• Yamuna Depot station is a large train maintance depot and an import interchange
station as well located on the Blue line of Delhi Metro.
• Date of Commissioning of the Depot: 6th may 2005
• Total Number Train Holding in Depot: 36 trains
• Total Number of RS.2 Trains: 30 trains {4No’s(8car)+26No’s(6car)}
• Total Number of RS.1 Trains :06 trains {6No’s (8car)}
• Total car Holding:236 car
ROLLING STOCK
• The first wave of Rolling stock was manufactured by a consortium of companies
comprising ROTEM, Mitsubishi Corporation and Mitsubishi Electric Corporation. Initial sets
were built by ROTEM in South Korea, with later examples Completed in India by public
sector undertaking Bharat Earth Movers Limited(BEML).BEML is also responsible for the
manufacturing coaches under technology transfer agreement. The air-conditioned trains
consist of four 3.2m wide ,stainless steel, lightweight ,although six and eight coaches is
possible. The trains have automatic doors, secondary air suspension and brakes controlled
by microprocessor. Delhi Metro has fleet of 280 coaches, which DMRC Runs as 70 trains
everyday. Each train can accommodate about 1,500 people,240 seated. Maximum speed is
80km/h (50mph),with a 20-second dwell time at stations. Train depots are located at
Khyber Pass,Najafgarh, Shastri Park,Mundaka,Sarita Vihar and Yamuna Bank.
• In May 2011, BEML received a contract worth Rs.9.2bn($205m) from DMRC to supply 136
intermediate metro cars. The delivery is expected to be Completed by December 2013.In
March 2008 Bombardier Transportation announced an 87m($137m) contract for 84 MOVIA
metro cars,a follow- on to an order for 340 placed July 2007.The new Vehicles are being
deployed as part of phase II Expansion. In September 2011,Bombardier received a $120m
order for 76 additional MOVIA Metro Cars.
• A Phase I board gauge train, supplied by Hyundai Rotem-BEML(RS-1).
• A Phase II board gauge train, supplied by Bombardier(RS-2).
• The Metro Rolling Stock of two different gauges. Phase I lines use 1,676mm (5.499ft)
broad gauge rolling stock, while three Phase II Lines use 1,435mm (4,708
ft)standard gauge rolling stock.
• Broad gauge
• The broad Gauge rolling stock is manufactured by two major suppliers Hyundai
Rotem,Mitsubishi Corporation and MELCO.The coaches were initially built in South
Korea by ROTEM.
• Standerd gauge
The initial trains were made in Germany and Sweden, the remainder will be built at
Bombardier’s factory in Savli,near Vadodara. The coaches posses several improved
features like Closed Circuit Television(CCTV) Cameras,charging points in all coaches
for cell phones and laptops, improved air conditioning to provide a temperature of
25 degree Celsius even in packed conditions and heaters for Winter.
RS-2 TRAIN OVERVIEW:
• TRAIN FORMATION:
• One train set consists of 4/6/8 cars. Three types of cars (DT,T and M) are used to form a train
set. At each end is a “DT” car which is a trailer car with driver’s cab and pantograph. The
other type is an “M” car, which is a motor car without pantograph and “T” car with
pantograph.
-4 car
The 4-car trains consist of driving trailer car with pantograph (DT) and motor car
(M), in the following configuration DT-M + M-DT.
- 6 car
The 6 car train consists of driver trailer car with pantograph (DT), motor car (M) and
trailer car with pantograph (T), in the following configuration DT-M + T-M + M-DT.
- 8 car
The 6 car train consists of driver trailer car with pantograph (DT), motor car (M) and trailer car with
pantograph (T), in the following configuration DT-M + T-M + T-M + M-DT.
• SALIENT FEATURES:
• Broad gauge (1.676 metre )
• 25 KV Supply Voltage System
• Light weight stainless steel structure
• Three phase A.C. induction motor
• Fail safe braking system with regenerative braking.
Car Body:
RS-2 trains have three different car bodies, one for each type of car in the train set.
• DT car body
• M car body
• T car body
The function of car body shell is to carry and protect the passengers, staff and various
subsystems of the train. The car body shell distributes the accelerating and braking forces
generated by the bogie.
• Cab doors
• The function of the cab or driver’s door is to provide access to the cab for the driver.
Only DT car is equipped with two cab doors.
• Passenger door
• The function of the passenger door is to prevent passengers from entering or leaving the
train.
• Each car has 8 passenger doors
• Each door consists of two door leaves
• Sliding externally on the car body wall
• Electrically operated
• Detrainment door
• The function of the detrainment door is to provide evacuation of passengers and crew to
track in case of emergency.
• When detrainment door opens it becomes an emergency ramp from cab floor level down
to track level.
• The detrainment door is bolted into the cab structure.
• The door is located in the front of the cab.
• Free opening width 750 mm.
• Free opening height 1900 mm.