Third Party Inspection Qualification Schedule: Available
Third Party Inspection Qualification Schedule: Available
Third Party Inspection Qualification Schedule: Available
FURNACE PLAN 12.07.10 15.07.10 3. K.R. RAJAGOPALAN DME - 20 YEARS EXP Q& Q INSPECTION SERVICES - CHENNAI VALID UP TO 01.06.2012
ACTUAL 14.07.10 15.07.10
POSITINOR 500 KG PLAN 17.07.10 20.07.10 P. BABU PTAW SSLC 10 YEARS IN PTAW
ENKAY TECH - CHENNAI ACTUAL 19.07.10 20.07.10
M. MURUGAN GTAW SSLC 5 YEARS IN GTAW AT VIRCAP
1 TON CRANE PLAN 15.07.10 20.07.10
ARAVIND ENGG WORKS ACTUAL 17.07.10 20.07.10 P. SUBASH SMAW SSLC 4 YEARS AT VIRCAP IN SMAW
POSITINOR 1 TON PLAN ********* ********* ********* ********* V. SAMPATH MIG SSLC 10 YEARS IN MIG WELDING
POWER TECH - CHENNAI ACTUAL ********* ********* ********* *********
********* AVAILABLE
WCB
C12A
WC6
WC9
316L
WCB TPI SOURCE WELDING WITNESS SUBMISSION OF APP BY TPI SUBMISSION TO L&T
DNV/TUV (BY TPI)PLANNED DOC TO TPI
SMAW
GTAW
PTAW
FCAW
C12A
SMAW
GTAW
PTAW
WC6/WC9
SMAW
GTAW
PTAW
316L
SMAW
GTAW
PTAW
FCAW
23.08 24.08 25.08 26.08 27.08 28.08 29.08 30.08 31.08
SHOP FLOOR
LAY OUT
FLOARING
WIRING
MISC
MIG
TIG
PTAW
TPI SCHEDULE
SMAW
WCB
C12A
WC6/WC9
316L
GTAW
WCB
C12A
WC6/WC9
316L
PTAW
WCB
C12A
WC6/WC9
316L
FCAW
WCB
316L