VMRL WBS
VMRL WBS
VMRL WBS
VMRL
Work Break Down
Structure
VMRL.1 VMRL.2 VMRL.3 VMRL.4 VMRL.11 VMRL.12 VMRL.13 VMRL.14 VMRL.15 VMRL.16 VMRL.17 VMRL.18
Land, R&R (Govt. Scope) Alignment & Formation Station Buildings DEPOT Rolling Stock Permanent Way Lifts and Escalators Traction and Power S&T,AFC, PSD Misc Works Capital Expenditure on Transit Oriented
Supply Security Development
VMRL.2.a VMRL.3.a VMRL.4.a VMRL.11.a VMRL.12.a VMRL.13.a VMRL.14.a VMRL.15.a VMRL.16.a VMRL.17.a
Elevated Section incl. Elevated station incl. EM Civil Works Car Body/ Door/Coupler Ballastless Track for Elev. Lifts Power Rail (3rd Rail) Signaling and Telecom Utilities Civil Works
station length works section
VMRL.4.a.iv
Workshop
VMRL.3.b.i VMRL.12.b.i
Civil Works Continuous welded rail
VMRL.4.b (CWR)
EM Works
VMRL.3.b.ii VMRL.12.b.ii
EM works incl. LV Power Turnout & Switch
Supply, Lighting, HVAC
VMRL.4.b.i
Fixed and Mobile Lifting
jack
VMRL.4.b.ii
Train wash facility
VMRL.4.b.iii
Stinger Power