Estimate Factor
Estimate Factor
Estimate Factor
I. MASONRY WORKS
Class B/Class C Riprap
Mortar Plastering Boulder x 1.21 = cement
4" CHB = Cement - (0.39 x A) 0.192 x A x 2 Boulder x 0.14 = sand
Sand - (1 x A) x 0.044 0.016 x A x 2
6" CHB = Cement - (1.33 x A) x 0.76 0.192 x A x 2 C. Siab on Fill
Sand - ( 1 x A) x 0.089 0.016 x A x 2 10mm Ø x 6m =
kls of tiewire =
Pcs of CHB - (12.5 x A x 1.05)
Pcs of RSB (600mm sp) - [(A x 2.15) + (A x 2.13)] / 6 D. Spiral Ties
Kls of tiewire - (0.0025 x # of CHB) Column Diameter
PITCH 300mm
II. CONCRETE WORKS 50mm 2.604
Cement - (9 x V) 62.5mm 2.108
Sand - (0.5 x V) 75mm 1.778
Gravel - (1 x V)
Pcs of RSB Ties (6m) = (N x length of column
TOPPING (Class B) Kls of Tiewire = (no. of vertical bars x t x 0.0
III. STEEL WORKS Concrete = V x 12 t = turns of HE/meter
A. Lateral Ties / Stirrups Sand = V
(stirrup length-concrete cover) PITCH
L of X-set LA Net Length 50mm -21
100mm 20mm 62.5mm -17
200mm 120mm 75mm -15
300mm 220mm
400mm 320mm E. Roof Slabs (2 Way slab)
500mm 420mm 12mmØ x 6m (pcs) =
600mm 520mm 10mmØ x 6m (pcs) =
tiewire (kls) =
125mm 45mm
225mm 145mm IV. CEILING WORKS
325mm 245mm A. Fixer Cement on Metal Furring
425mm 345mm spacing 600mm x 600mm
525mm 445mm 5m metal furring =
625mm 545mm rivets =
S-furring clip =
150mm 70mm hangers (drip = 0.80)
250mm 170mm angle bar wall= Perimeter/6m
350mm 270mm carrying channel= total # of furring channel
450mm 370mm shortcut:
550mm 470mm furring channel,3m(pcs)= 0.5825 x A
650mm 570mm top cross rail= 0.5825 x A
TCR to FC connector clip (pcs)= 3xA
175mm 95mm TCR Joiner= # of pcs of TCr
275mm 195mm Suspension rod (set galvanized), 4mm=0.71
375mm 295mm Suspension rod bracket to concrete(pcs)=0.
475mm 395mm 25mm S-type screws (pcs)=(# of pcs of FCx2
575mm 495mm (# of pcs of joints x 4)+ (connector x6)
V. ROOFING WORKS 2x2 (bd ft)=(ttl length of col x 21)+ (ttl length of col x 1
long span roofing (ln-m)=A/0.8955 2x3 (bd ft)= (ttl length of col x 7)
tekscrew (pcs)= (A/3.29)x(22 or 26)
GI sheet (pcs) = length/0.6 B. For Beams
umbrella nails (pcs)= # of Gi sheet x 26 for 12 2x2 (bdft)=(ttl length of beam x 4.67)
umbrella nails (pcs)= # of Gi sheet x 22 for 9 2x3 (bdft)= (ttl length of beam x 6)
tekscrew (pcs)= (A/3.29)x(22 or 26)
8' gutter (pcs)= L/2.35 X. HARDWARE
ridge roll (pcs)= L/2.2 A. Tiewire kls
purlins= 0.96 x A of roof (# of main bars x stirrups x 0.3)/53
D. Roofing
red oxide primer (gals)= A/25
roof master (gals)= (A*2)/25
paint thinner (lit)= total gals of quick dry enamel
METAL REINFORCEMENT
CONCRETE
CONCRETE PROPORTION (Volume Method)
CEMENT IN BAG SAND GRAVEL
PROPORTION
MIXTURE CLASS 40kg 50kg cu.m. cu.m
AA 1:1 1/2:3 12.0 9.5 0.50 1.00
A 1:02:04 9.0 7.0 0.50 1.00
B 1:2 1/2:5 7.5 6.0 0.50 1.00
C 1:03:06 6.0 5.0 0.50 1.00
MIXTURE CLASS
SAND
SLAB thickness 40kg Cement 50kg Cement cu.m
mm. A B C A B C
50.00 0.450 0.375 0.300 0.350 0.300 0.250 0.0250
75.00 0.675 0.563 0.450 0.252 0.450 0.375 0.0375
100.00 0.900 0.750 0.600 0.700 0.600 0.500 0.0500
125.00 1.125 0.938 0.750 0.875 0.750 0.625 0.0630
150.00 1.350 1.125 0.900 1.050 0.900 0.750 0.0750
175.00 1.575 1.313 1.050 1.225 1.050 0.875 0.0880
200.00 1.800 1.500 1.200 1.400 1.200 1.000 0.1000
225.00 2.030 1.688 1.350 1.575 1.350 1.125 1.1125
250.00 2.250 1.875 1.500 1.750 1.500 1.250 1.1250
275.00 2.475 2.063 1.650 1.925 1.650 1.375 0.1380
300.00 2.700 2.250 1.800 2.100 1.800 1.500 0.1500
MASONRY
MORTAR MIXTURE (Volume Method)
PLASTER MIXTURE
BAR SPACING
NUMBER OF STEEL BARS PER SQ.M.
mm. 6m 7.5m 9m 12m
100 3.764 2.937 9.421 1.769
125 3.062 2.381 1.934 1.427
150 2.584 2.004 1.636 1.197
175 2.232 1.726 1.407 1.033
200 1.98 1.528 1.258 0.914
225 1.786 1.369 1.109 0.81
250 1.627 1.25 1.014 0.736
BAR SPACING
NUMBER OF STEEL BARS PER SQ.M.
mm. 6m 7.5m 9m 12m
100 4.369 3.337 2.772 2.022
125 3.603 2.662 2.245 1.635
150 3.221 2.296 1.921 1.382
175 2.647 2.025 1.65 1.196
200 2.36 1.775 1.461 1.056
225 2.168 1.601 1.312 0.907
250 1.977 1.466 1.217 0.862
Column Diameter
350mm 400mm 450mm 500mm
3.183 3.762 4.34 4.919
2.577 3.045 3.513 3.982
2.172 2.567 2.962 3.357
hannel,3m(pcs)= 0.5825 x A
rail= 0.5825 x A
connector clip (pcs)= 3xA
r= # of pcs of TCr
on rod (set galvanized), 4mm=0.714xA
on rod bracket to concrete(pcs)=0.714xA
type screws (pcs)=(# of pcs of FCx2)+
of joints x 4)+ (connector x6)
on Good Lumber
pcs)= A/2.88
.6x0.6 sp)(bd ft)=A x 7
p)(bd ft)= A x 8.312)
.6x0.6 sp)(bd ft)= A x 4.667
p)(bd ft)= A x 5.445)
)= (Ax0.05)+(# of plywood x 0.055)
h of beam x 4.67)
h of beam x 6)
sp 600mmx600mm
sp 600mmx600mm
HORIZONTAL
LENGTH OF BARS
Per Block Per sq m
0.264 3.3
0.172 2.15
0.138 1.72
GRAVEL
cu.m
0.050
0.075
0.100
0.125
0.150
0.175
0.200
0.225
0.250
0.275
0.300
12.0m
0.4
0.598
0.391
0.276
0.204
0.160
0.126
0.103
12.0m
0.4
0.794
0.561
0.396
0.275
0.217
0.173
0.155