HFHF
HFHF
HFHF
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
CONSTRUCTION 2539-00-CWP-01 Construction Work Package No.1 (Air system - Civil Part A 04-Aug-2016 IFR 30-Aug-2016 T-T-P-00781 IFR 13-Sep-2016 27-Sep-2016 T-P-T-0421 Approved PTSC C
CONSTRUCTION 2539-00-CWP-01-002 Construction Work Package No.1 - Service Air & Instrume A 21-Nov-2016 IFR 22-Nov-2016 T-T-P-00982 IFR 05-Dec-2016 16-Dec-2016 C-NH3-0472/T-P-T-0783 Commented PTSC C
CONSTRUCTION 2539-00-CWP-02 Construction Work Package No.2 (Demi Water System - C A 04-Aug-2016 IFR 30-Aug-2016 T-T-P-00781 IFR 13-Sep-2016 27-Sep-2016 T-P-T-0421 Approved PTSC C
CONSTRUCTION 2539-00-CWP-02-002 Construction Work Package No.2 - Closed Cooling Water A 21-Nov-2016 IFR 22-Nov-2016 T-T-P-00982 IFR 05-Dec-2016 Transmitted PTSC C
CONSTRUCTION 2539-00-CWP-03 Construction Work Package No.3 (River Cooling Water Sy A 04-Aug-2016 IFR 30-Aug-2016 T-T-P-00781 IFR 13-Sep-2016 27-Sep-2016 T-P-T-0421 Approved PTSC C
CONSTRUCTION 2539-00-CWP-04 Construction Work Package No.4 (Ammonia Storage Syste A 04-Aug-2016 IFR 30-Aug-2016 T-T-P-00781 IFR 13-Sep-2016 27-Sep-2016 T-P-T-0421 Approved PTSC C
CONSTRUCTION 2539-00-CWP-05 Construction Work Package No.5 (Procress Unit - Civil P A 04-Aug-2016 IFR 30-Aug-2016 T-T-P-00781 IFR 13-Sep-2016 27-Sep-2016 T-P-T-0421 Approved PTSC C
CONSTRUCTION 2539-00-CWP-06 Construction Work Package No.6 (Ammonia Synthesis Sys A 04-Aug-2016 IFR 30-Aug-2016 T-T-P-00781 IFR 13-Sep-2016 27-Sep-2016 T-P-T-0421 Approved PTSC C
CONSTRUCTION 2539-00-CWP-07 Construction Work Package No. 7 - Existing Substations; A 04-Aug-2016 IFR 05-Sep-2016 T-T-P-00791 IFR 19-Sep-2016 27-Sep-2016 C-NH3-0305/T-P-T-0411 Commented PTSC C
CONSTRUCTION 2539-00-CWP-10-001 Construction Work Package - Service Air & Instrument - A 28-Feb-2017 IFR 10-Mar-2017 T-T-P-01282 IFR 23-Mar-2017 30-Mar-2017 C-NH3-0706/T-P-T-1702 Commented PTSC H
CONSTRUCTION 2539-00-CWP-10-001 Construction Work Package No 01 - Service Air & Instru 0 24-Apr-2017 IFE 27-Apr-2017 T-T-P-01387 IFA 10-May-2017 27-Jun-2017 C-NH3-0845/T-P-T-2235 Commented PTSC C
CONSTRUCTION 2539-00-CWP-11-001 Construction Work Package - Closed Cooling Water & De A 28-Feb-2017 IFR 10-Mar-2017 T-T-P-01282 IFR 23-Mar-2017 30-Mar-2017 C-NH3-0706/T-P-T-1702 Commented PTSC H
CONSTRUCTION 2539-00-CWP-11-001 Construction Work Package No 02 - Closed Cooling Wat 0 24-Apr-2017 IFE 27-Apr-2017 T-T-P-01388 IFA 10-May-2017 27-Jun-2017 C-NH3-0846/T-P-T-2236 Commented PTSC C
CONSTRUCTION 2539-00-CWP-12-001 Construction Work Package - River Water Make Up & Coo A 28-Feb-2017 IFR 10-Mar-2017 T-T-P-01282 IFR 23-Mar-2017 30-Mar-2017 C-NH3-0706/T-P-T-1702 Commented PTSC H
CONSTRUCTION 2539-00-CWP-12-001 Construction Work Package No 03 - River Water Make U 0 24-Apr-2017 IFE 27-Apr-2017 T-T-P-01389 IFA 10-May-2017 27-Jun-2017 C-NH3-0847/T-P-T-2237 Commented PTSC C
CONSTRUCTION 2539-00-CWP-13-001 Construction Work Package - Amonia Storage & Dispatch A 28-Feb-2017 IFR 10-Mar-2017 T-T-P-01282 IFR 23-Mar-2017 30-Mar-2017 C-NH3-0706/T-P-T-1702 Commented PTSC H
CONSTRUCTION 2539-00-CWP-13-001 Construction Work Package No 04 - Amonia Storage & Di 0 24-Apr-2017 IFE 27-Apr-2017 T-T-P-01390 IFA 10-May-2017 09-May-2017 T-P-T-1995 Approved PTSC C
CONSTRUCTION 2539-00-CWP-14-001 Construction Work Package - Ammonia Reforming & CO2 A 28-Feb-2017 IFR 10-Mar-2017 T-T-P-01282 IFR 23-Mar-2017 30-Mar-2017 C-NH3-0706/T-P-T-1702 Commented PTSC H
CONSTRUCTION 2539-00-CWP-14-001 Construction Work Package No 05 - Ammonia Reforming 0 24-Apr-2017 IFE 27-Apr-2017 T-T-P-01391 IFA 10-May-2017 16-May-2017 T-P-T-2041 Approved PTSC C
CONSTRUCTION 2539-00-CWP-15-001 Construction Work Package - Ammonia Synthesis - Pipi A 28-Feb-2017 IFR 10-Mar-2017 T-T-P-01282 IFR 23-Mar-2017 30-Mar-2017 C-NH3-0706/T-P-T-1702 Commented PTSC H
CONSTRUCTION 2539-00-CWP-15-001 Construction Work Package No 06 - Ammonia Synthesis 0 24-Apr-2017 IFE 27-Apr-2017 T-T-P-01392 IFA 10-May-2017 27-Jun-2017 C-NH3-0848/T-P-T-2238 Commented PTSC C
CONSTRUCTION 2539-00-CWP-16-001 Construction Work Package - MTA Tie-in Works A 06-Mar-2017 IFR 10-Mar-2017 T-T-P-01283 IFR 23-Mar-2017 31-Mar-2017 C-NH3-0709/T-P-T-1710 Commented PTSC H
CONSTRUCTION 2539-00-CWP-16-001 Construction Work Package No 08 - MTA Tie-in Works 0 24-Apr-2017 IFE 27-Apr-2017 T-T-P-01393 IFA 10-May-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-CWP-24-001 Construction Work Package No.24 - Revamping of 10-S A 29-May-2017 IFR 05-Jun-2017 T-T-P-01441 IFR 18-Jun-2017 27-Jun-2017 C-NH3-0851/T-P-T-2256 Commented PTSC C
CONSTRUCTION 2539-00-CWP-25-001 Construction Work Package No.1 - Service Air & Instrumen A 07-Apr-2017 IFR 12-Apr-2017 T-T-P-01351 IFR 25-Apr-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-CWP-26-001 Construction Work Package No.2 - Cooling Water Distribu A 07-Apr-2017 IFR 12-Apr-2017 T-T-P-01351 IFR 25-Apr-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-CWP-27-001 Construction Work Package No.3 - River Cooling Water S A 07-Apr-2017 IFR 12-Apr-2017 T-T-P-01351 IFR 25-Apr-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-CWP-28-001 Construction Work Package No.4 - Ammonia Storage Sys A 07-Apr-2017 IFR 12-Apr-2017 T-T-P-01351 IFR 25-Apr-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-CWP-29-001 Construction Work Package No.7 - Existing Substations; A 07-Apr-2017 IFR 12-Apr-2017 T-T-P-01351 IFR 25-Apr-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-CWP-30-001 Construction Work Package No.8 - Substations 1&2; Cont A 07-Apr-2017 IFR 12-Apr-2017 T-T-P-01351 IFR 25-Apr-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-CWP-31-001 Construction Work Package No.1 - Air System - Instrum A 07-Apr-2017 IFR 12-Apr-2017 T-T-P-01351 IFR 25-Apr-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-CWP-32-001 Construction Work Package No.2 - Cooling Water Distrib A 07-Apr-2017 IFR 12-Apr-2017 T-T-P-01351 IFR 25-Apr-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-CWP-33-001 Construction Work Package No.3 - River Cooling Water A 07-Apr-2017 IFR 12-Apr-2017 T-T-P-01351 IFR 25-Apr-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-CWP-34-001 Construction Work Package No.4 - Ammonia Storag Syst A 07-Apr-2017 IFR 12-Apr-2017 T-T-P-01351 IFR 25-Apr-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-CWP-35-001 Construction Work Package No.5 - Heat Exchanger Pefo A 07-Apr-2017 IFR 12-Apr-2017 T-T-P-01351 IFR 25-Apr-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-CWP-36-001 Construction Work Package No.6 - S50 Ammonia Synthesi A 07-Apr-2017 IFR 12-Apr-2017 T-T-P-01351 IFR 25-Apr-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-CWP-37-001 Construction Work Package No.8 - Substations 1&2; Con A 07-Apr-2017 IFR 12-Apr-2017 T-T-P-01351 IFR 25-Apr-2017 09-May-2017 T-P-T-2017 Approved PTSC C
CONSTRUCTION 2539-00-CWP-38-001 Construction Work Package No.1 - Service Air & Instrume A 11-Apr-2017 IFR 14-Apr-2017 T-T-P-01354 IFR 27-Apr-2017 03-May-2017 C-NH3-0787/T-P-T-1962 Commented PTSC C
CONSTRUCTION 2539-00-CWP-39-001 Construction Work Package No.2 - Turbine Condensate C A 11-Apr-2017 IFR 14-Apr-2017 T-T-P-01354 IFR 27-Apr-2017 03-May-2017 C-NH3-0787/T-P-T-1962 Commented PTSC C
CONSTRUCTION 2539-00-CWP-40-001 Construction Work Package No.3 - River Water Make Up A 11-Apr-2017 IFR 14-Apr-2017 T-T-P-01354 IFR 27-Apr-2017 03-May-2017 C-NH3-0787/T-P-T-1962 Commented PTSC C
CONSTRUCTION 2539-00-CWP-41-001 Construction Work Package No.4 - Ammonia Storage & D A 11-Apr-2017 IFR 14-Apr-2017 T-T-P-01354 IFR 27-Apr-2017 03-May-2017 C-NH3-0787/T-P-T-1962 Commented PTSC C
CONSTRUCTION 2539-00-CWP-42-001 Construction Work Package No.5 - Ammonia Reforming A 11-Apr-2017 IFR 14-Apr-2017 T-T-P-01354 IFR 27-Apr-2017 09-May-2017 T-P-T-2015 Approved PTSC H
CONSTRUCTION 2539-00-CWP-42-001 Construction Work Package No.5 - Ammonia Reforming 0 11-May-2017 IFC 03-Jul-2017 T-T-P-01472 IFC 16-Jul-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-CWP-43-001 Construction Work Package No.6 - Ammonia Synthesis - A 11-Apr-2017 IFR 14-Apr-2017 T-T-P-01354 IFR 27-Apr-2017 03-May-2017 C-NH3-0787/T-P-T-1962 Commented PTSC C
CONSTRUCTION 2539-00-CWP-44-001 Construction Work Package No.8 - Pump Modification - A 11-Apr-2017 IFR 14-Apr-2017 T-T-P-01354 IFR 27-Apr-2017 03-May-2017 C-NH3-0787/T-P-T-1962 Commented PTSC C
CONSTRUCTION 2539-00-CWP-45-001 Construction Work Package No.9 - Replace of Cold Colec A 11-Apr-2017 IFR 14-Apr-2017 T-T-P-01354 IFR 27-Apr-2017 09-May-2017 T-P-T-2015 Approved PTSC H
CONSTRUCTION 2539-00-CWP-45-001 Construction Work Package No.9 - Cold Collector & Trans 0 11-May-2017 IFC 03-Jul-2017 T-T-P-01473 IFA 16-Jul-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-CWP-46-001 Construction Work Package No.10 - Secondary Reformer A 11-Apr-2017 IFR 14-Apr-2017 T-T-P-01354 IFR 27-Apr-2017 09-May-2017 T-P-T-2015 Approved PTSC H
CONSTRUCTION 2539-00-CWP-46-001 Construction Work Package No.10 - Secondary Reformer 0 11-May-2017 IFC 03-Jul-2017 T-T-P-01474 IFA 16-Jul-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-ITP-002 Inspection & Testing Plan for Piling Work A 28-Jan-2016 IFR 29-Jan-2016 T-T-P-00266 IFR 11-Feb-2016 No Comment PTSC H
CONSTRUCTION 2539-00-ITP-002 Inspection & Testing Plan for Piling Work 0 15-Jun-2016 IFE 17-Jun-2016 T-T-P-00657 IFE 07-Jul-2016 C-NH3-0211/T-P-T-0246 Commented PTSC H
CONSTRUCTION 2539-00-ITP-002 Inspection & Testing Plan for Piling Work 1 14-Jul-2016 IFE 20-Jul-2016 T-T-P-00707 IFE Transmitted PTSC H
CONSTRUCTION 2539-00-ITP-002 Inspection & Testing Plan for Piling Work 2 03-Aug-2016 IFE 04-Aug-2016 T-T-P-00736 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-ITP-003 Inspection & Testing Plan for Electrical A 10-Feb-2017 IFR 13-Feb-2017 T-T-P-01218 IFR 26-Feb-2017 27-Feb-2017 T-P-T-1354 Approved PTSC H
CONSTRUCTION 2539-00-ITP-003 Inspection & Testing Plan for Electrical 0 06-Mar-2017 IFC 07-Mar-2017 T-T-P-01273 IFA 20-Mar-2017 29-Mar-2017 T-P-T-1673 Approved PTSC C
CONSTRUCTION 2539-00-ITP-004 Inspection & Testing Plan for Steel Structure A 09-May-2016 IFR 13-May-2016 T-T-P-00586 IFR 26-May-2016 31-May-2016 T-P-T-0192 Approved PTSC H
CONSTRUCTION 2539-00-ITP-004 Inspection & Testing Plan for Steel Structure 0 09-Jun-2016 IFE 10-Jun-2016 T-T-P-00646 IFE Approved PTSC C
CONSTRUCTION 2539-00-ITP-005 Inspection & Testing Plan for Piping A 12-May-2016 IFR 17-May-2016 T-T-P-00591 IFR 30-May-2016 25-May-2016 C-NH3-0159/T-P-T-0178 Rejected PTSC H
CONSTRUCTION 2539-00-ITP-005 Inspection & Testing Plan for Piping B 02-Jun-2016 Re-IFR 06-Jun-2016 T-T-P-00632 Re-IFR 19-Jun-2016 10-Jun-2016 C-NH3-0176/T-P-T-0204 Commented PTSC H
CONSTRUCTION 2539-00-ITP-005 Inspection & Testing Plan for Piping Works C 15-Jul-2016 Re-IFR 08-Aug-2016 T-T-P-00744 IFR 21-Aug-2016 No Comment PTSC H
CONSTRUCTION 2539-00-ITP-005 Inspection & Testing Plan for Piping 0 17-Dec-2016 IFE 19-Dec-2016 T-T-P-01061 IFA 01-Jan-2017 08-Jan-2017 C-NH3-0535/T-P-T-0955 Commented PTSC H
CONSTRUCTION 2539-00-ITP-005 Inspection & Testing Plan for Piping Works 1 20-Jan-2017 IFE 02-Mar-2017 T-T-P-01257 IFA 15-Mar-2017 17-Mar-2017 C-NH3-0679/T-P-T-1580 Approved with comments PTSC H
CONSTRUCTION 2539-00-ITP-005 Inspection & Testing Plan for Piping Works 2 09-Jun-2017 IFE 12-Jun-2017 T-T-P-01450 IFA 25-Jun-2017 No Comment PTSC H
CONSTRUCTION 2539-00-ITP-005 Inspection & Testing Plan for Piping Works 3 03-Jul-2017 IFE 06-Jul-2017 T-T-P-01482 IFA 19-Jul-2017 01-Aug-2017 T-P-T-2381 Approved PTSC C
CONSTRUCTION 2539-00-ITP-006 Inspection & Testing Plan for Mechanical Installation A 12-Apr-2016 IFR 21-Jun-2016 T-T-P-00662 IFR 04-Jul-2016 16-Jul-2016 C-NH3-0220/T-P-T-0263 Commented PTSC H
CONSTRUCTION 2539-00-ITP-006 Inspection & Testing Plan for Mechanical Installation 0 30-Mar-2017 IFE 31-Mar-2017 T-T-P-01324 IFA 13-Apr-2017 17-Apr-2017 T-P-T-1838; C-NH3-0800/T-P-T-2010 Commented PTSC H
CONSTRUCTION 2539-00-ITP-006 Inspection & Testing Plan for Mechanical Installation 1 14-Jul-2017 IFE 20-Jul-2017 T-T-P-01501 IFA 02-Aug-2017 No Comment PTSC H
CONSTRUCTION 2539-00-ITP-006 Inspection & Testing Plan for Mechanical Installation 2 01-Aug-2017 IFE 04-Aug-2017 T-T-P-01517 IFA 17-Aug-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-ITP-007 Inspection & Testing Plan for Blasting & Painting A 09-May-2016 IFR 10-May-2016 T-T-P-00580 IFR 23-May-2016 31-May-2016 T-P-T-0187 Approved PTSC H
CONSTRUCTION 2539-00-ITP-007 Inspection & Testing Plan for Blasting & Painting 0 01-Jun-2016 IFE 03-Jun-2016 T-T-P-00628 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-ITP-008 Inspection & Testing Plan for Concrete A 16-Sep-2016 IFR 19-Oct-2016 T-T-P-00883 IFR 02-Nov-2016 04-Nov-2016 T-P-T-0506 Approved PTSC H
CONSTRUCTION 2539-00-ITP-008 Inspection & Testing Plan for Concrete 0 02-Nov-2016 IFC 19-Apr-2017 T-T-P-01367 IFA 02-May-2017 27-Apr-2017 C-NH3-0778/T-P-T-1912 Commented PTSC H
CONSTRUCTION 2539-00-ITP-008 Inspection & Testing Plan for Concrete 1 06-May-2017 IFC 08-May-2017 T-T-P-01404 IFA 21-May-2017 16-May-2017 T-P-T-2039 Approved PTSC C
CONSTRUCTION 2539-00-ITP-009 Inspection & Testing Plan for Pumps Installation A 20-Jul-2017 IFR 21-Jul-2017 T-T-P-01503 IFR 03-Aug-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-ITP-011 Inspection & Testing Plan for Instrument A 10-Feb-2017 IFR 13-Feb-2017 T-T-P-01218 IFR 26-Feb-2017 24-Feb-2017 T-P-T-1352 Approved PTSC H
CONSTRUCTION 2539-00-ITP-011 Inspection & Testing Plan for Instrument 0 06-Mar-2017 IFC 07-Mar-2017 T-T-P-01273 IFA 20-Mar-2017 24-Mar-2017 T-P-T-1636; C-NH3-0740/T-P-T-1831 Commented PTSC H
CONSTRUCTION 2539-00-ITP-011 Inspection & Testing Plan for Instrument 1 17-Apr-2017 IFC 24-Apr-2017 T-T-P-01376 IFA 07-May-2017 02-May-2017 T-P-T-1944 Approved PTSC C
CONSTRUCTION 2539-00-ITP-012 Inspection & Testing Plan for Plastic Piping Works A 20-Jan-2017 IFR 06-Mar-2017 T-T-P-01267 IFR 19-Mar-2017 24-Mar-2017 C-NH3-0699/T-P-T-1639 Commented PTSC H
CONSTRUCTION 2539-00-ITP-012 Inspection & Testing Plan for Plastic Piping Works 0 27-Mar-2017 IFE 31-Mar-2017 T-T-P-01324 IFA 13-Apr-2017 17-Apr-2017 T-P-T-1838 Approved PTSC C
CONSTRUCTION 2539-00-ITP-013 Inspection & Testing Plan for Wrapping for Polyethylene A 11-Apr-2017 IFR 14-Apr-2017 T-T-P-01355 IFR 27-Apr-2017 05-May-2017 T-P-T-1980 Approved PTSC H
CONSTRUCTION 2539-00-ITP-013 Inspection & Testing Plan for Wrapping for Polyethylene 0 10-May-2017 IFE 15-Jun-2017 T-T-P-01456 IFA 28-Jun-2017 06-Jul-2017 T-P-T-2299 Approved PTSC C
CONSTRUCTION 2539-00-ITP-014 Inspection & Testing Plan for Insulation Installation A 03-Aug-2017 IFR 07-Aug-2017 T-T-P-01519 IFR 20-Aug-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-ITP-017 Inspection & Testing Plan for Refractory on HTER 0 20-Jul-2017 IFC 20-Jul-2017 T-T-P-01502 IFA 02-Aug-2017 No Comment PTSC H
CONSTRUCTION 2539-00-ITP-017 Inspection & Testing Plan for Refractory on HTER 1 20-Jul-2017 IFC 21-Jul-2017 T-T-P-01504 IFA 03-Aug-2017 26-Jul-2017 C-NH3-0862/T-P-T-2368 Commented PTSC C
CONSTRUCTION 2539-00-MS-0000-51 Job Construction Specification Guidelines for Welders A 21-Dec-2016 IFR 11-Jan-2017 T-T-P-01141 IFR 24-Jan-2017 Transmitted TPIT C
CONSTRUCTION 2539-00-MS-0000-52 Job Construction Specification Guidelines for Welding A A 21-Dec-2016 IFR 11-Jan-2017 T-T-P-01141 IFR 24-Jan-2017 Transmitted TPIT C
CONSTRUCTION 2539-00-MS-0000-53 Job Construction Specification Guidelines for Piping Mate A 21-Dec-2016 IFR 11-Jan-2017 T-T-P-01141 IFR 24-Jan-2017 Transmitted TPIT C
CONSTRUCTION 2539-00-MS-0310-01 Method Statement for Installation of Cooling Tower 30 A 05-Apr-2017 IFR 12-Apr-2017 T-T-P-01349 IFR 25-Apr-2017 21-Apr-2017 T-P-T-1862 Approved PTSC H
CONSTRUCTION 2539-00-MS-0310-01 Method Statement for Installation of Cooling Tower 30 0 08-May-2017 IFA 09-May-2017 T-T-P-01407 IFA 22-May-2017 25-May-2017 C-NH3-0814/T-P-T-2073 Commented PTSC H
CONSTRUCTION 2539-00-MS-0310-01 Method Statement for Installation of Cooling Tower 30 1 29-May-2017 IFA 15-Jun-2017 T-T-P-01456 IFA 28-Jun-2017 27-Jun-2017 T-P-T-2243 Approved PTSC C
CONSTRUCTION 2539-00-MS-0410-01 Method Statement for Remove of Secondary Reformer A 25-Apr-2017 IFR 02-Jun-2017 T-T-P-01435 IFR 15-Jun-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-MS-0411-01 Method Statement for Installation of Heat Exchanger A 18-Mar-2017 IFR 26-Apr-2017 T-T-P-01385 IFR 09-May-2017 23-May-2017 T-P-T-2067 Approved PTSC H
CONSTRUCTION 2539-00-MS-0411-01 MS for Installation of Heat Exchanger Reformer 10-H 0 25-Apr-2017 IFA 26-Jul-2017 T-T-P-01509 IFA 08-Aug-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-MS-0411-50 Method Statement for Installation of Ammonia Converte A 18-Mar-2017 IFR 26-Apr-2017 T-T-P-01385 IFR 09-May-2017 23-May-2017 T-P-T-2067 Approved PTSC C
CONSTRUCTION 2539-00-MS-0661-001 Method Statement for Installation of 30-E-1002 Condens 0 15-Apr-2017 IFC 17-Apr-2017 T-T-P-01361 IFA 30-Apr-2017 03-May-2017 T-P-T-1965 Approved PTSC H
CONSTRUCTION 2539-00-MS-0661-001 Method Statement for Installation of 30-E-1002 Condens A 20-Apr-2017 IFR 03-Apr-2017 T-T-P-01333 IFR 16-Apr-2017 12-Apr-2017 T-P-T-1809 Approved PTSC C
CONSTRUCTION 2539-00-MS-0710-001 Method Statement for Installation of 30-DR-5002 Instru A 20-Mar-2017 IFR 03-Apr-2017 T-T-P-01333 IFR 16-Apr-2017 12-Apr-2017 T-P-T-1809 Approved PTSC H
CONSTRUCTION 2539-00-MS-0710-001 Method Statement for Installation of 30-DR-5002 Instru 0 13-Apr-2017 IFC 17-Apr-2017 T-T-P-01361 IFA 30-Apr-2017 03-May-2017 T-P-T-1965 Approved PTSC C
CONSTRUCTION 2539-00-MS-0811-001 Method Statement for Installation of Replace Transfe A 25-Apr-2017 IFR 02-Jun-2017 T-T-P-01435 IFR 15-Jun-2017 30-Jun-2017 T-P-T-2281 Approved PTSC C
CONSTRUCTION 2539-00-MS-0910-001 Method Statement for Pump Modification of 30-P-3001A A 05-Apr-2017 IFR 07-Apr-2017 T-T-P-01343 IFR 20-Apr-2017 21-Apr-2017 C-NH3-0749/T-P-T-1855 Commented PTSC H
CONSTRUCTION 2539-00-MS-0910-001 Method Statement for Pump Modification of 30-P-3001A 0 08-May-2017 IFA 09-May-2017 T-T-P-01407 IFA 22-May-2017 25-May-2017 C-NH3-0814/T-P-T-2073 Commented PTSC H
CONSTRUCTION 2539-00-MS-0910-001 Method Statement for Pump Modification of 30-P-3001A 1 24-May-2017 IFA 15-Jun-2017 T-T-P-01456 IFA 28-Jun-2017 27-Jun-2017 T-P-T-2243 Approved PTSC C
CONSTRUCTION 2539-00-MS-1320-055 Method Statement for GRP Piping Fabrication and Install A 20-Jan-2017 IFR 24-Jan-2017 T-T-P-01180 IFR 17-Feb-2017 08-Feb-2017 C-NH3-0598/T-P-T-1223 Commented PTSC H
CONSTRUCTION 2539-00-MS-1320-055 Method Statement for GRP Piping Fabrication and Install 0 21-Feb-2017 IFC 09-Mar-2017 T-T-P-01276 IFA 22-Mar-2017 29-Mar-2017 T-P-T-1674 Approved PTSC C
CONSTRUCTION 2539-00-MS-1320-53 Method Statement for Piping Fabrication & Erection in Ph A 02-Feb-2017 IFR 03-Feb-2017 T-T-P-01195 IFR 16-Feb-2017 22-Feb-2017 T-P-T-1303 Approved PTSC H
CONSTRUCTION 2539-00-MS-1320-53 Method Statement for Piping Fabrication & Erection in Ph 0 22-Feb-2017 IFC 28-Feb-2017 T-T-P-01249 IFA 13-Mar-2017 15-Mar-2017 C-NH3-0676/T-P-T-1555 Commented PTSC H
CONSTRUCTION 2539-00-MS-1320-53 Method Statement for Piping Fabrication & Erection in Ph 1 22-Mar-2017 IFC 30-Mar-2017 T-T-P-01318 IFA 12-Apr-2017 12-Apr-2017 C-NH3-0738/T-P-T-1810 Commented PTSC H
CONSTRUCTION 2539-00-MS-1320-53 Method Statement for Piping Fabrication & Erection in Ph 2 13-Apr-2017 IFC 24-Apr-2017 T-T-P-01374 IFA 07-May-2017 01-Jun-2017 C-NH3-0830/T-P-T-2121 Commented PTSC C
CONSTRUCTION 2539-00-MS-1320-58 Method Statement for Verification Quality of Pipe Shi 0 27-Apr-2017 IFA 27-Apr-2017 T-T-P-01394 IFA 11-May-2017 09-May-2017 T-P-T-2023 Approved PTSC H
CONSTRUCTION 2539-00-MS-1320-58 Method Statement for Verification Quality of Pipe Shi 1 15-May-2017 IFA 16-May-2017 T-T-P-01416 IFA 29-May-2017 No Comment PTSC H
CONSTRUCTION 2539-00-MS-1320-58 Method Statement for Verification Quality of Pipe Shi 2 17-May-2017 IFA 30-May-2017 T-T-P-01428 IFA 12-Jun-2017 26-Jun-2017 T-P-T-2223 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-001 Method Statement for Piping Tie-in Work (FCR & FCS S A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
Page 1
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
CONSTRUCTION 2539-00-MS-1341-002 Method Statement for Piping Tie-in Work (GP System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-003 Method Statement for Piping Tie-in Work (APR System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-004 Method Statement for Piping Tie-in Work (GS System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-005 Method Statement for Piping Tie-in Work (WF System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-006 Method Statement for Piping Tie-in Work (NG System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-007 Method Statement for Piping Tie-in Work (HCV System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-008 Method Statement for Piping Tie-in Work (NHV System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-009 Method Statement for Piping Tie-in Work (H2 System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-010 Method Statement for Piping Tie-in Work (CD System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-011 Method Statement for Piping Tie-in Work (NHG System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-012 Method Statement for Piping Tie-in Work (NHL System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-013 Method Statement for Piping Tie-in Work (KS System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-014 Method Statement for Piping Tie-in Work (HS System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-015 Method Statement for Piping Tie-in Work (WBD System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-016 Method Statement for Piping Tie-in Work (WCP System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-017 Method Statement for Piping Tie-in Work (WT System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-018 Method Statement for Piping Tie-in Work (WBF System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-019 Method Statement for Piping Tie-in Work (N2 System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-020 Method Statement for Piping Tie-in Work (AC & IA Syste A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-021 Method Statement for Piping Tie-in Work (OS System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-022 Method Statement for Piping Tie-in Work (LS System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-023 Method Statement for Piping Tie-in Work (LC System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-024 Method Statement for Piping Tie-in Work (SA System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-025 Method Statement for Piping Tie-in Work (FUG System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-026 Method Statement for Piping Tie-in Work (WC System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-027 Method Statement for Piping Tie-in Work (CTR & CTS S A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-028 Method Statement for Piping Tie-in Work (WS System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-029 Method Statement for Piping Tie-in Work (WW System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-030 Method Statement for Piping Tie-in Work (PWA System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1341-031 Method Statement for Piping Tie-in Work (WR System) A 25-Apr-2017 IFR 26-Apr-2017 T-T-P-01386 IFR 09-May-2017 09-May-2017 T-P-T-2025 Approved PTSC C
CONSTRUCTION 2539-00-MS-1430-002 Method Statement for Pile Installation & Testing in Unit 3 A 04-Jul-2016 IFR 06-Jul-2016 T-T-P-00692 IFR 19-Jul-2016 20-Jul-2016 C-NH3-0222/T-P-T-0268 Commented PTSC H
CONSTRUCTION 2539-00-MS-1430-002 Method Statement for Pile Installation & Testing in Unit 3 0 16-Aug-2016 IFE 24-Aug-2016 T-T-P-00771 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-MS-1430-003 Method Statement for Piling Work Inside of Ammonia Pla A 01-Jun-2016 IFR 02-Jun-2016 T-T-P-00623 IFR 15-Jun-2016 17-Jun-2016 C-NH3-0189/T-P-T-0218 Commented PTSC H
CONSTRUCTION 2539-00-MS-1430-003 Method Statement for Piling Work Inside of Ammonia Pla 0 23-Jun-2016 IFE 27-Jun-2016 T-T-P-00670 IFE No Comment PTSC H
CONSTRUCTION 2539-00-MS-1430-003 Method Statement for Piling Work Inside of Phu My Fertil 1 22-Sep-2016 IFE 23-Sep-2016 T-T-P-00831 IFE 06-Oct-2016 T-P-T-0435 Approved PTSC C
CONSTRUCTION 2539-00-MS-1430-004 Method Statement for Excavation & Backfilling Work A 04-May-2016 IFR 06-May-2016 T-T-P-00570 IFR 19-May-2016 31-May-2016 C-NH3-0162/T-P-T-0182 Commented PTSC H
CONSTRUCTION 2539-00-MS-1430-004 Method Statement for Excavation & Backfilling Work 0 18-Jun-2016 IFE 21-Jun-2016 T-T-P-00663 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-MS-1430-005 Method Statement for Concrete Work A 04-May-2016 IFR 06-May-2016 T-T-P-00570 IFR 19-May-2016 31-May-2016 C-NH3-0162/T-P-T-0182 Commented PTSC H
CONSTRUCTION 2539-00-MS-1430-005 Method Statement of Civil & Concrete Structure Work 0 18-Jun-2016 IFE 21-Jun-2016 T-T-P-00663 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-MS-1430-006 Method Statement for Transportation Materials; Equipme A 08-Aug-2016 IFR 09-Aug-2016 T-T-P-00746 IFR 22-Aug-2016 22-Aug-2016 C-NH3-0263/T-P-T-0339 Commented PTSC C
CONSTRUCTION 2539-00-MS-1430-01 Method Statement for Pile Fabrication & Supply A 28-Jan-2016 IFR 01-Feb-2016 T-T-P-00273 IFR 15-Feb-2016 No Comment PTSC H
CONSTRUCTION 2539-00-MS-1430-01 Method Statement for Pile Fabrication & Supply 0 01-Mar-2016 IFE 17-Jun-2016 T-T-P-00657 IFE 07-Jul-2016 C-NH3-0211/T-P-T-0246 Commented PTSC H
CONSTRUCTION 2539-00-MS-1430-01 Method Statement for Pile Fabrication & Supply 1 04-Aug-2016 IFE 04-Aug-2016 T-T-P-00737 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-MS-1430-010 Method Statement on Mass Pile Testing A 11-Oct-2016 IFR 12-Oct-2016 T-T-P-00871 IFR 25-Oct-2016 19-Oct-2016 T-P-T-0476 Approved PTSC H
CONSTRUCTION 2539-00-MS-1430-010 Method Statement on Mass Pile Testing 0 20-Oct-2016 IFC 21-Oct-2016 T-T-P-00892 IFC 16-Nov-2016 T-P-T-0532 Approved PTSC H
CONSTRUCTION 2539-00-MS-1430-010 Method Statement on Mass Pile Testing 1 02-Nov-2016 IFC 03-Nov-2016 T-T-P-00926 IFC 10-Nov-2016 T-P-T-0562 Approved PTSC C
CONSTRUCTION 2539-00-MS-1430-012 Method Statement of Civil & Concrete Structure Work in A 09-Dec-2016 IFR 16-Dec-2016 T-T-P-01055 IFR 29-Dec-2016 05-Jan-2017 T-P-T-0922 Approved PTSC H
CONSTRUCTION 2539-00-MS-1430-012 Method Statement of Civil & Concrete Structure Work in 0 05-Jan-2017 IFC 06-Jan-2017 T-T-P-01122 IFA 19-Jan-2017 19-Jan-2017 T-P-T-1052 Approved PTSC C
CONSTRUCTION 2539-00-MS-1430-014 Method Statement of Concrete Work for Cooling Tower & A 06-Feb-2017 IFR 08-Feb-2017 T-T-P-01203 IFR 21-Feb-2017 24-Feb-2017 C-NH3-0631/T-P-T-1344 Commented PTSC H
CONSTRUCTION 2539-00-MS-1430-014 Method Statement of Concrete Work for Cooling Tower & 0 16-Mar-2017 IFC 24-Mar-2017 T-T-P-01306 IFA 06-Apr-2017 30-Mar-2017 C-NH3-0705/T-P-T-1696 Commented PTSC H
CONSTRUCTION 2539-00-MS-1430-014 Method Statement of Concrete Work for Cooling Tower & 1 07-Apr-2017 IFC 10-Apr-2017 T-T-P-01346 IFA 23-Apr-2017 26-Apr-2017 C-NH3-0764/T-P-T-1889 Commented PTSC H
CONSTRUCTION 2539-00-MS-1430-014 Method Statement of Concrete Work for Cooling Tower & 2 27-Apr-2017 IFC 04-May-2017 T-T-P-01398 IFA 17-May-2017 09-May-2017 T-P-T-2016 Approved PTSC C
CONSTRUCTION 2539-00-MS-1430-015 Method Statement for Concrete Repair A 18-Jan-2017 IFR 23-Jan-2017 T-T-P-01179 IFR 17-Feb-2017 14-Mar-2017 T-P-T-1520 Approved PTSC H
CONSTRUCTION 2539-00-MS-1430-015 Method Statement for Concrete Repair 0 16-Mar-2017 IFC 24-Mar-2017 T-T-P-01306 IFA 06-Apr-2017 30-Mar-2017 C-NH3-0705/T-P-T-1696 Commented PTSC H
CONSTRUCTION 2539-00-MS-1430-015 Method Statement for Concrete Repair 1 08-Apr-2017 IFC 10-Apr-2017 T-T-P-01346 IFA 23-Apr-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-MS-1430-016 Method Statement for Casting Concrete of Filtration Fou A 11-Feb-2017 IFR 24-Apr-2017 T-T-P-01375 IFR 07-May-2017 04-May-2017 C-NH3-0789/T-P-T-1972 Commented PTSC H
CONSTRUCTION 2539-00-MS-1430-016 Method Statement for Casting Concrete of Filtration Fou 0 15-Feb-2017 IFC 13-Jun-2017 T-T-P-01454 IFA 26-Jun-2017 16-Jun-2017 T-P-T-2185 Approved PTSC C
CONSTRUCTION 2539-00-MS-1430-018 Method Statement of Concrete Platform for Cooling Pum A 27-Mar-2017 IFR 31-Mar-2017 T-T-P-01321 IFR 13-Apr-2017 03-Apr-2017 C-NH3-0712/T-P-T-1715 Commented PTSC H
CONSTRUCTION 2539-00-MS-1430-018 Method Statement of Concrete Platform for Cooling Pum 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01327 IFA 13-Apr-2017 11-Apr-2017 C-NH3-0735/T-P-T-1775 Commented PTSC C
CONSTRUCTION 2539-00-MS-1430-019 Method Statement for Casting Concrete of Wall & Cooli A 01-Apr-2017 IFR 19-Apr-2017 T-T-P-01366 IFR 02-May-2017 30-Apr-2017 C-NH3-0782/T-P-T-1924 Commented PTSC H
CONSTRUCTION 2539-00-MS-1430-019 Method Statement for Casting Concrete of Wall & Cooli 0 05-Apr-2017 IFC 09-May-2017 T-T-P-01408 IFA 22-May-2017 01-Jun-2017 T-P-T-2137 Approved PTSC C
CONSTRUCTION 2539-00-MS-1430-020 Method Statement for Casting Concrete of Settling Basin A 01-Apr-2017 IFR 19-Apr-2017 T-T-P-01366 IFR 02-May-2017 30-Apr-2017 C-NH3-0782/T-P-T-1924 Commented PTSC H
CONSTRUCTION 2539-00-MS-1430-020 Method Statement for Casting Concrete of Settling Basin 0 05-Apr-2017 IFC 09-May-2017 T-T-P-01408 IFA 22-May-2017 01-Jun-2017 T-P-T-2137 Approved PTSC C
CONSTRUCTION 2539-00-MS-1430-022 Method Statement for Concrete Work for Settling Basin A 06-Feb-2017 IFR 16-May-2017 T-T-P-01417 IFR 29-May-2017 05-Jun-2017 T-P-T-2139 Approved PTSC C
CONSTRUCTION 2539-00-MS-1430-023 Calculation for Steel Sheet Pile Support to Install of GRP A 05-May-2017 IFR 08-May-2017 T-T-P-01403 IFR 21-May-2017 19-May-2017 C-NH3-0810/T-P-T-2052 Commented PTSC H
CONSTRUCTION 2539-00-MS-1430-023 Calculation for Steel Sheet Piling Support to Install of G 0 30-May-2017 IFE 02-Jun-2017 T-T-P-01434 IFA 15-Jun-2017 20-Jun-2017 T-P-T-2191 Approved PTSC C
CONSTRUCTION 2539-00-MS-1430-024 Method Statement of Waterproofing for Cooling Tower an A 14-Jul-2017 IFR 18-Jul-2017 T-T-P-01497 IFR 31-Jul-2017 24-Jul-2017 C-NH3-0861/T-P-T-2362 Commented PTSC H
CONSTRUCTION 2539-00-MS-1430-024 Method Statement of Waterproofing for Cooling Tower an 0 29-Jul-2017 IFC 31-Jul-2017 T-T-P-01515 IFA 13-Aug-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-MS-1572-006 Method Statement for Installation Support; Field Instrum 0 05-Jun-2017 IFA 23-Jun-2017 T-T-P-01464 IFA 06-Jul-2017 07-Jul-2017 T-P-T-2302 Approved PTSC C
CONSTRUCTION 2539-00-MS-1572-007 Method Statement for E&I Testing; Cable Gland Installat 0 27-Jun-2017 IFA 26-Jul-2017 T-T-P-01509 IFA 08-Aug-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-MS-1612-001 Method Statement for Installation Under Ground Earthing 0 04-Feb-2017 IFA 07-Feb-2017 T-T-P-01199 IFA 20-Feb-2017 24-Feb-2017 T-P-T-1347 Approved PTSC C
CONSTRUCTION 2539-00-MS-1621-004 Method Statement for E&I Cable Pulling 0 30-Mar-2017 IFA 19-Apr-2017 T-T-P-01365 IFA 02-May-2017 02-May-2017 T-P-T-1940 Approved PTSC C
CONSTRUCTION 2539-00-MS-1622-002 Method Statement for Excavation & Concrete Cutting Insit 0 09-Mar-2017 IFA 10-Mar-2017 T-T-P-01281 IFA 23-Mar-2017 24-Mar-2017 T-P-T-1644 Approved PTSC C
CONSTRUCTION 2539-00-MS-1622-003 Method Statement for E&I Support and Ladder Tray Insta 0 17-Mar-2017 IFA 05-May-2017 T-T-P-01400 IFA 18-May-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-MS-1625-005 Method Statement for Cabinet Installation Inside Buildi 0 31-Mar-2017 IFA 19-Apr-2017 T-T-P-01365 IFA 02-May-2017 02-May-2017 T-P-T-1940 Approved PTSC C
CONSTRUCTION 2539-00-MS-1664-007 Method Statement for E&I Testing; Cable Gland Installati 0 27-Jun-2017 IFA 26-Jul-2017 T-T-P-01509 IFA 08-Aug-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-MS-1800-001 Method Statement for Steel Structures Erection/Installat A 20-Nov-2016 IFR 28-Nov-2016 T-T-P-01002 IFR 11-Dec-2016 20-Dec-2016 C-NH3-0470/T-P-T-0780 Commented PTSC H
CONSTRUCTION 2539-00-MS-1800-001 Method Statement for Steel Structures Erection/Installat B 22-Dec-2016 IFR 12-Jan-2017 T-T-P-01145 IFR 25-Jan-2017 16-Mar-2017 T-P-T-1579 Approved PTSC H
CONSTRUCTION 2539-00-MS-1800-001 Method Statement for Steel Structures Erection/Installat 0 17-Apr-2017 IFC 20-Apr-2017 T-T-P-01370 IFA 03-May-2017 04-May-2017 T-P-T-1970 Approved PTSC C
CONSTRUCTION 2539-00-MS-4025-001 Method Statement for Installation of Ammonia Truck A 08-Apr-2017 IFR 12-Apr-2017 T-T-P-01349 IFR 25-Apr-2017 21-Apr-2017 C-NH3-0752/T-P-T-1862 Commented PTSC H
CONSTRUCTION 2539-00-MS-4025-001 Method Statement for Installation of Ammonia Truck 0 08-May-2017 IFA 09-May-2017 T-T-P-01407 IFA 22-May-2017 25-May-2017 C-NH3-0814/T-P-T-2073 Commented PTSC H
CONSTRUCTION 2539-00-MS-4025-001 Method Statement for Installation of Ammonia Truck 1 29-May-2017 IFA 15-Jun-2017 T-T-P-01456 IFA 28-Jun-2017 27-Jun-2017 T-P-T-2243 Approved PTSC C
CONSTRUCTION 2539-00-MS-6893-004 Method Statement for Transportation Heavy Equipments A 11-Jan-2017 IFR 11-Jan-2017 T-T-P-01142 IFR 24-Jan-2017 13-Feb-2017 T-P-T-1247 Approved PTSC H
CONSTRUCTION 2539-00-MS-6893-004 Method Statement for Transportation Heavy Equipments 0 20-Feb-2017 IFC 21-Feb-2017 T-T-P-01236 IFA 06-Mar-2017 01-Mar-2017 C-NH3-0639/T-P-T-1372 Commented PTSC H
CONSTRUCTION 2539-00-MS-6893-004 Method Statement for Transportation Heavy Equipments 1 16-Mar-2017 IFC 17-Mar-2017 T-T-P-01296 IFA 30-Mar-2017 21-Mar-2017 T-P-T-1618 Approved PTSC C
CONSTRUCTION 2539-00-MS-6893-05 Method Statement for Lifting Ammonia Converter No 2 A 24-Jan-2017 IFR 25-Jan-2017 T-T-P-01187 IFR 08-Feb-2017 12-Feb-2017 C-NH3-0605/T-P-T-1242 Commented PTSC H
CONSTRUCTION 2539-00-MS-6893-05 Method Statement for Lifting Ammonia Converter No 2 B 10-Feb-2017 IFR 14-Feb-2017 T-T-P-01219 IFR 27-Feb-2017 01-Mar-2017 T-P-T-1376 Approved PTSC H
CONSTRUCTION 2539-00-MS-6893-05 Method Statement for Lifting Ammonia Converter No 2 0 01-Mar-2017 IFC 02-Mar-2017 T-T-P-01261 IFA 15-Mar-2017 15-Mar-2017 T-P-T-1558 Approved PTSC H
CONSTRUCTION 2539-00-MS-6893-05 Method Statement for Lifting Ammonia Converter No 2 1 16-Mar-2017 IFC 17-Mar-2017 T-T-P-01296 IFA 30-Mar-2017 21-Mar-2017 T-P-T-1618 Approved PTSC C
CONSTRUCTION 2539-00-MS-6893-06 Method Statement for Lifting Loop Waste Heat Boiler No A 24-Jan-2017 IFR 25-Jan-2017 T-T-P-01187 IFR 08-Feb-2017 12-Feb-2017 C-NH3-0605/T-P-T-1242 Commented PTSC H
CONSTRUCTION 2539-00-MS-6893-06 Method Statement for Lifting Loop Waste Heat Boiler No B 10-Feb-2017 IFR 14-Feb-2017 T-T-P-01219 IFR 27-Feb-2017 01-Mar-2017 T-P-T-1376 Approved PTSC H
CONSTRUCTION 2539-00-MS-6893-06 Method Statement for Lifting Loop Waste Heat Boiler No 0 01-Mar-2017 IFC 02-Mar-2017 T-T-P-01261 IFA 15-Mar-2017 15-Mar-2017 T-P-T-1558 Approved PTSC C
CONSTRUCTION 2539-00-MS-6893-07 Method Statement for Lifting HTER Pressure Shell A 24-Jan-2017 IFR 25-Jan-2017 T-T-P-01187 IFR 08-Feb-2017 12-Feb-2017 C-NH3-0605/T-P-T-1242 Commented PTSC H
CONSTRUCTION 2539-00-MS-6893-07 Method Statement for Lifting HTER Pressure Shell B 10-Feb-2017 IFR 14-Feb-2017 T-T-P-01219 IFR 27-Feb-2017 01-Mar-2017 T-P-T-1376 Approved PTSC H
CONSTRUCTION 2539-00-MS-6893-07 Method Statement for Lifting HTER Pressure Shell 0 01-Mar-2017 IFC 02-Mar-2017 T-T-P-01261 IFA 15-Mar-2017 15-Mar-2017 T-P-T-1558 Approved PTSC C
CONSTRUCTION 2539-00-MS-6893-08 Method Statement for Assembly Crawler Crane 250T & A 07-Feb-2017 IFR 07-Feb-2017 T-T-P-01201 IFR 20-Feb-2017 20-Feb-2017 C-NH3-0622/T-P-T-1301 Commented PTSC H
CONSTRUCTION 2539-00-MS-6893-08 Method Statement for Assembly Crawler Crane 250T & 0 21-Feb-2017 IFC 24-Feb-2017 T-T-P-01242 IFA 09-Mar-2017 08-Mar-2017 C-NH3-0649/T-P-T-1433 Commented PTSC H
CONSTRUCTION 2539-00-MS-6893-08 Method Statement for Assembly Crawler Crane 250T & 1 16-Mar-2017 IFC 17-Mar-2017 T-T-P-01296 IFA 30-Mar-2017 21-Mar-2017 T-P-T-1618 Approved PTSC C
CONSTRUCTION 2539-00-MS-6893-09 Method Statement for Lifting Unload Tube Bundle A 05-May-2017 IFR 12-May-2017 T-T-P-01412 IFR 25-May-2017 01-Jun-2017 T-P-T-2115 Approved PTSC H
CONSTRUCTION 2539-00-MS-6893-09 Method Statement for Lifting Unload Tube Bundle 0 07-Jun-2017 IFC 15-Jun-2017 T-T-P-01457 IFA 28-Jun-2017 29-Jun-2017 T-P-T-2270 Approved PTSC H
CONSTRUCTION 2539-00-MS-6893-09 Method Statement for Lifting Unload Tube Bundle 1 30-Jun-2017 IFC 03-Jul-2017 T-T-P-01470 IFA 16-Jul-2017 20-Jul-2017 T-P-T-2347 Approved PTSC C
CONSTRUCTION 2539-00-MS-6893-10 Method Statement for Installation Refractory Lining on A 07-Jun-2017 IFR 15-Jun-2017 T-T-P-01458 IFR 28-Jun-2017 30-Jun-2017 C-NH3-0854/T-P-T-2282; C-NH3-0855/T-P-T-2301 Commented PTSC H
CONSTRUCTION 2539-00-MS-6893-10 Method Statement for Installation Refractory Lining on 0 04-Jul-2017 IFC 05-Jul-2017 T-T-P-01479 IFA 18-Jul-2017 No Comment PTSC H
CONSTRUCTION 2539-00-MS-6893-10 Method Statement for Installation Refractory Lining on 1 16-Jul-2017 IFC 18-Jul-2017 T-T-P-01498 IFA 31-Jul-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-MS-6893-11 Method Statement for Lifting CO2 Vent Cooler A 15-Jun-2017 IFR 27-Jun-2017 T-T-P-01467 IFR 10-Jul-2017 19-Jul-2017 T-P-T-2341 Approved PTSC H
CONSTRUCTION 2539-00-MS-6893-11 Method Statement for Lifting CO2 Vent Cooler 0 22-Jul-2017 IFC 25-Jul-2017 T-T-P-01507 IFA 07-Aug-2017 No Comment PTSC H
CONSTRUCTION 2539-00-MS-6893-11 Method Statement for Lifting CO2 Vent Cooler 1 27-Jul-2017 IFC 28-Jul-2017 T-T-P-01512 IFA 10-Aug-2017 01-Aug-2017 T-P-T-2378 Approved PTSC C
CONSTRUCTION 2539-00-MS-6894-01 Method Statement for Transportation Secondary Reform A 19-Jun-2017 IFR 03-Jul-2017 T-T-P-01471 IFR 16-Jul-2017 20-Jul-2017 T-P-T-2348 Approved PTSC H
CONSTRUCTION 2539-00-MS-6894-01 Method Statement for Transportation Secondary Reform 0 21-Jul-2017 IFC 21-Jul-2017 T-T-P-01504 IFA 03-Aug-2017 26-Jul-2017 C-NH3-0862/T-P-T-2368 Commented PTSC C
CONSTRUCTION 2539-00-MS-6894-02 Method Statement for Lifting Equipment 40-PK-5005 0 17-Jul-2017 IFC 18-Jul-2017 T-T-P-01498 IFA 31-Jul-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-MS-6894-03 Method Statement for Installation of Refractories Work 0 19-Jul-2017 IFC 20-Jul-2017 T-T-P-01502 IFA 02-Aug-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-MS-6894-04 Formwork Drawing for HTER 0 19-Jul-2017 IFC 20-Jul-2017 T-T-P-01502 IFA 02-Aug-2017 Transmitted PTSC C
Page 2
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
CONSTRUCTION 2539-00-MS-6894-05 Method Statement for Lifting New Secondary Reformer 0 21-Jul-2017 IFC 21-Jul-2017 T-T-P-01504 IFA 03-Aug-2017 26-Jul-2017 C-NH3-0862/T-P-T-2368 Commented PTSC H
CONSTRUCTION 2539-00-MS-6894-05 Method Statement for Lifting New Secondary Reformer 1 26-Jul-2017 IFC 28-Jul-2017 T-T-P-01512 IFA 10-Aug-2017 01-Aug-2017 T-P-T-2378 Approved PTSC C
CONSTRUCTION 2539-00-MS-6894-06 Method Statement for Lifting Tube Bundle to Temporary 0 21-Jul-2017 IFC 21-Jul-2017 T-T-P-01504 IFA 03-Aug-2017 26-Jul-2017 C-NH3-0862/T-P-T-2368 Commented PTSC H
CONSTRUCTION 2539-00-MS-6894-06 Method Statement for Lifting Tube Bundle to Temporary 1 27-Jul-2017 IFC 28-Jul-2017 T-T-P-01512 IFA 10-Aug-2017 01-Aug-2017 T-P-T-2378 Approved PTSC C
CONSTRUCTION 2539-00-MS-8580-001 Method Statement of Settlement Monitoring for Structure A 25-May-2017 IFR 26-May-2017 T-T-P-01424 IFR 08-Jun-2017 05-Jun-2017 C-NH3-0833/T-P-T-2147 Commented PTSC H
CONSTRUCTION 2539-00-MS-8580-001 Method Statement of Settlement Monitoring for Structure 0 15-Jun-2017 IFA 27-Jul-2017 T-T-P-01510 IFA 09-Aug-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-NM-1572-01 Welder Register List for Steel Structure A 30-Dec-2016 IFR 03-Feb-2017 T-T-P-01193 IFR 16-Feb-2017 17-Feb-2017 T-P-T-1295 Rejected PTSC H
CONSTRUCTION 2539-00-NM-1572-01 Welder Register List for Steel Structure B 09-Mar-2017 IFR 10-Mar-2017 T-T-P-01280 IFR 23-Mar-2017 30-Mar-2017 T-P-T-1697 Approved PTSC C
CONSTRUCTION 2539-00-NM-1573-01 Welder Register List for Piping & Mechanical Works A 30-Dec-2016 IFR 03-Feb-2017 T-T-P-01193 IFR 16-Feb-2017 17-Feb-2017 T-P-T-1295 Rejected PTSC H
CONSTRUCTION 2539-00-NM-1573-01 Welder Register List for Piping & Mechanical Works B 03-Jun-2017 IFR 13-Jun-2017 T-T-P-01453 IFR 26-Jun-2017 29-Jun-2017 T-P-T-2269 Approved PTSC H
CONSTRUCTION 2539-00-NM-1573-01 Welder Register List for Piping & Mechanical Works 0 20-Jul-2017 IFE 26-Jul-2017 T-T-P-01509 IFA 08-Aug-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-NM-417-002 NDT Personnel and Equipment Register and Certificates A 03-May-2017 IFR 08-May-2017 T-T-P-01403 IFR 21-May-2017 25-May-2017 T-P-T-2082 Approved PTSC H
CONSTRUCTION 2539-00-NM-417-002 NDT Personnel and Equipment Register and Certificates 0 26-May-2017 IFC 29-May-2017 T-T-P-01426 IFA 11-Jun-2017 26-Jun-2017 T-P-T-2221 Approved PTSC C
CONSTRUCTION 2539-00-NM-417-003 Bonder Certificates for GRP Piping A 22-Feb-2017 IFR 24-Apr-2017 T-T-P-01379 IFR 07-May-2017 05-May-2017 T-P-T-1981 Approved PTSC H
CONSTRUCTION 2539-00-NM-417-003 Bonder Certificates for GRP Piping 0 16-May-2017 IFC 19-May-2017 T-T-P-01418 IFA 01-Jun-2017 No Comment PTSC H
CONSTRUCTION 2539-00-NM-417-003 Bonder Certificates for GRP Piping 1 12-Jun-2017 IFC 12-Jun-2017 T-T-P-01451 IFA 25-Jun-2017 14-Jul-2017 T-P-T-2322 Approved PTSC C
CONSTRUCTION 2539-00-PLG-812 Schedule for MV Energization 0 28-Jun-2017 II 04-Jul-2017 T-T-P-01478 II 28-Jul-2017 T-P-T-2370 Approved PTSC C
CONSTRUCTION 2539-00-PLG-813 Schedule for DCS System Power-Up 0 10-Jul-2017 II 10-Jul-2017 T-T-P-01485 II Transmitted PTSC C
CONSTRUCTION 2539-00-PLG-814 Schedule for Modification of 30P-3002A and 30P-3001A 0 18-Jul-2017 II 18-Jul-2017 T-T-P-01499 II Transmitted PTSC C
CONSTRUCTION 2539-00-PLG-815 Schedule for HTER Refractory Works 0 24-Jul-2017 II 24-Jul-2017 T-T-P-01506 II Transmitted PTSC C
CONSTRUCTION 2539-00-PP-387 Dimension Control Procedure A 10-Jun-2016 IFR 20-Jan-2017 T-T-P-01168 IFR 02-Feb-2017 22-Feb-2017 T-P-T-1302 Approved PTSC H
CONSTRUCTION 2539-00-PP-387 Dimension Control Procedure 0 10-Mar-2017 IFC 14-Mar-2017 T-T-P-01287 IFA 27-Mar-2017 19-Apr-2017 C-NH3-0748/T-P-T-1848 Commented PTSC C
CONSTRUCTION 2539-00-PP-554 Non Conformance Control Procedure A 18-Oct-2016 IFR 25-Oct-2016 T-T-P-00902 IFR 07-Nov-2016 03-Nov-2016 C-NH3-0362/T-P-T-0537 Commented PTSC H
CONSTRUCTION 2539-00-PP-554 Non Conformance Control Procedure 0 10-Mar-2017 IFE 11-Apr-2017 T-T-P-01348 IFA 24-Apr-2017 26-Apr-2017 C-NH3-0761/T-P-T-1886 Commented PTSC C
CONSTRUCTION 2539-00-PP-570 Welders Qualification Test Procedure A 23-Nov-2015 IFR 24-Nov-2015 T-T-P-00104 IFR 07-Dec-2015 17-Dec-2015 T-P-T-0038 Approved PTSC H
CONSTRUCTION 2539-00-PP-570 Welders Qualification Test Procedure 0 08-Mar-2016 IFE 10-Mar-2016 T-T-P-00417 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-PP-800 Golden Welding Procedure A 12-May-2016 IFR 13-May-2016 T-T-P-00587 IFR 26-May-2016 31-May-2016 C-NH3-0168/T-P-T-0191 Commented PTSC H
CONSTRUCTION 2539-00-PP-800 Golden Welding Procedure 0 02-Jun-2016 IFE 06-Jun-2016 T-T-P-00635 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-PP-801 Site Coordination Procedure A 04-Aug-2016 IFR 08-Aug-2016 T-T-P-00745 IFR 21-Aug-2016 22-Aug-2016 C-NH3-0264/T-P-T-0340 Commented PTSC H
CONSTRUCTION 2539-00-PP-801 Site Coordination Procedure 0 19-Dec-2016 IFE 05-Jan-2017 T-T-P-01117 IFA 18-Jan-2017 23-Jan-2017 C-NH3-0578/T-P-T-1118; C-NH3-0601/T-P-T-1229 Commented PTSC H
CONSTRUCTION 2539-00-PP-801 Site Coordination Procedure 1 06-Feb-2017 IFE 07-Feb-2017 T-T-P-01200 IFA 20-Feb-2017 22-Feb-2017 C-NH3-0623/T-P-T-1304 Commented PTSC C
CONSTRUCTION 2539-00-PP-806 Material Control Procedure A 15-Jul-2016 IFR 22-Jul-2016 T-T-P-00711 IFR 04-Aug-2016 10-Sep-2016 T-P-T-0375 Approved PTSC H
CONSTRUCTION 2539-00-PP-806 Material Control Procedure 0 22-Dec-2016 IFC 13-Jan-2017 T-T-P-01150 IFA 26-Jan-2017 06-Feb-2017 T-P-T-1186 Approved PTSC C
CONSTRUCTION 2539-00-PP-807 Planning - Scheduling - Progress Measuring & Reporting A 24-Nov-2015 IFR 24-Nov-2015 T-T-P-00105 IFR 07-Dec-2015 17-Dec-2015 T-P-T-0038 Approved PTSC H
CONSTRUCTION 2539-00-PP-807 Planning - Scheduling - Progress Measuring & Reporting 0 08-Mar-2016 IFE 10-Mar-2016 T-T-P-00418 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-PP-812 Site Security Management Plan A 25-Nov-2015 IFR 30-Nov-2015 T-T-P-00130 IFR 14-Dec-2015 21-Dec-2015 C-NH3-0070/T-P-T-0043 Commented PTSC H
CONSTRUCTION 2539-00-PP-812 Site Security Management Plan 0 29-Feb-2016 IFE 10-Mar-2016 T-T-P-00416 IFE Approved PTSC C
CONSTRUCTION 2539-00-PP-813 Emergency Response Procedure A 25-Nov-2015 IFR 30-Nov-2015 T-T-P-00130 IFR 14-Dec-2015 21-Dec-2015 C-NH3-0070/T-P-T-0043 Commented PTSC H
CONSTRUCTION 2539-00-PP-813 Emergency Response Procedure 0 29-Feb-2016 IFE 10-Mar-2016 T-T-P-00416 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-PP-814 Incident Reporting Procedure A 25-Nov-2015 IFR 30-Nov-2015 T-T-P-00130 IFR 14-Dec-2015 21-Dec-2015 C-NH3-0070/T-P-T-0043 Commented PTSC H
CONSTRUCTION 2539-00-PP-814 Incident Reporting Procedure 0 29-Feb-2016 IFE 10-Mar-2016 T-T-P-00416 IFE Approved PTSC C
CONSTRUCTION 2539-00-PP-815 Radiation Safety Procedure A 25-Nov-2015 IFR 30-Nov-2015 T-T-P-00130 IFR 14-Dec-2015 21-Dec-2015 C-NH3-0070/T-P-T-0043 Commented PTSC H
CONSTRUCTION 2539-00-PP-815 Radiation Safety Procedure 0 29-Feb-2016 IFE 10-Mar-2016 T-T-P-00416 IFE Approved PTSC C
CONSTRUCTION 2539-00-PP-816 Lifting Safety Procedure 0 29-Feb-2016 IFC 29-Mar-2017 T-T-P-01314 II 11-Apr-2017 Approved PTSC C
CONSTRUCTION 2539-00-PP-817 Scaffolding Safety Procedure 0 29-Feb-2016 IFC 29-Mar-2017 T-T-P-01314 II 11-Apr-2017 Approved PTSC C
CONSTRUCTION 2539-00-PP-820 Critical Lifting Procedure A 24-Nov-2015 IFR 26-Nov-2015 T-T-P-00109 IFR 08-Dec-2015 18-Dec-2015 T-P-T-0042 Approved PTSC H
CONSTRUCTION 2539-00-PP-820 Critical Lifting Procedure 0 28-Dec-2015 IFE 08-Jan-2016 T-T-P-00224 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-PP-821 Piping Tie-In Procedure A 24-Mar-2016 IFR 06-Apr-2016 T-T-P-00511 IFR 19-Apr-2016 21-Apr-2016 C-NH3-0141/T-P-T-0149 Commented PTSC H
CONSTRUCTION 2539-00-PP-821 Piping Tie-In Procedure 0 03-May-2016 IFE 04-May-2016 T-T-P-00568 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-PP-822 Piping Fabrication & Erection Procedure A 26-Dec-2016 IFR 17-Jan-2017 T-T-P-01159 IFR 31-Jan-2017 13-Feb-2017 C-NH3-0607/T-P-T-1244 Commented PTSC H
CONSTRUCTION 2539-00-PP-822 Piping Fabrication & Erection Procedure 0 15-Feb-2017 IFC 21-Feb-2017 T-T-P-01237 IFA 06-Mar-2017 07-Mar-2017 T-P-T-1452 Approved PTSC C
CONSTRUCTION 2539-00-PP-824 Piping Flushing & Pressure Testing Procedure A 26-Dec-2016 IFR 17-Jan-2017 T-T-P-01159 IFR 31-Jan-2017 13-Feb-2017 C-NH3-0607/T-P-T-1244 Commented PTSC H
CONSTRUCTION 2539-00-PP-824 Piping Flushing & Pressure Testing Procedure 0 15-Feb-2017 IFC 21-Feb-2017 T-T-P-01237 IFA 06-Mar-2017 07-Mar-2017 T-P-T-1452 Approved PTSC C
CONSTRUCTION 2539-00-PP-825 Piling Work Procedure A 03-May-2016 IFR 03-May-2016 T-T-P-00567 IFR 17-May-2016 27-Jul-2016 T-P-T-0291 Approved PTSC H
CONSTRUCTION 2539-00-PP-825 Piling Work Procedure 0 06-Feb-2017 IFC 07-Feb-2017 T-T-P-01200 IFA 20-Feb-2017 22-Feb-2017 C-NH3-0623/T-P-T-1304 Commented PTSC C
CONSTRUCTION 2539-00-PP-827 Civil Work Procedure A 03-May-2016 IFR 03-May-2016 T-T-P-00567 IFR 17-May-2016 27-Jul-2016 T-P-T-0291 Approved PTSC H
CONSTRUCTION 2539-00-PP-827 Civil Work Procedure 0 06-Feb-2017 IFC 07-Feb-2017 T-T-P-01200 IFA 20-Feb-2017 22-Feb-2017 C-NH3-0623/T-P-T-1304 Commented PTSC C
CONSTRUCTION 2539-00-PP-828 Piping Reinstatement Procedure A 26-Dec-2016 IFR 17-Jan-2017 T-T-P-01159 IFR 31-Jan-2017 13-Feb-2017 C-NH3-0607/T-P-T-1244 Commented PTSC H
CONSTRUCTION 2539-00-PP-828 Piping Reinstatement Procedure 0 15-Feb-2017 IFC 21-Feb-2017 T-T-P-01237 IFA 06-Mar-2017 07-Mar-2017 T-P-T-1452 Approved PTSC C
CONSTRUCTION 2539-00-PP-829 Mechanical Equipment Installation Procedure A 18-Feb-2017 IFR 08-Mar-2017 T-T-P-01275 IFR 21-Mar-2017 21-Mar-2017 C-NH3-0686/T-P-T-1602 Commented PTSC H
CONSTRUCTION 2539-00-PP-829 Mechanical Equipment Installation Procedure 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01327 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1777/T-P-T-1818 Approved PTSC C
CONSTRUCTION 2539-00-PP-832 Construction Engineering Control Procedure A 02-Feb-2016 IFR 18-Feb-2016 T-T-P-00328 IFR 01-Mar-2016 No Comment PTSC H
CONSTRUCTION 2539-00-PP-832 Construction Engineering Control Procedure 0 26-Mar-2016 IFE 01-Apr-2016 T-T-P-00496 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-PP-833 Tubing Flushing & Testing Procedure A 10-Feb-2017 IFR 15-Feb-2017 T-T-P-01220 IFR 28-Feb-2017 27-May-2017 T-P-T-2097 Approved PTSC C
CONSTRUCTION 2539-00-PP-835 Surface Preparation & Painting Procedure A 06-Sep-2016 IFR 06-Sep-2016 T-T-P-00792 IFR 19-Sep-2016 10-Sep-2016 T-P-T-0377 Approved PTSC H
CONSTRUCTION 2539-00-PP-835 Surface Preparation & Painting Procedure 0 12-Sep-2016 IFE 13-Sep-2016 T-T-P-00809 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-PP-836 Welding Control Procedure A 23-Nov-2015 IFR 25-Nov-2015 T-T-P-00107 IFR 07-Dec-2015 18-Dec-2015 T-P-T-0042 Approved PTSC H
CONSTRUCTION 2539-00-PP-836 Welding Control Procedure 0 28-Dec-2015 IFE 08-Jan-2016 T-T-P-00224 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-PP-837 Welding Consumable Control Procedure A 24-Nov-2015 IFR 24-Nov-2015 T-T-P-00106 IFR 07-Dec-2015 17-Dec-2015 C-NH3-0068/T-P-T-0039 Commented PTSC H
CONSTRUCTION 2539-00-PP-837 Welding Consumable Control Procedure 0 10-Mar-2016 IFE 18-Mar-2016 T-T-P-00450 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-PP-839 Welding Procedure Specification (WPS) for Steel Structu A 05-Jan-2016 IFR 17-Feb-2016 T-T-P-00322 IFR 01-Mar-2016 07-Mar-2016 C-CH3-0110/T-T-P-0087 Commented PTSC H
CONSTRUCTION 2539-00-PP-839 Welding Procedure Specification (WPS) for Steel Structu 0 16-May-2016 IFE 24-May-2016 T-T-P-00600 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-PP-840 Welding Procedure Specification (WPS) for Piping A 04-Mar-2016 IFR 06-May-2016 T-T-P-00573 IFR 19-May-2016 24-May-2016 T-P-T-0180 Approved PTSC H
CONSTRUCTION 2539-00-PP-840 Welding Procedure Specification (WPS) for Piping 0 02-Jun-2016 IFE 06-Jun-2016 T-T-P-00633 IFE No Comment PTSC H
CONSTRUCTION 2539-00-PP-840 Welding Procedure Specification (WPS) for Piping & Ves 1 27-Apr-2017 IFE 05-Jun-2017 T-T-P-01440 IFA 18-Jun-2017 26-Jun-2017 T-P-T-2222 Approved PTSC C
CONSTRUCTION 2539-00-PP-841 Magnetic Particle Testing Procedure A 19-Dec-2015 IFR 17-Feb-2016 T-T-P-00322 IFR 01-Mar-2016 04-Nov-2016 T-P-T-0509 Approved PTSC H
CONSTRUCTION 2539-00-PP-841 Magnetic Particle Testing Procedure 0 28-Nov-2016 IFE 02-Feb-2017 T-T-P-01191 IFA 15-Feb-2017 16-Feb-2017 T-P-T-1258 Approved PTSC C
CONSTRUCTION 2539-00-PP-842 Dye Penetrant Testing Procedure A 19-Dec-2015 IFR 17-Feb-2016 T-T-P-00322 IFR 01-Mar-2016 04-Nov-2016 T-P-T-0509 Approved PTSC H
CONSTRUCTION 2539-00-PP-842 Dye Penetrant Testing Procedure 0 28-Nov-2016 IFE 02-Feb-2017 T-T-P-01191 IFA 15-Feb-2017 16-Feb-2017 T-P-T-1258 Approved PTSC C
CONSTRUCTION 2539-00-PP-843 Radiographic Testing Procedure A 19-Dec-2015 IFR 17-Feb-2016 T-T-P-00322 IFR 01-Mar-2016 04-Nov-2016 T-P-T-0509 Approved PTSC H
CONSTRUCTION 2539-00-PP-843 Radiographic Testing Procedure 0 28-Nov-2016 IFE 02-Feb-2017 T-T-P-01191 IFA 15-Feb-2017 16-Feb-2017 T-P-T-1258 Approved PTSC C
CONSTRUCTION 2539-00-PP-844 Ultrasonic Testing Procedure A 19-Dec-2015 IFR 17-Feb-2016 T-T-P-00322 IFR 01-Mar-2016 04-Nov-2016 T-P-T-0509 Approved PTSC H
CONSTRUCTION 2539-00-PP-844 Ultrasonic Testing Procedure 0 28-Nov-2016 IFE 02-Feb-2017 T-T-P-01191 IFA 15-Feb-2017 16-Feb-2017 T-P-T-1258 Approved PTSC C
CONSTRUCTION 2539-00-PP-845 Phased Array Ultrasonic Testing Procedure A 05-May-2016 IFR 06-May-2016 T-T-P-00573 IFR 19-May-2016 24-May-2016 C-NH3-0161/T-P-T-0181 Approved with comments PTSC H
CONSTRUCTION 2539-00-PP-845 Phased Array Ultrasonic Testing Procedure 0 02-Jun-2016 IFE 06-Jun-2016 T-T-P-00633 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-PP-851 Site HSE Plan A 24-Nov-2015 IFR 30-Nov-2015 T-T-P-00131 IFR 14-Dec-2015 21-Dec-2015 C-NH3-0071/T-P-T-0043; T-P-T-0492 Approved PTSC H
CONSTRUCTION 2539-00-PP-851 Site HSE Plan 0 29-Feb-2016 IFA 29-Mar-2017 T-T-P-01314 II 11-Apr-2017 Approved PTSC C
CONSTRUCTION 2539-00-PP-854 Project Environment Management Plan A 23-Dec-2015 IFR 08-Jan-2016 T-T-P-00220 IFR 21-Jan-2016 26-Jan-2016 C-NH3-0092/T-P-T-0066 Commented PTSC H
CONSTRUCTION 2539-00-PP-854 Project Environment Management Plan 0 12-Mar-2016 IFE 18-Mar-2016 T-T-P-00451 IFE Approved PTSC C
CONSTRUCTION 2539-00-PP-855 Painting Matrix Procedure A 16-Jan-2017 IFR 23-Feb-2017 T-T-P-01240 IFR 08-Mar-2017 07-Mar-2017 T-P-T-1484 Approved PTSC H
CONSTRUCTION 2539-00-PP-855 Painting Matrix Procedure 0 08-Mar-2017 IFE 12-Apr-2017 T-T-P-01350 IFA 25-Apr-2017 21-Apr-2017 T-P-T-1853 Approved PTSC C
CONSTRUCTION 2539-00-PP-857 Flange Management Procedure A 13-Jul-2017 IFR 17-Jul-2017 T-T-P-01494 IFR 30-Jul-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-PP-876 Hardness Test Procedure A 05-May-2016 IFR 06-May-2016 T-T-P-00573 IFR 19-May-2016 24-May-2016 C-NH3-0161/T-P-T-0181 Approved with comments PTSC H
CONSTRUCTION 2539-00-PP-876 Hardness Test Procedure 0 02-Jun-2016 IFE 06-Jun-2016 T-T-P-00633 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-PP-877 Postweld Heat Treatment Procedure for Piping A 04-Mar-2016 IFR 06-May-2016 T-T-P-00573 IFR 19-May-2016 24-May-2016 C-NH3-0161/T-P-T-0181 Approved with comments PTSC H
CONSTRUCTION 2539-00-PP-877 Postweld Heat Treatment Procedure for Piping 0 02-Jun-2016 IFE 06-Jun-2016 T-T-P-00633 IFE Transmitted PTSC C
CONSTRUCTION 2539-00-PP-878 Wrapping Procedure for Polyethylene Coated Steel Pipi A 21-Mar-2017 IFR 30-Mar-2017 T-T-P-01317 IFR 12-Apr-2017 14-Apr-2017 T-P-T-1823 Approved PTSC H
CONSTRUCTION 2539-00-PP-878 Wrapping Procedure for Polyethylene Coated Steel Pipi 0 15-Apr-2017 IFE 11-May-2017 T-T-P-01410 IFA 24-May-2017 08-Jun-2017 T-P-T-2149 Approved PTSC C
CONSTRUCTION 2539-00-PP-880 Pickling and Passivation Procedure A 25-May-2016 IFR 25-May-2016 T-T-P-00604 IFR 06-Jun-2016 24-Jun-2016 C-NH3-0196/T-P-T-0230; C-NH3-0573/T-P-T-1113 Commented PTSC H
CONSTRUCTION 2539-00-PP-880 Pickling and Passivation Procedure 0 09-Jan-2017 IFE 13-Jan-2017 T-T-P-01148 IFA 26-Jan-2017 03-Feb-2017 C-NH3-0590/T-P-T-1160; C-NH3-0788/T-P-T-1963; C-NHCommented PTSC H
CONSTRUCTION 2539-00-PP-880 Pickling and Passivation Procedure 1 06-Mar-2017 IFE 24-Apr-2017 T-T-P-01380 IFA 07-May-2017 09-May-2017 T-P-T-2002 Approved PTSC H
CONSTRUCTION 2539-00-PP-880 Pickling and Passivation Procedure 2 10-May-2017 IFE 30-May-2017 T-T-P-01428 IFA 12-Jun-2017 26-Jun-2017 T-P-T-2223 Approved PTSC C
CONSTRUCTION 2539-00-PP-881 Positive Material Identification (PMI) Testing Procedure A 14-Dec-2015 IFR 17-Feb-2016 T-T-P-00322 IFR 01-Mar-2016 04-Nov-2016 T-P-T-0509 Approved PTSC H
CONSTRUCTION 2539-00-PP-881 Positive Material Identification (PMI) Testing Procedure 0 19-Dec-2016 IFE 23-Dec-2016 T-T-P-01080 IFA 05-Jan-2017 16-Jan-2017 T-P-T-1030 Approved PTSC C
CONSTRUCTION 2539-00-PP-882 GRP Pipes Underground Installation Procedure A 20-Feb-2017 IFR 21-Feb-2017 T-T-P-01235 IFR 06-Mar-2017 01-Mar-2017 T-P-T-1380 Approved PTSC H
CONSTRUCTION 2539-00-PP-882 GRP Pipes Underground Installation Procedure 0 02-Mar-2017 IFC 03-Apr-2017 T-T-P-01332 IFA 16-Apr-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-PP-883 Butt & Strap Lamination Procedure A 20-Feb-2017 IFR 21-Feb-2017 T-T-P-01235 IFR 06-Mar-2017 01-Mar-2017 T-P-T-1380 Approved PTSC H
CONSTRUCTION 2539-00-PP-883 Butt & Strap Lamination Procedure 0 02-Mar-2017 IFC 03-Apr-2017 T-T-P-01332 IFA 16-Apr-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-PP-884 GRP Piping Aboveground Installation Procedure A 20-Feb-2017 IFR 21-Feb-2017 T-T-P-01235 IFR 06-Mar-2017 01-Mar-2017 T-P-T-1380 Approved PTSC H
CONSTRUCTION 2539-00-PP-884 GRP Piping Aboveground Installation Procedure 0 02-Mar-2017 IFC 03-Apr-2017 T-T-P-01332 IFA 16-Apr-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-PP-885 Hydraulic Test Procedure for GRP Lines A 20-Feb-2017 IFR 21-Feb-2017 T-T-P-01235 IFR 06-Mar-2017 01-Mar-2017 T-P-T-1380 Approved PTSC H
CONSTRUCTION 2539-00-PP-885 Hydraulic Test Procedure for GRP Lines 0 02-Mar-2017 IFC 03-Apr-2017 T-T-P-01332 IFA 16-Apr-2017 09-May-2017 T-P-T-1994; C-NH3-0829/T-P-T-2120 Commented PTSC C
Page 3
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
CONSTRUCTION 2539-00-PTP-01 Piping Tie-in Package 45-TIP-035 A 30-Jun-2017 IFR 03-Jul-2017 T-T-P-01476 IFR 16-Jul-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-WI-1693-01 Vendor Approval Request for Electrical Testing A 06-Jun-2017 IFR 07-Jun-2017 T-T-P-01443 IFR 20-Jun-2017 27-Jun-2017 T-P-T-2249 Approved PTSC H
CONSTRUCTION 2539-00-WI-1693-01 Vendor Approval Request for Electrical Testing 0 03-Jul-2017 IFA 26-Jul-2017 T-T-P-01508 IFA 08-Aug-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-WI-1693-02 Vendor Approval Request for Instrument Calibration & L A 06-Jun-2017 IFR 07-Jun-2017 T-T-P-01443 IFR 20-Jun-2017 15-Jun-2017 C-NH3-0837/T-P-T-2181 Commented PTSC H
CONSTRUCTION 2539-00-WI-1693-02 Vendor Approval Request for Instrument Calibration & L B 21-Jun-2017 IFR 26-Jun-2017 T-T-P-01466 IFR 09-Jul-2017 27-Jun-2017 T-P-T-2258 Approved PTSC H
CONSTRUCTION 2539-00-WI-1693-02 Vendor Approval Request for Instrument Calibration & L 0 03-Jul-2017 IFA 26-Jul-2017 T-T-P-01508 IFA 08-Aug-2017 Transmitted PTSC C
CONSTRUCTION 2539-00-WI-1694-01 Vendor Approval Request for MV Termination Kit for Elect A 07-Jun-2017 IFR 08-Jun-2017 T-T-P-01445 IFR 21-Jun-2017 26-Jun-2017 T-P-T-2229 Approved PTSC C
CONSTRUCTION 2539-30-MS-0848-001 Method Statement for Installation of 30-PK-3006 Make-U A 26-May-2017 IFR 13-Jun-2017 T-T-P-01455 IFR 26-Jun-2017 30-Jun-2017 T-P-T-2280 Approved PTSC C
CONSTRUCTION 2539-30-RT-1430-01 Report on Test Results of Test Piles for Cooling Tower A 0 26-Apr-2016 II 27-Apr-2016 T-T-P-00555 II Transmitted PTSC C
CONSTRUCTION FRR-00-MI-CIV---0001 Field Revision Request - Reduce The Quantity of Pile 0 08-Dec-2016 IFA 01-Mar-2017 T-T-P-01251 II Transmitted PTSC C
CONSTRUCTION FRR-00-MI-CIV---0002 Field Revision Request - Change the Casting Beam MH 0 16-Dec-2016 IFA 01-Mar-2017 T-T-P-01251 II Transmitted PTSC C
CONSTRUCTION FRR-00-MI-CIV---0003 Field Revision Request - Extension Foundation of Pipe 0 28-Feb-2017 IFA 01-Mar-2017 T-T-P-01251 II Transmitted PTSC C
CONSTRUCTION FRR-00-MI-CIV---0004 Field Revision Request - Modify Beam of Structures Mis 0 03-Jul-2017 IFA 03-Jul-2017 T-T-P-01475 II Transmitted PTSC C
CONSTRUCTION FRR-00-MI-ELE---0001-00 Field Revision Request - Change Material of Electrical S 0 05-Apr-2017 IFC 07-Apr-2017 T-T-P-01342 II Transmitted PTSC C
CONSTRUCTION FRR-00-MI-INS---0001-00 Field Revision Request - Change Material of Instrument 0 05-Apr-2017 IFC 07-Apr-2017 T-T-P-01342 II Transmitted PTSC C
CONSTRUCTION FRR-00-MI-PP---0001-00 Field Revision Request - Change Material Grade Piping S 0 04-Apr-2017 IFA 04-Apr-2017 T-T-P-01338 II Transmitted PTSC C
CONSTRUCTION FRR-00-MI-PP---0002-00 Field Revision Request - Change Material Grade Piping S 0 04-Apr-2017 IFA 04-Apr-2017 T-T-P-01338 II Transmitted PTSC C
CONSTRUCTION FRR-00-MI-PP---0003-00 Field Revision Request - Change Plate Thickness of Pipi 0 24-Apr-2017 IFA 24-Apr-2017 T-T-P-01381 II Transmitted PTSC C
CONSTRUCTION FRR-30-MI-CIV---0005 Field Revision Request - Proposal to Change Thickness 0 10-Jul-2017 IFA 10-Jul-2017 T-T-P-01486 II Transmitted PTSC C
CSA 2539-00-CN-1441-01 Hydraulic Calculation Note for Utility Plant Unit 30 A 23-Dec-2015 IFR 11-Jan-2016 T-T-P-00225 IFR 25-Jan-2016 No Comment TPIT H
CSA 2539-00-CN-1441-01 Hydraulic Calculation Note for Utility Plant Unit 30 B 26-Jan-2016 IDD 05-Feb-2016 T-T-P-00283 IDD Transmitted TPIT C
CSA 2539-00-DW-1402-01-01 General Notes - Abbreviations & Symbols for Grading A 23-Nov-2015 IFR 27-Nov-2015 T-T-P-00112 IFR 10-Dec-2015 10-Dec-2015 C-NH3-0053/T-P-T-0030; C-NH3-0067/T-P-T-0036 Approved with comments TPIT H
CSA 2539-00-DW-1402-01-01 General Notes; Abbreviations & Symbols for Grading & 0 09-Dec-2015 IFC 11-Dec-2015 T-T-P-00181 IFC Transmitted TPIT C
CSA 2539-00-DW-1424-01-01 Overall Fence; Gate Plan & Profile A 16-Mar-2016 IFR 17-Mar-2016 T-T-P-00444 IFR 30-Mar-2016 No Comment TPIT H
CSA 2539-00-DW-1424-01-01 Overall Fence; Gate Plan & Profile 0 23-Mar-2016 IFC 23-Mar-2016 T-T-P-00464 IFC No Comment TPIT H
CSA 2539-00-DW-1424-01-01 Overall Fence; Gate Plan & Profile 1 25-Nov-2016 IFC 28-Nov-2016 T-T-P-00999 IFA 11-Dec-2016 13-Dec-2016 C-NH3-0464/T-P-T-0774; C-NH3-0501/T-P-T-0865 Commented TPVN C
CSA 2539-00-DW-1424-01-02 Internal Fence Detail A 16-Mar-2016 IFR 17-Mar-2016 T-T-P-00444 IFR 30-Mar-2016 No Comment TPIT H
CSA 2539-00-DW-1424-01-02 Internal Fence Detail 0 23-Mar-2016 IFC 23-Mar-2016 T-T-P-00464 IFC Transmitted TPIT C
CSA 2539-00-DW-1425-01-01 Utility Production Paving; Road & Surface Finishing 0 20-Jan-2017 IFC 20-Jan-2017 T-T-P-01175 IFA 03-Feb-2017 Transmitted TPVN C
CSA 2539-00-DW-1451-01-01 Key Plan Installation DWG. Ammonia Plant Utility Produ A 19-Feb-2016 IFR 25-Feb-2016 T-T-P-00345 IFR 09-Mar-2016 No Comment TPIT H
CSA 2539-00-DW-1451-01-01 Key Plan Installation DWG. Ammonia Plant Utility Produ B 23-Mar-2016 IDD 23-Mar-2016 T-T-P-00465 IDD No Comment TPIT H
CSA 2539-00-DW-1451-01-01 Key Plan Installation DWG. Ammonia Plant Utility Produ 0 22-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0742 Approved TPVN C
CSA 2539-00-DW-1702-01-01 Reinforced Concrete Works General Notes A 04-Dec-2015 IFR 09-Dec-2015 T-T-P-00162 IFR 22-Dec-2015 04-Jan-2016 T-P-T-0055 Approved TPIT H
CSA 2539-00-DW-1702-01-01 Reinforced Concrete Works General Notes 0 21-Dec-2015 IFC 23-Dec-2015 T-T-P-00208 IFC Transmitted TPIT C
CSA 2539-00-DW-1802-01-01 Steel Structures General Notes A 10-Nov-2015 IFR 27-Nov-2015 T-T-P-00111 IFR 10-Dec-2015 10-Dec-2015 C-NH3-0054/T-P-T-0030; C-NH3-0067/T-P-T-0036 Approved with comments TPIT H
CSA 2539-00-DW-1802-01-01 Steel Structures General Notes 0 09-Dec-2015 IFC 11-Dec-2015 T-T-P-00180 IFC Transmitted TPIT C
CSA 2539-00-DW-1802-01-02 Steel Structures General Notes A 10-Nov-2015 IFR 27-Nov-2015 T-T-P-00111 IFR 10-Dec-2015 10-Dec-2015 C-NH3-0053/T-P-T-0030; C-NH3-0067/T-P-T-0036 Approved with comments TPIT H
CSA 2539-00-DW-1802-01-02 Steel Structures General Notes 0 09-Dec-2015 IFC 11-Dec-2015 T-T-P-00180 IFC Transmitted TPIT C
CSA 2539-00-JSD-1400-01 Design Specification for Underground System A 05-Nov-2015 IFR 05-Nov-2015 T-T-P-00062 IFR 18-Nov-2015 No Comment TPIT H
CSA 2539-00-JSD-1400-01 Design Specification for Underground Systems 0 09-Dec-2015 IFE 11-Dec-2015 T-T-P-00177 IFE 27-Apr-2016 C-NH3-0142/T-P-T-153 Commented TPIT H
CSA 2539-00-JSD-1400-01 Design Specification for Underground Systems 1 05-Jul-2016 IFE 06-Jul-2016 T-T-P-00687 IFE 01-Sep-2016 C-NH3-0273/T-P-T-0356; C-NH3-0319/T-P-T-0439 Commented TPVN C
CSA 2539-00-JSD-1400-03 Specification for Site Preparation & General Earthworks A 18-Jan-2016 IFR 19-Jan-2016 T-T-P-00244 IFR 01-Feb-2016 No Comment TPIT H
CSA 2539-00-JSD-1400-03 Specification for Site Preparation & General Earthworks 0 16-Feb-2016 IFE 17-Feb-2016 T-T-P-00318 IFE 27-Apr-2016 C-NH3-0146/T-P-T-0158 Commented TPIT H
CSA 2539-00-JSD-1400-03 Specification for Site Preparation & General Earthworks 1 05-Jul-2016 IFE 06-Jul-2016 T-T-P-00687 IFE 01-Sep-2016 C-NH3-0273/T-P-T-0356; C-NH3-0319/T-P-T-0439; C-N Approved with comments TPVN C
CSA 2539-00-JSD-1410-01 Engineering Specification for Soil Investigation A 10-Aug-2015 IFR 30-Oct-2015 T-T-P-00054 IFR 12-Nov-2015 No Comment TPIT H
CSA 2539-00-JSD-1410-01 Engineering Specification for Soil Investigation 0 03-Dec-2015 IFE 04-Dec-2015 T-T-P-00153 IFE Transmitted TPIT C
CSA 2539-00-JSD-1410-02 Soil Analysis Report & Geotechnical Recommendation A 02-Dec-2015 IFR 04-Dec-2015 T-T-P-00151 IFR 17-Dec-2015 04-Jan-2016 T-P-T-0055 Approved TPIT H
CSA 2539-00-JSD-1410-02 Soil Analysis Report & Geotechnical Recommendation 0 22-Dec-2015 IFE 23-Dec-2015 T-T-P-00213 IFE Transmitted TPIT C
CSA 2539-00-JSD-1430-01 Engineering Specification for Spun Prestressed Precast A 14-Dec-2015 IFR 15-Dec-2015 T-T-P-00187 IFR 28-Dec-2015 No Comment TPIT H
CSA 2539-00-JSD-1430-01 Engineering Specification for Spun Prestressed Precast 0 15-Jan-2016 IFE 18-Jan-2016 T-T-P-00242 IFE 27-Apr-2016 C-NH3-0145/T-P-T-0157 Commented TPIT H
CSA 2539-00-JSD-1430-01 Engineering Specification for Spun Prestressed Precast 1 05-Jul-2016 IFE 06-Jul-2016 T-T-P-00687 IFE 01-Sep-2016 C-NH3-0273/T-P-T-0356; C-NH3-0319/T-P-T-0439 Commented TPVN C
CSA 2539-00-JSD-1700-01 Design Specification for Civil Works and Structures A 20-Oct-2015 IFR 20-Oct-2015 T-T-P-00017 IFR 02-Nov-2015 02-Nov-2015 C-NH3-00012/T-P-T-0005; C-NH3-0050/T-P-T-0025 Approved with comments TPIT H
CSA 2539-00-JSD-1700-01 Design Specification for Civil Works and Structures 0 01-Dec-2015 IFE 09-Dec-2015 T-T-P-00161 IFE 22-Dec-2015 04-Jan-2016 T-P-T-0055; C-NH3-0143/T-P-T-0155 Commented TPIT H
CSA 2539-00-JSD-1700-01 Design Specification for Civil Works and Structures 1 05-Jul-2016 IFE 06-Jul-2016 T-T-P-00687 IFE 01-Sep-2016 C-NH3-0273/T-P-T-0356; C-NH3-0319/T-P-T-0439 Commented TPVN C
CSA 2539-00-JSS-1800-01 General Supply Specification for Steel Structures A 04-Nov-2015 IFR 05-Nov-2015 T-T-P-00059 IFR 17-Nov-2015 No Comment TPIT H
CSA 2539-00-JSS-1800-01 General Supply Specification for Steel Structures 0 06-Dec-2015 IFE 09-Dec-2015 T-T-P-00163 IFE 22-Dec-2015 04-Jan-2016 T-P-T-0055 Approved TPIT C
CSA 2539-00-MR-1800-01 Material Requisition for Steel Structure; Anchor Bolts A 09-Sep-2016 IFI 12-Sep-2016 T-T-P-00808 IFR 26-Sep-2016 27-Sep-2016 T-P-T-0410 MR 1800-01. Approved TPVN H
CSA 2539-00-MR-1800-01 Material Requisition for Steel Structure; Anchor Bolts 0 24-Jan-2017 IFP 24-Jan-2017 T-T-P-01182 IFA 08-Feb-2017 12-Feb-2017 T-P-T-1241 Approved TPVN C
CSA 2539-00-RT-140 Settlement Evaluation of New Expansion Area in Unit 30 A 02-Nov-2015 IFR 04-Nov-2015 T-T-P-00060 IFR 17-Nov-2015 17-Nov-2015 C-NH3-0035/T-P-T-0014; C-NH3-0050/T-P-T-0025 Approved with comments TPIT H
CSA 2539-00-RT-140 Settlement Evaluation of New Expansion Area in Unit 30 0 01-Dec-2015 FIN 04-Dec-2015 T-T-P-00152 FIN 17-Dec-2015 04-Jan-2016 T-P-T-0055 Approved TPIT C
CSA 2539-00-RT-6100 Vibration Monitoring & Analysis of Steel Structure B & 1 0 31-Aug-2016 IFE 31-Aug-2016 T-T-P-00783 IFE Transmitted TPIT C
CSA 2539-00-SR-1800-01 Scope of Supply for Steel Structure; Anchor Bolts A 09-Sep-2016 IFI 12-Sep-2016 T-T-P-00808 IFR 26-Sep-2016 27-Sep-2016 T-P-T-0410 MR 1800-01. Approved TPVN H
CSA 2539-00-SR-1800-01 Scope of Supply for Steel Structure; Anchor Bolts 0 24-Jan-2017 IFP 24-Jan-2017 T-T-P-01182 IFA 08-Feb-2017 12-Feb-2017 T-P-T-1241 Approved TPVN C
CSA 2539-00-STC-1490-00 Underground Systems Site Finishing & Miscellaneous S A 23-Nov-2015 IFR 27-Nov-2015 T-T-P-00110 IFR 10-Dec-2015 10-Dec-2015 C-NH3-0053/T-P-T-0030; C-NH3-0067/T-P-T-0036 Approved with comments TPIT H
CSA 2539-00-STC-1490-00 Underground Systems; Site Finishing & Miscellaneous 0 09-Dec-2015 IFC 15-Dec-2015 T-T-P-00185 IFC 27-Apr-2016 C-NH3-0144/T-P-T-0156 Commented TPIT C
CSA 2539-00-STC-1790-00 Reinforced Concrete Work Standard Drawings A 03-Dec-2015 IFR 04-Dec-2015 T-T-P-00150 IFR 17-Dec-2015 04-Jan-2016 T-P-T-0055 Approved TPIT H
CSA 2539-00-STC-1790-00 Reinforced Concrete Work Standard Drawings 0 21-Dec-2015 IFC 23-Dec-2015 T-T-P-00215 IFC Transmitted TPIT C
CSA 2539-00-STC-1890-00 Steel Structures Standard Drawings A 10-Nov-2015 IFR 27-Nov-2015 T-T-P-00113 IFR 10-Dec-2015 10-Dec-2015 C-NH3-0056/T-P-T-0030; C-NH3-0067/T-P-T-0036 Approved with comments TPIT H
CSA 2539-00-STC-1890-00 Steel Structures Standard Drawings 0 09-Dec-2015 IFC 15-Dec-2015 T-T-P-00184 IFC Transmitted TPIT C
CSA 2539-10-CN-1731-01 Calculation Note for Concrete Structure of Piperack 01 A 19-Dec-2016 IFR 21-Dec-2016 T-T-P-01064 IFR 03-Jan-2017 05-Jan-2017 T-P-T-0925 Approved TPVN H
CSA 2539-10-CN-1731-01 Calculation Note for Concrete Structure of Piperack 01 0 07-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 24-Feb-2017 T-P-T-1349 Approved TPVN C
CSA 2539-10-CN-1732-01 Unit 10 Calculation Note for Structure C Foundation & R A 22-Dec-2016 IFR 23-Dec-2016 T-T-P-01075 IFR 05-Jan-2017 05-Jan-2017 T-P-T-0927 Approved TPVN H
CSA 2539-10-CN-1732-01 Unit 10 Calculation Note for Structure C Foundation & R 0 07-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 24-Feb-2017 T-P-T-1349 Approved TPVN C
CSA 2539-10-CN-1732-02 Unit 10 Calculation Note for Concrete Structure of Struct A 09-Jan-2017 IFR 10-Jan-2017 T-T-P-01134 IFR 23-Jan-2017 23-Jan-2017 T-P-T-1061 Approved TPVN H
CSA 2539-10-CN-1732-02 Unit 10 Calculation Note for Concrete Structure of Struct 0 06-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 24-Feb-2017 T-P-T-1349 Approved TPVN C
CSA 2539-10-CN-1732-03 Unit 10 Calculation Note for Concrete Structure of Struc A 20-Jan-2017 IFR 20-Jan-2017 T-T-P-01177 IFR 03-Feb-2017 14-Mar-2017 T-P-T-1519 Approved TPVN H
CSA 2539-10-CN-1732-03 Unit 10 Calculation Note for Concrete Structure of Struc 0 08-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 Transmitted TPVN C
CSA 2539-10-CN-1733-01 Unit 10 Calculation Note for Foundation of Phosphate A 05-Jan-2017 IFR 06-Jan-2017 T-T-P-01121 IFR 19-Jan-2017 19-Jan-2017 T-P-T-1051 Approved TPVN H
CSA 2539-10-CN-1733-01 Unit 10 Calculation Note for Foundation of Phosphate 0 23-Jan-2017 IFC 25-Jan-2017 T-T-P-01184 IFA 08-Feb-2017 14-Mar-2017 T-P-T-1521 Approved TPVN C
CSA 2539-10-CN-1733-02 Unit 10 Calculation Note for Foundation of HTER Bundle A 05-Jan-2017 IFR 06-Jan-2017 T-T-P-01121 IFR 19-Jan-2017 19-Jan-2017 T-P-T-1051 Approved TPVN H
CSA 2539-10-CN-1733-02 Unit 10 Calculation Note for Foundation of HTER Bundle 0 23-Jan-2017 IFC 25-Jan-2017 T-T-P-01184 IFA 08-Feb-2017 14-Mar-2017 T-P-T-1521 Approved TPVN C
CSA 2539-10-CN-1735-01 Calculation Note for Concrete Structure of Miscellaneo A 19-Dec-2016 IFR 21-Dec-2016 T-T-P-01064 IFR 03-Jan-2017 05-Jan-2017 T-P-T-0925 Approved TPVN H
CSA 2539-10-CN-1735-01 Calculation Note for Concrete Structure of Miscellaneo 0 07-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 24-Feb-2017 T-P-T-1349 Approved TPVN C
CSA 2539-10-CN-1831-01 Calculation Note for Steel Structure of Piperack 01 A 19-Dec-2016 IFR 21-Dec-2016 T-T-P-01064 IFR 03-Jan-2017 05-Jan-2017 T-P-T-0925 Approved TPVN H
CSA 2539-10-CN-1831-01 Calculation Note for Steel Structure of Piperack 01 0 07-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 24-Feb-2017 T-P-T-1349 Approved TPVN C
CSA 2539-10-CN-1832-01 Unit 10 Calculation Note for Steel Structure C A 22-Dec-2016 IFR 23-Dec-2016 T-T-P-01075 IFR 05-Jan-2017 05-Jan-2017 T-P-T-0927 Approved TPVN H
CSA 2539-10-CN-1832-01 Unit 10 Calculation Note for Steel Structure C 0 07-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 24-Feb-2017 T-P-T-1349 Approved TPVN C
CSA 2539-10-CN-1832-02 Unit 10 Calculation Note for Steel Structure of Structure A 09-Jan-2017 IFR 10-Jan-2017 T-T-P-01134 IFR 23-Jan-2017 23-Jan-2017 T-P-T-1061 Approved TPVN H
CSA 2539-10-CN-1832-02 Unit 10 Calculation Note for Steel Structure of Structure 0 06-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 24-Feb-2017 T-P-T-1349 Approved TPVN C
CSA 2539-10-CN-1832-03 Unit 10 Reanalysis Report Of Modified Structure B A 13-Jan-2017 IFR 13-Jan-2017 T-T-P-01153 IFR 27-Jan-2017 Transmitted TPVN H
CSA 2539-10-CN-1832-03 Unit 10 Reanalysis Report Of Modified Structure B 0 08-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 Transmitted TPVN C
CSA 2539-10-CN-1832-04 Unit 10 Calculation Note for Steel Structure of Structure A 20-Jan-2017 IFR 20-Jan-2017 T-T-P-01177 IFR 03-Feb-2017 14-Mar-2017 T-P-T-1519 Approved TPVN H
CSA 2539-10-CN-1832-04 Unit 10 Calculation Note for Steel Structure of Structure 0 08-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 Transmitted TPVN C
CSA 2539-10-CN-1833-01 Unit 10 Reanalysis Report of Modified Compressors Sh A 18-Jan-2017 IFR 20-Jan-2017 T-T-P-01177 IFR 03-Feb-2017 No Comment TPVN H
CSA 2539-10-CN-1833-01 Unit 10 Reanalysis Report of Modified Compressors Sh 0 08-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 Transmitted TPVN C
CSA 2539-10-CN-1835-01 Calculation Note for Steel Structure of Miscellaneous S A 19-Dec-2016 IFR 21-Dec-2016 T-T-P-01064 IFR 03-Jan-2017 05-Jan-2017 T-P-T-0925 Approved TPVN H
CSA 2539-10-CN-1835-01 Calculation Note for Steel Structure of Miscellaneous S 0 07-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 24-Feb-2017 T-P-T-1349 Approved TPVN C
CSA 2539-10-DW-1425-01-01 Unit 10 - Ammonia Plant Paving; Road & Surface Finishi A 03-Mar-2016 IFR 04-Mar-2016 T-T-P-00386 IFR 17-Mar-2016 No Comment TPIT H
CSA 2539-10-DW-1425-01-01 Unit 10 - Ammonia Plant Paving; Road & Surface Finishi 0 24-Mar-2016 IFC 24-Mar-2016 T-T-P-00466 IFC Transmitted TPIT C
CSA 2539-10-DW-1432-01-01 Unit 10 Ammonia Plant Piling Layout A 24-May-2016 IFR 25-May-2016 T-T-P-00602 IFR 07-Jun-2016 17-Jun-2016 C-NH3-0191/T-P-T-0220 Commented TPVN H
CSA 2539-10-DW-1432-01-01 Unit 10 Ammonia Plant Piling Layout 0 24-Jun-2016 IFC 24-Jun-2016 T-T-P-00668 IFC No Comment TPVN H
CSA 2539-10-DW-1432-01-01 Unit 10 Ammonia Plant Piling Layout 1 29-Jul-2016 IFC 02-Aug-2016 T-T-P-00732 IFC No Comment TPVN H
CSA 2539-10-DW-1432-01-01 Unit 10 Ammonia Plant Piling Layout 2 11-Oct-2016 IFC 11-Oct-2016 T-T-P-00867 IFC 16-Oct-2016 C-NH3-0328/T-P-T-0462; C-NH3-0349/T-P-T-0503 Approved TPVN C
CSA 2539-10-DW-1432-02-01 Unit 10 Piling Layout for Structure "E" A 12-Sep-2016 IFR 12-Sep-2016 T-T-P-00807 IFR 25-Sep-2016 27-Sep-2016 C-NH3-0309/T-P-T-0418; C-NH3-0316/T-P-T-0433 Approved with comments TPVN H
CSA 2539-10-DW-1432-02-01 Unit 10 Piling Layout for Structure "E" 0 30-Sep-2016 IFC 30-Sep-2016 T-T-P-00847 IFC Transmitted TPVN C
CSA 2539-10-DW-1442-01-01 Ammonia Plant - Major Underground Networks A 26-Jan-2016 IFR 04-Feb-2016 T-T-P-00281 IFR 17-Feb-2016 No Comment TPIT H
CSA 2539-10-DW-1442-01-01 Ammonia Plant - Major Underground Networks B 06-Apr-2016 IDD 11-Apr-2016 T-T-P-00524 IDD Transmitted TPVN C
CSA 2539-10-DW-1452-01-01 Ammonia Plant Grading; Underground & Foundation Pla A 19-Aug-2016 IFR 19-Aug-2016 T-T-P-00765 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0274/T-P-T-0357; C-NH3-0307/T-P-T-0415 Approved with comments TPVN H
CSA 2539-10-DW-1452-01-01 Ammonia Plant Grading; Underground & Foundation Pla 0 25-Nov-2016 IFC 28-Nov-2016 T-T-P-00999 IFA 11-Dec-2016 13-Dec-2016 T-P-T-0774 Approved TPVN H
CSA 2539-10-DW-1452-01-01 Ammonia Plant Grading; Underground & Foundation Pla 1 21-Mar-2017 IFC 23-Mar-2017 T-T-P-01304 IFA 05-Apr-2017 04-Apr-2017 T-P-T-1725 Approved TPVN C
CSA 2539-10-DW-1452-02-01 Ammonia Plant Grading; Underground & Foundation Pla A 19-Aug-2016 IFR 19-Aug-2016 T-T-P-00765 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0274/T-P-T-0357; C-NH3-0307/T-P-T-0415 Approved with comments TPVN H
CSA 2539-10-DW-1452-02-01 Ammonia Plant Grading; Underground & Foundation Pla 0 25-Nov-2016 IFC 28-Nov-2016 T-T-P-00999 IFA 11-Dec-2016 13-Dec-2016 T-P-T-0774 Approved TPVN H
Page 4
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
CSA 2539-10-DW-1452-02-01 Ammonia Plant Grading; Underground & Foundation Pla 1 21-Mar-2017 IFC 23-Mar-2017 T-T-P-01304 IFA 05-Apr-2017 05-Apr-2017 T-P-T-1725 Approved TPVN H
CSA 2539-10-DW-1452-02-01 Ammonia Plant Grading; Underground & Foundation Pla 2 08-May-2017 IFC 08-May-2017 T-T-P-01405 IFA 21-May-2017 16-May-2017 T-P-T-2040 Approved TPVN C
CSA 2539-10-DW-1452-03-01 Ammonia Plant Grading; Underground & Foundation Pla A 19-Aug-2016 IFR 19-Aug-2016 T-T-P-00765 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0274/T-P-T-0357; C-NH3-0307/T-P-T-0415 Approved with comments TPVN H
CSA 2539-10-DW-1452-03-01 Ammonia Plant Grading; Underground & Foundation Pla 0 25-Nov-2016 IFC 28-Nov-2016 T-T-P-00999 IFA 11-Dec-2016 13-Dec-2016 T-P-T-0774 Approved TPVN H
CSA 2539-10-DW-1452-03-01 Ammonia Plant Grading; Underground & Foundation Pla 1 08-May-2017 IFC 08-May-2017 T-T-P-01405 IFA 21-May-2017 16-May-2017 T-P-T-2040 Approved TPVN C
CSA 2539-10-DW-1452-04-01 Ammonia Plant Grading; Underground & Foundation Pla A 19-Aug-2016 IFR 19-Aug-2016 T-T-P-00765 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0274/T-P-T-0357; C-NH3-0307/T-P-T-0415 Approved with comments TPVN H
CSA 2539-10-DW-1452-04-01 Ammonia Plant Grading; Underground & Foundation Pla 0 25-Nov-2016 IFC 28-Nov-2016 T-T-P-00999 IFA 11-Dec-2016 13-Dec-2016 T-P-T-0774 Approved TPVN C
CSA 2539-10-DW-1452-06-01 Ammonia Plant Grading; Underground & Foundation Pla A 19-Aug-2016 IFR 19-Aug-2016 T-T-P-00765 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0274/T-P-T-0357; C-NH3-0307/T-P-T-0415 Approved with comments TPVN H
CSA 2539-10-DW-1452-06-01 Ammonia Plant Grading; Underground & Foundation Pla 0 25-Nov-2016 IFC 28-Nov-2016 T-T-P-00999 IFA 11-Dec-2016 13-Dec-2016 T-P-T-0774 Approved TPVN H
CSA 2539-10-DW-1452-06-01 Ammonia Plant Grading; Underground & Foundation Pla 1 12-Jan-2017 IFC 13-Jan-2017 T-T-P-01146 IFA 26-Jan-2017 Transmitted TPVN C
CSA 2539-10-DW-1452-07-01 Ammonia Plant Grading; Underground & Foundation Pla A 19-Aug-2016 IFR 19-Aug-2016 T-T-P-00765 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0274/T-P-T-0357; C-NH3-0307/T-P-T-0415 Approved with comments TPVN H
CSA 2539-10-DW-1452-07-01 Ammonia Plant Grading; Underground & Foundation Pla 0 25-Nov-2016 IFC 28-Nov-2016 T-T-P-00999 IFA 11-Dec-2016 13-Dec-2016 T-P-T-0774 Approved TPVN C
CSA 2539-10-DW-1452-08-01 Ammonia Plant Grading; Underground & Foundation Pla A 22-Nov-2016 IFR 22-Nov-2016 T-T-P-00983 IFR 05-Dec-2016 03-Dec-2016 C-NH3-0440/T-P-T-0721; C-NH3-0462/T-P-T-0772 Commented TPVN H
CSA 2539-10-DW-1452-08-01 Ammonia Plant Grading; Underground & Foundation Pla 0 12-Jan-2017 IFC 13-Jan-2017 T-T-P-01146 IFA 26-Jan-2017 Transmitted TPVN C
CSA 2539-10-DW-1452-09-01 Ammonia Plant Grading; Underground & Foundation Pla A 22-Nov-2016 IFR 22-Nov-2016 T-T-P-00983 IFR 05-Dec-2016 03-Dec-2016 C-NH3-0440/T-P-T-0721; C-NH3-0462/T-P-T-0772 Commented TPVN H
CSA 2539-10-DW-1452-09-01 Ammonia Plant Grading; Underground & Foundation Pla 0 12-Jan-2017 IFC 13-Jan-2017 T-T-P-01146 IFA 26-Jan-2017 Transmitted TPVN C
CSA 2539-10-DW-1490-01-01 Ammonia Plant Demolition Plan A 23-Dec-2015 IFR 08-Jan-2016 T-T-P-00223 IFR 21-Jan-2016 No Comment TPIT H
CSA 2539-10-DW-1490-01-01 Ammonia Plant Demolition Plan 0 18-Mar-2016 IFC 22-Mar-2016 T-T-P-00461 IFC 17-Jun-2016 C-NH3-0186/T-P-T-0215 Commented TPIT H
CSA 2539-10-DW-1490-01-01 Ammonia Plant Demolition Plan - Key Plan 1 05-Sep-2016 IFC 05-Sep-2016 T-T-P-00790 IFC 27-Sep-2016 T-P-T-0413 Approved TPVN C
CSA 2539-10-DW-1490-01-02 Ammonia Plant Demolition Details Plan 1 05-Sep-2016 IFC 05-Sep-2016 T-T-P-00790 IFC 27-Sep-2016 T-P-T-0413 Approved TPVN C
CSA 2539-10-DW-1741-01-01 Piperack 01 Foundation Formwork & Reinforcement Arr A 11-Aug-2016 IFR 15-Aug-2016 T-T-P-00751 IFR 28-Aug-2016 22-Aug-2016 C-NH3-0265/T-P-T-0341; C-NH3-0310/T-P-T-0420 Approved TPVN H
CSA 2539-10-DW-1741-01-01 Piperack 01 Foundation Formwork & Reinforcement Arr 0 31-Oct-2016 IFC 01-Nov-2016 T-T-P-00920 IFC 14-Nov-2016 T-P-T-0595 Approved TPVN H
CSA 2539-10-DW-1741-01-01 Piperack 01 Foundation Formwork & Reinforcement Arr 1 12-Jan-2017 IFC 13-Jan-2017 T-T-P-01146 IFA 26-Jan-2017 Transmitted TPVN C
CSA 2539-10-DW-1742-01-01 Structure C Foundation Plan & Details A 23-Sep-2016 IFR 23-Sep-2016 T-T-P-00833 IFR 06-Oct-2016 06-Oct-2016 C-NH3-0317/T-P-T-0436; C-NH3-0339/T-P-T-0480 Approved with comments TPVN H
CSA 2539-10-DW-1742-01-01 Structure C Foundation Plan & Details 0 20-Oct-2016 IFC 21-Oct-2016 T-T-P-00891 IFC 07-Nov-2016 T-P-T-0531 Approved TPVN C
CSA 2539-10-DW-1742-02-01 Structure C Foundation Reinforcement Arrangement & De A 23-Sep-2016 IFR 23-Sep-2016 T-T-P-00833 IFR 06-Oct-2016 06-Oct-2016 C-NH3-0317/T-P-T-0436; C-NH3-0339/T-P-T-0480 Approved with comments TPVN H
CSA 2539-10-DW-1742-02-01 Structure C Foundation Reinforcement Arrangement & De 0 20-Oct-2016 IFC 21-Oct-2016 T-T-P-00891 IFC 07-Nov-2016 T-P-T-0531 Approved TPVN C
CSA 2539-10-DW-1742-11-01 Structure D Formwork for Concrete Structure (Sht. 1) A 07-Oct-2016 IFR 07-Oct-2016 T-T-P-00863 IFR 21-Oct-2016 16-Oct-2016 C-NH3-0331/T-P-T-0465; C-NH3-0350/T-P-T-0504 Approved TPVN H
CSA 2539-10-DW-1742-11-01 Structure D Formwork for Concrete Structure (Sht. 1) 0 26-Oct-2016 IFC 28-Oct-2016 T-T-P-00914 IFC 14-Nov-2016 T-P-T-0594 Approved TPVN C
CSA 2539-10-DW-1742-12-01 Structure D Formwork for Concrete Structure (Sht. 2) A 07-Oct-2016 IFR 07-Oct-2016 T-T-P-00863 IFR 21-Oct-2016 16-Oct-2016 C-NH3-0331/T-P-T-0465; C-NH3-0350/T-P-T-0504 Approved TPVN H
CSA 2539-10-DW-1742-12-01 Structure D Formwork for Concrete Structure (Sht. 2) 0 26-Oct-2016 IFC 28-Oct-2016 T-T-P-00914 IFC 14-Nov-2016 T-P-T-0594 Approved TPVN H
CSA 2539-10-DW-1742-12-01 Structure D Formwork for Concrete Structure (Sht. 2) 1 21-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 C-NH3-0446/T-P-T-0742; C-NH3-0491/T-P-T-0844 Commented TPVN C
CSA 2539-10-DW-1742-13-01 Structure D Embebed Plates on Concrete Structure A 07-Oct-2016 IFR 07-Oct-2016 T-T-P-00863 IFR 21-Oct-2016 16-Oct-2016 C-NH3-0331/T-P-T-0465; C-NH3-0350/T-P-T-0504 Approved TPVN H
CSA 2539-10-DW-1742-13-01 Structure D Embebed Plates on Concrete Structure 0 26-Oct-2016 IFC 28-Oct-2016 T-T-P-00914 IFC 14-Nov-2016 T-P-T-0594 Approved TPVN H
CSA 2539-10-DW-1742-13-01 Structure D Embebed Plates on Concrete Structure 1 21-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0742 Approved TPVN C
CSA 2539-10-DW-1742-14-01 Structure D Reinforcement for Concrete Structure (Sht. 1 A 07-Oct-2016 IFR 07-Oct-2016 T-T-P-00863 IFR 21-Oct-2016 16-Oct-2016 C-NH3-0331/T-P-T-0465; C-NH3-0350/T-P-T-0504 Approved TPVN H
CSA 2539-10-DW-1742-14-01 Structure D Reinforcement for Concrete Structure (Sht. 1 0 26-Oct-2016 IFC 28-Oct-2016 T-T-P-00914 IFC 14-Nov-2016 T-P-T-0594 Approved TPVN C
CSA 2539-10-DW-1742-15-01 Structure D Reinforcement for Concrete Structure (Sht. 2 A 07-Oct-2016 IFR 07-Oct-2016 T-T-P-00863 IFR 21-Oct-2016 16-Oct-2016 C-NH3-0331/T-P-T-0465; C-NH3-0350/T-P-T-0504 Approved TPVN H
CSA 2539-10-DW-1742-15-01 Structure D Reinforcement for Concrete Structure (Sht. 2 0 26-Oct-2016 IFC 28-Oct-2016 T-T-P-00914 IFC 14-Nov-2016 T-P-T-0594 Approved TPVN C
CSA 2539-10-DW-1742-21-01 Structure "E" Foundation Formwork & Reinforcement Ar A 30-Sep-2016 IFR 30-Sep-2016 T-T-P-00846 IFR 13-Oct-2016 16-Oct-2016 C-NH3-0327/T-P-T-0461; C-NH3-0363/T-P-T-0538 Commented TPVN H
CSA 2539-10-DW-1742-21-01 Structure "E" Foundation Formwork & Reinforcement Ar 0 08-Nov-2016 IFC 09-Nov-2016 T-T-P-00941 IFC 24-Nov-2016 C-NH3-0420/T-P-T-0672; C-NH3-0451/T-P-T-0753 Commented TPVN C
CSA 2539-10-DW-1743-01-01 10-PK-8001-P4A/B Foundation Details A 04-Nov-2016 IFR 07-Nov-2016 T-T-P-00936 IFR 20-Nov-2016 24-Nov-2016 C-NH3-0419/T-P-T-0671; C-NH3-0508/T-P-T-0886 Commented TPVN H
CSA 2539-10-DW-1743-01-01 10-PK-8001-P4A/B Foundation Details 0 21-Nov-2016 IFC 28-Nov-2016 T-T-P-00999 IFA 11-Dec-2016 No Comment TPVN H
CSA 2539-10-DW-1743-01-01 10-PK-8001-P4A/B Foundation Details 1 04-Jan-2017 IFC 06-Jan-2017 T-T-P-01119 IFA 19-Jan-2017 19-Jan-2017 T-P-T-1050 Approved TPVN C
CSA 2539-10-DW-1743-02-01 Bundle HTER Foundation Detail A 26-Oct-2016 IFR 28-Oct-2016 T-T-P-00913 IFR 11-Nov-2016 03-Dec-2016 C-NH3-0438/T-P-T-0714 Commented TPVN H
CSA 2539-10-DW-1743-02-01 Bundle HTER Foundation Detail 0 18-Nov-2016 IFC 28-Nov-2016 T-T-P-00999 IFA 11-Dec-2016 13-Dec-2016 C-NH3-0464/T-P-T-0774; C-NH3-0501/T-P-T-0865 Commented TPVN C
CSA 2539-10-DW-1743-03-01 Reinforcement for Foundation 10-J-2001 A 16-Jan-2017 IFR 20-Jan-2017 T-T-P-01176 IFR 03-Feb-2017 No Comment TPVN H
CSA 2539-10-DW-1743-03-01 Reinforcement for Foundation 10-J-2001 0 13-Feb-2017 IFC 15-Feb-2017 T-T-P-01223 IFA 28-Feb-2017 01-Mar-2017 T-P-T-1373 Approved TPVN C
CSA 2539-10-DW-1745-01-01 Miscellaneous Support MS-01 Foundation Details A 04-Nov-2016 IFR 07-Nov-2016 T-T-P-00936 IFR 20-Nov-2016 24-Nov-2016 C-NH3-0419/T-P-T-0671; C-NH3-0508/T-P-T-0886 Commented TPVN H
CSA 2539-10-DW-1745-01-01 Miscellaneous Support MS-01 Foundation Details 0 29-Nov-2016 IFC 30-Nov-2016 T-T-P-01006 IFA 13-Dec-2016 13-Dec-2016 C-NH3-0466/T-P-T-0776; C-NH3-0503/T-P-T-0867 Commented TPVN H
CSA 2539-10-DW-1745-01-01 Miscellaneous Support MS-01 Foundation Details 1 27-Dec-2016 IFC 28-Dec-2016 T-T-P-01093 IFA 10-Jan-2017 No Comment TPVN H
CSA 2539-10-DW-1745-01-01 Miscellaneous Support MS-01 Foundation Details 2 07-Feb-2017 IFC 08-Feb-2017 T-T-P-01205 IFA 21-Feb-2017 24-Feb-2017 T-P-T-1345 Approved TPVN C
CSA 2539-10-DW-1745-02-01 Miscellaneous Support Foundation MS-02; MS-03; MS-0 A 17-Jan-2017 IFR 20-Jan-2017 T-T-P-01176 IFR 03-Feb-2017 No Comment TPVN H
CSA 2539-10-DW-1745-02-01 Miscellaneous Support Foundation MS-02; MS-03; MS-0 0 02-Mar-2017 IFC 03-Mar-2017 T-T-P-01263 IFA 16-Mar-2017 14-Mar-2017 C-NH3-0673/T-P-T-1547; C-NH3-0720/T-P-T-1731 Commented TPVN C
CSA 2539-10-DW-1841-01-01 Piperack 01 Framing Plans A 11-Aug-2016 IFR 15-Aug-2016 T-T-P-00751 IFR 28-Aug-2016 22-Aug-2016 C-NH3-0265/T-P-T-0341; C-NH3-0310/T-P-T-0420 Approved TPVN H
CSA 2539-10-DW-1841-01-01 Piperack 01 Framing Plans 0 31-Oct-2016 IFC 01-Nov-2016 T-T-P-00920 IFC 07-Nov-2016 C-NH3-0365/T-P-T-0543 Commented TPVN C
CSA 2539-10-DW-1841-02-01 Piperack 01 Elevations & Sections A 11-Aug-2016 IFR 15-Aug-2016 T-T-P-00751 IFR 28-Aug-2016 22-Aug-2016 C-NH3-0265/T-P-T-0341; C-NH3-0310/T-P-T-0420 Approved TPVN H
CSA 2539-10-DW-1841-02-01 Piperack 01 Elevations & Sections 0 31-Oct-2016 IFC 01-Nov-2016 T-T-P-00920 IFC 14-Nov-2016 T-P-T-0595 Approved TPVN C
CSA 2539-10-DW-1841-03-01 Piperack 01 Detail Connections - Sht.1 A 11-Aug-2016 IFR 15-Aug-2016 T-T-P-00751 IFR 28-Aug-2016 22-Aug-2016 C-NH3-0265/T-P-T-0341; C-NH3-0310/T-P-T-0420 Approved TPVN H
CSA 2539-10-DW-1841-03-01 Piperack 01 Detail Connections - Sht.1 0 31-Oct-2016 IFC 01-Nov-2016 T-T-P-00920 IFC 14-Nov-2016 T-P-T-0595 Approved TPVN C
CSA 2539-10-DW-1841-04-01 Piperack 01 Detail Connections - Sht.2 A 11-Aug-2016 IFR 15-Aug-2016 T-T-P-00751 IFR 28-Aug-2016 22-Aug-2016 C-NH3-0265/T-P-T-0341; C-NH3-0310/T-P-T-0420 Approved TPVN H
CSA 2539-10-DW-1841-04-01 Piperack 01 Detail Connections - Sht.2 0 31-Oct-2016 IFC 01-Nov-2016 T-T-P-00920 IFC 14-Nov-2016 T-P-T-0595 Approved TPVN C
CSA 2539-10-DW-1842-01-01 Structure "E" Framing Plans A 11-Nov-2016 IFR 14-Nov-2016 T-T-P-00959 IFR 27-Nov-2016 24-Nov-2016 C-NH3-0422/T-P-T-0674; C-NH3-0452/T-P-T-0754 Commented TPVN H
CSA 2539-10-DW-1842-01-01 Structure "E" Framing Plans 0 07-Dec-2016 IFC 09-Dec-2016 T-T-P-01028 IFA 22-Dec-2016 21-Dec-2016 C-NH3-0494/T-P-T-0850; C-NH3-0525/T-P-T-0929 Commented TPVN C
CSA 2539-10-DW-1842-02-01 Structure "E" Framing Elevations A 11-Nov-2016 IFR 14-Nov-2016 T-T-P-00959 IFR 27-Nov-2016 24-Nov-2016 C-NH3-0422/T-P-T-0674; C-NH3-0452/T-P-T-0754 Commented TPVN H
CSA 2539-10-DW-1842-02-01 Structure "E" Framing Elevations 0 07-Dec-2016 IFC 09-Dec-2016 T-T-P-01028 IFA 22-Dec-2016 21-Dec-2016 C-NH3-0494/T-P-T-0850; C-NH3-0525/T-P-T-0929 Commented TPVN H
CSA 2539-10-DW-1842-02-01 Structure "E" Framing Elevations 1 16-May-2017 IFC 16-May-2017 T-T-P-01415 IFA 29-May-2017 01-Jun-2017 T-P-T-2138 Approved TPVN C
CSA 2539-10-DW-1842-03-01 Structure "E" Connection Details A 11-Nov-2016 IFR 14-Nov-2016 T-T-P-00959 IFR 27-Nov-2016 No Comment TPVN H
CSA 2539-10-DW-1842-03-01 Structure "E" Connection Details 0 07-Dec-2016 IFC 09-Dec-2016 T-T-P-01028 IFA 22-Dec-2016 Transmitted TPVN C
CSA 2539-10-DW-1842-04-01 Structure "E" Equipment Support Details A 11-Nov-2016 IFR 14-Nov-2016 T-T-P-00959 IFR 27-Nov-2016 No Comment TPVN H
CSA 2539-10-DW-1842-04-01 Structure "E" Equipment Support Details 0 07-Dec-2016 IFC 09-Dec-2016 T-T-P-01028 IFA 22-Dec-2016 Transmitted TPVN C
CSA 2539-10-DW-1842-11-01 Structure C (10-HE-2001) Framing Plans A 19-Oct-2016 IFR 20-Oct-2016 T-T-P-00885 IFR 02-Nov-2016 07-Nov-2016 T-P-T-0533 Approved TPVN H
CSA 2539-10-DW-1842-11-01 Structure C (10-HE-2001) Framing Plans 0 22-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0742 Approved TPVN H
CSA 2539-10-DW-1842-11-01 Structure C (10-HE-2001) Framing Plans 1 12-Jan-2017 IFC 13-Jan-2017 T-T-P-01146 IFA 26-Jan-2017 No Comment TPVN H
CSA 2539-10-DW-1842-11-01 Structure C (10-HE-2001) Framing Plans 2 29-Mar-2017 IFC 29-Mar-2017 T-T-P-01312 IFA 11-Apr-2017 19-Apr-2017 T-P-T-1849 Approved TPVN C
CSA 2539-10-DW-1842-12-01 Structure C (10-HE-2001) Framing Elevations A 19-Oct-2016 IFR 20-Oct-2016 T-T-P-00885 IFR 02-Nov-2016 07-Nov-2016 T-P-T-0533 Approved TPVN H
CSA 2539-10-DW-1842-12-01 Structure C (10-HE-2001) Framing Elevations 0 22-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 C-NH3-0446/T-P-T-0742; C-NH3-0491/T-P-T-0844 Commented TPVN H
CSA 2539-10-DW-1842-12-01 Structure C (10-HE-2001) Framing Elevations 1 12-Jan-2017 IFC 13-Jan-2017 T-T-P-01146 IFA 26-Jan-2017 Transmitted TPVN C
CSA 2539-10-DW-1842-13-01 Structure C (10-HE-2001) Stairs Plans & Elevations A 19-Oct-2016 IFR 20-Oct-2016 T-T-P-00885 IFR 02-Nov-2016 07-Nov-2016 T-P-T-0533 Approved TPVN H
CSA 2539-10-DW-1842-13-01 Structure C (10-HE-2001) Stairs Plans & Elevations 0 22-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 05-Dec-2016 07-Dec-2016 T-P-T-0742 Approved TPVN C
CSA 2539-10-DW-1842-14-01 Structure C (10-HE-2001) Connection Details Sht. 1 A 19-Oct-2016 IFR 20-Oct-2016 T-T-P-00885 IFR 02-Nov-2016 07-Nov-2016 T-P-T-0533 Approved TPVN H
CSA 2539-10-DW-1842-14-01 Structure C (10-HE-2001) Connection Details Sht. 1 0 22-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0742 Approved TPVN H
CSA 2539-10-DW-1842-14-01 Structure C (10-HE-2001) Connection Details Sht. 1 1 12-Jan-2017 IFC 13-Jan-2017 T-T-P-01146 IFA 26-Jan-2017 Transmitted TPVN C
CSA 2539-10-DW-1842-15-01 Structure C (10-HE-2001) Connection Details Sht. 2 A 19-Oct-2016 IFR 20-Oct-2016 T-T-P-00885 IFR 02-Nov-2016 07-Nov-2016 T-P-T-0533 Approved TPVN H
CSA 2539-10-DW-1842-15-01 Structure C (10-HE-2001) Connection Details Sht. 2 0 22-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0742 Approved TPVN H
CSA 2539-10-DW-1842-15-01 Structure C (10-HE-2001) Connection Details Sht. 2 1 12-Jan-2017 IFC 13-Jan-2017 T-T-P-01146 IFA 26-Jan-2017 Transmitted TPVN C
CSA 2539-10-DW-1842-16-01 Structure C (10-HE-2001) Connection Details Sht. 3 A 19-Oct-2016 IFR 20-Oct-2016 T-T-P-00885 IFR 02-Nov-2016 07-Nov-2016 T-P-T-0533 Approved TPVN H
CSA 2539-10-DW-1842-16-01 Structure C (10-HE-2001) Connection Details Sht. 3 0 22-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0742 Approved TPVN C
CSA 2539-10-DW-1842-31-01 Structure D Framing Plan @ EL. +107475 A 25-Oct-2016 IFR 26-Oct-2016 T-T-P-00905 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0585 Approved TPVN H
CSA 2539-10-DW-1842-31-01 Structure D Framing Plan @ EL. +107475 0 21-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0742 Approved TPVN C
CSA 2539-10-DW-1842-32-01 Structure D Framing Plan @ EL. +110000 & EL.+112500 A 25-Oct-2016 IFR 26-Oct-2016 T-T-P-00905 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0585 Approved TPVN H
CSA 2539-10-DW-1842-32-01 Structure D Framing Plan @ EL. +110000 & EL.+112500 0 21-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0742 Approved TPVN H
CSA 2539-10-DW-1842-32-01 Structure D Framing Plan @ EL. +110000 & EL.+112500 1 19-Jan-2017 IFC 20-Jan-2017 T-T-P-01175 IFA 03-Feb-2017 No Comment TPVN H
CSA 2539-10-DW-1842-32-01 Structure D Framing Plan @ EL. +110000 & EL.+112500 2 28-Apr-2017 IFC 28-Apr-2017 T-T-P-01397 IFA 11-May-2017 09-May-2017 T-P-T-1993 Approved TPVN H
CSA 2539-10-DW-1842-32-01 Structure D Framing Plan @ EL. +110000 & EL.+112500 3 22-May-2017 IFC 23-May-2017 T-T-P-01420 IFA 05-Jun-2017 05-Jun-2017 T-P-T-2145 Approved TPVN C
CSA 2539-10-DW-1842-33-01 Structure D Framing Plan @ EL. +115000; EL.+117500 A 25-Oct-2016 IFR 26-Oct-2016 T-T-P-00905 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0585 Approved TPVN H
CSA 2539-10-DW-1842-33-01 Structure D Framing Plan @ EL. +115000; EL.+117500 0 21-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0742 Approved TPVN H
CSA 2539-10-DW-1842-33-01 Structure D Framing Plan @ EL. +115000; EL.+117500 1 28-Apr-2017 IFC 28-Apr-2017 T-T-P-01397 IFA 11-May-2017 09-May-2017 T-P-T-1993 Approved TPVN C
CSA 2539-10-DW-1842-34-01 Structure D Framing Elevations - Grid A; B A 25-Oct-2016 IFR 26-Oct-2016 T-T-P-00905 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0585 Approved TPVN H
CSA 2539-10-DW-1842-34-01 Structure D Framing Elevations - Grid A; B 0 21-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0742 Approved TPVN H
CSA 2539-10-DW-1842-34-01 Structure D Framing Elevations - Grid A; B 1 28-Apr-2017 IFC 28-Apr-2017 T-T-P-01397 IFA 11-May-2017 09-May-2017 T-P-T-1993 Approved TPVN C
CSA 2539-10-DW-1842-35-01 Structure D Framing Elevations - Grid 1; 2; 3 A 25-Oct-2016 IFR 26-Oct-2016 T-T-P-00905 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0585 Approved TPVN H
CSA 2539-10-DW-1842-35-01 Structure D Framing Elevations - Grid 1; 2; 3 0 21-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0742 Approved TPVN H
CSA 2539-10-DW-1842-35-01 Structure D Framing Elevations - Grid 1; 2; 3 1 28-Apr-2017 IFC 28-Apr-2017 T-T-P-01397 IFA 11-May-2017 09-May-2017 T-P-T-1993 Approved TPVN C
CSA 2539-10-DW-1842-36-01 Structure D Stair Plans & Details (Sht.1) A 25-Oct-2016 IFR 26-Oct-2016 T-T-P-00905 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0585 Approved TPVN H
CSA 2539-10-DW-1842-36-01 Structure D Stair Plans & Details (Sht.1) 0 21-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0742 Approved TPVN C
CSA 2539-10-DW-1842-37-01 Structure D Stair Plans & Details (Sht.2) A 25-Oct-2016 IFR 26-Oct-2016 T-T-P-00905 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0585 Approved TPVN H
CSA 2539-10-DW-1842-37-01 Structure D Stair Plans & Details (Sht.2) 0 21-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0742 Approved TPVN C
CSA 2539-10-DW-1842-38-01 Structure D Stair Plans & Details (Sht.3) A 25-Oct-2016 IFR 26-Oct-2016 T-T-P-00905 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0585 Approved TPVN H
CSA 2539-10-DW-1842-38-01 Structure D Stair Plans & Details (Sht.3) 0 21-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0742 Approved TPVN C
CSA 2539-10-DW-1842-39-01 Structure D Connection Details (Sht.1) A 25-Oct-2016 IFR 26-Oct-2016 T-T-P-00905 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0585 Approved TPVN H
CSA 2539-10-DW-1842-39-01 Structure D Connection Details (Sht.1) 0 21-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0742 Approved TPVN C
Page 5
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
CSA 2539-10-DW-1842-40-01 Structure D Connection Details (Sht.2) A 25-Oct-2016 IFR 26-Oct-2016 T-T-P-00905 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0585 Approved TPVN H
CSA 2539-10-DW-1842-40-01 Structure D Connection Details (Sht.2) 0 21-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0742 Approved TPVN C
CSA 2539-10-DW-1842-41-01 Structure D Connection Details (Sht.3) A 25-Oct-2016 IFR 26-Oct-2016 T-T-P-00905 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0585 Approved TPVN H
CSA 2539-10-DW-1842-41-01 Structure D Connection Details (Sht.3) 0 21-Nov-2016 IFC 22-Nov-2016 T-T-P-00984 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0742 Approved TPVN C
CSA 2539-10-DW-1842-42-01 Structure D Connection Details (Sht 4) 0 21-Nov-2016 IFC 23-Nov-2016 T-T-P-00988 IFA 06-Dec-2016 07-Dec-2016 T-P-T-0743 Approved TPVN C
CSA 2539-10-DW-1842-43-01 Structure D Connection Details (Sht 5) 0 21-Nov-2016 IFC 23-Nov-2016 T-T-P-00988 IFA 06-Dec-2016 07-Dec-2016 T-P-T-0743 Approved TPVN C
CSA 2539-10-DW-1842-44-01 Structure D Connection Details (Sht 6) 0 21-Nov-2016 IFC 23-Nov-2016 T-T-P-00988 IFA 06-Dec-2016 07-Dec-2016 T-P-T-0743 Approved TPVN C
CSA 2539-10-DW-1842-50-01 Structure for Refractory Line Equipment Framing Plans; A 24-Nov-2016 IFR 24-Nov-2016 T-T-P-00993 IFR 08-Dec-2016 20-Dec-2016 C-NH3-0469/T-P-T-0779; C-NH3-0524/T-P-T-0928 Commented TPVN H
CSA 2539-10-DW-1842-50-01 Structure for Refractory Line Equipment Framing Plans; 0 16-Mar-2017 IFC 16-Mar-2017 T-T-P-01293 IFA 29-Mar-2017 30-Mar-2017 C-NH3-0704/T-P-T-1695 Commented TPVN H
CSA 2539-10-DW-1842-50-01 Structure for Refractory Line Equipment Framing Plans; 1 28-Apr-2017 IFC 28-Apr-2017 T-T-P-01397 IFA 11-May-2017 09-May-2017 T-P-T-1993 Approved TPVN C
CSA 2539-10-DW-1842-51-01 Steel Structure for 10-R-2003 Framing Plan; Sections A 24-Nov-2016 IFR 24-Nov-2016 T-T-P-00993 IFR 08-Dec-2016 20-Dec-2016 C-NH3-0469/T-P-T-0779; C-NH3-0524/T-P-T-0928 Commented TPVN H
CSA 2539-10-DW-1842-51-01 Steel Structure for 10-R-2003 Framing Plan; Sections 0 12-Jan-2017 IFC 13-Jan-2017 T-T-P-01146 IFA 26-Jan-2017 Transmitted TPVN C
CSA 2539-10-DW-1842-52-01 Steel Structure for 10-R-2003 Connection Details A 24-Nov-2016 IFR 24-Nov-2016 T-T-P-00993 IFR 08-Dec-2016 20-Dec-2016 T-P-T-0779 Approved TPVN H
CSA 2539-10-DW-1842-52-01 Steel Structure for 10-R-2003 Connection Details 0 12-Jan-2017 IFC 13-Jan-2017 T-T-P-01146 IFA 26-Jan-2017 Transmitted TPVN C
CSA 2539-10-DW-1842-61-01 Reinforcement for Structure B Framing Plan at EL.+12 A 12-Jan-2017 IFR 13-Jan-2017 T-T-P-01147 IFR 26-Jan-2017 No Comment TPVN H
CSA 2539-10-DW-1842-61-01 Reinforcement for Structure B Framing Plan at EL.+12 0 13-Feb-2017 IFC 15-Feb-2017 T-T-P-01223 IFA 28-Feb-2017 01-Mar-2017 T-P-T-1373 Approved TPVN C
CSA 2539-10-DW-1842-62-01 Reinforcement for Structure B Framing Elevations - Grid A 12-Jan-2017 IFR 13-Jan-2017 T-T-P-01147 IFR 26-Jan-2017 No Comment TPVN H
CSA 2539-10-DW-1842-62-01 Reinforcement for Structure B Framing Elevations - Grid 0 13-Feb-2017 IFC 15-Feb-2017 T-T-P-01223 IFA 28-Feb-2017 01-Mar-2017 T-P-T-1373 Approved TPVN C
CSA 2539-10-DW-1842-63-01 Reinforcement for Structure B Framing Elevations - Grid A 12-Jan-2017 IFR 13-Jan-2017 T-T-P-01147 IFR 26-Jan-2017 No Comment TPVN H
CSA 2539-10-DW-1842-63-01 Reinforcement for Structure B Framing Elevations - Grid 0 13-Feb-2017 IFC 15-Feb-2017 T-T-P-01223 IFA 28-Feb-2017 01-Mar-2017 T-P-T-1373 Approved TPVN C
CSA 2539-10-DW-1843-01-01 Modification of Compressor Shelter Framing Plan at EL A 29-Nov-2016 IFR 30-Nov-2016 T-T-P-01005 IFR 13-Dec-2016 13-Dec-2016 C-NH3-0465/T-P-T-0775; C-NH3-0502/T-P-T-0866 Commented TPVN H
CSA 2539-10-DW-1843-01-01 Modification of Compressor Shelter Framing Plan at EL 0 06-Jan-2017 IFC 09-Jan-2017 T-T-P-01133 IFA 22-Jan-2017 23-Jan-2017 C-NH3-0575/T-P-T-1115; C-NH3-0627/T-P-T-1308 Commented TPVN H
CSA 2539-10-DW-1843-01-01 Modification of Compressor Shelter Framing Plan at EL 1 16-Feb-2017 IFC 16-Feb-2017 T-T-P-01228 IFA 01-Mar-2017 03-Mar-2017 C-NH3-0651/T-P-T-1449 Commented TPVN C
CSA 2539-10-DW-1843-02-01 Modification of Compressor Shelter Framing Elevations A 29-Nov-2016 IFR 30-Nov-2016 T-T-P-01005 IFR 13-Dec-2016 13-Dec-2016 C-NH3-0465/T-P-T-0775; C-NH3-0502/T-P-T-0866 Commented TPVN H
CSA 2539-10-DW-1843-02-01 Modification of Compressor Shelter Framing Elevations 0 06-Jan-2017 IFC 09-Jan-2017 T-T-P-01133 IFA 22-Jan-2017 23-Jan-2017 C-NH3-0575/T-P-T-1115; C-NH3-0627/T-P-T-1308 Commented TPVN C
CSA 2539-10-DW-1843-03-01 Modification of Compressor Shelter Stairs A 29-Nov-2016 IFR 30-Nov-2016 T-T-P-01005 IFR 13-Dec-2016 13-Dec-2016 C-NH3-0465/T-P-T-0775; C-NH3-0502/T-P-T-0866 Commented TPVN H
CSA 2539-10-DW-1843-03-01 Modification of Compressor Shelter Stairs 0 06-Jan-2017 IFC 09-Jan-2017 T-T-P-01133 IFA 22-Jan-2017 23-Jan-2017 C-NH3-0575/T-P-T-1115; C-NH3-0627/T-P-T-1308 Commented TPVN C
CSA 2539-10-DW-1843-04-01 Modification of Compressor Shelter Connection Details 0 06-Jan-2017 IFC 09-Jan-2017 T-T-P-01133 IFA 22-Jan-2017 23-Jan-2017 C-NH3-0575/T-P-T-1115; C-NH3-0627/T-P-T-1308 Commented TPVN C
CSA 2539-10-DW-1843-05-01 Modification of Compressor Shelter Connection Details 0 06-Jan-2017 IFC 09-Jan-2017 T-T-P-01133 IFA 22-Jan-2017 23-Jan-2017 C-NH3-0575/T-P-T-1115; C-NH3-0627/T-P-T-1308 Commented TPVN C
CSA 2539-10-DW-1843-06-01 Modification of Compressor Shelter Support Details for 0 06-Feb-2017 IFC 07-Feb-2017 T-T-P-01198 IFA 20-Feb-2017 17-Feb-2017 T-P-T-1283 Approved TPVN C
CSA 2539-10-DW-1843-07-01 Modification of Compressor Shelter Support Details for 0 06-Feb-2017 IFC 07-Feb-2017 T-T-P-01198 IFA 20-Feb-2017 17-Feb-2017 T-P-T-1283 Approved TPVN C
CSA 2539-10-DW-1843-08-01 Modification of Compressor Shelter Support Details for 0 06-Feb-2017 IFC 07-Feb-2017 T-T-P-01198 IFA 20-Feb-2017 17-Feb-2017 T-P-T-1283 Approved TPVN C
CSA 2539-10-DW-1843-09-01 Modification of Compressor Shelter Support Details for 0 06-Feb-2017 IFC 07-Feb-2017 T-T-P-01198 IFA 20-Feb-2017 17-Feb-2017 T-P-T-1283 Approved TPVN C
CSA 2539-10-DW-1843-10-01 Modification of Compressor Shelter Support Details for 0 06-Feb-2017 IFC 07-Feb-2017 T-T-P-01198 IFA 20-Feb-2017 17-Feb-2017 T-P-T-1283 Approved TPVN C
CSA 2539-10-DW-1843-11-01 Modification of Compressor Shelter Support Details for 0 06-Feb-2017 IFC 07-Feb-2017 T-T-P-01198 IFA 20-Feb-2017 17-Feb-2017 T-P-T-1283 Approved TPVN C
CSA 2539-10-DW-1845-01-01 Miscellaneous Support MS-01 Framing Plan & Elevation A 04-Nov-2016 IFR 07-Nov-2016 T-T-P-00936 IFR 20-Nov-2016 No Comment TPVN H
CSA 2539-10-DW-1845-01-01 Miscellaneous Support MS-01 Framing Plan & Elevation 0 29-Nov-2016 IFC 30-Nov-2016 T-T-P-01006 IFA 13-Dec-2016 No Comment TPVN H
CSA 2539-10-DW-1845-01-01 Miscellaneous Support MS-01 Framing Plan & Elevation 1 27-Dec-2016 IFC 28-Dec-2016 T-T-P-01093 IFA 10-Jan-2017 Transmitted TPVN C
CSA 2539-10-DW-1845-02-01 Miscellaneous Support MS-01 Connection Details A 04-Nov-2016 IFR 07-Nov-2016 T-T-P-00936 IFR 20-Nov-2016 No Comment TPVN H
CSA 2539-10-DW-1845-02-01 Miscellaneous Support MS-01 Connection Details 0 29-Nov-2016 IFC 30-Nov-2016 T-T-P-01006 IFA 13-Dec-2016 No Comment TPVN H
CSA 2539-10-DW-1845-02-01 Miscellaneous Support MS-01 Connection Details 1 27-Dec-2016 IFC 28-Dec-2016 T-T-P-01093 IFA 10-Jan-2017 Transmitted TPVN C
CSA 2539-10-DW-1845-03-01 Unit 10 Miscellaneous Steel Support MS-02; MS-03 A 19-Jan-2017 IFR 20-Jan-2017 T-T-P-01176 IFR 03-Feb-2017 No Comment TPVN H
CSA 2539-10-DW-1845-03-01 Unit 10 Miscellaneous Steel Support MS-02; MS-03 0 02-Mar-2017 IFC 03-Mar-2017 T-T-P-01263 IFA 16-Mar-2017 14-Mar-2017 C-NH3-0673/T-P-T-1547; C-NH3-0720/T-P-T-1731 Commented TPVN C
CSA 2539-10-DW-1845-04-01 Unit 10 Miscellaneous Steel Support MS-04 A 19-Jan-2017 IFR 20-Jan-2017 T-T-P-01176 IFR 03-Feb-2017 No Comment TPVN H
CSA 2539-10-DW-1845-04-01 Unit 10 Miscellaneous Steel Support MS-04 0 02-Mar-2017 IFC 03-Mar-2017 T-T-P-01263 IFA 16-Mar-2017 14-Mar-2017 T-P-T-1547 Approved TPVN C
CSA 2539-10-DW-1845-05-01 Unit 10 Access Platform for Elevated Monitor A 19-Jan-2017 IFR 20-Jan-2017 T-T-P-01176 IFR 03-Feb-2017 No Comment TPVN H
CSA 2539-10-DW-1845-05-01 Unit 10 Access Platform for Elevated Monitor 0 13-Feb-2017 IFC 15-Feb-2017 T-T-P-01223 IFA 28-Feb-2017 01-Mar-2017 C-NH3-0640/T-P-T-1373 Commented TPVN C
CSA 2539-20-DW-1742-01-01 Shelter for PCA2-5 Foundation Plan; Sections & Details A 13-Mar-2017 IFR 13-Mar-2017 T-T-P-01286 IFR 26-Mar-2017 31-Mar-2017 C-NH3-0703/T-P-T-1694 Commented TPVN H
CSA 2539-20-DW-1742-01-01 Shelter for PCA2-5 Foundation Plan; Sections & Details 0 27-Mar-2017 IFC 28-Mar-2017 T-T-P-01310 IFA 10-Apr-2017 11-Apr-2017 C-NH3-0724/T-P-T-1735 Commented TPVN C
CSA 2539-20-DW-1743-01-01 Power Capacity Bank PCA2-5 Foundation & Cable Tren A 13-Mar-2017 IFR 13-Mar-2017 T-T-P-01286 IFR 26-Mar-2017 No Comment TPVN H
CSA 2539-20-DW-1743-01-01 Power Capacity Bank PCA2-5 Foundation & Cable Tren 0 27-Mar-2017 IFC 28-Mar-2017 T-T-P-01310 IFA 10-Apr-2017 11-Apr-2017 T-P-T-1735 Approved TPVN C
CSA 2539-20-DW-1843-01-01 Shelter for PCA2-5 Framing Plans; Elevations & Details A 13-Mar-2017 IFR 13-Mar-2017 T-T-P-01286 IFR 26-Mar-2017 31-Mar-2017 C-NH3-0703/T-P-T-1694 Commented TPVN H
CSA 2539-20-DW-1843-01-01 Shelter for PCA2-5 Framing Plans; Elevations & Details 0 27-Mar-2017 IFC 28-Mar-2017 T-T-P-01310 IFA 10-Apr-2017 11-Apr-2017 C-NH3-0724/T-P-T-1735 Commented TPVN H
CSA 2539-20-DW-1843-01-01 Shelter for PCA2-5 Framing Plans; Elevations & Details 1 10-Apr-2017 IFC 10-Apr-2017 T-T-P-01347 IFA 24-Apr-2017 Transmitted TPVN C
CSA 2539-20-DW-1843-02-01 Shelter for PCA2-5 Steel Door Details A 13-Mar-2017 IFR 13-Mar-2017 T-T-P-01286 IFR 26-Mar-2017 No Comment TPVN H
CSA 2539-20-DW-1843-02-01 Shelter for PCA2-5 Steel Door Details 0 27-Mar-2017 IFC 28-Mar-2017 T-T-P-01310 IFA 10-Apr-2017 11-Apr-2017 T-P-T-1735 Approved TPVN C
CSA 2539-30-CN-1731-01 Unit 30 Calculation Note for Concrete Structure of Piper A 27-Dec-2016 IFR 28-Dec-2016 T-T-P-01095 IFR 10-Jan-2017 11-Jan-2017 T-P-T-0972 Approved TPVN H
CSA 2539-30-CN-1731-01 Unit 30 Calculation Note for Concrete Structure of Piper 0 10-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 24-Feb-2017 T-P-T-1349 Approved TPVN C
CSA 2539-30-CN-1732-01 Unit 30 Calculation Note for Foundation of Shelter 30-K A 18-Jan-2017 IFR 20-Jan-2017 T-T-P-01177 IFR 03-Feb-2017 No Comment TPVN H
CSA 2539-30-CN-1732-01 Unit 30 Calculation Note for Foundation of Shelter 30-K 0 13-Feb-2017 IFC 15-Feb-2017 T-T-P-01222 IFA 28-Feb-2017 01-Mar-2017 T-P-T-1377 Approved TPVN C
CSA 2539-30-CN-1733-01 Unit 30 Calculation Note for Foundation of Filtration P A 28-Dec-2016 IFR 29-Dec-2016 T-T-P-01096 IFR 11-Jan-2017 13-Jan-2017 T-P-T-0987 Approved TPVN H
CSA 2539-30-CN-1733-01 Unit 30 Calculation Note for Foundation of Filtration P 0 23-Jan-2017 IFC 25-Jan-2017 T-T-P-01185 IFA 08-Feb-2017 Transmitted TPVN C
CSA 2539-30-CN-1733-02 Unit 30 Calculation Note for Foundation of Coagulant/ A 19-Jan-2017 IFR 20-Jan-2017 T-T-P-01177 IFR 03-Feb-2017 No Comment TPVN H
CSA 2539-30-CN-1733-02 Unit 30 Calculation Note for Foundation of Coagulant/ 0 08-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 Transmitted TPVN C
CSA 2539-30-CN-1733-03 Unit 30 Calculation Note for Foundation of Instrument A A 27-Dec-2016 IFR 27-Dec-2016 T-T-P-01091 IFR 09-Jan-2017 11-Jan-2017 T-P-T-0971 Approved TPVN H
CSA 2539-30-CN-1733-03 Unit 30 Calculation Note for Foundation of Instrument A 0 23-Jan-2017 IFC 25-Jan-2017 T-T-P-01185 IFA 08-Feb-2017 Transmitted TPVN C
CSA 2539-30-CN-1733-04 Unit 30 Calculation Note for Foundation of Instrument A 27-Dec-2016 IFR 27-Dec-2016 T-T-P-01091 IFR 09-Jan-2017 11-Jan-2017 T-P-T-0971 Approved TPVN H
CSA 2539-30-CN-1733-04 Unit 30 Calculation Note for Foundation of Instrument 0 23-Jan-2017 IFC 25-Jan-2017 T-T-P-01185 IFA 08-Feb-2017 Transmitted TPVN C
CSA 2539-30-CN-1733-05 Unit 30 Calculation Note for Foundation of Turbine Con A 28-Dec-2016 IFR 29-Dec-2016 T-T-P-01096 IFR 11-Jan-2017 13-Jan-2017 T-P-T-0987 Approved TPVN H
CSA 2539-30-CN-1733-05 Unit 30 Calculation Note for Foundation of Turbine Con 0 23-Jan-2017 IFC 25-Jan-2017 T-T-P-01185 IFA 08-Feb-2017 Transmitted TPVN C
CSA 2539-30-CN-1734-01 Unit 30 Calculation Note for Concrete Structure of Coo 0 22-Nov-2016 II 23-Nov-2016 T-T-P-00990 II 06-Dec-2016 No Comment TPVN H
CSA 2539-30-CN-1734-01 Unit 30 Calculation Note for Concrete Structure of Coo 1 14-Dec-2016 IFC 14-Dec-2016 T-T-P-01047 IFA 28-Dec-2016 28-Dec-2016 T-P-T-0900 Approved TPVN C
CSA 2539-30-CN-1734-03 Unit 30 Calculation Note For Settling Basin 30-BA-3004 A 12-Jan-2017 IFR 13-Jan-2017 T-T-P-01153 IFR 27-Jan-2017 No Comment TPVN H
CSA 2539-30-CN-1734-03 Unit 30 Calculation Note For Settling Basin 30-BA-3004 0 08-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 Transmitted TPVN C
CSA 2539-30-CN-1735-01 Unit 30 Calculation Note for Foundation of Platform 30 A 06-Jan-2017 IFR 09-Jan-2017 T-T-P-01130 IFR 22-Jan-2017 19-Jan-2017 T-P-T-1054 Approved TPVN H
CSA 2539-30-CN-1735-01 Unit 30 Calculation Note for Concrete Structure Platfor 0 24-Feb-2017 IFC 27-Feb-2017 T-T-P-01247 IFA 12-Mar-2017 08-Mar-2017 T-P-T-1486 Approved TPVN C
CSA 2539-30-CN-1831-01 Unit 30 Calculation Note for Steel Structure of Piperack A 27-Dec-2016 IFR 28-Dec-2016 T-T-P-01095 IFR 10-Jan-2017 11-Jan-2017 T-P-T-0972 Approved TPVN H
CSA 2539-30-CN-1831-01 Unit 30 Calculation Note for Steel Structure of Piperack 0 10-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 24-Feb-2017 T-P-T-1349 Approved TPVN C
CSA 2539-30-CN-1833-01 Unit 30 Calculation Note for Steel Structure of Shelter A 18-Jan-2017 IFR 20-Jan-2017 T-T-P-01177 IFR 03-Feb-2017 No Comment TPVN H
CSA 2539-30-CN-1833-01 Unit 30 Calculation Note for Steel Structure of Shelter 0 13-Feb-2017 IFE 15-Feb-2017 T-T-P-01222 IFA 28-Feb-2017 01-Mar-2017 T-P-T-1377 Approved TPVN C
CSA 2539-30-CN-1835-01 Unit 30 Calculation Note for Steel Structure of Platfor A 06-Jan-2017 IFR 09-Jan-2017 T-T-P-01130 IFR 22-Jan-2017 19-Jan-2017 T-P-T-1054 Approved TPVN H
CSA 2539-30-CN-1835-01 Unit 30 Calculation Note for Steel Structure Platform of 0 24-Feb-2017 IFC 27-Feb-2017 T-T-P-01247 IFA 12-Mar-2017 08-Mar-2017 T-P-T-1486 Approved TPVN C
CSA 2539-30-CN-1835-02 Unit 30 Calculation Note for Steel Structure of Platform A 05-Jan-2017 IFR 06-Jan-2017 T-T-P-01121 IFR 19-Jan-2017 19-Jan-2017 T-P-T-1051 Approved TPVN H
CSA 2539-30-CN-1835-02 Unit 30 Calculation Note for Steel Structure of Platform 0 10-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 24-Feb-2017 T-P-T-1349 Approved TPVN C
CSA 2539-30-DW-1425-01-01 Utility Production Paving; Road & Surface Finishing A 08-Mar-2016 IFR 14-Mar-2016 T-T-P-00431 IFR 28-Mar-2016 14-Jul-2016 C-NH3-0218/T-P-T-0258 Commented TPIT H
CSA 2539-30-DW-1425-01-01 Utility Production Paving; Road & Surface Finishing 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01012 IFA 18-Dec-2016 28-Dec-2016 T-P-T-0902 Approved TPVN C
CSA 2539-30-DW-1425-01-02 Utility Production Paving; Road & Surface Finishing A 08-Mar-2016 IFR 14-Mar-2016 T-T-P-00431 IFR 28-Mar-2016 14-Jul-2016 C-NH3-0218/T-P-T-0258 Approved TPIT H
CSA 2539-30-DW-1425-01-02 Utility Production Paving; Road & Surface Finishing 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01012 IFA 18-Dec-2016 28-Dec-2016 C-NH3-0518/T-P-T-0902; C-NH3-0545/T-P-T-0986 Commented TPVN C
CSA 2539-30-DW-1432-01-01 Pilot Piles Filed Tests Plan for Utility Production Unit A 15-Dec-2015 IFR 22-Dec-2015 T-T-P-00198 IFR 04-Jan-2016 No Comment TPIT H
CSA 2539-30-DW-1432-01-01 Pilot Piles Filed Tests Plan for Utility Production Unit B 07-Jan-2016 IFR 11-Jan-2016 T-T-P-00226 Re-IFR 25-Jan-2016 No Comment TPIT H
CSA 2539-30-DW-1432-01-01 Pilot Piles Filed Tests Plan for Utility Production Unit 0 18-Jan-2016 IFC 19-Jan-2016 T-T-P-00243 IFC Transmitted TPIT C
CSA 2539-30-DW-1432-02-01 Unit 30 Utility Production Piling Layout A 01-Jul-2016 IFR 06-Jul-2016 T-T-P-00690 IFR 19-Jul-2016 01-Aug-2016 T-P-T-0296 Approved TPVN H
CSA 2539-30-DW-1432-02-01 Unit 30 Utility Production Piling Layout 0 05-Aug-2016 IFC 05-Aug-2016 T-T-P-00743 IFC Transmitted TPVN H
CSA 2539-30-DW-1432-02-01 Unit 30 Utility Production Piling Layout 1 16-Aug-2016 IFC 16-Aug-2016 T-T-P-00756 IFC 25-Aug-2016 C-NH3-0266/T-P-T-0347; C-NH3-0315/T-P-T-0432 Approved with comments TPVN H
CSA 2539-30-DW-1432-02-01 Unit 30 Utility Production Piling Layout 2 30-Sep-2016 IFC 30-Sep-2016 T-T-P-00847 IFC No Comment TPVN H
CSA 2539-30-DW-1432-02-01 Unit 30 Utility Production Piling Layout 3 04-Nov-2016 IFC 07-Nov-2016 T-T-P-00935 IFC 24-Nov-2016 T-P-T-0669 Approved TPVN H
CSA 2539-30-DW-1432-02-01 Unit 30 Utility Production Piling Layout 4 14-Dec-2016 IFC 14-Dec-2016 T-T-P-01045 IFA 27-Dec-2016 23-Dec-2016 C-NH3-0506/T-P-T-0881; T-P-T-0985 Commented TPVN H
CSA 2539-30-DW-1432-02-01 Unit 30 Utility Production Piling Layout 5 06-Jan-2017 IFC 06-Jan-2017 T-T-P-01123 IFA 19-Jan-2017 19-Jan-2017 T-P-T-1053 Approved TPVN H
CSA 2539-30-DW-1432-02-01 Unit 30 Utility Production Piling Layout 6 07-Feb-2017 IFC 08-Feb-2017 T-T-P-01205 IFA 21-Feb-2017 24-Feb-2017 C-NH3-0632/T-P-T-1345 Commented TPVN C
CSA 2539-30-DW-1432-03-01 Unit 30 - Piling Layout Air Compressor 30-K-5001E & Ai A 12-Aug-2016 IFR 15-Aug-2016 T-T-P-00751 IFR 28-Aug-2016 22-Aug-2016 C-NH3-0265/T-P-T-0341; C-NH3-0310/T-P-T-0420 Approved TPVN H
CSA 2539-30-DW-1432-03-01 Unit 30 - Piling Layout Air Compressor 30-K-5001E & Ai 0 23-Sep-2016 IFC 30-Sep-2016 T-T-P-00847 IFC No Comment TPVN H
CSA 2539-30-DW-1432-03-01 Unit 30 - Piling Layout Air Compressor 30-K-5001E & Ai 1 26-Dec-2016 IFC 28-Dec-2016 T-T-P-01093 IFA 10-Jan-2017 Transmitted TPVN C
CSA 2539-30-DW-1442-01-01 Utility Production Major Underground Networks A 11-Feb-2016 IFR 12-Feb-2016 T-T-P-00311 IFR 25-Feb-2016 No Comment TPIT H
CSA 2539-30-DW-1442-01-01 Utility Production Major Underground Networks B 12-Apr-2016 IDD 13-Apr-2016 T-T-P-00529 IDD Transmitted TPVN C
CSA 2539-30-DW-1442-01-02 Utility Production Major Underground Networks A 11-Feb-2016 IFR 12-Feb-2016 T-T-P-00311 IFR 25-Feb-2016 No Comment TPIT H
CSA 2539-30-DW-1442-01-02 Utility Production Major Underground Networks B 12-Apr-2016 IDD 13-Apr-2016 T-T-P-00529 IDD Transmitted TPVN C
CSA 2539-30-DW-1452-01-01 Utility Production Grading; Underground & Foundation P A 23-Sep-2016 IFR 23-Sep-2016 T-T-P-00833 IFR 06-Oct-2016 06-Oct-2016 C-NH3-0317/T-P-T-0436; C-NH3-0339/T-P-T-0480 Approved with comments TPVN H
CSA 2539-30-DW-1452-01-01 Utility Production Grading; Underground & Foundation P 0 14-Dec-2016 IFC 14-Dec-2016 T-T-P-01045 IFA 27-Dec-2016 23-Dec-2016 T-P-T-0881 Approved TPVN C
CSA 2539-30-DW-1452-03-01 Utility Production Grading; Underground & Foundation P A 17-Nov-2016 IFR 18-Nov-2016 T-T-P-00974 IFR 01-Dec-2016 No Comment TPVN H
CSA 2539-30-DW-1452-03-01 Utility Production Grading; Underground & Foundation P 0 16-Feb-2017 IFC 16-Feb-2017 T-T-P-01228 IFA 01-Mar-2017 03-Mar-2017 T-P-T-1449 Approved TPVN C
CSA 2539-30-DW-1452-04-01 Utility Production Grading; Underground & Foundation P A 17-Nov-2016 IFR 18-Nov-2016 T-T-P-00974 IFR 01-Dec-2016 No Comment TPVN H
CSA 2539-30-DW-1452-04-01 Utility Production Grading; Underground & Foundation P 0 14-Dec-2016 IFC 14-Dec-2016 T-T-P-01045 IFA 27-Dec-2016 23-Dec-2016 T-P-T-0881 Approved TPVN H
Page 6
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
CSA 2539-30-DW-1452-04-01 Utility Production Grading; Underground & Foundation P 1 01-Mar-2017 IFC 02-Mar-2017 T-T-P-01259 IFA 15-Mar-2017 10-Mar-2017 T-P-T-1512 Approved TPVN H
CSA 2539-30-DW-1452-04-01 Utility Production Grading; Underground & Foundation P 2 29-Mar-2017 IFC 31-Mar-2017 T-T-P-01319 IFA 13-Apr-2017 21-Apr-2017 T-P-T-1856 Approved TPVN C
CSA 2539-30-DW-1452-06-01 Utility Production Grading; Underground & Foundation P A 23-Sep-2016 IFR 23-Sep-2016 T-T-P-00833 IFR 06-Oct-2016 06-Oct-2016 C-NH3-0317/T-P-T-0436; C-NH3-0339/T-P-T-0480 Approved with comments TPVN H
CSA 2539-30-DW-1452-06-01 Utility Production Grading; Underground & Foundation P 0 14-Dec-2016 IFC 14-Dec-2016 T-T-P-01045 IFA 27-Dec-2016 23-Dec-2016 T-P-T-0881 Approved TPVN H
CSA 2539-30-DW-1452-06-01 Utility Production Grading; Underground & Foundation P 1 01-Mar-2017 IFC 02-Mar-2017 T-T-P-01259 IFA 15-Mar-2017 10-Mar-2017 T-P-T-1512 Approved TPVN C
CSA 2539-30-DW-1452-08-01 Utility Production Grading; Underground & Foundation P A 23-Sep-2016 IFR 23-Sep-2016 T-T-P-00833 IFR 06-Oct-2016 06-Oct-2016 C-NH3-0317/T-P-T-0436; C-NH3-0339/T-P-T-0480 Approved with comments TPVN H
CSA 2539-30-DW-1452-08-01 Utility Production Grading; Underground & Foundation P 0 14-Dec-2016 IFC 14-Dec-2016 T-T-P-01045 IFA 27-Dec-2016 23-Dec-2016 T-P-T-0881 Approved TPVN H
CSA 2539-30-DW-1452-08-01 Utility Production Grading; Underground & Foundation P 1 29-Mar-2017 IFC 31-Mar-2017 T-T-P-01319 IFA 13-Apr-2017 21-Apr-2017 T-P-T-1856 Approved TPVN C
CSA 2539-30-DW-1452-09-01 Utility Production Grading; Underground & Foundation P A 14-Nov-2016 IFR 18-Nov-2016 T-T-P-00974 IFR 01-Dec-2016 No Comment TPVN H
CSA 2539-30-DW-1452-09-01 Utility Production Grading; Underground & Foundation P 0 14-Dec-2016 IFC 14-Dec-2016 T-T-P-01045 IFA 27-Dec-2016 23-Dec-2016 C-NH3-0506/T-P-T-0881; T-P-T-0985 Commented TPVN H
CSA 2539-30-DW-1452-09-01 Utility Production Grading; Underground & Foundation P 1 01-Mar-2017 IFC 02-Mar-2017 T-T-P-01259 IFA 15-Mar-2017 10-Mar-2017 T-P-T-1512 Approved TPVN H
CSA 2539-30-DW-1452-09-01 Utility Production Grading; Underground & Foundation P 2 29-Mar-2017 IFC 31-Mar-2017 T-T-P-01319 IFA 13-Apr-2017 21-Apr-2017 C-NH3-0750/T-P-T-1856 Commented TPVN C
CSA 2539-30-DW-1452-10-01 Utility Production Grading; Underground & Foundation P A 14-Nov-2016 IFR 18-Nov-2016 T-T-P-00974 IFR 01-Dec-2016 No Comment TPVN H
CSA 2539-30-DW-1452-10-01 Utility Production Grading; Underground & Foundation P 0 14-Dec-2016 IFC 14-Dec-2016 T-T-P-01045 IFA 27-Dec-2016 23-Dec-2016 C-NH3-0506/T-P-T-0881; C-NH3-0544/T-P-T-0985 Commented TPVN H
CSA 2539-30-DW-1452-10-01 Utility Production Grading; Underground & Foundation P 1 01-Mar-2017 IFC 02-Mar-2017 T-T-P-01259 IFA 15-Mar-2017 10-Mar-2017 C-NH3-0664/T-P-T-1512; C-NH3-0719/T-P-T-1730 Commented TPVN H
CSA 2539-30-DW-1452-10-01 Utility Production Grading; Underground & Foundation P 2 29-Mar-2017 IFC 31-Mar-2017 T-T-P-01319 IFA 13-Apr-2017 21-Apr-2017 C-NH3-0750/T-P-T-1856 Commented TPVN C
CSA 2539-30-DW-1453-01-01 Details for Mainholes MH-30-01; MH-30-02 A 10-Jan-2017 IFR 11-Jan-2017 T-T-P-01139 IFR 24-Jan-2017 No Comment TPVN H
CSA 2539-30-DW-1453-01-01 Details for Mainholes MH-30-01; MH-30-02 0 27-Feb-2017 IFC 27-Feb-2017 T-T-P-01246 IFA 12-Mar-2017 08-Mar-2017 C-NH3-0661/T-P-T-1485; C-NH3-0718/T-P-T-1729 Commented TPVN C
CSA 2539-30-DW-1453-02-01 Details for Mainholes MH-30-03; MH-30-04; MH-30-05; A 03-Mar-2017 IFR 07-Mar-2017 T-T-P-01268 IFR 20-Mar-2017 14-Mar-2017 C-NH3-0674/T-P-T-1548; C-NH3-0721/T-P-T-1732 Commented TPVN H
CSA 2539-30-DW-1453-02-01 Details for Mainholes MH-30-03; MH-30-04; MH-30-05; 0 29-Mar-2017 IFC 31-Mar-2017 T-T-P-01319 IFA 13-Apr-2017 21-Apr-2017 T-P-T-1856 Approved TPVN C
CSA 2539-30-DW-1453-03-01 Details for Mainholes MH-30-07; MH-30-09; MH-30-10 A 13-Mar-2017 IFR 13-Mar-2017 T-T-P-01286 IFR 26-Mar-2017 No Comment TPVN H
CSA 2539-30-DW-1453-03-01 Details for Mainholes MH-30-07; MH-30-09; MH-30-10 0 29-Mar-2017 IFC 31-Mar-2017 T-T-P-01319 IFA 13-Apr-2017 21-Apr-2017 T-P-T-1856 Approved TPVN C
CSA 2539-30-DW-1453-04-01 Storm Sewer Mainhole A 13-Mar-2017 IFR 13-Mar-2017 T-T-P-01286 IFR 26-Mar-2017 No Comment TPVN H
CSA 2539-30-DW-1453-04-01 Storm Sewer Mainhole 0 29-Mar-2017 IFC 31-Mar-2017 T-T-P-01319 IFA 13-Apr-2017 21-Apr-2017 T-P-T-1856 Approved TPVN C
CSA 2539-30-DW-1453-05-01 Pipe Connection for Mainholes Details A 13-Mar-2017 IFR 13-Mar-2017 T-T-P-01286 IFR 26-Mar-2017 No Comment TPVN H
CSA 2539-30-DW-1453-05-01 Pipe Connection for Mainhole Details 0 29-Mar-2017 IFC 31-Mar-2017 T-T-P-01319 IFA 13-Apr-2017 21-Apr-2017 T-P-T-1856 Approved TPVN C
CSA 2539-30-DW-1453-06-01 Valve Pit VP-30-01; VP-30-02; VP-30-03 A 21-Mar-2017 IFR 24-Mar-2017 T-T-P-01305 IFR 06-Apr-2017 11-Apr-2017 T-P-T-1736 Approved TPVN H
CSA 2539-30-DW-1453-06-01 Valve Pit VP-30-01; VP-30-02; VP-30-03 0 10-Apr-2017 IFC 10-Apr-2017 T-T-P-01347 IFA 24-Apr-2017 Transmitted TPVN C
CSA 2539-30-DW-1453-07-01 Unit 30 - Utility Production Road & Drainage 0 23-May-2017 II 29-May-2017 T-T-P-01427 II 11-Jun-2017 Transmitted TPVN C
CSA 2539-30-DW-1453-08-01 Unit 30 - Utility Production Road Longitudinal Profile 0 23-May-2017 II 29-May-2017 T-T-P-01427 II 11-Jun-2017 Transmitted TPVN C
CSA 2539-30-DW-1453-09-01 Unit 30 - Utility Production Drainage Longitudinal Profile 0 23-May-2017 II 29-May-2017 T-T-P-01427 II 11-Jun-2017 Transmitted TPVN C
CSA 2539-30-DW-1490-01-01 Utility Production Demolition Plan A 23-Dec-2015 IFR 08-Jan-2016 T-T-P-00222 IFR 21-Jan-2016 No Comment TPIT H
CSA 2539-30-DW-1490-01-01 Utility Production Demolition Plan 0 18-Mar-2016 IFC 22-Mar-2016 T-T-P-00461 IFC 17-Jun-2016 C-NH3-0186/T-P-T-0215 Commented TPIT H
CSA 2539-30-DW-1490-01-01 Utility Production Demolition Plan - Key Plan 1 08-Sep-2016 IFC1 08-Sep-2016 T-T-P-00800 IFC 06-Oct-2016 T-P-T-0434 Approved TPVN C
CSA 2539-30-DW-1490-01-02 Utility Production Demolition Detail Plan 0 08-Sep-2016 IFC 08-Sep-2016 T-T-P-00800 IFC 06-Oct-2016 T-P-T-0434 Approved TPVN C
CSA 2539-30-DW-1735-01-01 Foundation for 30-P-3001E Platform & 48" Pipe Support A 09-Jan-2017 IFR 10-Jan-2017 T-T-P-01137 IFR 23-Jan-2017 23-Jan-2017 C-NH3-0577/T-P-T-1117 Commented TPVN H
CSA 2539-30-DW-1735-01-01 Foundation for 30-P-3001E Platform & 48" Pipe Support 0 08-Feb-2017 IFC 09-Feb-2017 T-T-P-01208 IFA 22-Feb-2017 24-Feb-2017 T-P-T-1347 Approved TPVN H
CSA 2539-30-DW-1735-01-01 Foundation for 30-P-3001E Platform & 48" Pipe Support 1 07-Mar-2017 IFC 08-Mar-2017 T-T-P-01274 IFA 21-Mar-2017 21-Mar-2017 C-NH3-0692/T-P-T-1619; C-NH3-0722/T-P-T-1733 Commented TPVN C
CSA 2539-30-DW-1741-01-01 Piperack 02 Foundation Details A 04-Nov-2016 IFR 07-Nov-2016 T-T-P-00936 IFR 20-Nov-2016 24-Nov-2016 C-NH3-0419/T-P-T-0671; C-NH3-0508/T-P-T-0886 Commented TPVN H
CSA 2539-30-DW-1741-01-01 Piperack 02 Foundation Details 0 25-Nov-2016 IFC 28-Nov-2016 T-T-P-00999 IFA 11-Dec-2016 13-Dec-2016 C-NH3-0464/T-P-T-0774; C-NH3-0501/T-P-T-0865 Commented TPVN H
CSA 2539-30-DW-1741-01-01 Piperack 02 Foundation Details 1 27-Dec-2016 IFC 28-Dec-2016 T-T-P-01093 IFA 10-Jan-2017 No Comment TPVN H
CSA 2539-30-DW-1741-01-01 Piperack 02 Foundation Details 2 08-Feb-2017 IFC 09-Feb-2017 T-T-P-01208 IFA 22-Feb-2017 24-Feb-2017 T-P-T-1346 Approved TPVN C
CSA 2539-30-DW-1742-01-01 Shelter for 30-K-5001E Foundation Plan & Details A 24-Jun-2016 IFR 24-Jun-2016 T-T-P-00667 IFR 08-Jul-2016 16-Jul-2016 C-NH3-0219/T-P-T-0261; C-NH3-0272/T-P-T-0355 Approved with comments TPVN H
CSA 2539-30-DW-1742-01-01 Shelter for 30-K-5001E Foundation Plan & Details 0 23-Sep-2016 IFC 26-Sep-2016 T-T-P-00839 IFC Transmitted TPVN C
CSA 2539-30-DW-1743-01-01 Filtration Package 30-PK-3006 Foundation Details A 18-Nov-2016 IFR 21-Nov-2016 T-T-P-00979 IFR 04-Dec-2016 03-Dec-2016 T-P-T-0720 Approved TPVN H
CSA 2539-30-DW-1743-01-01 Filtration Package 30-PK-3006 Foundation Details 0 27-Dec-2016 IFC 28-Dec-2016 T-T-P-01093 IFA 10-Jan-2017 No Comment TPVN H
CSA 2539-30-DW-1743-01-01 Filtration Package 30-PK-3006 Foundation Details 1 03-Jan-2017 IFC 04-Jan-2017 T-T-P-01105 IFA 17-Jan-2017 Transmitted TPVN C
CSA 2539-30-DW-1743-02-01 30-PK-3005 Foundation Details A 26-Dec-2016 IFR 27-Dec-2016 T-T-P-01092 IFR 10-Jan-2017 11-Jan-2017 C-NH3-0543/T-P-T-0974 Commented TPVN H
CSA 2539-30-DW-1743-02-01 30-PK-3005 Foundation Details 0 08-Feb-2017 IFC 09-Feb-2017 T-T-P-01208 IFA 22-Feb-2017 24-Feb-2017 C-NH3-0633/T-P-T-1346 Commented TPVN H
CSA 2539-30-DW-1743-02-01 30-PK-3005 Foundation Details 1 01-Mar-2017 IFC 02-Mar-2017 T-T-P-01259 IFA 15-Mar-2017 10-Mar-2017 T-P-T-1512 Approved TPVN C
CSA 2539-30-DW-1743-03-01 Utility Production FND. Detail for 30-DR-5002 A 31-Oct-2016 IFR 01-Nov-2016 T-T-P-00922 IFR 15-Nov-2016 24-Nov-2016 T-P-T-0668 Approved TPVN H
CSA 2539-30-DW-1743-03-01 30-DR-5002 Foundation Details 0 25-Nov-2016 IFC 28-Nov-2016 T-T-P-00999 IFA 11-Dec-2016 13-Dec-2016 C-NH3-0464/T-P-T-0774; C-NH3-0501/T-P-T-0865 Commented TPVN H
CSA 2539-30-DW-1743-03-01 30-DR-5002 Foundation Details 1 26-Dec-2016 IFC 28-Dec-2016 T-T-P-01093 IFA 10-Jan-2017 Transmitted TPVN C
CSA 2539-30-DW-1743-04-01 Utility Production FND. Detail for 30-K-5001E A 31-Oct-2016 IFR 01-Nov-2016 T-T-P-00922 IFR 15-Nov-2016 24-Nov-2016 T-P-T-0668 Approved TPVN H
CSA 2539-30-DW-1743-04-01 30-K-5001E Foundation Details 0 25-Nov-2016 IFC 28-Nov-2016 T-T-P-00999 IFA 11-Dec-2016 13-Dec-2016 T-P-T-0774 Approved TPVN H
CSA 2539-30-DW-1743-04-01 30-K-5001E Foundation Details 1 26-Dec-2016 IFC 28-Dec-2016 T-T-P-01093 IFA 10-Jan-2017 Transmitted TPVN C
CSA 2539-30-DW-1743-05-01 30-E-1002 Foundation Details A 31-Oct-2016 IFR 01-Nov-2016 T-T-P-00922 IFR 15-Nov-2016 24-Nov-2016 T-P-T-0668 Approved TPVN H
CSA 2539-30-DW-1743-05-01 30-E-1002 Foundation Details 0 25-Nov-2016 IFC 28-Nov-2016 T-T-P-00999 IFA 11-Dec-2016 13-Dec-2016 C-NH3-0464/T-P-T-0774; C-NH3-0501/T-P-T-0865 Commented TPVN C
CSA 2539-30-DW-1743-06-01 Modification of Pump 30-P-3002A for New Skid A 09-Mar-2017 IFR 13-Mar-2017 T-T-P-01286 IFR 26-Mar-2017 No Comment TPVN H
CSA 2539-30-DW-1743-06-01 Modification of Pump 30-P-3002A for New Skid 0 27-Mar-2017 IFC 28-Mar-2017 T-T-P-01310 IFA 10-Apr-2017 11-Apr-2017 C-NH3-0724/T-P-T-1735 Commented TPVN C
CSA 2539-30-DW-1744-01-01 Cooling Tower of 30-CT-3001K/L General View A 04-Nov-2016 IFR 07-Nov-2016 T-T-P-00936 IFR 20-Nov-2016 No Comment TPVN H
CSA 2539-30-DW-1744-01-01 Cooling Tower of 30-CT-3001K/L General View 0 09-Dec-2016 IFC 13-Dec-2016 T-T-P-01039 IFA 26-Dec-2016 23-Dec-2016 T-P-T-0859 Approved TPVN C
CSA 2539-30-DW-1744-02-01 Cooling Tower of 30-CT-3001K/L Plan; Sections & Details A 04-Nov-2016 IFR 07-Nov-2016 T-T-P-00936 IFR 20-Nov-2016 No Comment TPVN H
CSA 2539-30-DW-1744-02-01 Cooling Tower of 30-CT-3001K/L Plan; Sections & Details 0 09-Dec-2016 IFC 13-Dec-2016 T-T-P-01039 IFA 26-Dec-2016 23-Dec-2016 T-P-T-0859 Approved TPVN H
CSA 2539-30-DW-1744-02-01 Cooling Tower of 30-CT-3001K/L Plan; Sections & Details 1 09-Jan-2017 IFC 10-Jan-2017 T-T-P-01136 IFA 23-Jan-2017 23-Jan-2017 T-P-T-1116 Approved TPVN C
CSA 2539-30-DW-1744-03-01 Cooling Tower of 30-CT-3001K/L Plan; Sections & Details A 04-Nov-2016 IFR 07-Nov-2016 T-T-P-00936 IFR 20-Nov-2016 24-Nov-2016 C-NH3-0419/T-P-T-0671; C-NH3-0508/T-P-T-0886 Commented TPVN H
CSA 2539-30-DW-1744-03-01 Cooling Tower of 30-CT-3001K/L Plan; Sections & Details 0 09-Dec-2016 IFC 13-Dec-2016 T-T-P-01039 IFA 26-Dec-2016 23-Dec-2016 T-P-T-0859 Approved TPVN H
CSA 2539-30-DW-1744-03-01 Cooling Tower of 30-CT-3001K/L Plan; Sections & Details 1 16-Mar-2017 IFC 16-Mar-2017 T-T-P-01293 IFA 29-Mar-2017 30-Mar-2017 C-NH3-0704/T-P-T-1695 Commented TPVN C
CSA 2539-30-DW-1744-04-01 Cooling Tower of 30-CT-3001K/L Plan; Sections & Details A 04-Nov-2016 IFR 07-Nov-2016 T-T-P-00936 IFR 20-Nov-2016 No Comment TPVN H
CSA 2539-30-DW-1744-04-01 Cooling Tower of 30-CT-3001K/L Plan; Sections & Details 0 09-Dec-2016 IFC 13-Dec-2016 T-T-P-01039 IFA 26-Dec-2016 23-Dec-2016 T-P-T-0859 Approved TPVN C
CSA 2539-30-DW-1744-05-01 Cooling Tower of 30-CT-3001K/L Handrail Layouts & Deta A 04-Nov-2016 IFR 07-Nov-2016 T-T-P-00936 IFR 20-Nov-2016 No Comment TPVN H
CSA 2539-30-DW-1744-05-01 Cooling Tower of 30-CT-3001K/L Handrail Layouts & Deta 0 09-Dec-2016 IFC 13-Dec-2016 T-T-P-01039 IFA 26-Dec-2016 23-Dec-2016 T-P-T-0859 Approved TPVN H
CSA 2539-30-DW-1744-05-01 Cooling Tower of 30-CT-3001K/L Handrail Layouts & Deta 1 09-Jan-2017 IFC 10-Jan-2017 T-T-P-01136 IFA 23-Jan-2017 23-Jan-2017 T-P-T-1116 Approved TPVN H
CSA 2539-30-DW-1744-05-01 Cooling Tower of 30-CT-3001K/L Handrail Layouts & Deta 2 16-Mar-2017 IFC 16-Mar-2017 T-T-P-01293 IFA 29-Mar-2017 30-Mar-2017 C-NH3-0704/T-P-T-1695 Commented TPVN C
CSA 2539-30-DW-1744-06-01 Cooling Tower of 30-CT-3001K/L Valve Pit Plan; Details A 04-Nov-2016 IFR 07-Nov-2016 T-T-P-00936 IFR 20-Nov-2016 No Comment TPVN H
CSA 2539-30-DW-1744-06-01 Cooling Tower of 30-CT-3001K/L Valve Pit Plan; Details 0 09-Dec-2016 IFC 13-Dec-2016 T-T-P-01039 IFA 26-Dec-2016 23-Dec-2016 T-P-T-0859 Approved TPVN H
CSA 2539-30-DW-1744-06-01 Cooling Tower of 30-CT-3001K/L Valve Pit Plan; Details 1 28-Dec-2016 IFC 29-Dec-2016 T-T-P-01098 IFA 11-Jan-2017 13-Jan-2017 T-P-T-0988 Approved TPVN C
CSA 2539-30-DW-1744-07-01 Cooling Tower of 30-CT-3001K/L Stairway Plans; Elevatio A 04-Nov-2016 IFR 07-Nov-2016 T-T-P-00936 IFR 20-Nov-2016 No Comment TPVN H
CSA 2539-30-DW-1744-07-01 Cooling Tower of 30-CT-3001K/L Stairway Plans; Elevatio 0 09-Dec-2016 IFC 13-Dec-2016 T-T-P-01039 IFA 26-Dec-2016 23-Dec-2016 T-P-T-0859 Approved TPVN H
CSA 2539-30-DW-1744-07-01 Cooling Tower of 30-CT-3001K/L Stairway Plans; Elevatio 1 09-Jan-2017 IFC 10-Jan-2017 T-T-P-01136 IFA 23-Jan-2017 23-Jan-2017 C-NH3-0576/T-P-T-1116; C-NH3-0628/T-P-T-1309 Commented TPVN C
CSA 2539-30-DW-1744-08-01 Cooling Tower of 30-CT-3001K/L Basin Slab Re-bar Deta A 11-Nov-2016 IFR 11-Nov-2016 T-T-P-00954 IFR 24-Nov-2016 24-Nov-2016 T-P-T-0670 Approved TPVN H
CSA 2539-30-DW-1744-08-01 Cooling Tower of 30-CT-3001K/L Basin Slab Re-bar Deta 0 19-Dec-2016 IFC 20-Dec-2016 T-T-P-01062 IFA 02-Jan-2017 05-Jan-2017 T-P-T-0924 Approved TPVN C
CSA 2539-30-DW-1744-09-01 Cooling Tower of 30-CT-3001K/L Wall Re-bar Detail (W1 A 11-Nov-2016 IFR 11-Nov-2016 T-T-P-00954 IFR 24-Nov-2016 24-Nov-2016 T-P-T-0670 Approved TPVN H
CSA 2539-30-DW-1744-09-01 Cooling Tower of 30-CT-3001K/L Wall Re-bar Detail (W1 0 19-Dec-2016 IFC 20-Dec-2016 T-T-P-01062 IFA 02-Jan-2017 05-Jan-2017 T-P-T-0924 Approved TPVN H
CSA 2539-30-DW-1744-09-01 Cooling Tower of 30-CT-3001K/L Wall Re-bar Detail (W1 1 30-Dec-2016 IFC 03-Jan-2017 T-T-P-01103 IFA 16-Jan-2017 Transmitted TPVN C
CSA 2539-30-DW-1744-10-01 Cooling Tower of 30-CT-3001K/L Wall Re-bar Detail (W4 A 11-Nov-2016 IFR 11-Nov-2016 T-T-P-00954 IFR 24-Nov-2016 24-Nov-2016 T-P-T-0670 Approved TPVN H
CSA 2539-30-DW-1744-10-01 Cooling Tower of 30-CT-3001K/L Wall Re-bar Detail (W4 0 19-Dec-2016 IFC 20-Dec-2016 T-T-P-01062 IFA 02-Jan-2017 05-Jan-2017 T-P-T-0924 Approved TPVN H
CSA 2539-30-DW-1744-10-01 Cooling Tower of 30-CT-3001K/L Wall Re-bar Detail (W4 1 28-Dec-2016 IFC 29-Dec-2016 T-T-P-01098 IFA 11-Jan-2017 13-Jan-2017 T-P-T-0988 Approved TPVN C
CSA 2539-30-DW-1744-11-01 Cooling Tower of 30-CT-3001K/L Wall Re-bar Detail (W5 A 11-Nov-2016 IFR 11-Nov-2016 T-T-P-00954 IFR 24-Nov-2016 24-Nov-2016 T-P-T-0670 Approved TPVN H
CSA 2539-30-DW-1744-11-01 Cooling Tower of 30-CT-3001K/L Wall Re-bar Detail (W5 0 19-Dec-2016 IFC 20-Dec-2016 T-T-P-01062 IFA 02-Jan-2017 05-Jan-2017 T-P-T-0924 Approved TPVN C
CSA 2539-30-DW-1744-12-01 Cooling Tower of 30-CT-3001K/L Wall Re-bar Detail (1 A 11-Nov-2016 IFR 11-Nov-2016 T-T-P-00954 IFR 24-Nov-2016 24-Nov-2016 T-P-T-0670 Approved TPVN H
CSA 2539-30-DW-1744-12-01 Cooling Tower of 30-CT-3001K/L Wall Re-bar Detail (1 0 19-Dec-2016 IFC 20-Dec-2016 T-T-P-01062 IFA 02-Jan-2017 05-Jan-2017 T-P-T-0924 Approved TPVN C
CSA 2539-30-DW-1744-13-01 Cooling Tower of 30-CT-3001K/L Wall Re-bar Detail (3W A 11-Nov-2016 IFR 11-Nov-2016 T-T-P-00954 IFR 24-Nov-2016 24-Nov-2016 T-P-T-0670 Approved TPVN H
CSA 2539-30-DW-1744-13-01 Cooling Tower of 30-CT-3001K/L Wall Re-bar Detail (3W 0 19-Dec-2016 IFC 20-Dec-2016 T-T-P-01062 IFA 02-Jan-2017 05-Jan-2017 T-P-T-0924 Approved TPVN C
CSA 2539-30-DW-1744-14-01 Cooling Tower of 30-CT-3001K/L Wall Re-bar Detail (W A 11-Nov-2016 IFR 11-Nov-2016 T-T-P-00954 IFR 24-Nov-2016 24-Nov-2016 T-P-T-0670 Approved TPVN H
CSA 2539-30-DW-1744-14-01 Cooling Tower of 30-CT-3001K/L Wall Re-bar Detail (W 0 19-Dec-2016 IFC 20-Dec-2016 T-T-P-01062 IFA 02-Jan-2017 No Comment TPVN H
CSA 2539-30-DW-1744-14-01 Cooling Tower of 30-CT-3001K/L Wall Re-bar Detail (W 1 30-Dec-2016 IFC 03-Jan-2017 T-T-P-01103 IFA 16-Jan-2017 05-Jan-2017 T-P-T-0924 Approved TPVN C
CSA 2539-30-DW-1744-15-01 Cooling Tower of 30-CT-3001K/L Wall Re-bar Plan EL. 1 A 11-Nov-2016 IFR 11-Nov-2016 T-T-P-00954 IFR 24-Nov-2016 24-Nov-2016 T-P-T-0670 Approved TPVN H
CSA 2539-30-DW-1744-15-01 Cooling Tower of 30-CT-3001K/L Wall Re-bar Plan EL. 1 0 19-Dec-2016 IFC 20-Dec-2016 T-T-P-01062 IFA 02-Jan-2017 05-Jan-2017 T-P-T-0924 Approved TPVN C
CSA 2539-30-DW-1744-16-01 Cooling Tower of 30-CT-3001K/L Girder Re-bar Detail 2 A 11-Nov-2016 IFR 11-Nov-2016 T-T-P-00954 IFR 24-Nov-2016 24-Nov-2016 T-P-T-0670 Approved TPVN H
CSA 2539-30-DW-1744-16-01 Cooling Tower of 30-CT-3001K/L Girder Re-bar Detail 2 0 19-Dec-2016 IFC 20-Dec-2016 T-T-P-01062 IFA 02-Jan-2017 05-Jan-2017 T-P-T-0924 Approved TPVN C
CSA 2539-30-DW-1744-17-01 Cooling Tower of 30-CT-3001K/L Girder Re-bar 3G4; 3 A 11-Nov-2016 IFR 11-Nov-2016 T-T-P-00954 IFR 24-Nov-2016 24-Nov-2016 T-P-T-0670 Approved TPVN H
CSA 2539-30-DW-1744-17-01 Cooling Tower of 30-CT-3001K/L Girder Re-bar 3G4; 3 0 19-Dec-2016 IFC 20-Dec-2016 T-T-P-01062 IFA 02-Jan-2017 05-Jan-2017 T-P-T-0924 Approved TPVN C
CSA 2539-30-DW-1744-18-01 Cooling Tower of 30-CT-3001K/L Girder Re-bar 4G1; 4 A 11-Nov-2016 IFR 11-Nov-2016 T-T-P-00954 IFR 24-Nov-2016 24-Nov-2016 T-P-T-0670 Approved TPVN H
CSA 2539-30-DW-1744-18-01 Cooling Tower of 30-CT-3001K/L Girder Re-bar 4G1; 4 0 19-Dec-2016 IFC 20-Dec-2016 T-T-P-01062 IFA 02-Jan-2017 05-Jan-2017 T-P-T-0924 Approved TPVN C
CSA 2539-30-DW-1744-31-01 Settling Basin 30-BA-3004 Formwork (Sht.1) A 17-Nov-2016 IFR 18-Nov-2016 T-T-P-00974 IFR 01-Dec-2016 03-Dec-2016 C-NH3-0439/T-P-T-0719; C-NH3-0461/T-P-T-0771 Commented TPVN H
CSA 2539-30-DW-1744-31-01 Settling Basin 30-BA-3004 Formwork (Sht.1) 0 12-Dec-2016 IFC 13-Dec-2016 T-T-P-01039 IFA 26-Dec-2016 23-Dec-2016 T-P-T-0859 Approved TPVN H
CSA 2539-30-DW-1744-31-01 Settling Basin 30-BA-3004 Formwork (Sht.1) 1 07-Mar-2017 IFC 08-Mar-2017 T-T-P-01274 IFA 21-Mar-2017 21-Mar-2017 C-NH3-0692/T-P-T-1619; C-NH3-0722/T-P-T-1733 Commented TPVN C
CSA 2539-30-DW-1744-32-01 Settling Basin 30-BA-3004 Formwork (Sht.2) A 17-Nov-2016 IFR 18-Nov-2016 T-T-P-00974 IFR 01-Dec-2016 03-Dec-2016 C-NH3-0439/T-P-T-0719; C-NH3-0461/T-P-T-0771 Commented TPVN H
CSA 2539-30-DW-1744-32-01 Settling Basin 30-BA-3004 Formwork (Sht.2) 0 12-Dec-2016 IFC 13-Dec-2016 T-T-P-01039 IFA 26-Dec-2016 23-Dec-2016 T-P-T-0859 Approved TPVN C
CSA 2539-30-DW-1744-33-01 Settling Basin 30-BA-3004 Reinforcement (Sht.1) A 17-Nov-2016 IFR 18-Nov-2016 T-T-P-00974 IFR 01-Dec-2016 No Comment TPVN H
CSA 2539-30-DW-1744-33-01 Settling Basin 30-BA-3004 Reinforcement (Sht.1) 0 12-Dec-2016 IFC 13-Dec-2016 T-T-P-01039 IFA 26-Dec-2016 23-Dec-2016 T-P-T-0859 Approved TPVN C
Page 7
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
CSA 2539-30-DW-1744-34-01 Settling Basin 30-BA-3004 Reinforcement (Sht.2) A 17-Nov-2016 IFR 18-Nov-2016 T-T-P-00974 IFR 01-Dec-2016 No Comment TPVN H
CSA 2539-30-DW-1744-34-01 Settling Basin 30-BA-3004 Reinforcement (Sht.2) 0 12-Dec-2016 IFC 13-Dec-2016 T-T-P-01039 IFA 26-Dec-2016 23-Dec-2016 T-P-T-0859 Approved TPVN H
CSA 2539-30-DW-1744-34-01 Settling Basin 30-BA-3004 Reinforcement (Sht.2) 1 07-Mar-2017 IFC 08-Mar-2017 T-T-P-01274 IFA 21-Mar-2017 21-Mar-2017 C-NH3-0692/T-P-T-1619; C-NH3-0722/T-P-T-1733 Commented TPVN C
CSA 2539-30-DW-1744-35-01 Settling Basin 30-BA-3004 Working Platform A 12-Dec-2016 IFR 13-Dec-2016 T-T-P-01038 IFR 26-Dec-2016 23-Dec-2016 T-P-T-0858 Approved TPVN H
CSA 2539-30-DW-1744-35-01 Settling Basin 30-BA-3004 Working Platform 0 16-Jan-2017 IFC 20-Jan-2017 T-T-P-01175 IFA 03-Feb-2017 Transmitted TPVN C
CSA 2539-30-DW-1745-01-01 Unit 30 Pipe Support Locations A 09-Mar-2017 IFR 09-Mar-2017 T-T-P-01278 IFR 23-Mar-2017 21-Mar-2017 C-NH3-0693/T-P-T-1620; C-NH3-0716/T-P-T-1727 Approved with comments TPVN H
CSA 2539-30-DW-1745-01-01 Unit 30 Pipe Support Locations 0 27-Mar-2017 IFC 29-Mar-2017 T-T-P-01315 IFA 11-Apr-2017 26-Apr-2017 C-NH3-0763/T-P-T-1888 Commented TPVN C
CSA 2539-30-DW-1745-02-01 Unit 30 Foundation for Pipe Supports A 09-Mar-2017 IFR 09-Mar-2017 T-T-P-01278 IFR 23-Mar-2017 21-Mar-2017 C-NH3-0693/T-P-T-1620; C-NH3-0716/T-P-T-1727 Approved with comments TPVN H
CSA 2539-30-DW-1745-02-01 Unit 30 Foundation for Pipe Supports 0 27-Mar-2017 IFC 29-Mar-2017 T-T-P-01315 IFA 11-Apr-2017 26-Apr-2017 C-NH3-0763/T-P-T-1888 Commented TPVN C
CSA 2539-30-DW-1745-03-01 Shelter for 30-PK-3005 Foundation & Reinforcement Ar A 13-Mar-2017 IFR 13-Mar-2017 T-T-P-01286 IFR 26-Mar-2017 31-Mar-2017 C-NH3-0703/T-P-T-1694 Commented TPVN H
CSA 2539-30-DW-1745-03-01 Shelter for 30-PK-3005 Foundation & Reinforcement Ar 0 27-Mar-2017 IFC 28-Mar-2017 T-T-P-01310 IFA 10-Apr-2017 11-Apr-2017 C-NH3-0724/T-P-T-1735 Commented TPVN C
CSA 2539-30-DW-1835-01-01 Steel Structure for 30-P-3001E Platform & 48" Pipe Supp A 09-Jan-2017 IFR 10-Jan-2017 T-T-P-01137 IFR 23-Jan-2017 23-Jan-2017 C-NH3-0577/T-P-T-1117 Commented TPVN H
CSA 2539-30-DW-1835-01-01 Steel Structure for 30-P-3001E Platform & 48" Pipe Supp 0 08-Feb-2017 IFC 09-Feb-2017 T-T-P-01208 IFA 22-Feb-2017 24-Feb-2017 C-NH3-0633/T-P-T-1346 Commented TPVN H
CSA 2539-30-DW-1835-01-01 Steel Structure for 30-P-3001E Platform & 48" Pipe Supp 1 07-Mar-2017 IFC 08-Mar-2017 T-T-P-01274 IFA 21-Mar-2017 21-Mar-2017 C-NH3-0692/T-P-T-1619; C-NH3-0722/T-P-T-1733 Commented TPVN H
CSA 2539-30-DW-1835-01-01 Steel Structure for 30-P-3001E Platform & 48" Pipe Supp 2 28-Mar-2017 IFC 29-Mar-2017 T-T-P-01312 IFA 11-Apr-2017 19-Apr-2017 T-P-T-1849 Approved TPVN C
CSA 2539-30-DW-1841-01-01 Piperack 02 Framing Plan & Elevation A 25-Nov-2016 IFR 28-Nov-2016 T-T-P-00998 IFR 11-Dec-2016 13-Dec-2016 C-NH3-0463/T-P-T-0773; C-NH3-0500/T-P-T-0864 Commented TPVN H
CSA 2539-30-DW-1841-01-01 Piperack 02 Framing Plan & Elevation 0 16-Dec-2016 IFC 19-Dec-2016 T-T-P-01060 IFA 01-Jan-2017 05-Jan-2017 T-P-T-0923 Approved TPVN H
CSA 2539-30-DW-1841-01-01 Piperack 02 Framing Plan & Elevation 1 08-Feb-2017 IFC 09-Feb-2017 T-T-P-01208 IFA 22-Feb-2017 24-Feb-2017 T-P-T-1346 Approved TPVN C
CSA 2539-30-DW-1842-01-01 Cooling Tower of 30-CT-3001K/L Pipe Support Framing Pl 0 30-Dec-2016 IFC 03-Jan-2017 T-T-P-01103 IFA 16-Jan-2017 16-Jan-2017 C-NH3-0548/T-P-T-1004 Commented TPVN H
CSA 2539-30-DW-1842-01-01 Cooling Tower of 30-CT-3001K/L Pipe Support Framing Pl 1 07-Mar-2017 IFC 08-Mar-2017 T-T-P-01274 IFA 21-Mar-2017 21-Mar-2017 T-P-T-1619 Approved TPVN C
CSA 2539-30-DW-1842-02-01 Cooling Tower of 30-CT-3001K/L Monorail Framing Plans; 0 17-Feb-2017 IFC 17-Feb-2017 T-T-P-01230 IFA 02-Mar-2017 01-Mar-2017 C-NH3-0644/T-P-T-1401 Commented TPVN H
CSA 2539-30-DW-1842-02-01 Cooling Tower of 30-CT-3001K/L Monorail Framing Plans; 1 07-Mar-2017 IFC 08-Mar-2017 T-T-P-01274 IFA 21-Mar-2017 21-Mar-2017 T-P-T-1619 Approved TPVN C
CSA 2539-30-DW-1842-03-01 Cooling Tower of 30-CT-3001K/L Access Platform Plan; S A 25-Nov-2016 IFR 28-Nov-2016 T-T-P-00998 IFR 11-Dec-2016 13-Dec-2016 T-P-T-0773 Approved TPVN H
CSA 2539-30-DW-1842-03-01 Cooling Tower of 30-CT-3001K/L Access Platform Plan; S 0 27-Dec-2016 IFC 28-Dec-2016 T-T-P-01093 IFA 10-Jan-2017 Transmitted TPVN C
CSA 2539-30-DW-1842-04-01 Cooling Tower of 30-CT-3001K/L Water Screen Framing P 0 17-Feb-2017 IFC 17-Feb-2017 T-T-P-01230 IFA 02-Mar-2017 01-Mar-2017 T-P-T-1401 Approved TPVN C
CSA 2539-30-DW-1842-05-01 Cooling Tower of 30-CT-3001K/L Roof Access Walkway A 24-Jan-2017 IFR 25-Jan-2017 T-T-P-01183 IFR 08-Feb-2017 14-Mar-2017 C-NH3-0667/T-P-T-1518; C-NH3-0717/T-P-T-1728 Approved with comments TPVN H
CSA 2539-30-DW-1842-05-01 Cooling Tower of 30-CT-3001K/L Roof Access Walkway 0 13-Feb-2017 IFC 15-Feb-2017 T-T-P-01223 IFA 28-Feb-2017 01-Mar-2017 C-NH3-0640/T-P-T-1373 Commented TPVN C
CSA 2539-30-DW-1843-01-01 Shelter for 30-K-5001E Ground; Roof Plan; Elevations & A 24-Jun-2016 IFR 24-Jun-2016 T-T-P-00667 IFR 08-Jul-2016 16-Jul-2016 C-NH3-0219/T-P-T-0261; C-NH3-0272/T-P-T-0355 Approved with comments TPVN H
CSA 2539-30-DW-1843-01-01 Shelter for 30-K-5001E Ground; Roof Plan; Elevations & 0 23-Sep-2016 IFC 26-Sep-2016 T-T-P-00839 IFC Transmitted TPVN C
CSA 2539-30-DW-1843-02-01 Shelter for 30-K-5001E Framing Plans A 24-Jun-2016 IFR 24-Jun-2016 T-T-P-00667 IFR 08-Jul-2016 16-Jul-2016 C-NH3-0219/T-P-T-0261; C-NH3-0272/T-P-T-0355 Approved with comments TPVN H
CSA 2539-30-DW-1843-02-01 Shelter for 30-K-5001E Framing Plans 0 23-Sep-2016 IFC 26-Sep-2016 T-T-P-00839 IFC Transmitted TPVN C
CSA 2539-30-DW-1843-03-01 Shelter for 30-K-5001E Framing Elevations A 24-Jun-2016 IFR 24-Jun-2016 T-T-P-00667 IFR 08-Jul-2016 Transmitted TPVN H
CSA 2539-30-DW-1843-03-01 Shelter for 30-K-5001E Framing Elevations 0 23-Sep-2016 IFC 26-Sep-2016 T-T-P-00839 IFC Transmitted TPVN C
CSA 2539-30-DW-1843-04-01 Shelter for 30-PK-3005 Framing Plans; Elevations & Deta A 13-Mar-2017 IFR 13-Mar-2017 T-T-P-01286 IFR 26-Mar-2017 No Comment TPVN H
CSA 2539-30-DW-1843-04-01 Shelter for 30-PK-3005 Framing Plans; Elevations & Deta 0 27-Mar-2017 IFC 28-Mar-2017 T-T-P-01310 IFA 10-Apr-2017 11-Apr-2017 T-P-T-1735 Approved TPVN C
CSA 2539-30-DW-1845-01-01 Unit 40 Pipe Supports Details A 09-Mar-2017 IFR 09-Mar-2017 T-T-P-01278 IFR 23-Mar-2017 21-Mar-2017 T-P-T-1620 Approved TPVN H
CSA 2539-30-DW-1845-01-01 Unit 30 Pipe Supports Details 0 27-Mar-2017 IFC 28-Mar-2017 T-T-P-01310 IFA 10-Apr-2017 11-Apr-2017 T-P-T-1735 Approved TPVN C
CSA 2539-30-DW-1845-02-01 30-E-1002 Serviced Platform A 11-Nov-2016 IFR 11-Nov-2016 T-T-P-00954 IFR 24-Nov-2016 24-Nov-2016 T-P-T-0670 Approved TPVN H
CSA 2539-30-DW-1845-02-01 30-E-1002 Serviced Platform 0 03-Jan-2017 IFC 04-Jan-2017 T-T-P-01105 IFA 17-Jan-2017 16-Jan-2017 C-NH3-0549/T-P-T-1005; C-NH3-0625/T-P-T-1306 Commented TPVN C
CSA 2539-30-DW-1845-03-01 30-PK-3002 Serviced Platform 0 29-Mar-2017 IFC 29-Mar-2017 T-T-P-01312 IFA 11-Apr-2017 19-Apr-2017 T-P-T-1849 Approved TPVN C
CSA 2539-40-CN-1731-01 Unit 40 - Calculation Note for Concrete Structure of Pipe A 16-Dec-2016 IFR 21-Dec-2016 T-T-P-01064 IFR 03-Jan-2017 05-Jan-2017 T-P-T-0925 Approved TPVN H
CSA 2539-40-CN-1731-01 Unit 40 - Calculation Note for Concrete Structure of Pipe 0 10-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 24-Feb-2017 T-P-T-1349 Approved TPVN C
CSA 2539-40-CN-1733-01 Unit 40 Calculation Note for Foundation of Ammonia Tr A 05-Jan-2017 IFR 06-Jan-2017 T-T-P-01121 IFR 19-Jan-2017 19-Jan-2017 T-P-T-1051 Approved TPVN H
CSA 2539-40-CN-1733-01 Unit 40 Calculation Note for Foundation of Ammonia Tr 0 23-Jan-2017 IFC 25-Jan-2017 T-T-P-01186 IFA 08-Feb-2017 14-Mar-2017 T-P-T-1522 Approved TPVN C
CSA 2539-40-CN-1733-02 Unit 40 Calculation Note for Foundation of Ammonia He A 04-Jan-2017 IFR 06-Jan-2017 T-T-P-01121 IFR 19-Jan-2017 19-Jan-2017 T-P-T-1051 Approved TPVN H
CSA 2539-40-CN-1733-02 Unit 40 Calculation Note for Foundation of Ammonia He 0 23-Jan-2017 IFC 25-Jan-2017 T-T-P-01186 IFA 08-Feb-2017 14-Mar-2017 T-P-T-1522 Approved TPVN C
CSA 2539-40-CN-1733-04 Unit 40 Calculation Note for Foundation of Ammonia L A 04-Jan-2017 IFR 06-Jan-2017 T-T-P-01121 IFR 19-Jan-2017 19-Jan-2017 T-P-T-1051 Approved TPVN H
CSA 2539-40-CN-1733-04 Unit 40 Calculation Note for Foundation of Ammonia L 0 23-Jan-2017 IFC 25-Jan-2017 T-T-P-01186 IFA 08-Feb-2017 14-Mar-2017 T-P-T-1522 Approved TPVN C
CSA 2539-40-CN-1733-05 Unit 40 Calculation Note for Foundation of Ammonia Va A 03-Jan-2017 IFR 06-Jan-2017 T-T-P-01121 IFR 19-Jan-2017 19-Jan-2017 T-P-T-1051 Approved TPVN H
CSA 2539-40-CN-1733-05 Unit 40 Calculation Note for Foundation of Ammonia Va 0 23-Jan-2017 IFC 25-Jan-2017 T-T-P-01186 IFA 08-Feb-2017 14-Mar-2017 T-P-T-1522 Approved TPVN C
CSA 2539-40-CN-1733-06 Unit 40 Calculation Note for Foundation of Ammonia Tr A 04-Jan-2017 IFR 06-Jan-2017 T-T-P-01121 IFR 19-Jan-2017 19-Jan-2017 T-P-T-1051 Approved TPVN H
CSA 2539-40-CN-1733-06 Unit 40 Calculation Note for Foundation of Ammonia Tr 0 23-Jan-2017 IFC 25-Jan-2017 T-T-P-01186 IFA 08-Feb-2017 14-Mar-2017 T-P-T-1522 Approved TPVN C
CSA 2539-40-CN-1735-01 Unit 40 Calculation Note for Concrete Structure of Misc 0 24-Feb-2017 IFC 27-Feb-2017 T-T-P-01247 IFA 12-Mar-2017 08-Mar-2017 T-P-T-1486 Approved TPVN C
CSA 2539-40-CN-1831-01 Unit 40 - Calculation Note for Steel Structure of Piperack A 16-Dec-2016 IFR 21-Dec-2016 T-T-P-01064 IFR 03-Jan-2017 05-Jan-2017 T-P-T-0925 Approved TPVN H
CSA 2539-40-CN-1831-01 Unit 40 - Calculation Note for Steel Structure of Piperack 0 10-Feb-2017 IFC 13-Feb-2017 T-T-P-01217 IFA 26-Feb-2017 24-Feb-2017 T-P-T-1349 Approved TPVN C
CSA 2539-40-CN-1835-01 Unit 40 Structural Steel Calculation Note of Miscellaneo 0 27-Feb-2017 IFC 27-Feb-2017 T-T-P-01247 IFA 12-Mar-2017 08-Mar-2017 T-P-T-1486 Approved TPVN C
CSA 2539-40-DW-1425-01-01 Utility Production Paving; Road & Surface Finishing A 24-Nov-2016 IFR 25-Nov-2016 T-T-P-00994 IFR 08-Dec-2016 07-Dec-2016 C-NH3-0447/T-P-T-0744; C-NH3-0492/T-P-T-0845 Commented TPVN H
CSA 2539-40-DW-1425-01-01 Utility Production Paving; Road & Surface Finishing 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01012 IFA 18-Dec-2016 28-Dec-2016 T-P-T-0902 Approved TPVN C
CSA 2539-40-DW-1432-01-01 Unit 40 Piling Layout for Pipe Bridge A 01-Jul-2016 IFR 06-Jul-2016 T-T-P-00690 IFR 19-Jul-2016 01-Aug-2016 T-P-T-0296 Approved TPVN H
CSA 2539-40-DW-1432-01-01 Unit 40 Piling Layout for Pipe Bridge 0 05-Aug-2016 IFC 05-Aug-2016 T-T-P-00743 IFC Transmitted TPVN C
CSA 2539-40-DW-1432-02-01 Unit 40 - Piling Layout Refrigeration Package 40-PK-500 A 12-Aug-2016 IFR 15-Aug-2016 T-T-P-00751 IFR 28-Aug-2016 22-Aug-2016 C-NH3-0265/T-P-T-0341; C-NH3-0310/T-P-T-0420 Approved TPVN H
CSA 2539-40-DW-1432-02-01 Unit 40 - Piling Layout Refrigeration Package 40-PK-500 0 26-Oct-2016 IFC 28-Oct-2016 T-T-P-00914 IFC 14-Nov-2016 T-P-T-0594 Approved TPVN C
CSA 2539-40-DW-1442-01-01 Ammonia Storage Flare & W.W.T Plant Major Undergrou A 15-Feb-2016 IFR 17-Feb-2016 T-T-P-00320 IFR 01-Mar-2016 No Comment TPIT H
CSA 2539-40-DW-1442-01-01 Ammonia Storage Flare & W.W.T Plant Major Undergrou B 14-Apr-2016 IDD 14-Apr-2016 T-T-P-00535 IDD Transmitted TPVN C
CSA 2539-40-DW-1442-01-02 Ammonia Storage Flare & W.W.T Plant Major Undergrou A 15-Feb-2016 IFR 17-Feb-2016 T-T-P-00320 IFR 01-Mar-2016 No Comment TPIT H
CSA 2539-40-DW-1442-01-02 Ammonia Storage Flare & W.W.T Plant Major Undergrou B 14-Apr-2016 IDD 14-Apr-2016 T-T-P-00535 IDD Transmitted TPVN C
CSA 2539-40-DW-1442-01-03 Ammonia Storage Flare & W.W.T Plant Major Undergrou A 15-Feb-2016 IFR 17-Feb-2016 T-T-P-00320 IFR 01-Mar-2016 No Comment TPIT H
CSA 2539-40-DW-1442-01-03 Ammonia Storage Flare & W.W.T Plant Major Undergrou B 14-Apr-2016 IDD 14-Apr-2016 T-T-P-00535 IDD Transmitted TPVN C
CSA 2539-40-DW-1452-01-01 Ammonia Storage Flare & W.W.T Plant Grading; Undergr A 17-Nov-2016 IFR 21-Nov-2016 T-T-P-00979 IFR 04-Dec-2016 03-Dec-2016 T-P-T-0720 Approved TPVN H
CSA 2539-40-DW-1452-01-01 Ammonia Storage Flare & W.W.T Plant Grading; Undergr 0 19-Dec-2016 IFC 20-Dec-2016 T-T-P-01062 IFA 02-Jan-2017 05-Jan-2017 T-P-T-0924 Approved TPVN H
CSA 2539-40-DW-1452-01-01 Ammonia Storage Flare & W.W.T Plant Grading; Undergr 1 30-Mar-2017 IFC 10-Apr-2017 T-T-P-01347 IFA 24-Apr-2017 Transmitted TPVN C
CSA 2539-40-DW-1452-02-01 Ammonia Storage Flare & W.W.T Plant Grading; Undergr A 17-Nov-2016 IFR 21-Nov-2016 T-T-P-00979 IFR 04-Dec-2016 03-Dec-2016 T-P-T-0720 Approved TPVN H
CSA 2539-40-DW-1452-02-01 Ammonia Storage Flare & W.W.T Plant Grading; Undergr 0 19-Dec-2016 IFC 20-Dec-2016 T-T-P-01062 IFA 02-Jan-2017 05-Jan-2017 C-NH3-0522/T-P-T-0924 Commented TPVN C
CSA 2539-40-DW-1452-03-01 Ammonia Storage Flare & W.W.T Plant Grading; Undergr A 17-Nov-2016 IFR 21-Nov-2016 T-T-P-00979 IFR 04-Dec-2016 03-Dec-2016 T-P-T-0720 Approved TPVN H
CSA 2539-40-DW-1452-03-01 Ammonia Storage Flare & W.W.T Plant Grading; Undergr 0 19-Dec-2016 IFC 20-Dec-2016 T-T-P-01062 IFA 02-Jan-2017 05-Jan-2017 T-P-T-0924 Approved TPVN C
CSA 2539-40-DW-1490-01-01 Ammonia Storage Demolition Plan A 17-Nov-2016 IFR 21-Nov-2016 T-T-P-00979 IFR 04-Dec-2016 03-Dec-2016 T-P-T-0720 Approved TPVN H
CSA 2539-40-DW-1490-01-01 Ammonia Storage Demolition Plan 0 23-Dec-2016 IFC 28-Dec-2016 T-T-P-01093 IFA 10-Jan-2017 11-Jan-2017 C-NH3-0542/T-P-T-0973 Commented TPVN C
CSA 2539-40-DW-1741-01-01 Piperack 03 Foundations Plan & Sections A 29-Jul-2016 IFR 02-Aug-2016 T-T-P-00731 IFR 15-Aug-2016 Transmitted TPVN H
CSA 2539-40-DW-1741-01-01 Piperack 03 Foundations Plan & Sections 0 30-Sep-2016 IFC 30-Sep-2016 T-T-P-00847 IFC Transmitted TPVN C
CSA 2539-40-DW-1741-02-01 Piperack 03 Foundations Reinforcement A 29-Jul-2016 IFR 02-Aug-2016 T-T-P-00731 IFR 15-Aug-2016 Transmitted TPVN H
CSA 2539-40-DW-1741-02-01 Piperack 03 Foundations Reinforcement 0 30-Sep-2016 IFC 30-Sep-2016 T-T-P-00847 IFC No Comment TPVN H
CSA 2539-40-DW-1741-02-01 Piperack 03 Foundation Reinforcement 1 10-Feb-2017 IFC 13-Feb-2017 T-T-P-01214 IFA 26-Feb-2017 01-Mar-2017 T-P-T-1375 Approved TPVN C
CSA 2539-40-DW-1743-01-01 40-P-5003 Foundation Detail A 04-Nov-2016 IFR 07-Nov-2016 T-T-P-00936 IFR 20-Nov-2016 Transmitted TPVN H
CSA 2539-40-DW-1743-01-01 40-P-5003 Foundation Detail 0 25-Nov-2016 IFC 28-Nov-2016 T-T-P-00999 IFA 11-Dec-2016 13-Dec-2016 T-P-T-0774 Approved TPVN H
CSA 2539-40-DW-1743-01-01 40-P-5003 Foundation Details 1 03-Jan-2017 IFC 06-Jan-2017 T-T-P-01119 IFA 19-Jan-2017 19-Jan-2017 C-NH3-0559/T-P-T-1050; C-NH3-0626/T-P-T-1307 Commented TPVN C
CSA 2539-40-DW-1743-02-01 40-E-5002 Foundation Detail A 31-Oct-2016 IFC 01-Nov-2016 T-T-P-00922 IFR 15-Nov-2016 24-Nov-2016 T-P-T-0668 Approved TPVN H
CSA 2539-40-DW-1743-02-01 40-E-5002 Foundation Details 0 25-Nov-2016 IFC 28-Nov-2016 T-T-P-00999 IFA 11-Dec-2016 13-Dec-2016 C-NH3-0464/T-P-T-0774; C-NH3-0501/T-P-T-0865 Commented TPVN H
CSA 2539-40-DW-1743-02-01 40-E-5002 Foundation Details 1 03-Jan-2017 IFC 04-Jan-2017 T-T-P-01105 IFA 17-Jan-2017 16-Jan-2017 C-NH3-0549/T-P-T-1005; C-NH3-0625/T-P-T-1306 Commented TPVN C
CSA 2539-40-DW-1743-03-01 40-PK-5003 & 40-PK-5004 Foundation Details A 31-Oct-2016 IFR 01-Nov-2016 T-T-P-00922 IFR 15-Nov-2016 24-Nov-2016 T-P-T-0668 Approved TPVN H
CSA 2539-40-DW-1743-03-01 40-PK-5003 & 40-PK-5004 Foundation Details 0 25-Nov-2016 IFC 28-Nov-2016 T-T-P-00999 IFA 11-Dec-2016 13-Dec-2016 T-P-T-0774 Approved TPVN H
CSA 2539-40-DW-1743-03-01 40-PK-5003 & 40-PK-5004 Foundation Details 1 04-Jan-2017 IFC 06-Jan-2017 T-T-P-01119 IFA 19-Jan-2017 19-Jan-2017 T-P-T-1050 Approved TPVN C
CSA 2539-40-DW-1743-04-01 40-LA-5003/4; 40-LA-5005/6 Foundation Details A 31-Oct-2016 IFR 01-Nov-2016 T-T-P-00922 IFR 15-Nov-2016 24-Nov-2016 T-P-T-0668 Approved TPVN H
CSA 2539-40-DW-1743-04-01 40-LA-5003/4 & 40-LA-5005/6 Foundation Details 0 25-Nov-2016 IFC 28-Nov-2016 T-T-P-00999 IFA 11-Dec-2016 13-Dec-2016 C-NH3-0464/T-P-T-0774; C-NH3-0501/T-P-T-0865 Commented TPVN H
CSA 2539-40-DW-1743-04-01 40-LA-5003/4 & 40-LA-5005/6 Foundation Details 1 04-Jan-2017 IFC 06-Jan-2017 T-T-P-01119 IFA 19-Jan-2017 19-Jan-2017 T-P-T-1050 Approved TPVN C
CSA 2539-40-DW-1743-05-01 40-PK-5005 Foundation Detail A 31-Oct-2016 IFR 01-Nov-2016 T-T-P-00922 IFR 15-Nov-2016 24-Nov-2016 T-P-T-0668 Approved TPVN H
CSA 2539-40-DW-1743-05-01 40-PK-5005 Foundation Details 0 25-Nov-2016 IFC 28-Nov-2016 T-T-P-00999 IFA 11-Dec-2016 13-Dec-2016 T-P-T-0774 Approved TPVN H
CSA 2539-40-DW-1743-05-01 40-PK-5005 Foundation Details 1 03-Jan-2017 IFC 04-Jan-2017 T-T-P-01105 IFA 17-Jan-2017 16-Jan-2017 C-NH3-0549/T-P-T-1005; C-NH3-0625/T-P-T-1306 Commented TPVN H
CSA 2539-40-DW-1743-05-01 40-PK-5005 Foundation Details 2 19-Jan-2017 IFC 20-Jan-2017 T-T-P-01175 IFA 03-Feb-2017 Transmitted TPVN C
CSA 2539-40-DW-1745-01-01 Shelter Foundation Details A 22-Dec-2016 IFR 23-Dec-2016 T-T-P-01074 IFR 05-Jan-2017 05-Jan-2017 C-NH3-0523/T-P-T-0926 Commented TPVN H
CSA 2539-40-DW-1745-01-01 Shelter Foundation Details 0 08-Feb-2017 IFC 09-Feb-2017 T-T-P-01208 IFA 22-Feb-2017 24-Feb-2017 T-P-T-1346 Approved TPVN C
CSA 2539-40-DW-1745-02-01 Unit 40 Pipe Support Locations A 28-Feb-2017 IFR 02-Mar-2017 T-T-P-01258 IFR 15-Mar-2017 14-Mar-2017 C-NH3-0671/T-P-T-1542; C-NH3-0715/T-P-T-1726 Approved with comments TPVN H
CSA 2539-40-DW-1745-02-01 Unit 40 Pipe Support Locations 0 22-Mar-2017 IFC 23-Mar-2017 T-T-P-01304 IFA 05-Apr-2017 11-Apr-2017 C-NH3-0723/T-P-T-1734 Commented TPVN C
CSA 2539-40-DW-1745-03-01 Unit 40 Foundation for Pipe Supports (SHT.1) A 08-Mar-2017 IFR 02-Mar-2017 T-T-P-01258 IFR 15-Mar-2017 14-Mar-2017 C-NH3-0671/T-P-T-1542; C-NH3-0715/T-P-T-1726 Approved with comments TPVN H
CSA 2539-40-DW-1745-03-01 Unit 40 Foundation for Pipe Supports (SHT.1) 0 22-Mar-2017 IFC 23-Mar-2017 T-T-P-01304 IFA 05-Apr-2017 11-Apr-2017 C-NH3-0723/T-P-T-1734 Commented TPVN C
CSA 2539-40-DW-1745-04-01 Unit 40 Foundation for Pipe Supports (SHT.2) A 28-Feb-2017 IFR 02-Mar-2017 T-T-P-01258 IFR 15-Mar-2017 14-Mar-2017 C-NH3-0671/T-P-T-1542; C-NH3-0715/T-P-T-1726 Approved with comments TPVN H
CSA 2539-40-DW-1745-04-01 Unit 40 Foundation for Pipe Supports (SHT.2) 0 22-Mar-2017 IFC 23-Mar-2017 T-T-P-01304 IFA 05-Apr-2017 11-Apr-2017 C-NH3-0723/T-P-T-1734 Commented TPVN C
CSA 2539-40-DW-1745-05-01 Unit 40 Foundation for Pipe Supports (SHT.3) A 28-Feb-2017 IFR 02-Mar-2017 T-T-P-01258 IFR 15-Mar-2017 No Comment TPVN H
CSA 2539-40-DW-1745-05-01 Unit 40 Foundation for Pipe Supports (SHT.3) 0 22-Mar-2017 IFC 23-Mar-2017 T-T-P-01304 IFA 05-Apr-2017 05-Apr-2017 T-P-T-1725 Approved TPVN C
CSA 2539-40-DW-1745-06-01 Unit 40 Serviced Platform Foundation A 24-Mar-2017 IFR 28-Mar-2017 T-T-P-01309 IFR 10-Apr-2017 26-Apr-2017 C-NH3-0762/T-P-T-1887 Commented TPVN H
CSA 2539-40-DW-1745-06-01 Unit 40 Serviced Platform Foundation 0 10-Apr-2017 IFC 10-Apr-2017 T-T-P-01347 IFA 24-Apr-2017 26-Apr-2017 C-NH3-0765/T-P-T-1890 Commented TPVN C
CSA 2539-40-DW-1841-01-01 Piperack 03 Framing Plans A 29-Jul-2016 IFR 02-Aug-2016 T-T-P-00731 IFR 15-Aug-2016 Transmitted TPVN H
CSA 2539-40-DW-1841-01-01 Piperack 03 Framing Plans 0 30-Sep-2016 IFC 30-Sep-2016 T-T-P-00847 IFC No Comment TPVN H
Page 8
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
CSA 2539-40-DW-1841-01-01 Piperack 03 Framing Plans 1 10-Feb-2017 IFC 13-Feb-2017 T-T-P-01214 IFA 26-Feb-2017 01-Mar-2017 T-P-T-1375 Approved TPVN C
CSA 2539-40-DW-1841-02-01 Piperack 03 Framing Elevations A 29-Jul-2016 IFR 02-Aug-2016 T-T-P-00731 IFR 15-Aug-2016 Transmitted TPVN H
CSA 2539-40-DW-1841-02-01 Piperack 03 Framing Elevations 0 30-Sep-2016 IFC 30-Sep-2016 T-T-P-00847 IFC No Comment TPVN H
CSA 2539-40-DW-1841-02-01 Piperack 03 Framing Elevations 1 27-Dec-2016 IFC 28-Dec-2016 T-T-P-01093 IFA 10-Jan-2017 11-Jan-2017 C-NH3-0542/T-P-T-0973 Commented TPVN H
CSA 2539-40-DW-1841-02-01 Piperack 03 Framing Elevations 2 10-Feb-2017 IFC 13-Feb-2017 T-T-P-01214 IFA 26-Feb-2017 01-Mar-2017 T-P-T-1375 Approved TPVN H
CSA 2539-40-DW-1841-02-01 Piperack 03 Framing Elevations 3 21-Mar-2017 IFC 23-Mar-2017 T-T-P-01304 IFA 05-Apr-2017 04-Apr-2017 C-NH3-0714/T-P-T-1725 Approved with comments TPVN C
CSA 2539-40-DW-1841-03-01 Piperack 03 Detail Connections A 29-Jul-2016 IFR 02-Aug-2016 T-T-P-00731 IFR 15-Aug-2016 Transmitted TPVN H
CSA 2539-40-DW-1841-03-01 Piperack 03 Detail Connections 0 30-Sep-2016 IFC 30-Sep-2016 T-T-P-00847 IFC No Comment TPVN H
CSA 2539-40-DW-1841-03-01 Piperack 03 Detail Connections 1 10-Feb-2017 IFC 13-Feb-2017 T-T-P-01214 IFA 26-Feb-2017 01-Mar-2017 T-P-T-1375 Approved TPVN C
CSA 2539-40-DW-1843-01-01 Shelter Framing Plans; Elevations & Details A 22-Dec-2016 IFR 23-Dec-2016 T-T-P-01074 IFR 05-Jan-2017 No Comment TPVN H
CSA 2539-40-DW-1843-01-01 Shelter Framing Plans; Elevations & Details 0 08-Feb-2017 IFC 09-Feb-2017 T-T-P-01208 IFA 22-Feb-2017 24-Feb-2017 T-P-T-1346 Approved TPVN C
CSA 2539-40-DW-1845-01-01 Unit 40 Pipe Supports Details A 28-Feb-2017 IFR 02-Mar-2017 T-T-P-01258 IFR 15-Mar-2017 14-Mar-2017 C-NH3-0671/T-P-T-1542; C-NH3-0715/T-P-T-1726 Approved with comments TPVN H
CSA 2539-40-DW-1845-01-01 Unit 40 Pipe Supports Details 0 22-Mar-2017 IFC 23-Mar-2017 T-T-P-01304 IFA 05-Apr-2017 05-Apr-2017 T-P-T-1725 Approved TPVN C
CSA 2539-40-DW-1845-02-01 Miscellaneous Pipe Supports Plan; Elevation & Details A 09-Mar-2017 IFR 09-Mar-2017 T-T-P-01278 IFR 23-Mar-2017 21-Mar-2017 T-P-T-1620 Approved TPVN H
CSA 2539-40-DW-1845-02-01 Miscellaneous Pipe Supports Plan; Elevation & Details 0 22-Mar-2017 IFC 23-Mar-2017 T-T-P-01304 IFA 05-Apr-2017 04-Apr-2017 T-P-T-1725 Approved TPVN C
CSA 2539-40-DW-1845-03-01 Ammonia Tank Piperack Reinforcement Structure A 09-Mar-2017 IFR 09-Mar-2017 T-T-P-01278 IFR 23-Mar-2017 21-Mar-2017 T-P-T-1620 Approved TPVN H
CSA 2539-40-DW-1845-03-01 Ammonia Tank Piperack Reinforcement Structure 0 22-Mar-2017 IFC 23-Mar-2017 T-T-P-01304 IFA 05-Apr-2017 04-Apr-2017 T-P-T-1725 Approved TPVN C
CSA 2539-40-DW-1845-04-01 Unit 40 Serviced Platform Framing Plans; Sections & Det A 24-Mar-2017 IFR 28-Mar-2017 T-T-P-01309 IFR 10-Apr-2017 26-Apr-2017 C-NH3-0762/T-P-T-1887 Commented TPVN H
CSA 2539-40-DW-1845-04-01 Unit 40 Serviced Platform Framing Plans; Sections & Det 0 10-Apr-2017 IFC 10-Apr-2017 T-T-P-01347 IFA 24-Apr-2017 26-Apr-2017 C-NH3-0765/T-P-T-1890 Commented TPVN C
ELECTRICAL 2539-00-CN-1611-01 Grounding & Lightning Protection System Study A 22-Apr-2016 IFR 25-Apr-2016 T-T-P-00552 IFR 08-May-2016 10-May-2016 C-NH3-0148/T-P-T-0162 Approved with comments TPVN H
ELECTRICAL 2539-00-CN-1611-01 Grounding & Lightning Protection System Study 0 15-Jun-2016 FIN 17-Jun-2016 T-T-P-00656 FIN Transmitted TPVN C
ELECTRICAL 2539-00-CN-1621-01 Electrical Cable Sizing A 10-Feb-2016 IDD 11-Feb-2016 T-T-P-00308 IFR 24-Feb-2016 04-Mar-2016 C-NH3-0106/T-P-T-0083 Commented TPIT H
ELECTRICAL 2539-00-CN-1621-01 Electrical Cable Sizing B 15-Apr-2016 Re-IDD 19-Apr-2016 T-T-P-00543 Re-IDD 02-May-2016 24-Jun-2016 T-P-T-0225 Approved TPVN H
ELECTRICAL 2539-00-CN-1621-01 Electrical Cable Sizing 0 15-Jun-2016 FIN 17-Jun-2016 T-T-P-00656 FIN Transmitted TPVN C
ELECTRICAL 2539-00-CN-1626-01 Electrical Load List & Analysis (Ex: 2539-52-CN-1626-01 B 19-Feb-2016 IDD 22-Feb-2016 T-T-P-00335 Re-IDD 04-Mar-2016 C-NH3-0107/T-P-T-0084 Commented TPIT H
ELECTRICAL 2539-00-CN-1626-01 Electrical Load List & Analysis (Ex: 2539-52-CN-1626-01 C 01-Jul-2016 Re-IDD 01-Jul-2016 T-T-P-00678 IFR 15-Jul-2016 18-Jul-2016 T-P-T-0262 Approved TPVN H
ELECTRICAL 2539-00-CN-1626-01 Electrical Load List & Analysis (Ex: 2539-52-CN-1626-01 0 19-Aug-2016 FIN 19-Aug-2016 T-T-P-00763 FIN No Comment TPVN H
ELECTRICAL 2539-00-CN-1626-01 Electrical Load List & Analysis (Ex: 2539-52-CN-1626-01 1 21-Feb-2017 FIN 21-Feb-2017 T-T-P-01238 IFA 06-Mar-2017 10-Mar-2017 T-P-T-1504 Approved TPVN C
ELECTRICAL 2539-00-CN-1651-01 Short Circuit Analysis A 14-Jan-2016 IDD 19-Jan-2016 T-T-P-00247 IFR 01-Feb-2016 16-Feb-2016 C-NH3-0094/T-P-T-0070 Commented TPIT H
ELECTRICAL 2539-00-CN-1651-01 Short Circuit Analysis B 08-Mar-2016 IDD 08-Mar-2016 T-T-P-00399 Re-IFR 21-Mar-2016 23-Mar-2016 C-NH3-0123/T-P-T-0115 Commented TPIT H
ELECTRICAL 2539-00-CN-1651-01 Short Circuit Analysis 0 30-Aug-2016 FIN 30-Aug-2016 T-T-P-00780 FIN 14-Oct-2016 C-NH3-0325/T-P-T-0459 Commented TPVN H
ELECTRICAL 2539-00-CN-1651-01 Short Circuit Analysis 1 16-Dec-2016 FIN 19-Dec-2016 T-T-P-01058 IFA 01-Jan-2017 05-Jan-2017 T-P-T-0919 Approved TPVN C
ELECTRICAL 2539-00-CN-1651-02 Load Flow & Voltage Drop Analysis A 14-Jan-2016 IDD 19-Jan-2016 T-T-P-00247 IFR 01-Feb-2016 16-Feb-2016 C-NH3-0094/T-P-T-0070 Commented TPIT H
ELECTRICAL 2539-00-CN-1651-02 Load Flow & Voltage Drop Analysis B 08-Mar-2016 IDD 08-Mar-2016 T-T-P-00399 Re-IFR 21-Mar-2016 23-Mar-2016 C-NH3-0123/T-P-T-0115 Commented TPIT H
ELECTRICAL 2539-00-CN-1651-02 Load Flow & Voltage Drop Analysis 0 30-Aug-2016 FIN 30-Aug-2016 T-T-P-00780 FIN No Comment TPVN H
ELECTRICAL 2539-00-CN-1651-02 Load Flow & Voltage Drop Analysis 1 16-Dec-2016 FIN 19-Dec-2016 T-T-P-01058 IFA 01-Jan-2017 05-Jan-2017 T-P-T-0919 Approved TPVN C
ELECTRICAL 2539-00-CN-1651-03 Motor Starting Analysis A 14-Jan-2016 IDD 19-Jan-2016 T-T-P-00247 IFR 01-Feb-2016 16-Feb-2016 C-NH3-0094/T-P-T-0070 Commented TPIT H
ELECTRICAL 2539-00-CN-1651-03 Motor Starting Analysis B 08-Mar-2016 IDD 08-Mar-2016 T-T-P-00399 Re-IFR 21-Mar-2016 23-Mar-2016 C-NH3-0123/T-P-T-0115 Commented TPIT H
ELECTRICAL 2539-00-CN-1651-03 Motor Starting Analysis 0 30-Aug-2016 FIN 30-Aug-2016 T-T-P-00780 FIN 14-Oct-2016 C-NH3-0325/T-P-T-0459 Commented TPVN H
ELECTRICAL 2539-00-CN-1651-03 Motor Starting Analysis 1 16-Dec-2016 FIN 19-Dec-2016 T-T-P-01058 IFA 01-Jan-2017 05-Jan-2017 T-P-T-0919 Approved TPVN C
ELECTRICAL 2539-00-CN-1651-05 Power Factor Improvement System Sizing A 15-Jan-2016 IDD 19-Jan-2016 T-T-P-00247 IFR 01-Feb-2016 16-Feb-2016 C-NH3-0094/T-P-T-0070 Commented TPIT H
ELECTRICAL 2539-00-CN-1651-05 Power Factor Improvement System Sizing 0 07-Jun-2016 FIN 08-Jun-2016 T-T-P-00641 FIN 17-Jun-2016 C-NH3-0185/T-P-T-0214 Commented TPVN H
ELECTRICAL 2539-00-CN-1651-05 Power Factor Improvement System Sizing 1 28-Jul-2016 FIN 29-Jul-2016 T-T-P-00724 FIN Transmitted TPVN C
ELECTRICAL 2539-00-CN-1661-01 Protective Relay Coordination Study A 23-Dec-2016 IDD 26-Dec-2016 T-T-P-01083 IFR 08-Jan-2017 08-Feb-2017 C-NH3-0596 Commented TPVN H
ELECTRICAL 2539-00-CN-1661-01 Protective Relay Coordination Study 0 28-Feb-2017 FIN 01-Mar-2017 T-T-P-01252 IFA 14-Mar-2017 Transmitted TPVN C
ELECTRICAL 2539-00-CN-1684-01 Cathodic Protection System Calculation A 29-Jul-2016 IFR 01-Aug-2016 T-T-P-00730 IFR 14-Aug-2016 15-Sep-2016 C-NH3-0288/T-P-T-0385 Commented TPVN H
ELECTRICAL 2539-00-CN-1684-01 Cathodic Protection System Calculation 0 20-Sep-2016 IFE 20-Sep-2016 T-T-P-00824 IFE Transmitted TPVN C
ELECTRICAL 2539-00-DW-1611-01-01 General Notes & Legend for Electrical (1/3) A 09-Nov-2015 IFR 11-Nov-2015 T-T-P-00078 IFR 24-Nov-2015 25-Nov-2015 C-NH3-0043/T-P-T-0019 Commented TPIT H
ELECTRICAL 2539-00-DW-1611-01-01 General Notes & Legend for Electrical (1/3) 0 22-Jan-2016 IFC 19-Jan-2016 T-T-P-00249 IFC Transmitted TPIT C
ELECTRICAL 2539-00-DW-1611-02-01 General Notes & Legend for Electrical (2/3) A 09-Nov-2015 IFR 11-Nov-2015 T-T-P-00078 IFR 24-Nov-2015 25-Nov-2015 C-NH3-0043/T-P-T-0019 No Comment TPIT H
ELECTRICAL 2539-00-DW-1611-02-01 General Notes & Legend for Electrical (2/3) 0 22-Jan-2016 IFC 19-Jan-2016 T-T-P-00249 IFC Transmitted TPIT C
ELECTRICAL 2539-00-DW-1611-03-01 General Notes & Legend for Electrical (3/3) A 09-Nov-2015 IFR 11-Nov-2015 T-T-P-00078 IFR 24-Nov-2015 25-Nov-2015 C-NH3-0043/T-P-T-0019 No Comment TPIT H
ELECTRICAL 2539-00-DW-1611-03-01 General Notes & Legend for Electrical (3/3) 0 22-Jan-2016 IFC 19-Jan-2016 T-T-P-00249 IFC Transmitted TPIT C
ELECTRICAL 2539-00-DW-1612-01-01 Grounding Plan (Overall & Key Plan) A 22-Apr-2016 IFR 26-Apr-2016 T-T-P-00554 IFR 09-May-2016 24-Jun-2016 T-P-T-0225 Approved TPVN H
ELECTRICAL 2539-00-DW-1612-01-01 Grounding Plan (Overall & Key Plan) B 07-Oct-2016 IDD 11-Oct-2016 T-T-P-00865 IFR 24-Oct-2016 16-Nov-2016 T-P-T-0566 Approved TPVN H
ELECTRICAL 2539-00-DW-1612-01-01 Grounding Plan (Overall & Key Plan) 0 02-Dec-2016 IFC 07-Dec-2016 T-T-P-01021 IFA 20-Dec-2016 23-Dec-2016 T-P-T-0883 Approved TPVN C
ELECTRICAL 2539-00-DW-1622-01-01 Main Cable Route Plan (Overall & Key Plan) A 07-Mar-2016 IFR 08-Mar-2016 T-T-P-00403 IFR 21-Mar-2016 24-Jun-2016 T-P-T-0223 Approved TPIT H
ELECTRICAL 2539-00-DW-1622-01-01 Main Cable Route Plan (Overall & Key Plan) B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-00-DW-1622-01-01 Main Cable Route Plan (Overall & Key Plan) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-00-DW-1622-02-01 Power Plan (Key Plan) A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-00-DW-1622-02-01 Power Plan (Key Plan) B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-00-DW-1622-02-01 Power Plan (Key Plan) 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-00-DW-1632-01-01 Lighting Fixture Schedule A 10-May-2016 IFR 11-May-2016 T-T-P-00584 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-00-DW-1632-01-01 Lighting Fixture Schedule B 21-Oct-2016 IDD 21-Oct-2016 T-T-P-00906 IFR 08-Nov-2016 18-Nov-2016 T-P-T-0624 Approved TPVN H
ELECTRICAL 2539-00-DW-1632-01-01 Lighting Fixture Schedule 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-00-DW-1632-02-01 Lighting Plan (Key Plan) A 10-May-2016 IFR 11-May-2016 T-T-P-00584 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-00-DW-1632-02-01 Lighting Plan (Key Plan) B 21-Oct-2016 IDD 21-Oct-2016 T-T-P-00906 IFR 08-Nov-2016 18-Nov-2016 T-P-T-0624 Approved TPVN H
ELECTRICAL 2539-00-DW-1632-02-01 Lighting Plan (Key Plan) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-00-DW-1632-03-01 Lighting Plan (Street Lighting) A 10-May-2016 IFR 11-May-2016 T-T-P-00584 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-00-DW-1632-03-01 Lighting Plan (Street Lighting) B 21-Oct-2016 IDD 21-Oct-2016 T-T-P-00906 IFR 08-Nov-2016 18-Nov-2016 T-P-T-0624 Approved TPVN H
ELECTRICAL 2539-00-DW-1632-03-01 Lighting Plan (Street Lighting) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-00-DW-1632-03X-01 Lighting Plan Street Lighting (Demolition Plan) A 10-May-2016 IFR 11-May-2016 T-T-P-00584 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-00-DW-1632-03X-01 Lighting Plan Street Lighting (Demolition Plan) B 21-Oct-2016 IDD 21-Oct-2016 T-T-P-00906 IFR 08-Nov-2016 18-Nov-2016 T-P-T-0624 Approved TPVN H
ELECTRICAL 2539-00-DW-1632-03X-01 Lighting Plan Street Lighting (Demolition Plan) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-00-DW-1634-01 Lighting Circuits Panel Schedule A 10-May-2016 IFR 11-May-2016 T-T-P-00582 IFR 24-May-2016 24-Jun-2016 T-P-T-0225 Approved TPVN H
ELECTRICAL 2539-00-DW-1634-01 Lighting Circuits Panel Schedule B 21-Oct-2016 IDD 21-Oct-2016 T-T-P-00906 IFR 08-Nov-2016 18-Nov-2016 T-P-T-0624 Approved TPVN H
ELECTRICAL 2539-00-DW-1634-01 Lighting Circuits Panel Schedule 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-00-DW-1652-01-01 Electrical Cables Block Diagram A 15-Jan-2016 IFR 19-Jan-2016 T-T-P-00248 IFR 01-Feb-2016 16-Feb-2016 C-NH3-0095/T-P-T-0070 Commented TPIT H
ELECTRICAL 2539-00-DW-1652-01-01 Electrical Cables Block Diagram B 07-Mar-2016 IFR 08-Mar-2016 T-T-P-00404 Re-IFR 21-Mar-2016 24-Jun-2016 T-P-T-0223 Approved TPIT H
ELECTRICAL 2539-00-DW-1652-01-01 Electrical Cables Block Diagram C 21-Oct-2016 IDD 21-Oct-2016 T-T-P-00895 IFR 06-Nov-2016 07-Nov-2016 T-P-T-0552 Approved TPVN H
ELECTRICAL 2539-00-DW-1652-01-01 Electrical Cables Block Diagram 0 14-Dec-2016 IFC 14-Dec-2016 T-T-P-01050 IFA 28-Dec-2016 02-Jan-2017 T-P-T-0906 Approved TPVN H
ELECTRICAL 2539-00-DW-1652-01-01 Electrical Cables Block Diagram 1 21-Jun-2017 IFC 21-Jun-2017 T-T-P-01462 IFA 04-Jul-2017 Transmitted TPVN C
ELECTRICAL 2539-00-DW-1662-01 MV Schematic Diagrams A 10-May-2016 IFI 11-May-2016 T-T-P-00581 IFR 24-May-2016 31-May-2016 C-NH3-0166/T-P-T-0189 Commented TPVN H
ELECTRICAL 2539-00-DW-1662-01 MV Schematic Diagrams 0 19-Aug-2016 IFP 19-Aug-2016 T-T-P-00764 IFP Transmitted TPVN C
ELECTRICAL 2539-00-DW-1664-01 Electrical Connection Diagram A 18-Jan-2017 IFR 19-Jan-2017 T-T-P-01163 IFR 01-Feb-2017 03-Feb-2017 T-P-T-1161 Approved TPVN H
ELECTRICAL 2539-00-DW-1664-01 Electrical Connection Diagram 0 02-Mar-2017 IFC 03-Mar-2017 T-T-P-01265 IFA 16-Mar-2017 29-Mar-2017 T-P-T-1672 Approved TPVN H
ELECTRICAL 2539-00-DW-1664-01 Electrical Connection Diagram 1 12-Jul-2017 IFC 12-Jul-2017 T-T-P-01487 IFA 25-Jul-2017 Transmitted TPVN C
ELECTRICAL 2539-00-DW-1664-01X Electrical Connection Diagram (Demolition Scope) 0 10-Nov-2016 IFC 11-Nov-2016 T-T-P-00950 IFA 24-Nov-2016 26-Nov-2016 T-P-T-0683 Approved TPVN C
ELECTRICAL 2539-00-ITP-1620-01 Inspection & Test Plan for Power Materials 0 18-Jan-2017 IFP 20-Jan-2017 T-T-P-01170 IFA 02-Feb-2017 08-Feb-2017 T-P-T-1226 Approved TPVN C
ELECTRICAL 2539-00-ITP-1621-01 Inspection & Test Plan for Electrical Cable A 10-Aug-2016 IFI 12-Aug-2016 T-T-P-00748 IFR 25-Aug-2016 24-Aug-2016 T-P-T-0345 MR 1621-01. Approved TPVN H
ELECTRICAL 2539-00-ITP-1621-01 Inspection & Test Plan for Electrical Cable 0 14-Dec-2016 IFP 15-Dec-2016 T-T-P-01051 IFA 28-Dec-2016 02-Jan-2017 T-P-T-0907 Approved TPVN C
ELECTRICAL 2539-00-ITP-1623-01 Inspection & Test Plan for Cable Ladders / Trays A 19-Aug-2016 IFI 23-Aug-2016 T-T-P-00768 IFR 05-Sep-2016 15-Sep-2016 T-P-T-0398 MR 1623-01. Approved TPVN H
ELECTRICAL 2539-00-ITP-1623-01 Inspection & Test Plan for Cable Ladders / Trays 0 13-Jan-2017 IFP 13-Jan-2017 T-T-P-01154 IFA 27-Jan-2017 23-Jan-2017 T-P-T-1148 Approved TPVN C
ELECTRICAL 2539-00-ITP-1630-01 Inspection & Test Plan for Lighting Material A 29-Jul-2016 IFI 01-Aug-2016 T-T-P-00729 IFR 14-Aug-2016 24-Aug-2016 T-P-T-0344 MR 1630-01. Approved TPVN H
ELECTRICAL 2539-00-ITP-1630-01 Inspection & Test Plan for Lighting Material 0 17-Jan-2017 IFP 18-Jan-2017 T-T-P-01160 IFA 31-Jan-2017 23-Jan-2017 T-P-T-1150 Approved TPVN C
ELECTRICAL 2539-00-ITP-1652-01 Inspection & Test Plan for Medium Voltage (6.6KV) Swit A 19-May-2016 IFI 20-May-2016 T-T-P-00596 IFR 02-Jun-2016 09-Jun-2016 T-P-T-0197 MR 1652-01. Approved TPVN H
ELECTRICAL 2539-00-ITP-1652-01 Inspection & Test Plan for 6.6KV Switchgear (MS2-3) 0 11-Oct-2016 IFP 11-Oct-2016 T-T-P-00868 IFP 10-Nov-2016 T-P-T-0570 MR 1652-01. Approved TPVN C
ELECTRICAL 2539-00-ITP-1654-01 Inspection & Test Plan for Low Voltage Switchgears & M A 01-Jul-2016 IFI 01-Jul-2016 T-T-P-00681 IFR 15-Jul-2016 18-Jul-2016 T-P-T-0265 MR 1654-01. Approved TPVN H
ELECTRICAL 2539-00-ITP-1654-01 Inspection & Test Plan for Low Voltage Switchgears & M 0 21-Nov-2016 IFP 22-Nov-2016 T-T-P-00985 IFA 05-Dec-2016 06-Dec-2016 T-P-T-0741 Approved TPVN C
ELECTRICAL 2539-00-ITP-1656-01 Inspection & Test Plan for Medium Voltage (6.6KV) Pow A 20-May-2016 IFI 23-May-2016 T-T-P-00599 IFR 06-Jun-2016 09-Jun-2016 T-P-T-0197 MR 1656-01. Approved TPVN H
ELECTRICAL 2539-00-ITP-1656-01 Inspection & Test Plan for Medium Voltage (6.6KV) Pow 0 14-Oct-2016 IFP 14-Oct-2016 T-T-P-00877 IFP Transmitted TPVN C
ELECTRICAL 2539-00-ITP-1661-01 Inspection & Test Plan for Electrical Control Systems (E A 17-Jun-2016 IFI 20-Jun-2016 T-T-P-00661 IFR 03-Jul-2016 09-Jul-2016 C-NH3-0209/T-P-T-0243 MR 1661-01. Commented TPVN H
ELECTRICAL 2539-00-ITP-1661-01 Inspection & Test Plan for Electrical Control Systems (E 0 06-Oct-2016 IFP 06-Oct-2016 T-T-P-00858 IFP 24-Oct-2016 C-NH3-0343/T-P-T-0490 MR 1661-01. Commented TPVN C
ELECTRICAL 2539-00-ITP-1684-01 Inspection & Test Plan for Cathodic Protection System A 20-Sep-2016 IFI 21-Sep-2016 T-T-P-00827 IFR 04-Oct-2016 10-Nov-2016 T-P-T-0569 MR 1684-01. Approved TPVN H
ELECTRICAL 2539-00-ITP-1684-01 Inspection & Test Plan for Cathodic Protection System 0 19-Jan-2017 IFP 20-Jan-2017 T-T-P-01166 IFA 02-Feb-2017 08-Feb-2017 T-P-T-1225 Approved TPVN C
ELECTRICAL 2539-00-JSD-1600-01 General Design Rules for Electrical System A 23-Oct-2015 IFR 23-Oct-2015 T-T-P-00026 IFR 05-Nov-2015 10-Nov-2015 C-NH3-0019/T-P-T-0009 Commented TPIT H
ELECTRICAL 2539-00-JSD-1600-01 General Design Rules for Electrical System 0 22-Jan-2016 IFE 19-Jan-2016 T-T-P-00250 IFE Transmitted TPIT H
ELECTRICAL 2539-00-JSD-1600-01 General Design Rules for Electrical System 1 04-Jul-2016 IFE 06-Jul-2016 T-T-P-00685 IFE Transmitted TPVN C
ELECTRICAL 2539-00-JSD-1600-02 General Design Rules for Electrical Systems for Packa A 23-Oct-2015 IFR 23-Oct-2015 T-T-P-00026 IFR 05-Nov-2015 10-Nov-2015 C-NH3-0019/T-P-T-0009 No Comment TPIT H
ELECTRICAL 2539-00-JSD-1600-02 General Design Rules for Electrical Systems for Packa 0 22-Jan-2016 IFE 19-Jan-2016 T-T-P-00250 IFE Transmitted TPIT C
ELECTRICAL 2539-00-JSS-1621-01 General Supply Rules for Electrical Power and Control C A 23-Oct-2015 IFR 23-Oct-2015 T-T-P-00026 IFR 05-Nov-2015 10-Nov-2015 C-NH3-0019/T-P-T-0009 No Comment TPIT H
ELECTRICAL 2539-00-JSS-1621-01 General Supply Rules for Electrical Power and Control C 0 22-Jan-2016 IFE 19-Jan-2016 T-T-P-00250 IFE Transmitted TPIT C
Page 9
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
ELECTRICAL 2539-00-JSS-1652-02 General Supply Specification for High Voltage Metal Cla A 23-Oct-2015 IFR 23-Oct-2015 T-T-P-00026 IFR 05-Nov-2015 10-Nov-2015 C-NH3-0019/T-P-T-0009 Commented TPIT H
ELECTRICAL 2539-00-JSS-1652-02 General Supply Specification for High Voltage Metal Cla 0 22-Jan-2016 IFE 19-Jan-2016 T-T-P-00250 IFE Transmitted TPIT C
ELECTRICAL 2539-00-JSS-1654-01 Modifications Scope of Works for Existing LV Switch A 10-Nov-2015 IFR 11-Nov-2015 T-T-P-00077 IFR 24-Nov-2015 25-Nov-2015 C-NH3-0042/T-P-T-0019 Commented TPIT H
ELECTRICAL 2539-00-JSS-1654-01 Modifications Scope of Works for Existing LV Switchb 0 22-Feb-2016 IFE 22-Feb-2016 T-T-P-00336 IFE 04-Mar-2016 C-NH3-0108/T-P-T-0085 Commented TPIT H
ELECTRICAL 2539-00-JSS-1654-01 Modifications Scope of Works for Existing LV Switchb 1 01-Jul-2016 Re-IFE 01-Jul-2016 T-T-P-00679 Re-IFE No Comment TPVN H
ELECTRICAL 2539-00-JSS-1654-01 Modifications Scope of Works for Existing LV Switchbo 2 21-Nov-2016 IFP 22-Nov-2016 T-T-P-00985 IFA 05-Dec-2016 06-Dec-2016 T-P-T-0741 Approved TPVN C
ELECTRICAL 2539-00-JSS-1656-01 General Supply Rules for Power Factor Correction Syst A 23-Oct-2015 IFR 23-Oct-2015 T-T-P-00026 IFR 05-Nov-2015 10-Nov-2015 C-NH3-0019/T-P-T-0009 No Comment TPIT H
ELECTRICAL 2539-00-JSS-1656-01 General Supply Rules for Power Factor Correction Syst 0 22-Jan-2016 IFE 19-Jan-2016 T-T-P-00250 IFE Transmitted TPIT C
ELECTRICAL 2539-00-JSS-1657-01 General Supply Rules for Metal Enclosed Distribution Pa A 23-Oct-2015 IFR 23-Oct-2015 T-T-P-00026 IFR 05-Nov-2015 10-Nov-2015 C-NH3-0019/T-P-T-0009 No Comment TPIT H
ELECTRICAL 2539-00-JSS-1657-01 General Supply Rules for Metal Enclosed Distribution Pa 0 22-Jan-2016 IFE 19-Jan-2016 T-T-P-00250 IFE Transmitted TPIT C
ELECTRICAL 2539-00-JSS-1661-01 Modification Scope of Works for Electrical Control Syst A 28-Oct-2015 IFR 29-Oct-2015 T-T-P-00041 IFR 11-Nov-2015 11-Nov-2015 C-NH3-0024/T-P-T-0010 Commented TPIT H
ELECTRICAL 2539-00-JSS-1661-01 Modification Scope of Works for Electrical Control Syst B 10-Feb-2016 IFR 11-Feb-2016 T-T-P-00306 Re-IFR 24-Feb-2016 24-Jun-2016 T-P-T-0223 Approved TPIT H
ELECTRICAL 2539-00-JSS-1661-01 Modification Scope of Works for Electrical Control Syst 0 09-Sep-2016 IFE 09-Sep-2016 T-T-P-00802 IFE 22-Sep-2016 C-NH3-0304/T-P-T-0409; C-NH3-0337/T-P-T-0477 Approved with comments TPVN H
ELECTRICAL 2539-00-JSS-1661-01 Modification Scope of Works for Electrical Control Syst 1 04-Oct-2016 IFE 05-Oct-2016 T-T-P-00854 IFE Transmitted TPVN C
ELECTRICAL 2539-00-JSS-1684-01 General Supply Specification for Cathodic Protection Sy A 23-Oct-2015 IFR 23-Oct-2015 T-T-P-00026 IFR 05-Nov-2015 10-Nov-2015 C-NH3-0019/T-P-T-0009 Commented TPIT H
ELECTRICAL 2539-00-JSS-1684-01 General Supply Specification for Cathodic Protection Sy 0 22-Jan-2016 IFE 19-Jan-2016 T-T-P-00250 IFE Transmitted TPIT C
ELECTRICAL 2539-00-JSS-1691-01 General Supply Rules for LV Induction Motors A 23-Oct-2015 IFR 23-Oct-2015 T-T-P-00026 IFR 05-Nov-2015 10-Nov-2015 C-NH3-0019/T-P-T-0009 No Comment TPIT H
ELECTRICAL 2539-00-JSS-1691-01 General Supply Rules for LV Induction Motors 0 22-Jan-2016 IFE 19-Jan-2016 T-T-P-00250 IFE Transmitted TPIT C
ELECTRICAL 2539-00-JSS-1692-01 General Supply Rules for MV Induction Motors A 23-Oct-2015 IFR 23-Oct-2015 T-T-P-00026 IFR 05-Nov-2015 10-Nov-2015 C-NH3-0019/T-P-T-0009 Commented TPIT H
ELECTRICAL 2539-00-JSS-1692-01 General Supply Rules for MV Induction Motors 0 22-Jan-2016 IFE 19-Jan-2016 T-T-P-00250 IFE Transmitted TPIT C
ELECTRICAL 2539-00-ML-1611-01 Technical Bid Tabulation for Grounding & Lightning Mater 0 25-Aug-2016 II 25-Aug-2016 T-T-P-00774 II Transmitted TPVN C
ELECTRICAL 2539-00-ML-1620-01 Technical Bid Tabulation for Power Materials 0 29-Dec-2016 II 29-Dec-2016 T-T-P-01100 II 11-Jan-2017 No Comment TPVN H
ELECTRICAL 2539-00-ML-1620-01 Technical Bid Tabulation for Power Materials 1 04-Jan-2017 II 04-Jan-2017 T-T-P-01111 II 17-Jan-2017 Transmitted TPVN C
ELECTRICAL 2539-00-ML-1621-01 Technical Bid Tabulation for Electrical Cable 0 25-Nov-2016 II 25-Nov-2016 T-T-P-00995 II 08-Dec-2016 Transmitted TPVN C
ELECTRICAL 2539-00-ML-1623-01 Technical Bid Tabulation for Cable Ladders / Trays 0 08-Dec-2016 II 09-Dec-2016 T-T-P-01031 II 22-Dec-2016 Transmitted TPVN C
ELECTRICAL 2539-00-ML-1630-01 Technical Bid Tabulation for Lighting Materials 0 18-Nov-2016 II 18-Nov-2016 T-T-P-00975 II No Comment TPVN H
ELECTRICAL 2539-00-ML-1630-01 Technical Bid Tabulation for Lighting Materials 1 13-Dec-2016 II 13-Dec-2016 T-T-P-01043 II 26-Dec-2016 Transmitted TPVN C
ELECTRICAL 2539-00-ML-1652-01 Technical Bid Tabulation for New MV Switchgear (MS2-3 A 03-Aug-2016 IFA 03-Aug-2016 T-T-P-00735 IFA 16-Aug-2016 22-Aug-2016 T-P-T-0338 Approved TPVN C
ELECTRICAL 2539-00-ML-1654-01 Technical Bid Tabulation for LV Switchboard/MCC Modific 0 28-Oct-2016 IFA 28-Oct-2016 T-T-P-00912 IFA 10-Nov-2016 14-Nov-2016 T-P-T-0586 Approved TPVN C
ELECTRICAL 2539-00-ML-1656-01 Technical Bid Tabulation for MV (6.6KV) Capacitor Bank 0 27-Sep-2016 IFA 28-Sep-2016 T-T-P-00842 IFA 11-Oct-2016 13-Oct-2016 T-P-T-0456 Approved TPVN C
ELECTRICAL 2539-00-ML-1661-01 Technical Bid Tabulation for ESC Modification 0 07-Sep-2016 IFA 07-Sep-2016 T-T-P-00797 IFA 20-Sep-2016 21-Sep-2016 T-P-T-0408 Approved TPVN C
ELECTRICAL 2539-00-ML-1684-01 Technical Bid Tabulation for Cathodic Protection System 0 29-Dec-2016 II 29-Dec-2016 T-T-P-01100 II 11-Jan-2017 Transmitted TPVN C
ELECTRICAL 2539-00-MR-1611-01 Material Requisition for Grounding & Lightning Material A 17-Jun-2016 IFI 20-Jun-2016 T-T-P-00660 IFR 03-Jul-2016 MR 1611-01. Transmitted TPVN H
ELECTRICAL 2539-00-MR-1611-01 Material Requisition for Grounding & Lightning Material 0 23-Sep-2016 IFP 23-Sep-2016 T-T-P-00832 IFP Transmitted TPVN C
ELECTRICAL 2539-00-MR-1620-01 Material Requisition for Power Materials A 19-Aug-2016 IFI 19-Aug-2016 T-T-P-00762 IFR 01-Sep-2016 10-Sep-2016 T-P-T-0380 MR 1620-01. Approved TPVN H
ELECTRICAL 2539-00-MR-1620-01 Material Requisition for Power Materials 0 18-Jan-2017 IFP 20-Jan-2017 T-T-P-01170 IFA 02-Feb-2017 08-Feb-2017 T-P-T-1226 Approved TPVN C
ELECTRICAL 2539-00-MR-1621-01 Material Requisition for Electrical Cable A 10-Aug-2016 IFI 12-Aug-2016 T-T-P-00748 IFR 25-Aug-2016 24-Aug-2016 T-P-T-0345 MR 1621-01. Approved TPVN H
ELECTRICAL 2539-00-MR-1621-01 Material Requisition for Electrical Cable 0 14-Dec-2016 IFP 15-Dec-2016 T-T-P-01051 IFA 28-Dec-2016 02-Jan-2017 T-P-T-0907 Approved TPVN H
ELECTRICAL 2539-00-MR-1621-01 Material Requisition for Electrical Cable 1 23-Dec-2016 IFP 23-Dec-2016 T-T-P-01078 IFA 05-Jan-2017 05-Jan-2017 T-P-T-0921 Approved TPVN C
ELECTRICAL 2539-00-MR-1623-01 Material Requisition for Cable Ladders / Trays A 19-Aug-2016 IFI 23-Aug-2016 T-T-P-00768 IFR 05-Sep-2016 15-Sep-2016 T-P-T-0398 MR 1623-01. Approved TPVN H
ELECTRICAL 2539-00-MR-1623-01 Material Requisition for Cable Ladders / Trays 0 13-Jan-2017 IFP 13-Jan-2017 T-T-P-01154 IFA 27-Jan-2017 23-Jan-2017 T-P-T-1148 Approved TPVN H
ELECTRICAL 2539-00-MR-1623-01 Material Requisition for Cable Ladders / Trays 1 19-Jan-2017 IFP 20-Jan-2017 T-T-P-01165 IFA 02-Feb-2017 08-Feb-2017 T-P-T-1214 Approved TPVN C
ELECTRICAL 2539-00-MR-1630-01 Material Requisition for Lighting Material A 29-Jul-2016 IFI 01-Aug-2016 T-T-P-00729 IFR 14-Aug-2016 24-Aug-2016 T-P-T-0344 MR 1630-01. Approved TPVN H
ELECTRICAL 2539-00-MR-1630-01 Material Requisition for Lighting Material 0 17-Jan-2017 IFP 18-Jan-2017 T-T-P-01160 IFA 31-Jan-2017 23-Jan-2017 T-P-T-1150 Approved TPVN C
ELECTRICAL 2539-00-MR-1652-01 Material Requisition for Medium Voltage (6.6KV) Switch A 19-May-2016 IFI 20-May-2016 T-T-P-00596 IFR 02-Jun-2016 09-Jun-2016 T-P-T-0197 MR 1652-01. Approved TPVN H
ELECTRICAL 2539-00-MR-1652-01 Material Requisition for 6.6KV Switchgear (MS2-3) 0 11-Oct-2016 IFP 11-Oct-2016 T-T-P-00868 IFP 10-Nov-2016 T-P-T-0570 MR 1652-01. Approved TPVN C
ELECTRICAL 2539-00-MR-1654-01 Material Requisition for LV Switchboard-MCC Modificatio A 01-Jul-2016 IFI 01-Jul-2016 T-T-P-00681 IFR 15-Jul-2016 18-Jul-2016 T-P-T-0265 MR 1654-01. Approved TPVN H
ELECTRICAL 2539-00-MR-1654-01 Material Requisition for LV Switchboard/MCC Modificatio 0 21-Nov-2016 IFP 22-Nov-2016 T-T-P-00985 IFA 05-Dec-2016 06-Dec-2016 T-P-T-0741 Approved TPVN C
ELECTRICAL 2539-00-MR-1656-01 Material Requisition for Medium Voltage (6.6KV) Power A 20-May-2016 IFI 23-May-2016 T-T-P-00599 IFR 06-Jun-2016 09-Jun-2016 T-P-T-0197 MR 1656-01. Approved TPVN H
ELECTRICAL 2539-00-MR-1656-01 Material Requisition for Medium Voltage (6.6KV) Power B 28-Jul-2016 Re-IFI 29-Jul-2016 T-T-P-00725 IFR 11-Aug-2016 23-Aug-2016 T-P-T-0346 MR 1656-01. Approved TPVN H
ELECTRICAL 2539-00-MR-1656-01 Material Requisition for Medium Voltage (6.6KV) Power 0 14-Oct-2016 IFP 14-Oct-2016 T-T-P-00877 IFP Transmitted TPVN C
ELECTRICAL 2539-00-MR-1661-01 Material Requisition for Electrical Control Systems (ECS) A 15-Jun-2016 IFI 20-Jun-2016 T-T-P-00661 IFR 03-Jul-2016 06-Jul-2016 T-P-T-0245; C-NH3-0209/T-P-T-0243 MR 1661-01. Commented TPVN H
ELECTRICAL 2539-00-MR-1661-01 Material Requisition for Electrical Control Systems (ECS) 0 06-Oct-2016 IFP 06-Oct-2016 T-T-P-00858 IFP 24-Oct-2016 C-NH3-0343/T-P-T-0490 MR 1661-01. No Comment TPVN C
ELECTRICAL 2539-00-MR-1684-01 Material Requisition for Cathodic Protection System A 20-Sep-2016 IFI 21-Sep-2016 T-T-P-00827 IFR 04-Oct-2016 10-Nov-2016 T-P-T-0569 MR 1684-01. Approved TPVN H
ELECTRICAL 2539-00-MR-1684-01 Material Requisition for Cathodic Protection System 0 19-Jan-2017 IFP 20-Jan-2017 T-T-P-01166 IFA 02-Feb-2017 08-Feb-2017 T-P-T-1225 Approved TPVN C
ELECTRICAL 2539-00-MTO-1629-01 Preliminary Material Take Off 0 11-Mar-2016 II 16-Mar-2016 T-T-P-00432 II No Comment TPIT H
ELECTRICAL 2539-00-MTO-1629-01 Material Take Off (Electrical) 1 16-Sep-2016 IF1T 16-Sep-2016 T-T-P-00820 IFR 30-Sep-2016 10-Nov-2016 T-P-T-0568 Approved TPVN H
ELECTRICAL 2539-00-MTO-1629-01 Material Take Off (Electrical) 2 13-Jan-2017 IF2T 16-Jan-2017 T-T-P-01156 IFA 30-Jan-2017 23-Jan-2017 T-P-T-1149 Approved TPVN C
ELECTRICAL 2539-00-NM-1623-01 Electrical Cable Schedule A 07-Mar-2016 IDD 09-Mar-2016 T-T-P-00412 IFR 22-Mar-2016 23-Mar-2016 C-NH3-0125/T-P-T-0117 Commented TPIT H
ELECTRICAL 2539-00-NM-1623-01 Electrical Cable Schedule B 21-Oct-2016 Re-IDD 24-Oct-2016 T-T-P-00896 IFR 06-Nov-2016 07-Nov-2016 T-P-T-0553 Approved TPVN H
ELECTRICAL 2539-00-NM-1623-01 Electrical Cable Schedule 0 14-Dec-2016 FIN 15-Dec-2016 T-T-P-01052 IFA 28-Dec-2016 05-Jan-2017 T-P-T-0908 Approved TPVN H
ELECTRICAL 2539-00-NM-1623-01 Electrical Cable Schedule 1 23-Dec-2016 FIN 23-Dec-2016 T-T-P-01078 IFA 05-Jan-2017 05-Jan-2017 T-P-T-0921 Approved TPVN H
ELECTRICAL 2539-00-NM-1623-01 Electrical Cable Schedule 2 14-Jul-2017 FIN 14-Jul-2017 T-T-P-01493 IFA 27-Jul-2017 02-Aug-2017 T-P-T-02382 Approved TPVN C
ELECTRICAL 2539-00-NM-1623-02 Cable Drum Schedule A 10-Aug-2016 IFI 12-Aug-2016 T-T-P-00748 IFR 25-Aug-2016 24-Aug-2016 T-P-T-0345 MR 1621-01. Approved TPVN H
ELECTRICAL 2539-00-NM-1623-02 Cable Drum Schedule 0 14-Dec-2016 IFP 15-Dec-2016 T-T-P-01052 IFA 28-Dec-2016 05-Jan-2017 T-P-T-0908 Approved TPVN H
ELECTRICAL 2539-00-NM-1623-02 Cable Drum Schedule 1 23-Dec-2016 IFP 23-Dec-2016 T-T-P-01078 IFA 05-Jan-2017 05-Jan-2017 T-P-T-0921 Approved TPVN C
ELECTRICAL 2539-00-SP-1691-01 Datasheet for Low Voltage Motor (Typical) A 25-Jan-2016 IFI 09-Mar-2016 T-T-P-00413 IFR 22-Mar-2016 24-Jun-2016 T-P-T-0224 Approved TPIT C
ELECTRICAL 2539-00-SR-1611-01 Scope of Supply for Grounding & Lightning Material A 17-Jun-2016 IFI 20-Jun-2016 T-T-P-00660 IFR 03-Jul-2016 MR 1611-01. Transmitted TPVN H
ELECTRICAL 2539-00-SR-1611-01 Scope of Supply for Grounding & Lightning Material 0 23-Sep-2016 IFP 23-Sep-2016 T-T-P-00832 IFP Transmitted TPVN C
ELECTRICAL 2539-00-SR-1620-01 Scope of Supply for Power Materials A 19-Aug-2016 IFI 19-Aug-2016 T-T-P-00762 IFR 01-Sep-2016 10-Sep-2016 T-P-T-0380 MR 1620-01. Approved TPVN H
ELECTRICAL 2539-00-SR-1620-01 Scope of Supply for Power Materials 0 18-Jan-2017 IFP 20-Jan-2017 T-T-P-01170 IFA 02-Feb-2017 08-Feb-2017 T-P-T-1226 Approved TPVN C
ELECTRICAL 2539-00-SR-1621-01 Scope of Supply for Electrical Cable A 10-Aug-2016 IFI 12-Aug-2016 T-T-P-00748 IFR 25-Aug-2016 24-Aug-2016 T-P-T-0345 MR 1621-01. Approved TPVN H
ELECTRICAL 2539-00-SR-1621-01 Scope of Supply for Electrical Cable 0 14-Dec-2016 IFP 15-Dec-2016 T-T-P-01051 IFA 28-Dec-2016 02-Jan-2017 T-P-T-0907 Approved TPVN C
ELECTRICAL 2539-00-SR-1623-01 Scope of Supply for Cable Ladders / Trays A 19-Aug-2016 IFI 23-Aug-2016 T-T-P-00768 IFR 05-Sep-2016 15-Sep-2016 T-P-T-0398 MR 1623-01. Approved TPVN H
ELECTRICAL 2539-00-SR-1623-01 Scope of Supply for Cable Ladders / Trays 0 13-Jan-2017 IFP 13-Jan-2017 T-T-P-01154 IFA 27-Jan-2017 23-Jan-2017 T-P-T-1148 Approved TPVN H
ELECTRICAL 2539-00-SR-1623-01 Scope of Supply for Cable Ladders / Trays 1 19-Jan-2017 IFP 20-Jan-2017 T-T-P-01165 IFA 02-Feb-2017 08-Feb-2017 T-P-T-1214 Approved TPVN C
ELECTRICAL 2539-00-SR-1630-01 Scope of Supply for Lighting Material A 29-Jul-2016 IFI 01-Aug-2016 T-T-P-00729 IFR 14-Aug-2016 24-Aug-2016 T-P-T-0344 MR 1630-01. Approved TPVN H
ELECTRICAL 2539-00-SR-1630-01 Scope of Supply for Lighting Material 0 17-Jan-2017 IFP 18-Jan-2017 T-T-P-01160 IFA 31-Jan-2017 23-Jan-2017 T-P-T-1150 Approved TPVN C
ELECTRICAL 2539-00-SR-1652-01 Scope of Supply for Medium Voltage (6.6KV) Switchgear A 19-May-2016 IFI 20-May-2016 T-T-P-00596 IFR 02-Jun-2016 09-Jun-2016 T-P-T-0197 MR 1652-01. Approved TPVN H
ELECTRICAL 2539-00-SR-1652-01 Scope of Supply for 6.6KV Switchgear (MS2-3) 0 11-Oct-2016 IFP 11-Oct-2016 T-T-P-00868 IFP 10-Nov-2016 T-P-T-0570 MR 1652-01. Approved TPVN C
ELECTRICAL 2539-00-SR-1654-01 Scope of Supply for for LV Switchboard-MCC Modificatio A 01-Jul-2016 IFI 01-Jul-2016 T-T-P-00681 IFR 15-Jul-2016 18-Jul-2016 T-P-T-0265 MR 1654-01. Approved TPVN H
ELECTRICAL 2539-00-SR-1654-01 Scope of Supply for for LV Switchboard-MCC Modificatio 0 21-Nov-2016 IFP 22-Nov-2016 T-T-P-00985 IFA 05-Dec-2016 06-Dec-2016 T-P-T-0741 Approved TPVN C
ELECTRICAL 2539-00-SR-1656-01 Scope of Supply for Medium Voltage (6.6KV) Power Cap A 20-May-2016 IFI 23-May-2016 T-T-P-00599 IFR 06-Jun-2016 09-Jun-2016 T-P-T-0197 MR 1656-01. Approved TPVN H
ELECTRICAL 2539-00-SR-1656-01 Scope of Supply for Medium Voltage (6.6KV) Power Cap B 28-Jul-2016 Re-IFI 29-Jul-2016 T-T-P-00725 IFR 11-Aug-2016 23-Aug-2016 T-P-T-0346 MR 1656-01. Approved TPVN H
ELECTRICAL 2539-00-SR-1656-01 Scope of Supply for Medium Voltage (6.6KV) Power Cap 0 14-Oct-2016 IFP 14-Oct-2016 T-T-P-00877 IFP Transmitted TPVN C
ELECTRICAL 2539-00-SR-1661-01 Scope of Supply for Electrical Control Systems (ECS) Mo A 17-Jun-2016 IFI 20-Jun-2016 T-T-P-00661 IFR 03-Jul-2016 06-Jul-2016 T-P-T-0245; C-NH3-0209/T-P-T-0243 MR 1661-01. Commented TPVN H
ELECTRICAL 2539-00-SR-1661-01 Scope of Supply for Electrical Control Systems (ECS) Mo 0 06-Oct-2016 IFP 06-Oct-2016 T-T-P-00858 IFP 24-Oct-2016 C-NH3-0343/T-P-T-0490 MR 1661-01. No Comment TPVN C
ELECTRICAL 2539-00-SR-1684-01 Scope of Supply for Cathodic Protection System A 20-Sep-2016 IFI 21-Sep-2016 T-T-P-00827 IFR 04-Oct-2016 10-Nov-2016 T-P-T-0569 MR 1684-01. Approved TPVN H
ELECTRICAL 2539-00-SR-1684-01 Scope of Supply for Cathodic Protection System 0 19-Jan-2017 IFP 20-Jan-2017 T-T-P-01166 IFA 02-Feb-2017 08-Feb-2017 T-P-T-1225 Approved TPVN C
ELECTRICAL 2539-00-STC-1691-01 Electrical Grounding System Typical Installation Details A 29-Oct-2015 IFR 29-Oct-2015 T-T-P-00042 IFR 11-Nov-2015 11-Dec-2015 C-NH3-0025/T-P-T-0010 Commented TPIT H
ELECTRICAL 2539-00-STC-1691-01 Electrical Grounding System Typical Installation Details 0 26-Feb-2016 IFC 29-Feb-2016 T-T-P-00370 IFC Transmitted TPIT C
ELECTRICAL 2539-00-STC-1692-01 Electrical Power System Typical Installation Details A 30-Oct-2015 IFR 30-Oct-2015 T-T-P-00052 IFR 12-Nov-2015 11-Nov-2015 C-NH3-0027/T-P-T-0010 Commented TPIT H
ELECTRICAL 2539-00-STC-1692-01 Electrical Power System Typical Installation Details 0 26-Feb-2016 IFC 29-Feb-2016 T-T-P-00371 IFC Transmitted TPIT C
ELECTRICAL 2539-00-STC-1693-01 Lighting System Typical Installation Details A 28-Oct-2015 IFR 29-Oct-2015 T-T-P-00043 IFR 11-Nov-2015 11-Nov-2015 C-NH3-0026/T-P-T-0010 Commented TPIT H
ELECTRICAL 2539-00-STC-1693-01 Lighting System Typical Installation Details 0 26-Feb-2016 IFC 29-Feb-2016 T-T-P-00372 IFC Transmitted TPIT C
ELECTRICAL 2539-10-DW-1612-01-01 Grounding Plan (Ammonia Plant - 1/2) A 22-Apr-2016 IFR 26-Apr-2016 T-T-P-00554 IFR 09-May-2016 24-Jun-2016 T-P-T-0225 Approved TPVN H
ELECTRICAL 2539-10-DW-1612-01-01 Grounding Plan (Ammonia Plant - 1/2) B 07-Oct-2016 IDD 11-Oct-2016 T-T-P-00865 IFR 24-Oct-2016 16-Nov-2016 T-P-T-0566 Approved TPVN H
ELECTRICAL 2539-10-DW-1612-01-01 Grounding Plan (Ammonia Plant - 1/2) 0 02-Dec-2016 IFC 07-Dec-2016 T-T-P-01021 IFA 20-Dec-2016 23-Dec-2016 T-P-T-0883 Approved TPVN C
ELECTRICAL 2539-10-DW-1612-01-02 Grounding Plan (Ammonia Plant - 2/2) A 22-Apr-2016 IFR 26-Apr-2016 T-T-P-00554 IFR 09-May-2016 24-Jun-2016 T-P-T-0225 Approved TPVN H
ELECTRICAL 2539-10-DW-1612-01-02 Grounding Plan (Ammonia Plant - 2/2) B 07-Oct-2016 IDD 11-Oct-2016 T-T-P-00865 IFR 24-Oct-2016 16-Nov-2016 T-P-T-0566 Approved TPVN H
ELECTRICAL 2539-10-DW-1612-01-02 Grounding Plan (Ammonia Plant - 2/2) 0 02-Dec-2016 IFC 07-Dec-2016 T-T-P-01021 IFA 20-Dec-2016 23-Dec-2016 T-P-T-0883 Approved TPVN C
ELECTRICAL 2539-10-DW-1622-01-01 Main Cable Route Plan (Ammonia Plant) A 07-Mar-2016 IFR 08-Mar-2016 T-T-P-00405 IFR 21-Mar-2016 23-Mar-2016 C-NH3-0124/T-P-T-0116 Commented TPIT H
ELECTRICAL 2539-10-DW-1622-01-01 Main Cable Route Plan (Ammonia Plant) B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-10-DW-1622-01-01 Main Cable Route Plan (Ammonia Plant) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-10-DW-1622-02-01 Power Plan (Ammonia Plant) A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-10-DW-1622-02-01 Power Plan (Ammonia Plant) B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-10-DW-1622-02-01 Power Plan (Ammonia Plant) 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-10-DW-1632-01-01 Lighting Plan (Ammonia Plant - 1/3) A 10-May-2016 IFR 11-May-2016 T-T-P-00584 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-10-DW-1632-01-01 Lighting Plan (Ammonia Plant - 1/3) B 21-Oct-2016 IDD 21-Oct-2016 T-T-P-00906 IFR 08-Nov-2016 18-Nov-2016 T-P-T-0624 Approved TPVN H
ELECTRICAL 2539-10-DW-1632-01-01 Lighting Plan (Ammonia Plant - 1/4) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-10-DW-1632-01-02 Lighting Plan (Ammonia Plant - 2/3) A 10-May-2016 IFR 11-May-2016 T-T-P-00584 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-10-DW-1632-01-02 Lighting Plan (Ammonia Plant - 2/3) B 21-Oct-2016 IDD 21-Oct-2016 T-T-P-00906 IFR 08-Nov-2016 18-Nov-2016 T-P-T-0624 Approved TPVN H
Page 10
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
ELECTRICAL 2539-10-DW-1632-01-02 Lighting Plan (Ammonia Plant - 2/4) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-10-DW-1632-01-03 Lighting Plan (Ammonia Plant - 3/3) A 10-May-2016 IFR 11-May-2016 T-T-P-00584 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-10-DW-1632-01-03 Lighting Plan (Ammonia Plant - 3/3) B 21-Oct-2016 IDD 21-Oct-2016 T-T-P-00906 IFR 08-Nov-2016 18-Nov-2016 T-P-T-0624 Approved TPVN H
ELECTRICAL 2539-10-DW-1632-01-03 Lighting Plan (Ammonia Plant - 3/4) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-10-DW-1632-01-04 Lighting Plan (Ammonia Plant - 4/4) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-10-DW-1632-01X-01 Lighting Plan Ammonia Plant (Demolition Plan - 1/2) A 10-May-2016 IFR 11-May-2016 T-T-P-00584 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-10-DW-1632-01X-01 Lighting Plan Ammonia Plant (Demolition Plan - 1/2) B 21-Oct-2016 IDD 21-Oct-2016 T-T-P-00906 IFR 08-Nov-2016 18-Nov-2016 T-P-T-0624 Approved TPVN H
ELECTRICAL 2539-10-DW-1632-01X-01 Lighting Plan Ammonia Plant (Demolition Plan - 1/2) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-10-DW-1632-01X-02 Lighting Plan Ammonia Plant (Demolition Plan - 2/2) A 10-May-2016 IFR 11-May-2016 T-T-P-00584 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-10-DW-1632-01X-02 Lighting Plan Ammonia Plant (Demolition Plan - 2/2) B 21-Oct-2016 IDD 21-Oct-2016 T-T-P-00906 IFR 08-Nov-2016 18-Nov-2016 T-P-T-0624 Approved TPVN H
ELECTRICAL 2539-10-DW-1632-01X-02 Lighting Plan Ammonia Plant (Demolition Plan - 2/2) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-10-DW-1920-01-01 Hazardous Area Classification Ammonia Plant A 01-Feb-2016 IFR 02-Feb-2016 T-T-P-00275 IFR 15-Feb-2016 No Comment TPIT H
ELECTRICAL 2539-20-DW-1622-01-01 Main Cable Route Plan (Substation 2) A 07-Mar-2016 IFR 08-Mar-2016 T-T-P-00406 IFR 21-Mar-2016 07-Apr-2016 C-NH3-0135/T-P-T-0136 Commented TPIT H
ELECTRICAL 2539-20-DW-1622-01-01 Main Cable Route Plan (Substation 2) B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-20-DW-1622-01-01 Main Cable Route Plan (Substation 2) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-20-DW-1622-02-01 Power Plan (Substation 2) A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-20-DW-1622-02-01 Power Plan (Substation 2) B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-20-DW-1622-02-01 Power Plan (Substation 2) 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-30-DW-1612-01-01 Grounding Plan (Utility Plant - 1/2) A 22-Apr-2016 IFR 26-Apr-2016 T-T-P-00554 IFR 09-May-2016 24-Jun-2016 T-P-T-0225 Approved TPVN H
ELECTRICAL 2539-30-DW-1612-01-01 Grounding Plan (Utility Plant - 1/2) B 07-Oct-2016 IDD 11-Oct-2016 T-T-P-00865 IFR 24-Oct-2016 16-Nov-2016 T-P-T-0566 Approved TPVN H
ELECTRICAL 2539-30-DW-1612-01-01 Grounding Plan (Utility Plant - 1/2) 0 02-Dec-2016 IFC 07-Dec-2016 T-T-P-01021 IFA 20-Dec-2016 26-Dec-2016 T-P-T-0885 Approved TPVN C
ELECTRICAL 2539-30-DW-1612-01-02 Grounding Plan (Utility Plant; New Cooling Tower Area - A 22-Apr-2016 IFR 26-Apr-2016 T-T-P-00554 IFR 09-May-2016 24-Jun-2016 T-P-T-0225 Approved TPVN H
ELECTRICAL 2539-30-DW-1612-01-02 Grounding Plan (Utility Plant; New Cooling Tower Area - B 07-Oct-2016 IDD 11-Oct-2016 T-T-P-00865 IFR 24-Oct-2016 16-Nov-2016 T-P-T-0566 Approved TPVN H
ELECTRICAL 2539-30-DW-1612-01-02 Grounding Plan (Utility Plant; New Cooling Tower Area - 0 02-Dec-2016 IFC 07-Dec-2016 T-T-P-01021 IFA 20-Dec-2016 26-Dec-2016 T-P-T-0885 Approved TPVN C
ELECTRICAL 2539-30-DW-1622-01-01 Main Cable Route Plan (Utility Plant 1-7) A 07-Mar-2016 IFR 08-Mar-2016 T-T-P-00407 IFR 21-Mar-2016 07-Apr-2016 C-NH3-0136/T-P-T-0137 Commented TPIT H
ELECTRICAL 2539-30-DW-1622-01-01 Main Cable Route Plan (Utility Plant 1-7) B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-30-DW-1622-01-01 Main Cable Route Plan (Utility Plant 1-7) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-30-DW-1622-01-02 Main Cable Route Plan (Utility Plant 2-7) A 07-Mar-2016 IFR 08-Mar-2016 T-T-P-00407 IFR 21-Mar-2016 07-Apr-2016 C-NH3-0136/T-P-T-0137 Commented TPIT H
ELECTRICAL 2539-30-DW-1622-01-02 Main Cable Route Plan (Utility Plant 2-7) B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-30-DW-1622-01-02 Main Cable Route Plan (Utility Plant 2-7) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-30-DW-1622-01-03 Main Cable Route Plan (Utility Plant 3-7) A 07-Mar-2016 IFR 08-Mar-2016 T-T-P-00407 IFR 21-Mar-2016 07-Apr-2016 T-P-T-00139 Approved TPIT H
ELECTRICAL 2539-30-DW-1622-01-03 Main Cable Route Plan (Utility Plant 3-7) B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-30-DW-1622-01-03 Main Cable Route Plan (Utility Plant 3-7) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-30-DW-1622-01-04 Main Cable Route Plan (Utility Plant 4-7) A 07-Mar-2016 IFR 08-Mar-2016 T-T-P-00407 IFR 21-Mar-2016 07-Apr-2016 T-P-T-00139 Approved TPIT H
ELECTRICAL 2539-30-DW-1622-01-04 Main Cable Route Plan (Utility Plant 4-7) B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-30-DW-1622-01-04 Main Cable Route Plan (Utility Plant 4-7) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-30-DW-1622-01-05 Main Cable Route Plan (Utility Plant 5-7) A 07-Mar-2016 IFR 08-Mar-2016 T-T-P-00407 IFR 21-Mar-2016 07-Apr-2016 T-P-T-00139 Approved TPIT H
ELECTRICAL 2539-30-DW-1622-01-05 Main Cable Route Plan (Utility Plant 5-7) B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-30-DW-1622-01-05 Main Cable Route Plan (Utility Plant 5-7) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-30-DW-1622-01-06 Main Cable Route Plan (Utility Plant 6-7) A 07-Mar-2016 IFR 08-Mar-2016 T-T-P-00407 IFR 21-Mar-2016 07-Apr-2016 T-P-T-00139 Approved TPIT H
ELECTRICAL 2539-30-DW-1622-01-06 Main Cable Route Plan (Utility Plant 6-7) B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-30-DW-1622-01-06 Main Cable Route Plan (Utility Plant 6-7) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-30-DW-1622-01-07 Main Cable Route Plan (Utility Plant 7-7) A 07-Mar-2016 IFR 08-Mar-2016 T-T-P-00407 IFR 21-Mar-2016 07-Apr-2016 T-P-T-00139 Approved TPIT H
ELECTRICAL 2539-30-DW-1622-01-07 Main Cable Route Plan (Utility Plant 7-7) B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-30-DW-1622-01-07 Main Cable Route Plan (Utility Plant 7-7) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-30-DW-1622-02-01 Power Plan (Utility Plant - 1/7) A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-30-DW-1622-02-01 Power Plan (Utility Plant - 1/7) B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-30-DW-1622-02-01 Power Plan (Utility Plant - 1/7) 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-30-DW-1622-02-02 Power Plan (Utility Plant - 2/7) A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-30-DW-1622-02-02 Power Plan (Utility Plant - 2/7) B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-30-DW-1622-02-02 Power Plan (Utility Plant - 2/7) 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-30-DW-1622-02-03 Power Plan (Utility Plant - 3/7) A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-30-DW-1622-02-03 Power Plan (Utility Plant - 3/7) B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-30-DW-1622-02-03 Power Plan (Utility Plant - 3/7) 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-30-DW-1622-02-04 Power Plan (Utility Plant - 4/7) A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-30-DW-1622-02-04 Power Plan (Utility Plant - 4/7) B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-30-DW-1622-02-04 Power Plan (Utility Plant - 4/7) 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-30-DW-1622-02-05 Power Plan (Utility Plant - 5/7) A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-30-DW-1622-02-05 Power Plan (Utility Plant - 5/7) B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-30-DW-1622-02-05 Power Plan (Utility Plant - 5/7) 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-30-DW-1622-02-06 Power Plan (Utility Plant - 6/7) A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-30-DW-1622-02-06 Power Plan (Utility Plant - 6/7) B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-30-DW-1622-02-06 Power Plan (Utility Plant - 6/7) 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-30-DW-1622-02-07 Power Plan (Utility Plant - 7/7) A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-30-DW-1622-02-07 Power Plan (Utility Plant - 7/7) B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-30-DW-1622-02-07 Power Plan (Utility Plant - 7/7) 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-30-DW-1622-02X-01 Power Plan Utility Plant (Demolition Plan - 1/2) A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-30-DW-1622-02X-01 Power Plan Utility Plant (Demolition Plan - 1/2) B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-30-DW-1622-02X-01 Power Plan Utility Plant (Demolition Plan - 1/2) 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-30-DW-1622-02X-02 Power Plan Utility Plant (Demolition Plan - 2/2) A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-30-DW-1622-02X-02 Power Plan Utility Plant (Demolition Plan - 2/2) B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-30-DW-1622-02X-02 Power Plan Utility Plant (Demolition Plan - 2/2) 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-30-DW-1632-01-01 Lighting Plan (Utility Area - 1/3) A 10-May-2016 IFR 11-May-2016 T-T-P-00584 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-30-DW-1632-01-01 Lighting Plan (Utility Area - 1/3) B 21-Oct-2016 IDD 21-Oct-2016 T-T-P-00906 IFR 08-Nov-2016 18-Nov-2016 T-P-T-0624 Approved TPVN H
ELECTRICAL 2539-30-DW-1632-01-01 Lighting Plan (Utility Area - 1/3) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-30-DW-1632-01-02 Lighting Plan (Utility Area - 2/3) A 10-May-2016 IFR 11-May-2016 T-T-P-00584 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-30-DW-1632-01-02 Lighting Plan (Utility Area - 2/3) B 21-Oct-2016 IDD 21-Oct-2016 T-T-P-00906 IFR 08-Nov-2016 18-Nov-2016 T-P-T-0624 Approved TPVN H
ELECTRICAL 2539-30-DW-1632-01-02 Lighting Plan (Utility Area - 2/3) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-30-DW-1632-01-03 Lighting Plan (Utility Area - 3/3) A 10-May-2016 IFR 11-May-2016 T-T-P-00584 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-30-DW-1632-01-03 Lighting Plan (Utility Area - 3/3) B 21-Oct-2016 IDD 21-Oct-2016 T-T-P-00906 IFR 08-Nov-2016 18-Nov-2016 T-P-T-0624 Approved TPVN H
ELECTRICAL 2539-30-DW-1632-01-03 Lighting Plan (Utility Area - 3/3) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-30-DW-1632-01X-01 Lighting Plan Utility Area (Demolition Plan) A 10-May-2016 IFR 11-May-2016 T-T-P-00584 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-30-DW-1632-01X-01 Lighting Plan Utility Area (Demolition Plan) 0 30-May-2017 V 30-May-2017 T-T-P-01430 II Transmitted TPVN C
ELECTRICAL 2539-30-SP-1692-01 Datasheet for MV Induction Motor - 30-MP-3001A A 25-Jan-2016 IFI 09-Mar-2016 T-T-P-00414 IFR 22-Mar-2016 24-Jun-2016 T-P-T-0224 Approved TPIT C
ELECTRICAL 2539-30-SP-1692-02 Datasheet for MV Induction Motor - 30-MP-3001 E A 25-Jan-2016 IFI 09-Mar-2016 T-T-P-00414 IFR 22-Mar-2016 24-Jun-2016 T-P-T-0224 Approved TPIT C
ELECTRICAL 2539-30-SP-1692-03 Datasheet for MV Induction Motor - 30-MP-3002 A A 25-Jan-2016 IFI 09-Mar-2016 T-T-P-00414 IFR 22-Mar-2016 24-Jun-2016 T-P-T-0224 Approved TPIT C
ELECTRICAL 2539-30-SP-1692-04 Datasheet for MV Induction Motor - 30-MK-5001 E A 25-Mar-2016 IFI 09-Mar-2016 T-T-P-00414 IFR 22-Mar-2016 24-Jun-2016 T-P-T-0224 Approved TPIT C
ELECTRICAL 2539-40-DW-1612-01-01 Grounding Plan (Ammonia Storage Tank Area & Flare; W A 22-Apr-2016 IFR 26-Apr-2016 T-T-P-00554 IFR 09-May-2016 24-Jun-2016 T-P-T-0225 Approved TPVN H
ELECTRICAL 2539-40-DW-1612-01-01 Grounding Plan (Ammonia Storage Tank Area & Flare; W B 07-Oct-2016 IDD 11-Oct-2016 T-T-P-00865 IFR 24-Oct-2016 16-Nov-2016 T-P-T-0566 Approved TPVN H
ELECTRICAL 2539-40-DW-1612-01-01 Grounding Plan (Ammonia Storage Tank Area & Flare; W 0 02-Dec-2016 IFC 07-Dec-2016 T-T-P-01021 IFA 20-Dec-2016 26-Dec-2016 T-P-T-0885 Approved TPVN C
ELECTRICAL 2539-40-DW-1612-01-02 Grounding Plan (Ammonia Storage Tank Area & Flare; W A 22-Apr-2016 IFR 26-Apr-2016 T-T-P-00554 IFR 09-May-2016 24-Jun-2016 T-P-T-0225 Approved TPVN H
ELECTRICAL 2539-40-DW-1612-01-02 Grounding Plan (Ammonia Storage Tank Area & Flare; W B 07-Oct-2016 IDD 11-Oct-2016 T-T-P-00865 IFR 24-Oct-2016 16-Nov-2016 T-P-T-0566 Approved TPVN H
ELECTRICAL 2539-40-DW-1612-01-02 Grounding Plan (Ammonia Storage Tank Area & Flare; W 0 02-Dec-2016 IFC 07-Dec-2016 T-T-P-01021 IFA 20-Dec-2016 26-Dec-2016 T-P-T-0885 Approved TPVN C
ELECTRICAL 2539-40-DW-1612-01-03 Grounding Plan (Ammonia Storage Tank Area & Flare; W A 22-Apr-2016 IFR 26-Apr-2016 T-T-P-00554 IFR 09-May-2016 24-Jun-2016 T-P-T-0225 Approved TPVN H
ELECTRICAL 2539-40-DW-1612-01-03 Grounding Plan (Ammonia Storage Tank Area & Flare; W B 07-Oct-2016 IDD 11-Oct-2016 T-T-P-00865 IFR 24-Oct-2016 16-Nov-2016 T-P-T-0566 Approved TPVN H
ELECTRICAL 2539-40-DW-1612-01-03 Grounding Plan (Ammonia Storage Tank Area & Flare; W 0 02-Dec-2016 IFC 07-Dec-2016 T-T-P-01021 IFA 20-Dec-2016 26-Dec-2016 T-P-T-0885 Approved TPVN C
ELECTRICAL 2539-40-DW-1612-01-04 Grounding Plan (Ammonia Storage Tank Area & Flare; W A 22-Apr-2016 IFR 26-Apr-2016 T-T-P-00554 IFR 09-May-2016 24-Jun-2016 T-P-T-0225 Approved TPVN H
ELECTRICAL 2539-40-DW-1612-01-04 Grounding Plan (Ammonia Storage Tank Area & Flare; W B 07-Oct-2016 IDD 11-Oct-2016 T-T-P-00865 IFR 24-Oct-2016 16-Nov-2016 T-P-T-0566 Approved TPVN H
ELECTRICAL 2539-40-DW-1612-01-04 Grounding Plan (Ammonia Storage Tank Area & Flare; W 0 02-Dec-2016 IFC 07-Dec-2016 T-T-P-01021 IFA 20-Dec-2016 26-Dec-2016 T-P-T-0885 Approved TPVN C
ELECTRICAL 2539-40-DW-1622-01-01 Main Cable Route Plan (Ammonia Storage Tank Area & A 07-Mar-2016 IFR 09-Mar-2016 T-T-P-00409 IFR 22-Mar-2016 07-Apr-2016 C-NH3-0137/T-P-T-0138 Commented TPIT H
ELECTRICAL 2539-40-DW-1622-01-01 Main Cable Route Plan (Ammonia Storage Tank Area & B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-40-DW-1622-01-01 Main Cable Route Plan (Ammonia Storage Tank Area & 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-40-DW-1622-01-02 Main Cable Route Plan (Ammonia Storage Tank Area & A 07-Mar-2016 IFR 09-Mar-2016 T-T-P-00409 IFR 22-Mar-2016 07-Apr-2016 C-NH3-0137/T-P-T-0138 Commented TPIT H
ELECTRICAL 2539-40-DW-1622-01-02 Main Cable Route Plan (Ammonia Storage Tank Area & B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-40-DW-1622-01-02 Main Cable Route Plan (Ammonia Storage Tank Area & 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-40-DW-1622-01-03 Main Cable Route Plan (Ammonia Storage Tank Area & A 07-Mar-2016 IFR 09-Mar-2016 T-T-P-00409 IFR 22-Mar-2016 07-Apr-2016 C-NH3-0137/T-P-T-0138 Commented TPIT H
ELECTRICAL 2539-40-DW-1622-01-03 Main Cable Route Plan (Ammonia Storage Tank Area & B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-40-DW-1622-01-03 Main Cable Route Plan (Ammonia Storage Tank Area & 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-40-DW-1622-01-04 Main Cable Route Plan (Ammonia Storage Tank Area & A 07-Mar-2016 IFR 09-Mar-2016 T-T-P-00409 IFR 22-Mar-2016 07-Apr-2016 T-P-T-00139 Approved TPIT H
ELECTRICAL 2539-40-DW-1622-01-04 Main Cable Route Plan (Ammonia Storage Tank Area & B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-40-DW-1622-01-04 Main Cable Route Plan (Ammonia Storage Tank Area & 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-40-DW-1622-02-01 Power Plan (Ammonia Storage Tank Area; New Grid Intak A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
Page 11
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
ELECTRICAL 2539-40-DW-1622-02-01 Power Plan (Ammonia Storage Tank Area; New Grid Intak B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-40-DW-1622-02-01 Power Plan (Ammonia Storage Tank Area; New Grid Intak 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-40-DW-1622-02-02 Power Plan (Ammonia Storage Tank Area & Flare; WWT A A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-40-DW-1622-02-02 Power Plan (Ammonia Storage Tank Area & Flare; WWT A B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-40-DW-1622-02-02 Power Plan (Ammonia Storage Tank Area & Flare; WWT A 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-40-DW-1622-02-03 Power Plan (Ammonia Storage Tank Area - 3/3) A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-40-DW-1622-02-03 Power Plan (Ammonia Storage Tank Area - 3/3) B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-40-DW-1622-02-03 Power Plan (Ammonia Storage Tank Area - 3/3) 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-40-DW-1632-01-01 Lighting Plan (Ammonia Storage - 1/2) A 10-May-2016 IFR 11-May-2016 T-T-P-00584 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-40-DW-1632-01-01 Lighting Plan (Ammonia Storage - 1/2) B 21-Oct-2016 IDD 21-Oct-2016 T-T-P-00906 IFR 08-Nov-2016 18-Nov-2016 T-P-T-0624 Approved TPVN H
ELECTRICAL 2539-40-DW-1632-01-01 Lighting Plan (Ammonia Storage - 1/2) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-40-DW-1632-01-02 Lighting Plan (Ammonia Storage - 2/2) A 10-May-2016 IFR 11-May-2016 T-T-P-00584 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-40-DW-1632-01-02 Lighting Plan (Ammonia Storage - 2/2) B 21-Oct-2016 IDD 21-Oct-2016 T-T-P-00906 IFR 08-Nov-2016 18-Nov-2016 T-P-T-0624 Approved TPVN H
ELECTRICAL 2539-40-DW-1632-01-02 Lighting Plan (Ammonia Storage - 2/2) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-40-DW-1920-01-01 Hazardous Area Classification Ammonia Storage A 01-Feb-2016 IFR 02-Feb-2016 T-T-P-00276 IFR 15-Feb-2016 No Comment TPIT H
ELECTRICAL 2539-50-DW-1612-01-01 Grounding Plan (Substation-1) A 22-Apr-2016 IFR 26-Apr-2016 T-T-P-00554 IFR 09-May-2016 24-Jun-2016 T-P-T-0225 Approved TPVN H
ELECTRICAL 2539-50-DW-1612-01-01 Grounding Plan (Substation-1) B 07-Oct-2016 IDD 11-Oct-2016 T-T-P-00865 IFR 24-Oct-2016 16-Nov-2016 T-P-T-0566 Approved TPVN H
ELECTRICAL 2539-50-DW-1612-01-01 Grounding Plan (Substation-1) 0 02-Dec-2016 IFC 07-Dec-2016 T-T-P-01021 IFA 20-Dec-2016 26-Dec-2016 T-P-T-0885 Approved TPVN C
ELECTRICAL 2539-50-DW-1612-01-02 Grounding Plan (Substation-2) A 22-Apr-2016 IFR 26-Apr-2016 T-T-P-00554 IFR 09-May-2016 24-Jun-2016 T-P-T-0225 Approved TPVN H
ELECTRICAL 2539-50-DW-1612-01-02 Grounding Plan (Substation-2) B 07-Oct-2016 IDD 11-Oct-2016 T-T-P-00865 IFR 24-Oct-2016 16-Nov-2016 T-P-T-0566 Approved TPVN H
ELECTRICAL 2539-50-DW-1612-01-02 Grounding Plan (Substation-2) 0 02-Dec-2016 IFC 07-Dec-2016 T-T-P-01021 IFA 20-Dec-2016 26-Dec-2016 T-P-T-0885 Approved TPVN C
ELECTRICAL 2539-50-DW-1622-01-01 Main Cable Route Plan (Substation-1 1-4) A 07-Mar-2016 IFR 09-Mar-2016 T-T-P-00410 IFR 22-Mar-2016 24-Jun-2016 T-P-T-0223 Approved TPIT H
ELECTRICAL 2539-50-DW-1622-01-01 Main Cable Route Plan (Substation-1; 1/4) B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-50-DW-1622-01-01 Main Cable Route Plan (Substation-1; 1/4) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-50-DW-1622-01-02 Main Cable Route Plan (Substation-1 2-4) A 07-Mar-2016 IFR 09-Mar-2016 T-T-P-00410 IFR 22-Mar-2016 24-Jun-2016 T-P-T-0223 Approved TPIT H
ELECTRICAL 2539-50-DW-1622-01-02 Main Cable Route Plan (Substation-1; 2/4) B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-50-DW-1622-01-02 Main Cable Route Plan (Substation-1; 2/4) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-50-DW-1622-01-03 Main Cable Route Plan (Substation-1 3-4) A 07-Mar-2016 IFR 09-Mar-2016 T-T-P-00410 IFR 22-Mar-2016 24-Jun-2016 T-P-T-0223 Approved TPIT H
ELECTRICAL 2539-50-DW-1622-01-03 Main Cable Route Plan (Substation-1; 3/4) B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-50-DW-1622-01-03 Main Cable Route Plan (Substation-1; 3/4) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-50-DW-1622-01-04 Main Cable Route Plan (Substation-1 4-4) A 07-Mar-2016 IFR 09-Mar-2016 T-T-P-00410 IFR 22-Mar-2016 24-Jun-2016 T-P-T-0223 Approved TPIT H
ELECTRICAL 2539-50-DW-1622-01-04 Main Cable Route Plan (Substation-1; 4/4) B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-50-DW-1622-01-04 Main Cable Route Plan (Substation-1; 4/4) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-50-DW-1622-01-05 Main Cable Route Plan (Substation-2 1-3) A 07-Mar-2016 IFR 09-Mar-2016 T-T-P-00410 IFR 22-Mar-2016 24-Jun-2016 T-P-T-0223 Approved TPIT H
ELECTRICAL 2539-50-DW-1622-01-05 Main Cable Route Plan (Substation-2; 1/3) B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-50-DW-1622-01-05 Main Cable Route Plan (Substation-2; 1/3) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-50-DW-1622-01-06 Main Cable Route Plan (Substation-2 2-3) A 07-Mar-2016 IFR 09-Mar-2016 T-T-P-00410 IFR 22-Mar-2016 24-Jun-2016 T-P-T-0223 Approved TPIT H
ELECTRICAL 2539-50-DW-1622-01-06 Main Cable Route Plan (Substation-2; 2/3) B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-50-DW-1622-01-06 Main Cable Route Plan (Substation-2; 2/3) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-50-DW-1622-01-07 Main Cable Route Plan (Substation-2 3-3) A 07-Mar-2016 IFR 09-Mar-2016 T-T-P-00410 IFR 22-Mar-2016 24-Jun-2016 T-P-T-0223 Approved TPIT H
ELECTRICAL 2539-50-DW-1622-01-07 Main Cable Route Plan (Substation-2; 3/3) B 21-Oct-2016 IDD 26-Oct-2016 T-T-P-00904 IFR 08-Nov-2016 14-Nov-2016 T-P-T-0600 Approved TPVN H
ELECTRICAL 2539-50-DW-1622-01-07 Main Cable Route Plan (Substation-2; 3/3) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN H
ELECTRICAL 2539-50-DW-1622-01-07 Main Cable Route Plan (Substation-2; 3/3) 1 14-Jul-2017 IFC 18-Jul-2017 T-T-P-01500 IFA 01-Aug-2017 02-Aug-2017 T-P-T-2383 Approved TPVN C
ELECTRICAL 2539-50-DW-1622-02-01 Power Plan (Substation 1; 1/2) A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-50-DW-1622-02-01 Power Plan (Substation 1; 1/2) B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-50-DW-1622-02-01 Power Plan (Substation 1; 1/2) 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-50-DW-1622-02-02 Power Plan (Substation 1; 2/2) A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-50-DW-1622-02-02 Power Plan (Substation 1; 2/2) B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-50-DW-1622-02-02 Power Plan (Substation 1; 2/2) 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-50-DW-1622-02-03 Power Plan (Substation 2; 1/2) (MV Cables) A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-50-DW-1622-02-03 Power Plan (Substation 2; 1/2) (MV Cables) B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-50-DW-1622-02-03 Power Plan (Substation 2; 1/2) (MV Cables) 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-50-DW-1622-02-04 Power Plan (Substation 2; 2/2) (LV & Control Cables) A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-50-DW-1622-02-04 Power Plan (Substation 2; 2/2) (LV & Control Cables) B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-50-DW-1622-02-04 Power Plan (Substation 2; 2/2) (LV & Control Cables) 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-50-DW-1622-02-05 Power Plan (Control Building) A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-50-DW-1622-02-05 Power Plan (Control Building) B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-50-DW-1622-02-05 Power Plan (Control Building) 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-50-DW-1622-02X-02 Power Plan (Substation 1) Demolition Plan A 10-May-2016 IFR 11-May-2016 T-T-P-00585 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-50-DW-1622-02X-02 Power Plan (Substation 1) Demolition Plan B 11-Nov-2016 IDD 14-Nov-2016 T-T-P-00960 IFR 27-Nov-2016 26-Nov-2016 T-P-T-0687 Approved TPVN H
ELECTRICAL 2539-50-DW-1622-02X-02 Power Plan (Substation 1) Demolition Plan 0 23-Dec-2016 IFC 23-Dec-2016 T-T-P-01081 IFA 05-Jan-2017 13-Jan-2017 T-P-T-1003 Approved TPVN C
ELECTRICAL 2539-50-DW-1632-01-01 Lighting Plan (Substation 2) A 10-May-2016 IFR 11-May-2016 T-T-P-00584 IFR 24-May-2016 31-May-2016 C-NH3-0165/T-P-T-0186 Commented TPVN H
ELECTRICAL 2539-50-DW-1632-01-01 Lighting Plan (Substation 2) B 21-Oct-2016 IDD 21-Oct-2016 T-T-P-00906 IFR 08-Nov-2016 18-Nov-2016 T-P-T-0624 Approved TPVN H
ELECTRICAL 2539-50-DW-1632-01-01 Lighting Plan (Substation 2) 0 16-Dec-2016 IFC 21-Dec-2016 T-T-P-01065 IFA 03-Jan-2017 05-Jan-2017 T-P-T-0935 Approved TPVN C
ELECTRICAL 2539-50-SP-1652-01 Datasheet for Medium Voltage (6.6KV) Switchgear (MS2 A 03-Mar-2016 IFR 10-Mar-2016 T-T-P-00415 IFR 23-Mar-2016 24-Jun-2016 T-P-T-0224 Approved TPIT H
ELECTRICAL 2539-50-SP-1652-01 Data Sheet for Medium Voltage (6.6KV) Switchgear (MS 0 22-Sep-2016 IFP 23-Sep-2016 T-T-P-00830 IFP Transmitted TPVN C
ELECTRICAL 2539-50-SP-1656-01 Datasheet for Medium Voltage (6.6KV) Power Capacitor A 03-Mar-2016 IFR 10-Mar-2016 T-T-P-00415 IFR 23-Mar-2016 24-Jun-2016 T-P-T-0224 Approved TPIT H
ELECTRICAL 2539-50-SP-1656-01 Data Sheet for Medium Voltage (6.6KV) Power Capacito B 28-Jul-2016 Re-IFR 29-Jul-2016 T-T-P-00725 IFR 11-Aug-2016 23-Aug-2016 T-P-T-0346 MR 1656-01. Approved TPVN H
ELECTRICAL 2539-50-SP-1656-01 Data Sheet for Medium Voltage (6.6KV) Power Capacito 0 11-Oct-2016 IFP 11-Oct-2016 T-T-P-00869 IFP 16-Nov-2016 T-P-T-0587 Approved TPVN C
ELECTRICAL 2539-50-SP-1657-01 Datasheet for Metal Enclosed Distribution Panel (1 kV) A 03-Mar-2016 IFR 14-Mar-2016 T-T-P-00429 IFR 28-Mar-2016 24-Jun-2016 T-P-T-0225 Approved TPIT H
ELECTRICAL 2539-50-SP-1657-01 Datasheet for Metal Enclosed Distribution Panel (1 kV) 0 21-Dec-2016 IFP 22-Dec-2016 T-T-P-01068 IFA 04-Jan-2017 05-Jan-2017 T-P-T-0920 Approved TPVN C
ELECTRICAL 2539-52-CN-1626-01 Electrical Load List & Analysis A 08-Jan-2016 IFR 11-Jan-2016 T-T-P-00227 IFR 25-Jan-2016 No Comment TPIT C
ELECTRICAL 2539-52-DW-1625-01-01 Elect. Equipment Layout (Substation-1) A 27-Nov-2015 IFR 27-Nov-2015 T-T-P-00124 IFR 10-Dec-2015 No Comment TPIT H
ELECTRICAL 2539-52-DW-1625-01-01 Elect. Equipment Layout (Substation-1) B 05-Feb-2016 IDD 05-Feb-2016 T-T-P-00294 IDD No Comment TPIT H
ELECTRICAL 2539-52-DW-1625-01-01 Elect. Equipment Layout (Substation-1; 1/2) 0 28-Oct-2016 IFC 31-Oct-2016 T-T-P-00916 IFC 14-Nov-2016 T-P-T-0599 Approved TPVN H
ELECTRICAL 2539-52-DW-1625-01-01 Elect. Equipment Layout (Substation-1; 1/2) 1 22-Feb-2017 IFC 22-Feb-2017 T-T-P-01239 IFA 07-Mar-2017 10-Mar-2017 T-P-T-1505 Approved TPVN C
ELECTRICAL 2539-52-DW-1625-01-02 Elect. Equipment Layout (Substation-1) B 05-Feb-2016 IDD 08-Feb-2016 T-T-P-00299 IDD No Comment TPIT H
ELECTRICAL 2539-52-DW-1625-01-02 Elect. Equipment Layout (Substation-1; 2/2) 0 28-Oct-2016 IFC 31-Oct-2016 T-T-P-00916 IFC 14-Nov-2016 T-P-T-0599 Approved TPVN H
ELECTRICAL 2539-52-DW-1625-01-02 Elect. Equipment Layout (Substation-1; 2/2) 1 22-Feb-2017 IFC 22-Feb-2017 T-T-P-01239 IFA 07-Mar-2017 10-Mar-2017 T-P-T-1505 Approved TPVN C
ELECTRICAL 2539-52-DW-1625-02-01 Elect. Equipment Layout (Substation-2) A 27-Nov-2015 IFR 27-Nov-2015 T-T-P-00124 IFR 10-Dec-2015 No Comment TPIT H
ELECTRICAL 2539-52-DW-1625-02-01 Elect. Equipment Layout (Substation-2) B 05-Feb-2016 IDD 05-Feb-2016 T-T-P-00294 IDD No Comment TPIT H
ELECTRICAL 2539-52-DW-1625-02-01 Elect. Equipment Layout (Substation-2; 1/2) 0 28-Oct-2016 IFC 31-Oct-2016 T-T-P-00916 IFC 14-Nov-2016 T-P-T-0599 Approved TPVN H
ELECTRICAL 2539-52-DW-1625-02-01 Elect. Equipment Layout (Substation-2; 1/2) 1 22-Feb-2017 IFC 22-Feb-2017 T-T-P-01239 IFA 07-Mar-2017 10-Mar-2017 T-P-T-1505 Approved TPVN C
ELECTRICAL 2539-52-DW-1625-02-02 Elect. Equipment Layout (Substation-2) A 27-Nov-2015 IFR 27-Nov-2015 T-T-P-00124 IFR 10-Dec-2015 No Comment TPIT H
ELECTRICAL 2539-52-DW-1625-02-02 Elect. Equipment Layout (Substation-2) B 05-Feb-2016 IDD 05-Feb-2016 T-T-P-00294 IDD No Comment TPIT H
ELECTRICAL 2539-52-DW-1625-02-02 Elect. Equipment Layout (Substation-2; 2/2) 0 28-Oct-2016 IFC 31-Oct-2016 T-T-P-00916 IFC 14-Nov-2016 T-P-T-0599 Approved TPVN H
ELECTRICAL 2539-52-DW-1625-02-02 Elect. Equipment Layout (Substation-2; 2/2) 1 22-Feb-2017 IFC 22-Feb-2017 T-T-P-01239 IFA 07-Mar-2017 10-Mar-2017 T-P-T-1505 Approved TPVN C
ELECTRICAL 2539-52-DW-1652-01-01 Main One Line Diagram (Symbol & Legend) A 09-Nov-2015 IFR 11-Nov-2015 T-T-P-00080 IFR 24-Nov-2015 26-Nov-2015 T-P-T-0021 No Comment TPIT H
ELECTRICAL 2539-52-DW-1652-01-01 Main One Line Diagram (Symbol & Legend) B 05-Feb-2016 IDD 05-Feb-2016 T-T-P-00293 IDD Transmitted TPIT H
ELECTRICAL 2539-52-DW-1652-01-01 Main One Line Diagram (Symbol & Legend) 0 31-May-2016 IFC 01-Jun-2016 T-T-P-00622 IFC Transmitted TPVN C
ELECTRICAL 2539-52-DW-1652-02-01 Overall Key One Line Diagram A 11-Nov-2015 IFR 11-Nov-2015 T-T-P-00079 IFR 24-Nov-2015 25-Nov-2015 C-NH3-0044/T-P-T-0019 Commented TPIT H
ELECTRICAL 2539-52-DW-1652-02-01 Overall Key One Line Diagram B 05-Feb-2016 IDD 05-Feb-2016 T-T-P-00293 IDD 29-Feb-2016 C-NH3-0103/T-P-T-0079 Commented TPIT H
ELECTRICAL 2539-52-DW-1652-02-01 Overall Key One Line Diagram C 10-Oct-2016 IDD 11-Oct-2016 T-T-P-00866 IFR 24-Oct-2016 14-Nov-2016 T-P-T-0577 Approved TPVN H
ELECTRICAL 2539-52-DW-1652-02-01 Overall Key One Line Diagram 0 10-Nov-2016 IFC 11-Nov-2016 T-T-P-00951 IFA 24-Nov-2016 01-Dec-2016 T-P-T-0681 Approved TPVN C
ELECTRICAL 2539-52-DW-1652-03-01 Main One Line Diagram (LV / SS-1 / PC1-2 / EMCC1-1) A 23-Nov-2015 IFR 25-Nov-2015 T-T-P-00108 IFR 08-Dec-2015 No Comment TPIT H
ELECTRICAL 2539-52-DW-1652-03-01 Main One Line Diagram (LV; S-S-1; PC1-1; EMCC1-1) B 05-Feb-2016 IDD 05-Feb-2016 T-T-P-00293 IDD No Comment TPIT H
ELECTRICAL 2539-52-DW-1652-03-01 Main One Line Diagram (LV; S-S-1; PC1-1; EMCC1-1) C 01-Jul-2016 IDD 01-Jul-2016 T-T-P-00680 IFR 15-Jul-2016 16-Jul-2016 C-NH3-0221/T-P-T-0264 Commented TPVN H
ELECTRICAL 2539-52-DW-1652-03-01 Main One Line Diagram (LV; S/S-1; PC1-1; EMCC1-1) D 10-Oct-2016 IDD 11-Oct-2016 T-T-P-00866 IFR 24-Oct-2016 14-Nov-2016 T-P-T-0577 Approved TPVN H
ELECTRICAL 2539-52-DW-1652-03-01 Main One Line Diagram (LV S/S-1; PC1-1; EMCC1-1) 0 10-Nov-2016 IFC 11-Nov-2016 T-T-P-00951 IFA 24-Nov-2016 01-Dec-2016 T-P-T-0681 Approved TPVN C
ELECTRICAL 2539-52-DW-1652-04-01 Main One Line Diagram (LV / SS-1 / MCC1-1 / ASP1-1) A 23-Nov-2015 IFR 25-Nov-2015 T-T-P-00108 IFR 08-Dec-2015 No Comment TPIT H
ELECTRICAL 2539-52-DW-1652-04-01 Main One Line Diagram (LV; S-S-1; MCC1-1; ASP1-1) B 05-Feb-2016 IDD 05-Feb-2016 T-T-P-00293 IDD No Comment TPIT H
ELECTRICAL 2539-52-DW-1652-04-01 Main One Line Diagram (LV; S-S-1; MCC1-1; ASP1-1) C 01-Jul-2016 IDD 01-Jul-2016 T-T-P-00680 IFR 15-Jul-2016 16-Jul-2016 C-NH3-0221/T-P-T-0264 Commented TPVN H
ELECTRICAL 2539-52-DW-1652-04-01 Main One Line Diagram (LV; S/S-1; MCC1-1; ASP1-1) D 10-Oct-2016 IDD 11-Oct-2016 T-T-P-00866 IFR 24-Oct-2016 14-Nov-2016 T-P-T-0577 Approved TPVN H
ELECTRICAL 2539-52-DW-1652-04-01 Main One Line Diagram (LV; S/S-1; MCC1-1; ASP1-1) 0 10-Nov-2016 IFC 11-Nov-2016 T-T-P-00951 IFA 24-Nov-2016 01-Dec-2016 T-P-T-0681 Approved TPVN C
ELECTRICAL 2539-52-DW-1652-05-01 Main One Line Diagram (LV / SS-1 / PC1-2) A 23-Nov-2015 IFR 25-Nov-2015 T-T-P-00108 IFR 08-Dec-2015 No Comment TPIT H
ELECTRICAL 2539-52-DW-1652-05-01 Main One Line Diagram (LV; S-S-1; PC1-2) B 05-Feb-2016 IDD 05-Feb-2016 T-T-P-00293 IDD 29-Feb-2016 C-NH3-0103/T-P-T-0079 Commented TPIT H
ELECTRICAL 2539-52-DW-1652-05-01 Main One Line Diagram (LV; S-S-1; PC1-2) C 01-Jul-2016 IDD 01-Jul-2016 T-T-P-00680 IFR 15-Jul-2016 16-Jul-2016 C-NH3-0221/T-P-T-0264 Commented TPVN H
ELECTRICAL 2539-52-DW-1652-05-01 Main One Line Diagram (LV; S/S-1; PC1-2) D 10-Oct-2016 IDD 11-Oct-2016 T-T-P-00866 IFR 24-Oct-2016 14-Nov-2016 T-P-T-0577 Approved TPVN H
ELECTRICAL 2539-52-DW-1652-05-01 Main One Line Diagram (LV; S/S-1; PC1-2) 0 10-Nov-2016 IFC 11-Nov-2016 T-T-P-00951 IFA 24-Nov-2016 01-Dec-2016 T-P-T-0681 Approved TPVN C
ELECTRICAL 2539-52-DW-1652-10-01 Main One Line Diagram (MV; SS2; MS2-3) A 26-Nov-2015 IFR 27-Nov-2015 T-T-P-00125 IFR 10-Dec-2015 No Comment TPIT H
ELECTRICAL 2539-52-DW-1652-10-01 Main One Line Diagram (MV; S-S2; MS2-3) B 05-Feb-2016 IDD 05-Feb-2016 T-T-P-00293 IDD 29-Feb-2016 C-NH3-0103/T-P-T-0079 Commented TPIT H
ELECTRICAL 2539-52-DW-1652-10-01 Main One Line Diagram (MV; S-S2; MS2-3) C 24-May-2016 IDD2 24-May-2016 T-T-P-00601 IFR 06-Jun-2016 09-Jun-2016 C-NH3-0170/T-P-T-0198 Commented TPVN H
Page 12
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
ELECTRICAL 2539-52-DW-1652-10-01 Main One Line Diagram (MV; S/S2; MS2-3) D 19-Oct-2016 IDD3 21-Oct-2016 T-T-P-00888 IFR 03-Nov-2016 07-Nov-2016 T-P-T-0541 Approved TPVN H
ELECTRICAL 2539-52-DW-1652-10-01 Main One Line Diagram (MV; S/S2; MS2-3) 0 10-Nov-2016 IFC 11-Nov-2016 T-T-P-00951 IFA 24-Nov-2016 01-Dec-2016 T-P-T-0681 Approved TPVN C
ELECTRICAL 2539-52-DW-1652-11-01 Main One Line Diagram (LV / SS-2 / PC2-1 / EMCC2-1) A 23-Nov-2015 IFR 25-Nov-2015 T-T-P-00108 IFR 08-Dec-2015 No Comment TPIT H
ELECTRICAL 2539-52-DW-1652-11-01 Main One Line Diagram (LV; S-S-2; PC2-1; EMCC2-1) B 05-Feb-2016 IDD 05-Feb-2016 T-T-P-00293 IDD No Comment TPIT H
ELECTRICAL 2539-52-DW-1652-11-01 Main One Line Diagram (LV; S-S-2; PC2-1; EMCC2-1) C 01-Jul-2016 IDD 01-Jul-2016 T-T-P-00680 IFR 15-Jul-2016 16-Jul-2016 C-NH3-0221/T-P-T-0264 Commented TPVN H
ELECTRICAL 2539-52-DW-1652-11-01 Main One Line Diagram (LV; S/S-2; PC2-1; EMCC2-1) 0 10-Oct-2016 V 11-Oct-2016 T-T-P-00866 IFR 24-Oct-2016 14-Nov-2016 T-P-T-0577 Approved TPVN C
ELECTRICAL 2539-52-DW-1652-12-01 Main One Line Diagram (LV / SS-2 / MCC2-3 / UPS2-1 / A 23-Nov-2015 IFR 25-Nov-2015 T-T-P-00108 IFR 08-Dec-2015 No Comment TPIT H
ELECTRICAL 2539-52-DW-1652-12-01 Main One Line Diagram (LV; S-S-2; MCC2-3; UPS2-1; D B 05-Feb-2016 IDD 05-Feb-2016 T-T-P-00293 IDD No Comment TPIT H
ELECTRICAL 2539-52-DW-1652-12-01 Main One Line Diagram (LV; S-S-2; MCC2-3; UPS2-1; D C 01-Jul-2016 IDD 01-Jul-2016 T-T-P-00680 IFR 15-Jul-2016 16-Jul-2016 C-NH3-0221/T-P-T-0264 Commented TPVN H
ELECTRICAL 2539-52-DW-1652-12-01 Main One Line Diagram (LV; S/S-2; MCC2-3; UPS2-1; D D 10-Oct-2016 IDD 11-Oct-2016 T-T-P-00866 IFR 24-Oct-2016 14-Nov-2016 T-P-T-0577 Approved TPVN H
ELECTRICAL 2539-52-DW-1652-12-01 Main One Line Diagram (LV; S/S-2; MCC2-3; UPS2-1; D 0 10-Nov-2016 IFC 11-Nov-2016 T-T-P-00951 IFA 24-Nov-2016 01-Dec-2016 T-P-T-0681 Approved TPVN C
ELECTRICAL 2539-52-DW-1652-13-01 Main One Line Diagram (LV / SS-2 / PC2-2) A 23-Nov-2015 IFR 25-Nov-2015 T-T-P-00108 IFR 08-Dec-2015 No Comment TPIT H
ELECTRICAL 2539-52-DW-1652-13-01 Main One Line Diagram (LV; S-S-2; PC2-2) B 05-Feb-2016 IDD 05-Feb-2016 T-T-P-00293 IDD 29-Feb-2016 C-NH3-0103/T-P-T-0079 Commented TPIT H
ELECTRICAL 2539-52-DW-1652-13-01 Main One Line Diagram (LV; S-S-2; PC2-2) C 01-Jul-2016 IDD 01-Jul-2016 T-T-P-00680 IFR 15-Jul-2016 16-Jul-2016 C-NH3-0221/T-P-T-0264 Commented TPVN H
ELECTRICAL 2539-52-DW-1652-13-01 Main One Line Diagram (LV; S/S-2; PC2-2) D 10-Oct-2016 IDD 11-Oct-2016 T-T-P-00866 IFR 24-Oct-2016 14-Nov-2016 T-P-T-0577 Approved TPVN H
ELECTRICAL 2539-52-DW-1652-13-01 Main One Line Diagram (LV; S/S-2; PC2-2) 0 10-Nov-2016 IFC 11-Nov-2016 T-T-P-00951 IFA 24-Nov-2016 01-Dec-2016 T-P-T-0681 Approved TPVN C
ELECTRICAL 2539-52-DW-1652-14-01 Main One Line Diagram (LV / SS-2 / MLP2-2) A 23-Nov-2015 IFR 25-Nov-2015 T-T-P-00108 IFR 08-Dec-2015 No Comment TPIT H
ELECTRICAL 2539-52-DW-1652-14-01 Main One Line Diagram (LV; S-S-2; MLP2-2) B 05-Feb-2016 IDD 05-Feb-2016 T-T-P-00293 IDD 29-Feb-2016 C-NH3-0103/T-P-T-0079 Commented TPIT H
ELECTRICAL 2539-52-DW-1652-14-01 Main One Line Diagram (LV; S-S-2; MLP2-2) C 01-Jul-2016 IDD 01-Jul-2016 T-T-P-00680 IFR 15-Jul-2016 16-Jul-2016 C-NH3-0221/T-P-T-0264 Commented TPVN H
ELECTRICAL 2539-52-DW-1652-14-01 Main One Line Diagram (LV; S/S-2; MLP2-2) D 10-Oct-2016 IDD 11-Oct-2016 T-T-P-00866 IFR 24-Oct-2016 14-Nov-2016 T-P-T-0577 Approved TPVN H
ELECTRICAL 2539-52-DW-1652-14-01 Main One Line Diagram (LV; S/S-2; MLP2-2) 0 10-Nov-2016 IFC 11-Nov-2016 T-T-P-00951 IFA 24-Nov-2016 01-Dec-2016 T-P-T-0681 Approved TPVN C
HTAS - PROCESS ------B30001-PRO Project List of Vendors Introduction Critical; Semi-Critic 0 16-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------B30002-PRO Project List of Vendors List I - Critical Equipment 0 16-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------E90001 General Specification for Electrical Design 0 08-Aug-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------E90003 General Specification for Classification of Hazardous Ar 0 08-Aug-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------E90010 Data Sheets; Hazardous Areas (IEC 60079-10-1; IP15) 0 19-Aug-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------E90050 Main Single Line Diagram 0 10-Sep-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------E90100 Classification Drawing with Hazardous Area Boundaries 0 10-Sep-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------E91021 Electrical Load list 0 09-Sep-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------J61021 General Specification for Instrumentation 0 13-Sep-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------J61021-011 Selection List for Instrument & Control Peripherals 0 11-Sep-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------J61024 Typical Hook-up Drawings for Instrumentation 0 11-Sep-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------J61036 Implementation of 2oo3 Philosophy in ESD and DCS 0 11-Sep-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------J62050 Instrument Data Sheets Loops 3 04-Jul-2016 R 06-Jul-2016 T-T-P-00694 II Transmitted HTAS H
HTAS - PROCESS ------J62050 Instrument Data Sheets Loops 4 11-Oct-2016 R 13-Oct-2016 T-T-P-00872 II Transmitted HTAS H
HTAS - PROCESS ------J62050 Instrument Data Sheets Loops 5 01-Nov-2016 R 03-Nov-2016 T-T-P-00925 II Transmitted HTAS C
HTAS - PROCESS ------J62050-1 Instrument Data Sheets Loops 1 31-May-2016 R 06-Jun-2016 T-T-P-00631 II Transmitted HTAS C
HTAS - PROCESS ------J62063 Instrument Data Sheets - Control Valves 2 04-Jul-2016 R 06-Jul-2016 T-T-P-00694 II Transmitted HTAS H
HTAS - PROCESS ------J62063 Instrument Data Sheets - Control Valves 4 11-Oct-2016 R 13-Oct-2016 T-T-P-00872 II Transmitted HTAS H
HTAS - PROCESS ------J62063 Instrument Data Sheets - Control Valves 5 01-Nov-2016 R 03-Nov-2016 T-T-P-00925 II Transmitted HTAS C
HTAS - PROCESS ------J62063-1 Instrument Data Sheets - Control Valves 1 01-Jun-2016 R 08-Jun-2016 T-T-P-00639 II Transmitted HTAS C
HTAS - PROCESS ------J62064 Instrument Data Sheets - Safety Relief Valves 2 30-Jun-2016 R 06-Jul-2016 T-T-P-00694 II Transmitted HTAS H
HTAS - PROCESS ------J62064 Instrument Data Sheets - Safety Relief Valves 3 11-Oct-2016 R 13-Oct-2016 T-T-P-00872 II Transmitted HTAS C
HTAS - PROCESS ------J66752 Block Diagrams for Complex Loops 0 24-Sep-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------M35001 Inspection Report No. 02 Ammonia Basket (Tag No. 10- 0 27-Jul-2016 R 28-Jul-2016 T-T-P-00723 II Transmitted HTAS C
HTAS - PROCESS ------M35053-1 Inspection Report No.01 HTER Pressure Shell (Tag No. 2 28-Jul-2016 R 01-Aug-2016 T-T-P-00727 II Transmitted HTAS C
HTAS - PROCESS ------M35053-2 Inspection Report No.02 HTER Pressure Shell (Tag No. 0 25-Sep-2016 R 28-Sep-2016 T-T-P-00844 II Transmitted HTAS C
HTAS - PROCESS ------M35053-3 Inspection Report No.03 HTER Pressure Shell (Tag No. 0 04-Nov-2016 R 07-Nov-2016 T-T-P-00939 II Transmitted HTAS H
HTAS - PROCESS ------M35053-3 Inspection Report No.03 HTER Pressure Shell (Tag No. 1 14-Nov-2016 R 17-Nov-2016 T-T-P-00968 II Transmitted HTAS C
HTAS - PROCESS ------M51201-19 HTER Catalyst Loading & Unloading Procedure (Item N 0 06-Aug-2015 IFA 19-Oct-2015 T-T-P-00016 II Transmitted HTAS H
HTAS - PROCESS ------M51201-19 HTER Catalyst Loading & Unloading Procedure (Item N 0X 06-Aug-2015 IFA 23-Oct-2015 T-T-P-00025 IFA Transmitted HTAS C
HTAS - PROCESS ------M51201-HE-01 HTER Pressure Shell Assembly & Details 1 22-Sep-2015 IFA 02-Nov-2015 T-T-P-00057 IFA 16-Nov-2015 Transmitted HTAS C
HTAS - PROCESS ------M51201-HE-02 General Specification for HTER Pressure Shell (Item No 1 06-Aug-2015 IFA 02-Nov-2015 T-T-P-00057 IFA 16-Nov-2015 Transmitted HTAS C
HTAS - PROCESS ------M51201-HE-03 General Specification for Refractory Lining of HTER Pre 1 06-Aug-2015 IFA 02-Nov-2015 T-T-P-00057 IFA 16-Nov-2015 Transmitted HTAS C
HTAS - PROCESS ------M51201-HE-04 HTER; Tube Bundle; Assembly 1 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00057 IFA 16-Nov-2015 Transmitted HTAS C
HTAS - PROCESS ------M51201-HE-05 HTER Tube Bundle Details 1 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00057 IFA 16-Nov-2015 Transmitted HTAS C
HTAS - PROCESS ------M51201-HE-06 HTER Tube Bundle Tube Sheet; Guide Plates & Details 1 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00057 IFA 16-Nov-2015 Transmitted HTAS C
HTAS - PROCESS ------M51201-HE-07 HTER Stuffing Box Cone 1 22-Sep-2015 IFA 02-Nov-2015 T-T-P-00057 IFA 16-Nov-2015 Transmitted HTAS C
HTAS - PROCESS ------M51201-HE-08 HTER Segmented Ring 1 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00057 IFA 16-Nov-2015 Transmitted HTAS C
HTAS - PROCESS ------M51201-HE-09 HTER Termal Protection Cover 1 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00057 IFA 16-Nov-2015 Transmitted HTAS C
HTAS - PROCESS ------M51201-HE-10 HTER Stuffing Box Shield For Bypass Operation 0 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00057 IFA 16-Nov-2015 Transmitted HTAS C
HTAS - PROCESS ------M51201-HE-11 HTER Tools For Stuffing Box Tightening 1 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00057 IFA 16-Nov-2015 Transmitted HTAS C
HTAS - PROCESS ------M51201-HE-12 HTER Stuffing Box Centering Tool 0 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00057 IFA 16-Nov-2015 Transmitted HTAS C
HTAS - PROCESS ------M51201-HE-13 HTER Transport Shell For Tube Bundle 0 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00057 IFA 16-Nov-2015 Transmitted HTAS C
HTAS - PROCESS ------M51201-HE-14 Specification for HTER Tube Bundle (Item No 10-HE-200 1 12-Aug-2015 IFA 02-Nov-2015 T-T-P-00057 IFA 16-Nov-2015 Transmitted HTAS C
HTAS - PROCESS ------M51201-HE-15 HTER Bayonet Tube Sub-Assemblies 1 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00057 IFA 16-Nov-2015 Transmitted HTAS C
HTAS - PROCESS ------M51201-HE-16 Specification for HTER Bayonet Tube Sub-Assemblies ( 1 06-Aug-2015 IFA 02-Nov-2015 T-T-P-00057 IFA 16-Nov-2015 Transmitted HTAS C
HTAS - PROCESS ------M51201-HE-17 HTER Tube Bundle Installation Procedure (Item No. 10- 0 08-Oct-2015 IFA 19-Oct-2015 T-T-P-00016 II Transmitted HTAS H
HTAS - PROCESS ------M51201-HE-17 HTER Tube Bundle Installation Procedure (Item No. 10- 0X 08-Oct-2015 IFA 23-Oct-2015 T-T-P-00025 IFA Transmitted HTAS C
HTAS - PROCESS ------M51201-TL-01 Transfer Lines Typical Refractory Details Assembly 0 08-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS H
HTAS - PROCESS ------M51201-TL-01 Transfer Lines Typical Refractory Details Assembly 2 06-Apr-2016 R 12-Apr-2016 T-T-P-00525 II Transmitted HTAS C
HTAS - PROCESS ------M52203-R-01 Secondary Reformer General Arrangement 0 16-Jun-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS H
HTAS - PROCESS ------M52203-R-01 Secondary Reformer General Arrangement 2 21-Oct-2016 R 24-Oct-2016 T-T-P-00899 II Transmitted HTAS C
HTAS - PROCESS ------M52203-R-02 Burner for Secondary Reformer Assembly & Details 0 16-Jun-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS C
HTAS - PROCESS ------M52203-R-03 Secondary Reformer Shell Assembly 0 16-Jun-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS C
HTAS - PROCESS ------M52203-R-04 Secondary Reformer Shell Details 0 16-Jun-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS C
HTAS - PROCESS ------M52203-R-05 Secondary Reformer Refractory Lining Assembly 0 16-Jun-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS H
HTAS - PROCESS ------M52203-R-05 Secondary Reformer Refractory Lining Assembly 2 21-Oct-2016 R 24-Oct-2016 T-T-P-00899 II Transmitted HTAS C
HTAS - PROCESS ------M52203-R-06 Secondary Reformer Refractory Lining Details 0 16-Jun-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS H
HTAS - PROCESS ------M52203-R-06 Secondary Reformer Refractory Lining Details 1 18-Oct-2016 R 24-Oct-2016 T-T-P-00899 II Transmitted HTAS C
HTAS - PROCESS ------M52203-R-07 Secondary Reformer Typical Support Structure 0 16-Jun-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS C
HTAS - PROCESS ------M52502-R-01 Ammonia Converter No. 2 S-50 Radial Flow Converter 0 21-Sep-2015 IFA 19-Oct-2015 T-T-P-00016 II Transmitted HTAS H
HTAS - PROCESS ------M52502-R-01 Ammonia Converter No. 2 S-50 Radial Flow Converter 0X 21-Sep-2015 IFA 23-Oct-2015 T-T-P-00023 II Transmitted HTAS C
HTAS - PROCESS ------M52502-R-02 Ammonia Converter No. 2 S-50 Radial Flow Converter B 0 21-Sep-2015 IFA 19-Oct-2015 T-T-P-00016 II Transmitted HTAS H
HTAS - PROCESS ------M52502-R-02 Ammonia Converter No. 2 S-50 Radial Flow Converter B 0X 21-Sep-2015 IFA 23-Oct-2015 T-T-P-00025 IFA Transmitted HTAS C
HTAS - PROCESS ------M52502-R-03 Ammonia Converter No. 2 S-50 Radial Flow Converter Be 0 21-Sep-2015 IFA 19-Oct-2015 T-T-P-00016 II Transmitted HTAS H
HTAS - PROCESS ------M52502-R-03 Ammonia Converter No. 2 S-50 Radial Flow Converter Be 0X 21-Sep-2015 IFA 23-Oct-2015 T-T-P-00025 IFA Transmitted HTAS C
HTAS - PROCESS ------M52502-R-04 Ammonia Converter No. 2 S-50 Radial Flow Converter Bot 0 21-Sep-2015 IFA 19-Oct-2015 T-T-P-00016 II Transmitted HTAS H
HTAS - PROCESS ------M52502-R-04 Ammonia Converter No. 2 S-50 Radial Flow Converter Bot 0X 21-Sep-2015 IFA 23-Oct-2015 T-T-P-00025 IFA Transmitted HTAS C
HTAS - PROCESS ------M52502-R-05 Ammonia Converter No. 2 S-50 Radial Flow Converter Bott 0 21-Sep-2015 IFA 19-Oct-2015 T-T-P-00016 II Transmitted HTAS H
HTAS - PROCESS ------M52502-R-05 Ammonia Converter No. 2 S-50 Radial Flow Converter Bott 0X 21-Sep-2015 IFA 23-Oct-2015 T-T-P-00025 IFA Transmitted HTAS C
HTAS - PROCESS ------M52502-R-06 Ammonia Converter No. 2 S-50 Radial Flow Converter Ce 0 21-Sep-2015 IFA 19-Oct-2015 T-T-P-00016 II Transmitted HTAS H
HTAS - PROCESS ------M52502-R-06 Ammonia Converter No. 2 S-50 Radial Flow Converter Ce 0X 21-Sep-2015 IFA 23-Oct-2015 T-T-P-00025 IFA Transmitted HTAS C
HTAS - PROCESS ------M52502-R-07 Ammonia Converter No. 2 S-50 Radial Flow Converter O 0 21-Sep-2015 IFA 19-Oct-2015 T-T-P-00016 II Transmitted HTAS H
HTAS - PROCESS ------M52502-R-07 Ammonia Converter No. 2 S-50 Radial Flow Converter O 0X 21-Sep-2015 IFA 23-Oct-2015 T-T-P-00025 IFA Transmitted HTAS C
HTAS - PROCESS ------M52502-R-08 Ammonia Converter No. 2 S-50 Radial Flow Converter Ou 0 21-Sep-2015 IFA 19-Oct-2015 T-T-P-00016 II Transmitted HTAS H
HTAS - PROCESS ------M52502-R-08 Ammonia Converter No. 2 S-50 Radial Flow Converter Ou 0X 21-Sep-2015 IFA 23-Oct-2015 T-T-P-00025 IFA Transmitted HTAS C
HTAS - PROCESS ------M52502-R-09 Ammonia Converter No. 2 S-50 Radial Flow Converter Ni 0 21-Sep-2015 IFA 19-Oct-2015 T-T-P-00016 II Transmitted HTAS H
HTAS - PROCESS ------M52502-R-09 Ammonia Converter No. 2 S-50 Radial Flow Converter Ni 0X 21-Sep-2015 IFA 23-Oct-2015 T-T-P-00025 IFA Transmitted HTAS C
HTAS - PROCESS ------M52502-R-10 Ammonia Converter No. 2 S-50 Radial Flow Converter P 0 21-Sep-2015 IFA 19-Oct-2015 T-T-P-00016 II Transmitted HTAS H
HTAS - PROCESS ------M52502-R-10 Ammonia Converter No. 2 S-50 Radial Flow Converter P 0X 21-Sep-2015 IFA 23-Oct-2015 T-T-P-00025 IFA Transmitted HTAS C
HTAS - PROCESS ------M52502-R-11 Ammonia Converter No. 2 S-50 Radial Flow Converter Te 0 21-Sep-2015 IFA 19-Oct-2015 T-T-P-00016 II Transmitted HTAS H
HTAS - PROCESS ------M52502-R-11 Ammonia Converter No. 2 S-50 Radial Flow Converter Te 0X 21-Sep-2015 IFA 23-Oct-2015 T-T-P-00025 IFA Transmitted HTAS C
HTAS - PROCESS ------M52502-R-12 Ammonia Converter No. 2 S-50 Radial Flow Converter Sh 0 21-Sep-2015 IFA 19-Oct-2015 T-T-P-00016 II Transmitted HTAS H
HTAS - PROCESS ------M52502-R-12 Ammonia Converter No. 2 S-50 Radial Flow Converter Sh 0X 21-Sep-2015 IFA 23-Oct-2015 T-T-P-00025 IFA Transmitted HTAS C
HTAS - PROCESS ------M52502-R-13 Ammonia Converter No. 2 S-50 Radial Flow Converter Sy 0 21-Sep-2015 IFA 19-Oct-2015 T-T-P-00016 II Transmitted HTAS H
HTAS - PROCESS ------M52502-R-13 Ammonia Converter No. 2 S-50 Radial Flow Converter Sy 0X 21-Sep-2015 IFA 23-Oct-2015 T-T-P-00025 IFA Transmitted HTAS C
HTAS - PROCESS ------M52502-R-50 Ammonia Converter No. 2 S-50 Pressure Shell Assembl 0 10-Aug-2015 IFA 19-Oct-2015 T-T-P-00016 II Transmitted HTAS H
HTAS - PROCESS ------M52502-R-50 Ammonia Converter No. 2 S-50 Pressure Shell Assembl 0X 10-Aug-2015 IFA 23-Oct-2015 T-T-P-00023 II Transmitted HTAS C
HTAS - PROCESS ------M52502-R-51 Ammonia Converter No. 2 S-50 Pressure Shell Detail Dr 0 10-Aug-2015 IFA 19-Oct-2015 T-T-P-00016 II Transmitted HTAS H
HTAS - PROCESS ------M52502-R-51 Ammonia Converter No. 2 S-50 Pressure Shell Detail Dr 0X 10-Aug-2015 IFA 23-Oct-2015 T-T-P-00023 II Transmitted HTAS C
HTAS - PROCESS ------M58001 Recommendation to Modifications & Repair of CO2 Remo 0 11-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
Page 13
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
HTAS - PROCESS ------M71001 Plot Plan Proposal 0 06-Sep-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P40002 Process Description 2 09-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P40003 Equipment Check of CO2 Removal Unit 0 12-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P40004 Emergency Hydrogen Storage 1 15-Apr-2016 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P40006 Revamp of CO2 Removal Unit 0 21-Sep-2016 R 13-Oct-2016 T-T-P-00872 II Transmitted HTAS C
HTAS - PROCESS ------P40100 Catalyst Specification 1 20-Oct-2016 R 24-Oct-2016 T-T-P-00899 II No Comment HTAS H
HTAS - PROCESS ------P40100 Catalyst Specification 2 19-Jan-2017 R 03-Feb-2017 T-T-P-01194 II Transmitted HTAS C
HTAS - PROCESS ------P40101 Design Basis 1 18-Oct-2013 R 04-Apr-2016 T-T-P-00499 II Transmitted HTAS C
HTAS - PROCESS ------P41201-L1 Process Flow Diagram - Desulphurization & Reforming 3 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00036 IFA 16-Nov-2015 Transmitted HTAS H
HTAS - PROCESS ------P41201-L1 Process Flow Diagram - Desulphurization & Reforming 4 07-Jul-2016 R 15-Jul-2016 T-T-P-00704 II Transmitted HTAS H
HTAS - PROCESS ------P41201-L1 Process Flow Diagram - Desulphurization & Reforming 5 17-Aug-2016 R 25-Oct-2016 T-T-P-00903 II Transmitted HTAS C
HTAS - PROCESS ------P41202-L1 Process Flow Diagram - CO Conversion 3 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00036 IFA 16-Nov-2015 Transmitted HTAS H
HTAS - PROCESS ------P41202-L1 Process Flow Diagram - CO Conversion 4 07-Jul-2016 R 15-Jul-2016 T-T-P-00704 II Transmitted HTAS H
HTAS - PROCESS ------P41202-L1 Process Flow Diagram - CO Conversion 5 17-Aug-2016 R 25-Oct-2016 T-T-P-00903 II Transmitted HTAS C
HTAS - PROCESS ------P41203-L1 Process Flow Diagram - MDEA C02 Removal 3 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00036 IFA 16-Nov-2015 Transmitted HTAS H
HTAS - PROCESS ------P41203-L1 Process Flow Diagram - MDEA C02 Removal 4 28-Jan-2016 R 11-Feb-2016 T-T-P-00307 II Transmitted HTAS H
HTAS - PROCESS ------P41203-L1 Process Flow Diagram - MDEA C02 Removal 5 09-Feb-2016 R 22-Feb-2016 T-T-P-00334 II Transmitted HTAS H
HTAS - PROCESS ------P41203-L1 Process Flow Diagram - MDEA C02 Removal 6 23-May-2016 R 06-Jun-2016 T-T-P-00631 II Transmitted HTAS H
HTAS - PROCESS ------P41203-L1 Process Flow Diagram - MDEA C02 Removal 7 07-Jul-2016 R 15-Jul-2016 T-T-P-00704 II Transmitted HTAS H
HTAS - PROCESS ------P41203-L1 Process Flow Diagram - MDEA C02 Removal 8 17-Aug-2016 R 25-Oct-2016 T-T-P-00903 II Transmitted HTAS C
HTAS - PROCESS ------P41204-L1 Process Flow Diagram - Methanation & Compressor 3 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00036 IFA 16-Nov-2015 Transmitted HTAS H
HTAS - PROCESS ------P41204-L1 Process Flow Diagram - Methanation & Compressor 4 07-Jul-2016 R 15-Jul-2016 T-T-P-00704 II Transmitted HTAS H
HTAS - PROCESS ------P41204-L1 Process Flow Diagram - Methanation & Compression 5 17-Aug-2016 R 25-Oct-2016 T-T-P-00903 II Transmitted HTAS C
HTAS - PROCESS ------P41205-L1 Process Flow Diagram - Ammonia Synthesis Loop 3 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00036 IFA 16-Nov-2015 Transmitted HTAS H
HTAS - PROCESS ------P41205-L1 Process Flow Diagram - Ammonia Synthesis Loop 4 07-Jul-2016 R 15-Jul-2016 T-T-P-00704 II Transmitted HTAS H
HTAS - PROCESS ------P41205-L1 Process Flow Diagram - Ammonia Synthesis Loop 5 17-Aug-2016 R 25-Oct-2016 T-T-P-00903 II Transmitted HTAS C
HTAS - PROCESS ------P41206-L1 Process Flow Diagram - Ammonia Refrigeration 3 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00036 IFA 16-Nov-2015 Transmitted HTAS H
HTAS - PROCESS ------P41206-L1 Process Flow Diagram - Ammonia Refrigeration 5 14-Jul-2016 R 15-Jul-2016 T-T-P-00704 II Transmitted HTAS H
HTAS - PROCESS ------P41206-L1 Process Flow Diagram - Ammonia Refrigeration 6 17-Aug-2016 R 25-Oct-2016 T-T-P-00903 II Transmitted HTAS C
HTAS - PROCESS ------P41207-L1 Process Flow Diagram - Ammonia Recovery 3 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00036 IFA 16-Nov-2015 Transmitted HTAS H
HTAS - PROCESS ------P41207-L1 Process Flow Diagram - Ammonia Recovery 5 14-Jul-2016 R 15-Jul-2016 T-T-P-00704 II Transmitted HTAS H
HTAS - PROCESS ------P41207-L1 Process Flow Diagram - Ammonia Recovery 6 17-Aug-2016 R 25-Oct-2016 T-T-P-00903 II Transmitted HTAS C
HTAS - PROCESS ------P41208-L1 Process Flow Diagram - Process Condensate Stripping 3 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00036 IFA 16-Nov-2015 Transmitted HTAS H
HTAS - PROCESS ------P41208-L1 Process Flow Diagram - Process Condensate Stripping 4 07-Jul-2016 R 15-Jul-2016 T-T-P-00704 II Transmitted HTAS H
HTAS - PROCESS ------P41208-L1 Process Flow Diagram - Process Condensate Stripping 5 17-Aug-2016 R 25-Oct-2016 T-T-P-00903 II Transmitted HTAS C
HTAS - PROCESS ------P41209-L1 Process Flow Diagram - 1620 MTPD NH3 - Revamp cas 3 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00036 IFA 16-Nov-2015 Transmitted HTAS H
HTAS - PROCESS ------P41209-L1 Process Flow Diagram - 1620 MTPD NH3 - Revamp cas 4 07-Jul-2016 R 15-Jul-2016 T-T-P-00704 II Transmitted HTAS H
HTAS - PROCESS ------P41209-L1 Process Flow Diagram - 1620 MTPD NH3 - Revamp cas 5 17-Aug-2016 R 25-Oct-2016 T-T-P-00903 II Transmitted HTAS C
HTAS - PROCESS ------P41210-L1 Process Flow Diagram - Steam Balance - Part 2 3 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00036 IFA 16-Nov-2015 Transmitted HTAS H
HTAS - PROCESS ------P41210-L1 Process Flow Diagram - Steam Balance - Part 2 4 07-Jul-2016 R 15-Jul-2016 T-T-P-00704 II Transmitted HTAS H
HTAS - PROCESS ------P41210-L1 Process Flow Diagram - Steam Balance - Part 2 5 17-Aug-2016 R 25-Oct-2016 T-T-P-00903 II Transmitted HTAS C
HTAS - PROCESS ------P41211-L1 Process Flow Diagram - 1620 MTPD NH3 - Revamp Ca 3 17-Sep-2015 IFA 02-Nov-2015 T-T-P-00036 IFA 16-Nov-2015 Transmitted HTAS H
HTAS - PROCESS ------P41211-L1 Emergency Hydrogen Storage - Utility Diagram 0 25-Jan-2016 R 11-Feb-2016 T-T-P-00307 II Transmitted HTAS H
HTAS - PROCESS ------P41211-L1 Process Flow Diagram - 1620 MTPD NH3 - Revamp Ca 4 07-Jul-2016 R 15-Jul-2016 T-T-P-00704 II Transmitted HTAS H
HTAS - PROCESS ------P41211-L1 Process Flow Diagram - 1620 MTPD NH3 - Revamp Ca 5 17-Aug-2016 R 25-Oct-2016 T-T-P-00903 II Transmitted HTAS C
HTAS - PROCESS ------P41221-L1 Desulphurization and Reforming - Material Selection Di 0 17-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P41222-L1 Material Selection Diagram MSD03 0 17-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P41223-L1 Material Selection Diagram MSD05 0 17-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P41301-L1 Desulphurization and Reforming C3 PFD1 1 02-Jul-2015 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS H
HTAS - PROCESS ------P41301-L1 Desulphurization and Reforming C3 PFD1 2 05-Aug-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS C
HTAS - PROCESS ------P41302-L1 CO Conversion C3 PFD2 1 02-Jul-2015 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS H
HTAS - PROCESS ------P41302-L1 CO Conversion C3 PFD2 2 05-Aug-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS C
HTAS - PROCESS ------P41303-L1 MDEA CO2 Removal C3 PFD3 1 02-Jul-2015 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS H
HTAS - PROCESS ------P41303-L1 MDEA CO2 Removal C3 PFD3 2 05-Aug-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS C
HTAS - PROCESS ------P41304-L1 Methanation and Compression C3 PFD4 1 02-Jul-2015 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS H
HTAS - PROCESS ------P41304-L1 Methanation and Compression C3 PFD4 2 05-Aug-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS C
HTAS - PROCESS ------P41305-L1 Ammonia Synthesis Loop C3 PFD5 1 02-Jul-2015 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS H
HTAS - PROCESS ------P41305-L1 Ammonia Synthesis Loop C3 PFD5 2 05-Aug-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS C
HTAS - PROCESS ------P41306-L1 Ammonia Refrigeration C3 PFD6 1 02-Jul-2015 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS H
HTAS - PROCESS ------P41306-L1 Ammonia Refrigeration C3 PFD6 2 05-Aug-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS C
HTAS - PROCESS ------P41307-L1 Ammonia Recovery C3 PFD7 1 02-Jul-2015 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS H
HTAS - PROCESS ------P41307-L1 Ammonia Recovery C3 PFD7 0 05-Aug-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS C
HTAS - PROCESS ------P41308-L1 Process Condensate Stripping C3 PFD8 1 02-Jul-2015 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS H
HTAS - PROCESS ------P41308-L1 Process Condensate Stripping C3 PFD8 2 05-Aug-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS C
HTAS - PROCESS ------P41309-L1 Process Flow Diagram C3 PFD9 1 02-Jul-2015 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS H
HTAS - PROCESS ------P41309-L1 Process Condensate Stripping C3 PFD9 2 05-Aug-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS C
HTAS - PROCESS ------P41310-L1 Steam Balance - Part 2 C3 PFD10 1 02-Jul-2015 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS H
HTAS - PROCESS ------P41310-L1 Steam Balance - Part 2 C3 PFD10 2 05-Aug-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS C
HTAS - PROCESS ------P41311-L1 Process Flow Diagram C3 PFD11 1 02-Jul-2015 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS H
HTAS - PROCESS ------P41311-L1 Process Flow Diagram C3 PFD11 2 05-Aug-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS C
HTAS - PROCESS ------P41401-L1 Desulphurization & Reforming 1 12-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P41402-L1 CO Conversion 1 12-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P41403-L1 MDEA CO2 Removal 1 12-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P41404-L1 Methanation & Compression 1 12-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P41405-L1 Ammonia Synthesis Loop 1 12-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P41406-L1 Ammonia Refrigeration 1 12-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P41407-L1 Ammonia Recovery 1 12-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P41408-L1 Process Condensate Stripping 1 12-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P41409-L1 Steam Balance - Part 1 1 12-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P41410-L1 Steam Balance - Part 2 1 12-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P41411-L1 Cooling Water Balance 1 12-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P42001 Preliminary Risk Assessment 1 13-Nov-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P42101 CO2 OH Condenser 1 17-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P42102 Heat Exchange Reformer 3 25-Jan-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS H
HTAS - PROCESS ------P42102 Heat Exchange Reformer 5 29-Apr-2016 R 31-May-2016 T-T-P-00618 II Transmitted HTAS H
HTAS - PROCESS ------P42102 Heat Exchange Reformer 6 01-Jul-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS H
HTAS - PROCESS ------P42102 Heat Exchange Reformer 7 07-Oct-2016 R 13-Oct-2016 T-T-P-00872 II Transmitted HTAS C
HTAS - PROCESS ------P42103 Ammonia Synthesis Part 2A 2 08-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS H
HTAS - PROCESS ------P42103 Ammonia Synthesis Part 2A 4 17-May-2016 R 31-May-2016 T-T-P-00618 II Transmitted HTAS H
HTAS - PROCESS ------P42103 Ammonia Synthesis Part 2A 5 07-Oct-2016 R 13-Oct-2016 T-T-P-00872 II Transmitted HTAS C
HTAS - PROCESS ------P42105 Piping and Instrument Diagram P05 1 23-Oct-2015 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P42106 Piping and Instrument Diagram P06 1 23-Oct-2015 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P42107 Flue Gas Waste Heat Section Part 2 3 29-Apr-2016 R 31-May-2016 T-T-P-00618 II Transmitted HTAS C
HTAS - PROCESS ------P42108 Secondary Reformer P08 2 11-Feb-2016 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P42109 P&ID P09 1 23-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P42110 P&ID P10 1 23-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P42111 P&ID P11 1 23-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P42112 P&ID P12 1 23-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P42115 Ammonia Synthesis Part 2 0 07-Oct-2016 R 13-Oct-2016 T-T-P-00872 II Transmitted HTAS C
HTAS - PROCESS ------P42115-A Ammonia Synthesis Part 2 0 07-Oct-2016 R 13-Oct-2016 T-T-P-00872 II Transmitted HTAS C
HTAS - PROCESS ------P42188 LT Shift Conversion 0 12-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P42202 N2 Start-Up Circuit 0 12-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS H
HTAS - PROCESS ------P42202 N2 Start-Up Circuit 2 29-Apr-2016 R 31-May-2016 T-T-P-00618 II Transmitted HTAS C
HTAS - PROCESS ------P42204 H2 Recycle System 0 12-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P42205 BFW Pumps & Blow Down Drums 0 12-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P42214 Emergency Hydrogen Storage 2 29-Apr-2016 R 31-May-2016 T-T-P-00618 II Transmitted HTAS C
HTAS - PROCESS ------P42301 Interlock System 1 21-Jan-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS H
HTAS - PROCESS ------P42301 Interlock System 3 19-May-2016 R 31-May-2016 T-T-P-00618 II Transmitted HTAS H
HTAS - PROCESS ------P42301 Interlock System 4 07-Oct-2016 R 13-Oct-2016 T-T-P-00872 II Transmitted HTAS C
HTAS - PROCESS ------P42302 Interlock System - Interlock Diagram 1 21-Jan-2016 R 11-Feb-2016 T-T-P-00307 II Transmitted HTAS H
HTAS - PROCESS ------P42302 Interlock System - Interlock Diagram 3 07-Oct-2016 R 13-Oct-2016 T-T-P-00872 II Transmitted HTAS C
HTAS - PROCESS ------P42303 Interlock System 0 19-May-2016 R 31-May-2016 T-T-P-00618 II Transmitted HTAS H
Page 14
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
HTAS - PROCESS ------P42303 Interlock System 1 07-Oct-2016 R 13-Oct-2016 T-T-P-00872 II Transmitted HTAS C
HTAS - PROCESS ------P42811 MDEA Circulation Pumps 0 12-Feb-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P43001 Equipment List 0 10-Sep-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P43002 Pipe Number Register for New Piping Including Tie-in Po 1 24-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P43010 Stream Table for Case C2 Revamp Case 2 16-Feb-2016 R 04-Apr-2016 T-T-P-00497 II Transmitted HTAS H
HTAS - PROCESS ------P43010 Stream Table for Case C2 Revamp Case 5 14-Jul-2016 R 15-Jul-2016 T-T-P-00704 II Transmitted HTAS H
HTAS - PROCESS ------P43010 Stream Table for Case C2 Revamp Case 6 17-Aug-2016 R 25-Oct-2016 T-T-P-00903 II Transmitted HTAS C
HTAS - PROCESS ------P43011 Stream Table for Case C10 Revamp Case to Storage Up 0 15-Feb-2016 R 22-Feb-2016 T-T-P-00334 II Transmitted HTAS C
HTAS - PROCESS ------P43012 Stream Table for Case C3 Revamp Case to Storage 0 29-Aug-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS C
HTAS - PROCESS ------P44010 Production & Consumption Figures Including Utility Speci 2 21-Oct-2015 II 04-Dec-2015 T-T-P-00155 II Transmitted HTAS C
HTAS - PROCESS ------P44020 Effluent Summary 2 08-Feb-2016 R 04-Apr-2016 T-T-P-00498 II Transmitted HTAS C
HTAS - PROCESS ------P44030 Flare Load Summary 0 13-Sep-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P44040 Specification of Tower Packings 1 18-Feb-2016 R 24-Feb-2016 T-T-P-00343 II No Comment HTAS H
HTAS - PROCESS ------P44040 Specification of Tower Packings 2 24-Jan-2017 R 03-Feb-2017 T-T-P-01194 II Transmitted HTAS C
HTAS - PROCESS ------P44050 Specification for Chemicals for Oase Unit 0 20-Jan-2016 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P47001 Chapter I Introduction 1 30-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS H
HTAS - PROCESS ------P47001 Chapter I Introduction 3 07-Nov-2016 R 17-Nov-2016 T-T-P-00968 II Transmitted HTAS C
HTAS - PROCESS ------P47002 Chapter II Process Description of Changes 1 30-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS H
HTAS - PROCESS ------P47002 Chapter II Process Description of Changes 2 07-Nov-2016 R 17-Nov-2016 T-T-P-00968 II Transmitted HTAS C
HTAS - PROCESS ------P47003 Chapter III Preparatory Procedures 1 30-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS H
HTAS - PROCESS ------P47003 Chapter III Preparatory Procedures 2 17-Aug-2016 R 17-Nov-2016 T-T-P-00968 II Transmitted HTAS C
HTAS - PROCESS ------P47004 Chapter IV Start-Up Procedures 2 19-Feb-2016 R 24-Feb-2016 T-T-P-00343 II Transmitted HTAS H
HTAS - PROCESS ------P47004 Chapter IV Start-Up Procedures 3 10-Nov-2016 R 17-Nov-2016 T-T-P-00968 II Transmitted HTAS C
HTAS - PROCESS ------P47005 Chapter V Normal Operations 1 30-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS H
HTAS - PROCESS ------P47005 Chapter V Normal Operations 2 17-Aug-2016 R 17-Nov-2016 T-T-P-00968 II Transmitted HTAS C
HTAS - PROCESS ------P47006 Chapter VI Shut Down Procedures 1 19-Feb-2016 R 24-Feb-2016 T-T-P-00343 II Transmitted HTAS H
HTAS - PROCESS ------P47006 Chapter VI Shut Down Procedures 2 30-Mar-2016 R 04-Apr-2016 T-T-P-00497 II Transmitted HTAS H
HTAS - PROCESS ------P47006 Chapter VI Shut Down Procedures 3 07-Nov-2016 R 17-Nov-2016 T-T-P-00968 II Transmitted HTAS C
HTAS - PROCESS ------P47007 Chapter VII Start-up after Normal Shut-down 1 31-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P47008 Chapter VIII Emergency Procedures 1 30-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS H
HTAS - PROCESS ------P47008 Chapter VIII Emergency Procedures 2 11-Nov-2016 R 17-Nov-2016 T-T-P-00968 II Transmitted HTAS C
HTAS - PROCESS ------P47009 Chapter IX Safety Instructions 1 31-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS H
HTAS - PROCESS ------P47009 Chapter IX Safety Instructions 2 17-Aug-2016 R 17-Nov-2016 T-T-P-00968 II Transmitted HTAS C
HTAS - PROCESS ------P47010 Chapter X Analytical Procedures 0 04-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P47011 Chapter XI Appendices 1 30-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS H
HTAS - PROCESS ------P47011 Chapter XI Appendices 2 07-Nov-2016 R 17-Nov-2016 T-T-P-00968 II Transmitted HTAS C
HTAS - PROCESS --------P47012 Performance Test Procedure 0 17-Mar-2017 R 12-May-2017 T-T-P-01411 II 19-May-2017 C-NH3-0809/T-P-T-2051 Commented HTAS C
HTAS - PROCESS ------P47100 Supplementary Operating Manual 1 30-Oct-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P51200 Description of Furnace Purge & Burner Tightness Test P 0 18-Feb-2016 R 24-Feb-2016 T-T-P-00343 II Transmitted HTAS C
HTAS - PROCESS ------P51201 Heat Exchange Reformer 4 08-Oct-2015 R 15-Feb-2016 T-T-P-00315 II Transmitted HTAS C
HTAS - PROCESS ------P52003 Process Specification for 10-R-2003 Secondary Reforme 0 29-Apr-2016 R 31-Aug-2016 T-T-P-00782 II Transmitted HTAS H
HTAS - PROCESS ------P52003 Process Specification for 10-R-2003 Secondary Reforme 1 04-Oct-2016 R 07-Oct-2016 T-T-P-00859 II Transmitted HTAS H
HTAS - PROCESS ------P52003 Process Specification for 10-R-2003 Secondary Reforme 2 04-Nov-2016 R 09-Nov-2016 T-T-P-00943 II Transmitted HTAS C
HTAS - PROCESS ------P52502 Process Specification for 10-R5002 - Ammonia Converte 3 02-Nov-2015 IFA 06-Nov-2015 T-T-P-00066 IFA 19-Nov-2015 22-Apr-2016 C-NH3-0039/T-P-T-0150 Approved with comments HTAS H
HTAS - PROCESS ------P52502 Process Specification for 10-R5002 - Ammonia Converte 3A 06-Apr-2016 R 06-Jun-2016 T-T-P-00631 II Transmitted HTAS H
HTAS - PROCESS ------P52502 Process Specification for 10-R5002 - Ammonia Converte 5 08-Jun-2016 R 06-Jul-2016 T-T-P-00694 II Transmitted HTAS C
HTAS - PROCESS ------P53001 Process Specification for 10-E3007 C02 Cooler 2 18-Mar-2016 R 04-Apr-2016 T-T-P-00497 II Transmitted HTAS C
HTAS - PROCESS ------P53002 Process Specification for 10-E-5000 Loop Waste Heat Bo 2 15-Apr-2016 R 06-Jun-2016 T-T-P-00631 II Transmitted HTAS C
HTAS - PROCESS ------P53003 Process Specification for 10-E3007 CO2 Cooler 1 18-Mar-2016 R 19-Apr-2016 T-T-P-00545 II Transmitted HTAS C
HTAS - PROCESS ------P53500 Process Specification for 10-E5000 Loop Waste Heat Bo 2 19-Aug-2015 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P56001 Process Specification for P 3001 A-B Semi-lean Solutio 0 13-Sep-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P56002 Process Specification for P 3002 A-B Lean Solution Pum 0 13-Sep-2013 R 21-Jul-2016 T-T-P-00710 II Transmitted HTAS C
HTAS - PROCESS ------P58301 Process Specification for 10-T-3001 CO2 Stripping Col 0 05-Jul-2016 R 06-Jul-2016 T-T-P-00694 II Transmitted HTAS C
HTAS - PROCESS ------P58302 Process Specification for 10-T3002 CO2 Absorber 0 05-Jul-2016 R 06-Jul-2016 T-T-P-00694 II Transmitted HTAS C
HTAS - PROCESS ------P58303 Process Specification for 10-V-3001 LP Flash Drum 0 05-Jul-2016 R 06-Jul-2016 T-T-P-00694 II No Comment HTAS H
HTAS - PROCESS ------P58303 Process Specification for 10-V-3001 LP Flash Drum 1 14-Feb-2017 R 20-Feb-2017 T-T-P-01231 II Transmitted HTAS C
HTAS - PROCESS --------P58304 Process Specification for 10-V-3002 HP Flash Drum 0 14-Feb-2017 R 20-Feb-2017 T-T-P-01231 II Transmitted HTAS C
HTAS - PROCESS ------SP-285-EN Platforms; Ladders & Stairways 0 20-May-2015 R 13-Oct-2016 T-T-P-00872 II Transmitted HTAS C
HTAS - PROCESS ------SP-324-EN Refractory Lining Specification for Air Fired Secondary 0 01-Jul-2015 R 13-Oct-2016 T-T-P-00872 II Transmitted HTAS C
HTAS - PROCESS ------SP-353-EN Metal Anchors for Monolithic Castings 0 01-Jul-2015 R 13-Oct-2016 T-T-P-00872 II Transmitted HTAS C
HTAS - PROCESS ------SP-43-EN Vertical Cylindrical Vessels Tolerances 0 25-Nov-2015 R 24-Oct-2016 T-T-P-00899 II Transmitted HTAS C
HTAS - PROCESS ------SP-48-EN Vessel Details Basering with Anchor-bolt Chairs for Vert 0 25-Nov-2014 R 13-Oct-2016 T-T-P-00872 II Transmitted HTAS C
HTAS - PROCESS ------SP-65-EN Catalyst Support 0 02-Dec-2014 R 13-Oct-2016 T-T-P-00872 II Transmitted HTAS C
HTAS - PROCESS ------WHB53010 Loop Waste Heat Boiler 10-E-5000 Recommendations for 0 13-Oct-2015 IFA 19-Nov-2015 T-T-P-00091 IFA 02-Dec-2015 Transmitted HTAS C
HTAS - PROCESS ------WHB53500-E-001 Loop Waste Heat Boiler No. 2 with Integral Steam Drum 1 06-Nov-2015 IFA 19-Nov-2015 T-T-P-00091 IFA 02-Dec-2015 Transmitted HTAS H
HTAS - PROCESS ------WHB53500-E-001 Loop Waste Heat Boiler No. 2 with Integral Steam Drum 2 07-Jan-2016 IFR 21-Jan-2016 T-T-P-00251 IFR 03-Feb-2016 Transmitted HTAS H
HTAS - PROCESS ------WHB53500-E-001 Loop Waste Heat Boiler No. 2 with Integral Steam Drum 4 24-Jun-2016 R 01-Jul-2016 T-T-P-00675 II Transmitted HTAS C
HTAS - PROCESS ------WHB53500-E-002 Loop Waste Heat Boiler No. 2 with Integral Steam Drum 1 06-Nov-2015 IFA 19-Nov-2015 T-T-P-00091 IFA 02-Dec-2015 Transmitted HTAS H
HTAS - PROCESS ------WHB53500-E-002 Loop Waste Heat Boiler No. 2 with Integral Steam Drum 2 07-Jan-2016 IFR 21-Jan-2016 T-T-P-00251 IFR 03-Feb-2016 Transmitted HTAS C
INSTRUMENT 2539-00-DW-1512-02-01 Control Systems Schematic Diagram A 04-Feb-2016 IFR 05-Feb-2016 T-T-P-00288 IFR 18-Feb-2016 26-Feb-2016 C-NH3-0102/T-P-T-0077 Commented TPIT H
INSTRUMENT 2539-00-DW-1512-02-01 Control Systems Schematic Diagram B 07-Nov-2016 IDD 07-Nov-2016 T-T-P-00940 IDD 20-Nov-2016 16-Nov-2016 C-NH3-0388/T-P-T-0605 Commented TPVN H
INSTRUMENT 2539-00-DW-1512-02-01 Control Systems Schematic Diagram 0 16-Feb-2017 IFC 16-Feb-2017 T-T-P-01227 IFA 01-Mar-2017 01-Mar-2017 T-P-T-1416 Approved TPVN C
INSTRUMENT 2539-00-DW-1515-02-01 Fire Alarm Plan (Schematic Diagram) A 03-Jun-2016 IFR 03-Jun-2016 T-T-P-00629 IFR 17-Jun-2016 14-Jul-2016 T-P-T-0257 Approved TPVN H
INSTRUMENT 2539-00-DW-1515-02-01 Fire Alarm Plan (Schematic Diagram) B 18-Aug-2016 IDD 19-Aug-2016 T-T-P-00759 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0280/T-P-T-0365 Commented TPVN H
INSTRUMENT 2539-00-DW-1515-02-01 Fire Alarm Plan (Schematic Diagram) 0 09-Dec-2016 IFC 09-Dec-2016 T-T-P-01029 IFA 22-Dec-2016 Transmitted TPVN C
INSTRUMENT 2539-00-DW-1522-01-01 Instrument Power Distribution Diagram A 23-May-2016 IFR 27-May-2016 T-T-P-00606 IFR 09-Jun-2016 10-Jun-2016 C-NH3-0175/T-P-T-0203 Commented TPVN H
INSTRUMENT 2539-00-DW-1522-01-01 Instrument Power Distribution Diagram 0 20-Jan-2017 V 20-Jan-2017 T-T-P-01173 V No Comment TPVN H
INSTRUMENT 2539-00-DW-1522-01-01 Instrument Power Distribution Diagram 1 14-Jul-2017 IFC 14-Jul-2017 T-T-P-01491 IFA 27-Jul-2017 02-Aug-2017 T-P-T-2397 Approved TPVN C
INSTRUMENT 2539-00-DW-1522-01-02 Instrument Power Distribution Diagram A 23-May-2016 IFR 27-May-2016 T-T-P-00606 IFR 09-Jun-2016 10-Jun-2016 C-NH3-0175/T-P-T-0203 Commented TPVN H
INSTRUMENT 2539-00-DW-1522-01-02 Instrument Power Distribution Diagram 0 20-Jan-2017 V 20-Jan-2017 T-T-P-01173 V Transmitted TPVN C
INSTRUMENT 2539-00-DW-1522-03 Instrument-Electrical Interface A 04-Jul-2016 IFR 06-Jul-2016 T-T-P-00688 IFR 19-Jul-2016 21-Jul-2016 C-NH3-0224/T-P-T-0275 Commented TPVN H
INSTRUMENT 2539-00-DW-1522-03 Instrument/Electrical Interface 0 16-Mar-2017 IFC 16-Mar-2017 T-T-P-01294 IFA 29-Mar-2017 11-Apr-2017 T-P-T-1752 Approved TPVN C
INSTRUMENT 2539-00-DW-1523-01-01 Control Room Equipment Layout A 04-Feb-2016 IFR 05-Feb-2016 T-T-P-00287 IFR 18-Feb-2016 26-Feb-2016 C-NH3-0101/T-P-T-0077 Commented TPIT H
INSTRUMENT 2539-00-DW-1523-01-01 Control Room Equipment Layout (1/1) B 10-Nov-2016 IDD 11-Nov-2016 T-T-P-00949 IFR 24-Nov-2016 26-Nov-2016 C-NH3-0425/T-P-T-0682 Commented TPVN H
INSTRUMENT 2539-00-DW-1523-01-01 Control Room Equipment Layout (1/1) 0 03-Jan-2017 IFC 04-Jan-2017 T-T-P-01112 IFA 17-Jan-2017 18-Jan-2017 T-P-T-1043 Approved TPVN C
INSTRUMENT 2539-00-DW-1523-02-01 Control Room Wiring Plan A 26-May-2016 IFR 01-Jun-2016 T-T-P-00619 IFR 14-Jun-2016 16-Jun-2016 C-NH3-0183/T-P-T-0212 Commented TPVN H
INSTRUMENT 2539-00-DW-1523-02-01 Control Room Wiring Plan B 18-Nov-2016 IDD 22-Nov-2016 T-T-P-00981 IFR 05-Dec-2016 07-Dec-2016 C-NH3-0450/T-P-T-0751 Commented TPVN H
INSTRUMENT 2539-00-DW-1523-02-01 Control Room Wiring Plan 0 04-Jan-2017 IFC 04-Jan-2017 T-T-P-01112 IFA 17-Jan-2017 18-Jan-2017 T-P-T-1043 Approved TPVN C
INSTRUMENT 2539-00-DW-1525-01 Instrument One Line Loop Diagram A 21-Dec-2016 IFR 22-Dec-2016 T-T-P-01073 IFR 04-Jan-2017 08-Jan-2017 C-NH3-0538/T-P-T-0965 Commented TPVN H
INSTRUMENT 2539-00-DW-1525-01 Instrument One Line Loop Diagram 0 28-Mar-2017 IFC 30-Mar-2017 T-T-P-01316 IFA 12-Apr-2017 14-Apr-2017 T-P-T-1827 Approved TPVN C
INSTRUMENT 2539-00-DW-1552-01 Dimensional Level Instrument Arrangement on Equipme B 07-Oct-2016 IDD 07-Oct-2016 T-T-P-00862 IFR 21-Oct-2016 25-Oct-2016 C-NH3-0348/T-P-T-0499 Commented TPVN H
INSTRUMENT 2539-00-DW-1552-01 Dimensional Level Instrument Arrangement on Equipmen 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01107 IFA 17-Jan-2017 20-Jan-2017 T-P-T-1094 Approved TPVN C
INSTRUMENT 2539-00-DW-1574-51-01 Instrument Earthing Plan A 26-Jun-2016 IFR 01-Jun-2016 T-T-P-00619 IFR 14-Jun-2016 16-Jun-2016 C-NH3-0183/T-P-T-0212 Commented TPVN H
INSTRUMENT 2539-00-DW-1574-51-01 Instrument Earthing Plan B 18-Nov-2016 IDD 22-Nov-2016 T-T-P-00981 IFR 05-Dec-2016 07-Dec-2016 C-NH3-0450/T-P-T-0751 Commented TPVN H
INSTRUMENT 2539-00-DW-1574-51-01 Instrument Earthing Plan 0 29-Dec-2016 IFC 29-Dec-2016 T-T-P-01101 IFA 12-Jan-2017 18-Jan-2017 C-NH3-0553/T-P-T-1038 Commented TPVN C
INSTRUMENT 2539-00-ITP-1510-01 Inspection & Test Plan for Control & Safety System A 22-Mar-2016 IFI 24-Mar-2016 T-T-P-00470 IFR 06-Apr-2016 11-Apr-2016 T-P-T-0141 MR 1510-01. Approved TPVN H
INSTRUMENT 2539-00-ITP-1510-01 Inspection & Test Plan for Control & Safety System 0 25-Nov-2016 IFP 28-Nov-2016 T-T-P-01000 IFA 11-Dec-2016 Transmitted TPVN C
INSTRUMENT 2539-00-ITP-1515-01 Inspection & Test Plan for Fire & Gas System Modificat A 24-Oct-2016 IFI 26-Oct-2016 T-T-P-00907 IFR 08-Nov-2016 10-Nov-2016 C-NH3-0378/T-P-T-0572 MR 1515-01. Commented TPVN H
INSTRUMENT 2539-00-ITP-1515-01 Inspection & Test Plan for Fire & Gas System Modificat 0 20-Mar-2017 IFP 20-Mar-2017 T-T-P-01299 IFA 02-Apr-2017 11-Apr-2017 C-NH3-0732/T-P-T-1753 Commented TPVN C
INSTRUMENT 2539-00-ITP-1541-01 Inspection & Test Plan for Control Valves A 27-Apr-2016 IFI 29-Apr-2016 T-T-P-00563 IFR 13-May-2016 19-May-2016 T-P-T-0171 MR 1541-01. Approved TPVN H
INSTRUMENT 2539-00-ITP-1541-01 Inspection & Test Plan for Control Valves 0 26-Oct-2016 IFP 28-Oct-2016 T-T-P-00911 IFP Transmitted TPVN C
INSTRUMENT 2539-00-ITP-1543-01 Inspection & Test Plan for On-Off Valves A 27-Apr-2016 IFI 28-Apr-2016 T-T-P-00557 IFR 11-May-2016 MR 1543-01. Transmitted TPVN H
INSTRUMENT 2539-00-ITP-1543-01 Inspection & Test Plan for On-Off Valves 0 28-Oct-2016 IFP 31-Oct-2016 T-T-P-00917 IFP Transmitted TPVN C
INSTRUMENT 2539-00-ITP-1545-01 Inspection & Test Plan for Safety Relief Valves A 06-May-2016 IFI 06-May-2016 T-T-P-00575 IFR 20-May-2016 24-May-2016 T-P-T-0180 MR 1545-01. Approved TPVN H
INSTRUMENT 2539-00-ITP-1545-01 Inspection & Test Plan for Safety Relief Valves 0 26-Oct-2016 IFP 28-Oct-2016 T-T-P-00911 IFP Transmitted TPVN C
INSTRUMENT 2539-00-ITP-1546-02 Inspection & Test Plan for Orifice Plates; Flow Nozzles; A 01-Jul-2016 IFI 06-Jul-2016 T-T-P-00689 IFR 19-Jul-2016 20-Jul-2016 C-NH3-0223/T-P-T-0273; C-NH3-0294/T-P-T-0392 MR 1546-02. Approved TPVN H
INSTRUMENT 2539-00-ITP-1546-02 Inspection & Test Plan for Orifice Plates; Flow Nozzles; 0 18-Nov-2016 IFP 22-Nov-2016 T-T-P-00987 IFP 06-Dec-2016 09-Dec-2016 T-P-T-0760 Approved TPVN C
INSTRUMENT 2539-00-ITP-1552-08 Inspection & Test Plan for Level Gauge & Transmitter A 01-Jul-2016 IFI 01-Jul-2016 T-T-P-00682 IFR 15-Jul-2016 14-Jul-2016 C-NH3-0217/T-P-T-0256; C-NH3-0229/T-P-T-0285 MR 1552-08. Approved with comments TPVN H
INSTRUMENT 2539-00-ITP-1552-08 Inspection & Test Plan for Level Gauge & Transmitter 0 18-Nov-2016 IFP 21-Nov-2016 T-T-P-00980 IFA 04-Dec-2016 Transmitted TPVN C
INSTRUMENT 2539-00-ITP-1553-01 Inspection & Test Plan for Electronic Transmitter A 15-Jul-2016 IFI 18-Jul-2016 T-T-P-00706 IFR 01-Aug-2016 08-Aug-2016 C-NH3-0239/T-P-T-0309; C-NH3-0298/T-P-T-0399 MR 1553-01. Approved TPVN H
INSTRUMENT 2539-00-ITP-1553-01 Inspection & Test Plan for Electronic Transmitter 0 02-Dec-2016 IFP 05-Dec-2016 T-T-P-01015 IFA 18-Dec-2016 21-Dec-2016 T-P-T-0848 Approved TPVN C
INSTRUMENT 2539-00-ITP-1553-02 Inspection & Test Plan for Pressure & Temperature Gau A 16-Aug-2016 IFI 19-Aug-2016 T-T-P-00758 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0278/T-P-T-0363; C-NH3-0299/T-P-T-0400 MR 1553-02. Commented TPVN H
Page 15
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
INSTRUMENT 2539-00-ITP-1553-02 Inspection & Test Plan for Pressure & Temperature Gau 0 14-Dec-2016 IFP 15-Dec-2016 T-T-P-01049 IFA 28-Dec-2016 27-Dec-2016 C-NH3-0513/T-P-T-0893 Commented TPVN C
INSTRUMENT 2539-00-ITP-1564-02 Inspection & Test Plan for Conductivity Analyzers A 21-Jul-2016 IFI 21-Jul-2016 T-T-P-00709 IFR 03-Aug-2016 08-Aug-2016 T-P-T-0308 MR 1564-02. Approved TPVN H
INSTRUMENT 2539-00-ITP-1564-02 Inspection & Test Plan for Conductivity Analyzers 0 11-Nov-2016 IFP 11-Nov-2016 T-T-P-00958 IFP Transmitted TPVN C
INSTRUMENT 2539-00-ITP-1566-01 Inspection & Test Plan for Gas Detectors & Manual Call A 22-Jul-2016 IFI 27-Jul-2016 T-T-P-00721 IFR 09-Aug-2016 16-Aug-2016 C-NH3-0256/T-P-T-0330; C-NH3-0291/T-P-T-0389 MR 1566-01. Approved TPVN H
INSTRUMENT 2539-00-ITP-1566-01 Inspection & Test Plan for Gas Detectors & Manual Call 0 18-Nov-2016 IFP 22-Nov-2016 T-T-P-00987 IFP 06-Dec-2016 09-Dec-2016 T-P-T-0760 Approved TPVN C
INSTRUMENT 2539-00-ITP-1572-01 Inspection & Test Plan for Instrument Tubing & Fittings A 15-Sep-2016 IFI 15-Sep-2016 T-T-P-00816 IFR 28-Sep-2016 28-Sep-2016 T-P-T-0424 MR 1572-01. Approved TPVN H
INSTRUMENT 2539-00-ITP-1572-01 Inspection & Test Plan for Instrument Tubing & Fittings 0 18-Jan-2017 IFP 08-Feb-2017 T-T-P-01202 IFA 21-Feb-2017 23-Feb-2017 T-P-T-1339 Approved TPVN C
INSTRUMENT 2539-00-ITP-1572-02 Inspection & Test Plan for Cable Tray & Accessories A 19-Sep-2016 IFI 19-Sep-2016 T-T-P-00822 IFR 02-Oct-2016 11-Oct-2016 T-P-T-0443 MR 1572-02. Approved TPVN H
INSTRUMENT 2539-00-ITP-1572-02 Inspection & Test Plan for Cable Tray & Accessories 0 10-Jan-2017 IFP 10-Jan-2017 T-T-P-01138 IFA 23-Jan-2017 06-Feb-2017 T-P-T-1190 Approved TPVN C
INSTRUMENT 2539-00-ITP-1574-01 Inspection & Test Plan for Instrument Cables A 05-Sep-2016 IFI 06-Sep-2016 T-T-P-00795 IFR 19-Sep-2016 20-Sep-2016 T-P-T-0406 MR 1574-01. Approved TPVN H
INSTRUMENT 2539-00-ITP-1574-01 Inspection & Test Plan for Instrument Cables 0 23-Jan-2017 IFP 25-Jan-2017 T-T-P-01181 IFA 08-Feb-2017 10-Feb-2017 T-P-T-1235 Approved TPVN C
INSTRUMENT 2539-00-ITP-1575-01 Inspection & Test Plan for Junction Boxes & Cable Gland A 13-Sep-2016 IFI 15-Sep-2016 T-T-P-00818 IFR 28-Sep-2016 No Comment TPVN H
INSTRUMENT 2539-00-ITP-1575-01 Inspection & Test Plan for Junction Boxes & Cable Gland 0 13-Jan-2017 IFP 16-Jan-2017 T-T-P-01155 IFA 30-Jan-2017 08-Feb-2017 T-P-T-1218 Approved TPVN C
INSTRUMENT 2539-00-ITP-1584-01 Inspection & Test Plan for Ammonia Metering Package 0 18-Aug-2016 IFP 19-Aug-2016 T-T-P-00757 IFP MR 1584-01. No Comment TPVN H
INSTRUMENT 2539-00-ITP-1584-01 Inspection & Test Plan for Ammonia Metering Package 1 31-Oct-2016 IFP 02-Nov-2016 T-T-P-00923 IFP Transmitted TPVN C
INSTRUMENT 2539-00-JSD-1501-01 Job Specification of Instrument Numbering A 30-Oct-2015 IFR 30-Oct-2015 T-T-P-00051 IFR 12-Nov-2015 No Comment TPIT H
INSTRUMENT 2539-00-JSD-1501-01 Job Specification of Instrument Numbering 0 25-Feb-2016 IFE 25-Feb-2016 T-T-P-00361 IFE No Comment TPIT H
INSTRUMENT 2539-00-JSD-1501-01 Job Specification for Design of Instrument Numbering 1 15-Mar-2017 IFE 16-Mar-2017 T-T-P-01294 IFA 29-Mar-2017 11-Apr-2017 C-NH3-0731/T-P-T-1752 Commented TPVN C
INSTRUMENT 2539-00-JSD-1501-02 Job Specification for Design for Smartplant Instrumentat A 28-Oct-2015 IFR 30-Oct-2015 T-T-P-00051 IFR 12-Nov-2015 16-Nov-2015 T-P-T-0013 Approved TPIT H
INSTRUMENT 2539-00-JSD-1501-02 Job Specification for Design for Smartplant Instrumentat 0 18-Feb-2016 IFE 19-Feb-2016 T-T-P-00333 IFE No Comment TPIT H
INSTRUMENT 2539-00-JSD-1501-02 Job Specification for Design for Smartplant Instrumentat 1 06-Mar-2017 Re-IFE 13-Mar-2017 T-T-P-01284 IFA 26-Mar-2017 31-Mar-2017 T-P-T-1706 Approved TPVN C
INSTRUMENT 2539-00-JSD-1510-01 Control & Safety System Philosophy A 11-Jan-2016 IFR 14-Jan-2016 T-T-P-00235 IFR 27-Jan-2016 No Comment TPIT H
INSTRUMENT 2539-00-JSD-1510-01 Control & Safety System Philosophy 0 07-Mar-2016 IFE 08-Mar-2016 T-T-P-00401 IFE 25-Mar-2016 C-NH3-0126/T-P-T-0120 Commented TPIT C
INSTRUMENT 2539-00-JSD-1540-01 General Design Rules for Instrumentation A 04-Nov-2015 IFR 06-Nov-2015 T-T-P-00063 IFR 19-Nov-2015 30-Nov-2015 C-NH3-0048/T-P-T-0022 Commented TPIT H
INSTRUMENT 2539-00-JSD-1540-01 General Design Rules for Instrumentation 0 24-Feb-2016 IFE 25-Feb-2016 T-T-P-00360 IFE Transmitted TPIT C
INSTRUMENT 2539-00-JSD-1541-01 Job Specification for Supply of Control Valves & On-Off A 26-Nov-2015 IFR 27-Nov-2015 T-T-P-00121 IFR 10-Dec-2015 23-Dec-2015 C-NH3-0075/T-P-T-0048 Commented. Rev 0: Number changed to 2539-00-JSS-1TPIT C
INSTRUMENT 2539-00-JSD-1545-01 Job Specification for Supply of Safety Relief Valves & R A 26-Nov-2015 IFR 27-Nov-2015 T-T-P-00121 IFR 10-Dec-2015 23-Dec-2015 C-NH3-0075/T-P-T-0048 Commented. Rev 0: Number changed to 2539-00-JSS-1TPIT H
INSTRUMENT 2539-00-JSD-1553-01 Job Specification for Supply of Electronic Pressure & Dif A 26-Nov-2015 IFR 27-Nov-2015 T-T-P-00121 IFR 10-Dec-2015 23-Dec-2015 C-NH3-0075/T-P-T-0048 Commented. Rev 0: Number changed to 2539-00-JSS-1TPIT C
INSTRUMENT 2539-00-JSD-1574-01 Job Specification for Supply of Instrumentation Cables A 26-Nov-2015 IFR 27-Nov-2015 T-T-P-00121 IFR 10-Dec-2015 23-Dec-2015 C-NH3-0075/T-P-T-0048 Commented. Rev 0: Number changed to 2539-00-JSS-1TPIT C
INSTRUMENT 2539-00-JSD-1575-01 Job Specification for Supply of Junction Boxes A 26-Nov-2015 IFR 27-Nov-2015 T-T-P-00121 IFR 10-Dec-2015 23-Dec-2015 C-NH3-0075/T-P-T-0048 Commented. Rev 0: Number changed to 2539-00-JSS-1TPIT C
INSTRUMENT 2539-00-JSD-1580-01 Job Specification for Design of Instrumentation for Pack A 30-Oct-2015 IFR 04-Nov-2015 T-T-P-00058 IFR 17-Nov-2015 No Comment TPIT H
INSTRUMENT 2539-00-JSD-1580-01 Job Specification for Design of Instrumentation for Pack 0 24-Feb-2016 IFE 25-Feb-2016 T-T-P-00360 IFE Transmitted TPIT C
INSTRUMENT 2539-00-JSS-1511-01 Job Specification for Supply of Distributed Control Syst A 18-Jan-2016 IFR 22-Jan-2016 T-T-P-00255 IFR 04-Feb-2016 24-Feb-2016 C-NH3-0098/T-P-T-0073 Commented TPIT H
INSTRUMENT 2539-00-JSS-1511-01 Job Specification for Supply of Distributed Control Syst 0 10-Mar-2016 IFE 11-Mar-2016 T-T-P-00421 IFE Transmitted TPIT C
INSTRUMENT 2539-00-JSS-1515-01 Job Specification for Supply of Emergency Shut-Down A 18-Jan-2016 IFR 22-Jan-2016 T-T-P-00255 IFR 04-Feb-2016 24-Feb-2016 C-NH3-0097/T-P-T-0073 Commented TPIT H
INSTRUMENT 2539-00-JSS-1515-01 Job Specification for Supply of Emergency Shut-Down 0 10-Mar-2016 IFE 11-Mar-2016 T-T-P-00421 IFE Transmitted TPIT C
INSTRUMENT 2539-00-JSS-1541-01 Job Specification for Supply of Control Valves & On-Off 0 25-Feb-2016 IFE 29-Feb-2016 T-T-P-00373 IFE Transmitted TPIT C
INSTRUMENT 2539-00-JSS-1545-01 Job Specification for Supply of Safety Relief Valves & R 0 25-Feb-2016 IFE 29-Feb-2016 T-T-P-00373 IFE Transmitted TPIT C
INSTRUMENT 2539-00-JSS-1553-01 Job Specification for Supply of Electronic Pressure & Dif 0 25-Feb-2016 IFE 29-Feb-2016 T-T-P-00373 IFE Transmitted TPIT C
INSTRUMENT 2539-00-JSS-1574-01 Job Specification for Supply of Instrumentation Cables 0 25-Feb-2016 IFE 29-Feb-2016 T-T-P-00373 IFE Transmitted TPIT C
INSTRUMENT 2539-00-JSS-1575-01 Job Specification for Supply of Junction Boxes 0 25-Feb-2016 IFE 29-Feb-2016 T-T-P-00373 IFE Transmitted TPIT C
INSTRUMENT 2539-00-JSS-1584-01 General Supply Rules for Flow Metering Stations A 13-Nov-2015 IFR 13-Nov-2015 T-T-P-00085 IFR 26-Nov-2015 No Comment TPIT H
INSTRUMENT 2539-00-JSS-1584-01 General Supply Rules for Flow Metering Stations 0 08-Feb-2016 FIN 09-Feb-2016 T-T-P-00301 FIN Transmitted TPIT C
INSTRUMENT 2539-00-ML-1510-01 Technical Bid Evaluation for Control & Safety System 0 07-Oct-2016 II 07-Oct-2016 T-T-P-00861 II 24-Oct-2016 T-P-T-0489 Approved TPVN C
INSTRUMENT 2539-00-ML-1515-01 Technical Bid Evaluation for Fire & Gas System Modific 0 27-Feb-2017 II 27-Feb-2017 T-T-P-01245 II 12-Mar-2017 Transmitted TPVN C
INSTRUMENT 2539-00-ML-1541-01 Technical Bid Evaluation for Control Valve 0 31-Aug-2016 II 31-Aug-2016 T-T-P-00784 II Transmitted TPVN C
INSTRUMENT 2539-00-ML-1543-01 Technical Bid Evaluation for On-Off Valves 0 31-Aug-2016 II 09-Sep-2016 T-T-P-00801 II Transmitted TPVN C
INSTRUMENT 2539-00-ML-1545-01 Technical Bid Evaluation for Safety Relief Valves 0 31-Aug-2016 II 01-Sep-2016 T-T-P-00785 II 20-Sep-2016 C-NH3-0302/T-P-T-0404 Commented TPVN C
INSTRUMENT 2539-00-ML-1546-02 Technical Bid Evaluation for Flow Elements (Orifice Pla 0 06-Oct-2016 II 06-Oct-2016 T-T-P-00857 II Transmitted TPVN C
INSTRUMENT 2539-00-ML-1552-08 Technical Bid Evaluation for Level Gauge & Transmitter 0 14-Oct-2016 II 18-Oct-2016 T-T-P-00880 II Transmitted TPVN C
INSTRUMENT 2539-00-ML-1553-01 Technical Bid Evaluation for Electronic Transmitter 0 19-Oct-2016 II 21-Oct-2016 T-T-P-00890 II Transmitted TPVN C
INSTRUMENT 2539-00-ML-1553-02 Technical Bid Evaluation for Pressure & Temperature G 0 25-Nov-2016 II 29-Nov-2016 T-T-P-01004 II 12-Dec-2016 Transmitted TPVN C
INSTRUMENT 2539-00-ML-1564-02 Technical Bid Evaluation for Conductivity Analyzers 0 06-Oct-2016 II 06-Oct-2016 T-T-P-00857 II Transmitted TPVN C
INSTRUMENT 2539-00-ML-1566-01 Technical Bid Evaluation for Gas Detector & Manual Call 0 19-Oct-2016 II 21-Oct-2016 T-T-P-00890 II Transmitted TPVN C
INSTRUMENT 2539-00-ML-1572-01 Technical Bid Evaluation for Instrument Tubing Fittings 0 20-Dec-2016 II 21-Dec-2016 T-T-P-01066 II 03-Jan-2017 Transmitted TPVN C
INSTRUMENT 2539-00-ML-1572-02 Technical Bid Evaluation for Instrument Cable Tray & Ac 0 09-Dec-2016 II 13-Dec-2016 T-T-P-01042 II 26-Dec-2016 Transmitted TPVN C
INSTRUMENT 2539-00-ML-1574-01 Technical Bid Tabulation for Instrument Cables 0 30-Dec-2016 II 04-Jan-2017 T-T-P-01109 II 17-Jan-2017 Transmitted TPVN C
INSTRUMENT 2539-00-ML-1575-01 Technical Bid Tabulation for Junction Boxes & Cable Gla 0 30-Dec-2016 II 04-Jan-2017 T-T-P-01109 II 17-Jan-2017 No Comment TPVN H
INSTRUMENT 2539-00-ML-1575-01 Technical Bid Tabulation for Junction Boxes & Cable Gla 1 18-Apr-2017 II 18-Apr-2017 T-T-P-01362 II 01-May-2017 Transmitted TPVN C
INSTRUMENT 2539-00-ML-1584-01 Technical Bid Evaluation for Ammonia Metering Packag 0 16-Jun-2016 II 17-Jun-2016 T-T-P-00655 II Transmitted TPVN H
INSTRUMENT 2539-00-ML-1584-01 Technical Bid Evaluation for Ammonia Metering Packag 1 01-Jul-2016 Re-II 01-Jul-2016 T-T-P-00677 Re-II 14-Jul-2016 T-P-T-0255 Approved TPVN C
INSTRUMENT 2539-00-MR-1510-01 Material Requisition for Control & Safety System A 22-Mar-2016 IFI 24-Mar-2016 T-T-P-00470 IFR 06-Apr-2016 11-Apr-2016 T-P-T-0141 MR 1510-01. Approved TPVN H
INSTRUMENT 2539-00-MR-1510-01 Material Requisition for Control & Safety System 0 25-Nov-2016 IFP 28-Nov-2016 T-T-P-01000 IFA 11-Dec-2016 Transmitted TPVN C
INSTRUMENT 2539-00-MR-1515-01 Material Requisition for Fire & Gas System Modificatio A 24-Oct-2016 IFI 26-Oct-2016 T-T-P-00907 IFR 08-Nov-2016 No Comment TPVN H
INSTRUMENT 2539-00-MR-1515-01 Material Requisition for Fire & Gas System Modificatio 0 20-Mar-2017 IFP 20-Mar-2017 T-T-P-01299 IFA 02-Apr-2017 11-Apr-2017 C-NH3-0732/T-P-T-1753 Commented TPVN C
INSTRUMENT 2539-00-MR-1541-01 Material Requisition for Control Valves A 27-Apr-2016 IFI 29-Apr-2016 T-T-P-00563 IFR 13-May-2016 19-May-2016 T-P-T-0171 MR 1541-01. Approved TPVN H
INSTRUMENT 2539-00-MR-1541-01 Material Requisition for Control Valves 0 26-Oct-2016 IFP 28-Oct-2016 T-T-P-00911 IFP No Comment TPVN H
INSTRUMENT 2539-00-MR-1541-01 Material Requisition for Control Valves 1 05-Jan-2017 IFP 06-Jan-2017 T-T-P-01125 IFA 20-Jan-2017 23-Jan-2017 T-P-T-1127 Approved TPVN C
INSTRUMENT 2539-00-MR-1543-01 Material Requisition for On-Off Valves A 27-Apr-2016 IFI 28-Apr-2016 T-T-P-00557 IFR 11-May-2016 MR 1543-01. Transmitted TPVN H
INSTRUMENT 2539-00-MR-1543-01 Material Requisition for On-Off Valves 0 28-Oct-2016 IFP 31-Oct-2016 T-T-P-00917 IFP Transmitted TPVN C
INSTRUMENT 2539-00-MR-1545-01 Material Requisition for Safety Relief Valves A 06-May-2016 IFI 06-May-2016 T-T-P-00575 IFR 20-May-2016 24-May-2016 T-P-T-0180 MR 1545-01. Approved TPVN H
INSTRUMENT 2539-00-MR-1545-01 Material Requisition for Safety Relief Valves 0 26-Oct-2016 IFP 28-Oct-2016 T-T-P-00911 IFP No Comment TPVN H
INSTRUMENT 2539-00-MR-1545-01 Material Requisition for Safety Relief Valves 1 19-Jan-2017 IFP 20-Jan-2017 T-T-P-01167 IFA 02-Feb-2017 14-Feb-2017 T-P-T-1249 Approved TPVN C
INSTRUMENT 2539-00-MR-1546-02 Material Requisition for Orifice Plates; Flow Nozzles; A A 01-Jul-2016 IFI 06-Jul-2016 T-T-P-00689 IFR 19-Jul-2016 20-Jul-2016 C-NH3-0223/T-P-T-0273; C-NH3-0294/T-P-T-0392 MR 1546-02. Approved TPVN H
INSTRUMENT 2539-00-MR-1546-02 Material Requisition for Orifice Plates; Flow Nozzles; A 0 18-Nov-2016 IFP 22-Nov-2016 T-T-P-00987 IFP 06-Dec-2016 09-Dec-2016 T-P-T-0760 Approved TPVN C
INSTRUMENT 2539-00-MR-1552-08 Material Requisition for Level Gauge & Transmitter A 01-Jul-2016 IFI 01-Jul-2016 T-T-P-00682 IFR 15-Jul-2016 14-Jul-2016 C-NH3-0217/T-P-T-0256; C-NH3-0229/T-P-T-0285 MR 1552-08. Approved with comments TPVN H
INSTRUMENT 2539-00-MR-1552-08 Material Requisition for Level Gauge & Transmitter 0 18-Nov-2016 IFP 21-Nov-2016 T-T-P-00980 IFA 04-Dec-2016 07-Dec-2016 C-NH3-0449/T-P-T-0750 Commented TPVN C
INSTRUMENT 2539-00-MR-1553-01 Material Requisition for Electronic Transmitter A 15-Jul-2016 IFI 18-Jul-2016 T-T-P-00706 IFR 01-Aug-2016 08-Aug-2016 C-NH3-0239/T-P-T-0309; C-NH3-0298/T-P-T-0399 MR 1553-01. Approved TPVN H
INSTRUMENT 2539-00-MR-1553-01 Material Requisition for Electronic Transmitter 0 02-Dec-2016 IFP 05-Dec-2016 T-T-P-01015 IFA 18-Dec-2016 21-Dec-2016 T-P-T-0848 Approved TPVN H
INSTRUMENT 2539-00-MR-1553-01 Material Requisition for Electronic Transmitter 1 20-Jan-2017 IFP 20-Jan-2017 T-T-P-01178 IFA 03-Feb-2017 08-Feb-2017 T-P-T-1231 Approved TPVN C
INSTRUMENT 2539-00-MR-1553-02 Material Requisition for Pressure & Temperature Gauges A 16-Aug-2016 IFI 19-Aug-2016 T-T-P-00758 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0278/T-P-T-0363; C-NH3-0299/T-P-T-0400 MR 1553-02. Commented TPVN H
INSTRUMENT 2539-00-MR-1553-02 Material Requisition for Pressure & Temperature Gauges 0 14-Dec-2016 IFP 15-Dec-2016 T-T-P-01049 IFA 28-Dec-2016 27-Dec-2016 C-NH3-0513/T-P-T-0893 Commented TPVN H
INSTRUMENT 2539-00-MR-1553-02 Material Requisition for Pressure & Temperature Gauges 1 19-Jan-2017 IFP 20-Jan-2017 T-T-P-01171 IFA 02-Feb-2017 08-Feb-2017 T-P-T-1230 Approved TPVN C
INSTRUMENT 2539-00-MR-1564-02 Material Requisition for Conductivity Analyzers A 21-Jul-2016 IFI 21-Jul-2016 T-T-P-00709 IFR 03-Aug-2016 08-Aug-2016 T-P-T-0308 MR 1564-02. Approved TPVN H
INSTRUMENT 2539-00-MR-1564-02 Material Requisition for Conductivity Analyzers 0 11-Nov-2016 IFP 11-Nov-2016 T-T-P-00958 IFP Transmitted TPVN C
INSTRUMENT 2539-00-MR-1566-01 Material Requisition for Gas Detectors & Manual Call Poi A 22-Jul-2016 IFI 27-Jul-2016 T-T-P-00721 IFR 09-Aug-2016 16-Aug-2016 C-NH3-0256/T-P-T-0330; C-NH3-0291/T-P-T-0389 MR 1566-01. Approved TPVN H
INSTRUMENT 2539-00-MR-1566-01 Material Requisition for Gas Detectors & Manual Call Poi 0 18-Nov-2016 IFP 22-Nov-2016 T-T-P-00987 IFP 06-Dec-2016 09-Dec-2016 T-P-T-0760 Approved TPVN C
INSTRUMENT 2539-00-MR-1572-01 Material Requisition for Instrument Tubing & Fittings A 15-Sep-2016 IFI 15-Sep-2016 T-T-P-00816 IFR 28-Sep-2016 28-Sep-2016 T-P-T-0424 MR 1572-01. Approved TPVN H
INSTRUMENT 2539-00-MR-1572-01 Material Requisition for Instrument Tubing & Fittings 0 18-Jan-2017 IFP 08-Feb-2017 T-T-P-01202 IFA 21-Feb-2017 23-Feb-2017 T-P-T-1339 Approved TPVN C
INSTRUMENT 2539-00-MR-1572-02 Material Requisition for Instrument Cable Tray & Accesso A 19-Sep-2016 IFI 19-Sep-2016 T-T-P-00822 IFR 02-Oct-2016 11-Oct-2016 T-P-T-0443 MR 1572-02. Approved TPVN H
INSTRUMENT 2539-00-MR-1572-02 Material Requisition for Instrument Cable Tray & Accesso 0 10-Jan-2017 IFP 10-Jan-2017 T-T-P-01138 IFA 23-Jan-2017 06-Feb-2017 T-P-T-1190 Approved TPVN C
INSTRUMENT 2539-00-MR-1574-01 Material Requisition for Instrument Cables A 05-Sep-2016 IFI 06-Sep-2016 T-T-P-00795 IFR 19-Sep-2016 20-Sep-2016 T-P-T-0406 MR 1574-01. Approved TPVN H
INSTRUMENT 2539-00-MR-1574-01 Material Requisition for Instrument Cables 0 23-Jan-2017 IFP 25-Jan-2017 T-T-P-01181 IFA 08-Feb-2017 10-Feb-2017 T-P-T-1235 Approved TPVN C
INSTRUMENT 2539-00-MR-1575-01 Material Requisition for Junction Boxes & Cable Glands A 13-Sep-2016 IFI 15-Sep-2016 T-T-P-00818 IFR 28-Sep-2016 No Comment TPVN H
INSTRUMENT 2539-00-MR-1575-01 Material Requisition for Junction Boxes & Cable Glands 0 13-Jan-2017 IFP 16-Jan-2017 T-T-P-01155 IFA 30-Jan-2017 08-Feb-2017 T-P-T-1218 Approved TPVN H
INSTRUMENT 2539-00-MR-1575-01 Material Requisition for Junction Boxes & Cable Glands 1 06-Feb-2017 IFP 06-Feb-2017 T-T-P-01196 IFA 19-Feb-2017 No Comment TPVN H
INSTRUMENT 2539-00-MR-1575-01 Material Requisition for Junction Boxes & Cable Glands 2 22-Mar-2017 IFP 22-Mar-2017 T-T-P-01303 IFA 04-Apr-2017 11-Apr-2017 T-P-T-1756 Approved TPVN C
INSTRUMENT 2539-00-MR-1584-01 Material Requisition for Ammonia Metering Package - 0 18-Aug-2016 IFP 19-Aug-2016 T-T-P-00757 IFP MR 1584-01. No Comment TPVN H
INSTRUMENT 2539-00-MR-1584-01 Material Requisition for Ammonia Metering Package - 4 1 31-Oct-2016 IFP 02-Nov-2016 T-T-P-00923 IFP Transmitted TPVN C
INSTRUMENT 2539-00-MTO-1571-01 Instrumentation Cables Preliminary Material Take Off 0 18-Mar-2016 II 22-Mar-2016 T-T-P-00457 II Transmitted TPIT C
INSTRUMENT 2539-00-MTO-1572-01 Material Take-Off for Tubing & Fittings A 14-Sep-2016 IFR 14-Sep-2016 T-T-P-00812 IFR 27-Sep-2016 28-Sep-2016 T-P-T-0423 Approved TPVN H
INSTRUMENT 2539-00-MTO-1572-01 Material Take-Off for Tubing & Fittings 0 06-Jan-2017 IFP 06-Jan-2017 T-T-P-01126 IFA 20-Jan-2017 20-Jan-2017 T-P-T-1097 Approved TPVN C
INSTRUMENT 2539-00-MTO-1572-02 Material Take Off for Cable Tray & Accessories A 16-Sep-2016 IF1T 19-Sep-2016 T-T-P-00821 IFR 02-Oct-2016 11-Oct-2016 T-P-T-0442 Approved TPVN H
INSTRUMENT 2539-00-MTO-1572-02 Material Take Off for Cable Tray & Accessories 0 10-Jan-2017 IFP 10-Jan-2017 T-T-P-01138 IFA 23-Jan-2017 06-Feb-2017 T-P-T-1190 Approved TPVN C
INSTRUMENT 2539-00-MTO-1572-03 Material Take-Off for Instrument Bulk Material A 13-Sep-2016 IFR 14-Sep-2016 T-T-P-00812 IFR 27-Sep-2016 28-Sep-2016 T-P-T-0423 Approved TPVN H
INSTRUMENT 2539-00-MTO-1572-03 Material Take-Off for Instrument Bulk Material 0 05-Jan-2017 IFP 05-Jan-2017 T-T-P-01118 IFA 18-Jan-2017 18-Jan-2017 T-P-T-1046 Approved TPVN H
INSTRUMENT 2539-00-MTO-1572-03 Material Take-Off for Instrument Bulk Material 1 27-Mar-2017 IFP 28-Mar-2017 T-T-P-01311 IFA 10-Apr-2017 13-Apr-2017 T-P-T-1824 Approved TPVN C
INSTRUMENT 2539-00-MTO-1574-01 Material Take Off for Instrumentation Cables A 01-Sep-2016 IF1T 05-Sep-2016 T-T-P-00788 IFR 18-Sep-2016 20-Sep-2016 C-NH3-0303/T-P-T-0407 Commented TPVN H
INSTRUMENT 2539-00-MTO-1574-01 Material Take Off for Instrumentation Cables 0 19-Jan-2017 IFP 20-Jan-2017 T-T-P-01169 IFA 02-Feb-2017 08-Feb-2017 T-P-T-1220 Approved TPVN H
INSTRUMENT 2539-00-MTO-1574-01 Material Take Off for Instrumentation Cables 1 15-Feb-2017 IFP 16-Feb-2017 T-T-P-01224 IFA 01-Mar-2017 27-Feb-2017 T-P-T-1359 Approved TPVN C
INSTRUMENT 2539-00-MTO-1575-01 Material Take Off for Instrumentation Junction Boxes & A 13-Sep-2016 IF1T 15-Sep-2016 T-T-P-00817 IFR 28-Sep-2016 19-Oct-2016 C-NH3-0332/T-P-T-0466 Commented TPVN H
INSTRUMENT 2539-00-MTO-1575-01 Material Take Off for Instrumentation Junction Boxes & 0 13-Jan-2017 IFP 16-Jan-2017 T-T-P-01155 IFA 30-Jan-2017 08-Feb-2017 T-P-T-1218 Approved TPVN H
Page 16
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
INSTRUMENT 2539-00-MTO-1575-01 Material Take Off for Instrumentation Junction Boxes & 1 06-Feb-2017 IFP 06-Feb-2017 T-T-P-01196 IFA 19-Feb-2017 17-Feb-2017 C-NH3-0620/T-P-T-1279 Commented TPVN H
INSTRUMENT 2539-00-MTO-1575-01 Material Take Off for Instrumentation Junction Boxes & 2 22-Mar-2017 IFP 22-Mar-2017 T-T-P-01303 IFA 04-Apr-2017 11-Apr-2017 T-P-T-1756 Approved TPVN C
INSTRUMENT 2539-00-NM-1571-02 Control Room Cable List A 27-Dec-2016 IFR 29-Dec-2016 T-T-P-01097 IFR 11-Jan-2017 13-Jan-2017 T-P-T-0999 Approved TPVN H
INSTRUMENT 2539-00-NM-1571-02 Control Room Cable List 0 03-Mar-2017 IFC 07-Mar-2017 T-T-P-01269 IFA 20-Mar-2017 24-Mar-2017 T-P-T-1635 Approved TPVN C
INSTRUMENT 2539-00-SP-1510-01 Control & Safety System Extent of Supply A 20-Mar-2016 II 25-Mar-2016 T-T-P-00483 II No Comment TPIT H
INSTRUMENT 2539-00-SP-1510-01 Control & Safety System Extent of Supply 0 25-Nov-2016 IFP 28-Nov-2016 T-T-P-01000 IFA 11-Dec-2016 16-Dec-2016 C-NH3-0471/T-P-T-0782 Commented TPVN C
INSTRUMENT 2539-00-SP-1550-01 Data Sheets for Instruments To Be Re-calibrated 0 12-Apr-2017 FIN 14-Apr-2017 T-T-P-01352 IFA 27-Apr-2017 Transmitted TPVN C
INSTRUMENT 2539-00-SP-1566-01 Instrument Data Sheets for Gas Detectors & Manual Call A 22-Jul-2016 IFI 27-Jul-2016 T-T-P-00721 IFR 09-Aug-2016 16-Aug-2016 C-NH3-0256/T-P-T-0330; C-NH3-0291/T-P-T-0389 MR 1566-01. Approved TPVN H
INSTRUMENT 2539-00-SP-1566-01 Instrument Data Sheets for Gas Detectors & Manual Call 0 18-Nov-2016 IFP 22-Nov-2016 T-T-P-00987 IFP 06-Dec-2016 09-Dec-2016 T-P-T-0760 Approved TPVN C
INSTRUMENT 2539-00-SP-1572-02 Technical Specification for Cable Tray & Accessories A 19-Sep-2016 IFI 19-Sep-2016 T-T-P-00822 IFR 02-Oct-2016 11-Oct-2016 T-P-T-0443 MR 1572-02. Approved TPVN H
INSTRUMENT 2539-00-SP-1572-02 Technical Specification for Cable Tray & Accessories 0 10-Jan-2017 IFP 10-Jan-2017 T-T-P-01138 IFA 23-Jan-2017 06-Feb-2017 T-P-T-1190 Approved TPVN C
INSTRUMENT 2539-00-SP-1574-01 Data Sheets for Instrument Cables A 01-Sep-2016 IFI 05-Sep-2016 T-T-P-00787 IFR 18-Sep-2016 20-Sep-2016 T-P-T-0405 Approved TPVN H
INSTRUMENT 2539-00-SP-1574-01 Data Sheets for Instrument Cables 0 23-Jan-2017 IFP 25-Jan-2017 T-T-P-01181 IFA 08-Feb-2017 10-Feb-2017 T-P-T-1235 Approved TPVN H
INSTRUMENT 2539-00-SP-1574-01 Data Sheets for Instrument Cables 1 20-Feb-2017 IFP 20-Feb-2017 T-T-P-01232 IFA 05-Mar-2017 01-Mar-2017 T-P-T-1417 Approved TPVN C
INSTRUMENT 2539-00-SP-1575-01 Data Sheets for Instrument Junction Boxes & Cable Gla A 13-Sep-2016 IFI 15-Sep-2016 T-T-P-00818 IFR 28-Sep-2016 No Comment TPVN H
INSTRUMENT 2539-00-SP-1575-01 Data Sheets for Instrument Junction Boxes & Cable Gla 0 13-Jan-2017 IFP 16-Jan-2017 T-T-P-01155 IFA 30-Jan-2017 08-Feb-2017 T-P-T-1218 Approved TPVN C
INSTRUMENT 2539-00-SP-1584-01 Particular Technical Specification for Ammonia Meterin 0 18-Aug-2016 IFP 19-Aug-2016 T-T-P-00757 IFP MR 1584-01. No Comment TPVN H
INSTRUMENT 2539-00-SP-1584-01 Particular Technical Specification for Ammonia Meterin 1 31-Oct-2016 IFP 02-Nov-2016 T-T-P-00923 IFP Transmitted TPVN C
INSTRUMENT 2539-00-SR-1510-01 Scope of Supply for Control & Safety System A 22-Mar-2016 IFI 24-Mar-2016 T-T-P-00470 IFR 06-Apr-2016 11-Apr-2016 T-P-T-0141 MR 1510-01. Approved TPVN H
INSTRUMENT 2539-00-SR-1510-01 Scope of Supply for Control & Safety System 0 25-Nov-2016 IFP 28-Nov-2016 T-T-P-01000 IFA 11-Dec-2016 Transmitted TPVN C
INSTRUMENT 2539-00-SR-1515-01 Scope of Supply for Fire & Gas System Modification; C A 24-Oct-2016 IFI 26-Oct-2016 T-T-P-00907 IFR 08-Nov-2016 10-Nov-2016 C-NH3-0378/T-P-T-0572 MR 1515-01. Commented TPVN H
INSTRUMENT 2539-00-SR-1515-01 Scope of Supply for Fire & Gas System Modification; C 0 20-Mar-2017 IFP 20-Mar-2017 T-T-P-01299 IFA 02-Apr-2017 11-Apr-2017 C-NH3-0732/T-P-T-1753 Commented TPVN C
INSTRUMENT 2539-00-SR-1541-01 Scope of Supply for Control Valves A 27-Apr-2016 IFI 29-Apr-2016 T-T-P-00563 IFR 13-May-2016 19-May-2016 T-P-T-0171 MR 1541-01. Approved TPVN H
INSTRUMENT 2539-00-SR-1541-01 Scope of Supply for Control Valves 0 26-Oct-2016 IFP 28-Oct-2016 T-T-P-00911 IFP No Comment TPVN H
INSTRUMENT 2539-00-SR-1541-01 Scope of Supply for Control Valves 1 05-Jan-2017 IFP 06-Jan-2017 T-T-P-01125 IFA 20-Jan-2017 23-Jan-2017 T-P-T-1127 Approved TPVN C
INSTRUMENT 2539-00-SR-1543-01 Scope of Supply for On-Off Valves A 27-Apr-2016 IFI 28-Apr-2016 T-T-P-00557 IFR 11-May-2016 MR 1543-01. Transmitted TPVN H
INSTRUMENT 2539-00-SR-1543-01 Scope of Supply for On-Off Valves 0 28-Oct-2016 IFP 31-Oct-2016 T-T-P-00917 IFP Transmitted TPVN C
INSTRUMENT 2539-00-SR-1545-01 Scope of Supply for Safety Relief Valves A 06-May-2016 IFI 06-May-2016 T-T-P-00575 IFR 20-May-2016 24-May-2016 T-P-T-0180 MR 1545-01. Approved TPVN H
INSTRUMENT 2539-00-SR-1545-01 Scope of Supply for Safety Relief Valves 0 26-Oct-2016 IFP 28-Oct-2016 T-T-P-00911 IFP No Comment TPVN H
INSTRUMENT 2539-00-SR-1545-01 Scope of Supply for Safety Relief Valves 1 19-Jan-2017 IFP 20-Jan-2017 T-T-P-01167 IFA 02-Feb-2017 14-Feb-2017 T-P-T-1249 Approved TPVN C
INSTRUMENT 2539-00-SR-1546-02 Scope of Supply for Orifice Plates; Flow Nozzles; Annub A 01-Jul-2016 IFI 06-Jul-2016 T-T-P-00689 IFR 19-Jul-2016 20-Jul-2016 C-NH3-0223/T-P-T-0273; C-NH3-0294/T-P-T-0392 MR 1546-02. Approved TPVN H
INSTRUMENT 2539-00-SR-1546-02 Scope of Supply for Orifice Plates; Flow Nozzles; Annub 0 18-Nov-2016 IFP 22-Nov-2016 T-T-P-00987 IFP 06-Dec-2016 09-Dec-2016 T-P-T-0760 Approved TPVN C
INSTRUMENT 2539-00-SR-1552-08 Scope of Supply for Level Gauge & Transmitter A 01-Jul-2016 IFI 01-Jul-2016 T-T-P-00682 IFR 15-Jul-2016 14-Jul-2016 C-NH3-0217/T-P-T-0256; C-NH3-0229/T-P-T-0285 MR 1552-08. Approved with comments TPVN H
INSTRUMENT 2539-00-SR-1552-08 Scope of Supply for Level Gauge & Transmitter 0 18-Nov-2016 IFP 21-Nov-2016 T-T-P-00980 IFA 04-Dec-2016 Transmitted TPVN C
INSTRUMENT 2539-00-SR-1553-01 Scope of Supply for Electronic Transmitter A 15-Jul-2016 IFI 18-Jul-2016 T-T-P-00706 IFR 01-Aug-2016 08-Aug-2016 C-NH3-0239/T-P-T-0309; C-NH3-0298/T-P-T-0399 MR 1553-01. Approved TPVN H
INSTRUMENT 2539-00-SR-1553-01 Scope of Supply for Electronic Transmitter 0 02-Dec-2016 IFP 05-Dec-2016 T-T-P-01015 IFA 18-Dec-2016 21-Dec-2016 T-P-T-0848 Approved TPVN H
INSTRUMENT 2539-00-SR-1553-01 Scope of Supply for Electronic Transmitter 1 20-Jan-2017 IFP 20-Jan-2017 T-T-P-01178 IFA 03-Feb-2017 08-Feb-2017 T-P-T-1231 Approved TPVN C
INSTRUMENT 2539-00-SR-1553-02 Scope of Supply for Pressure & Temperature Gauges A 16-Aug-2016 IFI 19-Aug-2016 T-T-P-00758 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0278/T-P-T-0363; C-NH3-0299/T-P-T-0400 MR 1553-02. Commented TPVN H
INSTRUMENT 2539-00-SR-1553-02 Scope of Supply for Pressure & Temperature Gauges 0 14-Dec-2016 IFP 15-Dec-2016 T-T-P-01049 IFA 28-Dec-2016 27-Dec-2016 C-NH3-0513/T-P-T-0893 Commented TPVN H
INSTRUMENT 2539-00-SR-1553-02 Scope of Supply for Pressure & Temperature Gauges 1 19-Jan-2017 IFP 20-Jan-2017 T-T-P-01171 IFA 02-Feb-2017 08-Feb-2017 T-P-T-1230 Approved TPVN C
INSTRUMENT 2539-00-SR-1564-02 Scope of Supply for Conductivity Analyzers A 21-Jul-2016 IFI 21-Jul-2016 T-T-P-00709 IFR 03-Aug-2016 08-Aug-2016 T-P-T-0308 MR 1564-02. Approved TPVN H
INSTRUMENT 2539-00-SR-1564-02 Scope of Supply for Conductivity Analyzers 0 11-Nov-2016 IFP 11-Nov-2016 T-T-P-00958 IFP Transmitted TPVN C
INSTRUMENT 2539-00-SR-1566-01 Scope of Supply for Gas Detectors & Manual Call Points A 22-Jul-2016 IFI 27-Jul-2016 T-T-P-00721 IFR 09-Aug-2016 16-Aug-2016 C-NH3-0256/T-P-T-0330; C-NH3-0291/T-P-T-0389 MR 1566-01. Approved TPVN H
INSTRUMENT 2539-00-SR-1566-01 Scope of Supply for Gas Detectors & Manual Call Points 0 18-Nov-2016 IFP 22-Nov-2016 T-T-P-00987 IFP 06-Dec-2016 09-Dec-2016 T-P-T-0760 Approved TPVN C
INSTRUMENT 2539-00-SR-1572-01 Scope of Supply for Instrument Tubing & Fittings A 15-Sep-2016 IFI 15-Sep-2016 T-T-P-00816 IFR 28-Sep-2016 28-Sep-2016 T-P-T-0424 MR 1572-01. Approved TPVN H
INSTRUMENT 2539-00-SR-1572-01 Scope of Supply for Instrument Tubing & Fittings 0 18-Jan-2017 IFP 08-Feb-2017 T-T-P-01202 IFA 21-Feb-2017 23-Feb-2017 T-P-T-1339 Approved TPVN C
INSTRUMENT 2539-00-SR-1572-02 Scope of Supply for Instrument Cable Tray & Accessorie A 19-Sep-2016 IFI 19-Sep-2016 T-T-P-00822 IFR 02-Oct-2016 11-Oct-2016 T-P-T-0443 MR 1572-02. Approved TPVN H
INSTRUMENT 2539-00-SR-1572-02 Scope of Supply for Instrument Cable Tray & Accessorie 0 10-Jan-2017 IFP 10-Jan-2017 T-T-P-01138 IFA 23-Jan-2017 06-Feb-2017 T-P-T-1190 Approved TPVN C
INSTRUMENT 2539-00-SR-1574-01 Scope of Supply for Instrument Cables A 05-Sep-2016 IFI 06-Sep-2016 T-T-P-00795 IFR 19-Sep-2016 20-Sep-2016 T-P-T-0406 MR 1574-01. Approved TPVN H
INSTRUMENT 2539-00-SR-1574-01 Scope of Supply for Instrument Cables 0 23-Jan-2017 IFP 25-Jan-2017 T-T-P-01181 IFA 08-Feb-2017 10-Feb-2017 T-P-T-1235 Approved TPVN C
INSTRUMENT 2539-00-SR-1575-01 Scope of Supply for Junction Boxes & Cable Glands A 13-Sep-2016 IFI 15-Sep-2016 T-T-P-00818 IFR 28-Sep-2016 No Comment TPVN H
INSTRUMENT 2539-00-SR-1575-01 Scope of Supply for Junction Boxes & Cable Glands 0 13-Jan-2017 IFP 16-Jan-2017 T-T-P-01155 IFA 30-Jan-2017 08-Feb-2017 T-P-T-1218 Approved TPVN C
INSTRUMENT 2539-00-SR-1584-01 Scope of Supply for Ammonia Metering Package - 40-P 0 18-Aug-2016 IFP 19-Aug-2016 T-T-P-00757 IFP MR 1584-01. No Comment TPVN H
INSTRUMENT 2539-00-SR-1584-01 Scope of Supply for Ammonia Metering Package - 40-P 1 31-Oct-2016 IFP 02-Nov-2016 T-T-P-00923 IFP Transmitted TPVN C
INSTRUMENT 2539-10-DW-1513-01 Interlock Logic Diagram Unit 10 A 10-Nov-2016 IFR 15-Nov-2016 T-T-P-00964 IFR 28-Nov-2016 03-Dec-2016 T-P-T-0711 Approved TPVN H
INSTRUMENT 2539-10-DW-1513-01 Interlock Logic Diagram Unit 10 0 16-Mar-2017 IFC 16-Mar-2017 T-T-P-01294 IFA 29-Mar-2017 11-Apr-2017 T-P-T-1752 Approved TPVN C
INSTRUMENT 2539-10-DW-1552-01 Dimensional Level Instrument Arrangement on Equipme A 18-May-2016 IFR 20-May-2016 T-T-P-00598 IFR 02-Jun-2016 10-Jun-2016 C-NH3-0174/T-P-T-0202 Commented TPVN C
INSTRUMENT 2539-10-DW-1572-01-01 Unit 10 (Ammonia) UG-AG Instrument Main Cable Routi A 29-Feb-2016 IFR 29-Feb-2016 T-T-P-00375 IFR 14-Mar-2016 21-Mar-2016 T-P-T-0110 Approved TPIT H
INSTRUMENT 2539-10-DW-1572-01-01 Unit 10 (Ammonia) UG-AG Instrument Main Cable Routi B 25-Aug-2016 IDD 25-Aug-2016 T-T-P-00773 IFR 07-Sep-2016 16-Sep-2016 C-NH3-0290/T-P-T-0387 Commented TPVN H
INSTRUMENT 2539-10-DW-1572-01-01 Unit 10 (Ammonia) UG/AG Instrument Main Cable Routi 0 27-Dec-2016 IFC 29-Dec-2016 T-T-P-01099 IFA 11-Jan-2017 13-Jan-2017 T-P-T-1000 Approved TPVN C
INSTRUMENT 2539-10-DW-1572-02 Unit 10 - Ammonia Plant Cable Routing Cross Sections A 10-Jun-2016 IFR 10-Jun-2016 T-T-P-00648 IFR 23-Jun-2016 01-Jul-2016 C-NH3-0204/T-P-T-0238; C-NH3-0251/T-P-T-0322 Approved with comments TPVN H
INSTRUMENT 2539-10-DW-1572-02 Unit 10 - Ammonia Plant Cable Routing Cross Sections B 14-Oct-2016 IDD 14-Oct-2016 T-T-P-00878 IFR 28-Oct-2016 02-Nov-2016 T-P-T-0519 Approved TPVN H
INSTRUMENT 2539-10-DW-1572-02 Unit 10 - Ammonia Plant Cable Routing Cross Sections 0 04-Jan-2017 IFC 04-Jan-2017 T-T-P-01114 IFA 17-Jan-2017 18-Jan-2017 T-P-T-1045 Approved TPVN C
INSTRUMENT 2539-10-DW-1573-00 Unit 10 - Ammonia Plant - Instrument Juntion Boxes A 27-May-2016 IFR 27-May-2016 T-T-P-00609 IFR 10-Jun-2016 16-Jun-2016 C-NH3-0182/T-P-T-0211; C-NH3-0195/T-P-T-0227 Commented TPVN H
INSTRUMENT 2539-10-DW-1573-00 Unit 10 - Ammonia Plant - Instrument Junction Boxes B 06-Oct-2016 IDD 07-Oct-2016 T-T-P-00862 IFR 21-Oct-2016 25-Oct-2016 C-NH3-0348/T-P-T-0499 Commented TPVN H
INSTRUMENT 2539-10-DW-1573-00 Unit 10 - Ammonia Plant - Instrument Junction Boxes 0 06-Jan-2017 IFC 06-Jan-2017 T-T-P-01127 IFA 20-Jan-2017 23-Jan-2017 T-P-T-1123 Approved TPVN C
INSTRUMENT 2539-10-DW-1574-01-01 Ammonia Plant Air Port Layout A 23-Jun-2016 IFR 23-Jun-2016 T-T-P-00665 IFR 06-Jul-2016 Transmitted TPVN H
INSTRUMENT 2539-10-DW-1574-01-01 Ammonia Plant Air Pot Layout B 14-Oct-2016 IDD 13-Oct-2016 T-T-P-00874 IFR 27-Oct-2016 27-Oct-2016 T-P-T-0502 Approved TPVN H
INSTRUMENT 2539-10-DW-1574-01-01 Ammonia Plant Air Pot Layout 0 22-Dec-2016 IFC 22-Dec-2016 T-T-P-01071 IFA 04-Jan-2017 09-Jan-2017 T-P-T-0946 Approved TPVN C
INSTRUMENT 2539-10-DW-1574-02-01 Ammonia Plant Analysis Point Layout A 23-Jun-2016 IFR 23-Jun-2016 T-T-P-00665 IFR 06-Jul-2016 Transmitted TPVN H
INSTRUMENT 2539-10-DW-1574-02-01 Ammonia Plant Analysis Point Layout B 12-Oct-2016 IDD 13-Oct-2016 T-T-P-00874 IFR 27-Oct-2016 27-Oct-2016 T-P-T-0502 Approved TPVN H
INSTRUMENT 2539-10-DW-1574-02-01 Ammonia Plant Analysis Point Layout 0 22-Dec-2016 IFC 22-Dec-2016 T-T-P-01071 IFA 04-Jan-2017 09-Jan-2017 T-P-T-0946 Approved TPVN C
INSTRUMENT 2539-10-DW-1576-01 Pneumatic Hook-up Drawings A 01-Jun-2016 IFR 02-Jun-2016 T-T-P-00625 IFR 15-Jun-2016 17-Jun-2016 C-NH3-0188/T-P-T-0217; C-NH3-0248/T-P-T-0319 Approved with comments TPVN H
INSTRUMENT 2539-10-DW-1576-01 Pneumatic Hook-up Drawings B 22-Aug-2016 IDD 23-Aug-2016 T-T-P-00769 Re-IDD 05-Sep-2016 16-Sep-2016 T-P-T-0382 Approved TPVN H
INSTRUMENT 2539-10-DW-1576-01 Pneumatic Hook-up Drawings 0 07-Dec-2016 IFC 07-Dec-2016 T-T-P-01023 IFA 20-Dec-2016 21-Dec-2016 T-P-T-0847 Approved TPVN C
INSTRUMENT 2539-10-DW-1576-02 Mechanical Hook-Up Drawings A 25-May-2016 IFR 01-Jun-2016 T-T-P-00620 IFR 14-Jun-2016 17-Jun-2016 C-NH3-0184/T-P-T-0213; C-NH3-0247/T-P-T-0318 Approved with comments TPVN H
INSTRUMENT 2539-10-DW-1576-02 Mechanical Hook-Up Drawings B 26-Aug-2016 IDD 26-Aug-2016 T-T-P-00776 IFR 08-Sep-2016 15-Sep-2016 T-P-T-0393 Approved TPVN H
INSTRUMENT 2539-10-DW-1576-02 Mechanical Hook-Up Drawings 0 26-Dec-2016 IFC 28-Dec-2016 T-T-P-01094 IFA 10-Jan-2017 10-Jan-2017 T-P-T-0967 Approved TPVN H
INSTRUMENT 2539-10-DW-1576-02 Mechanical Hook-Up Drawings 1 18-Apr-2017 IFC 20-Apr-2017 T-T-P-01369 IFA 03-May-2017 02-May-2017 T-P-T-1941 Approved TPVN C
INSTRUMENT 2539-10-DW-1576-07 Instrument Support Mounting Details A 03-Jun-2016 IFR 08-Jun-2016 T-T-P-00640 IFR 21-Jun-2016 01-Jul-2016 C-NH3-0203/T-P-T-0237 Commented TPVN H
INSTRUMENT 2539-10-DW-1576-07 Instrument Support Mounting Details B 19-Aug-2016 IDD 19-Aug-2016 T-T-P-00760 IFR 01-Sep-2016 No Comment TPVN H
INSTRUMENT 2539-10-DW-1576-07 Instrument Support Mounting Details 0 09-Dec-2016 IFC 12-Dec-2016 T-T-P-01036 IFA 25-Dec-2016 23-Dec-2016 T-P-T-0868 Approved TPVN H
INSTRUMENT 2539-10-DW-1576-07 Instrument Support Mounting Details 1 14-Apr-2017 IFC 18-Apr-2017 T-T-P-01363 IFA 01-May-2017 01-May-2017 T-P-T-1939 Approved TPVN H
INSTRUMENT 2539-10-DW-1576-07 Instrument Support Mounting Details 2 08-May-2017 IFC 09-May-2017 T-T-P-01406 IFA 22-May-2017 23-May-2017 T-P-T-2062 Approved TPVN C
INSTRUMENT 2539-10-DW-1576-08 Instrument Electrical Hook-Up Drawings A 30-May-2016 IFR 01-Jun-2016 T-T-P-00620 IFR 14-Jun-2016 16-Jun-2016 T-P-T-0209 Approved TPVN H
INSTRUMENT 2539-10-DW-1576-08 Instrument Electrical Hook-Up Drawings B 12-Aug-2016 IDD 15-Aug-2016 T-T-P-00753 IFR 29-Aug-2016 02-Sep-2016 T-P-T-0361 Approved TPVN H
INSTRUMENT 2539-10-DW-1576-08 Instrument Electrical Hook-Up Drawings 0 21-Oct-2016 IFC 21-Oct-2016 T-T-P-00889 IFC 07-Nov-2016 T-P-T-0539 Approved TPVN H
INSTRUMENT 2539-10-DW-1576-08 Instrument Electrical Hook-Up Drawings 1 08-May-2017 IFC 09-May-2017 T-T-P-01406 IFA 22-May-2017 23-May-2017 T-P-T-2062 Approved TPVN C
INSTRUMENT 2539-10-NM-1511-01 Control & Safety System In-Out List - Unit 10 Ammonia A 11-Jan-2016 IFR 13-Jan-2016 T-T-P-00228 IFR 25-Jan-2016 No Comment TPIT H
INSTRUMENT 2539-10-NM-1511-01 Control & Safety System In-Out List - Unit 10 Ammonia B 03-Jun-2016 IDD1 07-Jun-2016 T-T-P-00638 IFR 20-Jun-2016 24-Jun-2016 C-NH3-0198/T-P-T-0232 Commented TPVN H
INSTRUMENT 2539-10-NM-1511-01 Control & Safety System In/Out List - Unit 10 Ammonia 0 06-Mar-2017 IFC 07-Mar-2017 T-T-P-01269 IFA 20-Mar-2017 24-Mar-2017 T-P-T-1635 Approved TPVN C
INSTRUMENT 2539-10-NM-1551-01 Instrument List Unit 10 - Ammonia Plant A 04-Dec-2015 IFR 09-Dec-2015 T-T-P-00164 IFR 22-Dec-2015 10-May-2016 T-P-T-0165 Approved TPIT H
INSTRUMENT 2539-10-NM-1551-01 Instrument List Unit 10 - Ammonia Plant B 07-Jun-2016 IDD1 08-Jun-2016 T-T-P-00642 IFR 21-Jun-2016 26-Jun-2016 C-NH3-0201/T-P-T-0235 Commented TPVN H
INSTRUMENT 2539-10-NM-1551-01 Instrument List Unit 10 - Ammonia Plant 0 06-Mar-2017 IFC 07-Mar-2017 T-T-P-01269 IFA 20-Mar-2017 24-Mar-2017 T-P-T-1635 Approved TPVN C
INSTRUMENT 2539-10-NM-1571-01 Instrument Cables & Drum List - Unit 10 - Ammonia Plan A 17-Jun-2016 IFR 17-Jun-2016 T-T-P-00654 IFR 30-Jun-2016 09-Jul-2016 C-NH3-0208/T-P-T-0242 Commented TPVN H
INSTRUMENT 2539-10-NM-1571-01 Instrument Cables & Drum List - Unit 10 - Ammonia Plan B 03-Jan-2017 IDD 04-Jan-2017 T-T-P-01106 IFR 17-Jan-2017 18-Jan-2017 T-P-T-1039 Approved TPVN H
INSTRUMENT 2539-10-NM-1571-01 Instrument Cables & Drum List - Unit 10 - Ammonia Plan 0 19-Jan-2017 IFC 20-Jan-2017 T-T-P-01172 IFA 02-Feb-2017 08-Feb-2017 T-P-T-1222 Approved TPVN C
INSTRUMENT 2539-10-NM-1950-01 Ammonia Unit Field Alarms/Signals to/from Fire & Gas C A 11-Mar-2016 IFR 11-Mar-2016 T-T-P-00428 IFR 24-Mar-2016 31-Mar-2016 C-NH3-0131/T-P-T-0129; C-NH3-0202/T-P-T-0236 Approved with comments TPIT H
INSTRUMENT 2539-10-NM-1950-01 Ammonia Unit Field Alarms/Signals to/from Fire & Gas C B 04-Oct-2016 IDD 05-Oct-2016 T-T-P-00853 IFR 18-Oct-2016 19-Oct-2016 T-P-T-0479 Approved TPVN H
INSTRUMENT 2539-10-NM-1950-01 Ammonia Unit Field Alarms/Signals to/from Fire & Gas C 0 06-Jan-2017 IFC 06-Jan-2017 T-T-P-01124 IFA 19-Jan-2017 23-Jan-2017 T-P-T-1122 Approved TPVN C
INSTRUMENT 2539-10-SP-1541-01 Instrument Data Sheets for Control Valves Unit 10 A 27-Apr-2016 IFI 28-Apr-2016 T-T-P-00558 IFR 11-May-2016 19-May-2016 C-NH3-0153/T-P-T-0169; T-P-T-0188 MR 1541-01. Approved with comments TPVN H
INSTRUMENT 2539-10-SP-1541-01 Instrument Data Sheets for Control Valves Unit 10 0 05-Jan-2017 IFP 06-Jan-2017 T-T-P-01125 IFA 20-Jan-2017 23-Jan-2017 C-NH3-0580/T-P-T-1127 Commented TPVN C
INSTRUMENT 2539-10-SP-1543-01 Instrument Data Sheets for On-Off Valves Unit 10 A 22-Apr-2016 IFI 28-Apr-2016 T-T-P-00557 IFR 11-May-2016 19-May-2016 C-NH3-0152/T-P-T-0167; T-P-T-0188 MR 1543-01. Approved with comments TPVN H
INSTRUMENT 2539-10-SP-1543-01 Instrument Data Sheets for On-Off Valves Unit 10 0 09-Jan-2017 IFP 09-Jan-2017 T-T-P-01132 IFA 22-Jan-2017 23-Jan-2017 C-NH3-0581/T-P-T-1128 Commented TPVN C
INSTRUMENT 2539-10-SP-1545-01 Instrument Data Sheets for Safety Relief Valves Unit 10 A 06-May-2016 IFI 06-May-2016 T-T-P-00575 IFR 20-May-2016 24-May-2016 C-NH3-0160/T-P-T-0179 MR 1545-01. Approved with comments TPVN H
INSTRUMENT 2539-10-SP-1545-01 Instrument Data Sheets for Safety Relief Valves Unit 10 0 19-Jan-2017 IFP 20-Jan-2017 T-T-P-01167 IFA 02-Feb-2017 14-Feb-2017 T-P-T-1249 Approved TPVN C
INSTRUMENT 2539-10-SP-1546-02 Instrument Data Sheets for Orifice Plates Unit 10 A 01-Jul-2016 IFI 06-Jul-2016 T-T-P-00689 IFR 19-Jul-2016 20-Jul-2016 C-NH3-0223/T-P-T-0273; C-NH3-0294/T-P-T-0392 MR 1546-02. Approved TPVN H
INSTRUMENT 2539-10-SP-1546-02 Instrument Data Sheets for Orifice Plates Unit 10 0 16-Jan-2017 IFP 19-Jan-2017 T-T-P-01162 IFA 01-Feb-2017 08-Feb-2017 T-P-T-1219 Approved TPVN C
INSTRUMENT 2539-10-SP-1546-06 Instrument Data Sheets for Flow Nozzle & Venturi Tube A 01-Jul-2016 IFI 06-Jul-2016 T-T-P-00689 IFR 19-Jul-2016 20-Jul-2016 C-NH3-0223/T-P-T-0273; C-NH3-0294/T-P-T-0392 MR 1546-02. Approved TPVN H
INSTRUMENT 2539-10-SP-1546-06 Instrument Data Sheets for Flow Nozzle & Venturi Tube 0 16-Jan-2017 IFP 19-Jan-2017 T-T-P-01162 IFA 01-Feb-2017 08-Feb-2017 T-P-T-1219 Approved TPVN C
INSTRUMENT 2539-10-SP-1546-07 Instrument Data Sheets for Pitot / Annubar Flow Element A 01-Jul-2016 IFI 06-Jul-2016 T-T-P-00689 IFR 19-Jul-2016 20-Jul-2016 C-NH3-0223/T-P-T-0273; C-NH3-0294/T-P-T-0392 MR 1546-02. Approved TPVN H
INSTRUMENT 2539-10-SP-1546-07 Instrument Data Sheets for Pitot / Annubar Flow Element 0 16-Jan-2017 IFP 19-Jan-2017 T-T-P-01162 IFA 01-Feb-2017 08-Feb-2017 T-P-T-1219 Approved TPVN C
Page 17
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
INSTRUMENT 2539-10-SP-1552-01 Instrument Data Sheets for Level Gauges Unit 10 A 01-Jul-2016 IFI 01-Jul-2016 T-T-P-00682 IFR 15-Jul-2016 14-Jul-2016 C-NH3-0217/T-P-T-0256; C-NH3-0229/T-P-T-0285 MR 1552-08. Approved with comments TPVN H
INSTRUMENT 2539-10-SP-1552-01 Instrument Data Sheets for Level Gauges Unit 10 0 11-Jan-2017 IFP 11-Jan-2017 T-T-P-01140 IFA 24-Jan-2017 06-Feb-2017 T-P-T-1191 Approved TPVN C
INSTRUMENT 2539-10-SP-1552-02 Instrument Data Sheets for Hydrastep Level Transmitter A 01-Jul-2016 IFI 01-Jul-2016 T-T-P-00682 IFR 15-Jul-2016 14-Jul-2016 C-NH3-0217/T-P-T-0256; C-NH3-0229/T-P-T-0285 MR 1552-08. Approved with comments TPVN H
INSTRUMENT 2539-10-SP-1552-02 Instrument Data Sheets for Hydrastep Level Transmitter 0 14-Dec-2016 V 14-Dec-2016 T-T-P-01046 II Transmitted TPVN C
INSTRUMENT 2539-10-SP-1553-01 Instrument Data Sheets for Electronic Transmitter Unit 1 A 14-Jul-2016 IFI 18-Jul-2016 T-T-P-00706 IFR 01-Aug-2016 08-Aug-2016 C-NH3-0239/T-P-T-0309; C-NH3-0298/T-P-T-0399 MR 1553-01. Approved TPVN H
INSTRUMENT 2539-10-SP-1553-01 Instrument Data Sheets for Electronic Transmitter Unit 1 0 20-Jan-2017 IFP 20-Jan-2017 T-T-P-01178 IFA 03-Feb-2017 08-Feb-2017 T-P-T-1231 Approved TPVN C
INSTRUMENT 2539-10-SP-1553-02 Instrument Data Sheets for Pressure & Temperature Gau A 16-Aug-2016 IFI 19-Aug-2016 T-T-P-00758 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0278/T-P-T-0363; C-NH3-0299/T-P-T-0400 MR 1553-02. Commented TPVN H
INSTRUMENT 2539-10-SP-1553-02 Instrument Data Sheets for Pressure & Temperature Gau 0 19-Jan-2017 IFP 20-Jan-2017 T-T-P-01171 IFA 02-Feb-2017 08-Feb-2017 T-P-T-1230 Approved TPVN C
INSTRUMENT 2539-10-SP-1554-01 Instrument Data Sheets for Temperature Transmitters Un A 15-Jul-2016 IFI 18-Jul-2016 T-T-P-00706 IFR 01-Aug-2016 08-Aug-2016 C-NH3-0239/T-P-T-0309; C-NH3-0298/T-P-T-0399 MR 1553-01. Approved TPVN H
INSTRUMENT 2539-10-SP-1554-01 Instrument Data Sheets for Temperature Transmitters Un 0 06-Feb-2017 IFP 08-Feb-2017 T-T-P-01202 IFA 21-Feb-2017 23-Feb-2017 T-P-T-1339 Approved TPVN C
INSTRUMENT 2539-10-SP-1564-01 Instrument Data Sheets for Conductivity Analyzers Unit A 21-Jul-2016 IFI 21-Jul-2016 T-T-P-00709 IFR 03-Aug-2016 08-Aug-2016 T-P-T-0308 MR 1564-02. Approved TPVN H
INSTRUMENT 2539-10-SP-1564-01 Instrument Data Sheets for Conductivity Analyzers Unit 0 11-Nov-2016 IFP 11-Nov-2016 T-T-P-00958 IFP Transmitted TPVN C
INSTRUMENT 2539-30-DW-1513-03-01 Interlock Logic Diagram (DCS) for Utilities A 11-Nov-2016 IFR 17-Nov-2016 T-T-P-00969 IFR 30-Nov-2016 03-Dec-2016 T-P-T-0713 Approved TPVN H
INSTRUMENT 2539-30-DW-1513-03-01 Interlock Logic Diagram (DCS) for Utilities 0 16-Mar-2017 IFC 16-Mar-2017 T-T-P-01294 IFA 29-Mar-2017 11-Apr-2017 T-P-T-1752 Approved TPVN C
INSTRUMENT 2539-30-DW-1515-01-01 Fire Alarm Plan (Utility Plant) A 03-Jun-2016 IFR 03-Jun-2016 T-T-P-00629 IFR 17-Jun-2016 14-Jul-2016 T-P-T-0257 Approved TPVN H
INSTRUMENT 2539-30-DW-1515-01-01 Fire Alarm Plan (Utility Plant) B 18-Aug-2016 IDD 19-Aug-2016 T-T-P-00759 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0280/T-P-T-0365 Commented TPVN H
INSTRUMENT 2539-30-DW-1515-01-01 Fire Alarm Plan (Utility Plant) 0 09-Dec-2016 IFC 09-Dec-2016 T-T-P-01029 IFA 22-Dec-2016 Transmitted TPVN C
INSTRUMENT 2539-30-DW-1515-01-02 Fire Alarm Plan (Utility Plant) A 03-Jun-2016 IFR 03-Jun-2016 T-T-P-00629 IFR 17-Jun-2016 14-Jul-2016 T-P-T-0257 Approved TPVN H
INSTRUMENT 2539-30-DW-1515-01-02 Fire Alarm Plan (Utility Plant) B 18-Aug-2016 IDD 19-Aug-2016 T-T-P-00759 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0280/T-P-T-0365 Commented TPVN H
INSTRUMENT 2539-30-DW-1515-01-02 Fire Alarm Plan (Utility Plant) 0 09-Dec-2016 IFC 09-Dec-2016 T-T-P-01029 IFA 22-Dec-2016 Transmitted TPVN C
INSTRUMENT 2539-30-DW-1572-01-01 Unit 30 Utility Instrument Cable Tray Plan A 29-Feb-2016 IFR 29-Feb-2016 T-T-P-00376 IFR 14-Mar-2016 21-Mar-2016 T-P-T-0110 Approved TPIT H
INSTRUMENT 2539-30-DW-1572-01-01 Unit 30 Utility Instrument Cable Tray Plan B 18-Aug-2016 IDD 19-Aug-2016 T-T-P-00759 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0280/T-P-T-0365 Commented TPVN H
INSTRUMENT 2539-30-DW-1572-01-01 Unit 30 Utility Instrument Cable Tray Plan 0 30-Dec-2016 IFC 29-Dec-2016 T-T-P-01099 IFA 11-Jan-2017 13-Jan-2017 T-P-T-1000 Approved TPVN C
INSTRUMENT 2539-30-DW-1572-01-02 Unit 30 Utility Instrument Cable Tray Plan A 29-Feb-2016 IFR 29-Feb-2016 T-T-P-00376 IFR 14-Mar-2016 21-Mar-2016 T-P-T-0110 Approved TPIT H
INSTRUMENT 2539-30-DW-1572-01-02 Unit 30 Utility Instrument Cable Tray Plan B 18-Aug-2016 IDD 19-Aug-2016 T-T-P-00759 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0280/T-P-T-0365 Commented TPVN H
INSTRUMENT 2539-30-DW-1572-01-02 Unit 30 Utility Instrument Cable Tray Plan 0 30-Dec-2016 IFC 29-Dec-2016 T-T-P-01099 IFA 11-Jan-2017 13-Jan-2017 T-P-T-1000 Approved TPVN C
INSTRUMENT 2539-30-DW-1572-01-04 Unit 30 Utility Instrument Cable Tray Plan A 29-Feb-2016 IFR 29-Feb-2016 T-T-P-00376 IFR 14-Mar-2016 21-Mar-2016 T-P-T-0110 Approved TPIT H
INSTRUMENT 2539-30-DW-1572-01-04 Unit 30 Utility Instrument Cable Tray Plan B 18-Aug-2016 IDD 19-Aug-2016 T-T-P-00759 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0280/T-P-T-0365 Commented TPVN H
INSTRUMENT 2539-30-DW-1572-01-04 Unit 30 Utility Instrument Cable Tray Plan 0 30-Dec-2016 IFC 29-Dec-2016 T-T-P-01099 IFA 11-Jan-2017 13-Jan-2017 T-P-T-1000 Approved TPVN C
INSTRUMENT 2539-30-DW-1572-02-01 Unit 30 Utility Instrument Main Cable Plan A 13-May-2016 IFR 13-May-2016 T-T-P-00588 IFR 26-May-2016 31-May-2016 C-NH3-0163/T-P-T-0184 Commented TPVN H
INSTRUMENT 2539-30-DW-1572-02-01 Unit 30 Utility Instrument Main Cable Plan B 26-Aug-2016 IDD 13-Oct-2016 T-T-P-00873 IFR 26-Oct-2016 27-Oct-2016 T-P-T-0501 Approved TPVN H
INSTRUMENT 2539-30-DW-1572-02-01 Unit 30 Utility Instrument Main Cable Plan 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01112 IFA 17-Jan-2017 18-Jan-2017 T-P-T-1043 Approved TPVN C
INSTRUMENT 2539-30-DW-1572-02-02 Unit 30 Utility Instrument Main Cable Plan A 13-May-2016 IFR 13-May-2016 T-T-P-00588 IFR 26-May-2016 31-May-2016 C-NH3-0163/T-P-T-0184 Commented TPVN H
INSTRUMENT 2539-30-DW-1572-02-02 Unit 30 Utility Instrument Main Cable Plan B 26-Aug-2016 IDD 13-Oct-2016 T-T-P-00873 IFR 26-Oct-2016 27-Oct-2016 T-P-T-0501 Approved TPVN H
INSTRUMENT 2539-30-DW-1572-02-02 Unit 30 Utility Instrument Main Cable Plan 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01112 IFA 17-Jan-2017 18-Jan-2017 T-P-T-1043 Approved TPVN C
INSTRUMENT 2539-30-DW-1572-02-03 Unit 30 Utility Instrument Main Cable Plan A 13-May-2016 IFR 13-May-2016 T-T-P-00588 IFR 26-May-2016 31-May-2016 C-NH3-0163/T-P-T-0184 Commented TPVN H
INSTRUMENT 2539-30-DW-1572-02-03 Unit 30 Utility Instrument Main Cable Plan B 26-Oct-2016 IDD 13-Oct-2016 T-T-P-00873 IFR 26-Oct-2016 27-Oct-2016 T-P-T-0501 Approved TPVN H
INSTRUMENT 2539-30-DW-1572-02-03 Unit 30 Utility Instrument Main Cable Plan 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01112 IFA 17-Jan-2017 18-Jan-2017 T-P-T-1043 Approved TPVN C
INSTRUMENT 2539-30-DW-1573-01 Instrument Connection List - Unit 30 - Utility Plant A 27-May-2016 IFR 02-Jun-2016 T-T-P-00624 IFR 15-Jun-2016 17-Jun-2016 C-NH3-0187/T-P-T-0216 Commented TPVN H
INSTRUMENT 2539-30-DW-1573-01 Junction Boxes Wiring Drawings - Unit 30 - Utility Plant B 11-Nov-2016 IDD 11-Nov-2016 T-T-P-00955 IFR 24-Nov-2016 26-Nov-2016 C-NH3-0428/T-P-T-0693 Commented TPVN H
INSTRUMENT 2539-30-DW-1573-01 Junction Boxes Wiring Drawings - Unit 30 - Utility Plant 0 17-Jan-2017 IFC 20-Jan-2017 T-T-P-01172 IFA 02-Feb-2017 08-Feb-2017 T-P-T-01222 Approved TPVN C
INSTRUMENT 2539-30-DW-1574-01-01 Unit 30 Utility Instrument Wiring Plan A 27-May-2016 IFR 27-May-2016 T-T-P-00609 IFR 10-Jun-2016 16-Jun-2016 C-NH3-0182/T-P-T-0211; C-NH3-0195/T-P-T-0227 Commented TPVN H
INSTRUMENT 2539-30-DW-1574-01-01 Unit 30 Utility Instrument Wiring Plan B 03-Jan-2017 IDD 06-Jan-2017 T-T-P-01120 IFR 19-Jan-2017 20-Jan-2017 T-P-T-1095 Approved TPVN H
INSTRUMENT 2539-30-DW-1574-01-01 Unit 30 Utility Instrument Wiring Plan 0 12-Jan-2017 IFC 13-Jan-2017 T-T-P-01152 IFA 27-Jan-2017 06-Feb-2017 T-P-T-1197 Approved TPVN C
INSTRUMENT 2539-30-DW-1574-02-01 Unit 30 Utility Instrument Air Piping Plan A 27-May-2016 IFR 27-May-2016 T-T-P-00609 IFR 10-Jun-2016 16-Jun-2016 C-NH3-0182/T-P-T-0211; C-NH3-0195/T-P-T-0227 Commented TPVN H
INSTRUMENT 2539-30-DW-1574-02-01 Unit 30 Utility Instrument Air Piping Plan B 26-Aug-2016 IDD 29-Aug-2016 T-T-P-00779 IFR 11-Sep-2016 15-Sep-2016 T-P-T-0394 Approved TPVN H
INSTRUMENT 2539-30-DW-1574-02-01 Unit 30 Utility Instrument Air Piping Plan 0 22-Dec-2016 IFC 22-Dec-2016 T-T-P-01071 IFA 04-Jan-2017 09-Jan-2017 T-P-T-0946 Approved TPVN C
INSTRUMENT 2539-30-DW-1574-02-02 Unit 30 Utility Instrument Air Piping Plan A 27-May-2016 IFR 27-May-2016 T-T-P-00609 IFR 10-Jun-2016 16-Jun-2016 C-NH3-0182/T-P-T-0211; C-NH3-0195/T-P-T-0227 Commented TPVN H
INSTRUMENT 2539-30-DW-1574-02-02 Unit 30 Utility Instrument Air Piping Plan B 26-Aug-2016 IDD 29-Aug-2016 T-T-P-00779 IFR 11-Sep-2016 15-Sep-2016 T-P-T-0394 Approved TPVN H
INSTRUMENT 2539-30-DW-1574-02-02 Unit 30 Utility Instrument Air Piping Plan 0 22-Dec-2016 IFC 22-Dec-2016 T-T-P-01071 IFA 04-Jan-2017 09-Jan-2017 T-P-T-0946 Approved TPVN C
INSTRUMENT 2539-30-DW-1574-02-03 Unit 30 Utility Instrument Air Piping Plan A 27-May-2016 IFR 27-May-2016 T-T-P-00609 IFR 10-Jun-2016 16-Jun-2016 C-NH3-0182/T-P-T-0211; C-NH3-0195/T-P-T-0227 Commented TPVN H
INSTRUMENT 2539-30-DW-1574-02-03 Unit 30 Utility Instrument Air Piping Plan B 26-Aug-2016 IDD 29-Aug-2016 T-T-P-00779 IFR 11-Sep-2016 15-Sep-2016 T-P-T-0394 Approved TPVN H
INSTRUMENT 2539-30-DW-1574-02-03 Unit 30 Utility Instrument Air Piping Plan 0 22-Dec-2016 IFC 22-Dec-2016 T-T-P-01071 IFA 04-Jan-2017 09-Jan-2017 T-P-T-0946 Approved TPVN C
INSTRUMENT 2539-30-DW-1576-01 Pneumatic Hook-up Drawings A 09-Jun-2016 IFR 10-Jun-2016 T-T-P-00645 IFR 23-Jun-2016 26-Jun-2016 C-NH3-0200/T-P-T-0234; C-NH3-0250/T-P-T-0321 Approved with comments TPVN H
INSTRUMENT 2539-30-DW-1576-01 Pneumatic Hook-up Drawings B 26-Aug-2016 IDD 26-Aug-2016 T-T-P-00776 IFR 08-Sep-2016 15-Sep-2016 T-P-T-0393 Approved TPVN H
INSTRUMENT 2539-30-DW-1576-01 Pneumatic Hook-up Drawings 0 13-Dec-2016 IFC 14-Dec-2016 T-T-P-01044 IFA 27-Dec-2016 27-Dec-2016 T-P-T-0892 Approved TPVN C
INSTRUMENT 2539-30-DW-1576-02 Mechanical Hook-up Drawings A 04-May-2016 IFR 10-May-2016 T-T-P-00579 IFR 23-May-2016 31-May-2016 C-NH3-0164/T-P-T-0185; C-NH3-0177/T-P-T-0205 Approved with comments TPVN H
INSTRUMENT 2539-30-DW-1576-02 Mechanical Hook-up Drawings B 25-Aug-2016 IDD 26-Aug-2016 T-T-P-00776 IFR 08-Sep-2016 15-Sep-2016 T-P-T-0393 Approved TPVN H
INSTRUMENT 2539-30-DW-1576-02 Mechanical Hook-up Drawings 0 20-Dec-2016 IFC 21-Dec-2016 T-T-P-01067 IFA 03-Jan-2017 23-Jan-2017 T-P-T-1139 Approved TPVN C
INSTRUMENT 2539-30-DW-1576-07 Instrument Support Mounting Details A 10-Jun-2016 IFR 10-Jun-2016 T-T-P-00648 IFR 23-Jun-2016 04-Jul-2016 C-NH3-0204/T-P-T-0238; C-NH3-0251/T-P-T-0322 Approved with comments TPVN H
INSTRUMENT 2539-30-DW-1576-07 Instrument Support Mounting Details B 24-Aug-2016 IDD 24-Aug-2016 T-T-P-00770 IFR 06-Sep-2016 15-Sep-2016 C-NH3-0286/T-P-T-0383 Commented TPVN H
INSTRUMENT 2539-30-DW-1576-07 Instrument Support Mounting Details 0 09-Dec-2016 IFC 12-Dec-2016 T-T-P-01033 IFA 25-Dec-2016 No Comment TPVN H
INSTRUMENT 2539-30-DW-1576-07 Instrument Support Mounting Details 1 14-Apr-2017 IFC 18-Apr-2017 T-T-P-01363 IFA 01-May-2017 01-May-2017 T-P-T-1939 Approved TPVN C
INSTRUMENT 2539-30-DW-1576-08 Instrument Electrical Hook-up Drawings A 07-Jun-2016 IFR 08-Jun-2016 T-T-P-00640 IFR 21-Jun-2016 01-Jul-2016 C-NH3-0203/T-P-T-0237 Commented TPVN H
INSTRUMENT 2539-30-DW-1576-08 Instrument Electrical Hook-up Drawings B 12-Aug-2016 IDD 15-Aug-2016 T-T-P-00753 IFR 29-Aug-2016 02-Sep-2016 T-P-T-0361 Approved TPVN H
INSTRUMENT 2539-30-DW-1576-08 Instrument Electrical Hook-up Drawings 0 21-Oct-2016 IFC 21-Oct-2016 T-T-P-00889 IFC 07-Nov-2016 T-P-T-0539 Approved TPVN H
INSTRUMENT 2539-30-DW-1576-08 Instrument Electrical Hook-up Drawings 1 08-May-2017 IFC 09-May-2017 T-T-P-01406 IFA 22-May-2017 23-May-2017 T-P-T-2062 Approved TPVN C
INSTRUMENT 2539-30-NM-1511-01 Control & Safety System In-Out List - Unit 30 Utilities A 11-Jan-2016 IFR 13-Jan-2016 T-T-P-00229 IFR 25-Jan-2016 No Comment TPIT H
INSTRUMENT 2539-30-NM-1511-01 Control & Safety System In-Out List - Unit 30 Utilities B 03-Jun-2016 IDD1 07-Jun-2016 T-T-P-00638 IFR 20-Jun-2016 24-Jun-2016 C-NH3-0198/T-P-T-0232 Commented TPVN H
INSTRUMENT 2539-30-NM-1511-01 Control & Safety System In/Out List - Unit 30 Utilities 0 06-Mar-2017 IFC 07-Mar-2017 T-T-P-01272 IFA 20-Mar-2017 24-Mar-2017 T-P-T-1637 Approved TPVN C
INSTRUMENT 2539-30-NM-1551-01 Instrument List - Unit 30 - Utilities Production A 04-Dec-2015 IFR 09-Dec-2015 T-T-P-00165 IFR 22-Dec-2015 10-May-2016 T-P-T-0165 Approved TPIT H
INSTRUMENT 2539-30-NM-1551-01 Instrument List - Unit 30 - Utilities Production B 07-Jun-2016 IDD 08-Jun-2016 T-T-P-00642 IFR 21-Jun-2016 26-Jun-2016 C-NH3-0201/T-P-T-0235 Commented TPVN H
INSTRUMENT 2539-30-NM-1551-01 Instrument List - Unit 30 - Utilities Production 0 06-Mar-2017 IFC 07-Mar-2017 T-T-P-01269 IFA 20-Mar-2017 24-Mar-2017 T-P-T-1635 Approved TPVN C
INSTRUMENT 2539-30-NM-1571-01 Instrument Cables & Drum List - Unit 30 - Utility Plant A 10-Jun-2016 IFR 10-Jun-2016 T-T-P-00648 IFR 23-Jun-2016 01-Jul-2016 C-NH3-0204/T-P-T-0238; C-NH3-0251/T-P-T-0322 Approved with comments TPVN H
INSTRUMENT 2539-30-NM-1571-01 Instrument Cables & Drum List - Unit 30 - Utility Plant B 03-Jan-2017 IDD 04-Jan-2017 T-T-P-01113 IFR 17-Jan-2017 18-Jan-2017 T-P-T-1044 Approved TPVN H
INSTRUMENT 2539-30-NM-1571-01 Instrument Cables & Drum List - Unit 30 - Utility Plant 0 19-Jan-2017 IFC 20-Jan-2017 T-T-P-01172 IFA 02-Feb-2017 08-Feb-2017 T-P-T-01222 Approved TPVN C
INSTRUMENT 2539-30-NM-1950-01 Utility Unit Field Alarms/Signals to/from Fire & Gas Con A 11-Mar-2016 IFR 11-Mar-2016 T-T-P-00428 IFR 24-Mar-2016 31-Mar-2016 T-P-T-00130 Approved TPIT H
INSTRUMENT 2539-30-NM-1950-01 Utility Unit Field Alarms/Signals to/from Fire & Gas Con B 04-Oct-2016 IDD 05-Oct-2016 T-T-P-00853 IFR 18-Oct-2016 19-Oct-2016 T-P-T-0479 Approved TPVN H
INSTRUMENT 2539-30-NM-1950-01 Utility Unit Field Alarms/Signals to/from Fire & Gas Con 0 06-Jan-2017 IFC 06-Jan-2017 T-T-P-01124 IFA 19-Jan-2017 23-Jan-2017 T-P-T-1122 Approved TPVN C
INSTRUMENT 2539-30-SP-1541-01 Instrument Data Sheets for Control Valves Unit 30 A 27-Apr-2016 IFI 28-Apr-2016 T-T-P-00558 IFR 11-May-2016 19-May-2016 C-NH3-0153/T-P-T-0169; T-P-T-0188 MR 1541-01. Approved with comments TPVN H
INSTRUMENT 2539-30-SP-1541-01 Instrument Data Sheets for Control Valves Unit 30 0 05-Jan-2017 IFP 06-Jan-2017 T-T-P-01125 IFA 20-Jan-2017 23-Jan-2017 C-NH3-0580/T-P-T-1127 Commented TPVN C
INSTRUMENT 2539-30-SP-1545-01 Instrument Data Sheets for Safety Relief Valves Unit 30 A 06-May-2016 IFI 06-May-2016 T-T-P-00575 IFR 20-May-2016 24-May-2016 T-P-T-0180 MR 1545-01. Approved TPVN H
INSTRUMENT 2539-30-SP-1545-01 Instrument Data Sheets for Safety Relief Valves Unit 30 0 19-Jan-2017 IFP 20-Jan-2017 T-T-P-01167 IFA 02-Feb-2017 14-Feb-2017 T-P-T-1249 Approved TPVN C
INSTRUMENT 2539-30-SP-1546-07 Instrument Data Sheets for Pitot / Annubar Flow Element A 01-Jul-2016 IFI 06-Jul-2016 T-T-P-00689 IFR 19-Jul-2016 20-Jul-2016 C-NH3-0223/T-P-T-0273; C-NH3-0294/T-P-T-0392 MR 1546-02. Approved TPVN H
INSTRUMENT 2539-30-SP-1546-07 Instrument Data Sheets for Pitot / Annubar Flow Element 0 16-Jan-2017 IFP 19-Jan-2017 T-T-P-01162 IFA 01-Feb-2017 08-Feb-2017 T-P-T-1219 Approved TPVN C
INSTRUMENT 2539-30-SP-1547-02 Instrument Data Sheets for Purge Set Rotameter Unit 30 0 30-Mar-2017 IFP 31-Mar-2017 T-T-P-01320 IFA 13-Apr-2017 Transmitted TPVN C
INSTRUMENT 2539-30-SP-1547-03 Instrument Data Sheets for Ultrasonic Flow Meter Unit 3 A 01-Jul-2016 IFI 06-Jul-2016 T-T-P-00689 IFR 19-Jul-2016 20-Jul-2016 C-NH3-0223/T-P-T-0273; C-NH3-0294/T-P-T-0392 MR 1546-02. Approved TPVN H
INSTRUMENT 2539-30-SP-1547-03 Instrument Data Sheets for Ultrasonic Flow Meter Unit 3 0 16-Jan-2017 IFP 19-Jan-2017 T-T-P-01162 IFA 01-Feb-2017 08-Feb-2017 T-P-T-1219 Approved TPVN C
INSTRUMENT 2539-30-SP-1553-01 Instrument Data Sheets for Electronic Transmitter Unit 3 A 14-Jul-2016 IFI 18-Jul-2016 T-T-P-00706 IFR 01-Aug-2016 08-Aug-2016 C-NH3-0239/T-P-T-0309; C-NH3-0298/T-P-T-0399 MR 1553-01. Approved TPVN H
INSTRUMENT 2539-30-SP-1553-01 Instrument Data Sheets for Electronic Transmitter Unit 3 0 20-Jan-2017 IFP 20-Jan-2017 T-T-P-01178 IFA 03-Feb-2017 08-Feb-2017 T-P-T-1231 Approved TPVN C
INSTRUMENT 2539-30-SP-1553-02 Instrument Data Sheets for Pressure & Temperature Gau A 16-Aug-2016 IFI 19-Aug-2016 T-T-P-00758 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0278/T-P-T-0363; C-NH3-0299/T-P-T-0400 MR 1553-02. Commented TPVN H
INSTRUMENT 2539-30-SP-1553-02 Instrument Data Sheets for Pressure & Temperature Gau 0 19-Jan-2017 IFP 20-Jan-2017 T-T-P-01171 IFA 02-Feb-2017 08-Feb-2017 T-P-T-1230 Approved TPVN C
INSTRUMENT 2539-40-DW-1513-02 Interlock Logic Diagram (ESD) for Offsite A 11-Nov-2016 IFR 15-Nov-2016 T-T-P-00964 IFR 28-Nov-2016 No Comment TPVN H
INSTRUMENT 2539-40-DW-1513-02 Interlock Logic Diagram (ESD) for Offsite 0 16-Mar-2017 IFC 16-Mar-2017 T-T-P-01294 IFA 29-Mar-2017 11-Apr-2017 T-P-T-1752 Approved TPVN C
INSTRUMENT 2539-40-DW-1513-03 Interlock Logic Diagram (DCS) for Offsite A 11-Nov-2016 IFR 15-Nov-2016 T-T-P-00965 IFR 29-Nov-2016 03-Dec-2016 T-P-T-0712 Approved TPVN H
INSTRUMENT 2539-40-DW-1513-03 Interlock Logic Diagram (DCS) for Offsite 0 16-Mar-2017 IFC 16-Mar-2017 T-T-P-01294 IFA 29-Mar-2017 11-Apr-2017 T-P-T-1752 Approved TPVN C
INSTRUMENT 2539-40-DW-1515-01-01 Fire Alarm Plan (Storage Ammonia) A 03-Jun-2016 IFR 03-Jun-2016 T-T-P-00629 IFR 17-Jun-2016 14-Jul-2016 T-P-T-0257 Approved TPVN H
INSTRUMENT 2539-40-DW-1515-01-01 Fire Alarm Plan (Storage Ammonia) B 18-Aug-2016 IDD 19-Aug-2016 T-T-P-00759 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0280/T-P-T-0365 Commented TPVN H
INSTRUMENT 2539-40-DW-1515-01-01 Fire Alarm Plan (Storage Ammonia) 0 09-Dec-2016 IFC 09-Dec-2016 T-T-P-01029 IFA 22-Dec-2016 Transmitted TPVN C
INSTRUMENT 2539-40-DW-1515-01-02 Fire Alarm Plan (Storage Ammonia) A 03-Jun-2016 IFR 03-Jun-2016 T-T-P-00629 IFR 17-Jun-2016 14-Jul-2016 T-P-T-0257 Approved TPVN H
INSTRUMENT 2539-40-DW-1515-01-02 Fire Alarm Plan (Storage Ammonia) B 18-Aug-2016 IDD 19-Aug-2016 T-T-P-00759 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0280/T-P-T-0365 Commented TPVN H
INSTRUMENT 2539-40-DW-1515-01-02 Fire Alarm Plan (Storage Ammonia) 0 09-Dec-2016 IFC 09-Dec-2016 T-T-P-01029 IFA 22-Dec-2016 Transmitted TPVN C
INSTRUMENT 2539-40-DW-1572-01-02 Unit 40 Offsite Plant Instrument Cable Tray Plan A 29-Feb-2016 IFR 29-Feb-2016 T-T-P-00377 IFR 14-Mar-2016 21-Mar-2016 T-P-T-0110 Approved TPIT H
INSTRUMENT 2539-40-DW-1572-01-02 Unit 40 Offsite Plant Instrument Cable Tray Plan B 19-Aug-2016 IDD 19-Aug-2016 T-T-P-00761 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0281/T-P-T-0366 Commented TPVN H
INSTRUMENT 2539-40-DW-1572-01-02 Unit 40 Offsite Plant Instrument Cable Tray Plan 0 16-Dec-2016 IFC 19-Dec-2016 T-T-P-01059 IFA 01-Jan-2017 05-Jan-2017 T-P-T-0936 Approved TPVN C
INSTRUMENT 2539-40-DW-1572-02-01 Unit 40 Offsite Plant Instrument Main Cable Plan A 13-May-2016 IFR 13-May-2016 T-T-P-00588 IFR 26-May-2016 31-May-2016 C-NH3-0163/T-P-T-0184 Commented TPVN H
INSTRUMENT 2539-40-DW-1572-02-01 Unit 40 Offsite Plant Instrument Main Cable Plan B 25-Aug-2016 IDD 25-Aug-2016 T-T-P-00773 IFR 07-Sep-2016 16-Sep-2016 C-NH3-0290/T-P-T-0387 Commented TPVN H
INSTRUMENT 2539-40-DW-1572-02-01 Unit 40 Offsite Plant Instrument Main Cable Plan 0 29-Dec-2016 IFC 29-Dec-2016 T-T-P-01099 IFA 11-Jan-2017 13-Jan-2017 T-P-T-1000 Approved TPVN C
INSTRUMENT 2539-40-DW-1572-02-02 Unit 40 Offsite Plant Instrument Main Cable Plan A 13-May-2016 IFR 13-May-2016 T-T-P-00588 IFR 26-May-2016 31-May-2016 C-NH3-0163/T-P-T-0184 Commented TPVN H
INSTRUMENT 2539-40-DW-1572-02-02 Unit 40 Offsite Plant Instrument Main Cable Plan B 25-Aug-2016 IDD 25-Aug-2016 T-T-P-00773 IFR 07-Sep-2016 16-Sep-2016 C-NH3-0290/T-P-T-0387 Commented TPVN H
INSTRUMENT 2539-40-DW-1572-02-02 Unit 40 Offsite Plant Instrument Main Cable Plan 0 29-Dec-2016 IFC 29-Dec-2016 T-T-P-01099 IFA 11-Jan-2017 13-Jan-2017 T-P-T-1000 Approved TPVN C
INSTRUMENT 2539-40-DW-1573-01 Instrument Connection List - Unit 40 - Offsite Plant A 27-May-2016 IFR 02-Jun-2016 T-T-P-00624 IFR 15-Jun-2016 17-Jun-2016 C-NH3-0187/T-P-T-0216 Commented TPVN H
Page 18
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
INSTRUMENT 2539-40-DW-1573-01 Junction Boxes Wiring Drawings - Unit 40 - Offsite Plant B 22-Dec-2016 IDD 23-Dec-2016 T-T-P-01077 IFR 05-Jan-2017 05-Jan-2017 T-P-T-0944 Approved TPVN H
INSTRUMENT 2539-40-DW-1573-01 Junction Boxes Wiring Drawings - Unit 40 - Offsite Plant 0 18-Jan-2017 IFC 20-Jan-2017 T-T-P-01172 IFA 02-Feb-2017 08-Feb-2017 T-P-T-01222 Approved TPVN C
INSTRUMENT 2539-40-DW-1574-01-01 Unit 40 - Offsite Plant - Instrument Wiring Plan A 27-May-2016 IFR 27-May-2016 T-T-P-00609 IFR 10-Jun-2016 16-Jun-2016 C-NH3-0182/T-P-T-0211; C-NH3-0195/T-P-T-0227 Commented TPVN H
INSTRUMENT 2539-40-DW-1574-01-01 Unit 40 - Offsite Plant - Instrument Wiring Plan B 04-Jan-2017 IDD 06-Jan-2017 T-T-P-01120 IFR 19-Jan-2017 20-Jan-2017 T-P-T-1095 Approved TPVN H
INSTRUMENT 2539-40-DW-1574-01-01 Unit 40 - Offsite Plant - Instrument Wiring Plan 0 12-Jan-2017 IFC 13-Jan-2017 T-T-P-01152 IFA 27-Jan-2017 06-Feb-2017 T-P-T-1197 Approved TPVN C
INSTRUMENT 2539-40-DW-1574-01-02 Unit 40 - Offsite Plant - Instrument Wiring Plan A 27-May-2016 IFR 27-May-2016 T-T-P-00609 IFR 10-Jun-2016 16-Jun-2016 C-NH3-0182/T-P-T-0211; C-NH3-0195/T-P-T-0227 Commented TPVN H
INSTRUMENT 2539-40-DW-1574-01-02 Unit 40 - Offsite Plant - Instrument Wiring Plan B 04-Jan-2017 IDD 06-Jan-2017 T-T-P-01120 IFR 19-Jan-2017 20-Jan-2017 T-P-T-1095 Approved TPVN H
INSTRUMENT 2539-40-DW-1574-01-02 Unit 40 - Offsite Plant - Instrument Wiring Plan 0 12-Jan-2017 IFC 13-Jan-2017 T-T-P-01152 IFA 27-Jan-2017 06-Feb-2017 T-P-T-1197 Approved TPVN C
INSTRUMENT 2539-40-DW-1574-02-01 Unit 40 Offsite Plant - Instrument Air Piping Plan A 27-May-2016 IFR 27-May-2016 T-T-P-00609 IFR 10-Jun-2016 16-Jun-2016 C-NH3-0182/T-P-T-0211; C-NH3-0195/T-P-T-0227 Commented TPVN H
INSTRUMENT 2539-40-DW-1574-02-01 Unit 40 Offsite Plant - Instrument Air Piping Plan B 25-Aug-2016 IDD 13-Oct-2016 T-T-P-00873 IFR 26-Oct-2016 27-Oct-2016 T-P-T-0501 Approved TPVN H
INSTRUMENT 2539-40-DW-1574-02-01 Unit 40 Offsite Plant - Instrument Air Piping Plan 0 16-Dec-2016 IFC 19-Dec-2016 T-T-P-01059 IFA 01-Jan-2017 05-Jan-2017 T-P-T-0936 Approved TPVN C
INSTRUMENT 2539-40-DW-1574-02-02 Unit 40 Offsite Plant - Instrument Air Piping Plan A 27-May-2016 IFR 27-May-2016 T-T-P-00609 IFR 10-Jun-2016 16-Jun-2016 C-NH3-0182/T-P-T-0211; C-NH3-0195/T-P-T-0227 Commented TPVN H
INSTRUMENT 2539-40-DW-1574-02-02 Unit 40 Offsite Plant - Instrument Air Piping Plan B 25-Aug-2016 IDD 13-Oct-2016 T-T-P-00873 IFR 26-Oct-2016 27-Oct-2016 T-P-T-0501 Approved TPVN H
INSTRUMENT 2539-40-DW-1574-02-02 Unit 40 Offsite Plant - Instrument Air Piping Plan 0 16-Dec-2016 IFC 19-Dec-2016 T-T-P-01059 IFA 01-Jan-2017 05-Jan-2017 T-P-T-0936 Approved TPVN C
INSTRUMENT 2539-40-DW-1576-01 Pneumatic Hook-up Drawings A 08-Jun-2016 IFR 09-Jun-2016 T-T-P-00643 IFR 22-Jun-2016 26-Jun-2016 C-NH3-0199/T-P-T-0233; C-NH3-0249/T-P-T-0320 Approved with comments TPVN H
INSTRUMENT 2539-40-DW-1576-01 Pneumatic Hook-up Drawings B 24-Aug-2016 IDD 25-Aug-2016 T-T-P-00772 IFR 07-Sep-2016 16-Sep-2016 T-P-T-0388 Approved TPVN H
INSTRUMENT 2539-40-DW-1576-01 Pneumatic Hook-up Drawings 0 13-Dec-2016 IFC 14-Dec-2016 T-T-P-01044 IFA 27-Dec-2016 27-Dec-2016 T-P-T-0892 Approved TPVN C
INSTRUMENT 2539-40-DW-1576-02 Mechanical Hook-up Drawings A 28-Apr-2016 IFR 29-Apr-2016 T-T-P-00564 IFR 13-May-2016 21-Jul-2016 T-P-T-0274 Approved TPVN H
INSTRUMENT 2539-40-DW-1576-02 Mechanical Hook-up Drawings B 26-Aug-2016 IDD 26-Aug-2016 T-T-P-00776 IFR 08-Sep-2016 15-Sep-2016 T-P-T-0393 Approved TPVN H
INSTRUMENT 2539-40-DW-1576-02 Mechanical Hook-up Drawings 0 20-Dec-2016 IFC 22-Dec-2016 T-T-P-01072 IFC 04-Jan-2017 05-Jan-2017 T-P-T-0943 Approved TPVN C
INSTRUMENT 2539-40-DW-1576-07 Instrument Support Mounting Details A 13-Jun-2016 IFR 15-Jun-2016 T-T-P-00651 IFR 28-Jun-2016 09-Jul-2016 C-NH3-0207/T-P-T-0241; C-NH3-0252/T-P-T-0323 Approved with comments TPVN H
INSTRUMENT 2539-40-DW-1576-07 Instrument Support Mounting Details B 24-Aug-2016 IDD 24-Aug-2016 T-T-P-00770 IFR 06-Sep-2016 15-Sep-2016 C-NH3-0286/T-P-T-0383 Commented TPVN H
INSTRUMENT 2539-40-DW-1576-07 Instrument Support Mounting Details 0 09-Dec-2016 IFC 12-Dec-2016 T-T-P-01033 IFA 25-Dec-2016 No Comment TPVN H
INSTRUMENT 2539-40-DW-1576-07 Instrument Support Mounting Details 1 14-Apr-2017 IFC 18-Apr-2017 T-T-P-01363 IFA 01-May-2017 01-May-2017 T-P-T-1939 Approved TPVN C
INSTRUMENT 2539-40-DW-1576-08 Instrument Electrical Hook-up Drawings A 07-Jun-2016 IFR 08-Jun-2016 T-T-P-00640 IFR 21-Jun-2016 01-Jul-2016 C-NH3-0203/T-P-T-0237 Commented TPVN H
INSTRUMENT 2539-40-DW-1576-08 Instrument Electrical Hook-up Drawings B 12-Aug-2016 IDD 15-Aug-2016 T-T-P-00753 IFR 29-Aug-2016 02-Sep-2016 T-P-T-0361 Approved TPVN H
INSTRUMENT 2539-40-DW-1576-08 Instrument Electrical Hook-up Drawings 0 21-Oct-2016 IFC 21-Oct-2016 T-T-P-00889 IFC 07-Nov-2016 T-P-T-0539 Approved TPVN H
INSTRUMENT 2539-40-DW-1576-08 Instrument Electrical Hook-up Drawings 1 08-May-2017 IFC 09-May-2017 T-T-P-01406 IFA 22-May-2017 23-May-2017 T-P-T-2062 Approved TPVN C
INSTRUMENT 2539-40-NM-1511-01 Control & Safety System In-Out List - Unit 40 Offsites A 11-Jan-2016 IFR 13-Jan-2016 T-T-P-00230 IFR 25-Jan-2016 No Comment TPIT H
INSTRUMENT 2539-40-NM-1511-01 Control & Safety System In-Out List - Unit 40 Offsites B 03-Jun-2016 IDD1 07-Jun-2016 T-T-P-00638 IFR 20-Jun-2016 24-Jun-2016 C-NH3-0198/T-P-T-0232 Commented TPVN H
INSTRUMENT 2539-40-NM-1511-01 Control & Safety System In/Out List - Unit 40 Offsites 0 06-Mar-2017 IFC 07-Mar-2017 T-T-P-01269 IFA 20-Mar-2017 24-Mar-2017 T-P-T-1635 Approved TPVN C
INSTRUMENT 2539-40-NM-1551-01 Instrument List - Unit 40 - Offsites A 04-Dec-2015 IFR 09-Dec-2015 T-T-P-00166 IFR 22-Dec-2015 04-Jan-2016 T-P-T-0058 Approved TPIT H
INSTRUMENT 2539-40-NM-1551-01 Instrument List - Unit 40 - Offsites B 07-Jun-2016 IDD1 08-Jun-2016 T-T-P-00642 IFR 21-Jun-2016 26-Jun-2016 C-NH3-0201/T-P-T-0235 Commented TPVN H
INSTRUMENT 2539-40-NM-1551-01 Instrument List - Unit 40 - Offsites 0 06-Mar-2017 IFC 07-Mar-2017 T-T-P-01269 IFA 20-Mar-2017 24-Mar-2017 T-P-T-1635 Approved TPVN C
INSTRUMENT 2539-40-NM-1571-01 Instrument Cables & Drum List - Unit 40 - Ammonia Stor A 10-Jun-2016 IFR 10-Jun-2016 T-T-P-00648 IFR 23-Jun-2016 01-Jul-2016 C-NH3-0204/T-P-T-0238; C-NH3-0251/T-P-T-0322 Approved with comments TPVN H
INSTRUMENT 2539-40-NM-1571-01 Instrument Cables & Drum List - Unit 40 - Ammonia Stor B 03-Jan-2017 IDD 04-Jan-2017 T-T-P-01113 IFR 17-Jan-2017 18-Jan-2017 T-P-T-1044 Approved TPVN H
INSTRUMENT 2539-40-NM-1571-01 Instrument Cables & Drum List - Unit 40 - Ammonia Stor 0 18-Jan-2017 IFC 20-Jan-2017 T-T-P-01172 IFA 02-Feb-2017 08-Feb-2017 T-P-T-01222 Approved TPVN C
INSTRUMENT 2539-40-NM-1950-01 Offsites Field Alarms/Signals to/from Fire & Gas Contro B 04-Oct-2016 IDD 05-Oct-2016 T-T-P-00853 IFR 18-Oct-2016 19-Oct-2016 T-P-T-0479 Approved TPVN H
INSTRUMENT 2539-40-NM-1950-01 Offsites Field Alarms/Signals to/from Fire & Gas Contro 0 06-Jan-2017 IFC 06-Jan-2017 T-T-P-01124 IFA 19-Jan-2017 23-Jan-2017 T-P-T-1122 Approved TPVN C
INSTRUMENT 2539-40-SP-1541-01 Instrument Data Sheets for Control Valves Unit 40 A 27-Apr-2016 IFI 28-Apr-2016 T-T-P-00558 IFR 11-May-2016 19-May-2016 C-NH3-0153/T-P-T-0169; T-P-T-0188 MR 1541-01. Approved with comments TPVN H
INSTRUMENT 2539-40-SP-1541-01 Instrument Data Sheets for Control Valves Unit 40 0 05-Jan-2017 IFP 06-Jan-2017 T-T-P-01125 IFA 20-Jan-2017 23-Jan-2017 C-NH3-0580/T-P-T-1127 Commented TPVN C
INSTRUMENT 2539-40-SP-1543-01 Instrument Data Sheets for On-Off Valves Unit 40 A 22-Apr-2016 IFI 28-Apr-2016 T-T-P-00557 IFR 11-May-2016 19-May-2016 C-NH3-0152/T-P-T-0167; T-P-T-0188 MR 1543-01. Approved with comments TPVN H
INSTRUMENT 2539-40-SP-1543-01 Instrument Data Sheets for On-Off Valves Unit 40 0 09-Jan-2017 IFP 09-Jan-2017 T-T-P-01132 IFA 22-Jan-2017 23-Jan-2017 C-NH3-0581/T-P-T-1128 Commented TPVN C
INSTRUMENT 2539-40-SP-1545-01 Instrument Data Sheets for Safety Relief Valves Unit 40 A 06-May-2016 IFI 06-May-2016 T-T-P-00575 IFR 20-May-2016 24-May-2016 T-P-T-0180 MR 1545-01. Approved TPVN H
INSTRUMENT 2539-40-SP-1545-01 Instrument Data Sheets for Safety Relief Valves Unit 40 0 19-Jan-2017 IFP 20-Jan-2017 T-T-P-01167 IFA 02-Feb-2017 14-Feb-2017 T-P-T-1249 Approved TPVN C
INSTRUMENT 2539-40-SP-1547-02 Instrument Data Sheets for Rotameter Unit 40 A 26-Jul-2016 IFI 27-Jul-2016 T-T-P-00720 IFR 09-Aug-2016 13-Aug-2016 T-P-T-0326 Approved TPVN H
INSTRUMENT 2539-40-SP-1547-02 Instrument Data Sheets for Rotameter Unit 40 0 30-Mar-2017 IFP 31-Mar-2017 T-T-P-01320 IFA 13-Apr-2017 14-Apr-2017 C-NH3-0741/T-P-T-1832 Commented TPVN C
INSTRUMENT 2539-40-SP-1553-01 Instrument Data Sheets for Electronic Transmitter Unit 4 A 14-Jul-2016 IFI 18-Jul-2016 T-T-P-00706 IFR 01-Aug-2016 08-Aug-2016 C-NH3-0239/T-P-T-0309; C-NH3-0298/T-P-T-0399 MR 1553-01. Approved TPVN H
INSTRUMENT 2539-40-SP-1553-01 Instrument Data Sheets for Electronic Transmitter Unit 4 0 20-Jan-2017 IFP 20-Jan-2017 T-T-P-01178 IFA 03-Feb-2017 08-Feb-2017 T-P-T-1231 Approved TPVN C
INSTRUMENT 2539-40-SP-1553-02 Instrument Data Sheets for Pressure & Temperature Gau A 16-Aug-2016 IFI 19-Aug-2016 T-T-P-00758 IFR 01-Sep-2016 02-Sep-2016 C-NH3-0278/T-P-T-0363; C-NH3-0299/T-P-T-0400 MR 1553-02. Commented TPVN H
INSTRUMENT 2539-40-SP-1553-02 Instrument Data Sheets for Pressure & Temperature Gau 0 19-Jan-2017 IFP 20-Jan-2017 T-T-P-01171 IFA 02-Feb-2017 08-Feb-2017 T-P-T-1230 Approved TPVN C
INSTRUMENT 2539-40-SP-1554-01 Instrument Data Sheets for Temperature Transmitters Un A 15-Jul-2016 IFI 18-Jul-2016 T-T-P-00706 IFR 01-Aug-2016 08-Aug-2016 C-NH3-0239/T-P-T-0309; C-NH3-0298/T-P-T-0399 MR 1553-01. Approved TPVN H
INSTRUMENT 2539-40-SP-1554-01 Instrument Data Sheets for Temperature Transmitters Un 0 06-Feb-2017 IFP 08-Feb-2017 T-T-P-01202 IFA 21-Feb-2017 23-Feb-2017 T-P-T-1339 Approved TPVN C
MECHANICAL - MACHINERY 2539-00-ITP-0910-01 Inspection & Test Plan for Centrifugal Pumps 30-P-300 A 30-Nov-2015 IFI 03-Dec-2015 T-T-P-00144 IFR 16-Dec-2015 MR 0910-01. No Comment TPIT H
MECHANICAL - MACHINERY 2539-00-ITP-0910-01 Inspection & Test Plan for Centrifugal Pumps 30-P-3001 0 27-Apr-2016 IFP 29-Apr-2016 T-T-P-00561 II MR 0910-01. Transmitted TPIT C
MECHANICAL - MACHINERY 2539-00-ITP-0910-02 Inspection & Test Plan for Centrifugal Pumps (Revamp A 15-Dec-2015 IFI 18-Dec-2015 T-T-P-00194 IFR 31-Dec-2015 MR 0910-02. No Comment TPIT H
MECHANICAL - MACHINERY 2539-00-ITP-0910-02 Inspection & Test Plan for Centrifugal Pumps (Revamp 0 28-Jun-2016 IFP 28-Jun-2016 T-T-P-00671 IFP MR 0910-02. Transmitted TPVN C
MECHANICAL - MACHINERY 2539-00-ITP-0910-03 Inspection & Test Plan for Centrifugal Pumps - 40-P-500 0 09-Jun-2016 IFP 10-Jun-2016 T-T-P-00649 IFP Transmitted TPIT C
MECHANICAL - MACHINERY 2539-00-ITP-1011-01 Inspection & Test Plan for Centrifugal Compressor & Ste 0 18-Dec-2015 IFP 23-Dec-2015 T-T-P-00204 IFP MR 1011-01. No Comment TPIT H
MECHANICAL - MACHINERY 2539-00-ITP-1011-01 Inspection & Test Plan for Centrifugal Compressor & Ste 1 06-Jun-2016 Re-IFP 07-Jun-2016 T-T-P-00636 Re-IFP 21-Jun-2016 C-NH3-0193/T-P-T-0222 MR 1011-01. Commented TPIT C
MECHANICAL - MACHINERY 2539-00-ITP-1031-01 Inspection & Test Plan for Instrument & Service Air Com A 22-Jan-2016 IFI 27-Jan-2016 T-T-P-00265 IFR 09-Feb-2016 MR 1031-01. Transmitted TPIT H
MECHANICAL - MACHINERY 2539-00-ITP-1031-01 Inspection & Test Plan for Instrument & Service Air Com 0 16-Aug-2016 IFP 16-Aug-2016 T-T-P-00755 IFP Transmitted TPVN C
MECHANICAL - MACHINERY 2539-00-ITP-4046-01 Inspection & Test Plan for 10-E-5000 Phosphate Dosin A 28-Apr-2016 IFI 28-Apr-2016 T-T-P-00559 IFR 11-May-2016 19-May-2016 T-P-T-0168 MR 4046-01. Approved TPVN H
MECHANICAL - MACHINERY 2539-00-ITP-4046-01 Inspection & Test Plan for 10-E-5000 Phosphate Dosin 0 04-Oct-2016 IFP 05-Oct-2016 T-T-P-00855 IFP 04-Nov-2016 C-NH3-0351/T-P-T-0505 MR 4046-01. Commented TPVN C
MECHANICAL - MACHINERY 2539-00-ML-0910-01 Technical Evaluation for New Centrifugal Pumps 30-P-3 0 06-Apr-2016 II 07-Apr-2016 T-T-P-00513 II Transmitted TPIT H
MECHANICAL - MACHINERY 2539-00-ML-0910-01 Technical Evaluation for New Centrifugal Pumps 30-P-3 1 26-May-2016 II 30-May-2016 T-T-P-00612 II Transmitted TPIT C
MECHANICAL - MACHINERY 2539-00-ML-0910-02 Technical Bid Evaluation for Revamping of Centrifugal 0 02-Jun-2016 II 03-Jun-2016 T-T-P-00627 II 27-Jul-2016 C-NH3-0233/T-P-T-0292 Commented TPVN C
MECHANICAL - MACHINERY 2539-00-ML-1031-01 Technical Bid Evaluation for Instrument Air Compressor 0 27-May-2016 II 27-May-2016 T-T-P-00607 II Transmitted TPVN C
MECHANICAL - MACHINERY 2539-00-ML-4046-01 Technical Bid Evaluation for Phosphate Dosing Pump P 0 07-Sep-2016 IFA 08-Sep-2016 T-T-P-00799 IFA 21-Sep-2016 Transmitted TPVN C
MECHANICAL - MACHINERY 2539-00-MR-0910-01 Material Requisition for Centrifugal Pumps 30-P-3001E A 30-Nov-2015 IFI 03-Dec-2015 T-T-P-00144 IFR 16-Dec-2015 MR 0910-01. No Comment TPIT H
MECHANICAL - MACHINERY 2539-00-MR-0910-01 Material Requisition for Centrifugal Pumps 30-P-3001E 0 27-Apr-2016 IFP 29-Apr-2016 T-T-P-00561 II MR 0910-01. Transmitted TPIT C
MECHANICAL - MACHINERY 2539-00-MR-0910-02 Material Requisition for Centrifugal Pumps (Revamp of A 15-Dec-2015 IFI 18-Dec-2015 T-T-P-00194 IFR 31-Dec-2015 MR 0910-02. No Comment TPIT H
MECHANICAL - MACHINERY 2539-00-MR-0910-02 Material Requisition for Centrifugal Pumps (Revamp of 0 28-Jun-2016 IFP 28-Jun-2016 T-T-P-00671 IFP MR 0910-02. Transmitted TPVN C
MECHANICAL - MACHINERY 2539-00-MR-0910-03 Material Requisition for Centrifugal Pumps - 40-P-5003 0 09-Jun-2016 IFP 10-Jun-2016 T-T-P-00649 IFP Transmitted TPIT C
MECHANICAL - MACHINERY 2539-00-MR-1011-01 Material Requisition for Centrifugal Compressor & Steam 0 18-Dec-2015 IFP 23-Dec-2015 T-T-P-00204 IFP MR 1011-01. No Comment TPIT H
MECHANICAL - MACHINERY 2539-00-MR-1011-01 Material Requisition for Centrifugal Compressor & Steam 1 06-Jun-2016 Re-IFP 07-Jun-2016 T-T-P-00636 Re-IFP Transmitted TPIT C
MECHANICAL - MACHINERY 2539-00-MR-1031-01 Material Requisition for Instrument & Service Air Compr A 22-Jan-2016 IFI 27-Jan-2016 T-T-P-00265 IFR 09-Feb-2016 MR 1031-01. Transmitted TPIT H
MECHANICAL - MACHINERY 2539-00-MR-1031-01 Material Requisition for Instrument & Service Air Compr 0 16-Aug-2016 IFP 16-Aug-2016 T-T-P-00755 IFP Transmitted TPVN C
MECHANICAL - MACHINERY 2539-00-MR-4046-01 Material Requisition for Internals for 10-E-5000 Phos A 28-Apr-2016 IFI 28-Apr-2016 T-T-P-00559 IFR 11-May-2016 19-May-2016 T-P-T-0168 MR 4046-01. Approved TPVN H
MECHANICAL - MACHINERY 2539-00-MR-4046-01 Material Requisition for 10-E-5000 Phosphate Dosing P 0 04-Oct-2016 IFP 05-Oct-2016 T-T-P-00855 IFP Transmitted TPVN C
MECHANICAL - MACHINERY 2539-00-SOW-0940-01 Modifications Scope of Works for Antiscaling Dosing Pu 0 09-Feb-2017 IFC 13-Feb-2017 T-T-P-01213 IFA 26-Feb-2017 24-Feb-2017 C-NH3-0635/T-P-T-1353 Commented TPVN H
MECHANICAL - MACHINERY 2539-00-SOW-0940-01 Modifications Scope of Works for Antiscaling Dosing 1 24-Apr-2017 IFA 24-Apr-2017 T-T-P-01378 IFA 07-May-2017 09-May-2017 T-P-T-1992 Approved TPVN C
MECHANICAL - MACHINERY 2539-00-SP-0910-01 Particular Technical Specification for Centrifugal Pump A 30-Nov-2015 IFI 03-Dec-2015 T-T-P-00144 IFR 16-Dec-2015 MR 0910-01. No Comment TPIT H
MECHANICAL - MACHINERY 2539-00-SP-0910-01 Particular Technical Specification for New Centrifugal 0 27-Apr-2016 IFP 29-Apr-2016 T-T-P-00561 II MR 0910-01. Transmitted TPIT C
MECHANICAL - MACHINERY 2539-00-SP-0910-02 Particular Technical Specification for Revamping of 30 A 15-Dec-2015 IFI 18-Dec-2015 T-T-P-00194 IFR 31-Dec-2015 MR 0910-02. No Comment TPIT H
MECHANICAL - MACHINERY 2539-00-SP-0910-02 Particular Technical Specification for Revamping of 30 0 28-Jun-2016 IFP 28-Jun-2016 T-T-P-00671 IFP MR 0910-02. Transmitted TPVN C
MECHANICAL - MACHINERY 2539-00-SP-0910-03 Particular Technical Specification for New Centrifugal 0 09-Jun-2016 IFP 10-Jun-2016 T-T-P-00649 IFP Transmitted TPIT C
MECHANICAL - MACHINERY 2539-00-SP-1011-01 Particular Technical Specification for Revamping of Ste 0 18-Dec-2015 IFP 23-Dec-2015 T-T-P-00204 IFP MR 1011-01. No Comment TPIT H
MECHANICAL - MACHINERY 2539-00-SP-1011-01 Particular Technical Specification for Revamping of Ste 1 06-Jun-2016 Re-IFP 07-Jun-2016 T-T-P-00636 Re-IFP 21-Jun-2016 C-NH3-0193/T-P-T-0222 MR 1011-01. Commented TPIT C
MECHANICAL - MACHINERY 2539-00-SP-1031-01 Particular Technical Specification for Instrument & Ser A 22-Jan-2016 IFI 27-Jan-2016 T-T-P-00265 IFR 09-Feb-2016 MR 1031-01. Transmitted TPIT H
MECHANICAL - MACHINERY 2539-00-SP-1031-01 Particular Technical Specification for Instrument & Ser 0 16-Aug-2016 IFP 16-Aug-2016 T-T-P-00755 IFP Transmitted TPVN C
MECHANICAL - MACHINERY 2539-00-SP-4046-01 Particular Technical Specification for 10-E-5000 Phos A 28-Apr-2016 IFI 28-Apr-2016 T-T-P-00559 IFR 11-May-2016 19-May-2016 T-P-T-0168 MR 4046-01. Approved TPVN H
MECHANICAL - MACHINERY 2539-00-SP-4046-01 Particular Technical Specification for 10-E-5000 Pho 0 04-Oct-2016 IFP 05-Oct-2016 T-T-P-00855 IFP Transmitted TPVN C
MECHANICAL - MACHINERY 2539-00-SR-0910-01 Scope of Supply for Centrifugal Pumps 30-P-3001E & 4 A 30-Nov-2015 IFI 03-Dec-2015 T-T-P-00144 IFR 16-Dec-2015 MR 0910-01. No Comment TPIT H
MECHANICAL - MACHINERY 2539-00-SR-0910-01 Scope of Supply for Centrifugal Pumps 30-P-3001E 0 27-Apr-2016 IFP 29-Apr-2016 T-T-P-00561 II MR 0910-01. Transmitted TPIT C
MECHANICAL - MACHINERY 2539-00-SR-0910-02 Scope of Supply for Centrifugal Pumps (Revamp of 30- A 15-Dec-2015 IFI 18-Dec-2015 T-T-P-00194 IFR 31-Dec-2015 MR 0910-02. No Comment TPIT H
MECHANICAL - MACHINERY 2539-00-SR-0910-02 Scope of Supply for Centrifugal Pumps (Revamp of 30- 0 28-Jun-2016 IFP 28-Jun-2016 T-T-P-00671 IFP MR 0910-02. Transmitted TPVN C
MECHANICAL - MACHINERY 2539-00-SR-0910-03 Scope of Supply for Centrifugal Pumps - 40-P-5003 0 09-Jun-2016 IFP 10-Jun-2016 T-T-P-00649 IFP Transmitted TPIT C
MECHANICAL - MACHINERY 2539-00-SR-1011-01 Scope of Supply for Centrifugal Compressor & Steam Tur 0 18-Dec-2015 IFP 23-Dec-2015 T-T-P-00204 IFP MR 1011-01. No Comment TPIT H
MECHANICAL - MACHINERY 2539-00-SR-1011-01 Scope of Supply for Centrifugal Compressor & Steam Tur 1 06-Jun-2016 Re-IFP 07-Jun-2016 T-T-P-00636 Re-IFP 21-Jun-2016 C-NH3-0193/T-P-T-0222 MR 1011-01. Commented TPIT C
MECHANICAL - MACHINERY 2539-00-SR-1031-01 Scope of Supply for Instrument & Service Air Compresso A 22-Jan-2016 IFI 27-Jan-2016 T-T-P-00265 IFR 09-Feb-2016 MR 1031-01. Transmitted TPIT H
MECHANICAL - MACHINERY 2539-00-SR-1031-01 Scope of Supply for Instrument & Service Air Compresso 0 16-Aug-2016 IFP 16-Aug-2016 T-T-P-00755 IFP Transmitted TPVN C
MECHANICAL - MACHINERY 2539-00-SR-4046-01 Scope of Supply for Internals for 10-E-5000 Phosphat A 28-Apr-2016 IFI 28-Apr-2016 T-T-P-00559 IFR 11-May-2016 19-May-2016 T-P-T-0168 MR 4046-01. Approved TPVN H
MECHANICAL - MACHINERY 2539-00-SR-4046-01 Scope of Supply for Phosphate Dosing Pump & Anti Sca 0 04-Oct-2016 IFP 05-Oct-2016 T-T-P-00855 IFP Transmitted TPVN C
MECHANICAL - MACHINERY 2539-14-SP-1112-01. Datasheet for Steam Turbine for 10-K-4021 0 06-Jun-2016 IFP 07-Jun-2016 T-T-P-00636 Re-IFP 21-Jun-2016 C-NH3-0193/T-P-T-0222 MR 1011-01. Commented TPIT C
MECHANICAL - MACHINERY 2539-14-SP-1112-02. Datasheet for Steam Turbine for 10-K-4031 0 18-Dec-2015 IFP 23-Dec-2015 T-T-P-00204 IFP MR 1011-01. No Comment TPIT H
MECHANICAL - MACHINERY 2539-14-SP-1112-02. Datasheet for Steam Turbine for 10-K-4031 1 06-Jun-2016 Re-IFP 07-Jun-2016 T-T-P-00636 Re-IFP 21-Jun-2016 C-NH3-0193/T-P-T-0222 MR 1011-01. Commented TPIT C
MECHANICAL - MACHINERY 2539-18-SP-0940-01. Data Sheet for Phosphate Dosing Pumps - 10-E-5000 A 28-Apr-2016 IFI 28-Apr-2016 T-T-P-00559 IFR 11-May-2016 19-May-2016 T-P-T-0168 MR 4046-01. Approved TPVN H
MECHANICAL - MACHINERY 2539-18-SP-0940-01. Data Sheet for 10-E-5000 Phosphate Dosing Pumps 0 04-Oct-2016 IFP 05-Oct-2016 T-T-P-00855 IFP 04-Nov-2016 C-NH3-0351/T-P-T-0505 MR 4046-01. Commented TPVN C
MECHANICAL - MACHINERY 2539-33-SP-0910-01. Datasheet for Cooling Water Pump 30-P-3001 E A 30-Nov-2015 IFI 03-Dec-2015 T-T-P-00144 IFR 16-Dec-2015 24-May-2016 T-P-T-0124.A MR 0910-01. Approved TPIT H
MECHANICAL - MACHINERY 2539-33-SP-0910-01. Datasheet for Cooling Water Pump 30-P-3001 E 0 27-Apr-2016 IFP 29-Apr-2016 T-T-P-00561 II MR 0910-01. Transmitted TPIT C
MECHANICAL - MACHINERY 2539-33-SP-0940-01. Data Sheet for Anti-Scale Dosing Pump 30-PK-3002-P1 A 29-Aug-2016 IFI 29-Aug-2016 T-T-P-00778 IFR 11-Sep-2016 10-Sep-2016 T-P-T-0370 Approved TPVN H
Page 19
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
MECHANICAL - MACHINERY 2539-33-SP-0940-01. Data Sheet for Anti-Scale Dosing Pump 30-PK-3002/P1R 0 04-Oct-2016 IFP 05-Oct-2016 T-T-P-00855 IFP 04-Nov-2016 C-NH3-0351/T-P-T-0505 MR 4046-01. Commented TPVN C
MECHANICAL - MACHINERY 2539-35-SP-1031-01. Datasheet for Rotarytype Positive Displacement Compre A 22-Jan-2016 IFI 27-Jan-2016 T-T-P-00265 IFR 09-Feb-2016 MR 1031-01. Transmitted TPIT H
MECHANICAL - MACHINERY 2539-35-SP-1031-01. Datasheet for Rotarytype Positive Displacement Compre 0 16-Aug-2016 IFP 16-Aug-2016 T-T-P-00755 IFP Transmitted TPVN C
MECHANICAL - MACHINERY 2539-45-SP-0910-01. Datasheet for Ammonia Truck Loading Pump - 40-P-500 A 30-Nov-2015 IFI 03-Dec-2015 T-T-P-00144 IFR 16-Dec-2015 MR 0910-01. No Comment TPIT H
MECHANICAL - MACHINERY 2539-45-SP-0910-01. Datasheet for Ammonia Truck Loading Pump - 40-P-500 0 09-Jun-2016 IFP 10-Jun-2016 T-T-P-00649 IFP Transmitted TPIT C
MECHANICAL - MACHINERY 2539---A0002 Purchase Order (Unpriced) Relevant to MR 1011-01 0 23-Dec-2015 IFP 15-Jan-2016 T-T-P-00238 IFP MR 1011-01. Transmitted TPIT C
MECHANICAL - PACKAGE 2539-00-ITP-0132-01 Inspection & Test Plan for Refractory Lining for Seconda A 01-Aug-2016 IFI 12-Dec-2016 T-T-P-01034 II 25-Dec-2016 Transmitted TPIT H
MECHANICAL - PACKAGE 2539-00-ITP-0132-01 Inspection & Test Plan for Refractory Lining for Seconda 0 07-Dec-2016 IFP 12-Dec-2016 T-T-P-01035 IFA 25-Dec-2016 20-Jan-2017 T-P-T-1092 Approved TPIT C
MECHANICAL - PACKAGE 2539-00-ITP-0132-03 Inspection & Test Plan for Refractory Material for Wast 0 25-May-2017 IFP 26-May-2017 T-T-P-01423 IFA 08-Jun-2017 16-Jun-2017 T-P-T-2186 Approved TPIT C
MECHANICAL - PACKAGE 2539-00-ITP-0310-01 Inspection & Test Plan for Cooling Tower 30-CT-3001 K- A 02-Feb-2016 IFI 03-Feb-2016 T-T-P-00277 IFR 16-Feb-2016 05-Apr-2016 T-P-T-0133 MR 0310-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-ITP-0310-01 Inspection & Test Plan for Cooling Tower 30-CT-3001 K- 0 25-May-2016 IFP 25-May-2016 T-T-P-00603 IFP MR 0310-01. Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-ITP-0580-01 Inspection & Test Plan for Internals for Towers A 24-Mar-2016 IFI 29-Mar-2016 T-T-P-00491 IFR 11-Apr-2016 12-Apr-2016 T-P-T-00143 MR 0580-01. Approved TPIT C
MECHANICAL - PACKAGE 2539-00-ITP-0811-01 Inspection & Test Plan for Cold Outlet Collector & Transf A 27-May-2016 IFI 27-May-2016 T-T-P-00611 IFR 10-Jun-2016 MR 0811-01. Transmitted TPVN H
MECHANICAL - PACKAGE 2539-00-ITP-0811-01 Inspection & Test Plan for Cold Outlet Collector & Transf B 28-Jun-2016 IFI 21-Sep-2016 T-T-P-00829 IFA 05-Oct-2016 Transmitted TPIT H
MECHANICAL - PACKAGE 2539-00-ITP-0811-01 Inspection & Test Plan for Primary Reformer Cold Collect 0 14-Oct-2016 IFP 24-Oct-2016 T-T-P-00897 IFP 18-Nov-2016 T-P-T-0613 MR 0811-01. Approved TPIT C
MECHANICAL - PACKAGE 2539-00-ITP-0811-02 Inspection & Test Plan for Transfer Lines 0 14-Oct-2016 IFP 24-Oct-2016 T-T-P-00897 IFP 18-Nov-2016 T-P-T-0613 MR 0811-02. Approved TPIT C
MECHANICAL - PACKAGE 2539-00-ITP-0848-01 Inspection & Test Plan for Cooling Water Make Up & Side A 23-Dec-2015 IFI 23-Dec-2015 T-T-P-00201 IFR 05-Jan-2016 MR 0848-01. No Comment TPIT H
MECHANICAL - PACKAGE 2539-00-ITP-0848-01 Inspection & Test Plan for Cooling Water Make Up & Side B 10-Mar-2016 IFI 10-Mar-2016 T-T-P-00419 Re-IFR 23-Mar-2016 25-Mar-2016 T-P-T-0123 MR 0848-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-ITP-0848-01 Inspection & Test Plan for Make-up River Water & Side 0 29-Sep-2016 IFP 03-Oct-2016 T-T-P-00850 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-ITP-0870-01 Inspection & Test Plan for Internals for Drums A 25-Mar-2016 IFI 29-Mar-2016 T-T-P-00492 IFR 11-Apr-2016 12-Apr-2016 T-P-T-00143 MR 0870-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-ITP-0870-01 Inspection & Test Plan for Internals for Drums 0 13-Jan-2017 IFP 17-Jan-2017 T-T-P-01158 IFA 30-Jan-2017 16-Feb-2017 T-P-T-1259 Approved TPIT C
MECHANICAL - PACKAGE 2539-00-ITP-1584-01 Inspection & Test Plan for Ammonia Metering Package A 07-Mar-2016 IFI 09-Mar-2016 T-T-P-00408 IFR 22-Mar-2016 24-Mar-2016 T-P-T-0118 MR 1584-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-ITP-4025-01 Inspection & Test Plan for Ammonia Loading Arms & Va A 13-Jan-2016 IFI 14-Jan-2016 T-T-P-00236 IFR 27-Jan-2016 MR 4025-01. No Comment TPIT H
MECHANICAL - PACKAGE 2539-00-ITP-4025-01 Inspection & Test Plan for Ammonia Loading Arms & Va 0 04-Aug-2016 IFP 05-Aug-2016 T-T-P-00738 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-ITP-4046-02 Inspection & Test Plan for Coagulant-Flocculent Dosing A 18-Nov-2016 IFI 18-Nov-2016 T-T-P-00977 IFR 01-Dec-2016 20-Dec-2016 T-P-T-0828 Approved TPVN H
MECHANICAL - PACKAGE 2539-00-ITP-4046-02 Inspection & Test Plan for Coagulant-Flocculent Dosing 0 13-Jan-2017 IFP 17-Jan-2017 T-T-P-01157 IFA 30-Jan-2017 08-Feb-2017 T-P-T-1206 Approved TPVN C
MECHANICAL - PACKAGE 2539-00-ITP-4100-01 Inspection & Test Plan for Hydrogen Storage Package - A 07-Mar-2016 IFI 08-Mar-2016 T-T-P-00402 IFR 21-Mar-2016 16-Nov-2016 T-P-T-0109 MR 4100-01. Approved TPIT C
MECHANICAL - PACKAGE 2539-00-ITP-4151-01 Inspection & Test Plan for New Ammonia Refrigeration A 11-Mar-2016 IFI 11-Mar-2016 T-T-P-00424 IFR 24-Mar-2016 25-Mar-2016 T-P-T-0126 MR 4151-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-ITP-4151-01 Inspection & Test Plan for New Ammonia Refrigeration 0 12-Sep-2016 IFP 12-Sep-2016 T-T-P-00806 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-ITP-4171-01 Inspection & Test Plan for Instrument Air Dryer (30-DR-5 A 18-Dec-2015 IFI 18-Dec-2015 T-T-P-00193 IFR 31-Dec-2015 MR 4171-01. Transmitted TPIT H
MECHANICAL - PACKAGE 2539-00-ITP-4171-01 Inspection & Test Plan for Instrument Air Dryer (30-DR-5 0 15-Aug-2016 IFP 15-Aug-2016 T-T-P-00752 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-ML-0132-02 Technical Bid Evaluation for Refractory Work 0 20-Apr-2017 II 21-Apr-2017 T-T-P-01372 II 04-May-2017 Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-ML-0310-01 Technical Bid Evaluation for Cooling Tower 30-CT-3001 0 29-Apr-2016 II 29-Apr-2016 T-T-P-00565 II Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-ML-0848-01 Technical Bid Evaluation for Make-up River Water & Sid 0 14-Sep-2016 IFA 14-Sep-2016 T-T-P-00813 IFA 27-Sep-2016 05-Oct-2016 C-NH3-0313/T-P-T-0427 Commented TPVN C
MECHANICAL - PACKAGE 2539-00-ML-4025-01 Technical Bid Evaluation for Ammonia Loading Arms & 0 16-May-2016 II 17-May-2016 T-T-P-00590 II Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-ML-4046-02 Technical Bid Evaluation for Coagulant & Flocculent Pa 0 27-Dec-2016 IFA 27-Dec-2016 T-T-P-01090 IFA 09-Jan-2017 23-Jan-2017 T-P-T-1140 Approved TPVN C
MECHANICAL - PACKAGE 2539-00-ML-4151-01 Technical Bid Evaluation for New Ammonia Refrigeratio 0 14-Jul-2016 II 14-Jul-2016 T-T-P-00703 II 27-Jul-2016 C-NH3-0231/T-P-T-0288; C-NH3-0268/T-P-T-0350; C-N Commented TPVN C
MECHANICAL - PACKAGE 2539-00-ML-4171-01 Technical Bid Evaluation for Instrument Air Dryer 30-DR 0 16-May-2016 II 17-May-2016 T-T-P-00592 II Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-MR-0132-01 Material Requisition for Secondary Reformer; Cold Colle A 01-Aug-2016 IFI 12-Dec-2016 T-T-P-01034 II 25-Dec-2016 Transmitted TPIT H
MECHANICAL - PACKAGE 2539-00-MR-0132-01 Material Requisition for Secondary Reformer; Cold Colle 0 07-Dec-2016 IFP 12-Dec-2016 T-T-P-01035 IFA 25-Dec-2016 20-Jan-2017 T-P-T-1092 Approved TPIT H
MECHANICAL - PACKAGE 2539-00-MR-0132-01 Material Requisition for Secondary Reformer; Cold Colle 1 08-Feb-2017 IFP 10-Feb-2017 T-T-P-01210 IFA 23-Feb-2017 03-Mar-2017 T-P-T-1446 Approved TPIT C
MECHANICAL - PACKAGE 2539-00-MR-0132-03 Material Requisition for Refractory Material for Waste 0 25-May-2017 IFP 26-May-2017 T-T-P-01423 IFA 08-Jun-2017 16-Jun-2017 T-P-T-2186 Approved TPIT C
MECHANICAL - PACKAGE 2539-00-MR-0310-01 Material Requisition for Cooling Tower 30-CT-3001 K-L A 02-Feb-2016 IFI 03-Feb-2016 T-T-P-00277 IFR 16-Feb-2016 05-Apr-2016 T-P-T-0133 MR 0310-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-MR-0310-01 Material Requisition for Cooling Tower 30-CT-3001 K-L B 29-Feb-2016 IFI 01-Mar-2016 T-T-P-00378 Re-IFR 14-Mar-2016 14-Mar-2016 T-P-T-0094 MR 0310-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-MR-0310-01 Material Requisition for Cooling Tower 30-CT-3001 K-L 0 25-May-2016 IFP 25-May-2016 T-T-P-00603 IFP MR 0310-01. Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-MR-0411-50 Material Requsition for HTAS Equipment - Ref. to Sup 0 25-Feb-2016 IFP 26-Feb-2016 T-T-P-00364 IFP MR 0411-50. Transmitted TPIT C
MECHANICAL - PACKAGE 2539-00-MR-0580-01 Material Requisition for Internals for Towers A 24-Mar-2016 IFI 29-Mar-2016 T-T-P-00491 IFR 11-Apr-2016 12-Apr-2016 T-P-T-00143 MR 0580-01. Approved TPIT C
MECHANICAL - PACKAGE 2539-00-MR-0811-01 Material Requisition for Cold Outlet Collector & Transfer A 27-May-2016 IFI 27-May-2016 T-T-P-00611 IFR 10-Jun-2016 MR 0811-01. Transmitted TPVN H
MECHANICAL - PACKAGE 2539-00-MR-0811-01 Material Requisition for Cold Outlet Collector & Transfer B 28-Jun-2016 IFI 21-Sep-2016 T-T-P-00828 For record only. Transmitted TPIT H
MECHANICAL - PACKAGE 2539-00-MR-0811-01 Material Requisition for Cold Outlet Collector & Transfer C 15-Sep-2016 IFI 21-Sep-2016 T-T-P-00829 IFA 05-Oct-2016 Transmitted TPIT H
MECHANICAL - PACKAGE 2539-00-MR-0811-01 Material Requisition for Primary Reformer Cold Collector 0 14-Oct-2016 IFP 24-Oct-2016 T-T-P-00897 IFP 18-Nov-2016 T-P-T-0613 MR 0811-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-MR-0811-01 Material Requisition for Primary Reformer Cold Collector 1 16-Feb-2017 IFP 20-Feb-2017 T-T-P-01234 IFA 05-Mar-2017 07-Mar-2017 T-P-T-1474 Approved TPIT C
MECHANICAL - PACKAGE 2539-00-MR-0811-02 Material Requisition for Transfer Lines 0 14-Oct-2016 IFP 24-Oct-2016 T-T-P-00897 IFP 18-Nov-2016 T-P-T-0613 MR 0811-02. Approved TPIT C
MECHANICAL - PACKAGE 2539-00-MR-0848-01 Material Requisition for Cooling Water Make Up & Side S A 23-Dec-2015 IFI 23-Dec-2015 T-T-P-00201 IFR 05-Jan-2016 MR 0848-01. No Comment TPIT H
MECHANICAL - PACKAGE 2539-00-MR-0848-01 Material Requisition for Cooling Water Make Up & Side S B 10-Mar-2016 IFI 10-Mar-2016 T-T-P-00419 Re-IFR 23-Mar-2016 MR 0848-01. Transmitted TPIT H
MECHANICAL - PACKAGE 2539-00-MR-0848-01 Material Requisition for Make-up River Water & Side St 0 29-Sep-2016 IFP 03-Oct-2016 T-T-P-00850 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-MR-0870-01 Material Requisition for Internals for Drums A 25-Mar-2016 IFI 29-Mar-2016 T-T-P-00492 IFR 11-Apr-2016 12-Apr-2016 T-P-T-00143 MR 0870-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-MR-0870-01 Material Requisition for Internals for Drums 0 13-Jan-2017 IFP 17-Jan-2017 T-T-P-01158 IFA 30-Jan-2017 16-Feb-2017 T-P-T-1259 Approved TPIT C
MECHANICAL - PACKAGE 2539-00-MR-1584-01 Material Requisition for Ammonia Metering Package - A 07-Mar-2016 IFI 09-Mar-2016 T-T-P-00408 IFR 22-Mar-2016 24-Mar-2016 T-P-T-0118 MR 1584-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-MR-4025-01 Material Requsition for Ammonia Loading Arms & Vapo A 13-Jan-2016 IFI 14-Jan-2016 T-T-P-00236 IFR 27-Jan-2016 MR 4025-01. No Comment TPIT H
MECHANICAL - PACKAGE 2539-00-MR-4025-01 Material Requsition for Ammonia Loading Arms & Vapo B 02-Mar-2016 IFI 03-Mar-2016 T-T-P-00383 Re-IFR 16-Mar-2016 25-Mar-2016 T-P-T-0123 MR 4025-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-MR-4025-01 Material Requisition for Ammonia Loading Arms & Vapo 0 04-Aug-2016 IFP 05-Aug-2016 T-T-P-00738 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-MR-4046-02 Material Requisition for Coagulant-Flocculent Dosing P A 18-Nov-2016 IFI 18-Nov-2016 T-T-P-00977 IFR 01-Dec-2016 20-Dec-2016 T-P-T-0828 Approved TPVN H
MECHANICAL - PACKAGE 2539-00-MR-4046-02 Material Requisition for Coagulant-Flocculent Dosing P 0 13-Jan-2017 IFP 17-Jan-2017 T-T-P-01157 IFA 30-Jan-2017 08-Feb-2017 T-P-T-1206 Approved TPVN C
MECHANICAL - PACKAGE 2539-00-MR-4100-01 Material Requisition for Hydrogen Storage Package - 1 A 07-Mar-2016 IFI 08-Mar-2016 T-T-P-00402 IFR 21-Mar-2016 16-Nov-2016 T-P-T-0109 MR 4100-01. Approved TPIT C
MECHANICAL - PACKAGE 2539-00-MR-4151-01 Material Requisition for New Ammonia Refrigeration Pa A 11-Mar-2016 IFI 11-Mar-2016 T-T-P-00424 IFR 24-Mar-2016 25-Mar-2016 C-NH3-0129/T-P-T-0124 MR 4151-01. Commented TPIT H
MECHANICAL - PACKAGE 2539-00-MR-4151-01 Material Requisition for New Ammonia Refrigeration Pa 0 12-Sep-2016 IFP 12-Sep-2016 T-T-P-00806 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-MR-4171-01 Material Requisition for Instrument Air Dryer (30-DR-500 A 18-Dec-2015 IFI 18-Dec-2015 T-T-P-00193 IFR 31-Dec-2015 MR 4171-01. No Comment TPIT H
MECHANICAL - PACKAGE 2539-00-MR-4171-01 Material Requisition for Instrument Air Dryer (30-DR-500 B 24-Feb-2016 IFI 25-Feb-2016 T-T-P-00340 Re-IFR 09-Mar-2016 10-Mar-2016 C-CH3-0111/T-P-T-0088 MR 4171-01. Approved with comments TPIT H
MECHANICAL - PACKAGE 2539-00-MR-4171-01 Material Requisition for Instrument Air Dryer (30-DR-500 0 15-Aug-2016 IFP 15-Aug-2016 T-T-P-00752 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-SL-0811-01 Bidder List for Cold Outlet Collector & Transfer Lines P 1 02-Sep-2016 IFE 12-Sep-2016 T-T-P-00805 IFE Transmitted TPIT C
MECHANICAL - PACKAGE 2539-00-SP-0132-01 Particular Technical Specification for Refractory Lining A 01-Aug-2016 IFI 12-Dec-2016 T-T-P-01034 II 25-Dec-2016 Transmitted TPIT H
MECHANICAL - PACKAGE 2539-00-SP-0132-01 Particular Technical Specification for Refractory Lining 0 07-Dec-2016 IFP 12-Dec-2016 T-T-P-01035 IFA 25-Dec-2016 20-Jan-2017 T-P-T-1092 Approved TPIT H
MECHANICAL - PACKAGE 2539-00-SP-0132-01 Particular Technical Specification for Refractory Lining 1 08-Feb-2017 IFP 10-Feb-2017 T-T-P-01210 IFA 23-Feb-2017 03-Mar-2017 T-P-T-1446 Approved TPIT C
MECHANICAL - PACKAGE 2539-00-SP-0132-03 Particular Technical Specification for Refractory Materi 0 25-May-2017 IFP 26-May-2017 T-T-P-01423 IFA 08-Jun-2017 16-Jun-2017 T-P-T-2186 Approved TPIT C
MECHANICAL - PACKAGE 2539-00-SP-0310-01 Particular Technical Specification for Cooling Tower 30- A 02-Feb-2016 IFI 03-Feb-2016 T-T-P-00277 IFR 16-Feb-2016 05-Apr-2016 T-P-T-0133 MR 0310-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-SP-0310-01 Particular Technical Specification for Cooling Tower 30- 0 25-May-2016 IFP 25-May-2016 T-T-P-00603 IFP MR 0310-01. Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-SP-0580-01 Particular Technical Specification for Internals for Towers A 24-Mar-2016 IFI 29-Mar-2016 T-T-P-00491 IFR 11-Apr-2016 12-Apr-2016 T-P-T-00143 MR 0580-01. Approved TPIT C
MECHANICAL - PACKAGE 2539-00-SP-0811-01 Particular Technical Specification for Cold Outlet Collect A 27-May-2016 IFI 27-May-2016 T-T-P-00611 IFR 10-Jun-2016 MR 0811-01. Transmitted TPVN H
MECHANICAL - PACKAGE 2539-00-SP-0811-01 Particular Technical Specification for Cold Outlet Collect B 28-Jun-2016 IFI 21-Sep-2016 T-T-P-00828 For record only. Transmitted TPIT H
MECHANICAL - PACKAGE 2539-00-SP-0811-01 Particular Technical Specification for Cold Outlet Collect C 15-Sep-2016 IFI 21-Sep-2016 T-T-P-00829 IFA 05-Oct-2016 Transmitted TPIT H
MECHANICAL - PACKAGE 2539-00-SP-0811-01 Particular Technical Specification for Primary Reformer C 0 14-Oct-2016 IFP 24-Oct-2016 T-T-P-00897 IFP 18-Nov-2016 T-P-T-0613 MR 0811-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-SP-0811-01 Particular Technical Specification for Primary Reformer C 1 16-Feb-2017 IFP 20-Feb-2017 T-T-P-01234 IFA 05-Mar-2017 07-Mar-2017 T-P-T-1474 Approved TPIT C
MECHANICAL - PACKAGE 2539-00-SP-0811-02 Particular Technical Specification for Transfer Lines 0 14-Oct-2016 IFP 24-Oct-2016 T-T-P-00897 IFP 18-Nov-2016 T-P-T-0613 MR 0811-02. Approved TPIT C
MECHANICAL - PACKAGE 2539-00-SP-0848-01 Particular Technical Specification for Coagulant Dosi A 23-Dec-2015 IFI 23-Dec-2015 T-T-P-00201 IFR 05-Jan-2016 MR 0848-01. No Comment TPIT H
MECHANICAL - PACKAGE 2539-00-SP-0848-01 Particular Technical Specification for Coagulant Dosi B 10-Mar-2016 IFI 10-Mar-2016 T-T-P-00419 Re-IFR 23-Mar-2016 25-Mar-2016 T-P-T-0123 MR 0848-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-SP-0848-01 Particular Technical Specification for Make-up River Wa 0 29-Sep-2016 IFP 03-Oct-2016 T-T-P-00850 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-SP-0870-01 Particular Technical Specification for Internals for Drums A 25-Mar-2016 IFI 29-Mar-2016 T-T-P-00492 IFR 11-Apr-2016 12-Apr-2016 T-P-T-00143 MR 0870-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-SP-0870-01 Particular Technical Specification for Internals for Drums 0 13-Jan-2017 IFP 17-Jan-2017 T-T-P-01158 IFA 30-Jan-2017 16-Feb-2017 T-P-T-1259 Approved TPIT C
MECHANICAL - PACKAGE 2539-00-SP-1584-01 Particular Technical Specification for Ammonia Meterin A 07-Mar-2016 IFI 09-Mar-2016 T-T-P-00408 IFR 22-Mar-2016 24-Mar-2016 T-P-T-0118 MR 1584-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-SP-4025-01 Particular Technical Specification for Ammonia Loadin A 13-Jan-2016 IFI 14-Jan-2016 T-T-P-00236 IFR 27-Jan-2016 MR 4025-01. No Comment TPIT H
MECHANICAL - PACKAGE 2539-00-SP-4025-01 Particular Technical Specification for Ammonia Loadin B 02-Mar-2016 IFI 03-Mar-2016 T-T-P-00383 Re-IFR 16-Mar-2016 25-Mar-2016 T-P-T-0123 MR 4025-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-SP-4025-01 Particular Technical Specification for Ammonia Loadin 0 04-Aug-2016 IFP 05-Aug-2016 T-T-P-00738 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-SP-4046-02 Particular Technical Specification for Coagulant-Floccu A 18-Nov-2016 IFI 18-Nov-2016 T-T-P-00977 IFR 01-Dec-2016 20-Dec-2016 T-P-T-0828 Approved TPVN H
MECHANICAL - PACKAGE 2539-00-SP-4046-02 Particular Technical Specification for Coagulant-Floccu 0 13-Jan-2017 IFP 17-Jan-2017 T-T-P-01157 IFA 30-Jan-2017 08-Feb-2017 T-P-T-1206 Approved TPVN C
MECHANICAL - PACKAGE 2539-00-SP-4100-01 Particular Technical Specification for Hydrogen Storag A 07-Mar-2016 IFI 08-Mar-2016 T-T-P-00402 IFR 21-Mar-2016 16-Nov-2016 T-P-T-0109 MR 4100-01. Approved TPIT C
MECHANICAL - PACKAGE 2539-00-SP-4151-01 Particular Technical Specification for New Ammonia Ref A 11-Mar-2016 IFI 11-Mar-2016 T-T-P-00424 IFR 24-Mar-2016 25-Mar-2016 T-P-T-0126 MR 4151-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-SP-4151-01 Particular Technical Specification for Refrigeration Pac 0 12-Sep-2016 IFP 12-Sep-2016 T-T-P-00806 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-SP-4171-01 Particular Technical Specification for Instrument Air Dry A 18-Dec-2015 IFI 18-Dec-2015 T-T-P-00193 IFR 31-Dec-2015 MR 4171-01. No Comment TPIT H
MECHANICAL - PACKAGE 2539-00-SP-4171-01 Particular Technical Specification for Instrument Air Dry B 24-Feb-2016 IFI 25-Feb-2016 T-T-P-00340 Re-IFR 09-Mar-2016 10-Mar-2016 C-NH3-0111/T-P-T-0088 MR-4171-01. No Comment TPIT H
MECHANICAL - PACKAGE 2539-00-SP-4171-01 Particular Technical Specification for Instrument Air Dry 0 15-Aug-2016 IFP 15-Aug-2016 T-T-P-00752 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-SR-0132-01 Scope of Supply for Refractory Lining A 01-Aug-2016 IFI 12-Dec-2016 T-T-P-01034 II 25-Dec-2016 Transmitted TPIT H
MECHANICAL - PACKAGE 2539-00-SR-0132-01 Scope of Supply for Secondary Reformer; Cold Collector 0 07-Dec-2016 IFP 12-Dec-2016 T-T-P-01035 IFA 25-Dec-2016 20-Jan-2017 T-P-T-1092 Approved TPIT H
MECHANICAL - PACKAGE 2539-00-SR-0132-01 Scope of Supply for Secondary Reformer; Cold Collector 1 08-Feb-2017 IFP 10-Feb-2017 T-T-P-01210 IFA 23-Feb-2017 03-Mar-2017 T-P-T-1446 Approved TPIT C
MECHANICAL - PACKAGE 2539-00-SR-0132-03 Scope of Supply for Refractory Material for Waste Heat 0 25-May-2017 IFP 26-May-2017 T-T-P-01423 IFA 08-Jun-2017 16-Jun-2017 T-P-T-2186 Approved TPIT C
MECHANICAL - PACKAGE 2539-00-SR-0310-01 Scope of Supply for Cooling Tower 30-CT-3001 K-L A 02-Feb-2016 IFI 03-Feb-2016 T-T-P-00277 IFR 16-Feb-2016 05-Apr-2016 T-P-T-0133 MR 0310-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-SR-0310-01 Scope of Supply for Cooling Tower 30-CT-3001 K-L 0 25-May-2016 IFP 25-May-2016 T-T-P-00603 IFP MR 0310-01. Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-SR-0580-01 Scope of Supply for Internals for Towers A 24-Mar-2016 IFI 29-Mar-2016 T-T-P-00491 IFR 11-Apr-2016 12-Apr-2016 T-P-T-00143 MR 0580-01. Approved TPIT C
MECHANICAL - PACKAGE 2539-00-SR-0811-01 Scope of Supply for Cold Outlet Collector & Transfer Lin A 27-May-2016 IFI 27-May-2016 T-T-P-00611 IFR 10-Jun-2016 MR 0811-01. Transmitted TPVN H
MECHANICAL - PACKAGE 2539-00-SR-0811-01 Scope of Supply for Cold Outlet Collector & Transfer Lin B 28-Jun-2016 IFI 21-Sep-2016 T-T-P-00828 For record only. Transmitted TPIT H
MECHANICAL - PACKAGE 2539-00-SR-0811-01 Scope of Supply for Cold Outlet Collector & Transfer Lin C 15-Sep-2016 IFI 21-Sep-2016 T-T-P-00829 IFA 05-Oct-2016 Transmitted TPIT H
MECHANICAL - PACKAGE 2539-00-SR-0811-01 Scope of Supply for Primary Reformer Cold Collector 0 14-Oct-2016 IFP 24-Oct-2016 T-T-P-00897 IFP 24-Oct-2016 T-P-T-0613 MR 0811-01. Approved TPIT C
Page 20
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
MECHANICAL - PACKAGE 2539-00-SR-0811-02 Scope of Supply for Transfer Lines 0 14-Oct-2016 IFP 24-Oct-2016 T-T-P-00897 IFP 24-Oct-2016 T-P-T-0613 MR 0811-02. Approved TPIT C
MECHANICAL - PACKAGE 2539-00-SR-0848-01 Scope of Supply for Cooling Water Make Up & Side Strea A 23-Dec-2015 IFI 23-Dec-2015 T-T-P-00201 IFR 05-Jan-2016 MR 0848-01. No Comment TPIT H
MECHANICAL - PACKAGE 2539-00-SR-0848-01 Scope of Supply for Cooling Water Make Up & Side Strea B 10-Mar-2016 IFI 10-Mar-2016 T-T-P-00419 Re-IFR 23-Mar-2016 25-Mar-2016 C-NH3-0127/T-P-T-0121 MR 0848-01. Commented TPIT H
MECHANICAL - PACKAGE 2539-00-SR-0848-01 Scope of Supply for Make-up River Water & Side Stream 0 29-Sep-2016 IFP 03-Oct-2016 T-T-P-00850 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-SR-0870-01 Scope of Supply for Internals for Drums A 25-Mar-2016 IFI 29-Mar-2016 T-T-P-00492 IFR 11-Apr-2016 12-Apr-2016 T-P-T-00143 MR 0870-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-SR-0870-01 Scope of Supply for Internals for Drums 0 13-Jan-2017 IFP 17-Jan-2017 T-T-P-01158 IFA 30-Jan-2017 16-Feb-2017 T-P-T-1259 Approved TPIT C
MECHANICAL - PACKAGE 2539-00-SR-1584-01 Scope of Supply for Ammonia Metering Package - 40-P A 07-Mar-2016 IFI 09-Mar-2016 T-T-P-00408 IFR 22-Mar-2016 24-Mar-2016 T-P-T-0118 MR 1584-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-SR-4025-01 Scope of Supply for Ammonia Loading Arms & Vapor Re A 13-Jan-2016 IFI 14-Jan-2016 T-T-P-00236 IFR 27-Jan-2016 MR 4025-01. No Comment TPIT H
MECHANICAL - PACKAGE 2539-00-SR-4025-01 Scope of Supply for Ammonia Loading Arms & Vapor Re 0 04-Aug-2016 IFP 05-Aug-2016 T-T-P-00738 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-SR-4046-02 Scope of Supply for Coagulant-Flocculent Dosing Pack A 18-Nov-2016 IFI 18-Nov-2016 T-T-P-00977 IFR 01-Dec-2016 20-Dec-2016 T-P-T-0828 Approved TPVN H
MECHANICAL - PACKAGE 2539-00-SR-4046-02 Scope of Supply for Coagulant-Flocculent Dosing Pack 0 13-Jan-2017 IFP 17-Jan-2017 T-T-P-01157 IFA 30-Jan-2017 08-Feb-2017 T-P-T-1206 Approved TPVN C
MECHANICAL - PACKAGE 2539-00-SR-4100-01 Scope of Supply for Hydrogen Storage Package - 10-PK A 07-Mar-2016 IFI 08-Mar-2016 T-T-P-00402 IFR 21-Mar-2016 16-Nov-2016 T-P-T-0109 MR 4100-01. Approved TPIT C
MECHANICAL - PACKAGE 2539-00-SR-4151-01 Scope of Supply for New Ammonia Refrigeration Packag A 11-Mar-2016 IFI 11-Mar-2016 T-T-P-00424 IFR 24-Mar-2016 25-Mar-2016 T-P-T-0126 MR 4151-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-00-SR-4151-01 Scope of Supply for New Ammonia Refrigeration Packag 0 12-Sep-2016 IFP 12-Sep-2016 T-T-P-00806 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-SR-4171-01 Scope of Supply for Instrument Air Dryer (30-DR-5002) A 18-Dec-2015 IFI 18-Dec-2015 T-T-P-00193 IFR 31-Dec-2015 MR 4171-01. Transmitted TPIT H
MECHANICAL - PACKAGE 2539-00-SR-4171-01 Scope of Supply for Instrument Air Dryer (30-DR-5002) 0 15-Aug-2016 IFP 15-Aug-2016 T-T-P-00752 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-00-TBT-0811-01 Technical Bid Tabulation for Primary Reformer Cold Colle 0 12-Oct-2016 IFA 21-Oct-2016 T-T-P-00893 IFA 04-Nov-2016 18-Nov-2016 C-NH3-0391/T-P-T-0610 Commented TPIT C
MECHANICAL - PACKAGE 2539-00-TBT-0870-01 Technical Bid Tabulation for Internals for Drums 0 23-Dec-2016 IFA 12-Jun-2017 T-T-P-01452 IFA 25-Jun-2017 04-Jul-2017 T-P-T-2287 Approved TPIT C
MECHANICAL - PACKAGE 2539-12-DW-0810-01 Transfer Lines & Cold Collector - Typical Refractory Det A 28-Jun-2016 IFI 21-Sep-2016 T-T-P-00828 For record only. Transmitted TPIT H
MECHANICAL - PACKAGE 2539-12-DW-0810-01 Transfer Lines & Cold Collector - Typical Refractory Det B 02-Sep-2016 IFI 21-Sep-2016 T-T-P-00829 IFA 05-Oct-2016 13-Oct-2016 T-P-T-0453/C-NH3-0321; T-P-T-0382/C-NH3-0581 MR 0811-01. Approved with comments TPIT C
MECHANICAL - PACKAGE 2539-12-DW-0810-01-01 Transfer Lines & Typical Refractory Details Assembly 0 14-Oct-2016 IFP 24-Oct-2016 T-T-P-00897 IFP 24-Oct-2016 T-P-T-0613 MR 0811-02. Approved TPIT C
MECHANICAL - PACKAGE 2539-12-DW-0810-02-01 Primary Reformer Cold Collector - Typical Refractory De A 02-Sep-2016 IFI 21-Sep-2016 T-T-P-00829 IFA 05-Oct-2016 13-Oct-2016 T-P-T-0453/C-NH3-0321; T-P-T-0382/C-NH3-0581 MR 0811-01. Approved with comments TPIT H
MECHANICAL - PACKAGE 2539-12-DW-0810-02-01 Primary Reformer Cold Collector - Typical Refractory De 0 14-Oct-2016 IFP 24-Oct-2016 T-T-P-00897 IFP 24-Oct-2016 T-P-T-0613 MR 0811-01. Approved TPIT C
MECHANICAL - PACKAGE 2539-12-DW-0810-02-02 Primary Reformer Cold Collector - Pressure Instrument A 02-Sep-2016 II 21-Sep-2016 T-T-P-00829 IFA 05-Oct-2016 Transmitted TPIT H
MECHANICAL - PACKAGE 2539-12-DW-0810-02-02 Primary Reformer Cold Collector - Pressure Instrument 0 14-Oct-2016 II 24-Oct-2016 T-T-P-00897 IFP 18-Nov-2016 T-P-T-0613 MR 0811-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-12-DW-0810-02-02 Primary Reformer Cold Collector - Pressure Instrument 1 16-Feb-2017 IFP 20-Feb-2017 T-T-P-01234 IFA 05-Mar-2017 07-Mar-2017 T-P-T-1474 Approved TPIT C
MECHANICAL - PACKAGE 2539-12-SP-4100-01. Duty Specification for Hydrogen Bottles 10-PK-2001 A 07-Mar-2016 IFI 08-Mar-2016 T-T-P-00402 IFR 21-Mar-2016 MR 4100-01. Transmitted TPIT C
MECHANICAL - PACKAGE 2539-13-DW-0511-01-01 Unit 13 CO2 Absorber Manhole M3 Modification 0 22-Mar-2017 IFC 22-Mar-2017 T-T-P-01301 IFA 04-Apr-2017 12-Apr-2017 T-P-T-1814 Approved TPVN C
MECHANICAL - PACKAGE 2539-33-SP-0310-01 Datasheet for Mechanical Draft Cooling Towers - 30-CT A 02-Feb-2016 IFI 03-Feb-2016 T-T-P-00277 IFR 16-Feb-2016 05-Apr-2016 T-P-T-0133 MR 0310-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-33-SP-0310-01. Datasheet for Mechanical Draft Cooling Towers - 30-CT B 29-Feb-2016 IFI 01-Mar-2016 T-T-P-00378 Re-IFR 14-Mar-2016 14-Mar-2016 T-P-T-0094 MR 0310-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-33-SP-0310-01. Datasheet for Mechanical Draft Cooling Towers - 30-CT 0 25-May-2016 IFP 25-May-2016 T-T-P-00603 IFP MR 0310-01. Transmitted TPVN C
MECHANICAL - PACKAGE 2539-33-SP-0848-01 Duty Specification for Make-Up River Water Filters 30- A 23-Dec-2015 IFI 23-Dec-2015 T-T-P-00201 IFR 05-Jan-2016 MR 0848-01. No Comment TPIT H
MECHANICAL - PACKAGE 2539-33-SP-0848-01. Duty Specification for Make-Up River Water Filters 30- B 10-Mar-2016 IFI 10-Mar-2016 T-T-P-00419 Re-IFR 23-Mar-2016 MR 0848-01. Transmitted TPIT H
MECHANICAL - PACKAGE 2539-33-SP-0848-01. Duty Specification for Make-Up River Water Filters 30- 1 29-Sep-2016 V 03-Oct-2016 T-T-P-00850 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-33-SP-0848-02 Duty Specification for Side Stream Filters 30-SF-3001 A A 23-Dec-2015 IFI 23-Dec-2015 T-T-P-00201 IFR 05-Jan-2016 MR 0848-01. No Comment TPIT H
MECHANICAL - PACKAGE 2539-33-SP-0848-02. Duty Specification for Side Stream Filters 30-SF-3001 A B 10-Mar-2016 IFI 10-Mar-2016 T-T-P-00419 Re-IFR 23-Mar-2016 MR 0848-01. Transmitted TPIT H
MECHANICAL - PACKAGE 2539-33-SP-0848-02. Duty Specification for Side Stream Filters 30-SF-3001 A 1 29-Sep-2016 V 03-Oct-2016 T-T-P-00850 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-33-SP-4046-01. Data Sheet for Coagulant - Flocculant Dosing Package A 18-Nov-2016 IFI 18-Nov-2016 T-T-P-00977 IFR 01-Dec-2016 20-Dec-2016 C-NH3-0488/T-P-T-0828 Commented TPVN H
MECHANICAL - PACKAGE 2539-33-SP-4046-01. Data Sheet for Coagulant - Flocculant Dosing Package 0 13-Jan-2017 IFP 17-Jan-2017 T-T-P-01157 IFA 30-Jan-2017 08-Feb-2017 T-P-T-1206 Approved TPVN C
MECHANICAL - PACKAGE 2539-35-SP-4171-01 Mechanical Datasheet for Instrument Air Dryer - 30-DR- A 18-Dec-2015 IFI 18-Dec-2015 T-T-P-00193 IFR 31-Dec-2015 MR 4171-01. No Comment TPIT H
MECHANICAL - PACKAGE 2539-35-SP-4171-01. Datasheet for Instrument Air Dryer - 30-DR-5002 B 24-Feb-2016 IFI 25-Feb-2016 T-T-P-00340 Re-IFR 09-Mar-2016 10-Mar-2016 C-NH3-0111/T-P-T-0088 MR-4171-01. No Comment TPIT H
MECHANICAL - PACKAGE 2539-35-SP-4171-01. Data Sheet for Instrument Air Dryer - 30-DR-5002 0 15-Aug-2016 IFP 15-Aug-2016 T-T-P-00752 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-45-SP-1584-01. Duty Specification for Ammonia Metering Package N.2 A 07-Mar-2016 IFI 09-Mar-2016 T-T-P-00408 IFR 22-Mar-2016 28-Mar-2016 T-P-T-0127 Approved TPIT C
MECHANICAL - PACKAGE 2539-45-SP-1584-02. Duty Specification for Ammonia Metering Package N.3 A 07-Mar-2016 IFI 09-Mar-2016 T-T-P-00408 IFR 22-Mar-2016 28-Mar-2016 T-P-T-0127 Approved TPIT C
MECHANICAL - PACKAGE 2539-45-SP-4025-01 Datasheet for Truck Loading Arms - 40-LA-5003 - 40-LA A 13-Jan-2016 IFI 14-Jan-2016 T-T-P-00236 IFR 27-Jan-2016 MR 4025-01. No Comment TPIT H
MECHANICAL - PACKAGE 2539-45-SP-4025-01. Datasheet for Truck Loading Arms - 40-LA-5003 - 40-LA B 02-Mar-2016 IFI 03-Mar-2016 T-T-P-00383 Re-IFR 16-Mar-2016 25-Mar-2016 C-NH3-0128/T-P-T-0122 MR 4025-01. Commented TPIT H
MECHANICAL - PACKAGE 2539-45-SP-4025-01. Datasheet for Truck Loading Arms - 40-LA-5003 - 40-LA 0 04-Aug-2016 IFP 05-Aug-2016 T-T-P-00738 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-45-SP-4025-02 Datasheet for Truck Loading Arms - 40-LA-5005 - 40-LA A 13-Jan-2016 IFI 14-Jan-2016 T-T-P-00236 IFR 27-Jan-2016 MR 4025-01. No Comment TPIT H
MECHANICAL - PACKAGE 2539-45-SP-4025-02. Datasheet for Truck Loading Arms - 40-LA-5005 - 40-LA B 02-Mar-2016 IFI 03-Mar-2016 T-T-P-00383 Re-IFR 16-Mar-2016 25-Mar-2016 C-NH3-0128/T-P-T-0122 MR 4025-01. Commented TPIT H
MECHANICAL - PACKAGE 2539-45-SP-4025-02. Datasheet for Truck Loading Arms - 40-LA-5005 - 40-LA 0 04-Aug-2016 IFP 05-Aug-2016 T-T-P-00738 IFP Transmitted TPVN C
MECHANICAL - PACKAGE 2539-45-SP-4151-01. Duty Specification for New Ammonia Refrigeration Pack A 11-Mar-2016 IFI 11-Mar-2016 T-T-P-00424 IFR 24-Mar-2016 25-Mar-2016 T-P-T-0126 MR 4151-01. Approved TPIT H
MECHANICAL - PACKAGE 2539-45-SP-4151-01. Duty Specification for New Ammonia Refrigeration Pac 0 12-Sep-2016 IFP 12-Sep-2016 T-T-P-00806 IFP Transmitted TPVN C
MECHANICAL - PACKAGE ----TP-40-500-ME-EMOC-0002 Engineering Management Of Change - Piping & Instrum - 21-Mar-2017 IFE 22-Mar-2017 T-T-P-01300 II Transmitted TPVN C
MECHANICAL - PVHE 2539-00-ITP-0411-01 Inspection & Test Plan for Reactor Secondary Reforme A 18-Jul-2016 IFI 26-Jul-2016 T-T-P-00719 IFR 08-Aug-2016 19-Aug-2016 C-NH3-0255/T-P-T-0329 MR 0411-01. Approved with comments TPIT H
MECHANICAL - PVHE 2539-00-ITP-0411-01 Inspection & Test Plan for Reactor Secondary Reforme 0 09-Sep-2016 IFP 14-Sep-2016 T-T-P-00811 IFP Transmitted TPIT C
MECHANICAL - PVHE 2539-00-ITP-0411-50 Inspection & Test Plan for HTAS Equipment 0 25-Feb-2016 IFP 26-Feb-2016 T-T-P-00364 IFP MR 0411-50. Transmitted TPIT C
MECHANICAL - PVHE 2539-00-ITP-0610-01 Inspection & Test Plan for Low & High Pressure Shell & A 05-Feb-2016 IFI 09-Feb-2016 T-T-P-00302 IFR 22-Feb-2016 MR 0610-01. No Comment TPIT H
MECHANICAL - PVHE 2539-00-ITP-0610-01 Inspection & Test Plan for Low & High Pressure Shell & 0 13-Jun-2016 IFP 07-Jul-2016 T-T-P-00697 II 29-Jul-2016 T-P-T-0295 MR 0610-01. Approved TPIT C
MECHANICAL - PVHE 2539-00-ITP-0661-01 Inspection & Test Plan for Plates & Frame Heat Exchang A 16-Feb-2016 IFI 17-Feb-2016 T-T-P-00319 IFR 29-Feb-2016 03-Aug-2016 T-P-T-0297 MR 0661-01. Approved TPIT H
MECHANICAL - PVHE 2539-00-ITP-0661-01 Inspection & Test Plan for Plates & Frame Heat Exchang 0 20-Jun-2016 IFP 22-Jun-2016 T-T-P-00664 IFP MR 0661-01. Transmitted TPVN C
MECHANICAL - PVHE 2539-00-ITP-0661-02 Inspection & Test Plan for Plates & Frame Heat Exchang A 30-Jun-2016 IFI 04-Jul-2016 T-T-P-00683 IFR 17-Jul-2016 Transmitted TPIT C
MECHANICAL - PVHE 2539-00-ITP-0710-01 Inspection & Test Plan for Air Cooled Heat Exchangers A 03-Dec-2015 IFI 03-Dec-2015 T-T-P-00146 IFR 16-Dec-2015 04-Jan-2016 C-NH3-0082/T-P-T-0056; C-NH3-0238/T-P-T-0307 MR 0710-01. Approved with comments TPIT H
MECHANICAL - PVHE 2539-00-ITP-0710-01 Inspection & Test Plan for Air Cooled Heat Exchangers 0 03-Aug-2016 IFP 05-Aug-2016 T-T-P-00739 IFP Transmitted TPVN C
MECHANICAL - PVHE 2539-00-JSD-0400-01 Job Specification for Design of Pressure & Atmospheric A 21-Oct-2015 IFR 21-Oct-2015 T-T-P-00021 IFR 03-Nov-2015 06-Nov-2015 C-NH3-00016/T-P-T-00007 Commented TPIT H
MECHANICAL - PVHE 2539-00-JSD-0400-01 Job Specification for Design of Pressure & Atmospheric 0 30-Nov-2015 IFE 02-Dec-2015 T-T-P-00138 IFE Transmitted TPIT H
MECHANICAL - PVHE 2539-00-JSD-0400-01 Job Specification for Design of Pressure & Atmospheric 1 15-Jan-2016 IFE 19-Jan-2016 T-T-P-00245 Re-IFE Transmitted TPIT H
MECHANICAL - PVHE 2539-00-JSD-0400-01 Job Specification for Design of Pressure & Atmospheric 2 01-Jul-2016 IFE 01-Jul-2016 T-T-P-00676 IFE Transmitted TPVN C
MECHANICAL - PVHE 2539-00-JSS-0400-01 Job Specification for Supply Pressure & Atmospheric Eq A 23-Oct-2015 IFR 21-Oct-2015 T-T-P-00019 IFR 03-Nov-2015 06-Nov-2015 C-NH3-00015/T-P-T-00007 Commented TPIT H
MECHANICAL - PVHE 2539-00-JSS-0400-01 Job Specification for Supply Pressure & Atmospheric Eq 0 30-Nov-2015 IFE 02-Dec-2015 T-T-P-00138 IFE Transmitted TPIT C
MECHANICAL - PVHE 2539-00-JSS-0710-01 General Supply Rules for Air Cooled Heat Exchangers A 21-Oct-2015 IFR 21-Oct-2015 T-T-P-00020 IFR 03-Nov-2015 06-Nov-2015 C-NH3-00017/T-P-T-00007 Commented TPIT H
MECHANICAL - PVHE 2539-00-JSS-0710-01 General Supply Rules for Air Cooled Heat Exchangers 0 30-Nov-2015 IFE 02-Dec-2015 T-T-P-00138 IFE Transmitted TPIT C
MECHANICAL - PVHE 2539-00-ML-0411-01 Technical Bid Evaluation for Reactor Secondary Refor 0 09-Sep-2016 II 20-Sep-2016 T-T-P-00826 II Transmitted TPIT C
MECHANICAL - PVHE 2539-00-ML-0610-01 Technical Bid Evaluation for Low & High Pressure Shell 0 31-May-2016 II 07-Jul-2016 T-T-P-00696 II 27-Jul-2016 T-P-T-0289 Approved TPIT C
MECHANICAL - PVHE 2539-00-ML-0661-01 Technical Bid Evaluation for Plates & Frame Heat Excha 0 12-Apr-2016 II 14-Apr-2016 T-T-P-00534 II Transmitted TPVN C
MECHANICAL - PVHE 2539-00-ML-0710-01 Technical Bid Evaluation for Ammonia Heater 0 15-Apr-2016 II 19-Apr-2016 T-T-P-00544 II Transmitted TPVN C
MECHANICAL - PVHE 2539-00-MR-0411-01 Material Requisition for Reactor Secondary Reformer A 18-Jul-2016 IFI 26-Jul-2016 T-T-P-00719 IFR 08-Aug-2016 19-Aug-2016 C-NH3-0255/T-P-T-0329 MR 0411-01. Approved with comments TPIT H
MECHANICAL - PVHE 2539-00-MR-0411-01 Material Requisition for Reactor Secondary Reformer 0 09-Sep-2016 IFP 14-Sep-2016 T-T-P-00811 IFP Transmitted TPIT C
MECHANICAL - PVHE 2539-00-MR-0610-01 Material Requsition for Low & High Pressure Shell & Tu A 08-Feb-2016 IFI 09-Feb-2016 T-T-P-00302 IFR 22-Feb-2016 MR 0610-01. No Comment TPIT H
MECHANICAL - PVHE 2539-00-MR-0610-01 Material Requisition for Low & High Pressure Shell & T 0 13-Jun-2016 IFP 07-Jul-2016 T-T-P-00697 II 29-Jul-2016 T-P-T-0295 MR 0610-01. Approved TPIT C
MECHANICAL - PVHE 2539-00-MR-0661-01 Material Requsition for Plates & Frame Heat Exchangers A 16-Feb-2016 IFI 17-Feb-2016 T-T-P-00319 IFR 29-Feb-2016 03-Aug-2016 T-P-T-0297 MR 0661-01. Approved TPIT H
MECHANICAL - PVHE 2539-00-MR-0661-01 Material Requisition for Plates & Frame Heat Exchanger 0 20-Jun-2016 IFP 22-Jun-2016 T-T-P-00664 IFP MR 0661-01. Transmitted TPVN C
MECHANICAL - PVHE 2539-00-MR-0661-02 Material Requisition for Plates & Frame Heat Exchanger A 30-Jun-2016 IFI 04-Jul-2016 T-T-P-00683 IFR 17-Jul-2016 Transmitted TPIT C
MECHANICAL - PVHE 2539-00-MR-0710-01 Material Requisition for Air Cooled Heat Exchangers A 03-Dec-2015 IFI 03-Dec-2015 T-T-P-00146 IFR 16-Dec-2015 MR 0710-01. No Comment TPIT H
MECHANICAL - PVHE 2539-00-MR-0710-01 Material Requisition for Air Cooled Heat Exchangers 0 03-Aug-2016 IFP 05-Aug-2016 T-T-P-00739 IFP Transmitted TPVN C
MECHANICAL - PVHE 2539-00-SP-0411-01 Particular Technical Specification for Reactor Second A 18-Jul-2016 IFI 26-Jul-2016 T-T-P-00719 IFR 08-Aug-2016 19-Aug-2016 C-NH3-0255/T-P-T-0329 MR 0411-01. Approved with comments TPIT H
MECHANICAL - PVHE 2539-00-SP-0411-01 Particular Technical Specification for Reactor Secon 0 09-Sep-2016 IFP 14-Sep-2016 T-T-P-00811 IFP Transmitted TPIT C
MECHANICAL - PVHE 2539-00-SP-0610-01 Particular Technical Specification for Low & High Press A 08-Feb-2016 IFI 09-Feb-2016 T-T-P-00302 IFR 22-Feb-2016 MR 0610-01. No Comment TPIT H
MECHANICAL - PVHE 2539-00-SP-0610-01 Particular Technical Specification for Low & High Press 0 13-Jun-2016 IFP 07-Jul-2016 T-T-P-00697 II 29-Jul-2016 T-P-T-0295 MR 0610-01. Approved TPIT C
MECHANICAL - PVHE 2539-00-SP-0661-01 Particular Technical Specification for Plates & Frame H A 16-Feb-2016 IFI 17-Feb-2016 T-T-P-00319 IFR 29-Feb-2016 03-Aug-2016 T-P-T-0297 MR 0661-01. Approved TPIT H
MECHANICAL - PVHE 2539-00-SP-0661-01 Particular Technical Specification for Plates & Frame H 0 20-Jun-2016 IFP 22-Jun-2016 T-T-P-00664 IFP MR 0661-01. Transmitted TPVN C
MECHANICAL - PVHE 2539-00-SP-0661-02 Particular Technical Specification for Plates & Frame H A 30-Jun-2016 IFI 04-Jul-2016 T-T-P-00683 IFR 17-Jul-2016 Transmitted TPIT C
MECHANICAL - PVHE 2539-00-SP-0710-01 Particular Technical Specification for Air Cooled Heat E A 03-Dec-2015 IFI 03-Dec-2015 T-T-P-00146 IFR 16-Dec-2015 MR 0710-01. No Comment TPIT H
MECHANICAL - PVHE 2539-00-SP-0710-01 Particular Technical Specification for Air Cooled Heat E 0 03-Aug-2016 IFP 05-Aug-2016 T-T-P-00739 IFP Transmitted TPVN C
MECHANICAL - PVHE 2539-00-SR-0411-01 Scope of Supply for Reactor Secondary Reformer A 18-Jul-2016 IFI 26-Jul-2016 T-T-P-00719 IFR 08-Aug-2016 19-Aug-2016 C-NH3-0255/T-P-T-0329 MR 0411-01. Approved with comments TPIT H
MECHANICAL - PVHE 2539-00-SR-0411-01 Scope of Supply for Reactor Secondary Reformer 0 09-Sep-2016 IFP 14-Sep-2016 T-T-P-00811 IFP Transmitted TPIT C
MECHANICAL - PVHE 2539-00-SR-0411-50 Scope of Supply for HTAS Equipment 0 25-Feb-2016 IFP 26-Feb-2016 T-T-P-00364 IFP MR 0411-50. Transmitted TPIT C
MECHANICAL - PVHE 2539-00-SR-0610-01 Scope of Supply for Low & High Pressure Shell & Tube A 08-Feb-2016 IFI 09-Feb-2016 T-T-P-00302 IFR 22-Feb-2016 MR 0610-01. No Comment TPIT H
MECHANICAL - PVHE 2539-00-SR-0610-01 Scope of Supply for Low & High Pressure Shell & Tube 0 13-Jun-2016 IFP 07-Jul-2016 T-T-P-00697 II 29-Jul-2016 T-P-T-0295 MR 0610-01. Approved TPIT C
MECHANICAL - PVHE 2539-00-SR-0661-01 Scope of Supply for Plates & Frame Heat Exchangers A 16-Feb-2016 IFI 17-Feb-2016 T-T-P-00319 IFR 29-Feb-2016 03-Aug-2016 T-P-T-0297 MR 0661-01. Approved TPIT H
MECHANICAL - PVHE 2539-00-SR-0661-01 Scope of Supply for Plates & Frame Heat Exchangers 0 20-Jun-2016 IFP 22-Jun-2016 T-T-P-00664 IFP MR 0661-01. Transmitted TPVN C
MECHANICAL - PVHE 2539-00-SR-0661-02 Scope of Supply for Plates & Frame Heat Exchangers A 30-Jun-2016 IFI 04-Jul-2016 T-T-P-00683 IFR 17-Jul-2016 Transmitted TPIT C
MECHANICAL - PVHE 2539-00-SR-0710-01 Scope of Supply for Air Cooled Heat Exchangers A 03-Dec-2015 IFI 03-Dec-2015 T-T-P-00146 IFR 16-Dec-2015 MR 0710-01. No Comment TPIT H
MECHANICAL - PVHE 2539-00-SR-0710-01 Scope of Supply for Air Cooled Heat Exchangers 0 03-Aug-2016 IFP 05-Aug-2016 T-T-P-00739 IFP Transmitted TPVN C
MECHANICAL - PVHE 2539-00-STC-0490-00 Standard Construction Drawings for Pressure Equipmen A 29-Oct-2015 IFR 30-Oct-2015 T-T-P-00046 IFR 12-Nov-2015 No Comment TPIT H
MECHANICAL - PVHE 2539-00-STC-0490-00 Standard Construction Drawings for Pressure Equipmen B 24-Nov-2015 IFR 27-Nov-2015 T-T-P-00117 Re-IFR 10-Dec-2015 17-Dec-2015 T-P-T-0037 Approved TPIT H
MECHANICAL - PVHE 2539-00-STC-0490-00 Standard Construction Drawings for Pressure Equipmen 0 04-Dec-2015 IFC 04-Dec-2015 T-T-P-00154 IFC Transmitted TPIT C
MECHANICAL - PVHE 2539-12-DW-0410-01-01 Mechanical Data Sheet for Item 10-R-2003R 0 09-Sep-2016 IFP 14-Sep-2016 T-T-P-00811 IFP Transmitted TPIT C
MECHANICAL - PVHE 2539-13-DW-0610-01 Mechanical Datasheet for CO2 Vent Cooler - 10-E-3007 A 01-Feb-2016 IFI 09-Feb-2016 T-T-P-00302 IFR 22-Feb-2016 MR 0610-01. No Comment TPIT H
MECHANICAL - PVHE 2539-13-DW-0610-01 Mechanical Datasheet for CO2 Vent Cooler - 10-E-3007 0 10-Jun-2016 IFP 07-Jul-2016 T-T-P-00697 II 29-Jul-2016 T-P-T-0295 MR 0610-01. Approved TPIT C
MECHANICAL - PVHE 2539-14-DW-0610-01 Mechanical Datasheet for Process Air Compressor 1st S A 08-Feb-2016 IFI 09-Feb-2016 T-T-P-00302 IFR 22-Feb-2016 MR 0610-01. No Comment TPIT H
MECHANICAL - PVHE 2539-14-DW-0610-01 Mechanical Datasheet for Process Air Compressor 1st S 0 10-Jun-2016 IFP 07-Jul-2016 T-T-P-00697 II 29-Jul-2016 T-P-T-0295 MR 0610-01. Approved TPIT C
MECHANICAL - PVHE 2539-14-DW-0610-02 Mechanical Datasheet for Process Air Compressor 2nd A 01-Feb-2016 IFI 09-Feb-2016 T-T-P-00302 IFR 22-Feb-2016 MR 0610-01. No Comment TPIT H
Page 21
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
MECHANICAL - PVHE 2539-14-DW-0610-02 Mechanical Datasheet for Process Air Compressor 2nd 0 10-Jun-2016 IFP 07-Jul-2016 T-T-P-00697 II 29-Jul-2016 T-P-T-0295 MR 0610-01. Approved TPIT C
MECHANICAL - PVHE 2539-14-DW-0610-03 Mechanical Datasheet for Process Air Compressor 3rd S A 01-Feb-2016 IFI 09-Feb-2016 T-T-P-00302 IFR 22-Feb-2016 MR 0610-01. No Comment TPIT H
MECHANICAL - PVHE 2539-14-DW-0610-03 Mechanical Datasheet for Process Air Compressor 3rd S 0 10-Jun-2016 IFP 07-Jul-2016 T-T-P-00697 II 29-Jul-2016 T-P-T-0295 MR 0610-01. Approved TPIT C
MECHANICAL - PVHE 2539-14-DW-0610-04 Mechanical Datasheet for Synthesis Gas/Recirculation A 01-Feb-2016 IFI 09-Feb-2016 T-T-P-00302 IFR 22-Feb-2016 MR 0610-01. No Comment TPIT H
MECHANICAL - PVHE 2539-14-DW-0610-04 Mechanical Datasheet for Synthesis Gas/Recirculation 0 10-Jun-2016 IFP 07-Jul-2016 T-T-P-00697 II 29-Jul-2016 T-P-T-0295 MR 0610-01. Approved TPIT C
MECHANICAL - PVHE 2539-14-DW-0610-05 Mechanical Datasheet for Synthesis Gas/Recirculation A 01-Feb-2016 IFI 09-Feb-2016 T-T-P-00302 IFR 22-Feb-2016 MR 0610-01. No Comment TPIT H
MECHANICAL - PVHE 2539-14-DW-0610-05 Mechanical Datasheet for Synthesis Gas/Recirculation 0 10-Jun-2016 IFP 07-Jul-2016 T-T-P-00697 II 29-Jul-2016 T-P-T-0295 MR 0610-01. Approved TPIT C
MECHANICAL - PVHE 2539-14-DW-0610-06 Mechanical Datasheet for Synthesis Gas/Recirculation A 01-Feb-2016 IFI 09-Feb-2016 T-T-P-00302 IFR 22-Feb-2016 MR 0610-01. No Comment TPIT H
MECHANICAL - PVHE 2539-14-DW-0610-06 Mechanical Datasheet for Synthesis Gas/Recirculation 0 10-Jun-2016 IFP 07-Jul-2016 T-T-P-00697 II 29-Jul-2016 T-P-T-0295 MR 0610-01. Approved TPIT C
MECHANICAL - PVHE 2539-31-SP-0660-01. Datasheet for Plates & Frames Heat Exchanger - 30-E1 A 15-Feb-2016 IFI 17-Feb-2016 T-T-P-00319 IFR 29-Feb-2016 03-Aug-2016 T-P-T-0297 MR 0661-01. Approved TPIT H
MECHANICAL - PVHE 2539-31-SP-0660-01. Data Sheet for Plates & Frames Heat Exchanger - 30-E 0 20-Jun-2016 IFP 22-Jun-2016 T-T-P-00664 IFP MR 0661-01. Transmitted TPVN C
MECHANICAL - PVHE 2539-45-SP-0710-01. Datasheet for Air Fin Exchanger - 40-E-5002 A 30-Nov-2015 IFI 03-Dec-2015 T-T-P-00146 IFR 16-Dec-2015 MR 0710-01. No Comment TPIT H
MECHANICAL - PVHE 2539-45-SP-0710-01. Datasheet for Air Fin Exchanger - 40-E-5002 0 03-Aug-2016 IFP 05-Aug-2016 T-T-P-00739 IFP Transmitted TPVN C
PIPING 2539-00-DW-0051-01-01 General Plot Plan A 10-Dec-2015 IFR 10-Dec-2015 T-T-P-00170 IFR 23-Dec-2015 04-Jan-2016 C-NH3-0083/T-P-T-0057; T-P-T-0082 Approved with comments TPIT H
PIPING 2539-00-DW-0051-01-01 General Plot Plan B 24-Feb-2016 IDD 25-Feb-2016 T-T-P-00346 IDD No Comment TPIT H
PIPING 2539-00-DW-0051-01-01 General Plot Plan C 20-Sep-2016 IDD2 20-Sep-2016 T-T-P-00825 IFR 03-Oct-2016 11-Oct-2016 T-P-T-0440 Approved TPVN H
PIPING 2539-00-DW-0051-01-01 General Plot Plan 0 15-Nov-2016 IFC 16-Nov-2016 T-T-P-00966 IFC 01-Dec-2016 T-P-T-0698 Approved TPVN C
PIPING 2539-00-DW-0053-01-01 General Key Plan A 24-Feb-2016 IFR 25-Feb-2016 T-T-P-00350 IFR 09-Mar-2016 18-Mar-2016 C-NH3-0121/T-P-T-0107 Commented TPIT H
PIPING 2539-00-DW-0053-01-01 General Key Plan B 20-Sep-2016 IDD2 20-Sep-2016 T-T-P-00825 IFR 03-Oct-2016 11-Oct-2016 T-P-T-0440 Approved TPVN H
PIPING 2539-00-DW-0053-01-01 General Key Plan 0 15-Nov-2016 IFC 16-Nov-2016 T-T-P-00966 IFC 01-Dec-2016 T-P-T-0698 Approved TPVN C
PIPING 2539-00-DW-1341-02 Piping Isometric Drawings (Tie-ins & Dismantling) 0 30-Mar-2017 IFC 03-Apr-2017 T-T-P-01330 IFA 16-Apr-2017 17-Apr-2017 T-P-T-1842 Approved TPVN C
PIPING 2539-00-DW-1360-00 Special Auxiliary Piping Supports Collection 0 31-Mar-2017 IFE 31-Mar-2017 T-T-P-01326 IFA 13-Apr-2017 14-Apr-2017 T-P-T-1836 Approved TPVN C
PIPING 2539-00-ITP-1310-01 Inspection & Test Plan for Forged & Cast Valves A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 11-Mar-2016 T-P-T-0091 MR 1310-01. Approved TPIT H
PIPING 2539-00-ITP-1310-01 Inspection & Test Plan for Forged & Cast Valves 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP Transmitted TPIT C
PIPING 2539-00-ITP-1310-11 Inspection & Test Plan for Stainless Steel 347H & Alloy A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00367 IFR 10-Mar-2016 11-Mar-2016 T-P-T-0093 MR 1310-11. Approved TPIT H
PIPING 2539-00-ITP-1310-11 Inspection & Test Plan for Stainless Steel 347H & Alloy 0 07-Oct-2016 IFP 11-Oct-2016 T-T-P-00870 IFP 02-Nov-2016 T-P-T-0514 MR 1310-11. Approved TPIT C
PIPING 2539-00-ITP-1320-01 Inspection & Test Plan for Seamless & Welded Pipes A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 11-Mar-2016 T-P-T-0091 MR 1320-01. Approved TPIT H
PIPING 2539-00-ITP-1320-01 Inspection & Test Plan for Seamless & Welded Pipes 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP Transmitted TPIT C
PIPING 2539-00-ITP-1320-11 Inspection & Test Plan for Stainless Steel 347H & Alloy A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00367 IFR 10-Mar-2016 11-Mar-2016 T-P-T-0093 MR 1320-11. Approved TPIT H
PIPING 2539-00-ITP-1320-11 Inspection & Test Plan for Stainless Steel 347H & Alloy 0 07-Jul-2016 IFP 12-Jul-2016 T-T-P-00702 IFP Transmitted TPIT C
PIPING 2539-00-ITP-1328-01 Inspection & Test Plan for Plastic Piping A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 11-Mar-2016 T-P-T-0091 MR 1328-01. Approved TPIT H
PIPING 2539-00-ITP-1328-01 Inspection & Test Plan for Plastic Piping 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP Transmitted TPIT C
PIPING 2539-00-ITP-1328-02 Inspection & Test Plan for PVC Piping 0 07-Oct-2016 IFP 20-Oct-2016 T-T-P-00886 IFP Transmitted TPIT C
PIPING 2539-00-ITP-1330-01 Inspection & Test Plan for Forged & Buttwelding Fittings A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 11-Mar-2016 T-P-T-0091 MR 1330-01. Approved TPIT H
PIPING 2539-00-ITP-1330-01 Inspection & Test Plan for Forged & Buttwelding Fittings 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP Transmitted TPIT C
PIPING 2539-00-ITP-1330-11 Inspection & Test Plan for Stainless Steel 347H & Alloy S A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00367 IFR 10-Mar-2016 11-Mar-2016 T-P-T-0093 MR 1330-11. Approved TPIT H
PIPING 2539-00-ITP-1330-11 Inspection & Test Plan for Stainless Steel 347H & Alloy S 0 07-Jul-2016 IFP 25-Jul-2016 T-T-P-00716 IFP Transmitted TPVN C
PIPING 2539-00-ITP-1350-01 Inspection & Test Plan for Flanges Blinds And Drip Rings A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 11-Mar-2016 T-P-T-0091 MR 1350-01. Approved TPIT H
PIPING 2539-00-ITP-1350-01 Inspection & Test Plan for Flanges Blinds & Drip Rings 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP Transmitted TPIT C
PIPING 2539-00-ITP-1350-11 Inspection & Test Plan for Stainless Steel 347H & Alloy A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00367 IFR 10-Mar-2016 11-Mar-2016 T-P-T-0093 MR 1350-11. Approved TPIT H
PIPING 2539-00-ITP-1350-11 Inspection & Test Plan for Stainless Steel 347H & Alloy 0 07-Jul-2016 IFP 25-Jul-2016 T-T-P-00716 IFP Transmitted TPVN C
PIPING 2539-00-ITP-1360-01 Inspection & Test Plan for Gaskets A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 11-Mar-2016 T-P-T-0091 MR 1360-01. Approved TPIT H
PIPING 2539-00-ITP-1360-01 Inspection & Test Plan for Gaskets 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP Transmitted TPIT C
PIPING 2539-00-ITP-1360-11 Inspection & Test Plan for Stainless Steel 347H & Alloy A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00367 IFR 10-Mar-2016 11-Mar-2016 T-P-T-0093 MR 1360-11. Approved TPIT H
PIPING 2539-00-ITP-1360-11 Inspection & Test Plan for Stainless Steel 347H & Alloy 0 07-Jul-2016 IFP 25-Jul-2016 T-T-P-00716 IFP Transmitted TPVN C
PIPING 2539-00-ITP-1370-01 Inspection & Test Plan for Boltings A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 11-Mar-2016 T-P-T-0091 MR 1370-01. Approved TPIT H
PIPING 2539-00-ITP-1370-01 Inspection & Test Plan for Boltings 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP Transmitted TPIT C
PIPING 2539-00-ITP-1370-11 Inspection & Test Plan for Stainless Steel 347H & Alloy S A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00367 IFR 10-Mar-2016 11-Mar-2016 T-P-T-0093 MR 1370-11. Approved TPIT H
PIPING 2539-00-ITP-1370-11 Inspection & Test Plan for Stainless Steel 347H & Alloy S 0 07-Jul-2016 IFP 25-Jul-2016 T-T-P-00716 IFP Transmitted TPVN C
PIPING 2539-00-ITP-1383-01 Inspection & Test Plan for Spring Hanger; Tie Rods; Slid A 08-Apr-2016 IFI 14-Apr-2016 T-T-P-00536 IFI 27-Apr-2016 27-Apr-2016 T-P-T-0159 MR 1383-01. Approved TPIT H
PIPING 2539-00-ITP-1383-01 Inspection & Test Plan for Spring Hanger; Sliding Plate 0 10-Nov-2016 IFP 11-Nov-2016 T-T-P-00947 IFP Transmitted TPVN C
PIPING 2539-00-ITP-1390-01 Inspection & Testing Plan for Miscellaneous (Sight Glass A 31-May-2016 IFI 07-Jun-2016 T-T-P-00637 IFR 20-Jun-2016 24-Jun-2016 C-NH3-0194/T-P-T-0226 MR 1390-01. Commented TPIT H
PIPING 2539-00-ITP-1390-01 Inspection & Testing Plan for Miscellaneous (Sight Glass 0 01-Nov-2016 IFP 01-Nov-2016 T-T-P-00921 IFP Transmitted TPVN C
PIPING 2539-00-ITP-1390-02 Inspection & Testing Plan for Miscellaneous (Interlock Va A 08-Nov-2016 IFI 11-Nov-2016 T-T-P-00948 IFR 24-Nov-2016 26-Nov-2016 T-P-T-0690 Approved TPVN H
PIPING 2539-00-ITP-1390-02 Inspection & Testing Plan for Piping Special Items (Inter B 17-Nov-2016 IFI 18-Nov-2016 T-T-P-00976 IFR 01-Dec-2016 21-Dec-2016 T-P-T-0842 Approved TPVN H
PIPING 2539-00-ITP-1390-02 Inspection & Testing Plan for PI Special Items (Interlock 0 06-Feb-2017 IFP 10-Feb-2017 T-T-P-01209 IFA 23-Feb-2017 27-Feb-2017 T-P-T-1362 Approved TPVN C
PIPING 2539-00-ITP-1390-03 Inspection & Testing Plan for Piping Special Items (Sluic A 08-Feb-2017 IFI 09-Feb-2017 T-T-P-01206 IFR 22-Feb-2017 27-Feb-2017 T-P-T-1361 Approved TPVN H
PIPING 2539-00-ITP-1390-03 Inspection & Testing Plan for Piping Special Items (Sluic 0 03-Mar-2017 IFP 07-Mar-2017 T-T-P-01270 IFA 20-Mar-2017 21-Mar-2017 T-P-T-1596 Approved TPVN C
PIPING 2539-00-ITP-1391-01 Inspection & Test Plan for Expansion Joint 0 26-Oct-2016 IFP 27-Oct-2016 T-T-P-00909 IFP Transmitted TPVN C
PIPING 2539-00-JSD-1300-01 Piping Class Summary & Piping Classes A 30-Oct-2015 IFR 30-Oct-2015 T-T-P-00049 IFR 12-Nov-2015 17-Nov-2015 C-NH3-0036/T-P-T-0014; C-NH3-0065/T-P-T-0035 Commented TPIT H
PIPING 2539-00-JSD-1300-01 Piping Class Summary & Piping Classes 0 17-Feb-2016 IFE 17-Feb-2016 T-T-P-00323 IFE No Comment TPIT H
PIPING 2539-00-JSD-1300-01 Piping Class Summary & Piping Classes 1 28-Mar-2017 IFC 27-Mar-2017 T-T-P-01308 IFA 09-Apr-2017 12-Apr-2017 T-P-T-1793 Approved TPIT C
PIPING 2539-00-JSD-1300-02 General Design Rules for Piping A 28-Oct-2015 IFR 28-Oct-2015 T-T-P-00037 IFR 10-Nov-2015 16-Nov-2015 T-P-T-0013 Approved TPIT H
PIPING 2539-00-JSD-1300-02 General Design Rules for Piping 0 16-Feb-2016 IFC 17-Feb-2016 T-T-P-00317 IFC Transmitted TPIT C
PIPING 2539-00-JSD-1300-08 Job Design Specification for Piping Stress Analysis A 28-Oct-2015 IFR 28-Oct-2015 T-T-P-00038 IFR 10-Nov-2015 16-Nov-2015 T-P-T-0013 Approved TPIT H
PIPING 2539-00-JSD-1300-08 Job Design Specification for Piping Stress Analysis 0 27-Nov-2015 IFE 27-Nov-2015 T-T-P-00118 IFE 17-Dec-2015 T-P-T-0037 Approved TPIT C
PIPING 2539-00-JSD-1300-09 Job Design Specification for Loads on Piperaks Structu A 30-Oct-2015 IFR 30-Oct-2015 T-T-P-00047 IFR 12-Nov-2015 No Comment TPIT H
PIPING 2539-00-JSD-1300-09 Job Design Specification for Loads on Piperaks Structu 0 11-Dec-2015 IFE 11-Dec-2015 T-T-P-00178 IFE Transmitted TPIT C
PIPING 2539-00-JSD-1300-10 Job Design Specification for Auxiliary Piping Supports A 29-Oct-2015 IFR 29-Oct-2015 T-T-P-00045 IFR 11-Nov-2015 16-Nov-2015 T-P-T-0013 Approved TPIT H
PIPING 2539-00-JSD-1300-10 Job Design Specification for Auxiliary Piping Supports 0 27-Nov-2015 IFE 27-Nov-2015 T-T-P-00118 IFE 17-Dec-2015 T-P-T-0037 Approved TPIT H
PIPING 2539-00-JSD-1300-10 Job Design Specification for Auxiliary Piping Supports 1 13-Jan-2016 IFE 14-Jan-2016 T-T-P-00233 Re-IFE Transmitted TPIT H
PIPING 2539-00-JSD-1300-10 Job Design Specification for Auxiliary Piping Supports 2 18-Mar-2016 IFE 18-Mar-2016 T-T-P-00454 Re-IFE Transmitted TPIT C
PIPING 2539-00-JSD-2200-01 Job Design Specification for Hot Insulation A 30-Oct-2015 IFR 30-Oct-2015 T-T-P-00048 IFR 12-Nov-2015 No Comment TPIT H
PIPING 2539-00-JSD-2200-01 Job Design Specification for Hot Insulation 0 23-May-2016 IFE 27-May-2016 T-T-P-00608 IFE No Comment TPIT H
PIPING 2539-00-JSD-2200-01 Job Specification for Design for Hot Insulation 1 07-Nov-2016 IFE 10-Nov-2016 T-T-P-00944 IFE Transmitted TPIT C
PIPING 2539-00-JSD-2200-02 Job Specification for Cold & Anti-Sweat Insulation A 16-Feb-2016 IFR 18-Feb-2016 T-T-P-00326 IFR 01-Mar-2016 No Comment TPIT H
PIPING 2539-00-JSD-2200-02 Job Specification for Cold & Anti-Sweat Insulation 0 26-May-2016 IFE 31-May-2016 T-T-P-00616 IFE Transmitted TPIT C
PIPING 2539-00-JSD-2300-01 Job Specification for Design for Painting A 30-Oct-2015 IFR 02-Nov-2015 T-T-P-00056 IFR 16-Nov-2015 17-Nov-2015 C-NH3-0033/T-P-T-0014; C-NH3-0066/T-P-T-0035 Commented TPIT H
PIPING 2539-00-JSD-2300-01 Job Specification for Design for Painting 0 06-Feb-2016 IFE 18-Feb-2016 T-T-P-00325 IFE No Comment TPIT H
PIPING 2539-00-JSD-2300-01 Job Specification for Design for Painting 1 11-Jan-2017 IFE 12-Jan-2017 T-T-P-01143 IFA 25-Jan-2017 06-Feb-2017 T-P-T-1185 Approved TPIT H
PIPING 2539-00-JSD-2300-01 Job Specification for Design for Painting 2 16-Mar-2017 IFE 20-Mar-2017 T-T-P-01297 IFA 02-Apr-2017 04-Apr-2017 T-P-T-1720 Approved TPIT C
PIPING 2539-00-JSD-2300-02 Job Design Specification for Underground Coatings A 23-Feb-2016 IFR 24-Feb-2016 T-T-P-00342 IFR 08-Mar-2016 No Comment TPIT H
PIPING 2539-00-JSD-2300-02 Job Design Specification for Underground Coatings 0 26-May-2016 IFE 31-May-2016 T-T-P-00616 IFE Transmitted TPIT C
PIPING 2539-00-JSS-1300-01 General Supply Specification for Piping Material A 13-Nov-2015 IFR 13-Nov-2015 T-T-P-00082 IFR 26-Nov-2015 17-Dec-2015 T-P-T-0037 Approved TPIT H
PIPING 2539-00-JSS-1300-01 General Supply Specification for Piping Material 0 25-Feb-2016 IFE 25-Feb-2016 T-T-P-00357 IFE Transmitted TPIT C
PIPING 2539-00-JSS-1310-01 Detailed Supply Specification for Valves (Gate - Globe - A 13-Nov-2015 IFR 13-Nov-2015 T-T-P-00082 IFR 26-Nov-2015 17-Dec-2015 T-P-T-0037 Approved TPIT H
PIPING 2539-00-JSS-1310-01 Detailed Supply Specification for Valves (Gate - Globe - 0 25-Feb-2016 IFE 25-Feb-2016 T-T-P-00357 IFE No Comment TPIT H
PIPING 2539-00-JSS-1310-01 Detailed Supply Specification for Valves (Gate; Globe; C 1 18-Jun-2016 IFE 24-Jun-2016 T-T-P-00666 IFE Transmitted TPIT C
PIPING 2539-00-JSS-1310-02 Detailed Supply Specification for Butterfly Valves A 13-Nov-2015 IFR 13-Nov-2015 T-T-P-00082 IFR 26-Nov-2015 17-Dec-2015 T-P-T-0037 Approved TPIT H
PIPING 2539-00-JSS-1310-02 Detailed Supply Specification for Butterfly Valves 0 25-Feb-2016 IFE 25-Feb-2016 T-T-P-00357 IFE Transmitted TPIT C
PIPING 2539-00-JSS-1310-04 Detailed Supply Specification for Ball Valves A 13-Nov-2015 IFR 13-Nov-2015 T-T-P-00082 IFR 26-Nov-2015 17-Dec-2015 T-P-T-0037 Approved TPIT H
PIPING 2539-00-JSS-1310-04 Detailed Supply Specification for Ball Valves 0 25-Feb-2016 IFE 25-Feb-2016 T-T-P-00357 IFE Transmitted TPIT C
PIPING 2539-00-JSS-1320-01 Detailed Supply Specification for Pipe A 13-Nov-2015 IFR 13-Nov-2015 T-T-P-00082 IFR 26-Nov-2015 17-Dec-2015 T-P-T-0037 Approved TPIT H
PIPING 2539-00-JSS-1320-01 Detailed Supply Specification for Pipe 0 25-Feb-2016 IFE 25-Feb-2016 T-T-P-00357 IFE Transmitted TPIT C
PIPING 2539-00-JSS-1328-01 Job Supply Specification for Glass Reinforced Plastic Pi A 13-Nov-2015 IFR 13-Nov-2015 T-T-P-00082 IFR 26-Nov-2015 17-Dec-2015 T-P-T-0037 Approved TPIT H
PIPING 2539-00-JSS-1328-01 Job Supply Specification for Glass Reinforced Plastic Pi 0 25-Feb-2016 IFE 25-Feb-2016 T-T-P-00357 IFE No Comment TPIT H
PIPING 2539-00-JSS-1328-01 Job Supply Specification for Glass Reinforced Plastic Pi 1 10-Jun-2016 IFE 24-Jun-2016 T-T-P-00666 IFE Transmitted TPIT C
PIPING 2539-00-JSS-1330-01 Detailed Supply Specification for Butt-Welding Fittings A 13-Nov-2015 IFR 13-Nov-2015 T-T-P-00082 IFR 26-Nov-2015 17-Dec-2015 T-P-T-0037 Approved TPIT H
PIPING 2539-00-JSS-1330-01 Detailed Supply Specification for Butt-Welding Fittings 0 25-Feb-2016 IFE 25-Feb-2016 T-T-P-00357 IFE Transmitted TPIT C
PIPING 2539-00-JSS-1340-01 Detailed Supply Specification for Forged Fittings A 13-Nov-2015 IFR 13-Nov-2015 T-T-P-00082 IFR 26-Nov-2015 17-Dec-2015 T-P-T-0037 Approved TPIT H
PIPING 2539-00-JSS-1340-01 Detailed Supply Specification for Forged Fittings 0 25-Feb-2016 IFE 25-Feb-2016 T-T-P-00357 IFE Transmitted TPIT C
PIPING 2539-00-JSS-1350-01 Detailed Supply Specification for Flanges A 13-Nov-2015 IFR 13-Nov-2015 T-T-P-00082 IFR 26-Nov-2015 17-Dec-2015 T-P-T-0037 Approved TPIT H
PIPING 2539-00-JSS-1350-01 Detailed Supply Specification for Flanges 0 25-Feb-2016 IFE 25-Feb-2016 T-T-P-00357 IFE Transmitted TPIT C
PIPING 2539-00-JSS-1360-01 Detailed Supply Specification for Gaskets A 13-Nov-2015 IFR 13-Nov-2015 T-T-P-00082 IFR 26-Nov-2015 17-Dec-2015 T-P-T-0037 Approved TPIT H
PIPING 2539-00-JSS-1360-01 Detailed Supply Specification for Gaskets 0 25-Feb-2016 IFE 25-Feb-2016 T-T-P-00357 IFE Transmitted TPIT C
PIPING 2539-00-JSS-1370-01 Detailed Supply Specification for Bolting A 13-Nov-2015 IFR 13-Nov-2015 T-T-P-00082 IFR 26-Nov-2015 17-Dec-2015 T-P-T-0037 Approved TPIT H
PIPING 2539-00-JSS-1370-01 Detailed Supply Specification for Bolting 0 25-Feb-2016 IFE 25-Feb-2016 T-T-P-00357 IFE Transmitted TPIT C
PIPING 2539-00-JSS-1382-01 Job Supply Specification for Polyurethane Piping Suppor A 05-Feb-2016 IFR 05-Feb-2016 T-T-P-00285 IFR 18-Feb-2016 No Comment TPIT H
PIPING 2539-00-JSS-1382-01 Job Supply Specification for Polyurethane Piping Suppor 0 04-Mar-2016 IFE 09-Mar-2016 T-T-P-00411 IFE Transmitted TPIT C
PIPING 2539-00-JSS-1383-01 General Supply Rules for Rod & Spring Hangers A 27-Nov-2015 IFR 30-Nov-2015 T-T-P-00132 IFR 14-Dec-2015 18-Dec-2015 T-P-T-0040 Approved TPIT H
PIPING 2539-00-JSS-1383-01 General Supply Rules for Rod & Spring Hangers 0 19-Jan-2016 IFE 19-Jan-2016 T-T-P-00246 IFE Transmitted TPIT C
PIPING 2539-00-JSS-1384-01 General Supply Rules for Sliding Plates A 27-Nov-2015 IFR 30-Nov-2015 T-T-P-00132 IFR 14-Dec-2015 18-Dec-2015 T-P-T-0040 Approved TPIT H
Page 22
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
PIPING 2539-00-JSS-1384-01 General Supply Rules for Sliding Plates 0 19-Jan-2016 IFE 19-Jan-2016 T-T-P-00246 IFE Transmitted TPIT C
PIPING 2539-00-JSS-1386-01 General Supply Rules for Dynamic Piping Supports A 27-Nov-2015 IFR 30-Nov-2015 T-T-P-00132 IFR 14-Dec-2015 18-Dec-2015 T-P-T-0040 Approved TPIT H
PIPING 2539-00-JSS-1386-01 General Supply Rules for Dynamic Piping Supports 0 19-Jan-2016 IFE 19-Jan-2016 T-T-P-00246 IFE Transmitted TPIT C
PIPING 2539-00-JSS-1391-01 Job Supply Specification for Metallic Expansion Joints A 27-Nov-2015 IFR 30-Nov-2015 T-T-P-00132 IFR 14-Dec-2015 18-Dec-2015 T-P-T-0040 Approved TPIT H
PIPING 2539-00-JSS-1391-01 Job Supply Specification for Metallic Expansion Joints 0 19-Jan-2016 IFE 19-Jan-2016 T-T-P-00246 IFE Transmitted TPIT C
PIPING 2539-00-JSS-1391-02 Job Supply Specification for Non Metallic Expansion Join A 27-Nov-2015 IFR 30-Nov-2015 T-T-P-00132 IFR 14-Dec-2015 18-Dec-2015 T-P-T-0040 Approved TPIT H
PIPING 2539-00-JSS-1391-02 Job Supply Specification for Non Metallic Expansion Join 0 19-Jan-2016 IFE 19-Jan-2016 T-T-P-00246 IFE Transmitted TPIT C
PIPING 2539-00-JSS-6300-02 Job Specification for Welding & NDE of Pressure Vesse A 30-Oct-2015 IFR 30-Oct-2015 T-T-P-00050 IFR 12-Nov-2015 No Comment TPIT H
PIPING 2539-00-JSS-6300-02 Job Specification for Welding & NDE of Pressure Vesse 0 25-Feb-2016 IFE 25-Feb-2016 T-T-P-00359 IFE Transmitted TPIT C
PIPING 2539-00-JSS-6300-04 Job Specification for Supply Positive Alloy Material Ident A 30-Oct-2015 IFR 30-Oct-2015 T-T-P-00050 IFR 12-Nov-2015 No Comment TPIT H
PIPING 2539-00-JSS-6300-04 Job Specification for Supply Positive Alloy Material Ident 0 25-Feb-2016 IFE 25-Feb-2016 T-T-P-00359 IFE Transmitted TPIT C
PIPING 2539-00-ML-1310-01 Technical Bid Evaluation for Carbon & Stainless Steel 0 09-Aug-2016 II 10-Aug-2016 T-T-P-00747 II Transmitted TPVN H
PIPING 2539-00-ML-1310-01 Technical Bid Evaluation for Carbon & Stainless Steel 1 15-Aug-2016 II 15-Aug-2016 T-T-P-00750 II No Comment TPVN H
PIPING 2539-00-ML-1310-01 Technical Bid Evaluation for Carbon & Stainless Steel 2 26-Oct-2016 II 26-Oct-2016 T-T-P-00908 II Transmitted TPVN C
PIPING 2539-00-ML-1310-11 Technical Bid Evaluation for Stainless Steel 347H & Allo 0 05-Aug-2016 II 05-Aug-2016 T-T-P-00741 II Transmitted TPVN C
PIPING 2539-00-ML-1320-01 Technical Bid Evaluation for Carbon; Galvanized & Stai 0 02-Aug-2016 II 03-Aug-2016 T-T-P-00734 II No Comment TPVN H
PIPING 2539-00-ML-1320-01 Technical Bid Evaluation for Carbon; Galvanized & Stai 1 12-Sep-2016 II 13-Sep-2016 T-T-P-00810 Re-II No Comment TPVN H
PIPING 2539-00-ML-1320-01 Technical Bid Evaluation for Carbon; Galvanized & Stai 2 26-Oct-2016 II 26-Oct-2016 T-T-P-00908 II Transmitted TPVN C
PIPING 2539-00-ML-1320-11 Technical Bid Evaluation for Stainless Steel 347H & All 0 27-May-2016 II 30-May-2016 T-T-P-00614 II Transmitted TPVN C
PIPING 2539-00-ML-1328-01 Technical Bid Evaluation for Plastic Piping 0 27-Sep-2016 II 27-Sep-2016 T-T-P-00841 II No Comment TPVN H
PIPING 2539-00-ML-1328-01 Technical Bid Evaluation for Plastic Piping 1 26-Oct-2016 II 26-Oct-2016 T-T-P-00908 II Transmitted TPVN C
PIPING 2539-00-ML-1328-02 Technical Bid Evaluation for C-PVC Piping 0 16-Dec-2016 II 16-Dec-2016 T-T-P-01056 II 29-Dec-2016 Transmitted TPVN C
PIPING 2539-00-ML-1330-01 Technical Bid Evaluation for Carbon; Galvanized & Stainl 0 22-Jul-2016 II 26-Jul-2016 T-T-P-00718 II Transmitted TPVN H
PIPING 2539-00-ML-1330-01 Technical Bid Evaluation for Carbon; Galvanized & Stainl 1 04-Nov-2016 II 07-Nov-2016 T-T-P-00934 II Transmitted TPVN C
PIPING 2539-00-ML-1330-11 Technical Bid Evaluation for Stainless Steel 347H & Allo 0 14-Jun-2016 II 16-Jun-2016 T-T-P-00650 II Transmitted TPVN H
PIPING 2539-00-ML-1330-11 Technical Bid Evaluation for Stainless Steel 347H & Allo 1 16-Jun-2016 II 17-Jun-2016 T-T-P-00653 II 29-Jul-2016 C-NH3-0234/T-P-T-0293 Commented TPVN C
PIPING 2539-00-ML-1383-01 Technical Bid Evaluation for Spring Hangers; Tie Rods; S 0 31-Oct-2016 II 31-Oct-2016 T-T-P-00918 II Transmitted TPVN C
PIPING 2539-00-ML-1390-01 Technical Bid Evaluation for Miscellaneous (Expansion Jo 0 24-Oct-2016 II 25-Oct-2016 T-T-P-00900 II Transmitted TPVN C
PIPING 2539-00-ML-1390-02 Technical Bid Evaluation for Piping Special Items (Interl 0 17-Jan-2017 II 18-Jan-2017 T-T-P-01161 II 31-Jan-2017 Transmitted TPVN C
PIPING 2539-00-ML-1390-03 Technical Bid Evaluation for Piping Special Items (Sluice 0 15-Mar-2017 II 16-Mar-2017 T-T-P-01291 II Transmitted TPVN C
PIPING 2539-00-ML-1390-04 Technical Bid Evaluation for Piping Special Items (Silenc 0 04-Apr-2017 II 04-Apr-2017 T-T-P-01335 II Transmitted TPVN C
PIPING 2539-00-ML-251 30% Model Review Report 0 07-Apr-2016 II 08-Apr-2016 T-T-P-00521 II No Comment TPIT H
PIPING 2539-00-ML-251 30% Model Review Report 1 23-Sep-2016 II 26-Sep-2016 T-T-P-00838 II Transmitted TPVN C
PIPING 2539-00-ML-252 60% Model Review Report 0 03-Oct-2016 II 03-Oct-2016 T-T-P-00849 II No Comment TPVN H
PIPING 2539-00-ML-252 60% Model Review Report 1 06-Dec-2016 II 06-Dec-2016 T-T-P-01017 II Transmitted TPVN C
PIPING 2539-00-ML-253 90% Model Review Report 0 12-Dec-2016 II 13-Dec-2016 T-T-P-01040 II 26-Dec-2016 Transmitted TPVN C
PIPING 2539-00-MR-1310-01 Material Requisition for Forged & Cast Valves A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 10-Mar-2016 C-NH3-0113/T-P-T-0090; C-NH3-0117/T-P-T-0099 MR 1310-01. Commented TPIT H
PIPING 2539-00-MR-1310-01 Material Requisition for Forged & Cast Valves 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP No Comment TPIT H
PIPING 2539-00-MR-1310-01 Material Requisition for Forged & Cast Valves 1 10-Feb-2017 IFP 10-Feb-2017 T-T-P-01212 IFA 24-Feb-2017 28-Feb-2017 T-P-T-1371 Approved TPVN H
PIPING 2539-00-MR-1310-01 Material Requisition for Forged & Cast Valves 2 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-MR-1310-11 Material Requisition for Stainless Steel 347H & Alloy St A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00367 IFR 10-Mar-2016 11-Mar-2016 C-NH3-0114/T-P-T-0092; C-NH3-0118/T-P-T-0100 MR 1310-11. Commented TPIT H
PIPING 2539-00-MR-1310-11 Material Requisition for Stainless Steel 347H & Alloy St 0 07-Oct-2016 IFP 11-Oct-2016 T-T-P-00870 IFP 02-Nov-2016 T-P-T-0514 MR 1310-11. Approved TPIT H
PIPING 2539-00-MR-1310-11 Material Requisition for Stainless Steel 347H & Alloy St 1 10-Feb-2017 IFP 13-Feb-2017 T-T-P-01215 IFA 26-Feb-2017 01-Mar-2017 T-P-T-1379 Approved TPVN C
PIPING 2539-00-MR-1320-01 Material Requisition for Seamless & Welded Pipes A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 10-Mar-2016 C-NH3-0113/T-P-T-0090; C-NH3-0117/T-P-T-0099 MR 1320-01. Commented TPIT H
PIPING 2539-00-MR-1320-01 Material Requisition for Seamless & Welded Pipes 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP No Comment TPIT H
PIPING 2539-00-MR-1320-01 Material Requisition for Seamless & Welded Pipes 1 10-Feb-2017 IFP 10-Feb-2017 T-T-P-01212 IFA 24-Feb-2017 28-Feb-2017 T-P-T-1371 Approved TPVN H
PIPING 2539-00-MR-1320-01 Material Requisition for Seamless & Welded Pipes 2 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-MR-1320-11 Material Requisition for Stainless Steel 347H & Alloy S A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00367 IFR 10-Mar-2016 11-Mar-2016 C-NH3-0114/T-P-T-0092; C-NH3-0118/T-P-T-0100 MR 1320-11. Commented TPIT H
PIPING 2539-00-MR-1320-11 Material Requisition for Stainless Steel 347H & Alloy S 0 07-Jul-2016 IFP 12-Jul-2016 T-T-P-00702 IFP No Comment TPIT H
PIPING 2539-00-MR-1320-11 Material Requisition for Stainless Steel 347H & Alloy S 1 07-Oct-2016 IFP 20-Oct-2016 T-T-P-00886 IFP No Comment TPIT H
PIPING 2539-00-MR-1320-11 Material Requisition for Stainless Steel 347H & Alloy S 2 10-Feb-2017 IFP 13-Feb-2017 T-T-P-01215 IFA 26-Feb-2017 01-Mar-2017 T-P-T-1379 Approved TPVN H
PIPING 2539-00-MR-1320-11 Material Requisition for Stainless Steel 347H & Alloy S 3 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-MR-1328-01 Material Requisition for Plastic Piping A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 10-Mar-2016 C-NH3-0113/T-P-T-0090; C-NH3-0117/T-P-T-0099 MR 1328-01. Commented TPIT H
PIPING 2539-00-MR-1328-01 Material Requisition for Plastic Piping 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP No Comment TPIT H
PIPING 2539-00-MR-1328-01 Material Requisition for Plastic Piping 1 20-Oct-2016 IFP 20-Oct-2016 T-T-P-00886 IFP Transmitted TPIT H
PIPING 2539-00-MR-1328-01 Material Requisition for Plastic Piping 2 25-Nov-2016 IFP 25-Nov-2016 T-T-P-00997 IFA 08-Dec-2016 No Comment TPIT H
PIPING 2539-00-MR-1328-01 Material Requisition for Plastic Piping 3 10-Feb-2017 IFP 10-Feb-2017 T-T-P-01212 IFA 24-Feb-2017 28-Feb-2017 T-P-T-1371 Approved TPVN H
PIPING 2539-00-MR-1328-01 Material Requisition for Plastic Piping 4 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-MR-1328-02 Material Requisition for PVC Piping 0 07-Oct-2016 IFP 20-Oct-2016 T-T-P-00886 IFP No Comment TPIT H
PIPING 2539-00-MR-1328-02 Material Requisition for PVC Piping 1 10-Feb-2017 IFP 10-Feb-2017 T-T-P-01212 IFA 24-Feb-2017 28-Feb-2017 T-P-T-1371 Approved TPVN H
PIPING 2539-00-MR-1328-02 Material Requisition for PVC Piping 2 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-MR-1330-01 Material Requisition for Forged & Buttwelding Fittings A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 10-Mar-2016 C-NH3-0113/T-P-T-0090; C-NH3-0117/T-P-T-0099 MR 1330-01. Commented TPIT H
PIPING 2539-00-MR-1330-01 Material Requisition for Forged & Buttwelding Fittings 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP No Comment TPIT H
PIPING 2539-00-MR-1330-01 Material Requisition for Forged & Buttwelding Fittings 1 10-Feb-2017 IFP 10-Feb-2017 T-T-P-01212 IFA 24-Feb-2017 28-Feb-2017 T-P-T-1371 Approved TPVN H
PIPING 2539-00-MR-1330-01 Material Requisition for Forged & Buttwelding Fittings 2 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-MR-1330-11 Material Requisition for Stainless Steel 347H & Alloy Ste A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00367 IFR 10-Mar-2016 11-Mar-2016 C-NH3-0114/T-P-T-0092; C-NH3-0118/T-P-T-0100 MR 1330-11. Commented TPIT H
PIPING 2539-00-MR-1330-11 Material Requisition for Stainless Steel 347H & Alloy Ste 0 07-Jul-2016 IFP 25-Jul-2016 T-T-P-00716 IFP No Comment TPVN H
PIPING 2539-00-MR-1330-11 Material Requisition for Stainless Steel 347H & Alloy Ste 1 07-Oct-2016 IFP 20-Oct-2016 T-T-P-00886 IFP No Comment TPIT H
PIPING 2539-00-MR-1330-11 Material Requisition for Stainless Steel 347H & Alloy Ste 2 10-Feb-2017 IFP 13-Feb-2017 T-T-P-01215 IFA 26-Feb-2017 01-Mar-2017 T-P-T-1379 Approved TPVN H
PIPING 2539-00-MR-1330-11 Material Requisition for Stainless Steel 347H & Alloy Ste 3 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-MR-1350-01 Material Requisition for Flanges Blinds And Drip Rings A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 10-Mar-2016 C-NH3-0113/T-P-T-0090; C-NH3-0117/T-P-T-0099 MR 1350-01. Commented TPIT H
PIPING 2539-00-MR-1350-01 Material Requisition for Flanges Blinds & Drip Rings 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP No Comment TPIT H
PIPING 2539-00-MR-1350-01 Material Requisition for Flanges Blinds & Drip Rings 1 10-Feb-2017 IFP 10-Feb-2017 T-T-P-01212 IFA 24-Feb-2017 28-Feb-2017 T-P-T-1371 Approved TPVN H
PIPING 2539-00-MR-1350-01 Material Requisition for Flanges Blinds & Drip Rings 2 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-MR-1350-11 Material Requisition for Stainless Steel 347H & Alloy St A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00367 IFR 10-Mar-2016 11-Mar-2016 C-NH3-0114/T-P-T-0092; C-NH3-0118/T-P-T-0100 MR 1350-11. Commented TPIT H
PIPING 2539-00-MR-1350-11 Material Requisition for Stainless Steel 347H & Alloy Ste 0 07-Jul-2016 IFP 25-Jul-2016 T-T-P-00716 IFP No Comment TPIT H
PIPING 2539-00-MR-1350-11 Material Requisition for Stainless Steel 347H & Alloy Ste 1 07-Oct-2016 IFP 20-Oct-2016 T-T-P-00886 IFP No Comment TPIT H
PIPING 2539-00-MR-1350-11 Material Requisition for Stainless Steel 347H & Alloy Ste 2 10-Feb-2017 IFP 13-Feb-2017 T-T-P-01215 IFA 26-Feb-2017 01-Mar-2017 T-P-T-1379 Approved TPVN C
PIPING 2539-00-MR-1360-01 Material Requisition for Gaskets A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 10-Mar-2016 C-NH3-0113/T-P-T-0090; C-NH3-0117/T-P-T-0099 MR 1360-01. Commented TPIT H
PIPING 2539-00-MR-1360-01 Material Requisition for Gaskets 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP No Comment TPIT H
PIPING 2539-00-MR-1360-01 Material Requisition for Gaskets 1 10-Feb-2017 IFP 10-Feb-2017 T-T-P-01212 IFA 24-Feb-2017 28-Feb-2017 T-P-T-1371 Approved TPVN H
PIPING 2539-00-MR-1360-01 Material Requisition for Gaskets 2 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-MR-1360-11 Material Requisition for Stainless Steel 347H & Alloy Ste A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00367 IFR 10-Mar-2016 11-Mar-2016 C-NH3-0114/T-P-T-0092; C-NH3-0118/T-P-T-0100 MR 1360-11. Commented TPIT H
PIPING 2539-00-MR-1360-11 Material Requisition for Stainless Steel 347H & Alloy Ste 0 07-Jul-2016 IFP 25-Jul-2016 T-T-P-00716 IFP No Comment TPIT H
PIPING 2539-00-MR-1360-11 Material Requisition for Stainless Steel 347H & Alloy Ste 1 07-Oct-2016 IFP 20-Oct-2016 T-T-P-00886 IFP No Comment TPIT H
PIPING 2539-00-MR-1360-11 Material Requisition for Stainless Steel 347H & Alloy Ste 2 10-Feb-2017 IFP 13-Feb-2017 T-T-P-01215 IFA 26-Feb-2017 01-Mar-2017 T-P-T-1379 Approved TPVN C
PIPING 2539-00-MR-1370-01 Material Requisition for Boltings A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 10-Mar-2016 C-NH3-0113/T-P-T-0090; C-NH3-0117/T-P-T-0099 MR 1370-01. Commented TPIT H
PIPING 2539-00-MR-1370-01 Material Requisition for Boltings 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP No Comment TPIT H
PIPING 2539-00-MR-1370-01 Material Requisition for Boltings 1 10-Feb-2017 IFP 10-Feb-2017 T-T-P-01212 IFA 24-Feb-2017 28-Feb-2017 T-P-T-1371 Approved TPVN H
PIPING 2539-00-MR-1370-01 Material Requisition for Boltings 2 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-MR-1370-11 Material Requisition for Stainless Steel 347H & Alloy Stee A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00367 IFR 10-Mar-2016 11-Mar-2016 C-NH3-0114/T-P-T-0092; C-NH3-0118/T-P-T-0100 MR 1370-11. Commented TPIT H
PIPING 2539-00-MR-1370-11 Material Requisition for Stainless Steel 347H & Alloy Stee 0 07-Jul-2016 IFP 25-Jul-2016 T-T-P-00716 IFP No Comment TPIT H
PIPING 2539-00-MR-1370-11 Material Requisition for Stainless Steel 347H & Alloy Stee 1 07-Oct-2016 IFP 20-Oct-2016 T-T-P-00886 IFP No Comment TPIT H
PIPING 2539-00-MR-1370-11 Material Requisition for Stainless Steel 347H & Alloy Stee 2 10-Feb-2017 IFP 13-Feb-2017 T-T-P-01215 IFA 26-Feb-2017 01-Mar-2017 T-P-T-1379 Approved TPVN H
PIPING 2539-00-MR-1370-11 Material Requisition for Stainless Steel 347H & Alloy Stee 3 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-MR-1383-01 Material Requisition for Spring Hanger; Tie Rods; Slidin A 08-Apr-2016 IFI 14-Apr-2016 T-T-P-00536 IFI 27-Apr-2016 27-Apr-2016 T-P-T-0159 MR 1383-01. Approved TPIT H
PIPING 2539-00-MR-1383-01 Material Requisition for Spring Hanger; Sliding Plates & 0 10-Nov-2016 IFP 11-Nov-2016 T-T-P-00947 IFP No Comment TPVN H
PIPING 2539-00-MR-1383-01 Material Requisition for Spring Hanger; Sliding Plates & 1 27-Feb-2017 IFP 01-Mar-2017 T-T-P-01255 IFA 14-Mar-2017 15-Mar-2017 T-P-T-1551 Approved TPVN C
PIPING 2539-00-MR-1390-01 Material Requisition for Miscellaneous (Sight Glass; Str A 31-May-2016 IFI 07-Jun-2016 T-T-P-00637 IFR 20-Jun-2016 MR 1390-01. Transmitted TPIT H
PIPING 2539-00-MR-1390-01 Material Requisition for Miscellaneous (Sight Glass; Str 0 01-Nov-2016 IFP 01-Nov-2016 T-T-P-00921 IFP Transmitted TPVN C
PIPING 2539-00-MR-1390-02 Material Requisition for Miscellaneous (Interlock Valves; A 08-Nov-2016 IFI 11-Nov-2016 T-T-P-00948 IFR 24-Nov-2016 26-Nov-2016 T-P-T-0690 Approved TPVN H
PIPING 2539-00-MR-1390-02 Material Requisition for Piping Special Items (Interlock B 17-Nov-2016 IFI 18-Nov-2016 T-T-P-00976 IFR 01-Dec-2016 21-Dec-2016 T-P-T-0842 Approved TPVN H
PIPING 2539-00-MR-1390-02 Material Requisition for Piping Special Items (Interlock V 0 06-Feb-2017 IFP 10-Feb-2017 T-T-P-01209 IFA 23-Feb-2017 27-Feb-2017 T-P-T-1362 Approved TPVN C
PIPING 2539-00-MR-1390-03 Material Requisition for Piping Special Items (Sluice Gat A 08-Feb-2017 IFI 09-Feb-2017 T-T-P-01206 IFR 22-Feb-2017 27-Feb-2017 T-P-T-1361 Approved TPVN H
PIPING 2539-00-MR-1390-03 Material Requisition for Piping Special Items (Sluice Gat 0 03-Mar-2017 IFP 07-Mar-2017 T-T-P-01270 IFA 20-Mar-2017 21-Mar-2017 T-P-T-1596 Approved TPVN C
PIPING 2539-00-MR-1391-01 Material Requisition for Expansion Joint 0 26-Oct-2016 IFP 27-Oct-2016 T-T-P-00909 IFP No Comment TPVN H
PIPING 2539-00-MR-1391-01 Material Requisition for Expansion Joint 1 06-Feb-2017 IFP 08-Feb-2017 T-T-P-01204 IFA 21-Feb-2017 27-Feb-2017 T-P-T-1360 Approved TPVN C
PIPING 2539-00-MS-1320-51 Construction Specification for Piping Prefabrication; Er A 19-Feb-2016 IFR 22-Feb-2016 T-T-P-00338 IFR 07-Mar-2016 Transmitted TPIT C
PIPING 2539-00-MTO-1300-11 Preliminary First Material Take Off A 24-Mar-2016 IFR 24-Mar-2016 T-T-P-00468 IFR 06-Apr-2016 28-Mar-2016 T-P-T-0127 Approved TPIT C
PIPING 2539-00-MTO-1300-12 Second Material Take Off A 27-Oct-2016 IFR 28-Oct-2016 T-T-P-00910 IFR 10-Nov-2016 26-Nov-2016 T-P-T-0689 Approved TPVN C
PIPING 2539-00-MTO-1300-13 Third Material Take Off 0 13-Feb-2017 II 13-Feb-2017 T-T-P-01216 II 26-Feb-2017 Transmitted TPVN C
PIPING 2539-00-MTO-1300-14 Fourth Material Take Off 0 28-Mar-2017 II 29-Mar-2017 T-T-P-01313 IFA 11-Apr-2017 12-Apr-2017 T-P-T-1811 Approved TPVN C
Page 23
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
PIPING 2539-00-MTO-1311-01 Piping Assembly Standard A 07-Jan-2016 IFR 08-Jan-2016 T-T-P-00218 IFR 21-Jan-2016 21-Jan-2016 T-P-T-0062 Approved TPIT H
PIPING 2539-00-MTO-1311-01 Piping Assembly Standard 0 25-Feb-2016 IFC 25-Feb-2016 T-T-P-00363 IFC Transmitted TPIT C
PIPING 2539-00-MTO-1311-02 Piping Material Destination & Ubication-Location Codes A 12-Jan-2016 IFR 13-Jan-2016 T-T-P-00232 IFR 25-Jan-2016 No Comment TPIT H
PIPING 2539-00-MTO-1311-02 Piping Material Destination & Ubication-Location Codes 0 24-Feb-2016 FIN 25-Feb-2016 T-T-P-00351 FIN Transmitted TPIT C
PIPING 2539-00-MTO-1311-04 Scope of Work & Working Instruction for First Piping Mate A 21-Jan-2016 IFR 22-Jan-2016 T-T-P-00258 IFR 04-Feb-2016 No Comment TPIT H
PIPING 2539-00-MTO-1311-04 Scope of Work & Working Instruction for First Piping Mate 0 17-Feb-2016 IFE 17-Feb-2016 T-T-P-00324 IFE Transmitted TPIT C
PIPING 2539-00-MTO-1313-01 Piping Support List And Bill of Materials 0 15-Feb-2017 IFC 16-Feb-2017 T-T-P-01225 IFA 01-Mar-2017 03-Mar-2017 T-P-T-1447 Approved TPVN H
PIPING 2539-00-MTO-1313-01 Piping Support List & Bill of Materials 1 04-Apr-2017 IFC 05-Apr-2017 T-T-P-01340 IFA 18-Apr-2017 28-Apr-2017 T-P-T-1917 Approved TPVN C
PIPING 2539-00-MTO-2221-01 Insulation Piping Summary 0 27-Mar-2017 IFC 29-Mar-2017 T-T-P-01313 IFA 11-Apr-2017 12-Apr-2017 T-P-T-1811 Approved TPIT C
PIPING 2539-00-MTO-2221-02 Insulation Piping Summary by Line 0 27-Mar-2017 IFC 29-Mar-2017 T-T-P-01313 IFA 11-Apr-2017 12-Apr-2017 T-P-T-1811 Approved TPIT C
PIPING 2539-00-MTO-2321-01 Painting Piping Summary 0 27-Mar-2017 IFC 29-Mar-2017 T-T-P-01313 IFA 11-Apr-2017 12-Apr-2017 T-P-T-1811 Approved TPIT C
PIPING 2539-00-MTO-2321-02 Painting Piping Summary by Line 0 27-Mar-2017 IFC 29-Mar-2017 T-T-P-01313 IFA 11-Apr-2017 12-Apr-2017 T-P-T-1811 Approved TPIT C
PIPING 2539-00-NM-1350-01 Piping Tie-Ins List A 11-Dec-2015 IFR 11-Dec-2015 T-T-P-00179 IFR 24-Dec-2015 No Comment TPIT H
PIPING 2539-00-NM-1350-01 Piping Tie-Ins List 0 21-Mar-2016 IFC 21-Mar-2016 T-T-P-00456 IFC No Comment TPIT H
PIPING 2539-00-NM-1350-01 Piping Tie-Ins List 1 22-Nov-2016 IFC 23-Nov-2016 T-T-P-00991 IFA 06-Dec-2016 07-Dec-2016 C-NH3-0448/T-P-T-0745; C-NH3-0586/T-P-T-1154 Commented TPVN H
PIPING 2539-00-NM-1350-01 Piping Tie-Ins List 2 14-Mar-2017 IFC 14-Mar-2017 T-T-P-01288 IFA 27-Mar-2017 11-Apr-2017 C-NH3-0736/T-P-T-1776 Commented TPVN H
PIPING 2539-00-NM-1350-01 Piping Tie-Ins List 3 14-Apr-2017 IFC 14-Apr-2017 T-T-P-01357 IFA 27-Apr-2017 02-May-2017 C-NH3-0785/T-P-T-1946; C-NH3-0826/T-P-T-2110 Commented TPVN H
PIPING 2539-00-NM-1350-01 Piping Tie-Ins List 4 24-May-2017 IFC 24-May-2017 T-T-P-01421 IFA 06-Jun-2017 Transmitted TPVN C
PIPING 2539-00-NM-1350-02 Isometric Sketches List Index 0 25-Jan-2017 IFC 26-Jan-2017 T-T-P-01189 IFA 09-Feb-2017 22-Feb-2017 T-P-T-1324 Approved TPVN H
PIPING 2539-00-NM-1350-02 Isometric Sketches List Index 1 28-Feb-2017 IFC 28-Feb-2017 T-T-P-01250 IFA 13-Mar-2017 15-Mar-2017 T-P-T-1552 Approved TPVN H
PIPING 2539-00-NM-1350-02 Isometric Sketches List Index 2 15-Mar-2017 IFC 15-Mar-2017 T-T-P-01290 IFA 28-Mar-2017 04-Apr-2017 T-P-T-1719 Approved TPVN H
PIPING 2539-00-NM-1350-02 Isometric Sketches List Index 3 30-Mar-2017 IFC 04-Apr-2017 T-T-P-01336 IFA 17-Apr-2017 28-Apr-2017 T-P-T-1916 Approved TPVN C
PIPING 2539-00-NM-1350-03 Isometric Sketches List 0 25-Jan-2017 IFC 26-Jan-2017 T-T-P-01189 IFA 09-Feb-2017 22-Feb-2017 T-P-T-1324 Approved TPVN H
PIPING 2539-00-NM-1350-03 Isometric Sketches List 1 28-Feb-2017 IFC 28-Feb-2017 T-T-P-01250 IFA 13-Mar-2017 15-Mar-2017 T-P-T-1552 Approved TPVN H
PIPING 2539-00-NM-1350-03 Isometric Sketches List 2 15-Mar-2017 IFC 15-Mar-2017 T-T-P-01290 IFA 28-Mar-2017 04-Apr-2017 T-P-T-1719 Approved TPVN H
PIPING 2539-00-NM-1350-03 Isometric Sketches List 3 30-Mar-2017 IFC 04-Apr-2017 T-T-P-01336 IFA 17-Apr-2017 28-Apr-2017 T-P-T-1916 Approved TPVN C
PIPING 2539-00-NM-1350-21 Existing Equipment - Gusset for Piping Supports & Pipin 0 03-Nov-2016 II 04-Nov-2016 T-T-P-00930 II Transmitted TPVN C
PIPING 2539-00-NM-1370-00 Computer Stress Analysis Calculation List All Unit 0 27-Mar-2017 IFC 31-Mar-2017 T-T-P-01323 IFA 13-Apr-2017 12-Apr-2017 T-P-T-1808 Approved TPVN C
PIPING 2539-00-NM-1370-01 Critical Line List A 15-Nov-2016 IDD 15-Nov-2016 T-T-P-00962 IFR 28-Nov-2016 26-Nov-2016 C-NH3-0427/T-P-T-0691; C-NH3-0551/T-P-T-1032; C-N Commented TPVN H
PIPING 2539-00-NM-1370-01 Critical Line List 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01326 IFA 13-Apr-2017 14-Apr-2017 T-P-T-1836 Approved TPVN C
PIPING 2539-00-NM-2200-01 Insulation & Painting Equipment List 0 29-Mar-2017 IFC 07-Apr-2017 T-T-P-01345 IFA 20-Apr-2017 26-Apr-2017 T-P-T-1879 Approved TPVN C
PIPING 2539-00-NM-2300-01 Insulation & Painting Line List A 04-Feb-2016 IFR 08-Feb-2016 T-T-P-00296 IFR 22-Feb-2016 No Comment TPIT H
PIPING 2539-00-NM-2300-01 Insulation & Painting Line List B 26-Apr-2016 IDD1 29-Apr-2016 T-T-P-00560 II 19-May-2016 C-NH3-0154/T-P-T-0170 Commented TPIT H
PIPING 2539-00-NM-2300-01 Insulation & Painting Line List C 09-Nov-2016 IDD2 09-Nov-2016 T-T-P-00945 IFR 23-Nov-2016 01-Dec-2016 T-P-T-0700 Approved TPIT H
PIPING 2539-00-NM-2300-01 Insulation & Painting Line List 0 03-Jan-2017 IFC 05-Jan-2017 T-T-P-01115 IFA 18-Jan-2017 23-Jan-2017 T-P-T-1142 Approved TPIT H
PIPING 2539-00-NM-2300-01 Insulation & Painting Line List 1 27-Apr-2017 IFC 28-Apr-2017 T-T-P-01395 IFA 11-May-2017 Transmitted TPIT C
PIPING 2539-00-SP-1328-01 Rubber Expansion Joint Data Sheet for SHX-001K; SH A 31-May-2016 IFI 01-Jun-2016 T-T-P-00621 IFR 14-Jun-2016 24-Jun-2016 T-P-T-0229 Approved TPVN H
PIPING 2539-00-SP-1328-01 Rubber Expansion Joint Data Sheet for SHX-001K; SH 0 26-Oct-2016 IFP 27-Oct-2016 T-T-P-00909 IFP No Comment TPVN H
PIPING 2539-00-SP-1328-01 Rubber Expansion Joint Data Sheet 1 06-Feb-2017 IFP 08-Feb-2017 T-T-P-01204 IFA 21-Feb-2017 27-Feb-2017 T-P-T-1360 Approved TPVN C
PIPING 2539-00-SP-1382-02 Data Sheet for Polyuretane Piping Supports 0 10-Nov-2016 IFP 11-Nov-2016 T-T-P-00947 IFP No Comment TPVN H
PIPING 2539-00-SP-1382-02 Data Sheet for Polyuretane Piping Supports 1 27-Feb-2017 IFP 01-Mar-2017 T-T-P-01255 IFA 14-Mar-2017 15-Mar-2017 T-P-T-1551 Approved TPVN C
PIPING 2539-00-SP-1383-01 Particular Technical Specification for Spring Hanger; Tie A 08-Apr-2016 IFI 14-Apr-2016 T-T-P-00536 IFI 27-Apr-2016 27-Apr-2016 T-P-T-0159 MR 1383-01. Approved TPIT H
PIPING 2539-00-SP-1383-01 Particular Technical Specification for Spring Hanger; Sl 0 10-Nov-2016 IFP 11-Nov-2016 T-T-P-00947 IFP No Comment TPVN H
PIPING 2539-00-SP-1383-01 Particular Technical Specification for Tie Rod & Spring 1 20-Jan-2017 IFP 20-Jan-2017 T-T-P-01174 IFA 02-Feb-2017 14-Feb-2017 T-P-T-1250 Approved TPVN C
PIPING 2539-00-SP-1383-03 Tie-Rod Hanger Support Data Sheets A 08-Apr-2016 IFI 14-Apr-2016 T-T-P-00536 IFI 27-Apr-2016 27-Apr-2016 T-P-T-0159 MR 1383-01. Approved TPIT C
PIPING 2539-00-SP-1383-04 Variable Spring Support Data Sheets A 08-Apr-2016 IFI 14-Apr-2016 T-T-P-00536 IFI 27-Apr-2016 27-Apr-2016 T-P-T-0159 MR 1383-01. Approved TPIT H
PIPING 2539-00-SP-1383-04 Variable Spring Support Data Sheets 0 10-Nov-2016 IFP 11-Nov-2016 T-T-P-00947 IFP No Comment TPVN H
PIPING 2539-00-SP-1383-04 Variable Spring Support Data Sheets 1 27-Feb-2017 IFP 01-Mar-2017 T-T-P-01255 IFA 14-Mar-2017 15-Mar-2017 T-P-T-1551 Approved TPVN C
PIPING 2539-00-SP-1383-05 Costant Spring Support Data Sheets A 08-Apr-2016 IFI 14-Apr-2016 T-T-P-00536 IFI 27-Apr-2016 27-Apr-2016 T-P-T-0159 MR 1383-01. Approved TPIT C
PIPING 2539-00-SP-1384-02 Data Sheet for Antifriction Sliding Plates Support 0 10-Nov-2016 IFP 11-Nov-2016 T-T-P-00947 IFP No Comment TPVN H
PIPING 2539-00-SP-1384-02 Data Sheet for Antifriction Sliding Plates Support 1 27-Feb-2017 IFP 01-Mar-2017 T-T-P-01255 IFA 14-Mar-2017 15-Mar-2017 T-P-T-1551 Approved TPVN C
PIPING 2539-00-SP-1386-02 Rigid Struts Support Datasheet A 08-Apr-2016 IFI 14-Apr-2016 T-T-P-00536 IFI 27-Apr-2016 27-Apr-2016 T-P-T-0159 MR 1383-01. Approved TPIT C
PIPING 2539-00-SP-1390-01 Miscellaneous Data Sheet (Sight Glass; Strainer & Samp A 31-May-2016 IFI 07-Jun-2016 T-T-P-00637 IFR 20-Jun-2016 24-Jun-2016 C-NH3-0194/T-P-T-0226 MR 1390-01. Commented TPIT H
PIPING 2539-00-SP-1390-01 Miscellaneous Data Sheet (Sight Glass; Strainer & Samp 0 28-Oct-2016 IFP 01-Nov-2016 T-T-P-00921 IFP Transmitted TPVN C
PIPING 2539-00-SP-1390-02 Miscellaneous Data Sheet (Interlock Valves / Strainers / A 08-Nov-2016 IFI 11-Nov-2016 T-T-P-00948 IFR 24-Nov-2016 26-Nov-2016 T-P-T-0690 Approved TPVN H
PIPING 2539-00-SP-1390-02 Piping Special Items Data Sheet (Interlock Valves / Stra B 17-Nov-2016 IFI 18-Nov-2016 T-T-P-00976 IFR 01-Dec-2016 21-Dec-2016 T-P-T-0842 Approved TPVN H
PIPING 2539-00-SP-1390-02 Piping Special Items Datasheet (Interlock Valves; Y-Strai 0 06-Feb-2017 IFP 10-Feb-2017 T-T-P-01209 IFA 23-Feb-2017 27-Feb-2017 T-P-T-1362 Approved TPVN C
PIPING 2539-00-SP-1390-03 Piping Special Items Data Sheet Sluice Gate Valve A 08-Feb-2017 IFI 09-Feb-2017 T-T-P-01206 IFR 22-Feb-2017 27-Feb-2017 T-P-T-1361 Approved TPVN H
PIPING 2539-00-SP-1390-03 Piping Special Items Data Sheet Sluice Gate Valve 0 03-Mar-2017 IFP 07-Mar-2017 T-T-P-01270 IFA 20-Mar-2017 21-Mar-2017 T-P-T-1596 Approved TPVN C
PIPING 2539-00-SP-1391-01 Particular Technical Specification for Expansion Joints 0 26-Oct-2016 IFP 27-Oct-2016 T-T-P-00909 IFP Transmitted TPVN C
PIPING 2539-00-SR-1310-01 Scope of Supply for Forged & Cast Valves A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 10-Mar-2016 C-NH3-0113/T-P-T-0090; C-NH3-0117/T-P-T-0099 MR 1310-01. Commented TPIT H
PIPING 2539-00-SR-1310-01 Scope of Supply for Forged & Cast Valves 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP No Comment TPIT H
PIPING 2539-00-SR-1310-01 Scope of Supply for Forged & Cast Valves 1 10-Feb-2017 IFP 10-Feb-2017 T-T-P-01212 IFA 24-Feb-2017 28-Feb-2017 T-P-T-1371 Approved TPVN H
PIPING 2539-00-SR-1310-01 Scope of Supply for Forged & Cast Valves 2 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-SR-1310-11 Scope of Supply for Stainless Steel 347H & Alloy Steel A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00367 IFR 10-Mar-2016 11-Mar-2016 C-NH3-0114/T-P-T-0092; C-NH3-0118/T-P-T-0100 MR 1310-11. Commented TPIT H
PIPING 2539-00-SR-1310-11 Scope of Supply for Stainless Steel 347H & Alloy Steel 0 07-Oct-2016 IFP 11-Oct-2016 T-T-P-00870 IFP 02-Nov-2016 T-P-T-0514 MR 1310-11. Approved TPIT H
PIPING 2539-00-SR-1310-11 Scope of Supply for Stainless Steel 347H & Alloy Steel 1 10-Feb-2017 IFP 13-Feb-2017 T-T-P-01215 IFA 26-Feb-2017 01-Mar-2017 T-P-T-1379 Approved TPVN C
PIPING 2539-00-SR-1320-01 Scope of Supply for Seamless & Welded Pipes A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 10-Mar-2016 C-NH3-0113/T-P-T-0090; C-NH3-0117/T-P-T-0099 MR 1320-01. Commented TPIT H
PIPING 2539-00-SR-1320-01 Scope of Supply for Seamless & Welded Pipes 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP No Comment TPIT H
PIPING 2539-00-SR-1320-01 Scope of Supply for Seamless & Welded Pipes 1 10-Feb-2017 IFP 10-Feb-2017 T-T-P-01212 IFA 24-Feb-2017 28-Feb-2017 T-P-T-1371 Approved TPVN H
PIPING 2539-00-SR-1320-01 Scope of Supply for Seamless & Welded Pipes 2 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-SR-1320-11 Scope of Supply for Stainless Steel 347H & Alloy Steel A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00367 IFR 10-Mar-2016 11-Mar-2016 C-NH3-0114/T-P-T-0092; C-NH3-0118/T-P-T-0100 MR 1320-11. Commented TPIT H
PIPING 2539-00-SR-1320-11 Scope of Supply for Stainless Steel 347H & Alloy Steel 0 07-Jul-2016 IFP 12-Jul-2016 T-T-P-00702 IFP No Comment TPIT H
PIPING 2539-00-SR-1320-11 Scope of Supply for Stainless Steel 347H & Alloy Steel 1 07-Oct-2016 IFP 20-Oct-2016 T-T-P-00886 IFP No Comment TPIT H
PIPING 2539-00-SR-1320-11 Scope of Supply for Stainless Steel 347H & Alloy Steel 2 10-Feb-2017 IFP 13-Feb-2017 T-T-P-01215 IFA 26-Feb-2017 01-Mar-2017 T-P-T-1379 Approved TPVN H
PIPING 2539-00-SR-1320-11 Scope of Supply for Stainless Steel 347H & Alloy Steel 3 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-SR-1328-01 Scope of Supply for Plastic Piping A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 10-Mar-2016 C-NH3-0113/T-P-T-0090; C-NH3-0117/T-P-T-0099 MR 1328-01. Commented TPIT H
PIPING 2539-00-SR-1328-01 Scope of Supply for Plastic Piping 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP No Comment TPIT H
PIPING 2539-00-SR-1328-01 Scope of Supply for Plastic Piping 1 20-Oct-2016 IFP 20-Oct-2016 T-T-P-00886 IFP Transmitted TPIT H
PIPING 2539-00-SR-1328-01 Scope of Supply for Plastic Piping 2 25-Nov-2016 IFP 25-Nov-2016 T-T-P-00997 IFA 08-Dec-2016 No Comment TPIT H
PIPING 2539-00-SR-1328-01 Scope of Supply for Plastic Piping 3 10-Feb-2017 IFP 10-Feb-2017 T-T-P-01212 IFA 24-Feb-2017 28-Feb-2017 T-P-T-1371 Approved TPVN H
PIPING 2539-00-SR-1328-01 Scope of Supply for Plastic Piping 4 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-SR-1328-02 Scope of Supply for PVC Piping 0 07-Oct-2016 IFP 20-Oct-2016 T-T-P-00886 IFP No Comment TPIT H
PIPING 2539-00-SR-1328-02 Scope of Supply for PVC Piping 1 10-Feb-2017 IFP 10-Feb-2017 T-T-P-01212 IFA 24-Feb-2017 28-Feb-2017 T-P-T-1371 Approved TPVN H
PIPING 2539-00-SR-1328-02 Scope of Supply for PVC Piping 2 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-SR-1330-01 Scope of Supply for Forged & Buttwelding Fittings A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 10-Mar-2016 C-NH3-0113/T-P-T-0090; C-NH3-0117/T-P-T-0099 MR 1330-01. Commented TPIT H
PIPING 2539-00-SR-1330-01 Scope of Supply for Forged & Buttwelding Fittings 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP No Comment TPIT H
PIPING 2539-00-SR-1330-01 Scope of Supply for Forged & Buttwelding Fittings 1 10-Feb-2017 IFP 10-Feb-2017 T-T-P-01212 IFA 24-Feb-2017 28-Feb-2017 T-P-T-1371 Approved TPVN H
PIPING 2539-00-SR-1330-01 Scope of Supply for Forged & Buttwelding Fittings 2 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-SR-1330-11 Scope of Supply for Stainless Steel 347H & Alloy Steel F A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00367 IFR 10-Mar-2016 11-Mar-2016 C-NH3-0114/T-P-T-0092; C-NH3-0118/T-P-T-0100 MR 1330-11. Commented TPIT H
PIPING 2539-00-SR-1330-11 Scope of Supply for Stainless Steel 347H & Alloy Steel F 0 07-Jul-2016 IFP 25-Jul-2016 T-T-P-00716 IFP No Comment TPVN H
PIPING 2539-00-SR-1330-11 Scope of Supply for Stainless Steel 347H & Alloy Steel F 1 07-Oct-2016 IFP 20-Oct-2016 T-T-P-00886 IFP No Comment TPIT H
PIPING 2539-00-SR-1330-11 Scope of Supply for Stainless Steel 347H & Alloy Steel F 2 10-Feb-2017 IFP 13-Feb-2017 T-T-P-01215 IFA 26-Feb-2017 01-Mar-2017 T-P-T-1379 Approved TPVN H
PIPING 2539-00-SR-1330-11 Scope of Supply for Stainless Steel 347H & Alloy Steel F 3 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-SR-1350-01 Scope of Supply for Flanges Blinds And Drip Rings A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 10-Mar-2016 C-NH3-0113/T-P-T-0090; C-NH3-0117/T-P-T-0099 MR 1350-01. Commented TPIT H
PIPING 2539-00-SR-1350-01 Scope of Supply for Flanges Blinds & Drip Rings 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP No Comment TPIT H
PIPING 2539-00-SR-1350-01 Scope of Supply for Flanges Blinds & Drip Rings 1 10-Feb-2017 IFP 10-Feb-2017 T-T-P-01212 IFA 24-Feb-2017 28-Feb-2017 T-P-T-1371 Approved TPVN H
PIPING 2539-00-SR-1350-01 Scope of Supply for Flanges Blinds & Drip Rings 2 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-SR-1350-11 Scope of Supply for Stainless Steel 347H & Alloy Steel A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00367 IFR 10-Mar-2016 11-Mar-2016 C-NH3-0114/T-P-T-0092; C-NH3-0118/T-P-T-0100 MR 1350-11. Commented TPIT H
PIPING 2539-00-SR-1350-11 Scope of Supply for Stainless Steel 347H & Alloy Steel F 0 07-Jul-2016 IFP 25-Jul-2016 T-T-P-00716 IFP No Comment TPIT H
PIPING 2539-00-SR-1350-11 Scope of Supply for Stainless Steel 347H & Alloy Steel F 1 07-Oct-2016 IFP 20-Oct-2016 T-T-P-00886 IFP No Comment TPIT H
PIPING 2539-00-SR-1350-11 Scope of Supply for Stainless Steel 347H & Alloy Steel F 2 10-Feb-2017 IFP 13-Feb-2017 T-T-P-01215 IFA 26-Feb-2017 01-Mar-2017 T-P-T-1379 Approved TPVN C
PIPING 2539-00-SR-1360-01 Scope of Supply for Gaskets A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 10-Mar-2016 C-NH3-0113/T-P-T-0090; C-NH3-0117/T-P-T-0099 MR 1360-01. Commented TPIT H
PIPING 2539-00-SR-1360-01 Scope of Supply for Gaskets 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP No Comment TPIT H
PIPING 2539-00-SR-1360-01 Scope of Supply for Gaskets 1 10-Feb-2017 IFP 10-Feb-2017 T-T-P-01212 IFA 24-Feb-2017 28-Feb-2017 T-P-T-1371 Approved TPVN H
PIPING 2539-00-SR-1360-01 Scope of Supply for Gaskets 2 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-SR-1360-11 Scope of Supply for Stainless Steel 347H & Alloy Steel A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00367 IFR 10-Mar-2016 11-Mar-2016 C-NH3-0114/T-P-T-0092; C-NH3-0118/T-P-T-0100 MR 1360-11. Commented TPIT H
PIPING 2539-00-SR-1360-11 Scope of Supply for Stainless Steel 347H & Alloy Steel 0 07-Jul-2016 IFP 25-Jul-2016 T-T-P-00716 IFP No Comment TPIT H
PIPING 2539-00-SR-1360-11 Scope of Supply for Stainless Steel 347H & Alloy Steel 1 07-Oct-2016 IFP 20-Oct-2016 T-T-P-00886 IFP No Comment TPIT H
PIPING 2539-00-SR-1360-11 Scope of Supply for Stainless Steel 347H & Alloy Steel 2 10-Feb-2017 IFP 13-Feb-2017 T-T-P-01215 IFA 26-Feb-2017 01-Mar-2017 T-P-T-1379 Approved TPVN C
PIPING 2539-00-SR-1370-01 Scope of Supply for Boltings A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00366 IFR 10-Mar-2016 10-Mar-2016 C-NH3-0113/T-P-T-0090; C-NH3-0117/T-P-T-0099 MR 1370-01. Commented TPIT H
PIPING 2539-00-SR-1370-01 Scope of Supply for Boltings 0 07-Oct-2016 IFP 19-Oct-2016 T-T-P-00882 IFP No Comment TPIT H
Page 24
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
PIPING 2539-00-SR-1370-01 Scope of Supply for Boltings 1 10-Feb-2017 IFP 10-Feb-2017 T-T-P-01212 IFA 24-Feb-2017 28-Feb-2017 T-P-T-1371 Approved TPVN H
PIPING 2539-00-SR-1370-01 Scope of Supply for Boltings 2 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-SR-1370-11 Scope of Supply for Stainless Steel 347H & Alloy Steel B A 25-Feb-2016 IFI 26-Feb-2016 T-T-P-00367 IFR 10-Mar-2016 11-Mar-2016 C-NH3-0114/T-P-T-0092; C-NH3-0118/T-P-T-0100 MR 1370-11. Commented TPIT H
PIPING 2539-00-SR-1370-11 Scope of Supply for Stainless Steel 347H & Alloy Steel B 0 07-Jul-2016 IFP 25-Jul-2016 T-T-P-00716 IFP No Comment TPIT H
PIPING 2539-00-SR-1370-11 Scope of Supply for Stainless Steel 347H & Alloy Steel B 1 07-Oct-2016 IFP 20-Oct-2016 T-T-P-00886 IFP No Comment TPIT H
PIPING 2539-00-SR-1370-11 Scope of Supply for Stainless Steel 347H & Alloy Steel B 2 10-Feb-2017 IFP 13-Feb-2017 T-T-P-01215 IFA 26-Feb-2017 01-Mar-2017 T-P-T-1379 Approved TPVN H
PIPING 2539-00-SR-1370-11 Scope of Supply for Stainless Steel 347H & Alloy Steel B 3 04-Apr-2017 IFP 05-Apr-2017 T-T-P-01341 IFA 19-Apr-2017 26-Apr-2017 T-P-T-1878 Approved TPVN C
PIPING 2539-00-SR-1383-01 Scope of Supply for Spring Hanger; Tie Rods; Sliding Pla A 08-Apr-2016 IFI 14-Apr-2016 T-T-P-00536 IFI 27-Apr-2016 27-Apr-2016 T-P-T-0159 MR 1383-01. Approved TPIT H
PIPING 2539-00-SR-1383-01 Scope of Supply for Spring Hanger; Sliding Plates & Cr 0 10-Nov-2016 IFP 11-Nov-2016 T-T-P-00947 IFP No Comment TPVN H
PIPING 2539-00-SR-1383-01 Scope of Supply for Spring Hanger; Sliding Plates & Cr 1 27-Feb-2017 IFP 01-Mar-2017 T-T-P-01255 IFA 14-Mar-2017 15-Mar-2017 T-P-T-1551 Approved TPVN C
PIPING 2539-00-SR-1390-01 Scope of Supply for Miscellaneous (Sight Glass; Straine A 31-May-2016 IFI 07-Jun-2016 T-T-P-00637 IFR 20-Jun-2016 24-Jun-2016 C-NH3-0194/T-P-T-0226 MR 1390-01. Commented TPIT H
PIPING 2539-00-SR-1390-01 Scope of Supply for Miscellaneous (Sight Glass; Straine 0 01-Nov-2016 IFP 01-Nov-2016 T-T-P-00921 IFP Transmitted TPVN C
PIPING 2539-00-SR-1390-02 Scope of Supply for Miscellaneous (Interlock Valves; Y-S A 08-Nov-2016 IFI 11-Nov-2016 T-T-P-00948 IFR 24-Nov-2016 26-Nov-2016 T-P-T-0690 Approved TPVN H
PIPING 2539-00-SR-1390-02 Scope of Supply for Piping Special Items (Interlock Valv B 17-Nov-2016 IFI 18-Nov-2016 T-T-P-00976 IFR 01-Dec-2016 21-Dec-2016 T-P-T-0842 Approved TPVN H
PIPING 2539-00-SR-1390-02 Scope of Supply for Piping Special Items (Interlock Valve 0 06-Feb-2017 IFP 10-Feb-2017 T-T-P-01209 IFA 23-Feb-2017 27-Feb-2017 T-P-T-1362 Approved TPVN C
PIPING 2539-00-SR-1390-03 Scope of Supply for Piping Special Items (Sluice Gate Va A 08-Feb-2017 IFI 09-Feb-2017 T-T-P-01206 IFR 22-Feb-2017 27-Feb-2017 T-P-T-1361 Approved TPVN H
PIPING 2539-00-SR-1390-03 Scope of Supply for Piping Special Items (Sluice Gate Va 0 03-Mar-2017 IFP 07-Mar-2017 T-T-P-01270 IFA 20-Mar-2017 21-Mar-2017 T-P-T-1596 Approved TPVN C
PIPING 2539-00-SR-1391-01 Scope of Supply for Expansion Joint 0 26-Oct-2016 IFP 27-Oct-2016 T-T-P-00909 IFP No Comment TPVN H
PIPING 2539-00-SR-1391-01 Scope of Supply for Expansion Joint 1 06-Feb-2017 IFP 08-Feb-2017 T-T-P-01204 IFA 21-Feb-2017 27-Feb-2017 T-P-T-1360 Approved TPVN C
PIPING 2539-00-STC-1391-00 Standard Auxiliary Piping Supports Collection Welded Su A 13-Jan-2016 IFR 14-Jan-2016 T-T-P-00234 IFR 27-Jan-2016 27-Jan-2016 T-P-T-0067 Approved TPIT H
PIPING 2539-00-STC-1391-00 Standard Auxiliary Piping Supports Collection Welded Su 0 18-Mar-2016 IFC 18-Mar-2016 T-T-P-00449 IFC No Comment TPIT H
PIPING 2539-00-STC-1391-00 Standard Auxiliary Piping Supports Collection Welded Su 1 02-Nov-2016 IFC 04-Nov-2016 T-T-P-00929 IFC 18-Nov-2016 T-P-T-0640 Approved TPVN H
PIPING 2539-00-STC-1391-00 Standard Auxiliary Piping Supports Collection Welded Su 2 03-Apr-2017 IFC 03-Apr-2017 T-T-P-01331 IFA 16-Apr-2017 14-Apr-2017 T-P-T-1837 Approved TPVN C
PIPING 2539-00-STC-1392-00 Standard Auxiliary Piping Supports Collection Clamped A 13-Jan-2016 IFR 14-Jan-2016 T-T-P-00234 IFR 27-Jan-2016 27-Jan-2016 T-P-T-0067 Approved TPIT H
PIPING 2539-00-STC-1392-00 Standard Auxiliary Piping Supports Collection Clamped 0 18-Mar-2016 IFC 18-Mar-2016 T-T-P-00449 IFC No Comment TPIT H
PIPING 2539-00-STC-1392-00 Standard Auxiliary Piping Supports Collection Clamped 1 02-Nov-2016 IFC 04-Nov-2016 T-T-P-00929 IFC 18-Nov-2016 T-P-T-0640 Approved TPVN H
PIPING 2539-00-STC-1392-00 Standard Auxiliary Piping Supports Collection Clamped 2 03-Apr-2017 IFC 03-Apr-2017 T-T-P-01331 IFA 16-Apr-2017 14-Apr-2017 T-P-T-1837 Approved TPVN C
PIPING 2539-00-STC-1393-00 Standard Auxiliary Piping Supports Collection Hanger Su A 13-Jan-2016 IFR 14-Jan-2016 T-T-P-00234 IFR 27-Jan-2016 27-Jan-2016 T-P-T-0067 Approved TPIT H
PIPING 2539-00-STC-1393-00 Standard Auxiliary Piping Supports Collection Hanger Su 0 18-Mar-2016 IFC 18-Mar-2016 T-T-P-00449 IFC No Comment TPIT H
PIPING 2539-00-STC-1393-00 Standard Auxiliary Piping Supports Collection Hanger Su 1 02-Nov-2016 IFC 04-Nov-2016 T-T-P-00929 IFC 18-Nov-2016 T-P-T-0640 Approved TPVN H
PIPING 2539-00-STC-1393-00 Standard Auxiliary Piping Supports Collection Hanger Su 2 03-Apr-2017 IFC 03-Apr-2017 T-T-P-01331 IFA 16-Apr-2017 14-Apr-2017 T-P-T-1837 Approved TPVN C
PIPING 2539-00-STC-1394-00 Standard Auxiliary Piping Supports Collection Structural A 13-Jan-2016 IFR 14-Jan-2016 T-T-P-00234 IFR 27-Jan-2016 27-Jan-2016 T-P-T-0067 Approved TPIT H
PIPING 2539-00-STC-1394-00 Standard Auxiliary Piping Supports Collection Structural 0 18-Mar-2016 IFC 18-Mar-2016 T-T-P-00449 IFC No Comment TPIT H
PIPING 2539-00-STC-1394-00 Standard Auxiliary Piping Supports Collection Structural 1 02-Nov-2016 IFC 04-Nov-2016 T-T-P-00929 IFC 18-Nov-2016 T-P-T-0640 Approved TPVN H
PIPING 2539-00-STC-1394-00 Standard Auxiliary Piping Supports Collection Structural 2 03-Apr-2017 IFC 03-Apr-2017 T-T-P-01331 IFA 16-Apr-2017 14-Apr-2017 T-P-T-1837 Approved TPVN C
PIPING 2539-00-STC-1395-00 Standard Auxiliary Piping Supports Collection Vessel Su A 13-Jan-2016 IFR 14-Jan-2016 T-T-P-00234 IFR 27-Jan-2016 27-Jan-2016 T-P-T-0067 Approved TPIT H
PIPING 2539-00-STC-1395-00 Standard Auxiliary Piping Supports Collection Vessel Su 0 18-Mar-2016 IFC 18-Mar-2016 T-T-P-00449 IFC No Comment TPIT H
PIPING 2539-00-STC-1395-00 Standard Auxiliary Piping Supports Collection Vessel Su 1 02-Nov-2016 IFC 04-Nov-2016 T-T-P-00929 IFC 18-Nov-2016 T-P-T-0640 Approved TPVN H
PIPING 2539-00-STC-1395-00 Standard Auxiliary Piping Supports Collection Vessel Su 2 03-Apr-2017 IFC 03-Apr-2017 T-T-P-01331 IFA 16-Apr-2017 14-Apr-2017 T-P-T-1837 Approved TPVN C
PIPING 2539-00-STC-1396-00 Standard Auxiliary Piping Supports Collection Dynamic A 13-Jan-2016 IFR 14-Jan-2016 T-T-P-00234 IFR 27-Jan-2016 27-Jan-2016 T-P-T-0067 Approved TPIT H
PIPING 2539-00-STC-1396-00 Standard Auxiliary Piping Supports Collection Dynamic 0 18-Mar-2016 IFC 18-Mar-2016 T-T-P-00449 IFC No Comment TPIT H
PIPING 2539-00-STC-1396-00 Standard Auxiliary Piping Supports Collection Dynamic 1 02-Nov-2016 IFC 04-Nov-2016 T-T-P-00929 IFC 18-Nov-2016 T-P-T-0640 Approved TPVN H
PIPING 2539-00-STC-1396-00 Standard Auxiliary Piping Supports Collection Dynamic 2 03-Apr-2017 IFC 03-Apr-2017 T-T-P-01331 IFA 16-Apr-2017 14-Apr-2017 T-P-T-1837 Approved TPVN C
PIPING 2539-00-STC-1397-00 Standard Auxiliary Piping Supports Collection Small Dia A 13-Jan-2016 IFR 14-Jan-2016 T-T-P-00234 IFR 27-Jan-2016 27-Jan-2016 T-P-T-0067 Approved TPIT H
PIPING 2539-00-STC-1397-00 Standard Auxiliary Piping Supports Collection Small Dia 0 18-Mar-2016 IFC 18-Mar-2016 T-T-P-00449 IFC No Comment TPIT H
PIPING 2539-00-STC-1397-00 Standard Auxiliary Piping Supports Collection Small Dia 1 02-Nov-2016 IFC 04-Nov-2016 T-T-P-00929 IFC 18-Nov-2016 T-P-T-0640 Approved TPVN H
PIPING 2539-00-STC-1397-00 Standard Auxiliary Piping Supports Collection Small Dia 2 03-Apr-2017 IFC 03-Apr-2017 T-T-P-01331 IFA 16-Apr-2017 14-Apr-2017 T-P-T-1837 Approved TPVN C
PIPING 2539-00-STC-1398-00 Standard Auxiliary Piping Supports Collection Large Dia A 13-Jan-2016 IFR 14-Jan-2016 T-T-P-00234 IFR 27-Jan-2016 27-Jan-2016 T-P-T-0067 Approved TPIT H
PIPING 2539-00-STC-1398-00 Standard Auxiliary Piping Supports Collection Large Dia 0 18-Mar-2016 IFC 18-Mar-2016 T-T-P-00449 IFC No Comment TPIT H
PIPING 2539-00-STC-1398-00 Standard Auxiliary Piping Supports Collection Large Dia 1 02-Nov-2016 IFC 04-Nov-2016 T-T-P-00929 IFC 18-Nov-2016 T-P-T-0640 Approved TPVN H
PIPING 2539-00-STC-1398-00 Standard Auxiliary Piping Supports Collection Large Dia 2 03-Apr-2017 IFC 03-Apr-2017 T-T-P-01331 IFA 16-Apr-2017 14-Apr-2017 T-P-T-1837 Approved TPVN C
PIPING 2539-00-STC-1399-00 Standard Auxiliary Piping Supports Collection Cold Supp A 05-Feb-2016 IFR 05-Feb-2016 T-T-P-00286 IFR 18-Feb-2016 No Comment TPIT H
PIPING 2539-00-STC-1399-00 Standard Auxiliary Piping Supports Collection Cold Supp 0 18-Mar-2016 IFC 18-Mar-2016 T-T-P-00449 IFC No Comment TPIT H
PIPING 2539-00-STC-1399-00 Standard Auxiliary Piping Supports Collection Cold Supp 1 02-Nov-2016 IFC 04-Nov-2016 T-T-P-00929 IFC 18-Nov-2016 T-P-T-0640 Approved TPVN H
PIPING 2539-00-STC-1399-00 Standard Auxiliary Piping Supports Collection Cold Supp 2 03-Apr-2017 IFC 03-Apr-2017 T-T-P-01331 IFA 16-Apr-2017 14-Apr-2017 T-P-T-1837 Approved TPVN C
PIPING 2539-00-STC-139C-01 Standard Construction Drawing Long Welding Neck Fla 0 15-Jul-2016 IFE 25-Jul-2016 T-T-P-00717 IFE Transmitted TPIT C
PIPING 2539-00-STC-139C-12 Standard Construction Drawing Flanges Jackscrew Dim 0 15-Jul-2016 IFE 27-Jul-2016 T-T-P-00722 IFE Transmitted TPIT C
PIPING 2539-00-STC-139C-13 Standard Construction Drawing Flanges Jackscrew Dime 0 15-Jul-2016 IFE 27-Jul-2016 T-T-P-00722 IFE Transmitted TPIT C
PIPING 2539-10-CN-1370-001 Computer Stress Analysis Calculation Note 0 27-Mar-2017 IFC 31-Mar-2017 T-T-P-01323 IFA 13-Apr-2017 12-Apr-2017 T-P-T-1808 Approved TPVN C
PIPING 2539-10-CN-1370-002 Computer Stress Analysis Calculation Note 0 27-Mar-2017 IFC 31-Mar-2017 T-T-P-01323 IFA 13-Apr-2017 12-Apr-2017 T-P-T-1808 Approved TPVN C
PIPING 2539-10-CN-1370-003 Computer Stress Analysis Calculation Note 0 27-Mar-2017 IFC 31-Mar-2017 T-T-P-01323 IFA 13-Apr-2017 12-Apr-2017 T-P-T-1808 Approved TPVN C
PIPING 2539-10-CN-1370-004 Computer Stress Analysis Calculation Note 0 27-Mar-2017 IFC 31-Mar-2017 T-T-P-01323 IFA 13-Apr-2017 12-Apr-2017 T-P-T-1808 Approved TPVN C
PIPING 2539-10-CN-1370-005 Computer Stress Analysis Calculation Note 0 27-Mar-2017 IFC 31-Mar-2017 T-T-P-01323 IFA 13-Apr-2017 12-Apr-2017 T-P-T-1808 Approved TPVN C
PIPING 2539-10-CN-1370-006 Computer Stress Analysis Calculation Note 0 27-Mar-2017 IFC 31-Mar-2017 T-T-P-01323 IFA 13-Apr-2017 12-Apr-2017 T-P-T-1808 Approved TPVN C
PIPING 2539-10-CN-1370-010 Computer Stress Analysis Calculation Note 0 27-Mar-2017 IFC 31-Mar-2017 T-T-P-01323 IFA 13-Apr-2017 12-Apr-2017 T-P-T-1808 Approved TPVN C
PIPING 2539-10-CN-1370-011 Computer Stress Analysis Calculation Note 0 27-Mar-2017 IFC 31-Mar-2017 T-T-P-01323 IFA 13-Apr-2017 12-Apr-2017 T-P-T-1808 Approved TPVN C
PIPING 2539-10-CN-1370-013 Computer Stress Analysis Calculation Note 0 27-Mar-2017 IFC 31-Mar-2017 T-T-P-01323 IFA 13-Apr-2017 12-Apr-2017 T-P-T-1808 Approved TPVN C
PIPING 2539-10-CN-1370-014 Computer Stress Analysis Calculation Note 0 27-Mar-2017 IFC 31-Mar-2017 T-T-P-01323 IFA 13-Apr-2017 12-Apr-2017 T-P-T-1808 Approved TPVN C
PIPING 2539-10-CN-1370-015 Computer Stress Analysis Calculation Note 0 27-Mar-2017 IFC 31-Mar-2017 T-T-P-01323 IFA 13-Apr-2017 12-Apr-2017 T-P-T-1808 Approved TPVN C
PIPING 2539-10-CN-1370-016 Computer Stress Analysis Calculation Note 0 27-Mar-2017 IFC 31-Mar-2017 T-T-P-01323 IFA 13-Apr-2017 12-Apr-2017 T-P-T-1808 Approved TPVN C
PIPING 2539-10-CN-1370-017 Computer Stress Analysis Calculation Note 0 27-Mar-2017 IFC 31-Mar-2017 T-T-P-01323 IFA 13-Apr-2017 12-Apr-2017 T-P-T-1808 Approved TPVN C
PIPING 2539-10-CN-1370-018 Computer Stress Analysis Calculation Note 0 27-Mar-2017 IFC 31-Mar-2017 T-T-P-01323 IFA 13-Apr-2017 12-Apr-2017 T-P-T-1808 Approved TPVN C
PIPING 2539-10-DW-0051-01-01 Ammonia Plant Detailed Plot Plan A 23-Nov-2015 IFR 24-Nov-2015 T-T-P-00103 IFR 07-Dec-2015 14-Dec-2015 C-NH3-0058/T-P-T-0031; C-NH3-0083/T-P-T-0057; T-P- Approved with comments TPIT H
PIPING 2539-10-DW-0051-01-01 Ammonia Plant Detailed Plot Plan B 24-Feb-2016 IDD 25-Feb-2016 T-T-P-00347 IDD No Comment TPIT H
PIPING 2539-10-DW-0051-01-01 Ammonia Plant Detailed Plot Plan C 14-Sep-2016 IDD2 14-Sep-2016 T-T-P-00814 IDD2 28-Sep-2016 06-Oct-2016 T-P-T-0437 Approved TPVN H
PIPING 2539-10-DW-0051-01-01 Ammonia Plant Detailed Plot Plan 0 11-Nov-2016 IFC 11-Nov-2016 T-T-P-00956 IFC 24-Nov-2016 C-NH3-0421/T-P-T-0673; C-NH3-0587/T-P-T-1155 Commented TPVN C
PIPING 2539-10-DW-0051-02-01 Ammonia Plant Detailed Elevation Plan A 23-Nov-2015 IFR 24-Nov-2015 T-T-P-00103 IFR 07-Dec-2015 14-Dec-2015 C-NH3-0058/T-P-T-0031; C-NH3-0083/T-P-T-0057; T-P- Approved with comments TPIT H
PIPING 2539-10-DW-0051-02-01 Ammonia Plant Detailed Elevation Plan B 24-Feb-2016 IDD 25-Feb-2016 T-T-P-00347 IDD No Comment TPIT H
PIPING 2539-10-DW-0051-02-01 Ammonia Plant Detailed Elevation Plan C 14-Sep-2016 IDD2 14-Sep-2016 T-T-P-00814 IDD2 28-Sep-2016 06-Oct-2016 T-P-T-0437 Approved TPVN H
PIPING 2539-10-DW-0051-02-01 Ammonia Plant Detailed Elevation Plan 0 11-Nov-2016 IFC 11-Nov-2016 T-T-P-00956 IFC 24-Nov-2016 C-NH3-0421/T-P-T-0673; C-NH3-0587/T-P-T-1155 Commented TPVN C
PIPING 2539-10-DW-0053-01-01 Ammonia Plant - Detailed Key Plan 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-03-01 Piping Layout for Pipe Rack Area 1003 from EL.100000 A 27-Apr-2016 IFR 28-Apr-2016 T-T-P-00556 IFR 11-May-2016 10-May-2016 C-NH3-0151/T-P-T-0166 Commented TPVN H
PIPING 2539-10-DW-1332-03-01 Piping & Equipment Arrangement DWG for Pipe Rack Ar 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-04-01 Piping Layout for Pipe Rack Area 1004 from EL.100000 A 27-Apr-2016 IFR 28-Apr-2016 T-T-P-00556 IFR 11-May-2016 10-May-2016 C-NH3-0151/T-P-T-0166 Commented TPVN H
PIPING 2539-10-DW-1332-04-01 Piping & Equipment Arrangement DWG for Pipe Rack Ar 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-05-01 Ammonia Plant Piping Layout for Pipe Rack Area 1005 A 27-Apr-2016 IFR 28-Apr-2016 T-T-P-00556 IFR 11-May-2016 10-May-2016 C-NH3-0151/T-P-T-0166 Commented TPVN H
PIPING 2539-10-DW-1332-05-01 Piping & Equipment Arrangement DWG for Pipe Rack Ar 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-09-01 Piping & Equipment Arrangement DWG for Pipe Rack Ar 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-12-01 Piping & Equipment Arrangement DWG Area 1012 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-13-01 Ammonia Plant Piping Layout Area 1013 from EL.100000 A 27-Apr-2016 IFR 28-Apr-2016 T-T-P-00556 IFR 11-May-2016 10-May-2016 C-NH3-0151/T-P-T-0166 Commented TPVN H
PIPING 2539-10-DW-1332-13-01 Piping & Equipment Arrangement DWG Area 1013 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-14-01 Piping & Equipment Arrangement DWG Area 1014 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-14-02 Ammonia Plant Piping Layout Area 1014 from EL.106000 A 27-Apr-2016 IFR 28-Apr-2016 T-T-P-00556 IFR 11-May-2016 10-May-2016 C-NH3-0151/T-P-T-0166 Commented TPVN H
PIPING 2539-10-DW-1332-14-02 Piping & Equipment Arrangement DWG Area 1014 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-15-01 Ammonia Plant Piping Layout Area 1015 from EL.10000 A 27-Apr-2016 IFR 28-Apr-2016 T-T-P-00556 IFR 11-May-2016 10-May-2016 C-NH3-0151/T-P-T-0166 Commented TPVN H
PIPING 2539-10-DW-1332-15-01 Piping & Equipment Arrangement DWG Area 1015 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-15-02 Ammonia Plant Piping Layout Area 1015 from EL.106000 A 27-Apr-2016 IFR 28-Apr-2016 T-T-P-00556 IFR 11-May-2016 10-May-2016 C-NH3-0151/T-P-T-0166 Commented TPVN H
PIPING 2539-10-DW-1332-15-02 Piping & Equipment Arrangement DWG Area 1015 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-16-01 Ammonia Plant Piping Layout Area 1016 from EL.100000 A 27-Apr-2016 IFR 28-Apr-2016 T-T-P-00556 IFR 11-May-2016 10-May-2016 C-NH3-0151/T-P-T-0166 Commented TPVN H
PIPING 2539-10-DW-1332-16-01 Piping & Equipment Arrangement DWG Area 1016 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-17-01 Piping & Equipment Arrangement DWG Area 1017 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-19-01 Piping Layout Area 1019 from EL.100000 to Upper A 27-Apr-2016 IFR 28-Apr-2016 T-T-P-00556 IFR 11-May-2016 10-May-2016 C-NH3-0151/T-P-T-0166 Commented TPVN H
PIPING 2539-10-DW-1332-19-01 Piping & Equipment Arrangement DWG Area 1019 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-22-01 Piping Layout Area 1022 from EL.100000 to Upper A 27-Apr-2016 IFR 28-Apr-2016 T-T-P-00556 IFR 11-May-2016 10-May-2016 C-NH3-0151/T-P-T-0166 Commented TPVN H
PIPING 2539-10-DW-1332-22-01 Piping & Equipment Arrangement DWG Area 1022 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-24-01 Piping Layout for Pipe Rack Area 1024 from EL.100000 A 27-Apr-2016 IFR 28-Apr-2016 T-T-P-00556 IFR 11-May-2016 10-May-2016 C-NH3-0151/T-P-T-0166 Commented TPVN H
PIPING 2539-10-DW-1332-24-01 Piping & Equipment Arrangement DWG Area 1024 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-26-01 Piping & Equipment Arrangement DWG Area 1026 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-26-02 Piping & Equipment Arrangement DWG Area 1026 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-27-01 Piping & Equipment Arrangement DWG Area 1027 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-28-01 Piping & Equipment Arrangement DWG Area 1028 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-29-01 Piping & Equipment Arrangement DWG Area 1029 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
Page 25
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
PIPING 2539-10-DW-1332-29-02 Piping & Equipment Arrangement DWG Area 1029 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-29-03 Piping & Equipment Arrangement DWG Area 1029 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-30-01 Piping & Equipment Arrangement DWG Area 1030 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-32-01 Piping & Equipment Arrangement DWG Area 1032 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-33-01 Piping & Equipment Arrangement DWG Area 1033 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-33-02 Piping & Equipment Arrangement DWG Area 1033 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-33-03 Piping & Equipment Arrangement DWG Area 1033 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-33-04 Piping & Equipment Arrangement DWG Area 1033 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-34-01 Piping Layout for Pipe Rack Area 1034 from EL.100000 A 27-Apr-2016 IFR 28-Apr-2016 T-T-P-00556 IFR 11-May-2016 10-May-2016 C-NH3-0151/T-P-T-0166 Commented TPVN H
PIPING 2539-10-DW-1332-34-01 Piping & Equipment Arrangement DWG Area 1034 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-36-01 Piping & Equipment Arrangement DWG Area 1036 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-38-01 Ammonia Plant Piping Layout Area 1038 from EL.100000 A 27-Apr-2016 IFR 28-Apr-2016 T-T-P-00556 IFR 11-May-2016 10-May-2016 C-NH3-0151/T-P-T-0166 Commented TPVN H
PIPING 2539-10-DW-1332-38-01 Piping & Equipment Arrangement DWG Area 1038 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-39-01 Ammonia Plant Piping Layout Area 1039 from EL.100000 A 27-Apr-2016 IFR 28-Apr-2016 T-T-P-00556 IFR 11-May-2016 10-May-2016 C-NH3-0151/T-P-T-0166 Commented TPVN H
PIPING 2539-10-DW-1332-39-01 Piping & Equipment Arrangement DWG Area 1039 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-41-01 Ammonia Plant Piping Layout Area 1041 from EL.107500 A 27-Apr-2016 IFR 28-Apr-2016 T-T-P-00556 IFR 11-May-2016 10-May-2016 C-NH3-0151/T-P-T-0166 Commented TPVN H
PIPING 2539-10-DW-1332-41-01 Piping & Equipment Arrangement DWG Area 1041 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-41-02 Ammonia Plant Piping Layout Area 1041 from EL.10000 A 27-Apr-2016 IFR 28-Apr-2016 T-T-P-00556 IFR 11-May-2016 10-May-2016 C-NH3-0151/T-P-T-0166 Commented TPVN H
PIPING 2539-10-DW-1332-41-02 Piping & Equipment Arrangement DWG Area 1041 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-41-03 Piping & Equipment Arrangement DWG Area 1041 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-42-01 Ammonia Plant Piping Layout Area 1042 from EL.100000 A 27-Apr-2016 IFR 28-Apr-2016 T-T-P-00556 IFR 11-May-2016 10-May-2016 C-NH3-0151/T-P-T-0166 Commented TPVN H
PIPING 2539-10-DW-1332-42-01 Piping & Equipment Arrangement DWG Area 1042 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-42-02 Piping & Equipment Arrangement DWG Area 1042 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-DW-1332-42-03 Piping & Equipment Arrangement DWG Area 1042 from 0 23-Dec-2016 IFC 26-Dec-2016 T-T-P-01084 IFA 08-Jan-2017 18-Jan-2017 T-P-T-1055 Approved TPVN C
PIPING 2539-10-NM-1350-030 Piping Loads on Pipe Rack Unit 10 A 04-Mar-2016 IBD 04-Mar-2016 T-T-P-00385 IFR 17-Mar-2016 17-Mar-2016 T-P-T-0104 Approved TPIT H
PIPING 2539-10-NM-1350-030 Piping Loads on Pipe Rack Unit 10 B 16-May-2016 IDD 18-May-2016 T-T-P-00594 IFR 31-May-2016 01-Jun-2016 T-P-T-0196 Approved TPVN H
PIPING 2539-10-NM-1350-030 Piping Loads on Pipe Rack Unit 10 0 02-Aug-2016 IFC 02-Aug-2016 T-T-P-00733 IFC No Comment TPVN H
PIPING 2539-10-NM-1350-030 Piping Loads on Pipe Rack Unit 10 1 14-Sep-2016 IFC 14-Sep-2016 T-T-P-00815 IFC Transmitted TPVN C
PIPING 2539-10-NM-1350-090 Piping Main Supports Outline Position & Loads Unit 10 A 04-Mar-2016 IBD 04-Mar-2016 T-T-P-00385 IFR 17-Mar-2016 17-Mar-2016 T-P-T-0104 Approved TPIT H
PIPING 2539-10-NM-1350-090 Piping Main Supports Outline Position & Loads Unit 10 0 16-Nov-2016 IFC 16-Nov-2016 T-T-P-00967 IFC 07-Dec-2016 T-P-T-0757 Approved TPVN C
PIPING 2539-10-NM-1350-40 Piping Loads on Structure Unit 10 A 11-Mar-2016 IBD 11-Mar-2016 T-T-P-00425 IFR 24-Mar-2016 25-Mar-2016 T-P-T-0126 Approved TPIT H
PIPING 2539-10-NM-1350-40 Piping Loads on Structures Unit 10 B 23-Sep-2016 IDD 23-Sep-2016 T-T-P-00834 IFR 06-Oct-2016 No Comment TPVN H
PIPING 2539-10-NM-1350-40 Piping Loads on Structures Unit 10 0 02-Jun-2017 IFC 02-Jun-2017 T-T-P-01436 IFA 15-Jun-2017 Transmitted TPVN C
PIPING 2539-10-NM-2300-01 Insulation & Painting Line List A 04-Feb-2016 IFR 08-Feb-2016 T-T-P-00297 IFR 22-Feb-2016 No Comment TPIT H
PIPING 2539-10-NM-2300-01 Insulation & Painting Line List B 26-Apr-2016 IDD1 29-Apr-2016 T-T-P-00560 II 19-May-2016 C-NH3-0154/T-P-T-0170 Commented TPIT H
PIPING 2539-10-NM-2300-01 Insulation & Painting Line List C 09-Nov-2016 IDD2 09-Nov-2016 T-T-P-00945 IFR 23-Nov-2016 01-Dec-2016 T-P-T-0700 Approved TPIT H
PIPING 2539-10-NM-2300-01 Insulation & Painting Line List 0 03-Jan-2017 IFC 05-Jan-2017 T-T-P-01115 IFA 18-Jan-2017 23-Jan-2017 T-P-T-1142 Approved TPIT H
PIPING 2539-10-NM-2300-01 Insulation & Painting Line List 1 27-Apr-2017 IFC 28-Apr-2017 T-T-P-01395 IFA 11-May-2017 Transmitted TPIT C
PIPING 2539-30-DW-0051-01-01 Utility Production Detailed Plot Plan A 03-Dec-2015 IFR 04-Dec-2015 T-T-P-00148 IFR 17-Dec-2015 04-Jan-2016 C-NH3-0083/T-P-T-0057; T-P-T-0082 Approved with comments TPIT H
PIPING 2539-30-DW-0051-01-01 Utility Production Detailed Plot Plan B 24-Feb-2016 IDD 25-Feb-2016 T-T-P-00348 IDD No Comment TPIT H
PIPING 2539-30-DW-0051-01-01 Utility Production Detailed Plot Plan C 20-Sep-2016 IDD2 20-Sep-2016 T-T-P-00825 IFR 03-Oct-2016 11-Oct-2016 T-P-T-0440 Approved TPVN H
PIPING 2539-30-DW-0051-01-01 Utility Production Detailed Plot Plan 0 15-Nov-2016 IFC 16-Nov-2016 T-T-P-00966 IFC 01-Dec-2016 T-P-T-0698 Approved TPVN C
PIPING 2539-30-DW-0053-01-01 Utility Production Detailed Key Plan 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-30-DW-1332-06-01 Piping & Equipment Arrangement Drawing for Cooling T 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-30-DW-1332-09-01 Piping & Equipment Arrangement Drawing for Fresh Coo 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-30-DW-1332-09-02 Piping & Equipment Arrangement Drawing for Fresh Coo 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-30-DW-1332-11-01 Piping & Equipment Arrangement Drawing for Antiscalin 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-30-DW-1332-12-01 Piping & Equipment Arrangement Drawing for Utility Sub 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-30-DW-1332-14-02 Piping & Equipment Arrangement Drawing for Deminerali 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-30-DW-1332-16-01 Piping & Equipment Arrangement Drawing for H2SO4 St 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-30-DW-1332-17-01 Piping & Equipment Arrangement Drawing for Air System 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-30-DW-1332-19-01 Piping & Equipment Arrangement Drawing for Utility Pip 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-30-DW-1332-19-02 Piping & Equipment Arrangement Drawing for Utility Pip 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-30-DW-1332-20-01 Piping & Equipment Arrangement Drawing for Utility Pip 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-30-DW-1332-20-02 Piping & Equipment Arrangement Drawing for Utility Pip 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-30-DW-1332-22-01 Piping & Equipment Arrangement Drawing for Cooling T 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-30-DW-1332-23-01 Piping & Equipment Arrangement Drawing for Settling Ba 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-30-DW-1332-24-01 Piping & Equipment Arrangement Drawing for Cooling W 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-30-DW-1332-25-01 Piping & Equipment Arrangement Drawing for Make-up Ri 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-30-NM-2300-01 Insulation & Painting Line List A 04-Feb-2016 IFR 08-Feb-2016 T-T-P-00298 IFR 22-Feb-2016 No Comment TPIT H
PIPING 2539-30-NM-2300-01 Insulation & Painting Line List B 26-Apr-2016 IDD1 29-Apr-2016 T-T-P-00560 II 19-May-2016 C-NH3-0154/T-P-T-0170 Commented TPIT H
PIPING 2539-30-NM-2300-01 Insulation & Painting Line List C 09-Nov-2016 IDD2 09-Nov-2016 T-T-P-00945 IFR 23-Nov-2016 01-Dec-2016 T-P-T-0700 Approved TPIT H
PIPING 2539-30-NM-2300-01 Insulation & Painting Line List 0 03-Jan-2017 IFC 05-Jan-2017 T-T-P-01115 IFA 18-Jan-2017 23-Jan-2017 T-P-T-1142 Approved TPIT H
PIPING 2539-30-NM-2300-01 Insulation & Painting Line List 1 27-Apr-2017 IFC 28-Apr-2017 T-T-P-01395 IFA 11-May-2017 Transmitted TPIT C
PIPING 2539-40-CN-1370-005 Computer Stress Analysis Calculation Note 0 27-Mar-2017 IFC 31-Mar-2017 T-T-P-01323 IFA 13-Apr-2017 12-Apr-2017 T-P-T-1808 Approved TPVN C
PIPING 2539-40-DW-0051-01-01 Ammonia Storage Detailed Plot Plan A 03-Dec-2015 IFR 04-Dec-2015 T-T-P-00149 IFR 17-Dec-2015 04-Jan-2016 C-NH3-0083/T-P-T-0057; T-P-T-0082 Approved with comments TPIT H
PIPING 2539-40-DW-0051-01-01 Ammonia Storage Detailed Plot Plan B 24-Feb-2016 IDD 25-Feb-2016 T-T-P-00349 IDD 10-May-2016 C-NH3-0149/T-P-T-0163 Approved with comments TPIT H
PIPING 2539-40-DW-0051-01-01 Ammonia Storage Detailed Plot Plan C 20-Sep-2016 IDD2 20-Sep-2016 T-T-P-00825 IFR 03-Oct-2016 11-Oct-2016 T-P-T-0440 Approved TPVN H
PIPING 2539-40-DW-0051-01-01 Ammonia Storage Detailed Plot Plan 0 15-Nov-2016 IFC 16-Nov-2016 T-T-P-00966 IFC 01-Dec-2016 T-P-T-0698 Approved TPVN C
PIPING 2539-40-NM-1350-30 Piping Loads on Pipe Rack & Sleeper Way Offsite Area U A 27-May-2016 IFR 30-May-2016 T-T-P-00615 IFR 12-Jun-2016 16-Jun-2016 C-NH3-0180/T-P-T-0208 Commented TPVN H
PIPING 2539-40-NM-1350-30 Piping Loads on Pipe Rack & Sleeper Way Offsite Area U 0 16-Nov-2016 IFC 16-Nov-2016 T-T-P-00967 IFC 07-Dec-2016 T-P-T-0757 Approved TPVN C
PIPING 2539-40-NM-1350-40 Piping Loads on Structure Unit 40 A 02-Jun-2016 IFR 02-Jun-2016 T-T-P-00626 IFR 15-Jun-2016 17-Jun-2016 C-NH3-0190/T-P-T-0219 Commented TPVN H
PIPING 2539-40-NM-1350-40 Piping Loads on Structure Unit 40 0 14-Nov-2016 IFC 15-Nov-2016 T-T-P-00961 IFC 07-Dec-2016 T-P-T-0748 Approved TPVN C
PIPING 2539-40-NM-1350-90 Piping Main Supports Outline Position & Loads Unit 40 A 27-May-2016 IFR 30-May-2016 T-T-P-00615 IFR 12-Jun-2016 16-Jun-2016 C-NH3-0180/T-P-T-0208 Commented TPVN H
PIPING 2539-40-NM-1350-90 Piping Main Supports Outline Position & Loads Unit 40 0 14-Nov-2016 IFC 15-Nov-2016 T-T-P-00961 IFC 07-Dec-2016 T-P-T-0748 Approved TPVN C
PIPING 2539-40-NM-2300-01 Insulation & Painting Line List A 04-Feb-2016 IFR 08-Feb-2016 T-T-P-00300 IFR 22-Feb-2016 No Comment TPIT H
PIPING 2539-40-NM-2300-01 Insulation & Painting Line List B 26-Apr-2016 IDD1 29-Apr-2016 T-T-P-00560 II 19-May-2016 C-NH3-0154/T-P-T-0170 Commented TPIT H
PIPING 2539-40-NM-2300-01 Insulation & Painting Line List C 09-Nov-2016 IDD2 09-Nov-2016 T-T-P-00945 IFR 23-Nov-2016 01-Dec-2016 T-P-T-0700 Approved TPIT H
PIPING 2539-40-NM-2300-01 Insulation & Painting Line List 0 03-Jan-2017 IFC 05-Jan-2017 T-T-P-01115 IFA 18-Jan-2017 23-Jan-2017 T-P-T-1142 Approved TPIT H
PIPING 2539-40-NM-2300-01 Insulation & Painting Line List 1 27-Apr-2017 IFC 28-Apr-2017 T-T-P-01395 IFA 11-May-2017 Transmitted TPIT C
PIPING 2539-45-DW-0053-01-01 Ammonia Storage Detailed Key Plan 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-45-DW-1332-01-01 Piping & Equipment Arrangement Drawing for Ammonia 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-45-DW-1332-05-01 Piping & Equipment Arrangement Drawing for Ammonia 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-45-DW-1332-06-01 Piping & Equipment Arrangement Drawing for Ammonia 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-45-DW-1332-07-01 Piping & Equipment Arrangement Drawing for New Ammo 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-45-DW-1332-08-01 Piping & Equipment Arrangement Drawing for New Ammo 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-45-DW-1332-09-01 Piping & Equipment Arrangement Drawing for Ammonia 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-45-DW-1332-10-01 Piping & Equipment Arrangement Drawing for Ammonia 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-45-DW-1332-10-02 Piping & Equipment Arrangement Drawing for Ammonia 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PIPING 2539-45-DW-1332-11-01 Piping & Equipment Arrangement Drawing for New Ammo 0 30-Dec-2016 IFC 04-Jan-2017 T-T-P-01110 IFA 17-Jan-2017 03-Feb-2017 T-P-T-1164 Approved TPVN C
PRE-COM/COM 2539-00-MS-1393-01 Job Specification for Start-up Water Flushing of Piping A 01-Dec-2016 IFR 07-Dec-2016 T-T-P-01022 IFR 20-Dec-2016 21-Dec-2016 C-NH3-0493/T-P-T-0849; C-NH3-0654/T-P-T-1453 Commented TPIT H
PRE-COM/COM 2539-00-MS-1393-01 Job Specification for Start-up Water Flushing of Piping 0 28-Feb-2017 IFE 02-Mar-2017 T-T-P-01260 IFA 15-Mar-2017 21-Mar-2017 T-P-T-1595 Approved TPIT C
PRE-COM/COM 2539-00-MS-1393-02 Job Specification for Start-up Air Blowing of Piping & Eq A 01-Dec-2016 IFR 07-Dec-2016 T-T-P-01022 IFR 20-Dec-2016 21-Dec-2016 C-NH3-0493/T-P-T-0849; C-NH3-0654/T-P-T-1453 Commented TPIT H
PRE-COM/COM 2539-00-MS-1393-02 Job Specification for Start-up Air Blowing of Piping & Eq 0 28-Feb-2017 IFE 02-Mar-2017 T-T-P-01260 IFA 15-Mar-2017 21-Mar-2017 T-P-T-1595 Approved TPIT C
PRE-COM/COM 2539-00-MS-1393-03 Job Specification for Start-up Drying of Piping & Equipm A 01-Dec-2016 IFR 07-Dec-2016 T-T-P-01022 IFR 20-Dec-2016 21-Dec-2016 C-NH3-0493/T-P-T-0849; C-NH3-0654/T-P-T-1453 No Comment TPIT H
PRE-COM/COM 2539-00-MS-1393-03 Job Specification for Start-up Drying of Piping & Equipm 0 28-Feb-2017 IFE 02-Mar-2017 T-T-P-01262 IFA 15-Mar-2017 21-Mar-2017 T-P-T-1599 Approved TPIT C
PRE-COM/COM 2539-00-MS-1393-04 Job Specification for Start-up Tightness Test of Piping A 01-Dec-2016 IFR 07-Dec-2016 T-T-P-01022 IFR 20-Dec-2016 21-Dec-2016 C-NH3-0493/T-P-T-0849; C-NH3-0654/T-P-T-1453 Commented TPIT H
PRE-COM/COM 2539-00-MS-1393-04 Job Specification for Start-up Tightness Test of Piping 0 28-Feb-2017 IFE 02-Mar-2017 T-T-P-01260 IFA 15-Mar-2017 21-Mar-2017 T-P-T-1595 Approved TPIT C
PRE-COM/COM 2539-00-MS-1393-06 Job Specification for Start-up Steam Blowing of Piping A 01-Dec-2016 IFR 07-Dec-2016 T-T-P-01022 IFR 20-Dec-2016 21-Dec-2016 C-NH3-0493/T-P-T-0849; C-NH3-0654/T-P-T-1453 Commented TPIT H
PRE-COM/COM 2539-00-MS-1393-06 Job Specification for Start-up Steam Blowing of Piping 0 28-Feb-2017 IFE 02-Mar-2017 T-T-P-01260 IFA 15-Mar-2017 21-Mar-2017 T-P-T-1595 Approved TPIT C
PRE-COM/COM 2539-00-MS-1393-09 Job Specification for Start-up Nitrogen Purging of Pipin A 01-Dec-2016 IFR 07-Dec-2016 T-T-P-01022 IFR 20-Dec-2016 21-Dec-2016 C-NH3-0493/T-P-T-0849; C-NH3-0654/T-P-T-1453 Commented TPIT H
PRE-COM/COM 2539-00-MS-1393-09 Job Specification for Start-up Nitrogen Purging of Pipin 0 28-Feb-2017 IFE 02-Mar-2017 T-T-P-01260 IFA 15-Mar-2017 21-Mar-2017 T-P-T-1595 Approved TPIT C
PRE-COM/COM 2539-00-MS-1393-10 Job Specification for Start-up Hydro-Jetting of Piping & A 01-Dec-2016 IFR 07-Dec-2016 T-T-P-01022 IFR 20-Dec-2016 21-Dec-2016 C-NH3-0493/T-P-T-0849; C-NH3-0654/T-P-T-1453 Commented TPIT H
PRE-COM/COM 2539-00-MS-1393-10 Job Specification for Start-up Hydro-Jetting of Piping & 0 28-Feb-2017 IFE 02-Mar-2017 T-T-P-01260 IFA 15-Mar-2017 21-Mar-2017 T-P-T-1595 Approved TPIT C
PRE-COM/COM 2539-00-MS-1393-12 Job Specification for Start-up Manual Cleaning for Large A 01-Dec-2016 IFR 07-Dec-2016 T-T-P-01022 IFR 20-Dec-2016 21-Dec-2016 C-NH3-0493/T-P-T-0849; C-NH3-0654/T-P-T-1453 Commented TPIT H
PRE-COM/COM 2539-00-MS-1393-12 Job Specification for Start-up Manual Cleaning for Large 0 28-Feb-2017 IFE 02-Mar-2017 T-T-P-01260 IFA 15-Mar-2017 21-Mar-2017 T-P-T-1595 Approved TPIT C
PRE-COM/COM 2539-00-MS-1393-14 Job Specification for Start-up Piping Inspection A 01-Dec-2016 IFR 07-Dec-2016 T-T-P-01022 IFR 20-Dec-2016 21-Dec-2016 C-NH3-0493/T-P-T-0849; C-NH3-0654/T-P-T-1453 No Comment TPIT H
PRE-COM/COM 2539-00-MS-1393-14 Job Specification for Start-up Piping Inspection 0 28-Feb-2017 IFE 02-Mar-2017 T-T-P-01262 IFA 15-Mar-2017 21-Mar-2017 T-P-T-1599 Approved TPIT C
PRE-COM/COM 2539-00-MS-1593-01 Job Specification for Start-up Loop Check Execution Pr A 14-Dec-2016 IFR 19-Dec-2016 T-T-P-01063 IFR 03-Jan-2017 18-Jan-2017 T-P-T-1033 Approved TPIT C
PRE-COM/COM 2539-00-MS-1593-02 Job Specification for Start-up Loop Folder Management A 14-Dec-2016 IFR 19-Dec-2016 T-T-P-01063 IFR 03-Jan-2017 18-Jan-2017 T-P-T-1033 Approved TPIT C
PRE-COM/COM 2539-00-MS-1652-01 Job Specification for Start-up MV Energization Procedur A 21-Jun-2017 IFR 21-Jun-2017 T-T-P-01461 IFR 04-Jul-2017 Transmitted TPVN C
PRE-COM/COM 2539-00-MS-1654-01 Job Specification for Start-up Temporary LV Power Conn A 15-Mar-2017 IFR 16-Mar-2017 T-T-P-01292 IFR 29-Mar-2017 No Comment TPVN H
Page 26
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
PRE-COM/COM 2539-00-MS-1654-01 Job Specification for Start-up Temporary LV Power Conn 0 30-May-2017 IFE 30-May-2017 T-T-P-01429 IFA 12-Jun-2017 Transmitted TPVN C
PRE-COM/COM 2539-00-MS-1654-02 Job Specification for Start-up Temporary UPS Power Co A 03-Jul-2017 IFR 04-Jul-2017 T-T-P-01477 IFR 17-Jul-2017 Transmitted TPVN C
PRE-COM/COM 2539-00-MS-1693-01 Job Specification for Start-up Electric Motor Run-in Pro A 14-Dec-2016 IFR 19-Dec-2016 T-T-P-01063 IFR 03-Jan-2017 18-Jan-2017 T-P-T-1033 Approved TPIT C
PRE-COM/COM 2539-00-MS-1693-02 Job Specification for Start-Up Revamp Pumps Motor R A 11-Jul-2017 IFR 12-Jul-2017 T-T-P-01488 IFR 25-Jul-2017 25-Jul-2017 T-P-T-2363 Approved TPVN C
PRE-COM/COM 2539-00-MS-2610-01 OASE Solution Top-Up Procedure A 29-Jun-2017 IFR 03-Jul-2017 T-T-P-01469 IFR 16-Jul-2017 18-Jul-2017 C-NH3-0858/T-P-T-2337 Commented TPVN C
PRE-COM/COM 2539-00-MS-6893-02 Job Specification for Vessels/Equipment Inspection Pro A 01-Dec-2016 IFR 07-Dec-2016 T-T-P-01022 IFR 20-Dec-2016 21-Dec-2016 C-NH3-0493/T-P-T-0849; C-NH3-0654/T-P-T-1453 No Comment TPIT H
PRE-COM/COM 2539-00-MS-6893-02 Job Specification for Vessels/Equipment Inspection Pro 0 28-Feb-2017 IFE 02-Mar-2017 T-T-P-01262 IFA 15-Mar-2017 21-Mar-2017 C-NH3-0683/T-P-T-1599 Commented TPIT H
PRE-COM/COM 2539-00-MS-6893-02 Job Specification for Vessels/Equipment Inspection Pro 1 12-Apr-2017 IFE 14-Apr-2017 T-T-P-01353 IFA 27-Apr-2017 09-May-2017 T-P-T-2014 Approved TPVN C
PRE-COM/COM 2539-00-MS-6893-03 Job Specification for Machinery Cold Final Alignment A 01-Dec-2016 IFR 07-Dec-2016 T-T-P-01022 IFR 20-Dec-2016 21-Dec-2016 C-NH3-0493/T-P-T-0849; C-NH3-0654/T-P-T-1453 No Comment TPIT H
PRE-COM/COM 2539-00-MS-6893-03 Job Specification for Machinery Cold Final Alignment 0 28-Feb-2017 IFE 02-Mar-2017 T-T-P-01262 IFA 15-Mar-2017 21-Mar-2017 C-NH3-0683/T-P-T-1599 Commented TPIT H
PRE-COM/COM 2539-00-MS-6893-03 Job Specification for Start-up Machinery Cold Final Alig 1 12-Apr-2017 IFE 14-Apr-2017 T-T-P-01353 IFA 27-Apr-2017 09-May-2017 T-P-T-2014 Approved TPVN C
PRE-COM/COM 2539-00-NM-0004-02 Consumables Summary for Commissioning/Start-up A 10-Jul-2017 IFR 12-Jul-2017 T-T-P-01489 IFR 25-Jul-2017 Transmitted TPVN C
PRE-COM/COM 2539-00-NM-905 Precommissioning & Commissioning Deliverable List 0 22-Dec-2016 II 27-Dec-2016 T-T-P-01088 II Transmitted TPIT C
PRE-COM/COM 2539-00-NM-9902 Project System List A 25-Apr-2017 IFR 25-Apr-2017 T-T-P-01383 IFR 08-May-2017 09-May-2017 C-NH3-0792/T-P-T-1991 Commented TPVN H
PRE-COM/COM 2539-00-NM-9902 Project System List 0 03-Jul-2017 IFPR 06-Jul-2017 T-T-P-01481 IFA 19-Jul-2017 19-Jul-2017 C-NH3-0859/T-P-T-2342 Commented TPVN C
PRE-COM/COM 2539-00-NM-9905 System Component List with Identification Drawings A 14-Apr-2017 IFR 21-Apr-2017 T-T-P-01373 IFR 04-May-2017 09-May-2017 C-NH3-0791/T-P-T-1990; C-NH3-0824/T-P-T-2103 Commented TPVN H
PRE-COM/COM 2539-00-NM-9905 System Component List with Identification Drawings 0 18-May-2017 IFE 26-May-2017 T-T-P-01422 IFA 08-Jun-2017 20-Jun-2017 T-P-T-2204 Approved TPVN C
PRE-COM/COM 2539-00-PP-846 Mechanical Completion Procedure A 14-Jul-2017 IFR 17-Jul-2017 T-T-P-01496 IFR 30-Jul-2017 Transmitted TPVN C
PRE-COM/COM 2539-00-PP-901 Pre-commissioning; Commissioning; Start-up and Perfor A 10-May-2017 IFR 10-May-2017 T-T-P-01409 IFR 23-May-2017 27-May-2017 C-NH3-0823/T-P-T-2102; C-NH3-0851/T-P-T-2557 Commented TPIT H
PRE-COM/COM 2539-00-PP-901 Pre-commissioning; Commissioning; Start-up and Perfor 0 05-Jun-2017 IFE 09-Jun-2017 T-T-P-01447 IFE 22-Jun-2017 Transmitted TPIT C
PRE-COM/COM 2539-00-PP-903-01 Handover Procedure A 14-Apr-2017 IFR 14-Apr-2017 T-T-P-01359 IFA 27-Apr-2017 09-May-2017 C-NH3-0790/T-P-T-1989 Commented TPVN H
PRE-COM/COM 2539-00-PP-903-01 Handover Procedure 0 24-May-2017 IFE 26-May-2017 T-T-P-01422 IFA 08-Jun-2017 Transmitted TPVN C
PRE-COM/COM 2539-00-PP-905 Cooling Water Pumps 30-P3001A and 30-P3002A Demons A 06-Jul-2017 IFR 07-Jul-2017 T-T-P-01483 IFR 20-Jul-2017 No Comment TPVN H
PRE-COM/COM 2539-00-PP-905 Cooling Water Pumps 30-P3001A and 30-P3002A Demons 0 12-Jul-2017 IFE 13-Jul-2017 T-T-P-01490 IFA 26-Jul-2017 No Comment TPVN H
PRE-COM/COM 2539-00-PP-905 Cooling Water Pumps 30-P3001A and 30-P3002A Demons 1 14-Jul-2017 IFE 14-Jul-2017 T-T-P-01492 IFA 27-Jul-2017 01-Aug-2017 T-P-T-2380 Approved TPVN C
PRE-COM/COM 2539-00-PP-908 Instructions to Vendor for Filling-up of Spare Parts List 0 19-Feb-2016 IFE 23-Feb-2016 T-T-P-00339 IFE 20-Apr-2016 C-NH3-0140/T-P-T-0148 Commented TPIT C
PRE-COM/COM 2539-00-PP-918 Relief Valves Management Procedure 0 14-Apr-2017 IFE 17-Apr-2017 T-T-P-01360 IFA 30-Apr-2017 03-May-2017 T-P-T-1964 Approved TPVN C
PRE-COM/COM 2539-00-PP-919 System Punch List Management Procedure A 25-Apr-2017 IFR 25-Apr-2017 T-T-P-01382 IFR 08-May-2017 12-Jul-2017 T-P-T-2311 Approved TPVN C
PRE-COM/COM 2539-00-PP-951 Permit To Work Procedure A 22-Dec-2015 IFA 08-Jan-2016 T-T-P-00219 IFA 21-Jan-2016 22-Jan-2016 C-NH3-0091/T-P-T-0064 Commented PTSC H
PRE-COM/COM 2539-00-PP-951 Permit To Work Procedure 0 29-Feb-2016 IFC 29-Mar-2017 T-T-P-01314 II 11-Apr-2017 Approved PTSC C
PRE-COM/COM 2539-00-QCP-1300-51 Precommissioning/Commissioning Quality Control Plan - A 07-Dec-2016 IFR 09-Dec-2016 T-T-P-01026 IFR 22-Dec-2016 27-Dec-2016 C-NH3-0514/T-P-T-0894; C-NH3-0796/T-P-T-2006 Commented TPIT H
PRE-COM/COM 2539-00-QCP-1300-51 Precommissioning/Commissioning Quality Control Plan - 0 14-Mar-2017 IFE 14-Mar-2017 T-T-P-01289 IFA 27-Mar-2017 11-Apr-2017 T-P-T-1780 Approved TPIT C
PRE-COM/COM 2539-00-QCP-1500-51 Precommissioning/Commissioning Quality Control Plan - A 07-Dec-2016 IFR 09-Dec-2016 T-T-P-01026 IFR 22-Dec-2016 16-Jan-2017 T-P-T-1029 Approved TPIT C
PRE-COM/COM 2539-00-QCP-1600-51 Precommissioning/Commissioning Quality Control Plan - A 07-Dec-2016 IFR 09-Dec-2016 T-T-P-01026 IFR 22-Dec-2016 16-Jan-2017 T-P-T-1029 Approved TPIT C
PRE-COM/COM 2539-00-QCP-6800-51 Precommissioning/Commissioning Quality Control Plan - A 07-Dec-2016 IFR 09-Dec-2016 T-T-P-01026 IFR 22-Dec-2016 Transmitted TPIT C
PRE-COM/COM 2539-00-SP-9904 Systemization Philosophy A 23-Dec-2016 IFR 27-Dec-2016 T-T-P-01089 IFR 09-Jan-2017 18-Jan-2017 C-NH3-0556/T-P-T-1042; C-NH3-0797/T-P-T-2007 Commented TPIT C
PRE-COM/COM 2539-00-SP-9904-01 Systemization Philosophy 0 14-Mar-2017 IFE 14-Mar-2017 T-T-P-01289 IFA 27-Mar-2017 11-Apr-2017 T-P-T-1780 Approved TPIT C
PROCESS 2539-00-CN-0008-01 Process Control Philosophy A 27-Nov-2015 IBD 30-Nov-2015 T-T-P-00133 IFR 14-Dec-2015 No Comment TPIT H
PROCESS 2539-00-CN-0008-01 Process Control Philosophy B 10-Mar-2016 IDD 16-Mar-2016 T-T-P-00433 IDD Transmitted TPIT C
PROCESS 2539-00-JSD-0000-02 Process Design Specification A 27-Nov-2015 IFA 30-Nov-2015 T-T-P-00134 IFA 14-Dec-2015 No Comment TPIT H
PROCESS 2539-00-JSD-0000-02 Process Design Specification 0 09-Mar-2016 IFE 16-Mar-2016 T-T-P-00430 IFE Transmitted TPIT C
PROCESS 2539-00-JSD-0000-03 Standard Specification for PID Preparation A 30-Sep-2015 IFA 30-Oct-2015 T-T-P-00053 IFA 12-Nov-2015 No Comment TPIT H
PROCESS 2539-00-JSD-0000-03 Standard Specification for PID Preparation 0 10-Dec-2015 IFE 11-Dec-2015 T-T-P-00176 IFE Transmitted TPIT C
PROCESS 2539-00-JSD-1900-01 Design Specification for Firefighting A 30-Nov-2015 IFR 01-Dec-2015 T-T-P-00136 IFR 14-Dec-2015 No Comment TPIT H
PROCESS 2539-00-JSD-1900-01 Design Specification for Firefighting 0 22-Dec-2015 FIN 23-Dec-2015 T-T-P-00206 FIN No Comment TPIT H
PROCESS 2539-00-JSD-1900-03 Safety Process Design Criteria A 25-Nov-2015 IFR 27-Nov-2015 T-T-P-00122 IFR 10-Dec-2015 21-Dec-2015 T-P-T-0045 Approved TPIT H
PROCESS 2539-00-JSD-1900-03 Safety Process Design Criteria 0 22-Dec-2015 IFE 23-Dec-2015 T-T-P-00199 IFE Transmitted TPIT C
PROCESS 2539-00-JSD-1950-01 Design Specification for Fire & Gas Detection System A 30-Nov-2015 IFR 01-Dec-2015 T-T-P-00135 IFR 14-Dec-2015 17-Dec-2015 T-P-T-0037 Approved TPIT H
PROCESS 2539-00-JSD-1950-01 Design Specification for Fire & Gas Detection System 0 22-Dec-2015 FIN 23-Dec-2015 T-T-P-00207 FIN No Comment TPIT H
PROCESS 2539-00-JSD-6000-01 Plant Noise Control Specification A 02-Dec-2015 IFR 03-Dec-2015 T-T-P-00137 IFR 16-Dec-2015 21-Dec-2015 T-P-T-0045 Approved TPIT H
PROCESS 2539-00-JSD-6000-01 Plant Noise Control Specification 0 22-Dec-2015 FIN 23-Dec-2015 T-T-P-00202 FIN Transmitted TPIT C
PROCESS 2539-00-JSD-6000-02 Equipment Noise Specification A 02-Dec-2015 IFR 03-Dec-2015 T-T-P-00137 IFR 16-Dec-2015 21-Dec-2015 T-P-T-0045 Approved TPIT H
PROCESS 2539-00-JSD-6000-02 Equipment Noise Specification 0 22-Dec-2015 FIN 23-Dec-2015 T-T-P-00202 FIN Transmitted TPIT H
PROCESS 2539-00-JSD-6000-02 Equipment Noise Specification 1 18-Mar-2016 FIN 23-Mar-2016 T-T-P-00463 FIN Transmitted TPIT C
PROCESS 2539-00-JSD-6200-01 Environmental Protection Design Criteria A 25-Nov-2015 IFR 27-Nov-2015 T-T-P-00128 IFR 10-Dec-2015 07-Dec-2015 T-P-T-0026/T-P-T-0046 Approved with comments TPIT H
PROCESS 2539-00-JSD-6200-01 Environmental Protection Design Criteria 0 22-Dec-2015 IFE 23-Dec-2015 T-T-P-00203 IFE Transmitted TPIT C
PROCESS 2539-00-ML-213 Hazop Study Report for Ammonia Plant; Utilities & Offsit 0 23-Dec-2015 IFE 23-Dec-2015 T-T-P-00212 IFE Transmitted TPIT C
PROCESS 2539-00-ML-223 HAZOP Study Recommendation Closeout Report for Ammoni 0 18-Oct-2016 II 20-Oct-2016 T-T-P-00884 II Transmitted TPIT C
PROCESS 2539-00-ML-230 SIL Classification Report for Ammonia Plant; Utilities & Of A 23-Dec-2015 IFR 08-Jan-2016 T-T-P-00221 IFR 21-Jan-2016 15-Jul-2016 T-P-T-0259 Approved TPIT H
PROCESS 2539-00-ML-230 SIL Classification Report for Ammonia Plant; Utilities & Of 0 18-Oct-2016 II 20-Oct-2016 T-T-P-00884 II Transmitted TPIT C
PROCESS 2539-00-NM-0002-01 Fluid List A 27-Nov-2015 IFR 27-Nov-2015 T-T-P-00123 IFR 10-Dec-2015 21-Dec-2015 C-NH3-0072/T-P-T-0044 Commented TPIT H
PROCESS 2539-00-NM-0002-01 Fluid List B 01-Apr-2016 IDD 01-Apr-2016 T-T-P-00495 IDD No Comment TPIT H
PROCESS 2539-00-NM-0002-01 Fluid List 0 23-Dec-2016 FIN 26-Dec-2016 T-T-P-01086 IFA 08-Jan-2017 18-Jan-2017 C-NH3-0550/T-P-T-1031 Commented TPVN C
PROCESS 2539-00-NM-0022-01 Mechanical Line List A 21-Jan-2016 IFR 22-Jan-2016 T-T-P-00256 IFR 04-Feb-2016 No Comment TPIT H
PROCESS 2539-00-NM-0022-01 Mechanical Line List B 07-Apr-2016 IDD1 08-Apr-2016 T-T-P-00517 IDD No Comment TPIT H
PROCESS 2539-00-NM-0022-01 Mechanical Line List 0 21-Dec-2016 IFC 22-Dec-2016 T-T-P-01070 IFA 04-Jan-2017 No Comment TPVN H
PROCESS 2539-00-NM-0022-01 Mechanical Line List 1 30-Mar-2017 IFC 03-Apr-2017 T-T-P-01329 IFA 16-Apr-2017 21-Apr-2017 T-P-T-1854 Approved TPVN C
PROCESS 2539-00-PID-0021-01-01 Piping & Instrument Diagram - Standards & Symbols A 06-Nov-2015 IFR 11-Nov-2015 T-T-P-00071 IFR 24-Nov-2015 26-Nov-2015 T-P-T-0021 No Comment TPIT H
PROCESS 2539-00-PID-0021-01-01 Piping & Instrument Diagram - Standards & Symbols B 11-Mar-2016 IDD 11-Mar-2016 T-T-P-00427 IDD Transmitted TPIT H
PROCESS 2539-00-PID-0021-01-01 Piping & Instrument Diagram - Standards & Symbols C 04-Jul-2016 IDD2 06-Jul-2016 T-T-P-00686 IFR 19-Jul-2016 09-Aug-2016 T-P-T-0311 Approved TPVN H
PROCESS 2539-00-PID-0021-01-01 Piping & Instrument Diagram - Standards & Symbols 0 28-Nov-2016 IFC 06-Dec-2016 T-T-P-01018 IFA 19-Dec-2016 23-Dec-2016 T-P-T-0879 Approved TPVN C
PROCESS 2539-00-PID-0031-51-01 Utility Distribution Diagram - Steam & Condensate Distri A 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-00-PID-0031-51-01 Utility Distribution Diagram - Steam & Condensate Distri 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-00-PID-0031-53-01 Utility Distribution Diagram - Cooling Water Distribution A 02-Dec-2015 IFR 09-Dec-2015 T-T-P-00159 IFR 22-Dec-2015 24-Dec-2015 T-P-T-0051 No Comment TPIT H
PROCESS 2539-00-PID-0031-53-01 Utility Distribution Diagram - Cooling Water Distribution B 23-Mar-2016 IDD1 24-Mar-2016 T-T-P-00472 IDD No Comment TPIT H
PROCESS 2539-00-PID-0031-53-01 Utility Distribution Diagram - Cooling Water Distribution C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-00-PID-0031-53-01 Utility Distribution Diagram - Cooling Water Distribution 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-00-PID-0031-54-01 Utility Distribution Diagram Air; Nitrogen & Fuel Gas Dis A 02-Dec-2015 IFR 09-Dec-2015 T-T-P-00159 IFR 22-Dec-2015 24-Dec-2015 C-NH3-0078/T-P-T-0050 Commented TPIT H
PROCESS 2539-00-PID-0031-54-01 Utility Distribution Diagram Air; Nitrogen & Fuel Gas Dis B 23-Mar-2016 IDD1 24-Mar-2016 T-T-P-00472 IDD No Comment TPIT H
PROCESS 2539-00-PID-0031-54-01 Utility Distribution Diagram Air; Nitrogen & Fuel Gas Dis C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-00-PID-0031-54-01 Utility Distribution Diagram Air; Nitrogen & Fuel Gas Dis 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-00-PID-0031-55-01 Utility Distribution Diagram - Flare Network A 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-00-PID-0031-55-01 Utility Distribution Diagram - Flare Network 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-00-PP-904-01 Performance Test Procedure A 31-May-2017 IFR 01-Jun-2017 T-T-P-01432 IFR 14-Jun-2017 01-Aug-2017 C-NH3-0867/C-NH3-0867 Commented TPVN C
PROCESS 2539-00-RR-101-02 System Hydraulic & Existing Instrumentation Verificati 0 16-Dec-2016 IFE 16-Dec-2016 T-T-P-01057 IFA 30-Dec-2016 11-Jan-2017 C-NH3-0541/T-P-T-0969; C-NH3-0827/T-P-T-2114 Commented TPVN C
PROCESS 2539-10-CN-0009-01 Process Description A 23-Oct-2015 IBD 23-Oct-2015 T-T-P-00024 IFR 05-Nov-2015 16-Nov-2015 C-NH3-0031/T-P-T-0012 Commented TPIT H
PROCESS 2539-10-CN-0009-01 Process Description B 15-Mar-2016 FIN 17-Mar-2016 T-T-P-00441 FIN No Comment TPIT H
PROCESS 2539-10-CN-0009-01 Process Description 0 06-Jan-2017 FIN 13-Jan-2017 T-T-P-01151 IFA 27-Jan-2017 01-Mar-2017 C-NH3-0641/T-P-T-1374; C-NH3-0745/T-P-T-1839 Commented TPVN C
PROCESS 2539-10-CN-0009-03 Sequence & Special Control A 22-Feb-2017 IFR 01-Mar-2017 T-T-P-01253 IFR 14-Mar-2017 16-Mar-2017 C-NH3-0678/T-P-T-1571 Commented TPVN H
PROCESS 2539-10-CN-0009-03 Sequence & Special Control 0 30-May-2017 FIN 31-May-2017 T-T-P-01431 IFA 13-Jun-2017 20-Jun-2017 C-NH3-0842/T-P-T-2205 Commented TPVN C
PROCESS 2539-10-DW-1933-01-01 Ammonia Plant Firefighting Layout A 23-Dec-2015 IFR 23-Dec-2015 T-T-P-00210 IFR 05-Jan-2016 08-Jan-2016 T-P-T-0059 Approved TPIT H
PROCESS 2539-10-DW-1950-01-01 Ammonia Plant Fire & Gas Layout A 23-Dec-2015 IFR 23-Dec-2015 T-T-P-00210 IFR 05-Jan-2016 08-Jan-2016 T-P-T-0059 Approved TPIT H
PROCESS 2539-10-ML-901 Ammonia Plant Supplementary Operating Manual A 14-Apr-2017 IFR 20-Apr-2017 T-T-P-01368 IFR 03-May-2017 23-May-2017 C-NH3-0813/T-P-T-2060 Commented TPVN C
PROCESS 2539-10-NM-0003-01 Utility Consumption Summary Unit 10 - Case 2 A 18-Dec-2015 IFR 23-Dec-2015 T-T-P-00209 IFR 05-Jan-2016 No Comment TPIT H
PROCESS 2539-10-NM-0003-01 Utility Consumption Summary Unit 10 - Case 2 B 18-Mar-2016 IBD 25-Mar-2016 T-T-P-00476 IBD No Comment TPIT H
PROCESS 2539-10-NM-0003-01 Utility Consumption Summary Unit 10 - Case 2 0 06-Jan-2017 FIN 13-Jan-2017 T-T-P-01151 IFA 27-Jan-2017 01-Mar-2017 C-NH3-0641/T-P-T-1374; C-NH3-0745/T-P-T-1839 Commented TPVN C
PROCESS 2539-10-NM-0003-11 Utility Consumption Summary Unit 10 - Case 3 A 18-Dec-2015 IFR 23-Dec-2015 T-T-P-00209 IFR 05-Jan-2016 No Comment TPIT H
PROCESS 2539-10-NM-0003-11 Utility Consumption Summary Unit 10 - Case 3 B 18-Mar-2016 IBD 25-Mar-2016 T-T-P-00476 IBD No Comment TPIT H
PROCESS 2539-10-NM-0003-11 Utility Consumption Summary Unit 10 - Case 3 0 06-Jan-2017 FIN 13-Jan-2017 T-T-P-01151 IFA 27-Jan-2017 01-Mar-2017 C-NH3-0641/T-P-T-1374; C-NH3-0745/T-P-T-1839 Commented TPVN C
PROCESS 2539-10-NM-0004-01 Chemical Consumption Summary - Unit 10 A 26-Feb-2016 IFR 29-Feb-2016 T-T-P-00368 IFR 14-Mar-2016 No Comment TPIT H
PROCESS 2539-10-NM-0004-01 Catalyst & Chemical Consumption Summary - Unit 10 B 25-Mar-2016 IBD 25-Mar-2016 T-T-P-00477 IBD No Comment TPIT H
PROCESS 2539-10-NM-0004-01 Catalyst & Chemical Consumption Summary - Unit 10 0 09-Mar-2017 FIN 13-Mar-2017 T-T-P-01285 IFA 26-Mar-2017 03-Apr-2017 C-NH3-0713/T-P-T-1718; C-NH3-0793/T-P-T-2003 Commented TPVN C
PROCESS 2539-10-NM-0005-01 Liquid Effluent Summary - Unit 10 A 03-Feb-2016 IFR 04-Feb-2016 T-T-P-00282 IFR 17-Feb-2016 No Comment TPIT H
PROCESS 2539-10-NM-0005-01 Liquid Effluent Summary - Unit 10 B 29-Mar-2016 IBD 04-Apr-2016 T-T-P-00504 IBD No Comment TPIT H
PROCESS 2539-10-NM-0005-01 Liquid Effluent Summary - Unit 10 0 06-Jan-2017 FIN 13-Jan-2017 T-T-P-01151 IFA 27-Jan-2017 01-Mar-2017 T-P-T-1374 Approved TPVN C
PROCESS 2539-10-NM-0006-01 Pressure Relief Valves & Rupture Disks Summary of Rat A 05-Feb-2016 IBD 10-Feb-2016 T-T-P-00305 IFR 23-Feb-2016 18-Jul-2016 C-NH3-0213/T-P-T-0250; C-NH3-0478/T-P-T-0803 Commented TPIT H
PROCESS 2539-10-NM-0006-01 Pressure Relief Valves & Rupture Disks Summary of Rat 0 10-Jan-2017 FIN 13-Jan-2017 T-T-P-01151 IFA 27-Jan-2017 01-Mar-2017 C-NH3-0641/T-P-T-1374; C-NH3-0745/T-P-T-1839 Commented TPVN H
PROCESS 2539-10-NM-0006-01 Pressure Relief Valves & Rupture Disks Summary of Rat 1 17-Mar-2017 FIN 31-Mar-2017 T-T-P-01328 IFA 13-Apr-2017 17-Apr-2017 T-P-T-1840 Approved TPVN C
PROCESS 2539-10-NM-0013-01 Safety Interlock Trip System - Trip Diagram A 20-Nov-2015 IBD 20-Nov-2015 T-T-P-00100 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-10-NM-0013-01 Safety Interlock Trip System - Trip Diagram B 14-Mar-2016 IDD 16-Mar-2016 T-T-P-00434 IDD No Comment TPIT H
PROCESS 2539-10-NM-0013-01 Safety Interlock Trip System - Trip Diagram 0 14-Oct-2016 FIN 14-Oct-2016 T-T-P-00881 FIN 07-Nov-2016 C-NH3-0370/T-P-T-0554 Commented TPVN H
PROCESS 2539-10-NM-0013-01 Safety Interlock Trip System - Trip Diagram 1 22-Feb-2017 FIN 01-Mar-2017 T-T-P-01254 IFA 14-Mar-2017 21-Mar-2017 C-NH3-0690/T-P-T-1610; C-NH3-0802/T-P-T-2012 Commented TPVN C
Page 27
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
PROCESS 2539-10-NM-0013-02 Safety Interlock Trip System - Trip Diagram A 20-Nov-2015 IBD 20-Nov-2015 T-T-P-00100 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-10-NM-0013-02 Safety Interlock Trip System - Trip Diagram B 14-Mar-2016 IDD 16-Mar-2016 T-T-P-00434 IDD No Comment TPIT H
PROCESS 2539-10-NM-0013-02 Safety Interlock Trip System - Trip Diagram 0 14-Oct-2016 FIN 14-Oct-2016 T-T-P-00881 FIN 07-Nov-2016 C-NH3-0370/T-P-T-0554 Commented TPVN H
PROCESS 2539-10-NM-0013-02 Safety Interlock Trip System - Trip Diagram 1 22-Feb-2017 FIN 01-Mar-2017 T-T-P-01254 IFA 14-Mar-2017 21-Mar-2017 C-NH3-0690/T-P-T-1610; C-NH3-0802/T-P-T-2012 Commented TPVN C
PROCESS 2539-10-NM-0013-03 Safety Interlock Trip System - Trip Diagram A 14-Mar-2016 IBD 16-Mar-2016 T-T-P-00435 IBD 29-Mar-2016 15-Jul-2016 T-P-T-0260; T-P-T-0301 Approved TPIT H
PROCESS 2539-10-NM-0013-03 Safety Interlock Trip System - Trip Diagram 0 14-Oct-2016 FIN 14-Oct-2016 T-T-P-00881 FIN 07-Nov-2016 C-NH3-0370/T-P-T-0554 Commented TPVN H
PROCESS 2539-10-NM-0013-03 Safety Interlock Trip System - Trip Diagram 1 22-Feb-2017 FIN 01-Mar-2017 T-T-P-01254 IFA 14-Mar-2017 21-Mar-2017 C-NH3-0690/T-P-T-1610 No Comment TPVN C
PROCESS 2539-10-NM-0013-04 Safety Interlock Trip System - Trip Diagram 0 14-Oct-2016 FIN 14-Oct-2016 T-T-P-00881 FIN 07-Nov-2016 C-NH3-0370/T-P-T-0554 Commented TPVN H
PROCESS 2539-10-NM-0013-04 Safety Interlock Trip System - Trip Diagram 1 22-Feb-2017 FIN 01-Mar-2017 T-T-P-01254 IFA 14-Mar-2017 21-Mar-2017 C-NH3-0690/T-P-T-1610 No Comment TPVN C
PROCESS 2539-10-NM-0022-01 Mechanical Line List A 21-Jan-2016 IFR 22-Jan-2016 T-T-P-00259 IFR 04-Feb-2016 No Comment TPIT H
PROCESS 2539-10-NM-0022-01 Mechanical Line List B 07-Apr-2016 IDD1 08-Apr-2016 T-T-P-00518 IDD No Comment TPIT H
PROCESS 2539-10-NM-0022-01 Mechanical Line List C 07-Nov-2016 IDD2 08-Nov-2016 T-T-P-00942 IFR 22-Nov-2016 No Comment TPVN H
PROCESS 2539-10-NM-0022-01 Mechanical Line List 0 21-Dec-2016 IFC 22-Dec-2016 T-T-P-01070 IFA 04-Jan-2017 No Comment TPVN H
PROCESS 2539-10-NM-0022-01 Mechanical Line List 1 30-Mar-2017 IFC 03-Apr-2017 T-T-P-01329 IFA 16-Apr-2017 21-Apr-2017 T-P-T-1854 Approved TPVN C
PROCESS 2539-10-NM-1920-01 Item List for Area Classification Unit 10 A 14-Jan-2016 PI 15-Jan-2016 T-T-P-00241 IFR 28-Jan-2016 No Comment TPIT H
PROCESS 2539-10-NM-1920-01 Item List for Area Classification Unit 10 B 22-Mar-2016 PI 25-Mar-2016 T-T-P-00478 PI Transmitted TPIT C
PROCESS 2539-10-PFD-0010-01-01 Process Flow Diagram Ammonia Unit - C.W Balance Re A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00008 IFR 22-Oct-2015 31-Oct-2015 C-NH3-00008/T-P-T-00004 Commented TPIT H
PROCESS 2539-10-PFD-0010-01-01 Process Flow Diagram Ammonia Unit - C.W Balance Re B 03-Mar-2016 IBD 07-Mar-2016 T-T-P-00391 IBD No Comment TPIT H
PROCESS 2539-10-PFD-0010-01-01 Process Flow Diagram Ammonia Unit - C.W Balance Re 0 09-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 Transmitted TPVN C
PROCESS 2539-10-PFD-0010-11-01 Process Flow Diagram Ammonia Unit - C.W Balance Re A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00008 IFR 22-Oct-2015 31-Oct-2015 C-NH3-00008/T-P-T-00004 Commented TPIT H
PROCESS 2539-10-PFD-0010-11-01 Process Flow Diagram Ammonia Unit - C.W Balance Re B 12-Mar-2016 IBD 17-Mar-2016 T-T-P-00446 IBD No Comment TPIT H
PROCESS 2539-10-PFD-0010-11-01 Process Flow Diagram Ammonia Unit - C.W Balance Re 0 14-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 Transmitted TPVN C
PROCESS 2539-10-PID-0021-02-01 Piping & Instrument Diagram - Analysis Point & Steam T A 06-Nov-2015 IFR 11-Nov-2015 T-T-P-00072 IFR 24-Nov-2015 26-Nov-2015 T-P-T-0021 No Comment TPIT H
PROCESS 2539-10-PID-0021-02-01 Piping & Instrument Diagram - Analysis Point & Steam T B 11-Mar-2016 IDD 11-Mar-2016 T-T-P-00427 IDD No Comment TPIT H
PROCESS 2539-10-PID-0021-02-01 Piping & Instrument Diagram - Analysis Point & Steam T C 14-Sep-2016 IDD2 20-Sep-2016 T-T-P-00823 IFR 03-Oct-2016 13-Oct-2016 C-NH3-0322/T-P-T-0454; C-NH3-0431/T-P-T-0697 Commented TPVN H
PROCESS 2539-10-PID-0021-02-01 Piping & Instrument Diagram - Analysis Point & Steam T 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-10-PID-0031-51-01 Utility Distribution Diagram - Steam & Condensate Distri A 14-Sep-2016 IDD2 20-Sep-2016 T-T-P-00823 IFR 03-Oct-2016 13-Oct-2016 C-NH3-0322/T-P-T-0454; C-NH3-0431/T-P-T-0697 Approved TPVN H
PROCESS 2539-10-PID-0031-51-01 Utility Distribution Diagram - Steam & Condensate Distri 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-10-PID-0031-53-01 Utility Distribution Diagram - Cooling Water Distribution A 06-Nov-2015 IFR 11-Nov-2015 T-T-P-00072 IFR 24-Nov-2015 26-Nov-2015 T-P-T-0021 No Comment TPIT H
PROCESS 2539-10-PID-0031-53-01 Utility Distribution Diagram - Cooling Water Distribution B 14-Mar-2016 IDD 16-Mar-2016 T-T-P-00438 IDD 17-Mar-2016 T-P-T-0103 Approved TPIT H
PROCESS 2539-10-PID-0031-53-01 Utility Distribution Diagram - Cooling Water Distribution C 04-Jul-2016 IDD2 06-Jul-2016 T-T-P-00686 IFR 19-Jul-2016 09-Aug-2016 T-P-T-0311 Approved TPVN H
PROCESS 2539-10-PID-0031-53-01 Utility Distribution Diagram - Cooling Water Distribution 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 05-Jan-2017 C-NH3-0526/T-P-T-0930 Commented TPVN C
PROCESS 2539-10-PID-0031-54-01 Utility Distribution Diagram - Air; Nitrogen & L.P. Fuel Ga A 14-Mar-2016 IFR 16-Mar-2016 T-T-P-00439 IFA 29-Mar-2016 17-Mar-2016 T-P-T-0103 Approved TPIT H
PROCESS 2539-10-PID-0031-54-01 Utility Distribution Diagram - Air; Nitrogen & L.P. Fuel Ga B 18-Mar-2016 IBD 18-Mar-2016 T-T-P-00452 IBD No Comment TPIT H
PROCESS 2539-10-PID-0031-54-01 Utility Distribution Diagram - Air; Nitrogen & L.P. Fuel Ga C 28-Mar-2016 IDD 31-May-2016 T-T-P-00617 IFR 13-Jun-2016 14-Jul-2016 T-P-T-0254 Approved TPVN H
PROCESS 2539-10-PID-0031-54-01 Utility Distribution Diagram - Air; Nitrogen & L.P. Fuel Ga D 14-Sep-2016 IDD 20-Sep-2016 T-T-P-00823 IFR 03-Oct-2016 13-Oct-2016 C-NH3-0322/T-P-T-0454; C-NH3-0431/T-P-T-0697 Approved TPVN H
PROCESS 2539-10-PID-0031-54-01 Utility Distribution Diagram - Air; Nitrogen & L.P. Fuel Ga 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-10-PID-0031-55-01 Utility Distribution Diagram - Flare Networks A 06-Nov-2015 IFR 11-Nov-2015 T-T-P-00072 IFR 24-Nov-2015 26-Nov-2015 T-P-T-0021 No Comment TPIT H
PROCESS 2539-10-PID-0031-55-01 Utility Distribution Diagram - Flare Networks B 14-Mar-2016 IDD 16-Mar-2016 T-T-P-00438 IDD 17-Mar-2016 T-P-T-0103 Approved TPIT H
PROCESS 2539-10-PID-0031-55-01 Utility Distribution Diagram - Flare Networks C 14-Sep-2016 IDD2 20-Sep-2016 T-T-P-00823 IFR 03-Oct-2016 13-Oct-2016 C-NH3-0322/T-P-T-0454; C-NH3-0431/T-P-T-0697 Approved TPVN H
PROCESS 2539-10-PID-0031-55-01 Utility Distribution Diagram - Flare Networks 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 05-Jan-2017 C-NH3-0526/T-P-T-0930 Commented TPVN C
PROCESS 2539-10-PID-0031-55X-01 Piping & Instrument Diagram - Flare Networks - Dismant A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-10-PID-0031-55X-01 Piping & Instrument Diagram - Flare Networks - Dismant 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-10-SP-1500-40 Process Datasheet for Flow Instruments PA 22-Jan-2016 PI 22-Jan-2016 T-T-P-00262 IFA 04-Feb-2016 15-Mar-2016 C-NH3-0115/T-P-T-0095; T-P-T-0154 Approved with comments TPIT C
PROCESS 2539-10-SP-1500-41 Process Datasheet for Control Valves PA 22-Jan-2016 PI 22-Jan-2016 T-T-P-00262 IFA 04-Feb-2016 15-Mar-2016 C-NH3-0116/T-P-T-0096; T-P-T-0154 Approved with comments TPIT H
PROCESS 2539-10-SP-1500-41 Process Datasheet for Control Valves PB 13-Apr-2016 PI 14-Apr-2016 T-T-P-00531 Re-IFA 27-Apr-2016 24-May-2016 C-NH3-0157/T-P-T-0176; C-NH3-0423/T-P-T-0678 Approved with comments TPIT C
PROCESS 2539-10-SP-1500-43 Process Datasheet for Automation Valves PA 22-Jan-2016 PI 22-Jan-2016 T-T-P-00262 IFA 04-Feb-2016 15-Mar-2016 T-P-T-0097 Approved TPIT H
PROCESS 2539-10-SP-1500-43 Process Datasheet for Automation Valves PB 13-Apr-2016 PI 14-Apr-2016 T-T-P-00531 Re-IFA 27-Apr-2016 24-May-2016 C-NH3-0157/T-P-T-0176; C-NH3-0423/T-P-T-0678 Approved with comments TPIT C
PROCESS 2539-10-SP-1500-45 Pressure Safety Valves Process Datasheet - 10-PSV-35 PA 21-Jan-2016 PI 01-Feb-2016 T-T-P-00269 IFA 15-Feb-2016 29-Feb-2016 T-P-T-0078 Approved TPIT H
PROCESS 2539-10-SP-1500-45 Pressure Safety Valves Process Datasheet - 10-PSV-35 PB 05-May-2016 PI 06-May-2016 T-T-P-00574 IFA 20-May-2016 31-May-2016 T-P-T-0183 Approved TPVN C
PROCESS 2539-12-PFD-0010-01-01 Process Flow Diagram Desulphurization & Reforming R A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00007 IFR 22-Oct-2015 31-Oct-2015 C-NH3-00007/T-P-T-00004 Commented TPIT H
PROCESS 2539-12-PFD-0010-01-01 Process Flow Diagram Desulphurization & Reforming R B 03-Mar-2016 IBD 07-Mar-2016 T-T-P-00392 IBD No Comment TPIT H
PROCESS 2539-12-PFD-0010-01-01 Process Flow Diagram Desulphurization & Reforming R 0 09-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 10-Jan-2017 C-NH3-0540/T-P-T-0968 Commented TPVN H
PROCESS 2539-12-PFD-0010-01-01 Process Flow Diagram Desulphurization & Reforming R 1 31-Mar-2017 FIN 03-Apr-2017 T-T-P-01334 IFA 16-Apr-2017 17-Apr-2017 T-P-T-1841 Approved TPVN C
PROCESS 2539-12-PFD-0010-02-01 Process Flow Diagram Secondary Reformer Revamp Cas A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00007 IFR 22-Oct-2015 31-Oct-2015 C-NH3-00007/T-P-T-00004 Commented TPIT H
PROCESS 2539-12-PFD-0010-02-01 Process Flow Diagram Secondary Reformer Revamp Cas B 03-Mar-2016 IBD 07-Mar-2016 T-T-P-00392 IBD No Comment TPIT H
PROCESS 2539-12-PFD-0010-02-01 Process Flow Diagram Secondary Reformer Revamp Cas 0 09-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 Transmitted TPVN C
PROCESS 2539-12-PFD-0010-03-01 Process Flow Diagram Co-Conversion Revamp Case 2: A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00007 IFR 22-Oct-2015 No Comment TPIT H
PROCESS 2539-12-PFD-0010-03-01 Process Flow Diagram Co-Conversion Revamp Case 2: B 03-Mar-2016 IBD 07-Mar-2016 T-T-P-00392 IBD No Comment TPIT H
PROCESS 2539-12-PFD-0010-03-01 Process Flow Diagram Co-Conversion Revamp Case 2: 0 09-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 Transmitted TPVN C
PROCESS 2539-12-PFD-0010-04-01 Process Flow Diagram Steam Generation Revamp Case A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00007 IFR 22-Oct-2015 31-Oct-2015 C-NH3-00007/T-P-T-00004 Commented TPIT H
PROCESS 2539-12-PFD-0010-04-01 Process Flow Diagram Steam Generation Revamp Case B 03-Mar-2016 IBD 07-Mar-2016 T-T-P-00392 IBD No Comment TPIT H
PROCESS 2539-12-PFD-0010-04-01 Process Flow Diagram Steam Generation Revamp Case 0 09-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 Transmitted TPVN C
PROCESS 2539-12-PFD-0010-11-01 Process Flow Diagram Desulphurization & Reforming R A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00007 IFR 22-Oct-2015 31-Oct-2015 C-NH3-00007/T-P-T-00004 Commented TPIT H
PROCESS 2539-12-PFD-0010-11-01 Process Flow Diagram Desulphurization & Reforming R B 12-Mar-2016 IBD 17-Mar-2016 T-T-P-00446 IBD No Comment TPIT H
PROCESS 2539-12-PFD-0010-11-01 Process Flow Diagram Desulphurization & Reforming R 0 14-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 10-Jan-2017 C-NH3-0540/T-P-T-0968 Commented TPVN H
PROCESS 2539-12-PFD-0010-11-01 Process Flow Diagram Desulphurization & Reforming R 1 31-Mar-2017 FIN 03-Apr-2017 T-T-P-01334 IFA 16-Apr-2017 17-Apr-2017 T-P-T-1841 Approved TPVN C
PROCESS 2539-12-PFD-0010-12-01 Process Flow Diagram Secondary Reformer Revamp Cas A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00007 IFR 22-Oct-2015 31-Oct-2015 C-NH3-00007/T-P-T-00004 Commented TPIT H
PROCESS 2539-12-PFD-0010-12-01 Process Flow Diagram Secondary Reformer Revamp Cas B 12-Mar-2016 IBD 17-Mar-2016 T-T-P-00446 IBD No Comment TPIT H
PROCESS 2539-12-PFD-0010-12-01 Process Flow Diagram Secondary Reformer Revamp Cas 0 14-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 Transmitted TPVN C
PROCESS 2539-12-PFD-0010-13-01 Process Flow Diagram Co-Conversion Revamp Case 3: A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00007 IFR 22-Oct-2015 No Comment TPIT H
PROCESS 2539-12-PFD-0010-13-01 Process Flow Diagram Co-Conversion Revamp Case 3: B 12-Mar-2016 IBD 17-Mar-2016 T-T-P-00446 IBD No Comment TPIT H
PROCESS 2539-12-PFD-0010-13-01 Process Flow Diagram Co-Conversion Revamp Case 3: 0 14-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 Transmitted TPVN C
PROCESS 2539-12-PFD-0010-14-01 Process Flow Diagram Steam Generation Revamp Case A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00007 IFR 22-Oct-2015 31-Oct-2015 C-NH3-00007/T-P-T-00004 Commented TPIT H
PROCESS 2539-12-PFD-0010-14-01 Process Flow Diagram Steam Generation Revamp Case B 12-Mar-2016 IBD 17-Mar-2016 T-T-P-00446 IBD No Comment TPIT H
PROCESS 2539-12-PFD-0010-14-01 Process Flow Diagram Steam Generation Revamp Case 0 14-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 Transmitted TPVN C
PROCESS 2539-12-PID-0021-01-01 Utility Distribution Diagram - Natural Gas Distribution & A 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0395/T-P-T-0628; C-N Commented TPVN H
PROCESS 2539-12-PID-0021-01-01 Utility Distribution Diagram - Natural Gas Distribution & 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-12-PID-0021-02-01 Piping & Instrument Diagram - Flue Gas Waste Heat Sect 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-12-PID-0021-03-01 Piping & Instrument Diagram - Flue Gas Waste Heat Sect A 06-Nov-2015 IFR 11-Nov-2015 T-T-P-00070 IFR 24-Nov-2015 26-Nov-2015 C-NH3-0045/T-P-T-0020 Commented TPIT H
PROCESS 2539-12-PID-0021-03-01 Piping & Instrument Diagram - Flue Gas Waste Heat Sect B 09-Mar-2016 IDD 11-Mar-2016 T-T-P-00422 IDD No Comment TPIT H
PROCESS 2539-12-PID-0021-03-01 Piping & Instrument Diagram - Flue Gas Waste Heat Sect C 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0395/T-P-T-0628; C-N Approved TPVN H
PROCESS 2539-12-PID-0021-03-01 Piping & Instrument Diagram - Flue Gas Waste Heat Sect 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 05-Jan-2017 C-NH3-0526/T-P-T-0930 Commented TPVN C
PROCESS 2539-12-PID-0021-03X-01 Piping & Instrument Diagram - Flue Gas Waste Heat Sect A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-12-PID-0021-03X-01 Piping & Instrument Diagram - Flue Gas Waste Heat Sect 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-12-PID-0021-04-01 Utility Distribution Diagram - Primary Reformer Part 1 A 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0395/T-P-T-0628; C-N Commented TPVN H
PROCESS 2539-12-PID-0021-04-01 Utility Distribution Diagram - Primary Reformer Part 1 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-12-PID-0021-04X-01 Utility Distribution Diagram - Primary Reformer Part 1 - A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-12-PID-0021-04X-01 Utility Distribution Diagram - Primary Reformer Part 1 - 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-12-PID-0021-06-01 Piping & Instrument Diagram - Secondary Reformer A 06-Nov-2015 IFR 11-Nov-2015 T-T-P-00070 IFR 24-Nov-2015 26-Nov-2015 C-NH3-0045/T-P-T-0020 Commented TPIT H
PROCESS 2539-12-PID-0021-06-01 Piping & Instrument Diagram - Secondary Reformer B 09-Mar-2016 IDD 11-Mar-2016 T-T-P-00422 IDD No Comment TPIT H
PROCESS 2539-12-PID-0021-06-01 Piping & Instrument Diagram - Secondary Reformer C 14-Sep-2016 IDD2 20-Sep-2016 T-T-P-00823 IFR 03-Oct-2016 13-Oct-2016 C-NH3-0322/T-P-T-0454; C-NH3-0431/T-P-T-0697 Commented TPVN H
PROCESS 2539-12-PID-0021-06-01 Piping & Instrument Diagram - Secondary Reformer 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-12-PID-0021-06X-01 Piping & Instrument Diagram - Secondary Reformer - Di A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-12-PID-0021-06X-01 Piping & Instrument Diagram - Secondary Reformer - Di 0 29-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-12-PID-0021-08-01 Piping & Instrument Diagram - N2 Start-Up Circuit - H2 A 06-Nov-2015 IFR 11-Nov-2015 T-T-P-00070 IFR 24-Nov-2015 26-Nov-2015 C-NH3-0045/T-P-T-0020 No Comment TPIT H
PROCESS 2539-12-PID-0021-08-01 Piping & Instrument Diagram - N2 Start-Up Circuit - H2 B 09-Mar-2016 IDD 11-Mar-2016 T-T-P-00422 IDD No Comment TPIT H
PROCESS 2539-12-PID-0021-08-01 Piping & Instrument Diagram - N2 Start-Up Circuit - H2 C 14-Sep-2016 IDD2 20-Sep-2016 T-T-P-00823 IFR 03-Oct-2016 13-Oct-2016 C-NH3-0322/T-P-T-0454; C-NH3-0431/T-P-T-0697 Commented TPVN H
PROCESS 2539-12-PID-0021-08-01 Piping & Instrument Diagram - N2 Start-Up Circuit / H2 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-12-PID-0021-09-01 Piping & Instrument Diagram Heat Exchange Reformer A 06-Nov-2015 IFR 11-Nov-2015 T-T-P-00070 IFR 24-Nov-2015 26-Nov-2015 C-NH3-0045/T-P-T-0020 Commented TPIT H
PROCESS 2539-12-PID-0021-09-01 Piping & Instrument Diagram - Heat Exchange Reformer B 09-Mar-2016 IDD 11-Mar-2016 T-T-P-00422 IDD No Comment TPIT H
PROCESS 2539-12-PID-0021-09-01 Piping & Instrument Diagram - Heat Exchange Reformer C 14-Sep-2016 IDD2 20-Sep-2016 T-T-P-00823 IFR 03-Oct-2016 13-Oct-2016 C-NH3-0322/T-P-T-0454; C-NH3-0431/T-P-T-0697 Commented TPVN H
PROCESS 2539-12-PID-0021-09-01 Piping & Instrument Diagram - Heat Exchange Reformer 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-12-PID-0021-10-01 Piping & Instrument Diagram - Hydrogen Storage A 09-Mar-2016 IFR 11-Mar-2016 T-T-P-00423 IFA 24-Mar-2016 16-Mar-2016 C-NH3-0119/T-P-T-0101 Approved with comments TPIT H
PROCESS 2539-12-PID-0021-10-01 Piping & Instrument Diagram - Hydrogen Storage B 22-Mar-2016 IBD 24-Mar-2016 T-T-P-00471 IBD Transmitted TPIT H
PROCESS 2539-12-PID-0021-10-01 Piping & Instrument Diagram - Hydrogen Storage C 28-Mar-2016 IDD 31-May-2016 T-T-P-00617 IFR 13-Jun-2016 14-Jul-2016 T-P-T-0254 Approved TPVN H
PROCESS 2539-12-PID-0021-10-01 Piping & Instrument Diagram - H2 Recycle Gas for HTE D 14-Sep-2016 IDD2 20-Sep-2016 T-T-P-00823 IFR 03-Oct-2016 13-Oct-2016 C-NH3-0322/T-P-T-0454; C-NH3-0431/T-P-T-0697 Commented TPVN H
PROCESS 2539-12-PID-0021-10-01 Piping & Instrument Diagram - H2 Recycle Gas for HTE 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-12-SP-0410-03 Data Sheet for 10-R2003R Secondary Reformer PA 06-Sep-2016 PI 09-Sep-2016 T-T-P-00803 IFA 22-Sep-2016 Transmitted TPVN H
PROCESS 2539-12-SP-0410-03 Data Sheet for 10-R2003R Secondary Reformer PB 31-Oct-2016 PI 10-Nov-2016 T-T-P-00946 IFR 23-Nov-2016 24-Nov-2016 C-NH3-0414/T-P-T-0663 Commented TPVN H
PROCESS 2539-12-SP-0410-03 Data Sheet for 10-R2003R Secondary Reformer PC 22-Feb-2017 PI 27-Feb-2017 T-T-P-01244 IFA 12-Mar-2017 10-Mar-2017 C-NH3-0666/T-P-T-1517 Commented TPVN C
PROCESS 2539-12-SP-0610-01 Process Datasheet for 10-HE2001 Heat Exchange Refo PA 06-Nov-2015 PI 19-Nov-2015 T-T-P-00090 IFR 02-Dec-2015 30-Nov-2015 C-NH3-00047/T-P-T-0022 Commented TPIT H
Page 28
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
PROCESS 2539-12-SP-0610-01 Process Datasheet for 10-HE2001 Heat Exchange Refo PB 24-Feb-2016 PI 25-Feb-2016 T-T-P-00356 IFA 09-Mar-2016 18-Mar-2016 T-P-T-0108 Approved TPIT C
PROCESS 2539-12-SP-4100-01 Duty Specification for Hydrogen Bottles 10-PK-2001 PA 25-Mar-2016 PI 29-Feb-2016 T-T-P-00374 IFA 14-Mar-2016 22-Mar-2016 T-P-T-00111 Approved TPIT C
PROCESS 2539-13-PFD-0010-01-01 Process Flow Diagram MDEA CO2 Removal Revamp Cas A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00009 IFR 22-Oct-2015 31-Oct-2015 C-NH3-00009/T-P-T-00004 Commented TPIT H
PROCESS 2539-13-PFD-0010-01-01 Process Flow Diagram MDEA CO2 Removal Revamp Cas B 03-Mar-2016 IBD 07-Mar-2016 T-T-P-00393 IBD No Comment TPIT H
PROCESS 2539-13-PFD-0010-01-01 Process Flow Diagram MDEA CO2 Removal Revamp Cas 0 09-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 10-Jan-2017 C-NH3-0540/T-P-T-0968 Commented TPVN C
PROCESS 2539-13-PFD-0010-02-01 Process Flow Diagram Methanation Revamp Case 2: NH A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00009 IFR 22-Oct-2015 No Comment TPIT H
PROCESS 2539-13-PFD-0010-02-01 Process Flow Diagram Methanation Revamp Case 2: NH B 03-Mar-2016 IBD 07-Mar-2016 T-T-P-00393 IBD No Comment TPIT H
PROCESS 2539-13-PFD-0010-02-01 Process Flow Diagram Methanation Revamp Case 2: NH 0 09-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 Transmitted TPVN C
PROCESS 2539-13-PFD-0010-11-01 Process Flow Diagram MDEA CO2 Removal Revamp Cas A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00009 IFR 22-Oct-2015 31-Oct-2015 C-NH3-00009/T-P-T-00004 Commented TPIT H
PROCESS 2539-13-PFD-0010-11-01 Process Flow Diagram MDEA CO2 Removal Revamp Cas B 12-Mar-2016 IBD 17-Mar-2016 T-T-P-00446 IBD No Comment TPIT H
PROCESS 2539-13-PFD-0010-11-01 Process Flow Diagram MDEA CO2 Removal Revamp Cas 0 14-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 10-Jan-2017 C-NH3-0540/T-P-T-0968 Commented TPVN C
PROCESS 2539-13-PFD-0010-12-01 Process Flow Diagram Methanation Revamp Case 3: NH A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00009 IFR 22-Oct-2015 No Comment TPIT H
PROCESS 2539-13-PFD-0010-12-01 Process Flow Diagram Methanation Revamp Case 3: NH B 12-Mar-2016 IBD 17-Mar-2016 T-T-P-00446 IBD No Comment TPIT H
PROCESS 2539-13-PFD-0010-12-01 Process Flow Diagram Methanation Revamp Case 3: NH 0 14-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 Transmitted TPVN C
PROCESS 2539-13-PID-0021-01-01 Piping & Instrument Diagram - MDEA Stripping A 09-Mar-2016 IFR 11-Mar-2016 T-T-P-00426 IFA 24-Mar-2016 16-Mar-2016 T-P-T-0102 Approved TPIT H
PROCESS 2539-13-PID-0021-01-01 Piping & Instrument Diagram - MDEA Stripping B 18-Mar-2016 IBD 18-Mar-2016 T-T-P-00452 IBD Transmitted TPIT H
PROCESS 2539-13-PID-0021-01-01 Piping & Instrument Diagram - MDEA Stripping C 28-Mar-2016 IDD 31-May-2016 T-T-P-00617 IFR 13-Jun-2016 14-Jul-2016 T-P-T-0254 Approved TPVN H
PROCESS 2539-13-PID-0021-01-01 Piping & Instrument Diagram - MDEA Stripping D 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0395/T-P-T-0628; C-N Commented TPVN H
PROCESS 2539-13-PID-0021-01-01 Piping & Instrument Diagram - MDEA Stripping 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-13-PID-0021-01X-01 MDEA Stripping 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-13-PID-0021-02-01 Piping & Instrument Diagram - MDEA Flash A 06-Nov-2015 IFR 11-Nov-2015 T-T-P-00074 IFR 24-Nov-2015 26-Nov-2015 T-P-T-0021 No Comment TPIT H
PROCESS 2539-13-PID-0021-02-01 Piping & Instrument Diagram - MDEA Flash B 11-Mar-2016 IDD 11-Mar-2016 T-T-P-00427 IDD No Comment TPIT H
PROCESS 2539-13-PID-0021-02-01 Piping & Instrument Diagram - MDEA Flash C 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0395/T-P-T-0628; C-N Commented TPVN H
PROCESS 2539-13-PID-0021-02-01 Piping & Instrument Diagram - MDEA Flash 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 05-Jan-2017 C-NH3-0526/T-P-T-0930 Commented TPVN C
PROCESS 2539-13-PID-0021-02X-01 Piping & Instrument Diagram - MDEA Flash - Dismantlin A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 C-NH3-0663/T-P-T-1511; C-NH3-0801/T-P-T-2011 Commented TPVN H
PROCESS 2539-13-PID-0021-02X-01 Piping & Instrument Diagram - MDEA Flash - Dismantlin 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-13-PID-0021-03-01 Piping & Instrument Diagram - CO2 Absorption Part 1 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-13-PID-0021-04-01 Piping & Instrument Diagram - CO2 Absorption Part 2 A 09-Mar-2016 IFR 11-Mar-2016 T-T-P-00426 IFA 24-Mar-2016 16-Mar-2016 T-P-T-0102 Approved TPIT H
PROCESS 2539-13-PID-0021-04-01 Piping & Instrument Diagram - CO2 Absorption Part 2 B 18-Mar-2016 IBD 18-Mar-2016 T-T-P-00452 IBD Transmitted TPIT H
PROCESS 2539-13-PID-0021-04-01 Piping & Instrument Diagram - CO2 Absorption Part 2 C 28-Mar-2016 IDD 31-May-2016 T-T-P-00617 IFR 13-Jun-2016 14-Jul-2016 T-P-T-0254 Approved TPVN H
PROCESS 2539-13-PID-0021-04-01 Piping & Instrument Diagram - CO2 Absorption Part 2 D 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0395/T-P-T-0628; C-N Commented TPVN H
PROCESS 2539-13-PID-0021-04-01 Piping & Instrument Diagram - CO2 Absorption Part 2 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-13-PID-0021-04X-01 CO2 Absorption Part 2 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-13-PID-0021-07-01 Piping & Instrument Diagram - CO2 OH Condenser A 06-Nov-2015 IFR 11-Nov-2015 T-T-P-00074 IFR 24-Nov-2015 26-Nov-2015 T-P-T-0021 No Comment TPIT H
PROCESS 2539-13-PID-0021-07-01 Piping & Instrument Diagram - CO2 OH Condenser B 09-Mar-2016 IDD 11-Mar-2016 T-T-P-00422 IDD No Comment TPIT H
PROCESS 2539-13-PID-0021-07-01 Piping & Instrument Diagram - CO2 OH Condenser C 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0395/T-P-T-0628; C-N Commented TPVN H
PROCESS 2539-13-PID-0021-07-01 Piping & Instrument Diagram - CO2 OH Condenser 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-13-SP-0570-01 Process Datasheet for 10-T-3001 Internals PA 18-Mar-2016 PI 22-Mar-2016 T-T-P-00459 IFA 04-Apr-2016 04-Apr-2016 T-P-T-0132 Approved TPIT H
PROCESS 2539-13-SP-0570-01 Process Datasheet for 10-T-3001 Internals PB 10-Aug-2016 PI 16-Aug-2016 T-T-P-00754 IFA 29-Aug-2016 08-Sep-2016 C-NH3-0276/T-P-T-0359; C-NH3-0480/T-P-T-0816 Commented TPVN C
PROCESS 2539-13-SP-0570-02 Process Datasheet for 10-T-3002 Internals PA 18-Mar-2016 PI 22-Mar-2016 T-T-P-00459 IFA 04-Apr-2016 04-Apr-2016 T-P-T-0132 Approved TPIT H
PROCESS 2539-13-SP-0570-02 Process Datasheet for 10-T-3002 Internals PB 10-Aug-2016 PI 16-Aug-2016 T-T-P-00754 IFA 29-Aug-2016 08-Sep-2016 C-NH3-0276/T-P-T-0359; C-NH3-0480/T-P-T-0816 Commented TPVN C
PROCESS 2539-13-SP-0610-01 Process Datasheet for Co2 Vent Cooler - 10-E-3007 PA 19-Jan-2016 PI 21-Jan-2016 T-T-P-00253 IFA 03-Feb-2016 18-Feb-2016 C-NH3-0096/T-P-T-0071; T-P-T-0154 Approved with comments TPIT H
PROCESS 2539-13-SP-0610-01 Process Datasheet for Co2 Vent Cooler - 10-E-3007 PB 11-Apr-2016 PI 14-Apr-2016 T-T-P-00539 Re-IFA 27-Apr-2016 01-Jun-2016 T-P-T-0195 Approved TPIT C
PROCESS 2539-13-SP-0660-01 Process Datasheet for Plates & Frames Heat Exchange PA 10-Jun-2016 PI 29-Jun-2016 T-T-P-00674 IFA 13-Jul-2016 14-Jul-2016 C-NH3-0216/T-P-T-0253; C-NH3-0245/T-P-T-0316 Approved with comments TPVN C
PROCESS 2539-13-SP-0870-01 Process Datasheet for 10-V-3001 Internals PA 18-Mar-2016 PI 22-Mar-2016 T-T-P-00458 IFA 04-Apr-2016 04-Apr-2016 T-P-T-0132 Approved TPIT H
PROCESS 2539-13-SP-0870-01 Process Datasheet for 10-V-3001 Internals PB 10-Aug-2016 PI 16-Aug-2016 T-T-P-00754 IFA 29-Aug-2016 08-Sep-2016 C-NH3-0276/T-P-T-0359; C-NH3-0480/T-P-T-0816 Commented TPVN H
PROCESS 2539-13-SP-0870-01 Process Datasheet for 10-V-3001 Internals PC 22-Feb-2017 PI 27-Feb-2017 T-T-P-01244 IFA 12-Mar-2017 10-Mar-2017 T-P-T-1517 Approved TPVN C
PROCESS 2539-13-SP-0870-02 Process Datasheet for 10-V3002 Internals PA 22-Feb-2017 PI 27-Feb-2017 T-T-P-01244 IFA 12-Mar-2017 10-Mar-2017 T-P-T-1517 Approved TPVN C
PROCESS 2539-14-PFD-0010-01-01 Process Flow Diagram Steam Balance Revamp Case 2: A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00010 IFR 22-Oct-2015 31-Oct-2015 C-NH3-00010/T-P-T-00004 Commented TPIT H
PROCESS 2539-14-PFD-0010-01-01 Process Flow Diagram Steam Balance Revamp Case 2: B 03-Mar-2016 IBD 07-Mar-2016 T-T-P-00394 IBD No Comment TPIT H
PROCESS 2539-14-PFD-0010-01-01 Process Flow Diagram Steam Balance Revamp Case 2: 0 09-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 10-Jan-2017 C-NH3-0540/T-P-T-0968 Commented TPVN C
PROCESS 2539-14-PFD-0010-11-01 Process Flow Diagram Steam Balance Revamp Case 3: A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00010 IFR 22-Oct-2015 31-Oct-2015 C-NH3-00010/T-P-T-00004 Commented TPIT H
PROCESS 2539-14-PFD-0010-11-01 Process Flow Diagram Steam Balance Revamp Case 3: B 12-Mar-2016 IBD 17-Mar-2016 T-T-P-00446 IBD No Comment TPIT H
PROCESS 2539-14-PFD-0010-11-01 Process Flow Diagram Steam Balance Revamp Case 3: 0 14-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 10-Jan-2017 C-NH3-0540/T-P-T-0968 Commented TPVN C
PROCESS 2539-14-PID-0021-01-01 Piping & Instrument Diagram - Process Air Compression A 09-Mar-2016 IFR 11-Mar-2016 T-T-P-00423 IFA 24-Mar-2016 16-Mar-2016 T-P-T-0102 Approved TPIT H
PROCESS 2539-14-PID-0021-01-01 Piping & Instrument Diagram - Process Air Compression B 18-Mar-2016 IBD 18-Mar-2016 T-T-P-00452 IBD Transmitted TPIT H
PROCESS 2539-14-PID-0021-01-01 Piping & Instrument Diagram - Process Air Compression C 28-Mar-2016 IDD 31-May-2016 T-T-P-00617 IFR 13-Jun-2016 14-Jul-2016 T-P-T-0254 Approved TPVN H
PROCESS 2539-14-PID-0021-01-01 Piping & Instrument Diagram - Process Air Compression D 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0395/T-P-T-0628; C-N Approved TPVN H
PROCESS 2539-14-PID-0021-01-01 Process Air Compression 10-K4021 (1st - 2nd Stage) 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-14-PID-0021-01X-01 Ping & Instrument Diagram - Process Air Compression 10 A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 C-NH3-0663/T-P-T-1511; C-NH3-0801/T-P-T-2011 Commented TPVN H
PROCESS 2539-14-PID-0021-01X-01 Ping & Instrument Diagram - Process Air Compression 10 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-14-PID-0021-02-01 Piping & Instrument Diagram - Process Air Compression A 09-Mar-2016 IFR 11-Mar-2016 T-T-P-00423 IFA 24-Mar-2016 16-Mar-2016 T-P-T-0102 Approved TPIT H
PROCESS 2539-14-PID-0021-02-01 Piping & Instrument Diagram - Process Air Compression B 18-Mar-2016 IBD 18-Mar-2016 T-T-P-00452 IBD Transmitted TPIT H
PROCESS 2539-14-PID-0021-02-01 Piping & Instrument Diagram - Process Air Compression C 28-Mar-2016 IDD 31-May-2016 T-T-P-00617 IFR 13-Jun-2016 14-Jul-2016 T-P-T-0254 Approved TPVN H
PROCESS 2539-14-PID-0021-02-01 Piping & Instrument Diagram - Process Air Compression D 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0395/T-P-T-0628; C-N Approved TPVN H
PROCESS 2539-14-PID-0021-02-01 Process Air Compression 10-K4021 (3rd - 4th Stage) 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-14-PID-0021-02X-01 Ping & Instrument Diagram - Process Air Compression 10 A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 C-NH3-0663/T-P-T-1511; C-NH3-0801/T-P-T-2011 Commented TPVN H
PROCESS 2539-14-PID-0021-02X-01 Ping & Instrument Diagram - Process Air Compression 10 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-14-PID-0021-03-01 Piping & Instrument Diagram - Stream Turbine for 10-K 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-14-PID-0021-04-01 Piping & Instrument Diagram - Synthesis Gas Compressi A 09-Mar-2016 IFR 11-Mar-2016 T-T-P-00423 IFA 24-Mar-2016 16-Mar-2016 T-P-T-0102 Approved TPIT H
PROCESS 2539-14-PID-0021-04-01 Piping & Instrument Diagram - Synthesis Gas Compressi B 18-Mar-2016 IBD 18-Mar-2016 T-T-P-00452 IBD Transmitted TPIT H
PROCESS 2539-14-PID-0021-04-01 Piping & Instrument Diagram - Synthesis Gas Compressi C 28-Mar-2016 IDD 31-May-2016 T-T-P-00617 IFR 13-Jun-2016 14-Jul-2016 T-P-T-0254 Approved TPVN H
PROCESS 2539-14-PID-0021-04-01 Piping & Instrument Diagram - Synthesis Gas Compressi D 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0395/T-P-T-0628; C-N Commented TPVN H
PROCESS 2539-14-PID-0021-04-01 Synthesis Gas Compression 10-K4031 (1st - 2nd Stage) 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-14-PID-0021-04X-01 Ping & Instrument Diagram - Synthesis Gas Compression A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 C-NH3-0663/T-P-T-1511; C-NH3-0801/T-P-T-2011 Commented TPVN H
PROCESS 2539-14-PID-0021-04X-01 Ping & Instrument Diagram - Synthesis Gas Compression 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-14-PID-0021-05-01 Synthesis Gas Compression 10-K4031 (3rd Stage) - Reci A 09-Mar-2016 IFR 16-Mar-2016 T-T-P-00439 IFA 29-Mar-2016 17-Mar-2016 T-P-T-0103 Approved TPIT H
PROCESS 2539-14-PID-0021-05-01 Synthesis Gas Compression 10-K4031 (3rd Stage) - Reci B 18-Mar-2016 IBD 18-Mar-2016 T-T-P-00452 IBD Transmitted TPIT H
PROCESS 2539-14-PID-0021-05-01 Synthesis Gas Compression 10-K4031 (3rd Stage) - Reci C 28-Mar-2016 IDD 31-May-2016 T-T-P-00617 IFR 13-Jun-2016 14-Jul-2016 T-P-T-0254 Approved TPVN H
PROCESS 2539-14-PID-0021-05-01 Synthesis Gas Compression 10-K4031 (3rd Stage) - Reci D 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0395/T-P-T-0628; C-N Commented TPVN H
PROCESS 2539-14-PID-0021-05-01 Synthesis Gas Compression 10-K4031 (3rd Stage) / Reci 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-14-PID-0021-05X-01 Ping & Instrument Diagram - Synthesis Gas Compression A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 C-NH3-0663/T-P-T-1511; C-NH3-0801/T-P-T-2011 Commented TPVN H
PROCESS 2539-14-PID-0021-05X-01 Ping & Instrument Diagram - Synthesis Gas Compression 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-14-PID-0021-06-01 Piping & Instrument Diagram - Stream Turbine for 10-K 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-14-PID-0021-07-01 Piping & Instrument Diagram - Ammonia Compression A 14-Sep-2016 IDD2 20-Sep-2016 T-T-P-00823 IFR 03-Oct-2016 13-Oct-2016 C-NH3-0322/T-P-T-0454; C-NH3-0431/T-P-T-0697 Commented TPVN H
PROCESS 2539-14-PID-0021-07-01 Piping & Instrument Diagram - Ammonia Compression 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-14-SP-0610-01 Process Datasheet for Shell & Tube Heat Exchangers - PA 29-Jan-2016 PI 05-Feb-2016 T-T-P-00291 IFA 18-Feb-2016 23-Feb-2016 T-P-T-0072 Approved TPIT H
PROCESS 2539-14-SP-0610-01 Process Datasheet for Shell & Tube Heat Exchangers - PB 18-May-2016 PI 30-May-2016 T-T-P-00613 IFA 12-Jun-2016 16-Jun-2016 C-NH3-0181/T-P-T-0210; C-NH3-0230/T-P-T-0287 Approved with comments TPIT C
PROCESS 2539-14-SP-0610-02 Process Datasheet for Process Air Compressor 2nd Sta PA 20-Jan-2016 PI 21-Jan-2016 T-T-P-00254 IFA 03-Feb-2016 23-Feb-2016 T-P-T-0072 Approved TPIT H
PROCESS 2539-14-SP-0610-02 Process Datasheet for Process Air Compressor 2nd Sta PB 18-May-2016 PI 30-May-2016 T-T-P-00613 IFA 12-Jun-2016 16-Jun-2016 C-NH3-0181/T-P-T-0210; C-NH3-0230/T-P-T-0287 Approved with comments TPIT C
PROCESS 2539-14-SP-0610-03 Process Datasheet for Process Air Compressor 3rd Sta PA 20-Jan-2016 PI 21-Jan-2016 T-T-P-00254 IFA 03-Feb-2016 23-Feb-2016 T-P-T-0072 Approved TPIT H
PROCESS 2539-14-SP-0610-03 Process Datasheet for Process Air Compressor 3rd Sta PB 18-May-2016 PI 30-May-2016 T-T-P-00613 IFA 12-Jun-2016 16-Jun-2016 C-NH3-0181/T-P-T-0210; C-NH3-0230/T-P-T-0287 Approved with comments TPIT C
PROCESS 2539-14-SP-0610-04 Process Datasheet for Synthesis Gas - Recirculation C PA 20-Jan-2016 PI 21-Jan-2016 T-T-P-00254 IFA 03-Feb-2016 23-Feb-2016 T-P-T-0072 Approved TPIT H
PROCESS 2539-14-SP-0610-04 Process Datasheet for Synthesis Gas - Recirculation C PB 18-May-2016 PI 30-May-2016 T-T-P-00613 IFA 12-Jun-2016 16-Jun-2016 C-NH3-0181/T-P-T-0210; C-NH3-0230/T-P-T-0287 Approved with comments TPIT C
PROCESS 2539-14-SP-0610-05 Process Datasheet for Synthesis Gas - Recirculation PA 20-Jan-2016 PI 21-Jan-2016 T-T-P-00254 IFA 03-Feb-2016 23-Feb-2016 T-P-T-0072 Approved TPIT H
PROCESS 2539-14-SP-0610-05 Process Datasheet for Synthesis Gas - Recirculation PB 18-May-2016 PI 30-May-2016 T-T-P-00613 IFA 12-Jun-2016 16-Jun-2016 C-NH3-0181/T-P-T-0210; C-NH3-0230/T-P-T-0287 Approved with comments TPIT C
PROCESS 2539-14-SP-0610-06 Process Datasheet for Shell & Tube Heat Exchangers - PA 26-Jan-2016 PI 29-Jan-2016 T-T-P-00267 IFA 11-Feb-2016 23-Feb-2016 T-P-T-0072 Approved TPIT H
PROCESS 2539-14-SP-0610-06 Process Datasheet for Shell & Tube Heat Exchangers - PB 18-May-2016 PI 30-May-2016 T-T-P-00613 IFA 12-Jun-2016 16-Jun-2016 C-NH3-0181/T-P-T-0210; C-NH3-0230/T-P-T-0287 Approved with comments TPIT C
PROCESS 2539-14-SP-0810-01 Process Datasheet for Air Compressor 1st Stage Separa PA 22-Mar-2016 PI 24-Mar-2016 T-T-P-00469 IFA 06-Apr-2016 07-Apr-2016 C-NH3-0133/T-P-T-0135; C-NH3-0258/T-P-T-0333 Approved with comments TPIT H
PROCESS 2539-14-SP-0810-01 Process Datasheet for Air Compressor 1st Stage Separa PB 10-Aug-2016 PI 16-Aug-2016 T-T-P-00754 IFA 29-Aug-2016 02-Sep-2016 C-NH3-0277/T-P-T-0360; C-NH3-0335/T-P-T-0474 Approved with comments TPVN C
PROCESS 2539-14-SP-0810-02 Process Datasheet for Air Compressor 2nd Stage Separa PA 22-Mar-2016 PI 24-Mar-2016 T-T-P-00469 IFA 06-Apr-2016 07-Apr-2016 C-NH3-0133/T-P-T-0135; C-NH3-0258/T-P-T-0333 Approved with comments TPIT H
PROCESS 2539-14-SP-0810-02 Process Datasheet for Air Compressor 2nd Stage Separa PB 10-Aug-2016 PI 16-Aug-2016 T-T-P-00754 IFA 29-Aug-2016 02-Sep-2016 C-NH3-0277/T-P-T-0360; C-NH3-0335/T-P-T-0474 Approved with comments TPVN C
PROCESS 2539-14-SP-0810-03 Process Datasheet for Air Compressor 3rd Stage Separa PA 22-Mar-2016 PI 24-Mar-2016 T-T-P-00469 IFA 06-Apr-2016 07-Apr-2016 C-NH3-0133/T-P-T-0135; C-NH3-0258/T-P-T-0333 Approved with comments TPIT H
PROCESS 2539-14-SP-0810-03 Process Datasheet for Air Compressor 3rd Stage Separa PB 10-Aug-2016 PI 16-Aug-2016 T-T-P-00754 IFA 29-Aug-2016 02-Sep-2016 C-NH3-0277/T-P-T-0360; C-NH3-0335/T-P-T-0474 Approved with comments TPVN C
PROCESS 2539-14-SP-0810-04 Process Datasheet for Synthesis Gas - Recirc. Compres PA 22-Mar-2016 PI 24-Mar-2016 T-T-P-00469 IFA 06-Apr-2016 07-Apr-2016 C-NH3-0134/T-P-T-0135; C-NH3-0259/T-P-T-0334 Approved with comments TPIT H
PROCESS 2539-14-SP-0810-04 Process Datasheet for Synthesis Gas - Recirc. Compres PB 10-Aug-2016 PI 16-Aug-2016 T-T-P-00754 IFA 29-Aug-2016 02-Sep-2016 C-NH3-0277/T-P-T-0360; C-NH3-0335/T-P-T-0474 Approved with comments TPVN C
PROCESS 2539-14-SP-0810-05 Process Datasheet for Synthesis Gas - Recirc. Compres PA 22-Mar-2016 PI 24-Mar-2016 T-T-P-00469 IFA 06-Apr-2016 07-Apr-2016 C-NH3-0134/T-P-T-0135; C-NH3-0259/T-P-T-0334 Approved with comments TPIT H
PROCESS 2539-14-SP-0810-05 Process Datasheet for Synthesis Gas - Recirc. Compres PB 10-Aug-2016 PI 16-Aug-2016 T-T-P-00754 IFA 29-Aug-2016 02-Sep-2016 C-NH3-0277/T-P-T-0360; C-NH3-0335/T-P-T-0474 Approved with comments TPVN C
PROCESS 2539-14-SP-0810-06 Process Datasheet for Synthesis Gas - Recirc. Compres PA 22-Mar-2016 PI 24-Mar-2016 T-T-P-00469 IFA 06-Apr-2016 07-Apr-2016 C-NH3-0134/T-P-T-0135; C-NH3-0259/T-P-T-0334 Approved with comments TPIT H
PROCESS 2539-14-SP-0810-06 Process Datasheet for Synthesis Gas - Recirc. Compres PB 10-Aug-2016 PI 16-Aug-2016 T-T-P-00754 IFA 29-Aug-2016 02-Sep-2016 C-NH3-0277/T-P-T-0360; C-NH3-0335/T-P-T-0474 Approved with comments TPVN C
PROCESS 2539-14-SP-1112-01 Process Datasheet for Steam Turbine for 10-K-4021 PA 27-Jan-2016 PI 02-Feb-2016 T-T-P-00274 IFA 15-Feb-2016 29-Feb-2016 C-NH3-0104/T-P-T-0080 Approved with comments TPIT H
PROCESS 2539-14-SP-1112-01 Process Datasheet for Steam Turbine for 10-K-4021 PB 11-May-2016 PI 19-May-2016 T-T-P-00595 IFA 01-Jun-2016 13-Jun-2016 C-NH3-0178/T-P-T-0206; C-NH3-0246/T-P-T-0317; C-N Commented TPIT H
Page 29
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
PROCESS 2539-14-SP-1112-01 Process Datasheet for Steam Turbine for 10-K-4021 PC 22-Dec-2016 PI 26-Dec-2016 T-T-P-01085 IFA 08-Jan-2017 13-Jan-2017 C-NH3-0547/T-P-T-1002 Commented TPVN C
PROCESS 2539-14-SP-1112-02 Process Datasheet for Steam Turbine for 10-K-4031 PA 16-Oct-2015 PI 16-Oct-2015 T-T-P-00014 IFR 29-Oct-2015 No Comment TPIT H
PROCESS 2539-14-SP-1112-02 Process Datasheet for Steam Turbine for 10-K-4031 PB 17-Dec-2015 PI 18-Dec-2015 T-T-P-00195 IFA 31-Dec-2015 21-Jan-2016 C-NH3-0090/T-P-T-0063 Commented TPIT H
PROCESS 2539-14-SP-1112-02 Process Datasheet for Steam Turbine for 10-K-4031 PC 11-May-2016 PI 19-May-2016 T-T-P-00595 IFA 01-Jun-2016 14-Jun-2016 C-NH3-0179/T-P-T-0207; C-NH3-0253/T-P-T-0325; C-N Commented TPIT H
PROCESS 2539-14-SP-1112-02 Process Datasheet for Steam Turbine for 10-K-4031 PD 22-Dec-2016 PI 26-Dec-2016 T-T-P-01085 IFA 08-Jan-2017 13-Jan-2017 C-NH3-0547/T-P-T-1002 Commented TPVN C
PROCESS 2539-15-PFD-0010-01-01 Process Flow Diagram Ammonia Synthesis Loop Part 1 A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00011 IFR 22-Oct-2015 31-Oct-2015 C-NH3-00011/T-P-T-00004 Commented TPIT H
PROCESS 2539-15-PFD-0010-01-01 Process Flow Diagram Ammonia Synthesis Loop Part 1 B 03-Mar-2016 IBD 03-Mar-2016 T-T-P-00395 IBD No Comment TPIT H
PROCESS 2539-15-PFD-0010-01-01 Process Flow Diagram Ammonia Synthesis Loop Part 1 0 09-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 10-Jan-2017 C-NH3-0540/T-P-T-0968 Commented TPVN H
PROCESS 2539-15-PFD-0010-01-01 Process Flow Diagram Ammonia Synthesis Loop Part 1 1 31-Mar-2017 FIN 03-Apr-2017 T-T-P-01334 IFA 16-Apr-2017 17-Apr-2017 T-P-T-1841 Approved TPVN C
PROCESS 2539-15-PFD-0010-02-01 Process Flow Diagram Ammonia Synthesis Loop Part 2 A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00011 IFR 22-Oct-2015 No Comment TPIT H
PROCESS 2539-15-PFD-0010-02-01 Process Flow Diagram Ammonia Synthesis Loop Part 2 B 03-Mar-2016 IBD 03-Mar-2016 T-T-P-00395 IBD No Comment TPIT H
PROCESS 2539-15-PFD-0010-02-01 Process Flow Diagram Ammonia Synthesis Loop Part 2 0 09-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 Transmitted TPVN C
PROCESS 2539-15-PFD-0010-03-01 Process Flow Diagram Ammonia Refigeration Revamp C A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00011 IFR 22-Oct-2015 No Comment TPIT H
PROCESS 2539-15-PFD-0010-03-01 Process Flow Diagram Ammonia Refigeration Revamp C B 03-Mar-2016 IBD 03-Mar-2016 T-T-P-00395 IBD No Comment TPIT H
PROCESS 2539-15-PFD-0010-03-01 Process Flow Diagram Ammonia Refigeration Revamp C 0 09-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 Transmitted TPVN C
PROCESS 2539-15-PFD-0010-04-01 Process Flow Diagram Ammonia Recovery Revamp Case A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00011 IFR 22-Oct-2015 No Comment TPIT H
PROCESS 2539-15-PFD-0010-04-01 Process Flow Diagram Ammonia Recovery Revamp Case B 03-Mar-2016 IBD 03-Mar-2016 T-T-P-00395 IBD No Comment TPIT H
PROCESS 2539-15-PFD-0010-04-01 Process Flow Diagram Ammonia Recovery Revamp Case 0 09-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 10-Jan-2017 C-NH3-0540/T-P-T-0968 Commented TPVN C
PROCESS 2539-15-PFD-0010-11-01 Process Flow Diagram Ammonia Synthesis Loop Part 1 A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00011 IFR 22-Oct-2015 31-Oct-2015 C-NH3-00011/T-P-T-00004 Commented TPIT H
PROCESS 2539-15-PFD-0010-11-01 Process Flow Diagram Ammonia Synthesis Loop Part 1 B 12-Mar-2016 IBD 17-Mar-2016 T-T-P-00446 IBD No Comment TPIT H
PROCESS 2539-15-PFD-0010-11-01 Process Flow Diagram Ammonia Synthesis Loop Part 1 0 14-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 10-Jan-2017 C-NH3-0540/T-P-T-0968 Commented TPVN H
PROCESS 2539-15-PFD-0010-11-01 Process Flow Diagram Ammonia Synthesis Loop Part 1 1 31-Mar-2017 FIN 03-Apr-2017 T-T-P-01334 IFA 16-Apr-2017 17-Apr-2017 T-P-T-1841 Approved TPVN C
PROCESS 2539-15-PFD-0010-12-01 Process Flow Diagram Ammonia Synthesis Loop Part 2 A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00011 IFR 22-Oct-2015 No Comment TPIT H
PROCESS 2539-15-PFD-0010-12-01 Process Flow Diagram Ammonia Synthesis Loop Part 2 B 12-Mar-2016 IBD 17-Mar-2016 T-T-P-00446 IBD No Comment TPIT H
PROCESS 2539-15-PFD-0010-12-01 Process Flow Diagram Ammonia Synthesis Loop Part 2 0 14-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 Transmitted TPVN C
PROCESS 2539-15-PFD-0010-13-01 Process Flow Diagram Ammonia Refigeration Revamp Ca A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00011 IFR 22-Oct-2015 No Comment TPIT H
PROCESS 2539-15-PFD-0010-13-01 Process Flow Diagram Ammonia Refigeration Revamp Ca B 12-Mar-2016 IBD 17-Mar-2016 T-T-P-00446 IBD No Comment TPIT H
PROCESS 2539-15-PFD-0010-13-01 Process Flow Diagram Ammonia Refigeration Revamp Ca 0 14-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 10-Jan-2017 C-NH3-0540/T-P-T-0968 Commented TPVN C
PROCESS 2539-15-PFD-0010-14-01 Process Flow Diagram Ammonia Recovery Revamp Case A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00011 IFR 22-Oct-2015 No Comment TPIT H
PROCESS 2539-15-PFD-0010-14-01 Process Flow Diagram Ammonia Recovery Revamp Case B 12-Mar-2016 IBD 17-Mar-2016 T-T-P-00446 IBD No Comment TPIT H
PROCESS 2539-15-PFD-0010-14-01 Process Flow Diagram Ammonia Recovery Revamp Case 0 14-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 10-Jan-2017 C-NH3-0540/T-P-T-0968 Commented TPVN C
PROCESS 2539-15-PID-0021-01-01 Piping & Instrument Diagram - Ammonia Synthesis Part A 06-Nov-2015 IFR 11-Nov-2015 T-T-P-00073 IFR 24-Nov-2015 26-Nov-2015 C-NH3-0046/T-P-T-0020 No Comment TPIT H
PROCESS 2539-15-PID-0021-01-01 Piping & Instrument Diagram - Ammonia Synthesis Part B 09-Mar-2016 IDD 11-Mar-2016 T-T-P-00422 IDD No Comment TPIT H
PROCESS 2539-15-PID-0021-01-01 Piping & Instrument Diagram - Ammonia Synthesis Part C 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0395/T-P-T-0628; C-N Approved TPVN H
PROCESS 2539-15-PID-0021-01-01 Piping & Instrument Diagram - Ammonia Synthesis Part 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-15-PID-0021-02-01 Piping & Instrument Diagram - Ammonia Synthesis Part A 06-Nov-2015 IFR 11-Nov-2015 T-T-P-00073 IFR 24-Nov-2015 26-Nov-2015 C-NH3-0046/T-P-T-0020 No Comment TPIT H
PROCESS 2539-15-PID-0021-02-01 Piping & Instrument Diagram - Ammonia Synthesis Part B 09-Mar-2016 IDD 11-Mar-2016 T-T-P-00422 IDD No Comment TPIT H
PROCESS 2539-15-PID-0021-02-01 Piping & Instrument Diagram - Ammonia Synthesis Part C 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0395/T-P-T-0628; C-N Approved TPVN H
PROCESS 2539-15-PID-0021-02-01 Piping & Instrument Diagram - Ammonia Synthesis Part 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-15-PID-0021-02X-01 Piping & Instrument Diagram - Ammonia Synthesis Part 2 A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-15-PID-0021-02X-01 Piping & Instrument Diagram - Ammonia Synthesis Part 2 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-15-PID-0021-03-01 Synthesis Gas Compression 10-K4031 (3rd Stage) - Reci A 14-Sep-2016 IDD2 20-Sep-2016 T-T-P-00823 IFR 03-Oct-2016 13-Oct-2016 C-NH3-0322/T-P-T-0454; C-NH3-0431/T-P-T-0697 Approved TPVN H
PROCESS 2539-15-PID-0021-03-01 Piping & Instrument Diagram - Ammonia Synthesis Part 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-15-PID-0021-04-01 Piping & Instrument Diagram - Ammonia Synthesis Part 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 05-Jan-2017 C-NH3-0526/T-P-T-0930 Commented TPVN C
PROCESS 2539-15-PID-0021-04X-01 Piping & Instrument Diagram - Ammonia Synthesis Part 4 A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-15-PID-0021-04X-01 Piping & Instrument Diagram - Ammonia Synthesis Part 4 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-15-PID-0021-05-01 Piping & Instrument Diagram - Ammonia Synthesis Part 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-15-PID-0021-06-01 Utility Distribution Diagram - Ammonia Synthesis Part 6 A 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0395/T-P-T-0628; C-N Commented TPVN H
PROCESS 2539-15-PID-0021-06-01 Utility Distribution Diagram - Ammonia Synthesis Part 6 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 05-Jan-2017 C-NH3-0526/T-P-T-0930 Commented TPVN C
PROCESS 2539-15-PID-0021-08-01 Piping & Instrument Diagram - Ammonia Absorption 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-15-PID-0021-10-01 Piping & Instrument Diagram - Ammonia Distillation 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-15-PID-0021-11-01 Piping & Instrument Diagram - Ammonia Synthesis Part A 06-Nov-2015 IFR 11-Nov-2015 T-T-P-00073 IFR 24-Nov-2015 26-Nov-2015 C-NH3-0046/T-P-T-0020 Commented TPIT H
PROCESS 2539-15-PID-0021-11-01 Piping & Instrument Diagram - Ammonia Synthesis Part B 09-Mar-2016 IDD 11-Mar-2016 T-T-P-00422 IDD No Comment TPIT H
PROCESS 2539-15-PID-0021-11-01 Piping & Instrument Diagram - Ammonia Synthesis Part C 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0322/T-P-T-0454; C-NHCommented TPVN H
PROCESS 2539-15-PID-0021-11-01 Piping & Instrument Diagram - Ammonia Synthesis Part 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-15-SP-0160-01 Process Datasheet for 10-E5000 Loop Waste Heat Boiler PA 17-Nov-2015 PI 19-Nov-2015 T-T-P-00089 IFR 02-Dec-2015 07-Dec-2015 T-P-T-0028 Approved TPIT H
PROCESS 2539-15-SP-0160-01 Process Datasheet for 10-E5000 Loop Waste Heat Boiler PB 21-Jul-2016 PI 22-Jul-2016 T-T-P-00712 IFA 04-Aug-2016 08-Aug-2016 T-P-T-0306 Approved TPVN C
PROCESS 2539-15-SP-0410-01 Process Datasheet for 10- R5002 Ammonia Converter N PA 17-Nov-2015 PI 19-Nov-2015 T-T-P-00088 IFR 02-Dec-2015 07-Dec-2015 C-NH3-0051/T-P-T-0027 Commented TPIT H
PROCESS 2539-15-SP-0410-01 Process Datasheet for 10- R5002 Ammonia Converter N PB 21-Jul-2016 PI 22-Jul-2016 T-T-P-00712 IFA 04-Aug-2016 08-Aug-2016 T-P-T-0306 Approved TPVN C
PROCESS 2539-15-SP-0836-01 Process Datasheet for Silencer 10-SL5001 PA 31-Oct-2016 PI 04-Nov-2016 T-T-P-00932 IFA 17-Nov-2016 24-Nov-2016 C-NH3-0413/T-P-T-0662 Commented TPVN C
PROCESS 2539-15-SP-1560-01 Process Datasheet for Analysers - 10-AIT-5021 PA 18-Jan-2016 PI 22-Jan-2016 T-T-P-00261 IFA 04-Feb-2016 24-Feb-2016 C-NH3-0099/T-P-T-0074 Commented TPIT H
PROCESS 2539-15-SP-1560-01 Process Datasheet for Analysers - 10-AIT-5021 PB 25-Mar-2016 PI 08-Apr-2016 T-T-P-00514 Re-IFA 21-Apr-2016 No Comment TPIT H
PROCESS 2539-15-SP-1560-01 Process Datasheet for Analysers - 10-AIT-5021 PC 17-May-2016 FIN 18-May-2016 T-T-P-00593 FIN Transmitted TPVN C
PROCESS 2539-15-SP-1560-02 Process Datasheet for Analysers - 10-AIT-5022 PA 18-Jan-2016 PI 22-Jan-2016 T-T-P-00261 IFA 04-Feb-2016 24-Feb-2016 C-NH3-0099/T-P-T-0074 Commented TPIT H
PROCESS 2539-15-SP-1560-02 Process Datasheet for Analysers - 10-AIT-5022 PB 25-Mar-2016 PI 08-Apr-2016 T-T-P-00514 Re-IFA 21-Apr-2016 24-May-2016 C-NH3-0158/T-P-T-0177 Approved with comments TPIT H
PROCESS 2539-15-SP-1560-02 Process Datasheet for Analysers - 10-AIT-5022 PC 17-May-2016 FIN 18-May-2016 T-T-P-00593 FIN Transmitted TPVN C
PROCESS 2539-17-PID-0021-01-01 Piping & Instrument Diagram - Process Condensate Stri A 14-Mar-2016 IFR 16-Mar-2016 T-T-P-00439 IFA 29-Mar-2016 17-Mar-2016 T-P-T-0103 Approved TPIT H
PROCESS 2539-17-PID-0021-01-01 Piping & Instrument Diagram - Process Condensate Stri B 18-Mar-2016 IBD 18-Mar-2016 T-T-P-00452 IBD Transmitted TPIT H
PROCESS 2539-17-PID-0021-01-01 Piping & Instrument Diagram - Process Condensate Stri C 28-Mar-2016 IDD 31-May-2016 T-T-P-00617 IFR 13-Jun-2016 14-Jul-2016 T-P-T-0254 Approved TPVN H
PROCESS 2539-17-PID-0021-01-01 Piping & Instrument Diagram - Process Condensate Stri D 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0395/T-P-T-0628; C-N Approved TPVN H
PROCESS 2539-17-PID-0021-01-01 Piping & Instrument Diagram - Process Condensate Stri 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-17-PID-0021-02-01 Piping & Instrument Diagram - Blowdown System A 06-Nov-2015 IFR 11-Nov-2015 T-T-P-00075 IFR 24-Nov-2015 26-Nov-2015 T-P-T-0021 No Comment TPIT H
PROCESS 2539-17-PID-0021-02-01 Piping & Instrument Diagram - Blowdown System B 09-Mar-2016 IDD 11-Mar-2016 T-T-P-00422 IDD No Comment TPIT H
PROCESS 2539-17-PID-0021-02-01 Piping & Instrument Diagram - Blowdown System C 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0395/T-P-T-0628; C-N Approved TPVN H
PROCESS 2539-17-PID-0021-02-01 Piping & Instrument Diagram - Blowdown System 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-17-SP-0660-01 Process Datasheet for Plates & Frames Heat Exchange PA 18-Mar-2016 PI 24-Mar-2016 T-T-P-00467 IFA 06-Apr-2016 05-Apr-2016 T-P-T-0134 Approved TPIT H
PROCESS 2539-17-SP-0660-01 Process Datasheet for Plates & Frames Heat Exchange PB 10-Jun-2016 PI 29-Jun-2016 T-T-P-00673 IFA 12-Jul-2016 18-Jul-2016 C-NH3-0215/T-P-T-0252; C-NH3-0253/T-P-T-0324 Approved with comments TPVN C
PROCESS 2539-18-PFD-0010-01-01 Process Flow Diagram Stream Generation System Reva A 23-Oct-2015 IFR 23-Oct-2015 T-T-P-00028 IFR 05-Nov-2015 11-Nov-2015 C-NH3-0022/T-P-T-0010 Commented TPIT H
PROCESS 2539-18-PFD-0010-01-01 Process Flow Diagram Stream Generation System Reva B 24-Mar-2016 IBD 25-Mar-2016 T-T-P-00489 IBD No Comment TPIT H
PROCESS 2539-18-PFD-0010-01-01 Process Flow Diagram Stream Generation System Reva 0 15-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 10-Jan-2017 C-NH3-0540/T-P-T-0968 Commented TPVN C
PROCESS 2539-18-PFD-0010-11-01 Process Flow Diagram Stream Generation System Reva A 26-Oct-2015 IFR 27-Oct-2015 T-T-P-00034 IFR 09-Nov-2015 11-Nov-2015 C-NH3-0021/T-P-T-0010 Commented TPIT H
PROCESS 2539-18-PFD-0010-11-01 Process Flow Diagram Stream Generation System Reva B 24-Mar-2016 IBD 25-Mar-2016 T-T-P-00489 IBD No Comment TPIT H
PROCESS 2539-18-PFD-0010-11-01 Process Flow Diagram Stream Generation System Reva 0 15-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 10-Jan-2017 C-NH3-0540/T-P-T-0968 Commented TPVN C
PROCESS 2539-18-PID-0031-02-02 Piping & Instrument Diagram - Dosing Unit Supply for A 09-Mar-2016 IFR 11-Mar-2016 T-T-P-00423 IFA 24-Mar-2016 16-Mar-2016 T-P-T-0102 Approved TPIT H
PROCESS 2539-18-PID-0031-02-02 Piping & Instrument Diagram - Dosing Unit Supply for B 18-Mar-2016 IBD 18-Mar-2016 T-T-P-00452 IBD Transmitted TPIT H
PROCESS 2539-18-PID-0031-02-02 Piping & Instrument Diagram - Dosing Unit Supply for C 28-Mar-2016 IDD 31-May-2016 T-T-P-00617 IFR 13-Jun-2016 14-Jul-2016 T-P-T-0254 Approved TPVN H
PROCESS 2539-18-PID-0031-02-02 Piping & Instrument Diagram - Dosing Unit Supply for D 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0395/T-P-T-0628; C-N Approved TPVN H
PROCESS 2539-18-PID-0031-02-02 Piping & Instrument Diagram - Dosing Unit Supply for 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-18-PID-0031-06-01 Piping & Instrument Diagram - Dosing Unit Supply for A 09-Mar-2016 IFR 11-Mar-2016 T-T-P-00423 IFA 24-Mar-2016 16-Mar-2016 T-P-T-0102 Approved TPIT H
PROCESS 2539-18-PID-0031-06-01 Piping & Instrument Diagram - Dosing Unit Supply for B 18-Mar-2016 IBD 18-Mar-2016 T-T-P-00452 IBD Transmitted TPIT H
PROCESS 2539-18-PID-0031-06-01 Piping & Instrument Diagram - Dosing Unit Supply for C 28-Mar-2016 IDD 31-May-2016 T-T-P-00617 IFR 13-Jun-2016 14-Jul-2016 T-P-T-0254 Approved TPVN H
PROCESS 2539-18-PID-0031-06-01 Piping & Instrument Diagram - Dosing Unit Supply for D 31-Aug-2016 IDD2 07-Sep-2016 T-T-P-00796 IFR 20-Sep-2016 06-Oct-2016 C-NH3-0312/T-P-T-0426; C-NH3-0395/T-P-T-0628; C-N Approved TPVN H
PROCESS 2539-18-PID-0031-06-01 Piping & Instrument Diagram - Dosing Unit Supply for 0 28-Nov-2016 IFC 30-Nov-2016 T-T-P-01007 IFA 13-Dec-2016 Transmitted TPVN C
PROCESS 2539-18-SP-0940-01 Process Datasheet for Phosphate Dosing Pumps - 10-E PA 18-Mar-2016 PI 25-Mar-2016 T-T-P-00481 IFA 07-Apr-2016 12-Apr-2016 C-NH3-0138/T-P-T-0144 Commented TPIT H
PROCESS 2539-18-SP-0940-01 Process Datasheet for Phosphate Dosing Pumps - 10-E PB 13-Jun-2016 PI 20-Jun-2016 T-T-P-00659 IFA 03-Jul-2016 08-Aug-2016 T-P-T-0302 Approved TPVN C
PROCESS 2539-30-DW-1933-01-01 Utility Production Firefighting Layout A 23-Dec-2015 IFR 23-Dec-2015 T-T-P-00210 IFR 05-Jan-2016 08-Jan-2016 T-P-T-0059 Approved TPIT H
PROCESS 2539-30-DW-1950-01-01 Utility Production Fire And Gas Layout A 23-Dec-2015 IFR 23-Dec-2015 T-T-P-00210 IFR 05-Jan-2016 08-Jan-2016 T-P-T-0059 Approved TPIT H
PROCESS 2539-30-MSD-0011-21-01 Material Selection Diagram C.W. Balance A 27-Nov-2015 IFR 02-Dec-2015 T-T-P-00139 IFR 16-Dec-2015 29-Dec-2015 T-P-T-0054 Approved TPIT H
PROCESS 2539-30-MSD-0011-21-01 Material Selection Diagram C.W. Balance B 29-Mar-2016 IBD 04-Apr-2016 T-T-P-00502 IBD No Comment TPIT H
PROCESS 2539-30-MSD-0011-21-01 Material Selection Diagram C.W. Balance 0 30-Dec-2016 FIN 04-Jan-2017 T-T-P-01104 IFA 17-Jan-2017 23-Jan-2017 T-P-T-1141 Approved TPVN C
PROCESS 2539-30-NM-0003-01 Utility Consumption Summary Unit 30 - Case 2 A 23-Dec-2015 IFR 23-Dec-2015 T-T-P-00214 IFR 05-Jan-2016 No Comment TPIT H
PROCESS 2539-30-NM-0003-01 Utility Consumption Summary Unit 30 - Case 2 B 29-Mar-2016 IBD 04-Apr-2016 T-T-P-00505 IBD No Comment TPIT H
PROCESS 2539-30-NM-0003-01 Utility Consumption Summary Unit 30 - Case 2 0 25-Jan-2017 FIN 02-Feb-2017 T-T-P-01190 IFA 15-Feb-2017 16-Feb-2017 T-P-T-1269 Approved TPVN C
PROCESS 2539-30-NM-0003-02 Utility Consumption Summary Unit 30 - Case 3 A 23-Dec-2015 IFR 23-Dec-2015 T-T-P-00214 IFR 05-Jan-2016 No Comment TPIT H
PROCESS 2539-30-NM-0003-02 Utility Consumption Summary Unit 30 - Case 3 B 29-Mar-2016 IBD 04-Apr-2016 T-T-P-00505 IBD No Comment TPIT H
PROCESS 2539-30-NM-0003-02 Utility Consumption Summary Unit 30 - Case 3 0 25-Jan-2017 FIN 02-Feb-2017 T-T-P-01190 IFA 15-Feb-2017 16-Feb-2017 T-P-T-1269 Approved TPVN C
PROCESS 2539-30-NM-0004-01 Chemical Consumption Summary - Unit 30 A 03-Feb-2016 IFR 04-Feb-2016 T-T-P-00278 IFR 17-Feb-2016 No Comment TPIT H
PROCESS 2539-30-NM-0004-01 Chemical Consumption Summary - Unit 30 B 24-Mar-2016 IBD 25-Mar-2016 T-T-P-00486 IBD No Comment TPIT H
PROCESS 2539-30-NM-0004-01 Chemical Consumption Summary - Unit 30 0 23-Dec-2016 FIN 23-Dec-2016 T-T-P-01082 IFA 05-Jan-2017 05-Jan-2017 C-NH3-0530/T-P-T-0942; C-NH3-0588/T-P-T-1156 Commented TPVN C
PROCESS 2539-30-NM-0005-01 Liquid Effluent Summary - Unit 30 A 03-Feb-2016 IFR 04-Feb-2016 T-T-P-00279 IFR 17-Feb-2016 No Comment TPIT H
PROCESS 2539-30-NM-0005-01 Liquid Effluent Summary - Unit 30 B 29-Mar-2016 IBD 04-Apr-2016 T-T-P-00507 IBD No Comment TPIT H
PROCESS 2539-30-NM-0005-01 Liquid Effluent Summary - Unit 30 0 25-Jan-2017 FIN 02-Feb-2017 T-T-P-01190 IFA 15-Feb-2017 16-Feb-2017 T-P-T-1269 Approved TPVN C
Page 30
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
PROCESS 2539-30-NM-0006-01 Pressure Relief Valves & Rupture Disks Summary of Rat A 26-Feb-2016 IBD 25-Feb-2016 T-T-P-00353 IFR 09-Mar-2016 No Comment TPIT H
PROCESS 2539-30-NM-0006-01 Pressure Relief Valves & Rupture Disks Summary of Rat B 29-Mar-2016 IDD 08-Apr-2016 T-T-P-00515 IDD No Comment TPIT H
PROCESS 2539-30-NM-0006-01 Pressure Relief Valves & Rupture Disks Summary of Rat 0 21-Mar-2017 FIN 31-Mar-2017 T-T-P-01328 IFA 13-Apr-2017 17-Apr-2017 T-P-T-1840 Approved TPVN C
PROCESS 2539-30-NM-0022-01 Mechanical Line List A 21-Jan-2016 IFR 22-Jan-2016 T-T-P-00257 IFR 04-Feb-2016 No Comment TPIT H
PROCESS 2539-30-NM-0022-01 Mechanical Line List B 07-Apr-2016 IDD1 08-Apr-2016 T-T-P-00519 IDD No Comment TPIT H
PROCESS 2539-30-NM-0022-01 Mechanical Line List C 07-Nov-2016 IDD2 08-Nov-2016 T-T-P-00942 IFR 22-Nov-2016 01-Dec-2016 T-P-T-0699 Approved TPVN H
PROCESS 2539-30-NM-0022-01 Mechanical Line List 0 21-Dec-2016 IFC 22-Dec-2016 T-T-P-01070 IFA 04-Jan-2017 No Comment TPVN H
PROCESS 2539-30-NM-0022-01 Mechanical Line List 1 30-Mar-2017 IFC 03-Apr-2017 T-T-P-01329 IFA 16-Apr-2017 21-Apr-2017 T-P-T-1854 Approved TPVN C
PROCESS 2539-30-PFD-0010-21-01 Process Flow Diagram C.W. Balance A 23-Oct-2015 IFR 23-Oct-2015 T-T-P-00030 IFR 05-Nov-2015 12-Nov-2015 C-NH3-0030/T-P-T-0011 Commented TPIT H
PROCESS 2539-30-PFD-0010-21-01 Process Flow Diagram C.W. Balance B 09-Mar-2016 IBD 16-Mar-2016 T-T-P-00437 IBD No Comment TPIT H
PROCESS 2539-30-PFD-0010-21-01 Process Flow Diagram C.W. Balance 0 15-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 Transmitted TPVN C
PROCESS 2539-30-PID-0031-01-01 Piping & Instrument Diagram - Analysis Point A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00094 IFR 03-Dec-2015 14-Dec-2015 C-NH3-0063/T-P-T-0033 Commented TPIT H
PROCESS 2539-30-PID-0031-01-01 Piping & Instrument Diagram - Analysis Point B 16-Mar-2016 IDD 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-30-PID-0031-01-01 Piping & Instrument Diagram - Analysis Point C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-30-PID-0031-01-01 Piping & Instrument Diagram - Analysis Point 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-30-PID-0031-51-01 Utility Distribution Diagram - Steam & Condensate Distri A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00094 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-30-PID-0031-51-01 Utility Distribution Diagram - Steam & Condensate Distri B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-30-PID-0031-51-01 Utility Distribution Diagram - Steam & Condensate Distri C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-30-PID-0031-51-01 Utility Distribution Diagram - Steam & Condensate Distri 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-30-PID-0031-51X-01 Utility Distribution Diagram - Steam & Condensate Distri A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-30-PID-0031-51X-01 Utility Distribution Diagram - Steam & Condensate Distri 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-30-PID-0031-52-01 Utility Distribution Diagram - Water Distribution (Demi - A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00094 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-30-PID-0031-52-01 Utility Distribution Diagram - Water Distribution (Demi - B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-30-PID-0031-52-01 Utility Distribution Diagram - Water Distribution (Demi - C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 24-Oct-2016 C-NH3-0345/T-P-T-0494; C-NH3-0394/T-P-T-0625; C-N Commented TPVN H
PROCESS 2539-30-PID-0031-52-01 Utility Distribution Diagram - Water Distribution (Demi - 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 05-Jan-2017 C-NH3-0527/T-P-T-0931 Commented TPVN C
PROCESS 2539-30-PID-0031-52X-01 Utility Distribution Diagram - Water Distribution (Demi - A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-30-PID-0031-52X-01 Utility Distribution Diagram - Water Distribution (Demi - 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-30-PID-0031-53-01 Utility Distribution Diagram - Cooling Water Distribution A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00094 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-30-PID-0031-53-01 Utility Distribution Diagram - Cooling Water Distribution B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-30-PID-0031-53-01 Utility Distribution Diagram - Cooling Water Distribution C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-30-PID-0031-53-01 Utility Distribution Diagram - Cooling Water Distribution 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-30-PID-0031-53X-01 Utility Distribution Diagram - Cooling Water Distribution A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-30-PID-0031-53X-01 Utility Distribution Diagram - Cooling Water Distribution 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-30-PID-0031-54-01 Utility Distribution Diagram Air - Nitrogen & Fuel Gas Di A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00094 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-30-PID-0031-54-01 Utility Distribution Diagram Air; Nitrogen & Fuel Gas Dis B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-30-PID-0031-54-01 Utility Distribution Diagram Air; Nitrogen & Fuel Gas Dis C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-30-PID-0031-54-01 Utility Distribution Diagram Air; Nitrogen & Fuel Gas Dis 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 05-Jan-2017 C-NH3-0527/T-P-T-0931 Commented TPVN C
PROCESS 2539-30-SP-1500-40 Process Datasheet for Flow Instruments PA 19-Feb-2016 PI 19-Feb-2016 T-T-P-00331 IFA 03-Mar-2016 18-Mar-2016 T-P-T-0108 Approved TPIT H
PROCESS 2539-30-SP-1500-40 Process Datasheet for Flow Instruments PB 31-Mar-2016 PI 14-Apr-2016 T-T-P-00532 Re-IFA 27-Apr-2016 01-Jun-2016 T-P-T-0195 Approved TPIT C
PROCESS 2539-30-SP-1500-41 Process Datasheet for Control Valves PA 19-Feb-2016 PI 19-Feb-2016 T-T-P-00331 IFA 03-Mar-2016 18-Mar-2016 T-P-T-0108 Approved TPIT H
PROCESS 2539-30-SP-1500-41 Process Datasheet for Control Valves PB 31-Mar-2016 PI 14-Apr-2016 T-T-P-00532 Re-IFA 27-Apr-2016 01-Jun-2016 T-P-T-0195 Approved TPIT C
PROCESS 2539-30-SP-1500-45 Process Datasheet for Pressure Safety Valves PA 19-Feb-2016 PI 19-Feb-2016 T-T-P-00331 IFA 03-Mar-2016 18-Mar-2016 T-P-T-0108 Approved TPIT H
PROCESS 2539-30-SP-1500-45 Process Datasheet for Pressure Safety Valves PB 29-Mar-2016 PI 04-Apr-2016 T-T-P-00500 IFA 18-Apr-2016 19-May-2016 C-NH3-0155/T-P-T-0173 Approved with comments TPIT C
PROCESS 2539-31-CN-0009-01 Process Description Unit 31 - Demineralized Water Sys A 30-Oct-2015 IBD 30-Oct-2015 T-T-P-00055 IFR 12-Nov-2015 16-Nov-2015 C-NH3-0032/T-P-T-0012 No Comment TPIT H
PROCESS 2539-31-CN-0009-01 Process Description Unit 31 - Demineralized Water Sys B 03-Mar-2016 IDD 04-Mar-2016 T-T-P-00388 IDD No Comment TPIT H
PROCESS 2539-31-CN-0009-01 Process Description Unit 31 - Demineralized Water Sys 0 17-Nov-2016 FIN 17-Nov-2016 T-T-P-00970 FIN 03-Dec-2016 C-NH3-0437/T-P-T-0710 Commented TPVN C
PROCESS 2539-31-MSD-0011-01-01 Material Selection Diagram Demineralized Water System A 27-Nov-2015 IFR 02-Dec-2015 T-T-P-00140 IFR 16-Dec-2015 29-Dec-2015 T-P-T-0054 Approved TPIT H
PROCESS 2539-31-MSD-0011-01-01 Material Selection Diagram Demineralized Water System B 29-Mar-2016 IBD 04-Apr-2016 T-T-P-00502 IBD No Comment TPIT H
PROCESS 2539-31-MSD-0011-01-01 Material Selection Diagram Demineralized Water System 0 30-Dec-2016 FIN 04-Jan-2017 T-T-P-01104 IFA 17-Jan-2017 23-Jan-2017 T-P-T-1141 Approved TPVN C
PROCESS 2539-31-PFD-0010-01-01 Process Flow Diagram Demineralized Water System A 26-Oct-2015 IFR 27-Oct-2015 T-T-P-00035 IFR 09-Nov-2015 11-Nov-2015 C-NH3-0020/T-P-T-0010 Commented TPIT H
PROCESS 2539-31-PFD-0010-01-01 Process Flow Diagram Demineralized Water System B 09-Mar-2016 IBD 16-Mar-2016 T-T-P-00437 IBD No Comment TPIT H
PROCESS 2539-31-PFD-0010-01-01 Process Flow Diagram Demineralized Water System 0 15-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 Transmitted TPVN C
PROCESS 2539-31-PID-0031-01-01 Piping & Instrument Diagram - Demi Water System (1 - 9 A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00095 IFR 03-Dec-2015 14-Dec-2015 C-NH3-0059/T-P-T-0032 Commented TPIT H
PROCESS 2539-31-PID-0031-01-01 Piping & Instrument Diagram - Demi Water System (1 - 9 B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-31-PID-0031-01-01 Piping & Instrument Diagram - Demi Water System (1 - 9 C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 24-Oct-2016 C-NH3-0345/T-P-T-0494; C-NH3-0394/T-P-T-0625; C-N Commented TPVN H
PROCESS 2539-31-PID-0031-01-01 Piping & Instrument Diagram - Demi Water System (1 - 9 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-31-SP-0660-01 Process Datasheet for Plates & Frames Heat Exchanger PA 05-Feb-2016 PI 05-Feb-2016 T-T-P-00292 IFA 18-Feb-2016 15-Mar-2016 T-P-T-0097 Approved TPIT H
PROCESS 2539-31-SP-0660-01 Process Datasheet for Plates & Frames Heat Exchanger PB 01-Mar-2016 PI 01-Mar-2016 T-T-P-00379 Re-IFA 14-Mar-2016 22-Mar-2016 T-P-T-00111 Approved TPIT C
PROCESS 2539-32-PFD-0010-01-01 Process Flow Diagram Raw & Portable Water System A 26-Oct-2015 IFR 27-Oct-2015 T-T-P-00035 IFR 09-Nov-2015 11-Nov-2015 C-NH3-0020/T-P-T-0010 Commented TPIT H
PROCESS 2539-32-PFD-0010-01-01 Process Flow Diagram Raw & Portable Water System B 09-Mar-2016 IBD 16-Mar-2016 T-T-P-00437 IBD No Comment TPIT H
PROCESS 2539-32-PFD-0010-01-01 Process Flow Diagram Raw & Portable Water System 0 15-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 Transmitted TPVN C
PROCESS 2539-33-CN-0009-01 Process Description Unit 33 - Cooling Water System A 30-Oct-2015 IBD 30-Oct-2015 T-T-P-00055 IFR 12-Nov-2015 16-Nov-2015 C-NH3-0032/T-P-T-0012 Commented TPIT H
PROCESS 2539-33-CN-0009-01 Process Description Unit 33 - Cooling Water System B 25-Feb-2016 IDD 25-Feb-2016 T-T-P-00362 IDD No Comment TPIT H
PROCESS 2539-33-CN-0009-01 Process Description Unit 33 - Cooling Water System 0 17-Nov-2016 FIN 17-Nov-2016 T-T-P-00970 FIN 03-Dec-2016 C-NH3-0437/T-P-T-0710 Commented TPVN C
PROCESS 2539-33-CN-0009-02 Interlock Process Description (Cooling Water System) A 27-Nov-2015 IFR 11-Dec-2015 T-T-P-00172 IFR 24-Dec-2015 25-Dec-2015 C-NH3-0079/T-P-T-0052 Commented TPIT H
PROCESS 2539-33-CN-0009-02 Interlock Process Description (Cooling Water System) B 24-Mar-2016 IDD 25-Mar-2016 T-T-P-00487 IDD No Comment TPIT H
PROCESS 2539-33-CN-0009-02 Interlock Process Description (Cooling Water System) 0 07-Oct-2016 FIN 07-Oct-2016 T-T-P-00864 FIN Transmitted TPVN C
PROCESS 2539-33-MSD-0011-01-01 Material Selection Diagram Cooling Water System A 27-Nov-2015 IFR 02-Dec-2015 T-T-P-00141 IFR 16-Dec-2015 29-Dec-2015 T-P-T-0054 Approved TPIT H
PROCESS 2539-33-MSD-0011-01-01 Material Selection Diagram Cooling Water System B 29-Mar-2016 IBD 04-Apr-2016 T-T-P-00502 IBD No Comment TPIT H
PROCESS 2539-33-MSD-0011-01-01 Material Selection Diagram Cooling Water System 0 30-Dec-2016 FIN 04-Jan-2017 T-T-P-01104 IFA 17-Jan-2017 23-Jan-2017 T-P-T-1141 Approved TPVN C
PROCESS 2539-33-NM-0013-01 Cause & Effect Diagrams (Cooling Water System) A 27-Nov-2015 IFR 11-Dec-2015 T-T-P-00173 IFR 24-Dec-2015 25-Dec-2015 C-NH3-0080/T-P-T-0052 Commented TPIT H
PROCESS 2539-33-NM-0013-01 Cause & Effect Diagrams (Cooling Water System) B 24-Mar-2016 IDD 25-Mar-2016 T-T-P-00488 IDD No Comment TPIT H
PROCESS 2539-33-NM-0013-01 Cause & Effect Diagrams (Cooling Water System) 0 07-Oct-2016 FIN 07-Oct-2016 T-T-P-00864 FIN No Comment TPVN H
PROCESS 2539-33-NM-0013-01 Cause & Effect Diagrams (Cooling Water System) 1 17-Feb-2017 FIN 20-Feb-2017 T-T-P-01233 IFA 05-Mar-2017 17-Mar-2017 C-NH3-0662/T-P-T-1494 Commented TPVN C
PROCESS 2539-33-PFD-0010-01-01 Process Flow Diagram Cooling Water System A 28-Oct-2015 IFR 29-Oct-2015 T-T-P-00040 IFR 11-Nov-2015 11-Nov-2015 C-NH3-0023/T-P-T-0010 Commented TPIT H
PROCESS 2539-33-PFD-0010-01-01 Process Flow Diagram Cooling Water System B 09-Mar-2016 IBD 16-Mar-2016 T-T-P-00437 IBD No Comment TPIT H
PROCESS 2539-33-PFD-0010-01-01 Process Flow Diagram Cooling Water System 0 15-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 10-Jan-2017 C-NH3-0540/T-P-T-0968 Commented TPVN C
PROCESS 2539-33-PFD-0010-01-02 Process Flow Diagram Cooling Water System B 09-Mar-2016 IBD 16-Mar-2016 T-T-P-00437 IBD No Comment TPIT H
PROCESS 2539-33-PFD-0010-01-02 Process Flow Diagram Cooling Water System 0 15-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 10-Jan-2017 C-NH3-0540/T-P-T-0968 Commented TPVN C
PROCESS 2539-33-PID-0031-01-01 Piping & Instrument Diagram - River Cooling Water Syst A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00096 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-33-PID-0031-01-01 Piping & Instrument Diagram - River Cooling Water Syst B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-33-PID-0031-01-01 Piping & Instrument Diagram - River Cooling Water Syst C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 24-Oct-2016 C-NH3-0345/T-P-T-0494; C-NH3-0394/T-P-T-0625; C-N Commented TPVN H
PROCESS 2539-33-PID-0031-01-01 Piping & Instrument Diagram - River Cooling Water Syst 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-33-PID-0031-01X-01 Piping & Instrument Diagram - River Cooling Water Syste A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-33-PID-0031-01X-01 Piping & Instrument Diagram - River Cooling Water Syste 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-33-PID-0031-02-01 Piping & Instrument Diagram - River Cooling Water Syst A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00096 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-33-PID-0031-02-01 Piping & Instrument Diagram - River Cooling Water Syst B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-33-PID-0031-02-01 Piping & Instrument Diagram - River Cooling Water Syst C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-33-PID-0031-02-01 Piping & Instrument Diagram - River Cooling Water Syst 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-33-PID-0031-02X-01 Piping & Instrument Diagram - River Cooling Water Syste A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-33-PID-0031-02X-01 Piping & Instrument Diagram - River Cooling Water Syste 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-33-PID-0031-03-01 Piping & Instrument Diagram - River Cooling Water Syst A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00096 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-33-PID-0031-03-01 Piping & Instrument Diagram - River Cooling Water Syst B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-33-PID-0031-03-01 Piping & Instrument Diagram - River Cooling Water Syst C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-33-PID-0031-03-01 Piping & Instrument Diagram - River Cooling Water Syst 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-33-PID-0031-03X-01 Piping & Instrument Diagram - River Cooling Water Syste A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-33-PID-0031-03X-01 Piping & Instrument Diagram - River Cooling Water Syste 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-33-PID-0031-03X-02 Piping & Instrument Diagram - River Cooling Water Syst A 23-Jan-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-33-PID-0031-03X-02 Piping & Instrument Diagram - River Cooling Water Syst 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-33-PID-0031-05-01 Piping & Instrument Diagram - River Cooling Water Syst A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00096 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-33-PID-0031-05-01 Piping & Instrument Diagram - River Cooling Water Syst B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-33-PID-0031-05-01 Piping & Instrument Diagram - River Cooling Water Syst C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-33-PID-0031-05-01 Piping & Instrument Diagram - River Cooling Water Syst 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-33-PID-0031-05X-01 Piping & Instrument Diagram - River Cooling Water Syste A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-33-PID-0031-05X-01 Piping & Instrument Diagram - River Cooling Water Syste 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-33-PID-0031-06-01 Piping & Instrument Diagram - Fresh Cooling Water Syst A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00096 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-33-PID-0031-06-01 Piping & Instrument Diagram - Fresh Cooling Water Syst B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-33-PID-0031-06-01 Piping & Instrument Diagram - Fresh Cooling Water Syst C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-33-PID-0031-06-01 Piping & Instrument Diagram - Fresh Cooling Water Syst 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-33-PID-0031-06X-01 Piping & Instrument Diagram - Fresh Cooling Water Syst A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-33-PID-0031-06X-01 Piping & Instrument Diagram - Fresh Cooling Water Syst 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-33-PID-0031-07-01 Piping & Instrument Diagram - Fresh Cooling Water Syst A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00096 IFR 03-Dec-2015 No Comment TPIT H
Page 31
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
PROCESS 2539-33-PID-0031-07-01 Piping & Instrument Diagram - Fresh Cooling Water Syst B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-33-PID-0031-07-01 Piping & Instrument Diagram - Fresh Cooling Water Syst C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-33-PID-0031-07-01 Piping & Instrument Diagram - Fresh Cooling Water Syst 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-33-PID-0031-07X-01 Piping & Instrument Diagram - Fresh Cooling Water Syst A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-33-PID-0031-07X-01 Piping & Instrument Diagram - Fresh Cooling Water Syst 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-33-PID-0031-07X-02 Piping & Instrument Diagram - Fresh Cooling Water Syst A 23-Jan-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-33-PID-0031-07X-02 Piping & Instrument Diagram - Fresh Cooling Water Syst 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-33-PID-0031-09-01 Piping & Instrument Diagram - New River Cooling Water A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00096 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-33-PID-0031-09-01 Piping & Instrument Diagram - New River Cooling Water B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-33-PID-0031-09-01 Piping & Instrument Diagram - New River Cooling Water C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 24-Oct-2016 C-NH3-0345/T-P-T-0494; C-NH3-0394/T-P-T-0625; C-N Commented TPVN H
PROCESS 2539-33-PID-0031-09-01 Piping & Instrument Diagram - New River Cooling Water 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-33-PID-0031-10-01 Piping & Instrument Diagram - New River Cooling Water A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00096 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-33-PID-0031-10-01 Piping & Instrument Diagram - New River Cooling Water B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-33-PID-0031-10-01 Piping & Instrument Diagram - New River Cooling Water 0 16-Sep-2016 V 23-Sep-2016 T-T-P-00837 II 06-Oct-2016 C-NH3-0318/T-P-T-0438; C-NH3-0355/T-P-T-0522; C-N Commented TPVN C
PROCESS 2539-33-PID-0031-11-01 Piping & Instrument Diagram - New River Cooling Water A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00096 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-33-PID-0031-11-01 Piping & Instrument Diagram - New River Cooling Water B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-33-PID-0031-11-01 Piping & Instrument Diagram - New River Cooling Water C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-33-PID-0031-11-01 Piping & Instrument Diagram - New River Cooling Water 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-33-PID-0031-11-02 Piping & Instrument Diagram - New River Cooling Water 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 05-Jan-2017 C-NH3-0527/T-P-T-0931 Commented TPVN C
PROCESS 2539-33-PID-0031-11-03 Piping & Instrument Diagram - New River Cooling Water 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-33-PID-0031-11-04 Piping & Instrument Diagram - New River Cooling Water 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-33-PID-0031-12-01 Piping & Instrument Diagram - River Cooling Water Syst A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00096 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-33-PID-0031-12-01 Piping & Instrument Diagram - River Cooling Water Syst B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-33-PID-0031-12-01 Piping & Instrument Diagram - River Cooling Water Syst C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 24-Oct-2016 C-NH3-0345/T-P-T-0494; C-NH3-0394/T-P-T-0625; C-N Commented TPVN H
PROCESS 2539-33-PID-0031-12-01 Piping & Instrument Diagram - River Cooling Water Syst 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-33-PID-0031-13-01 Piping & Instrument Diagram - River Cooling Water Sy A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00096 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-33-PID-0031-13-01 Piping & Instrument Diagram - River Cooling Water Sy B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-33-PID-0031-13-01 Piping & Instrument Diagram - River Cooling Water Sy 0 16-Sep-2016 V 23-Sep-2016 T-T-P-00837 II 06-Oct-2016 C-NH3-0318/T-P-T-0438; C-NH3-0355/T-P-T-0522; C-N Commented TPVN C
PROCESS 2539-33-PID-0031-14-01 Piping & Instrument Diagram - River Cooling Water Sys A 16-Mar-2016 IFR 17-Mar-2016 T-T-P-00443 IFR 30-Mar-2016 18-Mar-2016 T-P-T-0105 Approved TPIT H
PROCESS 2539-33-PID-0031-14-01 Piping & Instrument Diagram - River Cooling Water Sys B 18-Mar-2016 IBD 18-Mar-2016 T-T-P-00453 IBD Transmitted TPIT H
PROCESS 2539-33-PID-0031-14-01 Piping & Instrument Diagram - River Cooling Water Sys C 28-Mar-2016 IDD 31-May-2016 T-T-P-00617 IFR 13-Jun-2016 14-Jul-2016 T-P-T-0254 Approved TPVN H
PROCESS 2539-33-PID-0031-14-01 Piping & Instrument Diagram - River Cooling Water Sys D 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPIT H
PROCESS 2539-33-PID-0031-14-01 Piping & Instrument Diagram - River Cooling Water Sys 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 05-Jan-2017 C-NH3-0527/T-P-T-0931 Commented TPVN C
PROCESS 2539-33-PID-0031-52-01 Piping & Instrument Diagram - River Cooling Water System A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00096 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-33-PID-0031-52-01 Piping & Instrument Diagram - River Cooling Water System B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-33-PID-0031-52-01 Piping & Instrument Diagram - River Cooling Water System 0 16-Sep-2016 V 23-Sep-2016 T-T-P-00837 II 06-Oct-2016 C-NH3-0318/T-P-T-0438; C-NH3-0355/T-P-T-0522; C-N Commented TPVN C
PROCESS 2539-33-PID-0031-53-01 Piping & Instrument Diagram - River Cooling Water Syst A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00096 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-33-PID-0031-53-01 Piping & Instrument Diagram - River Cooling Water Syst B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-33-PID-0031-53-01 Piping & Instrument Diagram - River Cooling Water Syst 0 16-Sep-2016 V 23-Sep-2016 T-T-P-00837 II 06-Oct-2016 C-NH3-0318/T-P-T-0438; C-NH3-0355/T-P-T-0522; C-N Commented TPVN C
PROCESS 2539-33-PID-0031-56-01 Piping & Instrument Diagram - Fresh Cooling Water Syste A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00096 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-33-PID-0031-56-01 Piping & Instrument Diagram - Fresh Cooling Water Syste B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-33-PID-0031-56-01 Piping & Instrument Diagram - Fresh Cooling Water Syste 0 16-Sep-2016 V 23-Sep-2016 T-T-P-00837 II 06-Oct-2016 C-NH3-0318/T-P-T-0438; C-NH3-0355/T-P-T-0522; C-N Commented TPVN C
PROCESS 2539-33-PID-0031-57-01 Piping & Instrument Diagram - Fresh Cooling Water Syst A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00096 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-33-PID-0031-57-01 Piping & Instrument Diagram - Fresh Cooling Water Syst B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-33-PID-0031-57-01 Piping & Instrument Diagram - Fresh Cooling Water Syst 0 16-Sep-2016 V 23-Sep-2016 T-T-P-00837 II 06-Oct-2016 C-NH3-0318/T-P-T-0438; C-NH3-0355/T-P-T-0522; C-N Commented TPVN C
PROCESS 2539-33-SP-0271-01 Process Datasheet for Cooling Water Basin 30-BA3003 PA 23-Dec-2015 PI 23-Dec-2015 T-T-P-00211 IFA 05-Jan-2016 22-Jan-2016 T-P-T-0065 Approved TPIT H
PROCESS 2539-33-SP-0271-01 Process Datasheet for Cooling Water Basin 30-BA3003 PB 26-Feb-2016 PI 29-Feb-2016 T-T-P-00369 IFA 14-Mar-2016 23-Mar-2016 T-P-T-00112 Approved TPIT C
PROCESS 2539-33-SP-0271-02 Process Datasheet for Settling Basin 30-BA3004 PA 23-Dec-2015 PI 23-Dec-2015 T-T-P-00211 IFA 05-Jan-2016 22-Jan-2016 T-P-T-0065 Approved TPIT H
PROCESS 2539-33-SP-0271-02 Process Datasheet for Settling Basin 30-BA3004 PB 29-Feb-2016 PI 01-Mar-2016 T-T-P-00380 Re-IFA 14-Mar-2016 25-Mar-2016 T-P-T-0126 Approved TPIT H
PROCESS 2539-33-SP-0271-02 Process Datasheet for Settling Basin 30-BA3004 PC 06-May-2016 PI 09-May-2016 T-T-P-00577 Re-IFA 22-May-2016 09-Jun-2016 C-NH3-0172/T-P-T-0200; C-NH3-0228/T-P-T-0284 Approved with comments TPVN H
PROCESS 2539-33-SP-0271-02 Process Datasheet for Settling Basin 30-BA3004 PD 22-Jul-2016 PI 25-Jul-2016 T-T-P-00714 IFA 07-Aug-2016 11-Aug-2016 C-NH3-0243/T-P-T-0314; C-NH3-0261/T-P-T-0336 Commented TPVN H
PROCESS 2539-33-SP-0271-02 Process Data Sheet for Settling Basin 30-BA3004 PE 25-Aug-2016 PI 26-Aug-2016 T-T-P-00775 IFA 08-Sep-2016 10-Sep-2016 T-P-T-0381 Approved TPVN C
PROCESS 2539-33-SP-0310-01 Process Datasheet for Mechanical Draft Cooling Towers PA 04-Dec-2015 PI 11-Dec-2015 T-T-P-00183 IFA 24-Dec-2015 11-Jan-2016 C-NH3-0085/T-P-T-0060 Commented TPIT H
PROCESS 2539-33-SP-0310-01 Process Datasheet for Mechanical Draft Cooling Towers PB 24-Feb-2016 PI 25-Feb-2016 T-T-P-00355 IFA 09-Mar-2016 18-Mar-2016 T-P-T-0108 Approved TPIT C
PROCESS 2539-33-SP-0848-01 Duty Specification for Make-Up River Water Filters 30- PA 16-Dec-2015 PI 17-Dec-2015 T-T-P-00191 IFR 30-Dec-2015 19-Jan-2016 C-NH3-0086/T-P-T-0061 Commented TPIT H
PROCESS 2539-33-SP-0848-01 Duty Specification for Make-Up River Water Filters 30- PB 02-Mar-2016 PI 03-Mar-2016 T-T-P-00384 Re-IFA 16-Mar-2016 23-Mar-2016 T-P-T-00112 Approved TPIT H
PROCESS 2539-33-SP-0848-01 Duty Specification for Make-Up River Water Filter 30-W 0 05-Sep-2016 V 06-Sep-2016 T-T-P-00793 V Transmitted TPVN C
PROCESS 2539-33-SP-0848-02 Duty Specification for Side Stream Filters 30-SF-3001 A PA 16-Dec-2015 PI 17-Dec-2015 T-T-P-00191 IFR 30-Dec-2015 19-Jan-2016 C-NH3-0087/T-P-T-0061 Commented TPIT H
PROCESS 2539-33-SP-0848-02 Duty Specification for Side Stream Filters 30-SF-3001 A PB 02-Mar-2016 PI 03-Mar-2016 T-T-P-00384 Re-IFA 16-Mar-2016 23-Mar-2016 T-P-T-00112 Approved TPIT H
PROCESS 2539-33-SP-0848-02 Duty Specification for Side Stream Filters 30-SF-3001 A 0 05-Sep-2016 V 06-Sep-2016 T-T-P-00793 V Transmitted TPVN C
PROCESS 2539-33-SP-0848-03 Duty Specification for Make-Up River Water & Side Stre PA 05-Sep-2016 PI 06-Sep-2016 T-T-P-00794 IFR 19-Sep-2016 27-Sep-2016 C-NH3-0306/T-P-T-0414; C-NH3-0360/T-P-T-0528; C-N Commented TPVN C
PROCESS 2539-33-SP-0910-01 Process Datasheet for Cooling Water Pump 30-P-3001 PA 23-Oct-2015 PI 23-Oct-2015 T-T-P-00027 IFR 05-Nov-2015 11-Nov-2015 C-NH3-0028/T-P-T-0010 Commented TPIT H
PROCESS 2539-33-SP-0910-01 Process Datasheet for Cooling Water Pump 30-P-3001 PB 27-Nov-2015 PI 27-Nov-2015 T-T-P-00126 Re-IFR 10-Dec-2015 22-Dec-2015 C-NH3-0074/T-P-T-0047 Commented TPIT C
PROCESS 2539-33-SP-0910-02 Process Datasheet for Cooling Water Pump - 30-P-3001 PA 18-Dec-2015 PI 18-Dec-2015 T-T-P-00196 IFA 31-Dec-2015 21-Jan-2016 C-NH3-0088/T-P-T-0063 Commented TPIT H
PROCESS 2539-33-SP-0910-02 Process Datasheet for Cooling Water Pump - 30-P-3001 PB 10-Feb-2016 PI 12-Feb-2016 T-T-P-00312 IFA 25-Feb-2016 17-Mar-2016 T-P-T-0103 Approved TPIT C
PROCESS 2539-33-SP-0910-03 Process Datasheet for Fresh Cooling Water Pump - 30- PA 18-Dec-2015 PI 18-Dec-2015 T-T-P-00196 IFA 31-Dec-2015 21-Jan-2016 C-NH3-0089/T-P-T-0063 Commented TPIT H
PROCESS 2539-33-SP-0910-03 Process Datasheet for Fresh Cooling Water Pump - 30- PB 10-Feb-2016 PI 12-Feb-2016 T-T-P-00312 IFA 25-Feb-2016 17-Mar-2016 T-P-T-0103 Approved TPIT C
PROCESS 2539-33-SP-0940-01 Process Data Sheet for Anti-Scale Dosing Pump 30-PK PA 22-Jul-2016 PI 25-Jul-2016 T-T-P-00714 IFA 07-Aug-2016 11-Aug-2016 C-NH3-0242/T-P-T-0313; C-NH3-0260/T-P-T-0335 Approved with comments TPVN H
PROCESS 2539-33-SP-0940-01 Process Data Sheet for Anti-Scale Dosing Pump 30-PK PB 19-Aug-2016 PI 22-Aug-2016 T-T-P-00767 IFA 04-Sep-2016 02-Sep-2016 C-NH3-0279/T-P-T-0364; C-NH3-0285/T-P-T-0379 Approved with comments TPVN C
PROCESS 2539-33-SP-4046-01 Process Data Sheet for Chemical Dosing Systems PA 22-Jul-2016 PI 25-Jul-2016 T-T-P-00714 IFA 07-Aug-2016 11-Aug-2016 C-NH3-0244/T-P-T-0315; C-NH3-0262/T-P-T-0337 Approved with comments TPVN H
PROCESS 2539-33-SP-4046-01 Process Data Sheet for Chemical Dosing Systems PB 04-Nov-2016 PI 04-Nov-2016 T-T-P-00933 IFA 18-Nov-2016 18-Nov-2016 C-NH3-0386/T-P-T-0601; C-NH3-0467/T-P-T-0777 Commented TPVN C
PROCESS 2539-34-PID-0031-02-01 Piping & Instrument Diagram - Fire Fighting System A 26-Jan-2016 IFR 26-Jan-2016 T-T-P-00264 IFR 08-Feb-2016 No Comment TPIT H
PROCESS 2539-34-PID-0031-02-01 Piping & Instrument Diagram - Fire Fighting System B 01-Mar-2016 IDD 07-Mar-2016 T-T-P-00396 IDD No Comment TPIT H
PROCESS 2539-35-CN-0009-01 Process Description Unit 35 - Instrument Air & Service A A 06-Nov-2015 IBD 06-Nov-2015 T-T-P-00064 IFR 19-Nov-2015 18-Mar-2016 C-NH3-00038/T-P-T-0015 Commented TPIT H
PROCESS 2539-35-CN-0009-01 Process Description Unit 35 - Instrument Air & Service A B 03-Mar-2016 IDD 04-Mar-2016 T-T-P-00389 IDD No Comment TPIT H
PROCESS 2539-35-CN-0009-01 Process Description Unit 35 - Instrument Air & Service A 0 06-Dec-2016 FIN 06-Dec-2016 T-T-P-01019 IFA 19-Dec-2016 23-Dec-2016 C-NH3-0498/T-P-T-0862; C-NH3-0579/T-P-T-1119 Commented TPVN C
PROCESS 2539-35-MSD-0011-01-01 Material Selection Diagram Instrument & Service Air Sy A 27-Nov-2015 IFR 02-Dec-2015 T-T-P-00142 IFR 16-Dec-2015 29-Dec-2015 T-P-T-0054 Approved TPIT H
PROCESS 2539-35-MSD-0011-01-01 Material Selection Diagram Instrument & Service Air Sy B 29-Mar-2016 IBD 04-Apr-2016 T-T-P-00502 IBD No Comment TPIT H
PROCESS 2539-35-MSD-0011-01-01 Material Selection Diagram Instrument & Service Air Sy 0 30-Dec-2016 FIN 04-Jan-2017 T-T-P-01104 IFA 17-Jan-2017 23-Jan-2017 T-P-T-1141 Approved TPVN C
PROCESS 2539-35-PFD-0010-01-01 Process Flow Diagram Instrument and Service Air Syst A 23-Oct-2015 IFR 23-Oct-2015 T-T-P-00032 IFR 05-Nov-2015 12-Nov-2015 C-NH3-0029/T-P-T-0011 Commented TPIT H
PROCESS 2539-35-PFD-0010-01-01 Process Flow Diagram Instrument and Service Air Syst B 09-Mar-2016 IBD 16-Mar-2016 T-T-P-00437 IBD No Comment TPIT H
PROCESS 2539-35-PFD-0010-01-01 Process Flow Diagram Instrument and Service Air Syst 0 15-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 10-Jan-2017 C-NH3-0540/T-P-T-0968 Commented TPVN C
PROCESS 2539-35-PID-0031-03-01 Piping & Instrument Diagram - Air System (3-4) A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00097 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-35-PID-0031-03-01 Piping & Instrument Diagram - Air System (3-4) B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-35-PID-0031-03-01 Piping & Instrument Diagram - Air System (3-4) C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 24-Oct-2016 C-NH3-0345/T-P-T-0494; C-NH3-0394/T-P-T-0625; C-N Commented TPVN H
PROCESS 2539-35-PID-0031-03-01 Piping & Instrument Diagram - Air System (3/4) 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-35-PID-0031-03X-01 Piping & Instrument Diagram - Air System (3/4) - Dismant A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-35-PID-0031-03X-01 Piping & Instrument Diagram - Air System (3/4) - Dismant 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-35-PID-0031-05-01 Piping & Instrument Diagram - Air System A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00097 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-35-PID-0031-05-01 Piping & Instrument Diagram - Air System B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-35-PID-0031-05-01 Piping & Instrument Diagram - Air System C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 24-Oct-2016 C-NH3-0345/T-P-T-0494; C-NH3-0394/T-P-T-0625; C-N Commented TPVN H
PROCESS 2539-35-PID-0031-05-01 Piping & Instrument Diagram - Air System 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 05-Jan-2017 C-NH3-0527/T-P-T-0931 Commented TPVN C
PROCESS 2539-35-PID-0031-06-01 Piping & Instrument Diagram - Air System A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00097 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-35-PID-0031-06-01 Piping & Instrument Diagram - Air System B 16-Mar-2016 IDD1 17-Mar-2016 T-T-P-00442 IDD No Comment TPIT H
PROCESS 2539-35-PID-0031-06-01 Piping & Instrument Diagram - Air System C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-35-PID-0031-06-01 Piping & Instrument Diagram - Air System 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 05-Jan-2017 C-NH3-0527/T-P-T-0931 Commented TPVN C
PROCESS 2539-35-SP-1031-01 Process Datasheet for Rotarytype Positive Displacemen PA 04-Dec-2015 PI 15-Dec-2015 T-T-P-00188 IFA 28-Dec-2015 No Comment TPIT H
PROCESS 2539-35-SP-1031-01 Process Datasheet for Rotarytype Positive Displacemen PB 12-Feb-2016 PI 12-Feb-2016 T-T-P-00314 IFA 25-Feb-2016 18-Mar-2016 C-NH3-0120/T-P-T-0106 Commented TPIT C
PROCESS 2539-35-SP-4171-01 Process Datasheet for Instrument Air Dryer - 30-DR-500 PA 13-Nov-2015 PI 13-Nov-2015 T-T-P-00087 IFR 26-Nov-2015 07-Dec-2015 T-P-T-0028 Approved TPIT H
PROCESS 2539-35-SP-4171-01 Process Datasheet for Instrument Air Dryer - 30-DR-500 PB 11-Feb-2016 PI 12-Feb-2016 T-T-P-00309 IFA 26-Feb-2016 16-Mar-2016 T-P-T-0102 Approved TPIT C
PROCESS 2539-37-PFD-0010-01-01 Process Flow Diagram Fuel Gas System A 23-Oct-2015 IFR 23-Oct-2015 T-T-P-00031 IFR 05-Nov-2015 16-Nov-2015 T-P-T-0013 Approved TPIT H
PROCESS 2539-37-PFD-0010-01-01 Process Flow Diagram Fuel Gas System B 09-Mar-2016 IBD 16-Mar-2016 T-T-P-00437 IBD No Comment TPIT H
PROCESS 2539-37-PFD-0010-01-01 Process Flow Diagram Fuel Gas System 0 15-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 Transmitted TPVN C
PROCESS 2539-40-DW-1933-01-01 Ammonia Storage Firefighting Layout A 23-Dec-2015 IFR 23-Dec-2015 T-T-P-00210 IFR 05-Jan-2016 08-Jan-2016 T-P-T-0059 Approved TPIT H
PROCESS 2539-40-DW-1950-01-01 Ammonia Storage Fire And Gas Layout A 23-Dec-2015 IFR 23-Dec-2015 T-T-P-00210 IFR 05-Jan-2016 08-Jan-2016 T-P-T-0059 Approved TPIT H
PROCESS 2539-40-NM-0003-01 Utility Consumption Summary Unit 40 - Case 2 & Case 3 A 23-Dec-2015 IFR 23-Dec-2015 T-T-P-00214 IFR 05-Jan-2016 No Comment TPIT H
PROCESS 2539-40-NM-0003-01 Utility Consumption Summary Unit 40 - Case 2 & Case 3 B 29-Mar-2016 IBD 04-Apr-2016 T-T-P-00506 IBD No Comment TPIT H
PROCESS 2539-40-NM-0003-01 Utility Consumption Summary Unit 40 - Case 2 & Case 3 0 25-Jan-2017 FIN 02-Feb-2017 T-T-P-01190 IFA 15-Feb-2017 16-Feb-2017 T-P-T-1269 Approved TPVN C
PROCESS 2539-40-NM-0005-01 Liquid Effluent Summary - Unit 40 A 03-Feb-2016 IFR 04-Feb-2016 T-T-P-00280 IFR 17-Feb-2016 No Comment TPIT H
PROCESS 2539-40-NM-0005-01 Liquid Effluent Summary - Unit 40 B 29-Mar-2016 IBD 04-Apr-2016 T-T-P-00508 IBD No Comment TPIT H
PROCESS 2539-40-NM-0005-01 Liquid Effluent Summary - Unit 40 0 25-Jan-2017 FIN 02-Feb-2017 T-T-P-01192 IFA 15-Feb-2017 16-Feb-2017 T-P-T-1270 Approved TPVN C
PROCESS 2539-40-NM-0006-01 Pressure Relief Valves & Rupture Disks Summary of Rat A 26-Feb-2016 IBD 25-Feb-2016 T-T-P-00354 IFR 09-Mar-2016 No Comment TPIT H
Page 32
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
PROCESS 2539-40-NM-0006-01 Pressure Relief Valves & Rupture Disks Summary of Rat B 29-Mar-2016 IDD 08-Apr-2016 T-T-P-00516 IDD No Comment TPIT H
PROCESS 2539-40-NM-0006-01 Pressure Relief Valves & Rupture Disks Summary of Rat 0 23-Mar-2017 FIN 31-Mar-2017 T-T-P-01328 IFA 13-Apr-2017 17-Apr-2017 T-P-T-1840 Approved TPVN C
PROCESS 2539-40-NM-0022-01 Mechanical Line List A 21-Jan-2016 IFR 22-Jan-2016 T-T-P-00260 IFR 04-Feb-2016 No Comment TPIT H
PROCESS 2539-40-NM-0022-01 Mechanical Line List B 07-Apr-2016 IDD1 08-Apr-2016 T-T-P-00520 IDD No Comment TPIT H
PROCESS 2539-40-NM-0022-01 Mechanical Line List C 07-Nov-2016 IDD2 08-Nov-2016 T-T-P-00942 IFR 22-Nov-2016 01-Dec-2016 T-P-T-0699 Approved TPVN H
PROCESS 2539-40-NM-0022-01 Mechanical Line List 0 21-Dec-2016 IFC 22-Dec-2016 T-T-P-01070 IFA 04-Jan-2017 No Comment TPVN H
PROCESS 2539-40-NM-0022-01 Mechanical Line List 1 30-Mar-2017 IFC 03-Apr-2017 T-T-P-01329 IFA 16-Apr-2017 21-Apr-2017 T-P-T-1854 Approved TPVN C
PROCESS 2539-40-NM-1920-01 Item List For Area Classification Unit 40 A 14-Jan-2016 PI 15-Jan-2016 T-T-P-00241 IFR 28-Jan-2016 Transmitted TPIT C
PROCESS 2539-40-NM-1950-01 Offsites Field Alarms/Signals to/from Fire & Gas Contro A 11-Mar-2016 IFR 11-Mar-2016 T-T-P-00428 IFR 24-Mar-2016 31-Mar-2016 C-NH3-0131/T-P-T-0129; C-NH3-0202/T-P-T-0236 Approved with comments TPIT H
PROCESS 2539-40-PID-0031-51-01 Utility Distribution Diagram - Steam & Condensate Distri A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00098 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-40-PID-0031-51-01 Utility Distribution Diagram - Steam & Condensate Distri B 16-Mar-2016 IDD1 18-Mar-2016 T-T-P-00448 IDD No Comment TPIT H
PROCESS 2539-40-PID-0031-51-01 Utility Distribution Diagram - Steam & Condensate Distri C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-40-PID-0031-51-01 Utility Distribution Diagram - Steam & Condensate Distri 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-40-PID-0031-51X-01 Utility Distribution Diagram - Steam & Condensate Distri A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-40-PID-0031-51X-01 Utility Distribution Diagram - Steam & Condensate Distri 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-40-PID-0031-52-01 Utility Distribution Diagram - Water Distribution (Demi P A 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-40-PID-0031-52-01 Utility Distribution Diagram - Water Distribution (Demi P 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-40-PID-0031-54-01 Utility Distribution Diagram Air - Nitrogen & Fuel Gas Di A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00098 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-40-PID-0031-54-01 Utility Distribution Diagram Air; Nitrogen & Fuel Gas Dis B 16-Mar-2016 IDD1 18-Mar-2016 T-T-P-00448 IDD No Comment TPIT H
PROCESS 2539-40-PID-0031-54-01 Utility Distribution Diagram Air; Nitrogen & Fuel Gas Dis C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-40-PID-0031-54-01 Utility Distribution Diagram Air; Nitrogen & Fuel Gas Dis 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-40-PID-0031-55-01 Utility Distribution Diagram - Flare Network A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00098 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-40-PID-0031-55-01 Utility Distribution Diagram - Flare Network B 16-Mar-2016 IDD1 18-Mar-2016 T-T-P-00448 IDD No Comment TPIT H
PROCESS 2539-40-PID-0031-55-01 Utility Distribution Diagram - Flare Network C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-40-PID-0031-55-01 Utility Distribution Diagram - Flare Network 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-40-SP-1500-40 Flow Instruments Process Datasheet PA 31-Mar-2016 PI 14-Apr-2016 T-T-P-00533 IFA 27-Apr-2016 01-Jun-2016 T-P-T-0195 Approved TPIT C
PROCESS 2539-40-SP-1500-41 Process Datasheet for Control Valves PA 19-Feb-2016 PI 19-Feb-2016 T-T-P-00332 IFA 03-Mar-2016 18-Mar-2016 T-P-T-0108 Approved TPIT H
PROCESS 2539-40-SP-1500-41 Process Datasheet for Control Valves PB 31-Mar-2016 PI 14-Apr-2016 T-T-P-00533 IFA 27-Apr-2016 01-Jun-2016 T-P-T-0195 Approved TPIT C
PROCESS 2539-40-SP-1500-43 On-Off Valves Process Datasheet PA 19-Feb-2016 PI 25-Feb-2016 T-T-P-00352 IFA 09-Mar-2016 18-Mar-2016 T-P-T-0108 Approved TPIT H
PROCESS 2539-40-SP-1500-43 On-Off Valves Process Datasheet PB 31-Mar-2016 PI 14-Apr-2016 T-T-P-00533 IFA 27-Apr-2016 31-May-2016 C-NH3-0167/T-P-T-0190 Commented TPIT C
PROCESS 2539-40-SP-1500-45 Process Datasheet for Pressure Safety Valves PA 19-Feb-2016 PI 19-Feb-2016 T-T-P-00332 IFA 03-Mar-2016 18-Mar-2016 T-P-T-0108 Approved TPIT H
PROCESS 2539-40-SP-1500-45 Process Datasheet for Pressure Safety Valves PB 29-Mar-2016 PI 04-Apr-2016 T-T-P-00501 IFA 18-Apr-2016 19-May-2016 C-NH3-0156/T-P-T-0174 Approved with comments TPIT C
PROCESS 2539-42-PID-0031-01-03 Piping & Instrument Diagram - Waste Water Treatment S A 22-Mar-2016 IFR 22-Mar-2016 T-T-P-00462 IFA 04-Apr-2016 23-Mar-2016 T-P-T-00114 Approved TPIT H
PROCESS 2539-42-PID-0031-01-03 Piping & Instrument Diagram - Waste Water Treatment S B 24-Mar-2016 IBD 24-Mar-2016 T-T-P-00473 IBD Transmitted TPIT H
PROCESS 2539-42-PID-0031-01-03 Piping & Instrument Diagram - Waste Water Treatment S C 28-Mar-2016 IDD 31-May-2016 T-T-P-00617 IFR 13-Jun-2016 14-Jul-2016 T-P-T-0254 Approved TPVN H
PROCESS 2539-42-PID-0031-01-03 Piping & Instrument Diagram - Waste Water Treatment S D 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-42-PID-0031-01-03 Piping & Instrument Diagram - Waste Water Treatment S 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-42-PID-0031-01X-03 Piping & Instrument Diagram - Waste Water Treatment Sy A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-42-PID-0031-01X-03 Piping & Instrument Diagram - Waste Water Treatment Sy 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-42-PID-0031-03-01 Piping & Instrument Diagram - Waste Water Treatment S A 22-Mar-2016 IFR 22-Mar-2016 T-T-P-00462 IFA 04-Apr-2016 23-Mar-2016 T-P-T-00114 Approved TPIT H
PROCESS 2539-42-PID-0031-03-01 Piping & Instrument Diagram - Waste Water Treatment S B 24-Mar-2016 IBD 24-Mar-2016 T-T-P-00473 IBD Transmitted TPIT H
PROCESS 2539-42-PID-0031-03-01 Piping & Instrument Diagram - Waste Water Treatment S C 28-Mar-2016 IDD 31-May-2016 T-T-P-00617 IFR 13-Jun-2016 14-Jul-2016 T-P-T-0254 Approved TPVN H
PROCESS 2539-42-PID-0031-03-01 Piping & Instrument Diagram - Waste Water Treatment S D 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-42-PID-0031-03-01 Piping & Instrument Diagram - Waste Water Treatment S 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-42-PID-0031-03X-01 Piping & Instrument Diagram - Waste Water Treatment Sy A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-42-PID-0031-03X-01 Piping & Instrument Diagram - Waste Water Treatment Sy 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-43-PID-0031-01-01 Piping & Instrument Diagram - Sewage & Storm Water (O A 22-Mar-2016 IFR 22-Mar-2016 T-T-P-00462 IFA 04-Apr-2016 23-Mar-2016 T-P-T-00114 Approved TPIT H
PROCESS 2539-43-PID-0031-01-01 Piping & Instrument Diagram - Sewage & Storm Water (O B 24-Mar-2016 IBD 24-Mar-2016 T-T-P-00473 IBD Transmitted TPIT H
PROCESS 2539-43-PID-0031-01-01 Piping & Instrument Diagram - Sewage & Storm Water (O C 28-Mar-2016 IDD 31-May-2016 T-T-P-00617 IFR 13-Jun-2016 14-Jul-2016 T-P-T-0254 Approved TPVN H
PROCESS 2539-43-PID-0031-01-01 Piping & Instrument Diagram - Sewage & Storm Water (O D 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-43-PID-0031-01-01 Piping & Instrument Diagram - Sewage & Storm Water (O 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-45-CN-0009-01 Process Description Unit 45 - Ammonia Storage System A 06-Nov-2015 IBD 06-Nov-2015 T-T-P-00065 IFR 19-Nov-2015 17-Nov-2015 C-NH3-0037/T-P-T-0014 Commented TPIT H
PROCESS 2539-45-CN-0009-01 Process Description Unit 45 - Ammonia Storage System B 03-Mar-2016 IDD 04-Mar-2016 T-T-P-00390 IDD No Comment TPIT H
PROCESS 2539-45-CN-0009-01 Process Description Unit 45 - Ammonia Storage System 0 17-Nov-2016 FIN 17-Nov-2016 T-T-P-00970 FIN 03-Dec-2016 C-NH3-0437/T-P-T-0710 Commented TPVN C
PROCESS 2539-45-CN-0009-02 Interlock Process Description (Ammonia Storage System A 27-Nov-2015 IFR 11-Dec-2015 T-T-P-00174 IFR 24-Dec-2015 12-Jan-2016 C-NH3-0084/T-P-T-0060 Commented TPIT H
PROCESS 2539-45-CN-0009-02 Interlock Process Description (Ammonia Storage System B 24-Mar-2016 IDD 25-Mar-2016 T-T-P-00480 IDD No Comment TPIT H
PROCESS 2539-45-CN-0009-02 Interlock Process Description (Ammonia Storage System 0 07-Oct-2016 FIN 07-Oct-2016 T-T-P-00864 FIN 07-Oct-2016 C-NH3-0353/T-P-T-0518; C-NH3-0380/T-P-T-0578 Approved with comments TPVN C
PROCESS 2539-45-MSD-0011-01-01 Material Selection Diagram Ammonia Storage System A 27-Nov-2015 IFR 02-Dec-2015 T-T-P-00143 IFR 16-Dec-2015 29-Dec-2015 T-P-T-0054 Approved TPIT H
PROCESS 2539-45-MSD-0011-01-01 Material Selection Diagram Ammonia Storage System B 29-Mar-2016 IBD 04-Apr-2016 T-T-P-00503 IBD No Comment TPIT H
PROCESS 2539-45-MSD-0011-01-01 Material Selection Diagram Ammonia Storage System 0 30-Dec-2016 FIN 04-Jan-2017 T-T-P-01104 IFA 17-Jan-2017 23-Jan-2017 T-P-T-1141 Approved TPVN C
PROCESS 2539-45-NM-0013-01 Cause & Effect Diagrams (Ammonia Storage System) A 27-Nov-2015 IFR 11-Dec-2015 T-T-P-00175 IFR 24-Dec-2015 No Comment TPIT H
PROCESS 2539-45-NM-0013-01 Cause & Effect Diagrams (Ammonia Storage System) B 24-Mar-2016 IDD 25-Mar-2016 T-T-P-00479 IDD No Comment TPIT H
PROCESS 2539-45-NM-0013-01 Cause & Effect Diagrams (Ammonia Storage System) 0 07-Oct-2016 FIN 07-Oct-2016 T-T-P-00864 FIN 03-Nov-2016 C-NH3-0353/T-P-T-0518; C-NH3-0380/T-P-T-0578 Approved with comments TPVN H
PROCESS 2539-45-NM-0013-01 Cause & Effect Diagrams (Ammonia Storage System) 1 17-Feb-2017 FIN 20-Feb-2017 T-T-P-01233 IFA 05-Mar-2017 17-Mar-2017 C-NH3-0662/T-P-T-1494 Commented TPVN C
PROCESS 2539-45-PFD-0010-01-01 Process Flow Diagram for Ammonia Storage System A 23-Oct-2015 IFR 23-Oct-2015 T-T-P-00029 IFR 05-Nov-2015 16-Nov-2015 T-P-T-0013 Approved TPIT H
PROCESS 2539-45-PFD-0010-01-01 Process Flow Diagrams for Ammonia Storage System B 09-Mar-2016 IBD 16-Mar-2016 T-T-P-00436 IBD No Comment TPIT H
PROCESS 2539-45-PFD-0010-01-01 Process Flow Diagrams for Ammonia Storage System 0 15-Dec-2016 FIN 16-Dec-2016 T-T-P-01054 IFA 29-Dec-2016 Transmitted TPVN C
PROCESS 2539-45-PID-0031-01-01 Piping & Instrument Diagram - Ammonia Storage System A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00099 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-45-PID-0031-01-01 Piping & Instrument Diagram - Ammonia Storage System B 16-Mar-2016 IDD1 18-Mar-2016 T-T-P-00448 IDD No Comment TPIT H
PROCESS 2539-45-PID-0031-01-01 Piping & Instrument Diagram - Ammonia Storage System C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 Transmitted TPVN H
PROCESS 2539-45-PID-0031-01-01 Piping & Instrument Diagram - Ammonia Storage System 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-45-PID-0031-01X-01 Piping & Instrument Diagram - Ammonia Storage System A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-45-PID-0031-01X-01 Piping & Instrument Diagram - Ammonia Storage System 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-45-PID-0031-02-01 Piping & Instrument Diagram - Ammonia Storage System A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00099 IFR 03-Dec-2015 No Comment TPIT H
PROCESS 2539-45-PID-0031-02-01 Piping & Instrument Diagram - Ammonia Storage System B 16-Mar-2016 IDD1 18-Mar-2016 T-T-P-00448 IDD No Comment TPIT H
PROCESS 2539-45-PID-0031-02-01 Piping & Instrument Diagram - Ammonia Storage System C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 24-Oct-2016 C-NH3-0345/T-P-T-0494; C-NH3-0394/T-P-T-0625; C-N Commented TPVN H
PROCESS 2539-45-PID-0031-02-01 Piping & Instrument Diagram - Ammonia Storage System 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 05-Jan-2017 C-NH3-0527/T-P-T-0931 Commented TPVN C
PROCESS 2539-45-PID-0031-02X-01 Piping & Instrument Diagram - Ammonia Storage System A 17-Feb-2017 IFR 24-Feb-2017 T-T-P-01241 IFR 09-Mar-2017 10-Mar-2017 T-P-T-1511 Approved TPVN H
PROCESS 2539-45-PID-0031-02X-01 Piping & Instrument Diagram - Ammonia Storage System 0 31-Mar-2017 IFC 31-Mar-2017 T-T-P-01322 IFA 13-Apr-2017 11-Apr-2017 T-P-T-1789 Approved TPVN C
PROCESS 2539-45-PID-0031-04-01 Piping & Instrument Diagram - Ammonia Storage System A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00099 IFR 03-Dec-2015 14-Dec-2015 C-NH3-0060/T-P-T-0032 Commented TPIT H
PROCESS 2539-45-PID-0031-04-01 Piping & Instrument Diagram - Ammonia Storage System B 16-Mar-2016 IDD1 18-Mar-2016 T-T-P-00448 IDD No Comment TPIT H
PROCESS 2539-45-PID-0031-04-01 Piping & Instrument Diagram - Ammonia Storage System C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 24-Oct-2016 C-NH3-0345/T-P-T-0494; C-NH3-0394/T-P-T-0625; C-N Commented TPVN H
PROCESS 2539-45-PID-0031-04-01 Piping & Instrument Diagram - Ammonia Storage System 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 05-Jan-2017 C-NH3-0527/T-P-T-0931 Commented TPVN C
PROCESS 2539-45-PID-0031-04-02 Piping & Instrument Diagram - Ammonia Storage System 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 Transmitted TPVN C
PROCESS 2539-45-PID-0031-05-01 Piping & Instrument Diagram - Ammonia Storage System A 19-Nov-2015 IFR 20-Nov-2015 T-T-P-00099 IFR 03-Dec-2015 14-Dec-2015 C-NH3-0061/T-P-T-0032 Commented TPIT H
PROCESS 2539-45-PID-0031-05-01 Piping & Instrument Diagram - Ammonia Storage System B 16-Mar-2016 IDD1 18-Mar-2016 T-T-P-00448 IDD No Comment TPIT H
PROCESS 2539-45-PID-0031-05-01 Piping & Instrument Diagram - Ammonia Storage System C 16-Sep-2016 IDD2 23-Sep-2016 T-T-P-00836 IFR 07-Oct-2016 24-Oct-2016 C-NH3-0345/T-P-T-0494; C-NH3-0394/T-P-T-0625; C-N Commented TPVN H
PROCESS 2539-45-PID-0031-05-01 Piping & Instrument Diagram - Ammonia Storage System 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 05-Jan-2017 C-NH3-0527/T-P-T-0931 Commented TPVN C
PROCESS 2539-45-PID-0031-05-02 Piping & Instrument Diagram - Ammonia Storage System 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 05-Jan-2017 C-NH3-0527/T-P-T-0931 Commented TPVN C
PROCESS 2539-45-PID-0031-05-03 Piping & Instrument Diagram - Ammonia Storage System 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 05-Jan-2017 C-NH3-0527/T-P-T-0931 Commented TPVN C
PROCESS 2539-45-PID-0031-05-04 Piping & Instrument Diagram - Ammonia Storage System 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 05-Jan-2017 C-NH3-0527/T-P-T-0931 Commented TPVN C
PROCESS 2539-45-PID-0031-05-05 Piping & Instrument Diagram - Ammonia Storage System 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 05-Jan-2017 C-NH3-0527/T-P-T-0931 Commented TPVN C
PROCESS 2539-45-PID-0031-05-06 Piping & Instrument Diagram - Ammonia Storage System 0 02-Dec-2016 IFC 05-Dec-2016 T-T-P-01013 IFA 18-Dec-2016 05-Jan-2017 C-NH3-0527/T-P-T-0931 Commented TPVN C
PROCESS 2539-45-SP-0710-01 Datasheet for Air Fin Exchanger PA 27-Nov-2015 PI 27-Nov-2015 T-T-P-00129 IFR 10-Dec-2015 21-Dec-2015 T-P-T-0045 Approved TPIT H
PROCESS 2539-45-SP-0710-01 Process Datasheet for Air Fin Exchanger - 40-E-5002 PB 10-Feb-2016 PI 12-Feb-2016 T-T-P-00310 IFA 25-Feb-2016 16-Mar-2016 T-P-T-0102 Approved TPIT C
PROCESS 2539-45-SP-0910-01 Datasheet of Ammonia Truck Loading Pump (40-P-5003 PA 30-Sep-2015 PI 02-Oct-2015 T-T-P-00001 IFR 16-Oct-2015 No Comment TPIT H
PROCESS 2539-45-SP-0910-01 Datasheet for Ammonia Truck Loading Pump - 40-P-500 PB 27-Nov-2015 PI 27-Nov-2015 T-T-P-00127 Re-IFR 10-Dec-2015 14-Dec-2015 C-NH3-0062/T-P-T-0032 Commented TPIT C
PROCESS 2539-45-SP-1584-01 Duty Specification for Ammonia Metering Package N.2 PA 14-Jan-2016 PI 15-Jan-2016 T-T-P-00239 IFA 28-Jan-2016 03-Feb-2016 T-P-T-0068 Approved TPIT H
PROCESS 2539-45-SP-1584-01 Duty Specification for Ammonia Metering Package N.2 PB 04-Mar-2016 PI 04-Mar-2016 T-T-P-00387 Re-IFR 17-Mar-2016 24-Mar-2016 T-P-T-0119 Approved TPIT C
PROCESS 2539-45-SP-1584-02 Duty Specification for Ammonia Metering Package N.3 PA 14-Jan-2016 PI 15-Jan-2016 T-T-P-00239 IFA 28-Jan-2016 03-Feb-2016 T-P-T-0068 Approved TPIT H
PROCESS 2539-45-SP-1584-02 Duty Specification for Ammonia Metering Package N.3 PB 04-Mar-2016 PI 04-Mar-2016 T-T-P-00387 Re-IFA 17-Mar-2016 24-Mar-2016 T-P-T-0119 Approved TPIT C
PROCESS 2539-45-SP-4025-01 Process Datasheet for Truck Loading Arms - 40-LA-5003 PA 13-Nov-2015 PI 13-Nov-2015 T-T-P-00086 IFR 26-Nov-2015 07-Dec-2015 T-P-T-0028 Approved TPIT H
PROCESS 2539-45-SP-4025-01 Process Datasheet for Truck Loading Arms - 40-LA-5003 PB 05-Feb-2016 PI 08-Feb-2016 T-T-P-00295 IFA 22-Feb-2016 15-Mar-2016 T-P-T-0097 Approved TPIT H
PROCESS 2539-45-SP-4025-01 Process Datasheet for Truck Loading Arms - 40-LA-5003 PC 02-Mar-2016 PI 02-Mar-2016 T-T-P-00382 Re-IFA 15-Mar-2016 22-Mar-2016 T-P-T-00111 Approved TPIT C
PROCESS 2539-45-SP-4025-02 Process Datasheet for Truck Loading Arms - 40-LA-5005 PA 13-Nov-2015 PI 13-Nov-2015 T-T-P-00086 IFR 26-Nov-2015 07-Dec-2015 T-P-T-0028 Approved TPIT H
PROCESS 2539-45-SP-4025-02 Process Datasheet for Truck Loading Arms - 40-LA-5005 PB 05-Feb-2016 PI 08-Feb-2016 T-T-P-00295 IFA 22-Feb-2016 15-Mar-2016 T-P-T-0097 Approved TPIT H
PROCESS 2539-45-SP-4025-02 Process Datasheet for Truck Loading Arms - 40-LA-5005 PC 02-Mar-2016 PI 02-Mar-2016 T-T-P-00382 Re-IFA 15-Mar-2016 22-Mar-2016 T-P-T-00111 Approved TPIT C
PROCESS 2539-45-SP-4151-01 Duty Specification for New Ammonia Refrigeration Pack PA 25-Feb-2016 PI 26-Feb-2016 T-T-P-00365 IFA 10-Mar-2016 24-Mar-2016 T-P-T-0119 Approved TPIT H
PROCESS 2539-45-SP-4151-01 Duty Specification for New Ammonia Refrigeration Pack PB 15-Mar-2016 PI 18-Mar-2016 T-T-P-00455 IFA 31-Mar-2016 01-Apr-2016 C-NH3-0132/T-P-T-0131 Approved with comments TPIT C
PROCESS ----TP-00-000-PR-EMOC-0002 Engineering Management Of Change - P&ID and Line Li - 07-Mar-2017 IFE 07-Mar-2017 T-T-P-01271 IFE Transmitted TPVN C
PROCESS SAFETY 2539-00-ITP-1900-01 Inspection & Test Plan for Fire Fighting Equipment A 29-Apr-2016 IFI 29-Apr-2016 T-T-P-00562 IFR 12-May-2016 20-May-2016 T-P-T-0172 MR 1900-01. Approved TPVN H
PROCESS SAFETY 2539-00-ITP-1900-01 Inspection & Test Plan for Fire Fighting Equipment 0 06-Dec-2016 IFP 06-Dec-2016 T-T-P-01020 IFA 20-Dec-2016 Transmitted TPVN C
Page 33
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
PROCESS SAFETY 2539-00-ITP-1900-02 Inspection & Test Plan for Safety Equipment A 06-May-2016 IFI 06-May-2016 T-T-P-00571 IFR 19-May-2016 24-May-2016 T-P-T-0175 MR 1900-02. Approved TPVN H
PROCESS SAFETY 2539-00-ITP-1900-02 Inspection & Test Plan for Safety Equipment 0 31-Oct-2016 IFP 31-Oct-2016 T-T-P-00919 IFP Transmitted TPVN C
PROCESS SAFETY 2539-00-ITP-1900-03 Inspection & Test Plan for Elevated Water Monitor - Rem A 06-May-2016 IFI 06-May-2016 T-T-P-00572 IFR 19-May-2016 01-Jun-2016 T-P-T-0194 MR 1900-03. Approved TPVN H
PROCESS SAFETY 2539-00-ITP-1900-03 Inspection & Test Plan for Elevated Water Monitor - Rem 0 22-Dec-2016 IFP 22-Dec-2016 T-T-P-01069 IFA 04-Jan-2017 No Comment TPVN H
PROCESS SAFETY 2539-00-ITP-1900-03 Inspection & Test Plan for Elevated Water Monitor - Rem 1 01-Mar-2017 IFP 01-Mar-2017 T-T-P-01256 IFA 14-Mar-2017 21-Mar-2017 T-P-T-1617 Approved TPVN C
PROCESS SAFETY 2539-00-JSD-1900-01 Design Specification for Firefighting 1 01-Dec-2016 FIN 01-Dec-2016 T-T-P-01009 IFA 14-Dec-2016 21-Dec-2016 C-NH3-0490/T-P-T-0841; C-NH3-0515/T-P-T-0895 Commented TPVN C
PROCESS SAFETY 2539-00-JSD-1950-01 Design Specification for Fire & Gas Detection System 1 22-Nov-2016 FIN 23-Nov-2016 T-T-P-00989 IFA 06-Dec-2016 07-Dec-2016 T-P-T-0752 Approved TPVN C
PROCESS SAFETY 2539-00-ML-1900-01 Technical Evaluation for Fire Fighting Equipment 0 07-Nov-2016 II 07-Nov-2016 T-T-P-00938 II Transmitted TPVN C
PROCESS SAFETY 2539-00-ML-1900-02 Technical Evaluation for Safety Equipment Package 0 20-Jul-2016 II 20-Jul-2016 T-T-P-00708 II Transmitted TPVN C
PROCESS SAFETY 2539-00-ML-1900-03 Technical Evaluation for Elevated Water Monitor - Remot 0 14-Oct-2016 II 14-Oct-2016 T-T-P-00875 II No Comment TPVN H
PROCESS SAFETY 2539-00-ML-1900-03 Technical Evaluation for Elevated Water Monitor - Remot 1 07-Nov-2016 II 07-Nov-2016 T-T-P-00937 II No Comment TPVN H
PROCESS SAFETY 2539-00-ML-1900-03 Technical Evaluation for Elevated Water Monitor - Remot 2 28-Feb-2017 II 28-Feb-2017 T-T-P-01248 II 13-Mar-2017 Transmitted TPVN C
PROCESS SAFETY 2539-00-ML-205 Quantitative Risk Analysis A 22-Mar-2016 IFR 25-Mar-2016 T-T-P-00484 IFR 07-Apr-2016 08-Apr-2016 T-P-T-00140 Approved TPIT H
PROCESS SAFETY 2539-00-ML-205 Quantitative Risk Analysis 0 20-Oct-2016 IFE 24-Oct-2016 T-T-P-00898 IFE Transmitted TPIT C
PROCESS SAFETY 2539-00-ML-214 HAZOP Study Report for Vendor Packages A 17-Nov-2016 IFR 17-Nov-2016 T-T-P-00971 IFR 30-Nov-2016 03-Dec-2016 T-P-T-0724 Approved TPVN H
PROCESS SAFETY 2539-00-ML-214 HAZOP Study Report for Vendor Packages 0 07-Dec-2016 IFE 07-Dec-2016 T-T-P-01024 IFA 21-Dec-2016 23-Dec-2016 T-P-T-0878 Approved TPVN C
PROCESS SAFETY 2539-00-ML-224 HAZOP Close-out Report for Vendor Packages 0 01-Jun-2017 II 02-Jun-2017 T-T-P-01437 II 15-Jun-2017 Transmitted TPVN C
PROCESS SAFETY 2539-00-MR-1900-01 Material Requisition for Fire Fighting Equipment A 29-Apr-2016 IFI 29-Apr-2016 T-T-P-00562 IFR 12-May-2016 20-May-2016 T-P-T-0172 MR 1900-01. Approved TPVN H
PROCESS SAFETY 2539-00-MR-1900-01 Material Requisition for Fire Fighting Equipment 0 06-Dec-2016 IFP 06-Dec-2016 T-T-P-01020 IFA 20-Dec-2016 Transmitted TPVN C
PROCESS SAFETY 2539-00-MR-1900-02 Material Requisition for Safety Equipment A 06-May-2016 IFI 06-May-2016 T-T-P-00571 IFR 19-May-2016 24-May-2016 T-P-T-0175 MR 1900-02. Approved TPVN H
PROCESS SAFETY 2539-00-MR-1900-02 Material Requisition for Safety Equipment 0 31-Oct-2016 IFP 31-Oct-2016 T-T-P-00919 IFP Transmitted TPVN C
PROCESS SAFETY 2539-00-MR-1900-03 Material Requisition for Elevated Water Monitor - Remot A 06-May-2016 IFI 06-May-2016 T-T-P-00572 IFR 19-May-2016 01-Jun-2016 T-P-T-0194 MR 1900-03. Approved TPVN H
PROCESS SAFETY 2539-00-MR-1900-03 Material Requisition for Elevated Water Monitor - Remot 0 22-Dec-2016 IFP 22-Dec-2016 T-T-P-01069 IFA 04-Jan-2017 No Comment TPVN H
PROCESS SAFETY 2539-00-MR-1900-03 Material Requisition for Elevated Water Monitor - Remot 1 01-Mar-2017 IFP 01-Mar-2017 T-T-P-01256 IFA 14-Mar-2017 21-Mar-2017 T-P-T-1617 Approved TPVN C
PROCESS SAFETY 2539-00-RT-6000-01 Noise Study (Noise Map) A 24-Mar-2016 IFR 29-Mar-2016 T-T-P-00493 IFR 11-Apr-2016 25-Apr-2016 T-P-T-0151 Approved TPIT H
PROCESS SAFETY 2539-00-RT-6000-01 Noise Study (Noise Map) 0 06-Jun-2016 FIN 09-Jun-2016 T-T-P-00644 FIN Transmitted TPIT C
PROCESS SAFETY 2539-00-SP-1900-01 Fire Fighting Equipment Extent of Supply A 29-Apr-2016 IFI 29-Apr-2016 T-T-P-00562 IFR 12-May-2016 20-May-2016 T-P-T-0172 MR 1900-01. Approved TPVN H
PROCESS SAFETY 2539-00-SP-1900-01 Fire Fighting Equipment Extent of Supply 0 06-Dec-2016 IFP 06-Dec-2016 T-T-P-01020 IFA 20-Dec-2016 27-Dec-2016 C-NH3-0510/T-P-T-0888; C-NH3-0531/T-P-T-0947 Commented TPVN C
PROCESS SAFETY 2539-00-SP-1900-02 Safety Equipment Extent of Supply A 06-May-2016 IFI 06-May-2016 T-T-P-00571 IFR 19-May-2016 24-May-2016 T-P-T-0175 MR 1900-02. Approved TPVN H
PROCESS SAFETY 2539-00-SP-1900-02 Safety Equipment Extent of Supply 0 31-Oct-2016 IFP 31-Oct-2016 T-T-P-00919 IFP Transmitted TPVN C
PROCESS SAFETY 2539-00-SP-1900-03 Particular Technical Specification for Elevated Water Mo A 06-May-2016 IFI 06-May-2016 T-T-P-00572 IFR 19-May-2016 01-Jun-2016 T-P-T-0194 MR 1900-03. Approved TPVN H
PROCESS SAFETY 2539-00-SP-1900-03 Particular Technical Specification for Elevated Water Mo 0 22-Dec-2016 IFP 22-Dec-2016 T-T-P-01069 IFA 04-Jan-2017 No Comment TPVN H
PROCESS SAFETY 2539-00-SP-1900-03 Particular Technical Specification for Elevated Water Mo 1 01-Mar-2017 IFP 01-Mar-2017 T-T-P-01256 IFA 14-Mar-2017 21-Mar-2017 T-P-T-1617 Approved TPVN C
PROCESS SAFETY 2539-00-SP-1900-10 Data Sheets for Fire Water Hydrants A 29-Apr-2016 IFI 29-Apr-2016 T-T-P-00562 IFR 12-May-2016 20-May-2016 T-P-T-0172 MR 1900-01. Approved TPVN H
PROCESS SAFETY 2539-00-SP-1900-10 Data Sheets for Fire Water Hydrants 0 06-Dec-2016 IFP 06-Dec-2016 T-T-P-01020 IFA 20-Dec-2016 Transmitted TPVN C
PROCESS SAFETY 2539-00-SP-1900-11 Data Sheets for Hose Boxes A 29-Apr-2016 IFI 29-Apr-2016 T-T-P-00562 IFR 12-May-2016 20-May-2016 T-P-T-0172 MR 1900-01. Approved TPVN H
PROCESS SAFETY 2539-00-SP-1900-11 Data Sheets for Hose Boxes 0 06-Dec-2016 IFP 06-Dec-2016 T-T-P-01020 IFA 20-Dec-2016 Transmitted TPVN C
PROCESS SAFETY 2539-00-SP-1900-12 Data Sheets for Elevated Water Monitor - Remote Contro A 06-May-2016 IFI 06-May-2016 T-T-P-00572 IFR 19-May-2016 01-Jun-2016 T-P-T-0194 MR 1900-03. Approved TPVN H
PROCESS SAFETY 2539-00-SP-1900-12 Data Sheets for Elevated Water Monitor - Remote Contro 0 22-Dec-2016 IFP 22-Dec-2016 T-T-P-01069 IFA 04-Jan-2017 05-Jan-2017 C-NH3-0528/T-P-T-0932; C-NH3-0585/T-P-T-1153 Commented TPVN H
PROCESS SAFETY 2539-00-SP-1900-12 Data Sheets for Elevated Water Monitor - Remote Contro 1 01-Mar-2017 IFP 01-Mar-2017 T-T-P-01256 IFA 14-Mar-2017 21-Mar-2017 T-P-T-1617 Approved TPVN C
PROCESS SAFETY 2539-00-SP-1900-20 Data Sheets for Portable Foam Generators A 29-Apr-2016 IFI 29-Apr-2016 T-T-P-00562 IFR 12-May-2016 20-May-2016 T-P-T-0172 MR 1900-01. Approved TPVN H
PROCESS SAFETY 2539-00-SP-1900-20 Data Sheets for Portable Foam Generators 0 06-Dec-2016 IFP 06-Dec-2016 T-T-P-01020 IFA 20-Dec-2016 Transmitted TPVN C
PROCESS SAFETY 2539-00-SP-1900-30 Data Sheets for Dry Powder Extinguishers A 29-Apr-2016 IFI 29-Apr-2016 T-T-P-00562 IFR 12-May-2016 20-May-2016 T-P-T-0172 MR 1900-01. Approved TPVN H
PROCESS SAFETY 2539-00-SP-1900-30 Data Sheets for Dry Powder Extinguishers 0 06-Dec-2016 IFP 06-Dec-2016 T-T-P-01020 IFA 20-Dec-2016 Transmitted TPVN C
PROCESS SAFETY 2539-00-SP-1900-40 Data Sheets for Safety Shower & Eye Wash A 06-May-2016 IFI 06-May-2016 T-T-P-00571 IFR 19-May-2016 24-May-2016 T-P-T-0175 MR 1900-02. Approved TPVN H
PROCESS SAFETY 2539-00-SP-1900-40 Data Sheets for Safety Shower & Eye Wash 0 31-Oct-2016 IFP 31-Oct-2016 T-T-P-00919 IFP Transmitted TPVN C
PROCESS SAFETY 2539-00-SR-1900-01 Scope of Supply for Fire Fighting Equipment A 29-Apr-2016 IFI 29-Apr-2016 T-T-P-00562 IFR 12-May-2016 20-May-2016 T-P-T-0172 MR 1900-01. Approved TPVN H
PROCESS SAFETY 2539-00-SR-1900-01 Scope of Supply for Fire Fighting Equipment 0 06-Dec-2016 IFP 06-Dec-2016 T-T-P-01020 IFA 20-Dec-2016 Transmitted TPVN C
PROCESS SAFETY 2539-00-SR-1900-02 Scope of Supply for Safety Equipment A 06-May-2016 IFI 06-May-2016 T-T-P-00571 IFR 19-May-2016 24-May-2016 T-P-T-0175 MR 1900-02. Approved TPVN H
PROCESS SAFETY 2539-00-SR-1900-02 Scope of Supply for Safety Equipment 0 31-Oct-2016 IFP 31-Oct-2016 T-T-P-00919 IFP Transmitted TPVN C
PROCESS SAFETY 2539-00-SR-1900-03 Scope of Supply for Elevated Water Monitor - Remote Co A 06-May-2016 IFI 06-May-2016 T-T-P-00572 IFR 19-May-2016 01-Jun-2016 T-P-T-0194 MR 1900-03. Approved TPVN H
PROCESS SAFETY 2539-00-SR-1900-03 Scope of Supply for Elevated Water Monitor - Remote Co 0 22-Dec-2016 IFP 22-Dec-2016 T-T-P-01069 IFA 04-Jan-2017 No Comment TPVN H
PROCESS SAFETY 2539-00-SR-1900-03 Scope of Supply for Elevated Water Monitor - Remote Co 1 01-Mar-2017 IFP 01-Mar-2017 T-T-P-01256 IFA 14-Mar-2017 21-Mar-2017 T-P-T-1617 Approved TPVN C
PROCESS SAFETY 2539-10-DW-1920-01-01 Hazardous Area Classification - Ammonia Plant B 21-Apr-2016 IDD 21-Apr-2016 T-T-P-00549 IDD 04-May-2016 09-May-2016 T-P-T-0160 Approved TPVN H
PROCESS SAFETY 2539-10-DW-1920-01-01 Hazardous Area Classification - Ammonia Plant C 26-Sep-2016 IDD2 26-Sep-2016 T-T-P-00840 IFR 09-Oct-2016 24-Oct-2016 T-P-T-0495 Approved TPVN H
PROCESS SAFETY 2539-10-DW-1920-01-01 Hazardous Area Classification - Ammonia Plant 0 22-Nov-2016 IFC 22-Nov-2016 T-T-P-00986 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0747 Approved TPVN C
PROCESS SAFETY 2539-10-DW-1933-01-01 Ammonia Plant - Firefighting Layout B 25-Apr-2016 IDD 25-Apr-2016 T-T-P-00553 IFR 08-May-2016 10-May-2016 T-P-T-0165 Approved TPVN H
PROCESS SAFETY 2539-10-DW-1933-01-01 Ammonia Plant - Firefighting Layout C 30-Sep-2016 IDD2 30-Sep-2016 T-T-P-00845 IFR 13-Oct-2016 11-Oct-2016 T-P-T-00441 Approved TPVN H
PROCESS SAFETY 2539-10-DW-1933-01-01 Ammonia Plant - Firefighting Layout 0 08-Dec-2016 IFC 09-Dec-2016 T-T-P-01027 IFA 22-Dec-2016 27-Dec-2016 T-P-T-0889 Approved TPVN H
PROCESS SAFETY 2539-10-DW-1933-01-01 Ammonia Plant - Firefighting Layout 1 25-Jul-2017 IFC 27-Jul-2017 T-T-P-01511 IFA 09-Aug-2017 Transmitted TPVN C
PROCESS SAFETY 2539-10-DW-1950-01-01 Ammonia Plant Fire & Gas Layout B 20-Apr-2016 IDD 20-Apr-2016 T-T-P-00547 IDD 03-May-2016 Transmitted TPVN H
PROCESS SAFETY 2539-10-DW-1950-01-01 Ammonia Plant Fire & Gas Layout C 26-Sep-2016 IDD2 26-Sep-2016 T-T-P-00840 IFR 09-Oct-2016 24-Oct-2016 T-P-T-0495 Approved TPVN H
PROCESS SAFETY 2539-10-DW-1950-01-01 Ammonia Plant Fire & Gas Layout 0 22-Nov-2016 IFC 22-Nov-2016 T-T-P-00986 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0747 Approved TPVN C
PROCESS SAFETY 2539-30-DW-1933-01-01 Utility Production - Firefighting Layout B 25-Apr-2016 IDD 25-Apr-2016 T-T-P-00553 IFR 08-May-2016 10-May-2016 T-P-T-0165 Approved TPVN H
PROCESS SAFETY 2539-30-DW-1933-01-01 Utility Production - Firefighting Layout C 30-Sep-2016 IDD2 30-Sep-2016 T-T-P-00845 IFR 13-Oct-2016 11-Oct-2016 T-P-T-0441 Approved TPVN H
PROCESS SAFETY 2539-30-DW-1933-01-01 Utility Production - Firefighting Layout 0 08-Dec-2016 IFC 09-Dec-2016 T-T-P-01027 IFA 22-Dec-2016 27-Dec-2016 T-P-T-0889 Approved TPVN H
PROCESS SAFETY 2539-30-DW-1933-01-01 Utility Production - Firefighting Layout 1 25-Jul-2017 IFC 27-Jul-2017 T-T-P-01511 IFA 09-Aug-2017 Transmitted TPVN C
PROCESS SAFETY 2539-30-DW-1950-01-01 Utility Production Fire & Gas Layout B 20-Apr-2016 IDD 20-Apr-2016 T-T-P-00547 IDD 03-May-2016 Transmitted TPVN H
PROCESS SAFETY 2539-30-DW-1950-01-01 Utility Production Fire & Gas Layout C 26-Sep-2016 IDD2 26-Sep-2016 T-T-P-00840 IFR 09-Oct-2016 24-Oct-2016 T-P-T-0495 Approved TPVN H
PROCESS SAFETY 2539-30-DW-1950-01-01 Utility Production Fire & Gas Layout 0 22-Nov-2016 IFC 22-Nov-2016 T-T-P-00986 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0747 Approved TPVN C
PROCESS SAFETY 2539-34-PID-0031-02-01 Piping & Instrument Diagram - Fire Fighting System C 22-Apr-2016 IDD2 22-Apr-2016 T-T-P-00551 IFR 05-May-2016 24-Jun-2016 T-P-T-0228 Approved TPVN H
PROCESS SAFETY 2539-34-PID-0031-02-01 Piping & Instrument Diagram - Fire Fighting System D 28-Sep-2016 IDD3 28-Sep-2016 T-T-P-00843 IFR 11-Oct-2016 13-Oct-2016 T-P-T-0457 Approved TPVN H
PROCESS SAFETY 2539-34-PID-0031-02-01 Piping & Instrument Diagram - Fire Fighting System 0 30-Nov-2016 IFC 01-Dec-2016 T-T-P-01008 IFA 14-Dec-2016 27-Feb-2017 T-P-T-1355 Approved TPVN H
PROCESS SAFETY 2539-34-PID-0031-02-01 Piping & Instrument Diagram - Fire Fighting System 1 25-Jul-2017 IFC 27-Jul-2017 T-T-P-01511 IFA 09-Aug-2017 Transmitted TPVN C
PROCESS SAFETY 2539-34-PID-0031-02X-01 Piping & Instrument Diagram - Fire Fighting System Demo A 19-Apr-2016 IFR 19-Apr-2016 T-T-P-00546 IFR 02-May-2016 09-May-2016 T-P-T-0160 Approved TPVN H
PROCESS SAFETY 2539-34-PID-0031-02X-01 Piping & Instrument Diagram - Fire Fighting System Demo 0 30-Nov-2016 IFC 01-Dec-2016 T-T-P-01008 IFA 14-Dec-2016 27-Feb-2017 T-P-T-1355 Approved TPVN C
PROCESS SAFETY 2539-40-DW-1920-01-01 Hazardous Area Classification - Ammonia Storage B 21-Apr-2016 IDD 21-Apr-2016 T-T-P-00549 IDD 04-May-2016 09-May-2016 C-NH3-0147/T-P-T-0161 Approved with comments TPVN H
PROCESS SAFETY 2539-40-DW-1920-01-01 Hazardous Area Classification - Ammonia Storage C 26-Sep-2016 IDD2 26-Sep-2016 T-T-P-00840 IFR 09-Oct-2016 24-Oct-2016 T-P-T-0495 Approved TPVN H
PROCESS SAFETY 2539-40-DW-1920-01-01 Hazardous Area Classification - Ammonia Storage 0 22-Nov-2016 IFC 22-Nov-2016 T-T-P-00986 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0747 Approved TPVN C
PROCESS SAFETY 2539-40-DW-1933-01-01 Ammonia Storage - Firefighting Layout B 25-Apr-2016 IDD 25-Apr-2016 T-T-P-00553 IFR 08-May-2016 10-May-2016 C-NH3-0150/T-P-T-0164 Approved with comments TPVN H
PROCESS SAFETY 2539-40-DW-1933-01-01 Ammonia Storage - Firefighting Layout C 30-Sep-2016 IDD2 30-Sep-2016 T-T-P-00845 IFR 13-Oct-2016 11-Oct-2016 T-P-T-0441 Approved TPVN H
PROCESS SAFETY 2539-40-DW-1933-01-01 Ammonia Storage - Firefighting Layout 0 08-Dec-2016 IFC 09-Dec-2016 T-T-P-01027 IFA 22-Dec-2016 27-Dec-2016 T-P-T-0889 Approved TPVN C
PROCESS SAFETY 2539-40-DW-1950-01-01 Ammonia Storage Fire & Gas Layout B 20-Apr-2016 IDD 20-Apr-2016 T-T-P-00547 IDD 03-May-2016 Transmitted TPVN H
PROCESS SAFETY 2539-40-DW-1950-01-01 Ammonia Storage Fire & Gas Layout C 26-Sep-2016 IDD2 26-Sep-2016 T-T-P-00840 IFR 09-Oct-2016 24-Oct-2016 T-P-T-0495 Approved TPVN H
PROCESS SAFETY 2539-40-DW-1950-01-01 Ammonia Storage Fire & Gas Layout 0 22-Nov-2016 IFC 22-Nov-2016 T-T-P-00986 IFA 05-Dec-2016 07-Dec-2016 T-P-T-0747 Approved TPVN C
PROJECT MANAGEMENT 2539-00-EL-001 Item Index 0 22-Jan-2016 II 22-Jan-2016 T-T-P-00263 II No Comment TPIT H
PROJECT MANAGEMENT 2539-00-EL-001 Equipment List 1 09-Dec-2016 II 09-Dec-2016 T-T-P-01030 II 22-Dec-2016 No Comment TPVN H
PROJECT MANAGEMENT 2539-00-EL-001 Equipment List 2 17-Feb-2017 IFA 15-Feb-2017 T-T-P-01221 IFA 28-Feb-2017 Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-JSD-0001-01 Basic Design Data A 04-Dec-2015 IFR 04-Dec-2015 T-T-P-00156 IFR 17-Dec-2015 28-Dec-2015 C-NH3-0081/T-P-T-0053 Commented TPIT H
PROJECT MANAGEMENT 2539-00-JSD-0001-01 Basic Design Data 0 24-Mar-2016 IFE 24-Mar-2016 T-T-P-00474 IFE No Comment TPIT H
PROJECT MANAGEMENT 2539-00-JSD-0001-01 Basic Design Data 1 12-Apr-2017 FIN 14-Apr-2017 T-T-P-01358 IFA 27-Apr-2017 26-Apr-2017 T-P-T-1906 Approved TPVN C
PROJECT MANAGEMENT 2539-00-ML-100 Basic Engineering Design Package 0 25-Mar-2016 II 25-Mar-2016 T-T-P-00485 II Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-ML-102 Detailed Engineering Design Documentation Index A 02-Jun-2017 IFR 02-Jun-2017 T-T-P-01438 IFR 15-Jun-2017 Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-ML-231 SIL Classification Report Vendor Packages A 17-Nov-2016 IFR 18-Nov-2016 T-T-P-00973 IFR 01-Dec-2016 03-Dec-2016 T-P-T-0727 Approved TPVN H
PROJECT MANAGEMENT 2539-00-ML-231 SIL Classification Report Vendor Packages 0 12-Dec-2016 IFE 12-Dec-2016 T-T-P-01037 IFA 25-Dec-2016 Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-MS-6300-01 Revamping of 10-T-3002 CO2 Absorber 0 25-Nov-2016 IFE 29-Nov-2016 T-T-P-01003 IFA 12-Dec-2016 16-Dec-2016 C-NH3-0475/T-P-T-0795 Commented TPIT C
PROJECT MANAGEMENT 2539-00-NM-107 Project Deliverable List A 11-Dec-2015 IFA 15-Dec-2015 T-T-P-00186 IFR 28-Dec-2015 No Comment TPIT H
PROJECT MANAGEMENT 2539-00-NM-107 Project Deliverable List B 16-Dec-2015 IFR 17-Dec-2015 T-T-P-00190 IFR 30-Dec-2015 No Comment TPIT H
PROJECT MANAGEMENT 2539-00-NM-107 Project Deliverable List C 24-Feb-2016 IFR 24-Feb-2016 T-T-P-00341 IFR 08-Mar-2016 24-Oct-2016 T-P-T-0492 Approved TPIT H
PROJECT MANAGEMENT 2539-00-NM-107 Project Deliverable List 0 15-Apr-2016 IFE 15-Apr-2016 T-T-P-00541 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-NM-120 Master Document Register 0 26-Feb-2016 II 01-Mar-2016 T-T-P-00381 II Transmitted TPIT H
PROJECT MANAGEMENT 2539-00-NM-120 Master Document Register 2 14-Apr-2016 II 14-Apr-2016 T-T-P-00540 II Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-NM-130 Unit 10 - Ammonia Unit - List of Revamping Activities A 17-Nov-2016 IFR 17-Nov-2016 T-T-P-00972 IFR 30-Nov-2016 01-Dec-2016 C-NH3-0434/T-P-T-0705; C-NH3-0505/T-P-T-0880 Commented TPVN H
PROJECT MANAGEMENT 2539-00-NM-130 Unit 10 - Ammonia Unit - List of Revamping Activities 0 09-Mar-2017 IFE 09-Mar-2017 T-T-P-01277 IFA 22-Mar-2017 Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-NM-131 Unit 30 - Utilities Production Unit - List of Revamping Acti A 26-Dec-2016 IFR 27-Dec-2016 T-T-P-01087 IFR 09-Jan-2017 20-Jan-2017 C-NH3-0570/T-P-T-1093; C-NH3-0804/T-P-T-2034 Commented TPVN H
PROJECT MANAGEMENT 2539-00-NM-131 Unit 30 - Utilities Production Unit - List of Revamping Acti 0 16-Feb-2017 IFE 16-Feb-2017 T-T-P-01226 IFA 01-Mar-2017 13-May-2017 C-NH3-0805/T-P-T-2035 Commented TPVN H
PROJECT MANAGEMENT 2539-00-NM-131 Unit 30 - Utilities Production Unit - List of Revamping Acti 1 21-Jun-2017 IFE 22-Jun-2017 T-T-P-01463 IFA 05-Jul-2017 17-Jul-2017 T-P-T-2333 Approved TPVN C
PROJECT MANAGEMENT 2539-00-NM-132 Unit 40 - Off-Sites - List of Revamping Activities A 03-Jan-2017 IFR 04-Jan-2017 T-T-P-01108 IFR 17-Jan-2017 18-Jan-2017 C-NH3-0561/T-P-T-1057; C-NH3-0615/T-P-T-1271 Commented TPVN H
PROJECT MANAGEMENT 2539-00-NM-132 Unit 40 - Off-Sites - List of Revamping Activities 0 15-Feb-2017 IFE 15-Feb-2017 T-T-P-01221 IFA 28-Feb-2017 Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-NM-305 Risk & Opportunity Register 0 24-Feb-2016 II 24-Feb-2016 T-T-P-00344 II Transmitted TPIT H
PROJECT MANAGEMENT 2539-00-NM-305 Risk & Opportunity Register 2 07-Jul-2016 IFE 08-Jul-2016 T-T-P-00698 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-NM-602 Quality Control Surveillance - Project Expediting & Inspect A 23-Nov-2015 IFR 27-Nov-2015 T-T-P-00119 IFR 10-Dec-2015 No Comment TPIT H
Page 34
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
PROJECT MANAGEMENT 2539-00-NM-602 Quality Control Surveillance - Project Expediting & Inspect 0 28-Jan-2016 IFE 01-Feb-2016 T-T-P-00272 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-NM-608 Equipment & Material Monthly Report April 2016 0 26-Apr-2016 II 16-Jun-2016 T-T-P-00652 II Transmitted TPIT H
PROJECT MANAGEMENT 2539-00-NM-608 Equipment & Material Monthly Report May 2016 1 26-May-2016 II 16-Jun-2016 T-T-P-00652 II Transmitted TPIT H
PROJECT MANAGEMENT 2539-00-NM-608 Equipment & Material Monthly Report June 2016 2 26-Jun-2016 II 06-Jul-2016 T-T-P-00693 II Transmitted TPIT H
PROJECT MANAGEMENT 2539-00-NM-608 Equipment & Material Monthly Report July 2016 3 27-Jul-2016 II 01-Aug-2016 T-T-P-00728 II No Comment TPIT H
PROJECT MANAGEMENT 2539-00-NM-608 Equipment & Material Monthly Report September 2016 4 27-Sep-2016 II 02-Dec-2016 T-T-P-01010 II 15-Dec-2016 Transmitted TPIT H
PROJECT MANAGEMENT 2539-00-NM-608 Equipment & Material Monthly Report October 2016 5 27-Oct-2016 II 02-Dec-2016 T-T-P-01010 II 15-Dec-2016 No Comment TPIT H
PROJECT MANAGEMENT 2539-00-NM-608 Equipment & Material Monthly Report November 2016 6 27-Nov-2016 II 18-Apr-2017 T-T-P-01364 II 01-May-2017 Transmitted TPIT H
PROJECT MANAGEMENT 2539-00-NM-608 Equipment & Material Monthly Report December 2016 7 30-Dec-2016 II 18-Apr-2017 T-T-P-01364 II 01-May-2017 Transmitted TPIT H
PROJECT MANAGEMENT 2539-00-NM-608 Equipment & Material Monthly Report January 2017 8 27-Jan-2017 II 18-Apr-2017 T-T-P-01364 II 01-May-2017 Transmitted TPIT H
PROJECT MANAGEMENT 2539-00-NM-608 Equipment & Material Monthly Report February 2017 9 27-Feb-2017 II 18-Apr-2017 T-T-P-01364 II 01-May-2017 Transmitted TPIT H
PROJECT MANAGEMENT 2539-00-NM-608 Equipment & Material Monthly Report March 2017 10 27-Mar-2017 II 18-Apr-2017 T-T-P-01364 II 01-May-2017 No Comment TPIT H
PROJECT MANAGEMENT 2539-00-NM-608 Equipment & Material Monthly Report April 2017 11 27-Apr-2017 II 12-May-2017 T-T-P-01413 II No Comment TPIT H
PROJECT MANAGEMENT 2539-00-NM-608 Equipment & Material Monthly Report May 2017 12 31-May-2017 II 12-Jun-2017 T-T-P-01449 II Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PLG-305 Level 2 Schedule A 15-Oct-2015 IFR 16-Oct-2015 T-T-P-00015 IFR 29-Oct-2015 02-Nov-2015 C-NH3-00013/T-P-T-00006 Commented TPIT C
PROJECT MANAGEMENT 2539-00-PLG-307 Level 3 Schedule A 22-Dec-2015 IFR 23-Dec-2015 T-T-P-00200 IFR 05-Jan-2016 04-Feb-2016 C-NH3-0093/T-P-T-0069 Commented TPIT H
PROJECT MANAGEMENT 2539-00-PLG-307 Level 3 Schedule 0 11-May-2016 IFA 11-May-2016 T-T-P-00583 IFA 24-May-2016 31-May-2016 C-NH3-0169/T-P-T-0193 Commented TPVN H
PROJECT MANAGEMENT 2539-00-PLG-307 Level 3 Schedule 1 28-Jun-2016 IFA 29-Jun-2016 T-T-P-00672 IFA 12-Jul-2016 10-Sep-2016 T-P-T-0373 Approved TPVN H
PROJECT MANAGEMENT 2539-00-PLG-307 Level 3 Schedule (Incorporated CO-06) 2 07-Sep-2016 IFA 07-Sep-2016 T-T-P-00798 IFA 20-Sep-2016 20-Sep-2016 C-NH3-0301/T-P-T-0403 Commented TPVN H
PROJECT MANAGEMENT 2539-00-PLG-307 Level 3 Schedule 3 20-Oct-2016 IFA 21-Oct-2016 T-T-P-00887 IFA 03-Nov-2016 No Comment TPVN H
PROJECT MANAGEMENT 2539-00-PLG-307 Level 3 Schedule 4 08-Dec-2016 IFA 08-Dec-2016 T-T-P-01025 IFA 21-Dec-2016 27-Dec-2016 C-NH3-0511/T-P-T-0890 Commented TPVN H
PROJECT MANAGEMENT 2539-00-PLG-307 Level 3 Schedule 5 01-Jun-2017 IFA 02-Jun-2017 T-T-P-01433 IFA 15-Jun-2017 14-Jun-2017 C-NH3-0836/T-P-T-2177 Approved with comments TPVN C
PROJECT MANAGEMENT 2539-00-PLG-810 CO2 Recovery Section Mechanical Activities of COP-04 0 28-Nov-2016 IFE 28-Nov-2016 T-T-P-01001 IFA 11-Dec-2016 13-Jan-2017 C-NH3-0546/T-P-T-1001 Commented TPVN C
PROJECT MANAGEMENT 2539-00-PP-014 Requirements for Vendor Documentation & Exchange o A 02-Dec-2015 IFR 04-Dec-2015 T-T-P-00157 IFR 17-Dec-2015 24-Oct-2016 T-P-T-0492 Approved TPIT H
PROJECT MANAGEMENT 2539-00-PP-014 Requirements for Vendor Documentation & Exchange o 0 08-Feb-2016 IFE 10-Feb-2016 T-T-P-00303 IFE Transmitted TPIT H
PROJECT MANAGEMENT 2539-00-PP-014 Requirements for Vendor Documentation & Exchange o 1 04-Apr-2016 IFE 14-Apr-2016 T-T-P-00538 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-015 Quality Control Surveillance - Prescriptions of Quality C A 23-Nov-2015 IFR 27-Nov-2015 T-T-P-00115 IFR 10-Dec-2015 24-Oct-2016 T-P-T-0492 Approved TPIT H
PROJECT MANAGEMENT 2539-00-PP-015 Quality Control Surveillance - Prescriptions of Quality C 0 28-Jan-2016 IFE 01-Feb-2016 T-T-P-00271 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-016 Prescriptions for Preparation of Vendor Data Book A 21-Dec-2015 IFR 13-Jan-2016 T-T-P-00231 IFR 25-Jan-2016 No Comment TPIT H
PROJECT MANAGEMENT 2539-00-PP-016 Prescriptions for Preparation of Vendor Data Book 0 08-Feb-2016 IFE 10-Feb-2016 T-T-P-00304 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-100 Project Organization Chart A 05-Feb-2016 IFR 05-Feb-2016 T-T-P-00289 IFR 18-Feb-2016 24-Oct-2016 T-P-T-0492 Approved TPIT H
PROJECT MANAGEMENT 2539-00-PP-100 Project Organization Chart 0 20-Mar-2017 IFE 20-Mar-2017 T-T-P-01298 IFA 02-Apr-2017 Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-PP-101 Project Execution Plan A 08-Apr-2016 IFR 08-Apr-2016 T-T-P-00522 IFR 21-Apr-2016 29-Jul-2016 C-NH3-0235/T-P-T-0294; C-NH3-0487/T-P-T-0827; C-N Commented TPIT H
PROJECT MANAGEMENT 2539-00-PP-101 Project Execution Plan 0 13-Dec-2016 IFE 13-Dec-2016 T-T-P-01041 IFA 26-Dec-2016 Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-PP-102 Coordination Procedure between PVFCCo and Consorti A 30-Sep-2015 IFR 02-Oct-2015 T-T-P-00002 IFR 15-Oct-2015 30-Oct-2015 C-NH3-00006/T-P-T-00003 Commented TPIT H
PROJECT MANAGEMENT 2539-00-PP-102 Coordination Procedure between PVFCCo and Consorti 0 04-Apr-2016 IFE 13-Apr-2016 T-T-P-00530 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-103 Coordination Procedure between TPIT & PTSC A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00006 IFR 22-Oct-2015 27-Oct-2015 C-NH3-00005/T-P-T-00002 Commented TPIT H
PROJECT MANAGEMENT 2539-00-PP-103 Coordination Procedure between TPIT & PTSC 0 04-Apr-2016 IFE 13-Apr-2016 T-T-P-00527 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-104 Coordination Procedure between TPIT and Haldor Tops A 06-Oct-2015 IFR 06-Oct-2015 T-T-P-00003 IFR 19-Oct-2015 27-Oct-2015 C-NH3-00004/T-P-T-00002 Commented TPIT H
PROJECT MANAGEMENT 2539-00-PP-104 Coordination Procedure between TPIT and Haldor Tops 0 04-Apr-2016 IFE 13-Apr-2016 T-T-P-00528 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-106 Project Tagging System A 09-Oct-2015 IFR 09-Oct-2015 T-T-P-00005 IFR 22-Oct-2015 23-Oct-2015 C-NH3-00003/T-P-T-00001 Commented TPIT H
PROJECT MANAGEMENT 2539-00-PP-106 Project Tagging System 0 04-Mar-2016 IFE 07-Mar-2016 T-T-P-00397 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-107 Project Document Coding A 05-Oct-2015 IFR 07-Oct-2015 T-T-P-00004 IFR 20-Oct-2015 23-Oct-2015 C-NH3-00002/T-P-T-00001 Commented TPIT H
PROJECT MANAGEMENT 2539-00-PP-107 Project Document Coding 0 04-Apr-2016 IFE 14-Apr-2016 T-T-P-00537 IFE Transmitted TPIT H
PROJECT MANAGEMENT 2539-00-PP-107 Project Document Coding 1 05-Jul-2016 IFE 07-Jul-2016 T-T-P-00695 IFE Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-PP-110 Document Issue; Distribution to & Approval by Owner A 01-Dec-2015 IFR 03-Dec-2015 T-T-P-00145 IFR 16-Dec-2015 15-Dec-2015 C-NH3-00064/T-P-T-0034 Commented TPIT H
PROJECT MANAGEMENT 2539-00-PP-110 Document Issue; Distribution to & Approval by Owner 0 07-Mar-2016 IFE 08-Mar-2016 T-T-P-00400 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-113 Final Documentation Procedure A 08-May-2017 IFR 08-May-2017 T-T-P-01402 IFR 21-May-2017 27-May-2017 C-NH3-0820/T-P-T-2098 Commented TPVN H
PROJECT MANAGEMENT 2539-00-PP-113 Final Documentation Procedure 0 21-Jun-2017 IFE 22-Jun-2017 T-T-P-01463 IFA 05-Jul-2017 Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-PP-117 IT Plan A 23-Oct-2015 IFR 28-Oct-2015 T-T-P-00039 IFR 10-Nov-2015 16-Nov-2015 T-P-T-0013 Approved TPIT H
PROJECT MANAGEMENT 2539-00-PP-117 IT Plan 0 21-Dec-2015 IFE 08-Jan-2016 T-T-P-00217 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-120 As Built Documentation Procedure A 08-May-2017 IFR 08-May-2017 T-T-P-01402 IFR 21-May-2017 27-May-2017 C-NH3-0820/T-P-T-2098 Commented TPVN H
PROJECT MANAGEMENT 2539-00-PP-120 As Built Documentation Procedure 0 21-Jun-2017 IFE 22-Jun-2017 T-T-P-01463 IFA 05-Jul-2017 Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-PP-122 Management of Change Procedure for Engineering Desi A 14-Dec-2016 IFR 14-Dec-2016 T-T-P-01048 IFR 28-Dec-2016 05-Jan-2017 T-P-T-0933 Approved TPVN H
PROJECT MANAGEMENT 2539-00-PP-122 Management of Change Procedure for Engineering Desi 0 06-Jan-2017 IFE 06-Jan-2017 T-T-P-01128 IFA 20-Jan-2017 20-Jan-2017 T-P-T-1098 Approved TPVN C
PROJECT MANAGEMENT 2539-00-PP-124 Basic Design Package & Detailed Design Package Prepa A 19-Feb-2016 IFA 22-Feb-2016 T-T-P-00337 IFA 07-Mar-2016 04-Mar-2016 C-NH3-0109/T-P-T-0086 Commented TPIT H
PROJECT MANAGEMENT 2539-00-PP-124 Basic Design Package & Detailed Design Package Prepa 0 23-Mar-2016 IFE 25-Mar-2016 T-T-P-00482 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-202 Process Hazard Analysis Procedure A 12-Nov-2015 IFR 13-Nov-2015 T-T-P-00083 IFR 26-Nov-2015 03-Dec-2015 T-P-T-0023 Approved TPIT H
PROJECT MANAGEMENT 2539-00-PP-202 Process Hazard Analysis Procedure 0 27-Nov-2015 IFE 27-Nov-2015 T-T-P-00120 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-204 SIL Procedure A 12-Nov-2015 IFR 13-Nov-2015 T-T-P-00083 IFR 26-Nov-2015 03-Dec-2015 T-P-T-0023 Approved TPIT H
PROJECT MANAGEMENT 2539-00-PP-204 SIL Procedure 0 27-Nov-2015 IFE 27-Nov-2015 T-T-P-00120 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-250 Field Design Change Procedure A 03-Oct-2016 IFR 04-Oct-2016 T-T-P-00852 IFR 18-Oct-2016 24-Oct-2016 T-P-T-0492 Approved TPVN H
PROJECT MANAGEMENT 2539-00-PP-250 Field Design Change Procedure 0 06-Dec-2016 IFE 06-Dec-2016 T-T-P-01016 IFA 19-Dec-2016 19-Jan-2017 T-P-T-1065 Approved TPVN C
PROJECT MANAGEMENT 2539-00-PP-254 3D Model Project Organization A 06-Nov-2015 IFR 10-Nov-2015 T-T-P-00068 IFR 23-Nov-2015 24-Nov-2015 C-NH3-0041/T-P-T-0018 Commented TPIT H
PROJECT MANAGEMENT 2539-00-PP-254 3D Model Project Organization 0 04-Dec-2015 IFE 11-Dec-2015 T-T-P-00182 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-259 Drafting Procedure For 2D Drawings A 18-Nov-2015 IFR 24-Nov-2015 T-T-P-00102 IFR 07-Dec-2015 07-Dec-2015 C-NH3-0052/T-P-T-0029 Approved with comments TPIT H
PROJECT MANAGEMENT 2539-00-PP-259 Drafting Procedure For 2D Drawings 0 09-Feb-2016 IFE 18-Feb-2016 T-T-P-00327 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-301 Planning Scheduling & Progress Measurement Procedur A 22-Oct-2015 IFR 26-Oct-2015 T-T-P-00033 IFR 09-Nov-2015 10-Nov-2015 C-NH3-00018/T-P-T-00008 Commented TPIT H
PROJECT MANAGEMENT 2539-00-PP-301 Planning; Scheduling & Progress Measurement Procedu 0 22-Mar-2016 IFE 24-Mar-2016 T-T-P-00475 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-306 Risk Management Procedure 0 07-Nov-2015 II 12-Nov-2015 T-T-P-00081 II 24-Oct-2016 T-P-T-0492 Approved TPIT C
PROJECT MANAGEMENT 2539-00-PP-307 Change Order Procedure A 20-Nov-2015 IFR 09-Dec-2015 T-T-P-00167 IFR 22-Dec-2015 23-Dec-2015 C-NH3-0076/T-P-T-0049 Commented TPIT H
PROJECT MANAGEMENT 2539-00-PP-307 Change Order Procedure 0 25-Mar-2016 IFE 30-Mar-2016 T-T-P-00494 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-401 Invoicing procedure A 10-Sep-2015 IFR 10-Nov-2015 T-T-P-00067 IFR 23-Nov-2015 23-Nov-2015 C-NH3-0040/T-P-T-0017 Commented TPIT H
PROJECT MANAGEMENT 2539-00-PP-401 Invoicing procedure 0 11-Dec-2015 IFE 16-Dec-2015 T-T-P-00189 IFE 24-Nov-2016 C-NH3-0406/T-P-T-0643 Commented TPIT H
PROJECT MANAGEMENT 2539-00-PP-401 Invoicing Procedure 1 12-Jan-2017 IFE 12-Jan-2017 T-T-P-01144 IFA 25-Jan-2017 Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-PP-500 Consortium Overall Project Quality Plan A 03-Nov-2015 IFR 11-Nov-2015 T-T-P-00076 IFR 24-Nov-2015 24-Oct-2016 T-P-T-0492 Approved TPIT H
PROJECT MANAGEMENT 2539-00-PP-500 Consortium Overall Project Quality Plan 0 02-Dec-2015 IFE 10-Dec-2015 T-T-P-00169 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-501 Project Quality Plan A 10-Nov-2015 IFR 23-Nov-2015 T-T-P-00101 IFR 07-Dec-2015 24-Oct-2016 T-P-T-0492 Approved PTSC H
PROJECT MANAGEMENT 2539-00-PP-501 Project Quality Plan 0 08-Feb-2017 IFE 09-Feb-2017 T-T-P-01207 IFA 22-Feb-2017 01-Mar-2017 T-P-T-1378 Approved PTSC C
PROJECT MANAGEMENT 2539-00-PP-503 Project Quality Plan A 03-Nov-2015 IFR 11-Nov-2015 T-T-P-00076 IFR 24-Nov-2015 24-Oct-2016 T-P-T-0492 Approved TPIT H
PROJECT MANAGEMENT 2539-00-PP-503 TPIT Project Quality Plan 0 02-Dec-2015 IFE 10-Dec-2015 T-T-P-00169 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-504 Nonconformity Control Procedure for Purchased Equipme A 19-Jul-2016 IFR 25-Jul-2016 T-T-P-00715 IFR 07-Aug-2016 01-Sep-2016 T-P-T-0362 Approved TPVN H
PROJECT MANAGEMENT 2539-00-PP-504 Nonconformity Control Procedure for Purchased Equipme 0 11-Nov-2016 IFE 15-Nov-2016 T-T-P-00963 IFE Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-PP-551 Project HSE Plan (Health - Safety & Environment) A 06-Nov-2015 IFA 19-Nov-2015 T-T-P-00093 IFA 02-Dec-2015 24-Oct-2016 T-P-T-0492 Approved TPIT H
PROJECT MANAGEMENT 2539-00-PP-551 Project HSE Plan (Health; Safety & Environment) 0 20-Mar-2017 IFA 20-Mar-2017 T-T-P-01298 IFA 02-Apr-2017 Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-601 Project Procurement Strategy & Plan A 23-Nov-2016 IFR 24-Nov-2016 T-T-P-00992 IFR 08-Dec-2016 23-Dec-2016 T-P-T-0854 Commented TPVN H
PROJECT MANAGEMENT 2539-00-PP-601 Project Procurement Strategy & Plan 0 12-Jan-2017 IFE 12-Jan-2017 T-T-P-01144 IFA 25-Jan-2017 Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-PP-602 Quality Control Surveillance - Projetc QCS Coordination A 23-Nov-2015 IFR 27-Nov-2015 T-T-P-00116 IFR 10-Dec-2015 24-Oct-2016 T-P-T-0492 Approved TPIT H
PROJECT MANAGEMENT 2539-00-PP-602 Quality Control Surveillance - Projetc QCS Coordination 0 28-Jan-2016 IFE 01-Feb-2016 T-T-P-00270 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-605 Quality Control Surveillance - QCS Requirements For Su A 23-Nov-2015 IFR 27-Nov-2015 T-T-P-00116 IFR 10-Dec-2015 24-Oct-2016 T-P-T-0492 Approved TPIT H
PROJECT MANAGEMENT 2539-00-PP-605 Quality Control Surveillance - QCS Requirements for Sup 0 28-Jan-2016 IFE 01-Feb-2016 T-T-P-00270 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-607 Prescriptions for Preparation of Document Packages for 0 03-Dec-2015 IFE 09-Dec-2015 T-T-P-00168 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-608 Quality Control Surveillance - Shop QCS Execution Proc A 23-Nov-2015 IFR 27-Nov-2015 T-T-P-00116 IFR 10-Dec-2015 24-Oct-2016 T-P-T-0492 Approved TPIT H
PROJECT MANAGEMENT 2539-00-PP-608 Quality Control Surveillance - Shop QCS Execution Proc 0 28-Jan-2016 IFE 01-Feb-2016 T-T-P-00270 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-609 Quality Control Surveillance - Shop QCS Execution Proc A 23-Nov-2015 IFR 27-Nov-2015 T-T-P-00116 IFR 10-Dec-2015 24-Oct-2016 T-P-T-0492 Approved TPIT H
PROJECT MANAGEMENT 2539-00-PP-609 Quality Control Surveillance - Shop QCS Execution Proc 0 28-Jan-2016 IFE 01-Feb-2016 T-T-P-00270 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-610 Shipping Document & Distribution Requirements A 13-Oct-2016 IFR 14-Oct-2016 T-T-P-00876 IFR 27-Oct-2016 10-Nov-2016 T-P-T-0574 Approved TPVN H
PROJECT MANAGEMENT 2539-00-PP-610 Shipping Document & Distribution Requirements 0 11-Nov-2016 IFE 11-Nov-2016 T-T-P-00952 IFE Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-PP-614 Quality Control Surveillance - Project Expediting & Inspec A 23-Nov-2015 IFR 27-Nov-2015 T-T-P-00116 IFR 10-Dec-2015 24-Oct-2016 T-P-T-0492 Approved TPIT H
PROJECT MANAGEMENT 2539-00-PP-614 Quality Control Surveillance - Project Expediting & Inspec 0 28-Jan-2016 IFE 01-Feb-2016 T-T-P-00270 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-805 Constructability Procedure for EPC Phase A 04-Feb-2016 IFR 05-Feb-2016 T-T-P-00290 IFR 18-Feb-2016 No Comment TPIT H
PROJECT MANAGEMENT 2539-00-PP-805 Constructability Procedure for EPC Phase 0 18-Apr-2016 IFE 21-Apr-2016 T-T-P-00548 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PP-848 Vendor Data Review Procedure A 12-Jan-2016 IFR 17-Feb-2016 T-T-P-00321 IFR 01-Mar-2016 27-Jul-2016 C-NH3-0232/T-P-T-0290 Commented PTSC C
PROJECT MANAGEMENT 2539-00-PP-908 Instructions to Vendor for Filling-up of Spare Parts List A 01-Dec-2015 IFR 04-Dec-2015 T-T-P-00158 IFR 17-Dec-2015 24-Oct-2016 T-P-T-0492 Approved TPIT H
PROJECT MANAGEMENT 2539-00-PP-918 Relief Valves Management Procedure A 23-Dec-2016 IFR 23-Dec-2016 T-T-P-01076 IFR 05-Jan-2017 08-Jan-2017 C-NH3-0533/T-P-T-0950 Commented TPIT H
PROJECT MANAGEMENT 2539-00-PTC-601 Addendum to General Purchase Conditions (1000 GTC 0 16-Dec-2015 IFE 18-Dec-2015 T-T-P-00192 IFE No Comment TPIT H
PROJECT MANAGEMENT 2539-00-PTC-601 Addendum to General Purchase Conditions (1000 GTC 1 26-Oct-2016 IFE 11-Nov-2016 T-T-P-00953 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-PTC-604 Addendum A to 1000-GTC 603-604 - Issue of Shipping Do 0 10-Feb-2016 IFE 15-Feb-2016 T-T-P-00316 IFE Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-101 Monthly Progress Report No. 001 as of October 31st 20 0 10-Nov-2015 II 10-Nov-2015 T-T-P-00069 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-102 Monthly Progress Report No. 002 as of November 30th 0 03-Dec-2015 II 09-Dec-2015 T-T-P-00160 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-103 Monthly Progress Report No. 003 as of December 31st 0 08-Jan-2016 II 15-Jan-2016 T-T-P-00240 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-104 Monthly Progress Report No. 004 as of January 25th 20 0 05-Feb-2016 II 05-Feb-2016 T-T-P-00284 II Non-deliverable. Transmitted TPIT C
Page 35
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
PROJECT MANAGEMENT 2539-00-RR-105 Monthly Progress Report No. 005 as of February 25th 2 0 04-Mar-2016 II 07-Mar-2016 T-T-P-00398 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-106 Monthly Progress Report No. 006 as of March 25th 2016 0 05-Apr-2016 II 06-Apr-2016 T-T-P-00510 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-107 Monthly Progress Report No. 007 as of Apr 29th 2016 0 05-May-2016 II 06-May-2016 T-T-P-00569 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-108 Monthly Progress Report No. 008 as of May 27th 2016 0 03-Jun-2016 II 03-Jun-2016 T-T-P-00630 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-109 Monthly Progress Report No. 009 as of June 30th 2016 0 05-Jul-2016 II 06-Jul-2016 T-T-P-00691 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-110 Monthly Progress Report No. 010 as of July 29th 2016 0 05-Aug-2016 II 05-Aug-2016 T-T-P-00740 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-111 Monthly Progress Report No. 011 as of Aug 26th 2016 0 05-Sep-2016 II 05-Sep-2016 T-T-P-00789 II 16-Sep-2016 C-NH3-0287/T-P-T-0384 Commented TPVN C
PROJECT MANAGEMENT 2539-00-RR-112 Monthly Progress Report No. 012 as of Sep 30th 2016 0 05-Oct-2016 II 06-Oct-2016 T-T-P-00856 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-113 Monthly Progress Report No. 013 as of Oct 28th 2016 0 04-Nov-2016 II 04-Nov-2016 T-T-P-00928 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-114 Monthly Progress Report No. 014 as of Nov 25th 2016 0 05-Dec-2016 II 05-Dec-2016 T-T-P-01014 II 10-Dec-2016 C-NH3-0460/T-P-T-0770 Commented TPVN C
PROJECT MANAGEMENT 2539-00-RR-115 Monthly Progress Report No. 015 as of Dec 30th 2016 0 05-Jan-2017 II 05-Jan-2017 T-T-P-01116 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-116 Monthly Progress Report No. 016 as of Jan 27th 2017 0 06-Feb-2017 II 06-Feb-2017 T-T-P-01197 II 16-Feb-2017 C-NH3-0612/T-P-T-1265 Commented TPVN C
PROJECT MANAGEMENT 2539-00-RR-117 Monthly Progress Report No. 017 as of Feb 24th 2017 0 06-Mar-2017 II 06-Mar-2017 T-T-P-01266 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-118 Monthly Progress Report No. 018 as of Mar 31st 2017 0 05-Apr-2017 II 04-Apr-2017 T-T-P-01337 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-119 Monthly Progress Report No. 019 as of April 28th 2017 0 03-May-2017 II 04-May-2017 T-T-P-01399 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-120 Monthly Progress Report No. 020 as of May 26th 2017 0 02-Jun-2017 II 05-Jun-2017 T-T-P-01442 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-121 Monthly Progress Report No. 021 as of June 30th 2017 0 05-Jul-2017 II 05-Jul-2017 T-T-P-01480 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-122 Monthly Progress Report No. 022 as of July 28th 2017 0 04-Aug-2017 II 04-Aug-2017 T-T-P-01516 II Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-202 Weekly Report No.2 as of October 15th 2015 0 16-Oct-2015 II 16-Oct-2015 T-T-P-00013 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-203 Weekly Report No.3 as of October 22nd 2015 0 22-Oct-2015 II 22-Oct-2015 T-T-P-00022 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-204 Weekly Report No.4 as of October 29th 2015 0 29-Oct-2015 II 29-Oct-2015 T-T-P-00044 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-205 Weekly Report No.5 as of November 5th 2015 0 05-Nov-2015 II 05-Nov-2015 T-T-P-00061 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-206 Weekly Report No.6 as of November 12th 2015 0 12-Nov-2015 II 13-Nov-2015 T-T-P-00084 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-207 Weekly Report No.7 as of November 19th 2015 0 19-Nov-2015 II 19-Nov-2015 T-T-P-00092 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-208 Weekly Report No.8 as of November 25th 2015 0 25-Nov-2015 II 27-Nov-2015 T-T-P-00114 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-209 Weekly Report No.9 as of December 03rd 2015 0 03-Dec-2015 II 03-Dec-2015 T-T-P-00147 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-210 Weekly Report No.10 as of December 10th 2015 0 10-Dec-2015 II 10-Dec-2015 T-T-P-00171 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-211 Weekly Report No.11 as of December 17th 2015 0 17-Dec-2015 II 18-Dec-2015 T-T-P-00197 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-212 Weekly Report No.12 as of December 23rd 2015 0 23-Dec-2015 II 23-Dec-2015 T-T-P-00205 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-213 Weekly Report No.13 as of January 07th 2016 0 07-Jan-2016 II 07-Jan-2016 T-T-P-00216 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-214 Weekly Report No.14 as of January 14th 2016 0 14-Jan-2016 II 14-Jan-2016 T-T-P-00237 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-215 Weekly Report No.15 as of January 21st 2016 0 21-Jan-2016 II 21-Jan-2016 T-T-P-00252 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-216 Weekly Report No.16 as of January 28th 2016 0 28-Jan-2016 II 29-Jan-2016 T-T-P-00268 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-217 Weekly Report No.17 as of February 04th 2016 0 04-Feb-2016 II 12-Feb-2016 T-T-P-00313 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-218 Weekly Report No.18 as of February 11th 2016 0 11-Feb-2016 II 12-Feb-2016 T-T-P-00313 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-219 Weekly Report No.19 as of February 18th 2016 0 18-Feb-2016 II 19-Feb-2016 T-T-P-00330 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-220 Weekly Report No.20 as of February 25th 2016 0 25-Feb-2016 II 25-Feb-2016 T-T-P-00358 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-223 Weekly Report No.23 as of March 17th 2016 - 17-Mar-2016 II 17-Mar-2016 T-T-P-00447 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-224 Weekly Report No.24 as of March 24th 2016 0 24-Mar-2016 II 25-Mar-2016 T-T-P-00490 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-225 Weekly Report No.25 as of March 31st 2016 0 31-Mar-2016 II 05-Apr-2016 T-T-P-00509 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-226 Weekly Report No.26 as of April 07th 2016 0 07-Apr-2016 II 19-Apr-2016 T-T-P-00542 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-227 Weekly Report No.27 as of April 14th 2016 0 14-Apr-2016 II 19-Apr-2016 T-T-P-00542 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-228 Weekly Report No.28 as of April 21st 2016 0 21-Apr-2016 II 22-Apr-2016 T-T-P-00550 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-229 Weekly Report No.29 as of April 29th 2016 0 29-Apr-2016 II 29-Apr-2016 T-T-P-00566 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-230 Weekly Report No.30 as of May 06th 2016 0 06-May-2016 II 06-May-2016 T-T-P-00576 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-231 Weekly Report No.31 as of May 13th 2016 0 16-May-2016 II 16-May-2016 T-T-P-00589 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-232 Weekly Report No.32 as of May 19th 2016 0 20-May-2016 II 20-May-2016 T-T-P-00597 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-233 Weekly Report No.33 as of May 26th 2016 0 27-May-2016 II 27-May-2016 T-T-P-00610 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-234 Weekly Report No.34 as of Jun 02nd 2016 0 03-Jun-2016 II 06-Jun-2016 T-T-P-00634 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-235 Weekly Report No.35 as of June 09th 2016 0 10-Jun-2016 II 10-Jun-2016 T-T-P-00647 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-236 Weekly Report No.36 as of June 16th 2016 0 17-Jun-2016 II 20-Jun-2016 T-T-P-00658 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-237 Weekly Report No.37 as of June 23th 2016 0 24-Jun-2016 II 27-Jun-2016 T-T-P-00669 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-238 Weekly Report No.38 as of June 30th 2016 0 01-Jul-2016 II 04-Jul-2016 T-T-P-00684 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-239 Weekly Report No.39 as of July 07th 2016 0 08-Jul-2016 II 11-Jul-2016 T-T-P-00700 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-240 Weekly Report No.40 as of July 14th 2016 - 15-Jul-2016 II 15-Jul-2016 T-T-P-00705 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-241 Weekly Report No.41 as of July 21th 2016 0 22-Jul-2016 II 22-Jul-2016 T-T-P-00713 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-242 Weekly Report No.42 as of July 28th 2016 0 29-Jul-2016 II 29-Jul-2016 T-T-P-00726 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-243 Weekly Report No.43 as of Aug 04th 2016 0 05-Aug-2016 II 05-Aug-2016 T-T-P-00742 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-244 Weekly Report No.44 as of Aug 11th 2016 0 12-Aug-2016 II 12-Aug-2016 T-T-P-00749 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-245 Weekly Report No.45 as of Aug 18th 2016 0 19-Aug-2016 II 19-Aug-2016 T-T-P-00766 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-246 Weekly Report No.46 as of Aug 25th 2016 0 26-Aug-2016 II 26-Aug-2016 T-T-P-00777 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-247 Weekly Report No.47 as of September 01st 2016 0 01-Sep-2016 II 05-Sep-2016 T-T-P-00786 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-248 Weekly Report No.48 as of September 08th 2016 0 09-Sep-2016 II 09-Sep-2016 T-T-P-00804 II 21-Sep-2016 C-NH3-0300/T-P-T-0402 Commented TPVN C
PROJECT MANAGEMENT 2539-00-RR-249 Weekly Report No.49 as of September 15th 2016 0 16-Sep-2016 II 16-Sep-2016 T-T-P-00819 II 16-Oct-2016 C-NH3-0326/T-P-T-0460 Commented TPVN C
PROJECT MANAGEMENT 2539-00-RR-250 Weekly Report No.50 as of September 22th 2016 0 23-Sep-2016 II 23-Sep-2016 T-T-P-00835 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-251 Weekly Report No.51 as of September 29th 2016 0 30-Oct-2016 II 03-Oct-2016 T-T-P-00848 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-252 Weekly Report No.52 as of October 06th 2016 0 07-Oct-2016 II 07-Oct-2016 T-T-P-00860 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-253 Weekly Report No.53 as of October 13th 2016 0 14-Oct-2016 II 14-Oct-2016 T-T-P-00879 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-254 Weekly Report No.54 as of October 20th 2016 0 21-Oct-2016 II 24-Oct-2016 T-T-P-00894 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-255 Weekly Report No.55 as of October 27th 2016 0 28-Oct-2016 II 31-Oct-2016 T-T-P-00915 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-256 Weekly Report No.56 as of November 03rd 2016 0 04-Nov-2016 II 04-Nov-2016 T-T-P-00931 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-257 Weekly Report No.57 as of November 10th 2016 0 11-Nov-2016 II 11-Nov-2016 T-T-P-00957 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-258 Weekly Report No.58 as of November 17th 2016 0 18-Nov-2016 II 18-Nov-2016 T-T-P-00978 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-259 Weekly Report No.59 as of November 24th 2016 0 25-Nov-2016 II 25-Nov-2016 T-T-P-00996 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-260 Weekly Report No.60 as of December 01st 2016 0 02-Dec-2016 II 02-Dec-2016 T-T-P-01011 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-261 Weekly Report No.61 as of December 08th 2016 0 09-Dec-2016 II 09-Dec-2016 T-T-P-01032 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-262 Weekly Report No.62 as of December 15th 2016 0 16-Dec-2016 II 16-Dec-2016 T-T-P-01053 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-263 Weekly Report No.63 as of December 22nd 2016 0 23-Dec-2016 II 23-Dec-2016 T-T-P-01079 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-264 Weekly Report No.64 as of December 29th 2016 0 30-Dec-2016 II 30-Dec-2016 T-T-P-01102 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-265 Weekly Report No.65 as of January 05th 2017 0 06-Jan-2017 II 06-Jan-2017 T-T-P-01129 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-266 Weekly Report No.66 as of January 12th 2017 0 13-Jan-2017 II 13-Jan-2017 T-T-P-01149 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-267 Weekly Report No.67 as of January 19th 2017 0 20-Jan-2017 II 20-Jan-2017 T-T-P-01164 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-268 Weekly Report No.68 as of January 26th 2017 0 27-Jan-2017 II 25-Jan-2017 T-T-P-01188 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-269 Weekly Report No.69 as of February 10th 2017 0 10-Feb-2017 II 10-Feb-2017 T-T-P-01211 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-270 Weekly Report No.70 as of February 16th 2017 0 17-Feb-2017 II 17-Feb-2017 T-T-P-01229 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-271 Weekly Report No.71 as of February 23rd 2017 0 24-Feb-2017 II 24-Feb-2017 T-T-P-01243 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-272 Weekly Report No.72 as of March 02nd 2017 0 03-Mar-2017 II 03-Mar-2017 T-T-P-01264 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-273 Weekly Report No.73 as of March 09th 2017 0 10-Mar-2017 II 10-Mar-2017 T-T-P-01279 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-274 Weekly Report No.74 as of March 16th 2017 0 17-Mar-2017 II 17-Mar-2017 T-T-P-01295 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-275 Weekly Report No.75 as of March 23rd 2017 0 24-Mar-2017 II 24-Mar-2017 T-T-P-01307 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-276 Weekly Report No.76 as of March 30th 2017 0 31-Mar-2017 II 31-Mar-2017 T-T-P-01325 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-277 Weekly Report No.77 as of April 06th 2017 0 07-Apr-2017 II 07-Apr-2017 T-T-P-01344 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-278 Weekly Report No.78 as of April 13th 2017 0 14-Apr-2017 II 14-Apr-2017 T-T-P-01356 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-279 Weekly Report No.79 as of April 20th 2017 0 21-Apr-2017 II 24-Apr-2017 T-T-P-01377 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-280 Weekly Report No.80 as of April 27th 2017 0 28-Apr-2017 II 28-Apr-2017 T-T-P-01396 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-281 Weekly Report No.81 as of May 04th 2017 0 05-May-2017 II 08-May-2017 T-T-P-01401 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-282 Weekly Report No.82 as of May 11th 2017 0 11-May-2017 II 12-May-2017 T-T-P-01414 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-283 Weekly Report No.83 as of May 18th 2017 0 19-May-2017 II 23-May-2017 T-T-P-01419 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-284 Weekly Report No.84 as of May 25th 2017 0 26-May-2017 II 29-May-2017 T-T-P-01425 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-285 Weekly Report No.85 as of June 01st 2017 0 02-Jun-2017 II 05-Jun-2017 T-T-P-01439 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-286 Weekly Report No.86 as of June 08th 2017 0 09-Jun-2017 II 09-Jun-2017 T-T-P-01448 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-287 Weekly Report No.87 as of June 15th 2017 0 16-Jun-2017 II 16-Jun-2017 T-T-P-01459 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-288 Weekly Report No.88 as of June 22th 2017 0 23-Jun-2017 II 23-Jun-2017 T-T-P-01465 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-289 Weekly Report No.89 as of June 29th 2017 0 29-Jun-2017 II 03-Jul-2017 T-T-P-01468 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-290 Weekly Report No.90 as of July 06th 2017 0 07-Jul-2017 II 07-Jul-2017 T-T-P-01484 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-291 Weekly Report No.91 as of July 13th 2017 0 14-Jul-2017 II 17-Jul-2017 T-T-P-01495 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-292 Weekly Report No.92 as of July 20th 2017 0 21-Jul-2017 II 24-Jul-2017 T-T-P-01505 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-293 Weekly Report No.93 as of July 27th 2017 0 28-Jul-2017 II 31-Jul-2017 T-T-P-01514 II Non-deliverable. Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-294 Weekly Report No.94 as of Aug 03rd 2017 0 04-Aug-2017 II 07-Aug-2017 T-T-P-01518 II Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-801 1st Constructability Workshop Report for EPC Phase 0 15-Mar-2016 II 17-Mar-2016 T-T-P-00445 II Non-deliverable. Transmitted TPIT C
PROJECT MANAGEMENT 2539-00-RR-802 2nd Constructability Workshop Report for EPC Phase 0 04-Nov-2016 II 04-Nov-2016 T-T-P-00927 II Transmitted TPVN C
PROJECT MANAGEMENT 2539-00-RR-803 3rd Constructability Workshop Report for EPC Phase 0 07-Jun-2017 II 08-Jun-2017 T-T-P-01444 II Transmitted TPVN C
Page 36
PDB - 5000 - NH3 REVAMPING PROJECT - Document - 11/07/2017
Discipline Document Reference Document Title Revision Number Revision Date Document Revision Object Transmittal Date Transmittal Reference Required Action Response Due Date Actual Response Date Response Document Reference Document Status Document Origin Current/History
PROJECT MANAGEMENT 2539-00-RT-101 Site Survey at Ammonia Plant Revamp Project in Phu My 0 16-Feb-2016 II 18-Feb-2016 T-T-P-00329 II Transmitted TPIT C
PROJECT MANAGEMENT 2539-MOM-T-P-003 Minute of Meeting - Coordination Meeting - 07-Sep-2015 II 15-Sep-2015 T-TH-PH-0004 II Non-deliverable. Transmitted TPVN C
Page 37