Jutal Reference List: Notes
Jutal Reference List: Notes
Jutal Reference List: Notes
E=Engineering; 1E means including Process Design / Detail Design; 2E Means Shop Design Only; P=Procurement; C=Construction/Fabrication;
Notes: L=Labor Contract (done on client's yard)
Qatar WHP‐3 platform project
J1550 Others 1 1EPC 1 set platform structure fabrication CNOOC CNOOC Qatar 2017.08~2018.08 2018
structure fabrication and installation
2 Sets SRU Module shop design, buck material
Jurassic Production Facility(JPF)
J1525 SRU Module 2 2EPC procurement and construction. Max. Size: Prosernat SPETCO/KOC Onshore / Kuwait 2017.05~2018.02 2018
Development Project SRU Module
18.6mx5.3mx3.9m.Total Weight: 1165T
Campana DHT Project Heat‐ Vessel & Heat‐ Onshore/Argentin
J1519 2 1EPC 2 Sets Heat‐Exchanger Supply Prosernat AXION ENERGY 2017.06~2018.01 2018
Exchanger Exchanger a
DF 13‐2 Gas Field Development 2 Sets TEG Dehydration & Regeneration Package
J1515 TEG 2 1EPC CNOOC CNOOC Offshore /China 2017.05~2018.04 2018
Project TEG Package (Process Guaranty) Supply, 120 tons
2 Sets Walnut Shell FilterSkids Package (Process
CPECC HALFAYA PHASE III Walnut Walnut Shell Filter Guaranty) Supply 2017/2/24~2018/
J1494 2 1EPC CPECC Iraq Branch CPECC Iraq Branch Iraq 2018
Shell Filter Package 330m³/hr‐200% 2/23
Oil content ≤10 mg/L , SS ≤10 mg/L, median of SS≤8 µm
HZ 32‐5 Modification & HZ 33‐
J1542 1Combine Development Project Hydrocyclone 1 1EPC 1 Set Hydrocyclone Package (Process Guaranty) Supply CNOOC CNOOC Offshore /China 2017.06~2017.10 2017
Hydrocyclone Package
HZ 32‐5 Modification & HZ 33‐
J1539 1Combine Development Project CFU CFU 1 1EPC 1 Set CFU Package (Process Guaranty) Supply CNOOC CNOOC Offshore /China 2017.6~2017.11 2017
Package
Vessel & Heat‐
J1532 SJEP Qitai he Coking Facility Project 160 1EPC 160 Sets Vessel & Heat‐Exchanger Supply SJEP SJEP Onshore /China 2017.04~2017.08 2017
Exchanger
1 Set Fuel Gas Filter Skids Package (Process Guaranty)
Side Stream Filter Supply (sand filter) 2017/2/14~2017/
J1498 TR Side Stream Filter Package 1 1EPC TR Saudi Aramco Saudi Aramco 2017
Package 289.2 USGPM 2 X 100% 12/26
removal >90% of SS greater than 50 microns
1 Set MOLECULAR SIEVE AND MERCURY REMOVAL
UNIT,
J1480 Naimat LPG Upgrade Project Skid Plant Package 16 2EPC 1 Set LPG RECOVERY UNIT and 1 Set H0T OIL SYSTEM CPE UEP Onshore /Pakistan 2016.11~ 2017
UNIT, Total 16 Packages in all. Max Weight & Size: 55T &
16m X 5m X 11m(high), Total Weight: 450T
4 Sets Wind Power Platform Jackets Construction. Max
J1473 Guishan Wind Power Station Project Jacket 4 C Weight & Size: 450T ea & Top 9m X 9m@Botom 15m X PCK PCK Offshore /China 2016.10~ 2017
15m @30m(high), Total Weight: 1800T
3 Sets Skids (U1 )and 14 Sets Filters (U2) Package
CARTRIDGE FILTRATION AND (Process Guaranty) Supply
J1455 Water Filters 17 1EPC CPEBJ CPEBJ Onshore /Iraq 2016.07~ 2017
WELLHEAD GUARD FILTER PACKAGE 190m³/hr‐100%
Particle&Solid removal >2um,99.50%;
Jutal Scope of Project Project
Project name Product Name QTY Project Description Client Enduser Year of Delivery
No. Supply Location Duration
OSCAR Organic Waste Treatment 36 sets Piprack Packages shop design and fabrication.
J1450 Pipe Rack 36 2EPC OSCAR OSCAR Onshore /China 2016.07~ 2017
Phase 1 Project Weight of 316L Piping:135T , weight of structure 160T.
J1418 Fadhili Gas Program Project TEG 4 1EPC 4 Sets TEG Dehydration & Regeneration. 140T each. TR Saudi Aramco Onshore /Saudi 2016.06~2017.12 2017
16 Sets FBR Package, 6 Sets Siemens Package fabrication
J1419 Gas / Water Racks Project Gas / Water Racks 22 2EPC Emerson Emerson Onshore /China 2016.04~ 2016
design, Procurement, Cleaning & Testing
SANTOS GLNG UPSTREAM PROJECT Vessels & Heat 16 Sets Pressure Vessels & heat exchangers of TEG Onshore
J1381 16 2EPC SUEZ Santos 2015.11~2016.04 2016
– TRAIN 2 Exchange Dehydration Detail Deisng, fabrication. /Australia
7 Sets Riser Porch Module Shop Design, Construction.
J1368 Modec MV29 FPSO Topside Mudule Riser Porch Module 7 2EPC Max. Module Size & Weight: 30mx16mx24(h)m & Modec Petrobras Offshore / Brazil 2015.07~2016.09 2016
1051T, Total Module Weigth:6800T
12 Sets Fuel Gas Conditioning Package Supply
Saudi Aramco Master Gas System 8.29MMSCFD‐50%‐120%
J1358 Fuel Gas Filter 12 1EPC Speco Saudi Aramco Onshore /Saudi 2015.7~2016.02 2016
Expansion (MGSE) Project, Phase‐1 Sizes 3 micron and above: 100%.
sizes 0.5 to 3 micron: 99.5%.
1 Set E‐house Module Detail Design, Bulk Material
Tartaruga Verde & Tartaruga
J1327 E‐house 1 2EPC Supply, Fabrication & load‐out, Module Size: 31m (W) x ABB Modec Offshore / Brazil 2015.04~2016.01 2016
Mestica FPSO
21m (L) x 15m (H) ,Module Weight: 895T(Estimated)
1 Set SRU,1 Set SWS,1 Set ARU Module shop design,
Onshore/Argentin
J1288 Campana Refinery Project SRU, SWS, ARU 3 2EPC buck material procurement and construction. Total Prosernat Prosernat 2015.03~2016.05 2016
a
Weight: 2000T
BZ13‐
J1348 1 oil field BOP project TEG Dehydrati TEG 2 1EPC 2 Sets TEG Gas Dehydration Packages Supply CNOOC CNOOC Offshore / China 2015.07~2015.12 2015
on System
2 sets Produced Water Coalescer Filters and 2 sets
HuangYan GAS Complex
J1325 Filter 4 1EPC Produced Water Coalescers Supply. Inlet ~1000mg/L, CNOOC CNOOC Offshore / China 2015.04~2015.08 2015
Development Project
Outlet <45mg/L. Flowrate 12 m3/h, Pressure 600kPa
EN23‐1 Oil field Development 5 Sets Chemical Injection Package, Max
J1318 Chemical Injection 5 1EPC CNOOC CNOOC Offshore / China 2015.03~2015.11 2015
Project Size:9500(L)x4500(W)x3200(H)
BZ35‐2 Oil Field Natural Gas
J1299 TEG 1 1EPC 1 Sets TEG Gas Dehydration Packages Supply CNOOC CNOOC Offshore / China 2015.01~2015.07 2015
Recovery Modification Project
18 Sets Heat Exchanger,29 Set Pressure Vessel, Total Onshore/Argentin
J1288 Campana Refinery Project Heat Exchanger 35 2EPC Prosernat Prosernat 2015.02~2015.12 2015
Weight: 300T a
LW 3‐1 Subsea Pipeline QJ 22" / 12" / 8" Subsea Pipeline QJ Fit‐up and Welding;
J1147 QJ Fabrication 692 2EPC Saipem HUSKY Offshore / china 2014.08~2015.11 2015
Fabrication Total Weight: 15000 T
Cantilever Petro Flame® Burner 2 Sets Flam Burner Boom detail design, Shop Design,
J1214 Flam Burner Boom 2 2EPC AG Group AG Group offshore 2014.06 ~ 2014
Booms Material Procurement and Fabrication
J1201 HZ19‐2 HYDROCYCLONE Hydrocyclone 1 1EPC 1 Set Hydrocyclone Packages (Process Guaranty) Supply CNOOC CNOOC Offshore / China 2014.05~2014.12 2014
2 Trains TEG Dehydration & Regeneration Package
J1188 Huangyan Gas Field TEG Project TEG 2 1EPC CNOOC CNOOC Offshore / China 2014.02 ~ 2014
(Process Guaranty) Supply
Tanzania Mnazi Bay & Songo Songo
2 Set E‐house detail design, procurement and Onshore / 2014.03 ~
J1182 Gas Processing Plant Project ‐ E‐ E‐house 1 2EPC Schneider CNPC 2014
constraction Tanzania 2014.10
house project
2014.06 ~
J1177 CDS FPSO ENIF Module Fabrication E‐house 1 2EPC E‐house detail design, procurement and constraction SBM Petrobras Offshore /Brazil 2014
2014.11
Jutal Scope of Project Project
Project name Product Name QTY Project Description Client Enduser Year of Delivery
No. Supply Location Duration
16 Sets Filters Supply, Including 4 Sets Lean Amine
Filter, 4 Sets Lean Amine Charcoal Filter, 4 Sets Lean
Saudi Aramco Wasit Inlet & Gas Amine Particulate Filters, 2 Sets Lean Sump Filters, 2 SK Engineering 2013.11.23~2014.
J1137 Gas Filters 16 1EPC Saudi Aramco Onshore /Saudi 2014
Processing Project Sets Inlet Filter Coalescer Co.,Ltd 06.24
10.2MMSCFD‐120%
Sizes 1 micron and above: 99.9%.
Tanzania Mnazi Bay & Songo Songo 12 Sets Gas Process Package and Pipe Rack Shop
Process Module, Pipe Onshore / 2013.07 ~
J1099 Gas Processing Plant Project ‐ 12 2EPC Design, All Material Supply, Fabrication, Total CPE CNPC 2014
Rack Tanzania 2014.04
Outside Package Fabrication weight:400T
Petrobras CDM&CDS FPSO Topside Work Category:2 Sets CO2 Module and 2 Sets VRU Offshore / Chenxi 2013.08 ~
J1098 CO2, VRU 4 2EPC SBM Petrobras 2014
Construction Module fabrication, Total weight:2500T Shipyard 2014.09
3 Sets Manifold + 5 Sets PTS Shop Design, Material
Chevron Wheatstone Manifold and offshore /
J1000 Manifold & PTS 8 2EPC Supply (Structual Material & Pipe Delow 2") and FMC Chevron 2011.12‐2014.09 2014
PTS Fabrication Australia
Fabrication