Abstract of 05Th Final Bill SR - No. Particulars Amount (RS.) Previous Present Total
Abstract of 05Th Final Bill SR - No. Particulars Amount (RS.) Previous Present Total
Abstract of 05Th Final Bill SR - No. Particulars Amount (RS.) Previous Present Total
3 Total 2761099.19
4 Add 17.5% Surcharge 1196941.11 483192.36 1680133.47
5 Total 8036604.61 3244291.55 11280896.16
6 Extra item 0.00 257619.71 257619.71
CIVIL WORK
Excavation for
10 foundation,substructure.trenches, M3 194 310 60140 240 2.73 242.73 46560 529.62 47089.62 0 0
sumps,pits etc……..
Providing,bending,laying,biding and
90 fixing in position reinforcement steel KG 50 25000 1250000 25000 0.00 25000.00 1250000 0.00 1250000.00 12274.79 613739.5
for RCC work.
170 Plastic emulsion Paint M2 85 100 8500 0 100.00 100.00 0 8500.00 8500.00 8.54 725.9
180 Synthetic enamel paint M2 74 10 740 0 8.70 8.70 0 643.80 643.80 0.00 0
270 Doorsall door M2 3522 26 91572 0 26.00 26.00 0 91572.00 91572.00 10.20 35924.4
310 Window and ventilator M2 3911 4.5 17599.5 0 3.92 3.92 0 15331.12 15331.12 0.00 0
400 Supply and laying G.I pipe 15mm M 258 100 25800 0 42.00 42.00 0 10836.00 10836.00 0.00 0
410 Supply and laying G.I pipe 20mm M 279 90 25110 0 18.00 18.00 0 5022.00 5022.00 0.00 0
420 Supply and laying G.I pipe 25mm M 352 10 3520 0 10.00 10.00 0 3520.00 3520.00 2.00 704
800 4x6 sq.mm copper cable M 223 10 2230 0 10.00 10.00 0 2230.00 2230.00 5.00 1115
Suppy,installation,testing &
830 Commissioning at cubical type main EA 75026 1 75026 0.75 0.25 1.00 56269.5 18756.50 75026.00 0.00 0
control panel etc…….
Providing,bending,bainding,stitch
welding and lowering into the pilebore
890 KG 50 22500 1125000 22500 0.00 22500.00 1125000 0.00 1125000.00 0.00 0
and holding in position reinforcement
at all depth as per drawing.
Total :- 257619.71
anaji, Goa.