Third Party Inspection Qualification Schedule: Available

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

SUPPORTING MACHINES PLANNING

IDENTIFICATION ORDERING PURCHASE INSTALLATION CALIBIRATION MAN POWER PLANNING - NDT


L 1 TURNER MAKE PLAN ********************* ************** ************** **************
16" CH - 7 FT - 5HP ACTUAL ********************* ************** ************** ************** NDT QUALIFICATION EXPERIENCE TRAINING FOR NDT LEVEL 2 COMPLETION FOR TRAINING

L 2 REKHA MAKE PLAN ********************* ************** ************** ************** PERSONS


12" CH - 7FT- 3HP ACTUAL ********************* ************** ************** **************
1. THIRUMALAI PANDIAN ITI - 7 YEARS EXP
DRILLING - BVR-5 PLAN ********************* ************** ************** **************
BATLIBOI - 50MM ACTUAL ********************* ************** ************** ************** 2. T. GOHILAKRISHNAN DME - 20 YEARS EXP

FURNACE PLAN 12.07.10 15.07.10 3. K.R. RAJAGOPALAN DME - 20 YEARS EXP Q& Q INSPECTION SERVICES - CHENNAI VALID UP TO 01.06.2012
ACTUAL 14.07.10 15.07.10

HOLDING OVEN PLAN 12.07.10 15.07.10


WELDING SPRING ACTUAL 12.07.10 15.07.10
WELDERS PLANNING
FLASK OVEN PLAN 12.07.10 15.07.10
WELDING SPRING ACTUAL 12.07.10 15.07.10 NAME TYPE OF WELDING QUALIFICATION EXPERIENCE

POSITINOR 500 KG PLAN 17.07.10 20.07.10 P. BABU PTAW SSLC 10 YEARS IN PTAW
ENKAY TECH - CHENNAI ACTUAL 19.07.10 20.07.10
M. MURUGAN GTAW SSLC 5 YEARS IN GTAW AT VIRCAP
1 TON CRANE PLAN 15.07.10 20.07.10
ARAVIND ENGG WORKS ACTUAL 17.07.10 20.07.10 P. SUBASH SMAW SSLC 4 YEARS AT VIRCAP IN SMAW

POSITINOR 1 TON PLAN ********* ********* ********* ********* V. SAMPATH MIG SSLC 10 YEARS IN MIG WELDING
POWER TECH - CHENNAI ACTUAL ********* ********* ********* *********

MIGWELDING - LINCOLN PLAN 10.07.10 25.07.10


500 AMPS ACTUAL 12.07.10 25.07.10

TIG & ARC WELDING PLAN 10.07.10 25.07.10


SUN POWER - 400 AMPS ACTUAL 12.07.10 25.07.10

PTAW - 400 AMPS PLAN ********* ********* ********* *********


JASIC MAKE POWER SOURCE ACTUAL ********* ********* ********* *********

********* AVAILABLE

THIRD PARTY INSPECTION QUALIFICATION SCHEDULE

CURRENT WPS/ PQR APPROVAL STATUS AT VIRCAP COIMBATORE

WELDING & OVERLAY SMAW PTAW GTAW FCAW

WCB

C12A

WC6

WC9

316L

ACTION PLAN FROM VIRCAP FOR COMPLETION OF THE WPS / PQR

WCB TPI SOURCE WELDING WITNESS SUBMISSION OF APP BY TPI SUBMISSION TO L&T
DNV/TUV (BY TPI)PLANNED DOC TO TPI
SMAW
GTAW
PTAW
FCAW

C12A
SMAW
GTAW
PTAW
WC6/WC9
SMAW
GTAW
PTAW
316L
SMAW
GTAW
PTAW
FCAW
23.08 24.08 25.08 26.08 27.08 28.08 29.08 30.08 31.08

SHOP FLOOR

LAY OUT

FLOARING

WIRING

MISC

MIG

TIG

PTAW

TPI SCHEDULE

SMAW
WCB
C12A
WC6/WC9
316L
GTAW
WCB
C12A
WC6/WC9
316L
PTAW
WCB
C12A
WC6/WC9
316L
FCAW
WCB

316L