SLOTS Application Form With T & C For Registration
SLOTS Application Form With T & C For Registration
SLOTS Application Form With T & C For Registration
The Fee Payable shall be the Registration Fee and the Application Fee respectively and
these two (2) cheques shall be made payable to The Singapore Contractors
Association Ltd
6b Company Business Profile with the Accounting and Corporate Regulatory Authority
(ACRA)
Latest copy of instant information service print-out from ACRA. It should be issued not
longer than 3 months before the date of submission.
6c Personnel resources
ii) Copy of CPF contributions of local employees for the duration of completed
projects.
iii) For foreign workers, please submit photocopies of their foreign work permit
card.
6d Financial Capacity
8. Has the applicant company including (sole proprietor, partner & director)
ever been convicted or paid composition fines on work permit and/or
occupational safety issues? (If reply is yes, please furnish
details)
9. Declaration
I further declare that the particulars given below are true and correct.
Address: __________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
Note: Please mark according to 1: Very good 2: Good 3: Average 4: Bad 5: Very Bad
a. Technical Capability 1 2 3 4 5
b. Work Progress 1 2 3 4 5
c. Quality of Work 1 2 3 4 5
d. Co-ordination and Supervision 1 2 3 4 5
e. Occupational Safety & Health
(i) safe work practices 1 2 3 4 5
(ii) safety education for workers 1 2 3 4 5
(iii) provide personal protective equipment to workers 1 2 3 4 5
f. Others: ________________________________ 1 2 3 4 5
(3) Main-contract:
Site & Location of Main-Contract: ____________________________________________________________________________________________
________________________________________________________________________________________________________________________
---------------------------------------------------
Signature of Person Making Declaration
IC No: ______________________________
---------------------------------------------------
Contact No: _______________________ Company Stamp
Date: ___________________________
3 SEP 16
FORM A - ENDORSEMENT BY MAIN-CONTRACTOR/OWNER
NOTE: This form is to be completed by the main-contractor or owner. Please complete this form and placed it in a sealed
envelope for submission by your subcontractor to SCAL.
IT IS A CRIMINAL OFFENCE TO GIVE FALSE INFORMATION AND FORGE SIGNATURE.
I further declare that the particulars given below are true and correct.
Address: __________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
Note: Please mark according to 1: Very good 2: Good 3: Average 4: Bad 5: Very Bad
a. Technical Capability 1 2 3 4 5
b. Work Progress 1 2 3 4 5
c. Quality of Work 1 2 3 4 5
d. Co-ordination and Supervision 1 2 3 4 5
e. Occupational Safety & Health
(i) safe work practices 1 2 3 4 5
(ii) safety education for workers 1 2 3 4 5
(iii) provide personal protective equipment to workers 1 2 3 4 5
f. Others: ________________________________ 1 2 3 4 5
(3) Main-contract:
Site & Location of Main-Contract: ____________________________________________________________________________________________
________________________________________________________________________________________________________________________
---------------------------------------------------
Signature of Person Making Declaration
IC No: ______________________________
---------------------------------------------------
Contact No: _______________________ Company Stamp
Date: ___________________________
4 SEP 16
The Singapore Contractors Association Limited (SCAL)
Construction House, 1 Bukit Merah Lane 2, Singapore 159760.
Tel: 62789577 Fax: 62733977 Email: enquiry@scal.com.sg
2 SUBMISSION OF DOCUMENTS
All applications should be submitted in the prescribed application forms. The submissions
should include every item in the checklist in the correct sequence. It is the applicants'
responsibility to ensure completeness of the submissions. Incomplete submissions will be
rejected. Processing will commence only after the submissions are found to be in
order.
3 REFERENCES
In the course of processing the applications, reference will be obtained from the applicant's
bankers and the clients/professional consultants who supervised the works of the
applicant. It is implied that the applicant has authorised SCAL to make all necessary
enquiries relating to the applicant. Should the bankers or professional consultants impose
any service charge on the enquiry, it shall be borne by the applicants.
4 PROCESSING TIME
Under normal circumstances, if the submissions are complete and in order, the
applicants will be informed of the outcome within 2 weeks for Conditional Approval.
Upon Conditional Approval of the application, the Applicant shall proceed to register with
SC2 Pte Ltd for SgMA* (Safety & Green Management System Training & Assessment) of
applicants organization and pay the required fee accordingly. This registration with SC2
requires the submission of the prescribed SC2 Request Form to be made within one (1)
week upon Conditional Approval, failure to comply would render the Conditional Approval
void.
5 SEP 16
Implementation of SgMA Scheme
* Companies certified with OHSAS 18001 by SAC Accredited Certification Bodies OR BCA Safety
Management Certification can request for waiver of this requirement.
6 REGISTRATION REQUSITES
6a Fee Payable
ii Registration Fee
Registration Fee Payable PER CATEGORY (REGISTRATION HEAD)
inclusive of 7% GST, shall be as follows:
6b Company Status
Applicants should satisfy SCAL that they have the necessary full-time personnel
resources stationed in Singapore to undertake the work corresponding to the
registration head applied for. The minimum personnel requirements are laid out in
Appendix B & C. A statement of the CPF contributions made with respect to these
employees should be attached with submissions. The CPF contribution will be
checked to ensure it realistically reflect the manpower and management structure
for the operation of a company and for the duration of declared projects.
6d Financial Capacity
Applicants should satisfy SCAL that they have sufficient financial resources to meet
the financial commitments that would normally arise. An applicant is required to
submit a copy of their latest audited financial report / other suitable accounting
documents / latest 6 months bank statements that will clearly certify the financial
position of the applicant for the preceding one year. Financial statements submitted
by sole-proprietor or partnership firms must be duly signed by the sole-proprietor or
principal partners.
7 REGISTRATION STATUS
Registration status shall be accorded only to firms which SCAL considers as having
sufficient resources, experience and technical expertise to undertake contracts of a nature
and size as defined by the Registration Work-Head and the trade allocated. The
requirements stipulated, as set forth shall be taken as defining only the minimum
requirements expected of an applicant.
8 AUTHORITY OF SCAL
SCAL serves the right to review the registration status of the registered firms from time to
time. SCAL shall de-register the firms from SLOTS registry if the firms fail to fulfill the
registration requisites. SCAL is not bound to accept any application notwithstanding that
the applicant may have complied with the minimum requirements as set forth in this
brochure. Furthermore, the applicant is also deemed to accept that SCAL is not bound to
assign any reasons for rejecting applications or de-registering a firm from the SLOTS
register.
7 SEP 16
9 UPDATES OF FIRMS PARTICULARS
A SLOTS registered contractor is required to advise SCAL immediately for any changes in
its management status, address or any other pertinent particulars, which may occur from
time to time. It should be noted that registration status is accorded to the firm on the basis
of the firm's particulars at the time of application and SCAL reserves the right to revoke or
modify the registration status in the event of any development or change in the firm's
particulars which, in the opinion of SCAL, renders the firm unsuitable to be accorded the
current registration status. Notification of change of firm's particulars should be in writing
and accompanied by copies of the supporting documents (e.g. the certificate of the
Accounting and Corporate Regulatory Authority) and addressed to the Executive Director.
In addition, SCAL may periodically require registered firms to furnish pertinent particulars
to the Board for the purpose of assessing the eligibility of their continued registration with
SCAL register.
10 VALIDITY
The validity of any registration is for a period of twelve (12) months from the date of
approval of registration. Registration will thereafter lapse automatically unless a renewal
is filed and approved by SCAL.
11 RENEWAL
Renewals shall be made one month before the expiry of the validity period. Notification for
renewals will be sent by SCAL to all registered contractors three months before the
certificate expiry date.
11.1 Safety & Green Management Assessment (SgMA) Audit requirement as reflected in
item 5 hereto.
11.2 Record of Attendance to any of SCAL or its subsidiaries organised
Seminar/Workshop/Courses for each year of renewal period.
11.3 Form to Update Company Particulars
11.4 Form A - Endorsement by Main-Contractor/Owner
11.5 Photocopy of CPF Statement (CPF Form 90) of local employee.
Latest three (3) months.
11.6 Cheque payable to "The Singapore Contractors Association Ltd" for the respective
registration categories and amounts.
Applicant may be requested by SCAL to produce further supporting documents and this is
to be produced within 7 working days, failing which the application will be rejected and
considered unsuccessful.
SCAL will notify each applicant on the outcome of the application as soon as the case has
been processed. Upon compliance with all the Terms and Conditions of Registration, and
the successful completion of the Safety Assessment, the applicant will be issued with a
Certificate of Registration, which shall state the head, and trade of registration allocated to
the applicant.
8 SEP 16
Appendix A
AF01 Wall and Partition External and internal bricklaying works including
block works, precast panel construction and
drywall installation.
AF04 Drain Laying/Pavement and Kerb Drain laying, pavement and kerb construction
Construction works.
AF05 Windows and Doors Windows and doors installation including glazing
works, solar control and security protection
lamination film and support structure.
AF08 Painting and Road Marking Painting and road marking works including
signages and display fittings/fixtures.
AF13 Horticulture and Landscaping Horticulture works indoor and outdoor including
general turfing and landscaping works.
AF14 Additions, Alterations Repair and Addition alteration and repair work including works
Interior Decoration forming part of an interior decoration service
contract.
9 SEP 16
Registration Head: Civil & Structural Works (C&S)
CS01 Road Works, Pipe and Cable Road works, installation of underground pipe and
Installation, Road Reinstatement cables and subsequent reinstatement of road and
and Maintenance other surfaces and maintenance thereof include
asphalt works.
CS02 Concrete Repair and Surface Reinforcement of structures and joints through the
Works use of cement-sand-mortar mix or the injection of
slurry into joints and cracks in concrete structures
and the application of spraying of cement-sand
mortar onto surfaces of reinforced concrete works
including grouting & repair works and gridblasting
work.
CS05 Metal Formwork and Support Metal formworks, strutting and support systems
Systems including system formwork, tableform, slipform and
the like.
CS08 Structural Steel Work Structural Steelwork including metal frame, space
frame, support structure and the like.
CS09 Timber Formwork and Support Timber formwork, strutting and support systems for
Systems structural works and architectural finishes.
CS11 Soil Investigation, Stabilisation and Soil investigation and stabilisation services include
Earthwork Services excavation and backfill services.
10 SEP 16
Registration Head: Mechanical & Electrical Works (M&E)
ME01 Air-Conditioning, Refrigeration & Ventilation Installation, testing, commissioning, maintenance and repairs of
Works. air-conditioning, refrigeration and ventilation systems.
The detail trade can be indicated as follows:
A - General ACMV Installation
B - General Coldroom Installation
C - Ductwork
D - Pipe Work
E - Duct Insulation
F - Pipe Insulation
G - Equipment Installation
H - Electrical Control Wiring
I - Air Grilles
J - Maintenance Service
K - Coldroom Panel Construction
ME02 Electrical Engineering Works. Installation, testing, commissioning, maintenance and repair of
electrical based systems such as switchgears, transformers and
large generators. It also includes high and low tension
overhead line installation, the electrical installations in building
and marine vessels.
The detail trade can be indicated as follows:
A - General Electrical Engineering Installation
B - Underground Cabling
C - Cable Jointing
D - Switchboard
E - Control Board
F - Maintenance Service
ME03 Fire Protection Works. Installation, testing, commissioning, maintenance and repair of
fire protection systems.
The detail trade can be indicated as follows:
A - Fire Alarm System
B - Sprinkler System
C - Fire Hydrant System
D - Portable Fire Extinguisher and Hose Reel
System
ME04 Plumbing, Sanitary and Gas Piping and Installation, testing, commissioning, maintenance and repairs of
Sewerage Works. plumbing and sanitary system.
The detail trade can be indicated as follows:
A - Gas Piping System
B - Water Treatment Plant
C - Pumping Facilities
D - Sewerage System
E - Filtration System
ME05 Lift and Escalator Installation Installation, testing, commissioning, maintenance and repair of
lift and escalator system.
The detail trade can be indicated as follows:
A - General Lift and Escalator Installation
B - Electrical Installation
C - Lift Car Fabrication
D - Mechanical Installation
ME06 Building Automation, Industrial and Process Installation, testing, commissioning, maintenance and repair of
Control System building automation, industrial and process control system.
ME07 Communication and Security System Installation, testing, commissioning, maintenance and repair of
communication system and security system.
The detail trade can be indicated as follows:
A - Telephone System
B - CCTC System
C - TV System
D - Cable TV System
E - Control or Traffic Light System
11 SEP 16
Registration Head: Equipment and Special Services (E&S)
ES01 Construction Plant and Equipment Supply and repair of construction plant and
Services equipment services including:
- crane and hoist operation
- bulldozer operation
- excavator operation
- shovel operation
- telescopic handler operation
ES05 Waste Removal and Recycling Provide waste removal and recycling services
Services
12 SEP 16
Appendix B
REGISTRATION REQUISITES
TRACK RECORD, PAID-UP CAPITAL & PERSONNEL
13 SEP 16
Appendix C
REGISTRATION REQUITES
PERSONNEL REQUIREMENTS IN DETAIL
Technical and Professional Qualifications for Construction Workheads and Construction Related
Work-Heads:
14 SEP 16