Al Marfaa Roads Cont. Co. L. L. C.

DAILY SITE ALLOCATION


Name of Project In Charge (P.M. / P. E.): …DHANU.S……………...…………….. Date: …01/05/2016……………
JOB NO:- J011/15 J011/15 J011/15 J011/15
Profession Gang 1 Gang 2 Gang 3 Gang 4 Profession Gang 1 Gang 2 Gang 3
Foreman Deepu Vijayan vishnu Bus
Excavator
Operator gurubrej singh saidan shah Back Hoe Loader 1
Wheel Loader 1
Vibrating Roller
Driver jidendrasingh lal paraz PTR Roller
sultan Combination Roller
Mason omprakash omprakash Grader
satnam Truck
Tipper pickup
Labour 1 qalath khan siraj younis Tipper Trailor
Labour 2 rahim riyas aliraza Low bed Trailor
Labour 3 saidulla bader ali burhan Water Tanker 1 1 1
Labour 4 sivaji Pick-up 3 ton 1 1 1
Labour 5 shahib zali Skid Stear Loader
Labour 6 Car 1 1 1
Labour 7 Dewatering Pump
Labour 8 Jetting Pump
Anticipating Programme. Anticipating Programme. Anticipating Programme. Anticipating Programme.Jetting Tank

Generator 2
earth cutting work Grinder
on area no-02
frame & cover Plate Compactor 1 1 1
swa2/2,swa2/1exc Footpath formation
fixing and hauching Vibrator with Pocker
avation and in area-01,area- vacum sewer
work IT chamber Small tools
pipelaying linking 02formation work excavation and laying
shuttering and
and grouting work after
concrete work Hilty 1 1
pipelaying,area-03
Exhaust fan
slope cutting,
Blower
…………

Gang 4
Al Marfaa Roads Cont. Co. L. L. C.
DAILY SITE ALLOCATION
Name of Project In Charge (P.M. / P. E.): …DHANU.S……………...…………….. Date: …02/05/2016……………
JOB NO:- J011/15 J011/15 J011/15 J011/15
Profession Gang 1 Gang 2 Gang 3 Gang 4 Profession Gang 1 Gang 2 Gang 3
Foreman Deepu Vijayan vishnu Bus
Excavator
Operator gurubrej singh saidan shah Back Hoe Loader 1
Wheel Loader 1
Vibrating Roller
Driver jidendrasingh lal paraz PTR Roller
sultan Combination Roller
Mason omprakash omprakash Grader
satnam Truck
najmul Tipper pickup
Labour 1 qalath khan siraj younis Tipper Trailor
Labour 2 rahim riyas aliraza Low bed Trailor
Labour 3 saidulla bader ali burhan Water Tanker 1 1 1
Labour 4 sivaji Pick-up 3 ton 1 1 1
Labour 5 shahib zali Skid Stear Loader
Labour 6 Car 1 1 1
Labour 7 Dewatering Pump
Labour 8 Jetting Pump
Anticipating Programme. Anticipating Programme. Anticipating Programme. Anticipating Programme.Jetting Tank

Generator 2
earth cutting work Grinder
on area no-02
frame & cover Plate Compactor 1 1 1
swa2/2,swa2/1exc Footpath formation
fixing and hauching Vibrator with Pocker
avation and in area-01,area- vacum sewer
work IT chamber Small tools
pipelaying 02formation work excavation and laying
shuttering and
backfilling after
concrete work Hilty 1 1
pipelaying,area-03
Exhaust fan
slope cutting,
Blower
…………

Gang 4
Al Marfaa Roads Cont. Co. L. L. C.
DAILY SITE ALLOCATION
Name of Project In Charge (P.M. / P. E.): …DHANU.S……………...…………….. Date: …03/05/2016……………
JOB NO:- J011/15 J011/15 J011/15 J011/15
Profession Gang 1 Gang 2 Gang 3 Gang 4 Profession Gang 1 Gang 2 Gang 3
Foreman Deepu Vijayan vishnu Bus
Excavator
Operator gurubrej singh saidan shah Back Hoe Loader 1
Wheel Loader 1
Vibrating Roller
Driver jidendrasingh lal paraz PTR Roller
sultan Combination Roller
Mason omprakash omprakash Grader
satnam Truck
najmul Tipper pickup
Labour 1 qalath khan siraj younis Tipper Trailor
Labour 2 rahim riyas aliraza Low bed Trailor
Labour 3 saidulla bader ali burhan Water Tanker 1 1 1
Labour 4 sivaji Pick-up 3 ton 1 1 1
Labour 5 shahib zali Skid Stear Loader
Labour 6 Car 1 1 1
Labour 7 Dewatering Pump
Labour 8 Jetting Pump
Anticipating Programme. Anticipating Programme. Anticipating Programme. Anticipating Programme.Jetting Tank

Generator 2
earth cutting work Grinder
on area no-02
frame & cover Plate Compactor 1 1 1
swa2/2,swa2/1exc Footpath formation
fixing and hauching Vibrator with Pocker
avation and in area-01,area- vacum sewer
work IT chamber Small tools
pipelaying 02formation work excavation and laying
shuttering and
backfilling after
concrete work Hilty 1 1
pipelaying,area-03
Exhaust fan
slope cutting,
Blower
…………

Gang 4
Al Marfaa Roads Cont. Co. L. L. C.
DAILY SITE ALLOCATION
Name of Project In Charge (P.M. / P. E.): …DHANU.S……………...…………….. Date: …04/05/2016……………
JOB NO:- J011/15 J011/15 J011/15 J011/15
Profession Gang 1 Gang 2 Gang 3 Gang 4 Profession Gang 1 Gang 2 Gang 3
Foreman Deepu Vijayan vishnu Bus
Excavator
Operator gurubrej singh saidan shah Back Hoe Loader 1
Wheel Loader 1
Vibrating Roller
Driver jidendrasingh lal paraz PTR Roller
sultan Combination Roller
Mason omprakash omprakash Grader
satnam Truck
Tipper pickup
Labour 1 qalath khan siraj younis Tipper Trailor
Labour 2 rahim riyas aliraza Low bed Trailor
Labour 3 saidulla bader ali burhan Water Tanker 1 1 1
Labour 4 sivaji Pick-up 3 ton 1 1 1
Labour 5 shahib zali Skid Stear Loader
Labour 6 Car 1 1 1
Labour 7 Dewatering Pump
Labour 8 Jetting Pump
Anticipating Programme. Anticipating Programme. Anticipating Programme. Anticipating Programme.Jetting Tank

Generator 2
earth cutting work Grinder
on area no-02 Plate Compactor 1 1 1
swa2/2,swa2/1exc
Footpath formation vacum sewer manhole heel kerb fixing and Vibrator with Pocker
avation and
in area-01,area-02 excavation and interlocklaying in Small tools
pipelaying
subbase,area- errection area-05
backfilling Hilty 1 1
03footpath sub
basework Exhaust fan
Blower
…………

Gang 4
Al Marfaa Roads Cont. Co. L. L. C.
DAILY SITE ALLOCATION
Name of Project In Charge (P.M. / P. E.): …DHANU.S……………...…………….. Date: …07/05/2016……………
JOB NO:- J005/14 J011/15 J011/15 J011/15
Profession Gang 1 Gang 2 Gang 3 Gang 4 Profession Gang 1 Gang 2 Gang 3
Foreman Deepu Vijayan vishnu Bus
pradeep Excavator
Operator giriraj baldev gurubrej Back Hoe Loader 1
Wheel Loader 1
Vibrating Roller
Driver sultan PTR Roller
rahman sultan Combination Roller
Mason omprakash Grader
satnam Truck
Tipper pickup
Labour 1 qalath khan siraj younis Tipper Trailor
Labour 2 rahim riyas aliraza Low bed Trailor
Labour 3 saidulla bader ali burhan Water Tanker 1 1 1
Labour 4 juyel sivaji Pick-up 3 ton 1 1 1
Labour 5 Atiq shahib zali Skid Stear Loader
Labour 6 Lal mahmod Car 1 1 1
Labour 7 Dewatering Pump
Labour 8 Jetting Pump
Anticipating Programme. Anticipating Programme. Anticipating Programme. Anticipating Programme.Jetting Tank

Generator 2
asphalt cutting earth cutting work Grinder
and lowering for on area no-02 Plate Compactor 1 1 1
dewatering and Footpath formation vacum sewer manhole
frame &cover Vibrator with Pocker
dewatering in area-01,area-02 excavation and
fixing and traffic Small tools
work .shifting the subbase,area- errection and it
sign board fixing
dewatering 03footpath sub chamber pacing Hilty 1 1
materials and run basework area-
Exhaust fan
the system 01&02 formation
Blower
…………

Gang 4
Al Marfaa Roads Cont. Co. L. L. C.
DAILY SITE ALLOCATION
Name of Project In Charge (P.M. / P. E.): …DHANU.S……………...…………….. Date: …08/05/2016……………
JOB NO:- J005/14 J011/15 J011/15
Profession Gang 1 Gang 2 Gang 3 Profession Gang 1 Gang 2 Gang 3
Foreman Deepu Vijayan vishnu Bus
pradeep Excavator
Operator giriraj baldev gurubrej Back Hoe Loader 1
Wheel Loader 1
Vibrating Roller
Driver sultan PTR Roller
sultan Combination Roller
Mason omprakash Grader
satnam Truck
Tipper pickup
Labour 1 qalath khan siraj younis Tipper Trailor
Labour 2 rahim riyas aliraza Low bed Trailor
Labour 3 saidulla bader ali burhan Water Tanker 1 1 1
Labour 4 juyel sivaji Pick-up 3 ton 1 1 1
Labour 5 Atiq shahib zali Skid Stear Loader
Labour 6 Lal mahmod Car 1 1 1
Labour 7 Dewatering Pump
Labour 8 Jetting Pump
Anticipating Programme. Anticipating Programme. Anticipating Programme. Anticipating Programme.Jetting Tank

existing manhole Generator 2


connection and earth cutting work Excavation for it Grinder
pipe laying inroad on area no-02 chamber and pacing Plate Compactor 1 1 1
closed area (zam Footpath formation presure forming for
zam building)after in area-01,area-02 gre 200 mm dia pipe Vibrator with Pocker
pipe laying subbase,area- site cleaning frame Small tools
opening the 03footpath sub &cover fixing and Hilty 1 1
road,removing the basework area- traffic sign board
Exhaust fan
dewatering 01&02 formation fixing
system Blower
…………

Gang 4
Al Marfaa Roads Cont. Co. L. L. C.
DAILY SITE ALLOCATION
Name of Project In Charge (P.M. / P. E.): …DHANU.S……………...…………….. Date: …09/05/2016……………
JOB NO:- J005/14 J011/15 J011/15
Profession Gang 1 Gang 2 Gang 3 Profession Gang 1 Gang 2 Gang 3
Foreman Deepu Vijayan vishnu Bus
pradeep Excavator
Operator giriraj baldev gurubrej Back Hoe Loader 1
Wheel Loader 1
Vibrating Roller
Driver sultan PTR Roller
sultan Combination Roller
Mason omprakash Grader
satnam Truck
Tipper pickup
Labour 1 qalath khan siraj younis Tipper Trailor
Labour 2 rahim riyas aliraza Low bed Trailor
Labour 3 saidulla bader ali burhan Water Tanker 1 1 1
Labour 4 juyel sivaji Pick-up 3 ton 1 1 1
Labour 5 Atiq shahib zali Skid Stear Loader
Labour 6 Lal mahmod Car 1 1 1
Labour 7 Dewatering Pump
Labour 8 Jetting Pump
Anticipating Programme. Anticipating Programme. Anticipating Programme. Anticipating Programme.Jetting Tank

existing manhole Generator 2


connection and earth cutting work Excavation for it Grinder
pipe laying inroad on area no-02 chamber and pacing Plate Compactor 1 1 1
closed area (zam Footpath formation presure forming for
zam building)after in area-01,area-02 gre 200 mm dia pipe Vibrator with Pocker
pipe laying subbase,area- site cleaning frame Small tools
opening the 03footpath sub &cover fixing and Hilty 1 1
road,removing the basework area- traffic sign board
Exhaust fan
dewatering 01&02 formation fixing
system Blower
…………

Gang 4
Al Marfaa Roads Cont. Co. L. L. C.
DAILY SITE ALLOCATION
Name of Project In Charge (P.M. / P. E.): …DHANU.S……………...…………….. Date: …09/05/2016……………
JOB NO:- J005/14 J011/15 J011/15
Profession Gang 1 Gang 2 Gang 3 Profession Gang 1 Gang 2 Gang 3
Foreman Deepu Vijayan vishnu Bus
pradeep Excavator
Operator giriraj baldev gurubrej Back Hoe Loader 1
Wheel Loader 1
Vibrating Roller
Driver sultan PTR Roller
sultan Combination Roller
Mason omprakash Grader
satnam Truck
Tipper pickup
Labour 1 qalath khan siraj younis Tipper Trailor
Labour 2 rahim riyas aliraza Low bed Trailor
Labour 3 saidulla bader ali burhan Water Tanker 1 1 1
Labour 4 juyel sivaji Pick-up 3 ton 1 1 1
Labour 5 Atiq shahib zali Skid Stear Loader
Labour 6 Lal mahmod Car 1 1 1
Labour 7 Dewatering Pump
Labour 8 Jetting Pump
Anticipating Programme. Anticipating Programme. Anticipating Programme. Anticipating Programme.Jetting Tank

existing manhole Generator 2


connection and earth cutting work Excavation for it Grinder
pipe laying inroad on area no-02 chamber and pacing Plate Compactor 1 1 1
closed area (zam Footpath formation presure forming for
zam building)after in area-01,area-02 gre 200 mm dia pipe Vibrator with Pocker
pipe laying subbase,area- site cleaning frame Small tools
opening the 03footpath sub &cover fixing and Hilty 1 1
road,removing the basework area- traffic sign board
Exhaust fan
dewatering 01&02 formation fixing
system Blower
…………

Gang 4
Al Marfaa Roads Cont. Co. L. L. C.
DAILY SITE ALLOCATION
Name of Project In Charge (P.M. / P. E.): …DHANU.S……………...…………….. Date: …09/05/2016……………
JOB NO:- J005/14 J011/15 J011/15
Profession Gang 1 Gang 2 Gang 3 Profession Gang 1 Gang 2 Gang 3
Foreman Deepu Vijayan vishnu Bus
pradeep Excavator
Operator giriraj baldev gurubrej Back Hoe Loader 1
Wheel Loader 1
Vibrating Roller
Driver sultan PTR Roller
sultan Combination Roller
Mason omprakash Grader
satnam Truck
Tipper pickup
Labour 1 qalath khan siraj younis Tipper Trailor
Labour 2 rahim riyas aliraza Low bed Trailor
Labour 3 saidulla bader ali burhan Water Tanker 1 1 1
Labour 4 juyel sivaji Pick-up 3 ton 1 1 1
Labour 5 Atiq shahib zali Skid Stear Loader
Labour 6 Lal mahmod Car 1 1 1
Labour 7 Dewatering Pump
Labour 8 Jetting Pump
Anticipating Programme. Anticipating Programme. Anticipating Programme. Anticipating Programme.Jetting Tank

existing manhole Generator 2


connection and earth cutting work Excavation for it Grinder
pipe laying inroad on area no-02 chamber and pacing Plate Compactor 1 1 1
closed area (zam Footpath formation presure forming for
zam building)after in area-01,area-02 gre 200 mm dia pipe Vibrator with Pocker
pipe laying subbase,area- site cleaning frame Small tools
opening the 03footpath sub &cover fixing and Hilty 1 1
road,removing the basework area- traffic sign board
Exhaust fan
dewatering 01&02 formation fixing
system Blower
…………

Gang 4
Al Marfaa Roads Cont. Co. L. L. C.
DAILY SITE ALLOCATION
Name of Project In Charge (P.M. / P. E.): …DHANU.S……………...…………….. Date: …09/05/2016……………
JOB NO:- J005/14 J011/15 J011/15
Profession Gang 1 Gang 2 Gang 3 Profession Gang 1 Gang 2 Gang 3
Foreman Deepu Vijayan vishnu Bus
pradeep Excavator
Operator giriraj baldev gurubrej Back Hoe Loader 1
Wheel Loader 1
Vibrating Roller
Driver sultan PTR Roller
sultan Combination Roller
Mason omprakash Grader
satnam Truck
Tipper pickup
Labour 1 qalath khan siraj younis Tipper Trailor
Labour 2 rahim riyas aliraza Low bed Trailor
Labour 3 saidulla bader ali burhan Water Tanker 1 1 1
Labour 4 juyel sivaji Pick-up 3 ton 1 1 1
Labour 5 Atiq shahib zali Skid Stear Loader
Labour 6 Lal mahmod Car 1 1 1
Labour 7 Dewatering Pump
Labour 8 Jetting Pump
Anticipating Programme. Anticipating Programme. Anticipating Programme. Anticipating Programme.Jetting Tank

existing manhole Generator 2


connection and earth cutting work Excavation for it Grinder
pipe laying inroad on area no-02 chamber and pacing Plate Compactor 1 1 1
closed area (zam Footpath formation presure forming for
zam building)after in area-01,area-02 gre 200 mm dia pipe Vibrator with Pocker
pipe laying subbase,area- site cleaning frame Small tools
opening the 03footpath sub &cover fixing and Hilty 1 1
road,removing the basework area- traffic sign board
Exhaust fan
dewatering 01&02 formation fixing
system Blower
…………

Gang 4
Al Marfaa Roads Cont. Co. L. L. C.
DAILY SITE ALLOCATION
Name of Project In Charge (P.M. / P. E.): …DHANU.S……………...…………….. Date: …10/11/2016……………
JOB NO:- J011/15 J007/16
Profession Gang 1 Gang 2 Gang 3 Profession Gang 1 Gang 2 Gang 3
Foreman Saj kumar Bus
Surveyor Rajanad Bobcat
Operator Back Hoe Loader
Wheel Loader
Vibrating Roller
Driver PTR Roller
Steel Roller
Mason omprakash Grader
Truck
Tipper pickup
Labour 1 saidulla Rajesh Tipper Trailor
Labour 2 riazat Low bed Trailor
Labour 3 younis Water Tanker
Labour 4 Pick-up 3 ton
Labour 5 Skid Stear Loader
Labour 6 Car 1 1
Labour 7 Dewatering Pump
Labour 8 Jetting Pump
Anticipating Programme. Anticipating Programme. Anticipating Programme. Anticipating Programme.Jetting Tank

Generator
Hand excavation
for street light 150 Grinder
mm dia duct up to Plate Compactor
existing street Vibrator with Pocker
survey work
light panel board Small tools
settingout
60 lm and 11 m
stone pitching Hilty
area removal and Exhaust fan
pipelaying
Blower
…………

Gang 4