This 3 sentence summary provides the key details about the document:
The document is a draft report on the results of a Phase II Environmental Site Assessment (ESA) in two stages conducted at a Gas Oil Separation Plant (GOSP) owned by Exxon Mobil Cepu Limited (EMCL) in Bojonegoro, Java, Indonesia. The assessment was prepared by environmental engineering firm PT. EnviReksatama for Exxon Mobil to evaluate the GOSP site. The report presents the findings and conclusions of the Stage 1 and Stage 2 assessments conducted at the GOSP.
This 3 sentence summary provides the key details about the document:
The document is a draft report on the results of a Phase II Environmental Site Assessment (ESA) in two stages conducted at a Gas Oil Separation Plant (GOSP) owned by Exxon Mobil Cepu Limited (EMCL) in Bojonegoro, Java, Indonesia. The assessment was prepared by environmental engineering firm PT. EnviReksatama for Exxon Mobil to evaluate the GOSP site. The report presents the findings and conclusions of the Stage 1 and Stage 2 assessments conducted at the GOSP.
This 3 sentence summary provides the key details about the document:
The document is a draft report on the results of a Phase II Environmental Site Assessment (ESA) in two stages conducted at a Gas Oil Separation Plant (GOSP) owned by Exxon Mobil Cepu Limited (EMCL) in Bojonegoro, Java, Indonesia. The assessment was prepared by environmental engineering firm PT. EnviReksatama for Exxon Mobil to evaluate the GOSP site. The report presents the findings and conclusions of the Stage 1 and Stage 2 assessments conducted at the GOSP.