Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
67 views

Assignment Matrix

This document contains a schedule for assignments and projects with weightages and due dates. It separates tasks into urgent and not urgent categories. In the urgent section, the highest weighted tasks are a group project due on June 16th at 50% and a consulting report due on June 17th at 25%. Several homework assignments are also due throughout June. The not urgent section contains additional homework, projects, cases and assignments due between June 18th and July 15th.

Uploaded by

Harsh Vardhan
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views

Assignment Matrix

This document contains a schedule for assignments and projects with weightages and due dates. It separates tasks into urgent and not urgent categories. In the urgent section, the highest weighted tasks are a group project due on June 16th at 50% and a consulting report due on June 17th at 25%. Several homework assignments are also due throughout June. The not urgent section contains additional homework, projects, cases and assignments due between June 18th and July 15th.

Uploaded by

Harsh Vardhan
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Urgent Not Urgent

MKDM Markstat-2 9-Jun 7.5% DMOP HW#2* 18-Jun


DMOP HW#1* 11-Jun 10% MKDM Markstrat-4 20-Jun
CSTR Project Proposal 14-Jun MKDM Markstrat-5 23-Jun
High Weightage

MKDM Markstat-3 15-Jun 7.5% DMOP HW#3* 25-Jun


GLEC Group Project 16-Jun 50% MKDM Markstrat-6 27-Jun
BCOM Consulting Report 17-Jun 25% MKDM Markstrat-7 30-Jun
BCOM YouTube Video 1-Jul
DMOP ODI Case 2-Jul
DMOP HW#4* 4-Jul
CSTR Group Project 15-Jul
MKDM Emotive Systems* 11-Jun 2.5% MKDM Montreaux Chocolate USA* 18-Jun
CSTR Ducati Case 11-Jun 5% CSTR FabIndia Case 18-Jun
Low Weightage

CSTR Apple Case 13-Jun 5% CSTR Gillette Case 20-Jun


MKDM BARCO Case* 25-Jun
CSTR GE Case 27-Jun
MKDM Cambridge Software* 2-Jul
*Individual Assignments CSTR Sabena Case 2-Jul
10%
7.5%
7.5%
10%
7.5%
7.5%
25%
10%
10%
25%
2.5%
5%
5%
2.5%
5%
2.5%
5%

You might also like