Horizontal
M11,near Walls 12 21
M11,span 8 13
V13 25 58
T11, near walls 273 458
T11, span 130 200
Vertical
M22,support 15 28
M22,span 13 21
V23 48 71
T22, suppot 30 52
T22, span 18 33
Vertical Horizontal
Support Span Near walls Span
H 300 300 300 300
R/F T 12 T 12 T 16 T 16
@ 150 @ 150 @ 150 @ 150
Project Deduru Oya WSP Designed MCR
Structure Flash Mixer, Flocculator & Clarifier Checked Abu
Document Title Flocculator Cross Wall - Wall 08 Date 28/02/2018
Document No. Minimum Reinforcement for Temperature & Moisture Revision 1
Vertical Horizontal
Support Span Near walls Span
Thickness of wall = 300 300 300 300 mm
Maximum crack width, Wmax = 0.2 0.2 0.2 0.2 mm
Direct tensile strength of immature concrete, fct = 1.6 1.6 1.6 1.6 N/mm2
Average bond strength, fb = 2.4 2.4 2.4 2.4 N/mm2
fct / fb ratio = 0.67 0.67 0.67 0.67
Assume, Maximum Cement content (OPC) = 390 390 390 390 kg/m3
O
Temperature fall due to seasonal variations, T2 = 14 14 14 14 C
Then, steel ratio, ρ= ([fct /fb]* ø *R*α * [T1+T2]) = 0.44% 0.44% 0.59% 0.59%
2 Wmax > > > >
Critical steel ratio, ρ crit = 0.35% 0.35% 0.35% 0.35%
Therefore, minimum steel ratio required, ρ min = 0.44% 0.44% 0.59% 0.59%
Area of concrete controlled by each face r/f = 150 150 150 150 mm
Area of reinforcement required at each face, A st,min = 660 660 880 880 mm2/m
Project Deduru Oya WSP Designed MCR
Structure Flash Mixer, Flocculator & Clarifier Checked Abu
Component/Location Flocculator Cross Wall - Wall 08 Date 28/02/2018
Document Title ULS Design Calculations Revision 1
2
Concrete Cube Strength fcu 35 N/mm
2
Steel Strength fy 460 N/mm
Vertical Horizontal
Support Span Near walls Span
Moment-ULS Mu 28 21 21 13 kNm/m
Direct Tension - ULS Tu 52 33 458 200 kN/m
Bredth of Section B 1000 1000 1000 1000 mm
Depth of Section h 300 300 300 300 mm
Main Bar dia T 12 12 16 16 mm
Cover to main rebar C 50 50 50 50 mm
Eff. Depth d 228 228 242 242 mm
K = M/fcu bd2 0.0154 0.0115 0.0102 0.0063
Shear Check OK OK
Project Deduru Oya WSP Designed MCR
Structure Flash Mixer, Flocculator & Clarifier Checked Abu
Component/Location Flocculator Cross Wall - Wall 08 Date 28/02/2018
Document Title Calculation of Crack Width in Mature Concrete Revision 1
Vertical Horizontal
Support Span Near walls Span
SLS Moment Ms = 15 13 12 8 kNm/m
SLS Direct Tension Fs = 30 18 273 130 kN/m
As,pro = 753.6 753.6 1340 1339.7 mm2/m
h = 300.0 300.0 300.0 300.0 mm
d = 228.0 228.0 242.0 242.0 mm
Assume service stress fs= 200 mm2/m and Z = 0.9 d
z = 205.2 205.2 217.8 217.8 mm
2
Required steel for Ms As1 = Ms / fs z = 365.5 316.8 275.5 183.7 mm /m
Required steel for Fs As2 = 0.5 Ft/fs = 75.0 45.0 682.5 325.0 mm2/m
2
Total required steel As,tot = As1 + As2 = 440.5 361.8 958.0 508.7 mm /m
Actual As resisting Ms = As1 x As,pro /As,tot = 625.3 659.9 385.3 483.7 mm2/m
Actual As resisting Fs = As2 x As,pro /As,tot = 128.3 93.7 954.5 856.0 mm2/m
% As resisting Ms = 100 As / bd = 0.27 0.29 0.16 0.20