Gail Gas Limited City Gas Distribution Project Dewas

Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

GAIL GAS LIMITED

CITY GAS DISTRIBUTION PROJECT


DEWAS

CLIENT JOB -
NO.
PROCESS DESIGN BASIS
TOTAL 9
SHEETS
DOCUMENT NO 11 0290 01 03 04 001

A 03/07/09 PRELIMINARY PK PS PKS

REV DATE DESCRIPTION PREP CHK APPR


TABLE OF CONTENTS

1 INTRODUCTION................................................................................................. 3
2 PROCESS DESCRIPTION ................................................................................. 4
3 DESIGN BASIS..................................................................................................... 6
3.1 Demand.............................................................................................................. 6
3.2 Supply Conditions and Salient Parameters ................................................... 6
3.3 STEEL RING PIPELINE DESIGN PARAMETERS .................................. 7
4 SOFTWARE .......................................................................................................... 8
5 ABBREVIATIONS ............................................................................................... 9

Document No.
PROCESS DESIGN BASIS Rev
110290-01-03-04-001 A
SHEET 2 of 9
1 INTRODUCTION

GAIL Gas Ltd (GGL) is the agency for transportation and supply of piped Natural
Gas and/or R-LNG to various domestic, commercial & industrial consumers and
CNG for vehicle transportation sections in the Dewas City within the Municipal
Limits.

The receipt of gas from the source and its transportation and distribution is intended
to be by means of a main steel pipeline downstream of CGS operating at 14-19
kg/cm2(g) pressure. Supply to individual consumers within the city shall be through
MDPE grid downstream of DRS.

This document defines the basic design parameters used for


 Process Design of main 35 km main steel pipeline with associated piping,
valves, SVs and tap off points.
 Hydraulic analysis and adequacy check of the 35 km main steel pipeline.

Document No.
PROCESS DESIGN BASIS Rev
110290-01-03-04-001 A
SHEET 3 of 9
2 PROCESS DESCRIPTION

Dewas City Gas Distribution:


Natural Gas supply for Dewas City Gas Project is proposed from Jagoti-Pithampur
Pipeline Network of GAIL. A 12” dia. spurline connects Dewas from tapoff at
Sanwer from Jagoti- Pithanpur line. Also, GAIL is presently supplying gas to a few
industrial units in Dewas.

In order to supply gas to various consumers in the City, metered and filtered gas
taken from CGS shall be fed to the main steel pipeline laid strategically in the city.
The City Gate Station has been proposed in Industrial Area No.3. Natural Gas from
the CGS is fed into single pipeline supplying gas to the city network. The pressure at
the downstream of CGS shall be 19 kg/cm2(g). A Primary network of steel pipeline
shall connect the various CNG stations and District Regulating Stations (DRS) for
further gas supply distribution to automotive and PNG consumers. The main grid
line is laid alongside roads and highways. The main steel pipeline is of approx. 35
km length operating at 11-19 kg/cm2(g).

SV Stations are installed at approx every 2.5 km distance. As far as possible, SV


Stations are planned to be installed near CNG stations for prompt maintenance
response.

Areas Covered:
Areas which are covered under Dewas City Gas Distribution project are as below
S. No. Charge Area Code Description
1 CA-01 BSNL Administrative Building
2 CA-02 Ranbaxy Laboratories Ltd.
3 CA-03 Tata International Limited

Document No.
PROCESS DESIGN BASIS Rev
110290-01-03-04-001 A
SHEET 4 of 9
4 CA-04 District Court
5 CA-05 Mendichauki
6 CA-06 District Masschussets General Hospital
7 CA-07 Kirloskar Brothers Limited
8 CA-08 Dewas Railway Station
9 CA-09 Srishti Club
10 CA-10 Holy Higher Secondary School
11 CA-11 Mahla

Document No.
PROCESS DESIGN BASIS Rev
110290-01-03-04-001 A
SHEET 5 of 9
3 DESIGN BASIS

The metered and filtered gas from CGS is fed to the main steel network. Gas supply
condition and other basis for the process design are detailed in sections below.
This section defines the basic design parameters used for design of Main Steel
Network and associated facilities for the present as well as future use.

3.1 Demand

Consolidated total Demand of Dewas for City Gas Distribution Project for period of
25 years including Domestic, Commercial, Industrial and Automobile sectors is
333235 SCMD.
The demand of gas in Dewas city in different categories for 10th and 25th year are as
below: -

Domestic Automobile Commercial Industrial Total


Demand for 3060 10998 81 24033 38172
10th year
Demand for 22141 35308 3175 272611 333235
25th year
(All Figures in SCMD)

Demand of 25th year has been considered for Process Design work.

3.2 Supply Conditions and Salient Parameters

Supply Pressure : 19 kg/cm2(g) (Downstream of CGS)


Operating Pressure : 14-19 kg/cm2(g)
Operating temperature : 19-23 ºC
Design Pressure : 49 kg/cm2(g)
Design Temperature : 0ºC / 60ºC

Document No.
PROCESS DESIGN BASIS Rev
110290-01-03-04-001 A
SHEET 6 of 9
Reqd. Pressure at customer ends : 11 kg/cm2 (g) (minimum)
Soil temperature : 25ºC (1.0 meter below ground level)
Gas specific gravity : 0.7
Gas Composition
Methane : 83.00%
Ethane : 6.83%
Propane : 3.65%
i-Butane : 0.61%
n-Butane : 0.77%
Carbon Dioxide : 4.67%
Nitrogen : 0.07%

3.3 STEEL RING PIPELINE DESIGN PARAMETERS

Service : Natural Gas


Primary Pipeline : 10”/12” dia
20,000 m length
Secondary Pipeline : 8”/10” dia
15,000 m length
Material of construction : Carbon Steel, API5LX42
Class : ANSI Class 300
Pipeline thickness : 6.4 mm
Corrosion Allowance : 1 mm
Pipeline roughness : 45 microns (No internal coating)
Subsoil temperature : 25ºC (1.0 meter below ground level)
Maximum Gas Velocity : 20 m/s
Design Flow : 333235 SCMD
(Maximum possible flow for given pressure & velocity conditions to be assessed)
SV Station : Every 2.5 km

Document No.
PROCESS DESIGN BASIS Rev
110290-01-03-04-001 A
SHEET 7 of 9
4 SOFTWARE

The following softwares shall be used for the Process engineering of this project:

Simulation : HYSYS 3.2

P& ID’s : AutoCAD 2000

Document No.
PROCESS DESIGN BASIS Rev
110290-01-03-04-001 A
SHEET 8 of 9
5 ABBREVIATIONS

ANSI : American National Standards Institute


API : American Petroleum Institute
ASME : American Society Of Mechanical Engineers
MMSCMD : Million Metric Standard Cubic Meter per Day
OISD : Oil Industry Safety Directorate
RLNG : Re-gasified Liquefied Natural Gas
SCADA : Supervisory Control and Data Acquisition
SV : Sectionalizing Valve
TOP : Tap Off Point
UPS : Uninterrupted Power Supply

Document No.
PROCESS DESIGN BASIS Rev
110290-01-03-04-001 A
SHEET 9 of 9