Summary of Quantities: Item D E S C R I P T I O N Unit Quantity As Plan Quantity Remarks As Take
Summary of Quantities: Item D E S C R I P T I O N Unit Quantity As Plan Quantity Remarks As Take
SUMMARY OF QUANTITIES
QUANTITY QUANTITY
ITEM D E S C R I P T I O N UNIT REMARKS
AS PLAN AS TAKE
Provision of 4x2 Pick Up Type Service Vehicle for the
A.1.2.(4) month 5.00 5.00 Same in Quantity
Engineer on Bare Rental Basis
B.7(1) Construction Safety and Health Program month 5.00 5.00 Same in Quantity
500(1)a3 Pipe Culverts (910 mm dia.); Class II, RCPC ln.m. - 10.00 Addition of New Item
1700(1) Clearing and Grubbing (with Stripping) l.s. 1.00 1.00 Same in Quantity
1701(1)b Structure Excavation (Foundation Excavation) cu.m. 2,583.00 2,583.00 Same in Quantity
1707(1) Aggregate Base Course (Foundation Fill) cu.m. 358.00 410.00 Increased in Quantity
Republic of the Philippines Department of Public Works and Highways PROJECT TITLE & LOCATION : Prepared: Checked: REVIEWED : RECOMMENDING APPROVAL : APPROVED : SHEET CONTENTS : SET NO. SHEET NO.
OFFICE OF THE DISTRICT ENGINEER
Southern Leyte District Engineering Office AS TAKE PLAN OF THE CONSTRUCTION MAINTENANCE
Maasin City
OF FLOOD MITIGATION STRUCTURES AND DRAINAGE
SYSTEMS/CONSTRUCTION OF DAS-AY FLOOD
5 5
Summary of Quantities
&
A.C. RIVERO DEVELOPMENT CORPORATION
CONTROL Along Jct. Himay-angan-Silago-abuyog-Bdry.
Road (S00210LT), Hinunangan, Southern Leyte)
ALFONSO C. RIVERO
Proprietor
ARLEEN O. VESTAL, D.M.
Project Engineer
LETECIA M. OLARTE
ENGINEER III
VINCENT T. SY, III
ENGINEER III
ALLAN D. EWAY
ASSISTANT DISTRICT ENGINEER
MA. MARGARITA C. JUNIA, DM
DISTRICT ENGINEER 12 18
Bacolod City CHIEF, CONSTRUCTION SECTION CHIEF,PLANNING & DESIGN SECTION