Drilling Log: RS. AMINAH, Kota Tangerang
Drilling Log: RS. AMINAH, Kota Tangerang
Drilling Log: RS. AMINAH, Kota Tangerang
BH1
Project RS. AMINAH, Kota Tangerang Type of Drilling Wash Boring Coordinat
Location JL. Ciledug Raya, Kreo Selatan Driller Siswanto X
Date 17-18 Agustus 2008 Supervisor Karyadi Y
GWL 4.0 m Z
N3 (30-45CM)
N2 (15-30CM)
SPT Curve Soil Laboratory Results
N1 (0-15CM)
N-SPT
Depth
0.5
1.0
1.5 UDS 1 silty CLAY, high plasticity, gray 1,68 2,65 49,49 91,84 33,30 UU 0,18 12,40
1.50- CH
2.00
2.0 SPT 1 grades soft consistancy 1 1 2 3
2,00-2,45
2.5
3.0
3.5
4.5
5.0
5.5
6.5
7.0
7.5
8.5
9.0
9.5
10.5
11.0
11.5
12.5
13.0
13.5
14.5
15.0
15.5 UDS 2 same as above 1,77 2,67 38,66 81,40 33,33 UU 0,40 12,40
15.50-16.00
16.5
17.0
17.5
19.0
N2 (15-30CM)
N3 (30-45CM)
SPT Curve Soil Laboratory Results
N1 (0-15CM)
N-SPT
Depth
21.0
21.5
22.5
23.0
23.5
25.0
25.5
26.0 SPT 13 silty CLAY, gray, medium plasticity, hard consistancy 25 60/5 60
26,00- CL
26,20
26.5
27.0
27.5
29.0
29.5
30.5
31.0
31.5
32.5
33.0
33.5
34.5
35.0
35.5
36.5
37.0
37.5
38.0 SPT 19 silty CLAY, gray, high plasticity, very stiff consistancy 10 16 18 34
38.00- CH
38.45
38.5
39.0
39.5