Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Kerucut Pasir (ASTM D 1556 - 82) : Sand Cone

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Lab.

Mekanika Tanah 1
Jurusan Teknik Sipil LAPORAN PRAKTIKUM
Politeknik Negeri Padang

KERUCUT PASIR ( SAND CONE )


( ASTM D 1556 – 82 )

Kelompok : 1 BETA Tanggal : 12 Oktober 2017


Kelas : II C Lokasi : Laboratorium Tanah
Jurusan : Teknik Sipil Instruktur : 1. SilviaNengsih, ST.,MT
Universitas : Politeknik Negeri Padang 2. Liliwarti ST.,MT
Kalibrasi Pasir Uji
Berat Tabung Kalibrasi ( W1 ) ( gram ) 704
Berat Tabung Kalibrasi + Pasir ( W2 ) ( gram ) 7390
Berat Tabung Kalibrasi + Air ( W3 ) ( gram ) 5492
Berat Air = Volume Tabung ( W3 - W1 ) ( gram ) 4788
Berat Pasir ( W2 - W1 ) ( gram ) 6686
Berat Isi Pasir Uji sand = ( W2 - W1 )/ ( W3 - W1 ) ( gr/cm3 ) 1,396
Kalibrasi Alat
Berat Tabung + Kerucut + Pasir Awal ( W4 ) ( gram ) 6960
Berat Tabung + Kerucut + Pasir Akhir ( W5 ) ( gram ) 5491
Berat Pasir dalam Kerucut W6 = W4 - W5 ( gram 1469
Penentuan Kadar Air
Benda Uji I II
No. Cawan 1 2 3 1 2 3
Berat Cawan W1 (gram) 7,61 7,63 7,91 7,42 7,19 7,64
Berat Cawan + Tanah Basah W2 (gram) 100 104,04 104,19 105,83 100,34 100,94
Berat Cawan + Tanah Kering W3 (gram) 83,55 87,74 87,32 78,96 74,74 75,23
Berat Air (gram) 16,45 16,30 16,87 26,87 25,60 25,71
Berat Tanah Kering (gram) 75,94 80,11 79,41 71,54 67,55 67,59
Kadar Air (%) 21,662 20,347 21,244 37,559 37,898 38,038
Kadar Air Rata - rata (%) 21,084 37,832
Pengujian Di lapangan
Sample I II
Berat Tabung + Kerucut + Pasir Sebelum Pengujian ( W8 ) ( gram ) 7005 6939
Berat Tabung + Kerucut + Pasir Setelah Pengujian ( W9 ) ( gram ) 3876 4174
Berat Pasir dalam Lubang dan Kerucut ( W8 - W9 ) ( gram ) 3129 2765
Berat Pasir dalam Kerucut ( W6 ) ( gram ) 1469 1469
Berat Pasir dalam Lubang W11 = ( W8 - W9 ) - W6 ( gram ) 1660 1296
Berat Isi Pasir γsand ( gr/cm3 ) 1,396 1,396
Volume Lubang Vh = W11/γsand ( cm3 ) 1188,76 928,096
Berat Tanah Basah ( W7 ) ( gram ) 1788 1521
Berat Isi Tanah Basah γwet = W7/Vh ( gr/cm3 ) 1,504 1,639
Kadar Air ( w ) ( % ) 21,084 37,832
Berat Isi Tanah Kering γdry = γwet/( 1 + w ) ( gr/cm3 ) 1,242 1,189
Derajat Kepadatan di Lapangan DR = γd field/γlab ( % ) 88,918 85,112
DR rata - rata ( % ) 87,015
Lab. Mekanika Tanah 1
Jurusan Teknik Sipil LAPORAN PRAKTIKUM
Politeknik Negeri Padang

Anggota : 1. Hazwil Zaineli (1601022030) Persetujuan Instruktur


2. Dina Noverina Sari (1601021044)
3. Fikky Alfurqon Zaki (1601022046)

(..................................)

You might also like