Project : Struktur Grand Design Gedung Baru MPR - DPR dan DPD RI

Site : Komplek MPR - DPR dan DPD RI, Senayan

ANALISA PERHITUNGAN BERAT BESI BETON BORE PILE 800

- Keliling = 2 x x r ; r = 0.396 - Keliling = 2 x x r ; r = 0.363


= 2 x 3.14 x 0.396 = 2 x 3.14 x 0.363
= 2.488 m = 2.278 m

KONTRAKTOR PERENCANA
Vol Panjang Overlap Jumlah Berat Berat Vol Bore Berat Besi Vol Panjang Overlap Jumlah
Panjang Panjang
BESI Besi Besi 40 D Vol Jumlah Panjang Jenis Besi Pile Bore Pile BESI Besi Besi 40 D Vol Jumlah Panjang
UTAMA (m) (bh) (m') (m') (bh) (m') (m') (kg/m) (kg) (bh) (kg) UTAMA (m) (bh) (m') (m') (bh) (m') (m')
a b (a x b) = c d (c + d) = e f (e x f) = g h (g x h) = i a b (a x b) = c d (c + d) = e

a. 6 D 19 3.4 6 20.4 0.76 0 0 20.4 2.226 45.410 40 1,816.416 a. 6 D 19 3.4 6 20.4 0 0 0 20.4

b. 12 D 19 6 10 60 0.76 10 7.6 67.6 2.226 150.478 40 6,019.104 b. 12 D 19 6 10 60 0 0 0 60

c. 18 D 19 6 14 84 0.76 14 10.64 94.64 2.226 210.669 40 8,426.746 c. 18 D 19 6 14 84 0 0 0 84

d. 24 D 19 7 18 126 0.76 24 18.24 144.24 2.226 321.078 40 12,843.130 d. 24 D 19 6.76 18 121.68 0 0 0 121.68

TOTAL BERAT BESI UTAMA 27,288.979 TOTAL BERAT BESI UTAMA

Panjang Vol Panjang Overlap Jumlah Berat Berat Vol Bore Berat Besi Panjang Vol Panjang Overlap Jumlah
BESI Keliling Besi Besi 40 D Vol Jumlah Panjang Jenis Besi Pile Bore Pile BESI Keliling Besi Besi 40 D Vol Jumlah Panjang
SPIRAL (m) (bh) (m') (m') (bh) (m') (m') (kg/m) (kg) (bh) (kg) SPIRAL (m) (bh) (m') (m') (bh) (m') (m')
a b (a x b) = c d (c + d) = e f (e x f) = g h (g x h) = i a b (a x b) = c d (c + d) = e

a. D 10 - 200 2.488 98 243.868 0.4 20 8 251.868 0.617 155.402618 40 6,216.105 a. D 10 - 200 2.278 97 220.966 0 0 0 220.966

b. D 10 - 100 2.488 11 27.373 0.4 2 0.8 28.173 0.617 17.3827102 40 695.308 b. D 10 - 100 2.278 10 22.78 0 0 0 22.78

c. D 13 - 100 2.488 21 52.257 0.52 4 2.08 54.337 1.042 54.452 40 2,178.091 c. D 13 - 100 2.278 10 22.78 0 0 0 22.78

TOTAL BERAT BESI SPIRAL 9,089.504 TOTAL BERAT BESI SPIRAL

TOTAL BERAT BESI BETON BORE PILE 1200 36,378.483 TOTAL BERAT BESI BETON BORE PILE 1200

No Perbedaan Kontraktor Perencana Keterangan

1 Besi Utama
a. Panjang Besi 24 D 19 (m) 7 6.76 kontraktor panjang sesuai gambar + 1000 ; perencana panjang sesuai gambar + 760
b. Overlap besi (m') ada tidak ada kontraktor ada overlap setiap sambungan besi = 40 D ; perencana tidak ada perhitungan overlap sambungan besi

2 Besi Spiral
a. Panjang Keliling (m) 2.488 2.278 kontraktor r = 0.396 ; perencana r = 0.363
b. Volume Besi D10-200 (bh) 98 97 kontraktor vol = (19,400 : 200) + 1 ; perencana vol = (19,400 : 200)
c. Volume Besi D10-100 (bh) 11 10 kontraktor vol = (1,200 : 100) + 1 ; perencana vol = (1,200 : 100)
d. Volume Besi D13-100 (bh) 21 10 kontraktor vol = ((1,000+1000) : 100) + 1 ; perencana vol = (1,000 : 100)
e. Overlap besi (m') ada tidak ada kontraktor ada overlap setiap sambungan besi = 40 D ; perencana tidak ada perhitungan overlap sambungan besi
Berat Berat Vol Bore Berat Besi
Jenis Besi Pile Bore Pile
(kg/m) (kg) (bh) (kg)
f (e x f) = g h (g x h) = i

2.226 45.4104 40 1,816.416

2.226 133.56 40 5,342.400

2.226 186.984 40 7,479.360

2.226 270.8597 40 10,834.387

25,472.563

Berat Berat Vol Bore Berat Besi


Jenis Besi Pile Bore Pile
(kg/m) (kg) (bh) (kg)
f (e x f) = g h (g x h) = i

0.617 136.336 40 5,453.441

0.617 14.055 40 562.210

1.042 23.737 40 949.470

6,965.122

1200 32,437.685

n overlap sambungan besi


n overlap sambungan besi
Project : Struktur Grand Design Gedung Baru MPR - DPR dan DPD RI
Site : Komplek MPR - DPR dan DPD RI, Senayan

ANALISA PERHITUNGAN VOLUME BETON BORE PILE 800

- Luas = x r ; r = 0.400 - Luas = x r ; r = 0.400


= 3.14 x 0.4 = 3.14 x 0.4
= 0.503 m = 0.503 m

KONTRAKTOR PERENCANA
Luas Tinggi Bore Vol beton Vol Bore Total Vol Luas Tinggi Bore Vol beton
Bore Pile Pile 1 bore pile Pile Beton Bore Pile Pile 1 bore pile
BETON (m) (m) (m) (bh) (m) BETON (m) (m) (m)
BORE a b (a x b) = c d (c x d) = e BORE a b (a x b) = c
PILE PILE
0.503 22.4 11.259 40 450.378 0.503 23 11.561

No Perbedaan Kontraktor Perencana Keterangan

1 Tinggi Bore Pile (m) 22.4 23 kontraktor tinggi bore pile = tinggi bore pile pada gambar + 100

ANALISA PERHITUNGAN VOLUME GALIAN BORE PILE 800

KONTRAKTOR PERENCANA
Luas Lubang Tinggi Lubang Vol 1 Lubang Vol Bore Total Vol Luas Lubang Tinggi Lubang Vol 1 Lubang
Bore Pile Bore Pile Bore Pile Pile Galian Bore Pile Bore Pile Bore Pile
GALIAN (m) (m) (m) (bh) (m) GALIAN (m) (m) (m)
BORE a b (a x b) = c d (c x d) = e BORE a b (a x b) = c
PILE PILE
0.503 30 15.080 40 603.185 1.000 30 30.000

No Perbedaan Kontraktor Perencana Keterangan

1 Luas Lubang Bore Pile (m) 0.503 1.000 perencana luas lubang bore pile = 1 m x 1 m = 1 m
PERENCANA
Vol Bore Total Vol
Pile Beton
(bh) (m)
d (c x d) = e

40 462.442

Keterangan

e = tinggi bore pile pada gambar + 1000

PERENCANA
Vol Bore Total Vol
Pile Galian
(bh) (m)
d (c x d) = e
40 1,200.000

Keterangan

ore pile = 1 m x 1 m = 1 m