Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Sample EBS Technical - Resume

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

XXXXXXXXXX Global Business Services

Education

Qualifications
Bachelor of Technology in Computer Engineering - 2004, XXXX Umiversity,
India.

Note: Provide highest two or three Educational Qualifications

Languages English Fluent


Hindi Fluent

Professional experience

Profile
- 13 years and 3 months of IT industry experience encompassing a
wide range of skill sets, roles and industry verticals.
- Extensive experience with analysis, design, development,
customizations, implementation and maintenance using Oracle
Applications R12 over varied versions and releases.
- Worked as onsite client coordinator in US for 5 years
- Experience in emerging as well as widely used technologies under
IBM Cognos Business Intelligence (BI) Suite.
- Experience in IBM Watson services on IBM cloud
- Oracle Cloud certified in General Ledger, Java Cloud Services
(Oracle PaaS) and Accounts Payable

Note: Highlight key areas/experience from your profile

Key Skills
ERP: Oracle Applications R12 (E-Business Suite)

Oracle Technologies: Oracle Reports, XML/BI Publisher,


Workflow, Interface, Conversion, Oracle Appliocation Framework
(OAF), RICE development

Development Tools: PL/SQL Developer, SQL Developer,


JDeveloper, SQL Plus, Oracle Dev Suite 10g (Reports, Forms),
Oracle Workflow Builder, Oracle XML Publisher Builder

Functional Modules: Discrete Manufacturing (MFG),


Distribution/Order Management (OM), Purchase Order (PO),
Inventory (INV), ASCP

RDBMS: Oracle 10g, 11g, 12c, MySQL

Languages: PL/SQL, Java, Oracle SQL, XML, PHP, REST API

Operating Systems: Windows XP, Unix, Linux

- 1/5 - Date: 06/04/18


Processes: IBM’s QMS (Quality Management System), IBM
Agile Methodology, IBM Waterfall Methodology.

- Version Management: Tortoise SVN, PVCS

Note: Write key points like Application version, database version, tools
worked on, main activities performed, etc. which will highlight key
technology/skills of your profile. Include Oracle and any non-Oracle
tools also as applicable.

Career 04/2008 – Current


History IBM India Pvt Limited
Role: Oracle eBS Technical Consultant with experience in SCM modules
Designation: IT Analyst

11/2004 – 04/2008
XXXXXXXX – Organization Name
Role: Oracle eBS Technical Consultant
Designation: Assistant System Engineer

Note: It is a list of employers and roles you had during your career so far.
The entries should be logically structured with the highest level of detail on
the most recent jobs.

Assignment Sep-09 Till Date - XXXXXXX Oracle eBS AMS - USA


History
Project Description: XXXXXXXX continued the journey from
Implementations to Application Maintenance & Services (AMS). The project
was to support roll-outs of 40 plants across the globe and maintain the
client’s production environment. This project continued after the first
successful implementation of Oracle eBS R12 on 01-Sept-2009. The work
streams involved were Finance, Manufacturing, Supply Chain Planning,
Projects and Order Management.
As a System Analyst I was responsible for analysis, design, development,
testing, maintenance and bug fixing of Oracle Application ERP solutions. I
also played the below mentioned roles.

 Responsible for resolving production issues with proper analysis, code


fix and deployment keeping the Service Line Agreements (SLA) in
mind.
 Responsible for managing production issues in ticket form in the Test
Director tool.
 Responsible for effective communication between the project team and
the customer.
 Provide day to day update to the user, support manager and onsite
coordinator and regular project status to the customer.

- 2/5 - Date: 06/04/18


 Responsible as a code reviewer to find issues in the code pack and
help the developer to maintain the code defect free and in aligned with
the standards. Perform unit testing and find defects.
 Lead the upgrade for manufacturing workstream from Oracle on-
premises version 12.1.3 to 12.2.6

Environments: Oracle Apps R12, Oracle 10g, 11g 12c database.


Team Size: 18 to 25

May-08 to Sep 09 - XXXXXXXX Oracle eBS Implementation - USA

Project Description: XXXXXXXX implementing Oracle Application R12 on


Oracle On-demand environment for their Rig solution business division. As
an implementation project, this required various integration between
different modules and customization in various oracle standard processes.
Almost all the modules in Oracle Application like Finance, Manufacturing,
Projects, and Order Management were implemented.

My role in the team was as follows:

 Analysis and Estimation of new Projects


 Mapping the User Requirements to IT Requirements
 Establish AID’s with external interfacing systems
 Developing Detail Design Document
 Assigning appropriate work in the project to team members
 Developed pl/sql interface related to check on hand quantity from
Purchase order system
 Developing reports in XML Publisher
 Review all Project deliverables
 Identify and manage project risks. Establish appropriate plan to mitigate
risks
 Surface issues / topics where "system" decisions are needed
 Helping team members to arrive at effective solutions for complex
issues
 Effectively co-ordinate with Client users, US team and third party teams
on daily activities
 Track projects/defects and send appropriate reports to the
management
Environment: Oracle Apps R12, Oracle 10g Database.
Team Size : 20 to 25

Apr-06 to Apr 08 - XXXXXXXX BioScience PST - Sweden

Project Description: XXXXXXXX BioScience business division in Sweden


implemented Oracle Application 11i with lots of complex interfaces, reports,
workflows like ATLS PNV interface, Delivery Grouping Interface, Clear Orbit
Interface, YYYYYYY Interface, Clear Orbit label printing. This project was to
provide support to the production environment and manage production

- 3/5 - Date: 06/04/18


issues within the Service Level Agreements (SLA). This project was a
Mission Critical Application (MCA) thus 24x7 support and maintenance was
required.

My role in the team was as follows:


 Provide continuous support to the client’s production environment so that
none of the production issues violates SLA.
 Analyze the production issue and provide solutions which may be a code
fix, setup issue or data issue.
 Direct communication with the business users with resolution of the issue
post thorough analysis.
 Manage the tickets and update them using the CRM tool Amdocs Clarify.
 Mentor the junior members in the team and to educate them on the
Oracle Application technology, client processes and SLA activities.
Environment: Oracle Apps 11i, Oracle 9i Database.
Team Size: 20 to 25

Dec-04 to Apr 06 - XXXXXXXX BioScience Implementation - Sweden

Project Description: XXXXXXXX BioScience business division in


Sweden implemented Oracle Application 11i with a complex landscape of
interfaces, reports, workflows like ATLS PNV interface, Delivery Grouping
Interface, Clear Orbit Interface, ISOALE/ISOWLE Interface, Clear Orbit
label printing. This project customized most of the standard oracle
processes as per GE’s need.

My role in the team was as follows:


 Understand MD60 which is the business requirement provided by the
functional analyst.
 Prepare the MD70 which is the technical design document to ensure that
the solution and design is aligned with the requirement.
 Participate in the global design which created global modules to be called
from different components.
 Design and develop multiple components like Interface, Conversion,
Reports etc as mentioned in the MD60 and in line with the design in
MD70.
 Participate in unit testing for the developed components.
 Participate in the integration testing and extend support during the user
acceptance test phase.
 Participate in the project GO Live phase.
 Communicate activities/progress to project managers and technical lead.

Environment: Oracle Apps 11i, Oracle 9i Database.


- Team Size : 30 to 35
Note: State your assignments with IBM in this section

- 4/5 - Date: 06/04/18


Other relevant information

Membership in e.g. PMI


Professional
Organisations

- 5/5 - Date: 06/04/18

You might also like