Release Management Plan Template
Release Management Plan Template
Release Management Plan Template
This template contains a paragraph style called Instructional Text. Text using this paragraph style is
designed to assist the reader in completing the document. Text in paragraphs added after this help text is
automatically set to the appropriate body text level. For best results and to maintain formatting
consistency, use the provided paragraphs styles.
2. Release schedule................................................................................1
4. Project Charter.....................................................................................2
8. Release Schedule................................................................................3
11. Documentation....................................................................................4
12. General.................................................................................................5
Release Name
Business description of
release
Business Justification
To enable Customer and OI&T
to more accurately identify staff
time (and therefore costs) spent
on significant operational
enhancements and major
development projects.
2. Release schedule
Go live date
and time – if applicable
Release end date
if applicable (Release will be
phased by Field Testing and
Operational Readiness Testing)
4. Project Charter
Charter document should be completed and approved before this release template is begun.
Template:
Capital development funded project? If yes, please provide the approved project name.
Facilities/Sites/Locations
8. Release Schedule
The Release is Managed using the Release Schedule which is generated from the IMP/IMS. This schedule
includes dependencies, milestones and deliverables for the Release.
Store the RM Schedule in the CMDB and supply links.
Template: http://
Example:
Process Name: Release Management
Change Requests:
CR1802: Description of change request
CR1820: Description of change request
all future expected technology / process or environment changes related to this release
‘Go Live’ change (if it is a different date to the nominated technology changes)
all relevant Information about change types, categories, approvers, status, exceptions
and lead times.
List all Configuration Items (CI’s) that are a part of this release:
Example:
Process Name: Release Management
Configuration Items:
CI 2010: Description of configuration item
CI 2011: Description configuration item
11. Documentation
Has Roles and Responsibilities manual been updated for VA
Service Desk?
12. General
Security
Has the IT Security team signed off on testing and release plan?
Yes No N/A
Disaster Recovery
Has the Disaster recovery plan (DR) been created or updated?
Provide links to the current or updated plans.
Yes No N/A
Decommissioning
Have plans been developed for decommissioning replaced service?
Summarize decommissioning plans
Yes No N/A
Other Policies
Records management: Is the Release compliant with records management policies?
__________________________________________________________
Signed: Date:
< Program/Project Manager >
__________________________________________________________
Signed: Date:
< Business Subject Matter Experts Representative >
__________________________________________________________
Signed: Date:
< Software Engineering Representative >
__________________________________________________________
Release Management Plan x <Month> <Year>
__________________________________________________________
Signed: Date:
< Information Protection Representative >
__________________________________________________________
Signed: Date:
< Section 508 Compliance Representative >
__________________________________________________________
Signed: Date:
< Enterprise Infrastructure Engineering (EIE) Representative >
__________________________________________________________
Signed: Date:
< Field Operations and Development (FOD) Representative >
__________________________________________________________
Signed: Date:
< Independent Verification and Validation Representative >
__________________________________________________________
Signed: Date:
< Operational Readiness Testing Representative >
Release Management Plan xi <Month> <Year>
__________________________________________________________
Signed: Date:
< Product Support Representative >
__________________________________________________________
Signed: Date:
< Implementation Manager >
__________________________________________________________
Signed: Date:
< Planner >
__________________________________________________________
Signed: Date:
< Training Manager >
__________________________________________________________
Signed: Date:
< Contracting Officer >
2. All completed Release criteria at time of approval to proceed through each phase of the Release
Management process.