9.20 IPLV
Packaged Terminal Air Conditioners (PTAC) & Packaged Terminal Heat Pumps (PTHP)
System Effici
No PTAC n/a 539347 9.305 EER
Yes Air cooled chiller n/a > 150 tons 2.80 CoP
12.75 IPLV
System Ef
Zonal supply system where fan is remote from zone, i.e. ceiling or
No 0.00
roof mounted
Zonal extract system where fan is remote from zone Yes 0.6 W/l/s
System Fan Power
Zonal supply & extract ventilation units such as ceiling void or roof
No 0.00
units serving single room/zone with heat recovery
Local supply & extract ventilation units such as wall/roof units serving
No 0.00
single room/zone with heat recovery
Local supply & extract ventilation units such as window/wall/roof
No 0.00
units serving single area (e.g. toilet extract)
HVAC Systems
Percentage Outdoor Air at Full Design Flow Rate >40% & <50% Energy Recovery System Not Required
Design Supply Airflow Rate, m/s 10.00 Has an Energy Recovery syste
Do any of these zones exceed 50m in area? No Has Demand Control Ventilatio
Are individual thermostatic controls provided in each zone, which are capable of responding to temperature
Is humidification/dehumidification provided by the system? No Does each humidity control system have ass
Are all installed Chilled Water pump motors fitted with Varia
Are the ducts located in unconditioned space
Are any ducts located in unconditioned spaces? No
minimum
Are the ducts located in external spaces insulated
Are any ducts located in external spaces? No
Is all piping serving the cooling system insulated with a minimum of 38mm insulation (insulation thermal conductivity < 0.039W/m.
System Perfo
Overall Pass / Fa
Previous
andatory requirements relating to efficiency, fan power and performance.
0.00 PASS
0.00 PASS
0.00 PASS
0.00 PASS
0.00 PASS
0.00 PASS
0.00 PASS
0.00 PASS
Next
Service Hot Water System
This section considers the performance of the service hot water system, excluding the contribution of any renewable technologies
Previous
Design Value Achieved Pass / Fail?
0.93 PASS
Next
Lighting
This section considers the overall performance of internal and external lighting systems. Compliance is based upon achievement or improvement beyond the target valu
Abu Dhabi International Energy Conservation Code. Compliance can be demonstrated either for Building Type or on a Space-by-Space basis. Calculation of the lighting p
(W/m) may require separate calculation relating to lighting power and area of coverage.
Design Value
Building/Space Type Target Requirement Pass / Fail?
Achieved
- PASS
- PASS
- PASS
- PASS
- PASS
- PASS
- PASS
- PASS
- PASS
Overall Pass / Fail for Internal Lighting PASS
Design Value
Area Type Units Included? Target Requirement
Achieved
W/linear m of door
Main Entrance Door No 88.6
width
W/linear m of door
Other Entrance Doors No 59.1
width
Canopies and
W/m No 12.1
Overhangs
Outdoor Sales, Open
W/m No 4.84
Areas
Exterior Lighting
Non-Tradable Surfaces
machines and night
depositories W per additional ATM
No 81.00
per location
Inspection stations at W/m of uncovered
No 12.11
guarded facilities area
Loading areas
W/m of uncovered
emergency service No 4.84
area
vehicles
Drive-up windows at
W per drive-through No 360.00
fast food restaurants
Parking near 24-hour
W per main entry No 720.00
retail entrances
Previous
or improvement beyond the target values outlined in the
pace basis. Calculation of the lighting power density
Yes
T
a
r
g
e
t
Length/Area Pass / Fail?
C
h
###
e
c
###
k
###
###
n/a ###
###
###
###
###
PASS
PASS
PASS
PASS
PASS
PASS
Next
Renewable Energy
This section considers the provision of an adequate solar thermal system for office buildings.
For other building typologies there is no requirement to provide renewable technologies.
Previous
Pass / Fail?
n/a
PASS No