JHA fo r PIPE WORK
Hazards analysis and precautio ns
ACTIVITY BASED RISK ASSESSMENT FOR PIPE WORK Maurel& Prom Ref.: GR-HSE-FRM-011
HSE Forms Rev.: 0 of 30/12/2014
Job Safety Analysis Page 1 of 7
Facility: Mnazi Bay MB3 Date: 09-01-2015 Pages: 7 Leader: LUO Participants :LUO,SUN,LIN,ZHANG,LU,KANG Description of work: Pipe work at MB3 Initial risk Residual risk Completion # Task Hazards / Risks / Scenario Action taken to limit danger Action by: Target date S P E S P E date -Prior to any activity on work site, set up wind direction indicator and watchman. -Check all safety means are available on site. -Set trash bins at worksite. -Fire or explosion -Provide banks man to guide the vehicle -Traffic accident. Supervisor, Mobilization when poor access or reverse driving. -Collision between vehicles. - Safety Supervisor, 1 (machinery equipment) 4 3 T -Organize circulation .segregate vehicles 4 1 A Collision with pedestrians - vehicle driver and pedestrians activities when Damages to M&P installations reasonably possible. -Falling of goods during -Put barricades to protect critical transportation. installations (well head) -Driver to check and make sure all goods are loaded and secured properly Post relevant safety signs. Poor Weather - Rain - Site Supervisor to instruct all men to Site Supervisor, 2 3 2 T 3 1 A Condition - Personal injury stop work and take shelter. Safety Supervisor. -Driver has to ensure the materials stacking properly onto the trailer / on the ground. -Falling object Lifting Crew, Materials loading and -Injury to workers, body 3 3 3 T -Only competent person to rig the 3 1 A Driver. unloading on trailer injuries, fractures, sprains materials & equipment. Safety Supervisor dislocations -designated responsible for the coordination of offloading/loading activities.
-Equipment and tools shall be checked
and are in good condition prior to working. -All staff must wear proper PPE during work. -Post relevant safety signs and warning tape. -Construction specification must be followed strictly. -Personal injury by polisher, -Welder and polisher must use welding Fit-up the pipe and pipe, welding machine mask. Safety Supervisor 4 4 3 T 4 1 A welding -Fire or explosion -Fire-extinguisher must be put near the Site Supervisor welding area. -Flashback must be put for the oxygen and acetylene cylinder. -A shelter must be used for the welding machine. -The distance between oxygen and acetylene cylinder should be more than 5m,and 10m from the welding area. -Provide guardian to guide the welding area. -Get valid Excavation permit, mandatory prior to start excavation work. -Designated watchman during Request M&P to -hit buried network excavation. issue excavation Pedestrian hit by excavator -Design with safety tape a safety area clearance and 5 Trench Excavation 4 3 T 4 1 A Fall into excavations around the excavator. PTW. (mechanical or hand) Safety Supervisor Injuries by hand tools. -Nobody allowed in the safety area of the excavator, except the watchman. Site Supervisor -Organize hand excavation if more than one people is in the trench. -Set up safety fence along the excavation. -Equipment and tools shall be checked and are in good condition prior to working. -Operation instruction shall be carried out severely, three rules are not allowed to against (command against - Pipes rolling down rules/operation against rules/labor -Personal injury/pipe damage discipline against rules),and to ensure Lifting Crew, -Landslide that crane operator and rigger are M&P Laying of pipeline to certificated qualified to do the job. -Personal injury by representative 6 the pipe trench. 4 3 T -Lifting must be completed prior to 4 1 A equipment, vehicles. Driver. work, lifting is not permit to work in the Safety Supervisor -Vehicles/crane overturn adverse weather. -Object and equipment Site Supervisor -All staff must wear proper PPE during damage work. -Post relevant safety signs and warning tape. -Construction specification must be followed strictly. -Ensure that no unauthorized people enter the lifting area -Equipment and tools shall be checked and are in good condition prior to working. -Always operate the crane with out- riggers and load repartition plates. -Operation instruction shall be carried out severely, three rules are not allowed to against (command against -Collision between vehicles rules/operation against rules/labor -Personal injury by discipline against rules),and to ensure Lifting Crew, equipment, vehicles. that crane operator and rigger are Lifting of pipeline to the Driver. 7 -Vehicles/crane overturn 4 3 T certificated qualified to do the job. 4 1 A pipe rack Safety Supervisor -Object and equipment -Lifting must be completed prior to Site Supervisor damage work, lifting is not permit to work in the adverse weather. -All staff must wear proper PPE during work. -Post relevant safety signs and warning tape. -Construction specification must be followed strictly. -Ensure that no unauthorized people enter the lifting area -Equipment and tools shall be checked and are in good condition prior to working. -All staff must wear proper PPE during work. -Post relevant safety signs and warning tape. -Construction specification must be followed strictly. -Personal injury by polisher, -Welder and polisher must use welding Fit-up the pipe and pipe, welding machine mask. Site Supervisor, 8 4 3 T 4 1 A welding -Fire or explosion -Fire-extinguisher must be put near the Safety Supervisor. welding area. -Flashback must be put for the oxygen and acetylene cylinder. -A shelter must be used for the welding machine. -The distance between oxygen and acetylene cylinder should be more than 5m,and 10m from the welding area. -Provide guardian to guide the welding area. -Design safety area-around excavator Trench backfilling - Machinery injury working range. Site Supervisor, 9 (excavator, shovels, - Personal injury Damages to 3 3 T -Only the designated bandsman inside 3 1 A whacker plate) installation the safety area of the excavator. Safety Supervisor. -Hand tools in good condition.
- Check and Cleaning. Site Supervisor,
- Pollution 10 Demobilization 2 2 A -Continue to pay attention. 2 1 A Trips hazards Safety Supervisor. - Recovery. Risk analysis validation: Name Position: Date: Name/Sign Ops Name/Sign Supervisor