Laying Out A Compound Curve: Engineering Surveys
Laying Out A Compound Curve: Engineering Surveys
ENGINEERING SURVEYS
(CE 411 - F)
FIELD WORK #3
LAYING OUT A
COMPOUND CURVE
Submitted by:
GROUP 2
BSCE IV-A
Submitted to:
Engr. Ermino G. Enriquez
Subject Professor
Date Submitted:
August 22, 2017
OBJECTIVE:
Measuring Tape
Marker
Theodolite
Range Pole
PROCEDURE:
Compute D2.
ILLUSTRATION:
Given:
1 = 30.5m
2 = 35 m
1 = 76
2 = 65
Solution:
30.5
0848
R1 = d1 =
tan 38 2
= . =
T2
R2 = I 3.78 2R
tan 2 =
2
D1 360
35
R2 = 3.78(360)
tan 32.5
D1 =
= . 2(39.038)
=
Value of Value of
6 R1 R1 I1
= LC1 =
D1 180 180
6 (180) (39.038)(76)
D1 = LC1 =
(39.038) 180
= = .
Value of
6 R2
=
D2 180
6 (180)
D2 = (54.94)
D
d2 =
2
0616
d2 =
2
=
2.33 2R
=
D2 360
2.33(360)
D2 =
2(54.94)
=
Value of
R 2 I2
LC2 =
180
(54.94)(65)
LC2 =
180
= .
D
d2 =
2
0225
d2 =
2
=
SURVEY DATA
DEFLECTION
STATION SUBCHORD (m) REMARKS
ANGLE
FIRST CURVE
0+000 P.C.
0+006 6 0424 1
0+012 6 0848 2
0+018 6 1312 3
0+024 6 1736 4
0+030 6 2200 5
0+036 6 2624 6
0+042 6 3048 7
0+048 6 3512 8
0+051.78 3.78 3800 P.C.C
SECOND CURVE
0+057.78 6 0308 9
0+063.78 6 0616 10
0+069.78 6 0924 11
0+075.78 6 1232 12
0+081.78 6 1540 13
0+087.78 6 1848 14
0+093.78 6 2156 15
0+099.78 6 2504 16
0+105.78 6 2812 17
0+111.78 6 3120 18
0+114.11 2.33 3230 P.T.
DOCUMENTATION:
MEMBERS: