A Docking & Undocking Services:: Dock In: Dock Out
A Docking & Undocking Services:: Dock In: Dock Out
A Docking & Undocking Services:: Dock In: Dock Out
322838224043
E MACHINING WORKS :
E-1 Alignment of bended portions of tailshaft by machine pressed.
Reface from outboard to inboard and fibering packing portion of
E-2
tailshaft.
Fabricate rudder pin sleeve using material manganese bronze
E-3
6" diam. X 140 mm
Machining of tailshaft bearings using magkuno wood :
E-4 Inboard : OD = 239.3 mm ID = 193 mm L = 8inches
Outboard : OD = 240.1 mm ID = 197.2 mm L = 725 mm
Materials magkunu wood by yard supply.
E-5 11" diam. X 3 ft
11" diam. X 2 ft
28.543307
F GENERAL SERVICES :
F-1 HULL GAUGING :
a. Conducted hammer testing on entire hull below H2O line for utg testing.
b. Conducted UTG testing on marked suspected areas of entire hull.
c. Provision of new shell expansion plan in absence of reference plan.
d. Furnished CAD drawing of shell expansion plan and indicated
updated readings taken from utg testing.
e. Provision of CAD drawing for new docking plan .
F-2 Shore Power :
a. Line connection and disconnection.
b. Supply of power onboard during repair works.
F-3 Fire Watchman and Security Watchman :
a. Fire watchman during the entire duration of repair.
b. Security watchman during the entire duration of repair.
F-4 Daily galley garbage during the entire duration of repair.
Conducted megger test on all motors and panel boards and submitted
F-5
insulation resistance report to OR as per MARINA requirements.
Shipyard Personnel :
Prepared by : Noted by :
Vessel's Crews :
#529 KM 4, Talon-talon, Zamboa
Chief Engineer: F/B AQUA-78 Captain: F/B AQUA-78
YL FISHING CORPORATION
Owner's Representative #529 KM 4, Talon-talon , Zamboanga City
Surveyed / Inspected by :
44-38-04-40-42-46
322838224043
44380440424.3
44-38-44-04-24
9.4527559 7.7637795
9.4527559 7.7637795
9.4527559 7.7637795
89.354594 60.276273
280.71574 189.3635
8011.6271 5404.4341
2002.9068 1351.1085
651.79824
4, Talon-talon, Zamboanga City