INVITATION TO TENDER
The Director, Purchase and Stores, Directorate of Purchase and Stores Department
of Atomic Energy, Government of India, for and on behalf of President of India, invites
online tenders for supply of stores as detailed in the Purchaser‟s Tender Specifications.
Tendering conditions are given in Section - A and conditions of contract which will govern
the contract pursuant to tender are as contained in Form No. DPS P-100 which is provided
in Section B of this tender document. If you are interested to quote, please go through the
contents of this document particularly the tendering conditions and ensure that quotation is
submitted online on or before the due date and time indicated.
You are requested to upload your quotation online as per technical specifications
indicated herein and scanned copy of duly signed and stamped undertaking as per
Form 102A appended.
Hard copy of tender will not be accepted.
Yours faithfully,
Assistant Purchase Officer/ Purchase Officer
for and on behalf of the President of India (The Purchaser)
1. PEAMBLE
1.1 While the conditions contained in Section I will apply to all contracts, Section
II will also apply to contracts for Plant/Machinery/Equipment/ Instrument.
2. DEFINITIONS AND INTERPRETATION : In the contract and the general
and special conditions governing it, unless the context otherwise requires
2.1 “PURCHASER” means the President of India and includes his successor or
assigns
2.2 “DIRECTOR, PURCHASE & STORES” means the Director, Purchase and
Stores, Govt. of India, for the time being in the administrative charge of the
Directorate of Purchase and Stores and includes Joint Director, Deputy
Director, Purchase and Stores, the Senior Purchase Officer, Purchase Officer
or Assistant Purchase officer of the said Directorate of Purchase and Stores or
any other officer authorized for the time being to execute contracts relating to
the purchase and supplies of stores on behalf of the Purchaser.
2.3 “CONTRACTOR” or “SUPPLIER” means the individual firm or company
with whom or with which the contract/purchase order for supply of Stores is
placed and shall be deemed to include his successors, heirs, executors,
administrators and permitted assignees, as the case may be.
2.4 “CONTRACT” or “PURCHASE ORDER” means and comprises of a Letter
or Email or ink signed or digitally signed document conveying acceptance of
Contractor‟s offer and invitation to tender, tender containing offer, advance
acceptance of the offer, acceptance of offer, general and special conditions of
contract specified in the acceptance of offer and any subsequent
amendments/alterations thereto made on the basis of mutual agreement.
2.5 “STORES” OR “MATERIAL” means the goods specified in the
contract/purchase order which the contractor has agreed to supply under the
contract.
2.6 “SUB-CONTRACTOR” or “SUB-CONTRACTOR” means any contractor or
supplier engaged by the contractor or the supplier with the prior approval of
the Purchaser in relation to the contract/purchase order.
2.7 “INSPECTOR” or “QUALITY SURVEYOR” means any Engineer nominated
and deputed by the purchaser or their appointed Consultants or quality
Surveillance Agency or any other person from time to time authorized by the
Purchaser to act as his representative for the purpose of inspection of stores
under the contract/purchase order.
2.8 PARTIES
2.9 The parties to the contract are the Contractor and the Purchaser and the
Purchaser named in the Contract/Purchase Order.
SECTION-II
SPECIAL CONDITIONS OF CONTRACTS
GOVERNING SUPPLIES OF PLANT AND MACHINERY
In addition to the General Conditions of Contract contained in Section-I above
the following Special conditions shall apply to contracts for supply of plant/
machinery/equipment/manufactured equipment. These special conditions in
Section-I shall override the latter.
29. RESPONSIBILITY FOR COMPLETENESS
29.1 All fittings or accessories which may not be specifically mentioned in the
tender specifications of the contract but which are necessary, are to be
provided by the contractor without extra charge and the
plant/machinery/equipment/instruments must be completed in all respect.
30. FINAL TEST
30.1 The final tests as to performance and guarantee shall commence within one
month of completion of installation.
31. REJECTION OF DEFECTIVE PLANT
31.1 If the completed plant or any portion thereof before it is finally accepted is
found to be defective or fails to fulfill the requirements of the contract, the
Purchaser shall give the Contractor notice setting forth with the details of such
defects or failure and the contractor shall forthwith rectify the defective plant
or alter the same to make comply with the requirement of the contract. Should
the contractors fail to do so within a reasonable time the Purchaser may reject
and replace at the cost of the Contractor, the whole or any portion of the Plant
as the case may be, which is defective or fails to fulfill the requirement of the
contract. Such replacement shall be carried out by the Purchaser within a
reasonable time and at reasonable price and where reasonably possible to the
same specifications and under competitive conditions. The Contractor shall be
liable to pay to the Purchaser the extra cost, if any, of such replacement
delivered and or erected as provided for in the contract such extra cost being
WEHREAS on or about the ________ day of ___________ M/s. ____________ having its registered
Office at _______ (hereinafter called 'The Contractor') entered into an Agreement No. ________
dated ______ for manufacture and supply of ____________ (hereinafter called 'The Contract') with
the President of India acting through the Director, Purchase and Stores, Department of Atomic Energy
(hereinafter called 'The Purchaser").
AND WHEREAS under the terms and conditions of the contract final payment amounting to --under
the contract is to be made against a performance bond in the form of bank guarantee furnished by the
Contactor for a sum _______ of equivalent to 10% (Ten per cent) of the value of the contract towards
satisfactory performance of the ______ (hereinafter called the equipment) valid for a period of 12
months from the date of putting into operation of the said equipment or ________ months from the
date of receipt of the last lot of consignment whichever is earlier.
NOW We, (bank) inconsideration of the promises and payment of the final/balance amount of ______
under the contract to the contractor hereby agree and undertake to pay on demand and without any
demur to the Director, Purchase & Stores, Directorate of Purchase and Stores, Department of Atomic
Energy on behalf of the contractor a sum not exceeding ________ against any loss or damage that
may be suffered by the Purchaser by the reasons of any unsatisfactory performance of the said
equipment.
AND we, ________ (Bank) hereby also agree that the decision of the said Director, Purchase &
Stores as to whether the said equipment is giving satisfactory performance or not and as to the amount
of loss or damages suffered by the Purchaser on account of unsatisfactory performance of the said
equipment shall be final and binding on us.
AND We (bank) hereby further agree that our liability hereunder shall not be discharged by virtue of
any agreement between the Purchaser & the Contractor whether with or without knowledge and/or
consent or by reason of the Purchaser showing any indulgence or forbearance to the contractor
whether as to payment, time performance or any other matter whatsoever relating to the contract
which but for this provision would amount to discharge of the surety under the law.
Our guarantee shall remain in force until ________ and unless a claim under the guarantee is lodged
with us within six months from the date (i.e. ________ ), all rights of the Purchaser under the
Guarantee shall be forfeited and we shall be relieved and discharged from all our liabilities hereunder.
Our liability under this guarantee shall not be affected by any change m our constitution or the
constitution of the contractor.
(Stamp & Signature)
FOR AND ON BEHALF _________ (BANK)
DATED AT ________
TENDER FORM
To
Dear Sir,
I/We have gone through the Purchaser‟s specifications of stores, instructions to
tenderers, the tendering conditions, General Conditions of Contracts and Special
Conditions of Contracts contained in Form No. DPS-P-100. I/We hereby agree to
supply the stores conforming to your tender specifications and also as per your General
Conditions of Contract and Special Conditions of Contract governing supply of stores.
2. You will be at liberty to accept any one or more of the items of stores offered by us and
I/We shall be bound to supply the stores as may be specified in the Purchase
Order/Contract.
3. I/We hereby agree to keep the price valid for your acceptance for a period of 90 days
from the date of opening of the tender.
4. Deviations to your technical specifications proposed are detailed in Annexure-A to the
tender form for your consideration.
5. I am/We are also enclosing herewith all the leaflets/catalogues etc. pertaining to the
stores offered.
Yours faithfully,