HIV Evaluation Final
HIV Evaluation Final
HIV Evaluation Final
Terms of Reference
HIV/AIDS Strategic Capacity Development (00060778)
Project Evaluation
The first cases of HIV in Libya were reported in the 1980s among hemophilia patients. In
subsequent years an increased rate of infection was witnessed among the non-Libyan
population. In the beginning of 1998, the number of HIV cases among Libyan nationals
began to exceed the recorded cases among non-Libyans. In 2007, according to the data
provided by the National Center for Infectious Diseases (NCID), there were around 10,855
people living with HIV, of which 8,484 were Libyan nationals.
In 2002/2003, it was found that over 90% of Libyan nationals living with HIV were
intravenous drug users. Additionally, according to a more recent government study, the
HIV prevalence in prison is estimated at 18%.
Official records show that HIV prevalence has increased over the last 10 years, and
policymakers are increasingly aware of the need to tackle this public health challenge. The
National Center for Infectious Diseases (NCID) has been implementing a rigorous
programme of public awareness and has supported outreach programmes to try to end the
silence surrounding the pandemic.
Like many countries in the region, HIV is still commonly associated with immoral
behavior and lifestyles. This stigma surrounding the pandemic has adversely affected
attempts to openly address the causes of HIV infection with a view to affecting behavioral
change at the societal and individual level as a means of strengthening the national
response to HIV/AIDS. UNDP CO, through the Regional Programme for Arab States
(HARPAS), has worked with national partners in Libya and conducted joint initiatives to
raise awareness and develop the capacity of key national stakeholders. UNDP CO has
worked with religious leaders in Libya and contributed to enlisting this influential group to
be strong advocates for the rights of people living with HIV/AIDS (PLWHA).
Project brief
The project aimed to contribute to ongoing efforts to support the capacities of the National
Center for Infectious Diseases (NCID), enabling it to increase its effective role in strengthening
the multi-sectoral response to HIV/AIDS. The project worked in close partnership with NCID
and Civil Society Organizations (CSOs) in order to achieve a higher level of harmony and
Page 1 of 8
alignment, all aimed towards increasing the impact of existing efforts on a better response to
HIV and AIDS
National Center for Infectious Diseases (NCID): NCID is the responsible institution of the
government of Libya in charge of combating all infectious diseases including HIV and AIDS.
The project was initially started in 2008 as a one year project and was then extended to the end
of 2010. The project will be closed at the end of 2010.
2. Evaluation purpose
As an integral part of the project implementation cycle, and in line with the country office evaluation
plan, the proposed evaluation will analyze the achievements of the project against its original objectives.
The evaluation will review technical and managerial aspects and will consider issues of effectiveness,
efficiency, relevance, impact and sustainability. The evaluation will identify factors that have facilitated
and/or impeded the achievement of objectives, and should result in recommendations and lessons learned
that will help in re-orienting and re-prioritizing project activities and managerial arrangements as needed.
The evaluation will assess the impact of the project on the national response to HIV/AIDS, including
behavior change at the individual level and throughout the population at large
The evaluation will also assess the extent to which the implementation of the project has
involved relevant stakeholders and CSOs. It will also assess the degree to which the project has
been able to create collaboration between different partners.
Page 2 of 8
4. Evaluation questions
Does the project demonstrate that awareness raising is an effective way of addressing the
HIV/AIDS challenges in the country? In what ways?
What has been the added value of addressing HIV/AIDS through religious leaders?
If the awareness campaign were not channeled through religious leaders, would the
results have been the same?
Has the project contributed to motivating CSOs to address the HIV/AIDS challenges?
Are there examples of good practices in the way that HIV/AIDS challenges have been
addressed that can be replicated in future?
Were the stated outputs achieved?
What factors have contributed to achieving or not achieving the intended outputs?
To what extent has UNDP and HARPAS assistance and support contributed to
achieving or progress towards achieving outputs?
Has the project strategy been appropriate and effective?
What factors contributed to the effectiveness or ineffectiveness of the implementation of
project activities? And what are the factors affecting the quality of outputs and
deliverables?
5. Methodology
However, it is expected that the evaluator will supply an inception report, in which he/she will
provide an outline of the evaluation methodology to be applied before proceeding with the evaluation
process. The inception report must be compliant with the evaluation report template
The key stakeholders of the project include but are not limited to the National Center for
Infectious Diseases (NCID), the GPC for Planning and Finance and CSOs.
Page 3 of 8
6. Evaluation products (deliverables)
The evaluation consultant will be accountable for producing the following deliverables in Arabic
and English language:
Education:
The candidate should hold an advanced university degree in social sciences,
development management or a related technical field.
Work experience:
Eight years of professional experience at the national and international levels in strategic
planning, programme monitoring and evaluation.
Experience with the UN and familiarity with UN planning and programming instruments
is an asset.
Languages
Fluency in Arabic and English.
Competencies
Strong statistical and analytical, quantitative and qualitative research skills.
Strong knowledge of results-based management.
Strong drafting skills.
Strong IT skills and knowledge of various office applications.
Page 4 of 8
Demonstrated ability to work in a multi-cultural environment and establish
harmonious and effective working relationships both within and outside the
organization.
Good negotiation and communication skills.
Specialized training in statistics or a statistical background is an asset.
Background on MDGs and HD reporting at the national level is an asset.
8. Evaluation ethics
This evaluation mission will be conducted in accordance with the principles outlined in the
UNEG “Ethical Guidelines for Evaluation”.
9. Implementation arrangements
To facilitate the project evaluation process, UNDP Libya has set up an Monitoring and
Evaluation Focal Point (EFP) to support the Portfolio Manager (PM) and the National Project
Coordinator (NPC) in coordinating the evaluation process internally and externally. During the
evaluation, the PM, NPC and EFP will help identify key partners for interviews by the evaluator.
However, the evaluation will be fully independent and the evaluator will retain enough flexibility
to determine the best approach in collecting and analyzing data for the project evaluation.
The evaluation mission will consist of one national/international consultant for a period
of two weeks.
Preparation of the inception report by the end of the third day of the mission.
One working day will be given to UNDP & NCID to read the report and give their
inputs.
The evaluation consultant will deliver a draft evaluation report to UNDP and NCID
by the end of sixth working day of the mission at the latest.
Two working days will be given to UNDP & NCID to read the report and give their
inputs.
The evaluation consultant will deliver the final evaluation report to UNDP by the end
of the tenth working day of the mission.
Page 5 of 8
Time Frame: 1st week
1st day (SUN) 2nd day (MON) 3rd day (TUE) 4th day (WED) 5th day (THU) FRI) (SAT)
- Meeting/Briefing - Meeting with - Meeting with - Meeting with - Meeting with NGOs
by UNDP. National media members religion leaders
AIDS who were trained
Programme
Manager at
NCID
- Meeting/Briefing Meeting with Meeting with people living
by UNDP judiciary with HIV/AIDS
- Meeting/Briefing
by Project NPC.
- Meeting with
National AIDS
Programme
Manager at NCID
- Receive Project
Documentation.
- Finalizing the evaluation design/methods - - Preparing the draft report.
Page 6 of 8
6th day (SUN) 7th day (MON) 8th day (TUE) 9th day (WED) 10th day (FRI) (SAT)
(THU)
- Meeting with NCID. - UNDP & NCID to give their input - Preparing and delivering the
on the draft report. final report.
Page 7 of 8
10. Cost
The daily rate for the evaluator will be determined according to qualifications and past
experience and based on UNDP rates.
The evaluation fees will be paid in three equal installments (33.33% each).
The first installment will be paid upon signing the consultancy contract;
The second installment upon submission of the draft report; and
The final one, upon acceptance of the final report.
Page 8 of 8