Supercussion
Supercussion
Supercussion
Program Description
Setup Time
Each member of the group has a carload of large instruments and we ask
that the presenting organization reserve 4 parking spaces near the venue load-in
point. This allows the setup to run quickly and efficiently. We need the venue to
be available for setup 45 minutes to 1 hour in advance of the start time. It takes
this much time to load-in and prepare all the instruments for the performance.
The exit time is much faster and we are usually out of the venue in 20 minutes.