Used Water Submission Procedures
Used Water Submission Procedures
Used Water Submission Procedures
Submission Procedures
Content
Topics Page
1. Introduction 4
2. Before Submission 4
Worker's Dormitory
9) PUB's In-principle Approval for Proposed 8
Worker's Dormitory
3. Simplified Submission
Page 2 of 25
5. Annex 1: Request for Service Plans 15
Annex 2:
- Result of Hydrostatic Tests on Sanitary Drainlines, 18
Inspection Chambers, Sewer, Manholes;
- Result of Air Tests on Sanitary Plumbing System 19
Annex 3:
General Requirements for Temporary Sanitary 20
Facilities for Trade Fairs
Annex 4:
General Requirements for Temporary Sanitary 23
Facilities for Construction Site
Page 3 of 25
INTRODUCTION
In general, all proposed developments have to comply with the relevant regulations of
the building authorities, i.e. URA, BCA, FSSD, NEA and PUB.
The building owner or developer of the land is required to appoint a Qualified Person
(QP) (who is Registered Architect or Professional Engineer) to prepare plans and
submit applications to PUB for development control clearance for the proposed
development/building works and Clearance certificates for the proposed
sewerage/sanitary works.
QPs should submit electronic plans and documents via the one-stop on-line portal –
CORENET - .
BEFORE SUBMISSION
Before proceeding with the design, QP shall purchase the Sewerage Information Plan
(SIP) which shows the location and alignments of public sewers and pumping mains
in the vicinity of the development. QP should incorporate the public sewerage system
onto the DC plan and DP for sewerage/sanitary works. See section on Purchase of
SIP.
Where necessary, QP may pre-consult PUB on the availability of public sewers, major
sewerage requirements or apply for waivers with supporting documents.
Building plan submissions are classified into several stages. QPs are encouraged to
refer to the information below to get a better understanding on the flow of the
submission and approval process.
QP shall ensure that the proposed development will not disrupt or affect any
sewer/drainline that is serving the adjacent lots/premises.
The information given in the SIP is indicative. QP shall carry out site survey and
investigation to ascertain the information. Any person who intends to dig, bore,
trench, grade, excavate, tunnel or break any ground shall:
Page 4 of 25
a) carry out trial trenches to physically ascertain the exact location,
alignments and levels of the sewerage system on site before
commencement of any works
b) ensure that a written approval from PUB for carrying out such works
has been obtained
Please refer to Annex 1 for info on how to purchase the SIP from PUB.
PUB will check the DC plans for compliance with the sewerage requirements
and Code of Practice on Sewerage and Sanitary Works and issue a
Clearance for the DC plan.
Page 5 of 25
(3) Detailed Plan (DP) Submission on Sanitary Works
QP shall submit the following technical detailed plans to PUB for clearance.
• Proposed internal sanitary plumbing and drainage system
• Proposed M&E equipment for sewage ejector or sewerage installations
(-to be submitted directly to PUB for clearance)
Upon obtaining clearance of the Detailed Plan (Sanitary) from PUB, the QP is
required to apply for PUB(WRN)’s approval before allowing the workmen to
enter the public sewer/manhole or other confined spaces to carry out any
works including inspection.
During the progress of the sanitary works, the QP is required to carry out his
own checks/inspections/water test to ensure that the sanitary works are
constructed in accordance with the registered plans.
The QP shall give at least 3 weeks of advance notice to PUB (WRN) to carry
out the inspection/water tests to avoid delay in obtaining the Compliance
Certificate.
Page 6 of 25
the “PUB-DPCLR” form to apply to PUB for the Clearance Certificate.
Upon obtaining clearance of the Detailed Plan (Sewer) from PUB, the QP (PE)
responsible for the sewerage works is required to apply for PUB(WRN)’s
approval before allowing the workmen to enter the public sewer/manhole or
other confined spaces to carry out any works including inspection.
During the progress of the sewerage works, the QP is required to carry out his
own checks to ensure that sewerage works are constructed in accordance with
the registered plans.
The QP shall give at least 3 weeks of advance notice to PUB (WRN) to carry
out the inspection/water tests to avoid delay in obtaining the Compliance
Certificate.
Page 7 of 25
a. Form B & B1 – to obtain the PUB’s approval before allowing the
workman to enter the public sewer/manhole or other confined spaces at
any sewerage installations to carry out works or inspection. If sewer
connection work is required, in addition to obtaining approval of Form B,
the contractor shall submit the Form B1 to the Network Management
Branch (NMB, PUB) to arrange for PUB’s officer to witness the sewer
connection works.
QP should also include the results of their hydrostatic test when submitting their
completion of work form. (Annex 2)
Page 8 of 25
Worker's Dormitory
Page 9 of 25
To ensure that the existing sewers can support proposed dormitories, QPs shall
consult PUB by submitting the following details of the proposal and obtain the prior
clearance from PUB (WRN) before seeking URA’s planning permission.
The following documents and details can be submitted online via Form J
application at www.pub.gov.sg/compliance/usedwater/forms
• Site Location and Plan with details of sanitary drain lines (Sanitary
Layout Plans) and sewer connection;
• Site area and Gross Floor Area (GFA) of the existing factory and the
proposed GFA to be converted to workers dormitory;
• No. of workers currently residing at the site and a copy of URA’s Written
Permission (WP) and approved plans showing the approved capacity of the
existing workers dormitory (applicable for renewal and/or proposals to increase
the capacity of existing workers dormitory);
• No. of shifts, working hours per shift and no. of workers in each shift (if
applicable);
• The Applicant shall notify PUB if the premises are no longer used as a
factory converted dormitory.
• The Applicant shall note that the proposed number of workers that can be
approved to reside at the site is subject to the available carrying capacity
of the existing sewerage network.
Page 9 of 25
• The applicant shall notify PUB in writing upon the completion of the
proposed workers dormitory and when the dormitory is fully occupied.
• The Applicant shall consult PUB if he wishes to carry out any of the
following:
• QP shall attach the PUB’s clearance together with the application for DC
clearance to PUB stating whether there is any change to the details above.
Other References:
NEA - Applications for Workers' Dormitory in Industrial Premises
Page 11 of 25
SIMPLIFIED SUBMISSION
Aim
-To streamline QP’s submission process for simple projects.
Page 12 of 25
ADDITION AND MODIFICATION OF SANITARY FACILITIES
Sanitary works, except those that are minor and exempted under Section 11(5) of the
Act, will require the approval of PUB. This is to ensure that sanitary works are carried
out in accordance with the requirements of the Code of Practice on Sewerage and
Sanitary works.
• new provision and installation of grease traps, oil & grease interceptor
• diversion of any on-site sewage treatment facilities into public sewer; etc
Exemption:
Approval of PUB is not required for the following minor sanitary works:
b. the addition of sanitary appliance (washbasin, bathtub, sink, urinal, toilet bowl)
within the existing sanitary facilities in a building.
To ensure good workmanship, PUB encourages the public to engage the Singapore
Plumbing Society (SPS)’s Registered Sanitary Plumbers (RPs) or PUB-licensed
Water Service Plumbers (LPs). HDB dwellers can also contact their respective Town
Councils to seek the Town Council's assistance to engage its term contractor's
trained and qualified plumbers.
To prevent overcharging, quotations from more than one plumber should be obtained
to compare prices.
Page 13 of 25
Registered Sanitary Plumber: The Singapore Plumbing Society (SPS) maintains a list
of trained and qualified plumbers to serve the construction industry and the public.
The list of SPS Registered plumbers is published in the SPS website. If you need the
service of a SPS registered Plumber, you may look it up at the SPS website or contact
the SPS at Tel: 62949252 or e-mail: sinspa@singnet.com.sg
Water Service Plumber: Water service plumbers are licensed by PUB to carry out
water service plumbing works (- refers to the laying, installation, alteration, repair or
replacement of water pipes, tanks, taps and fittings in the drinking water supply
system, for the conveyance of drinking water).
The sanitary wares, pipes and fittings, manhole/inspection chamber frames and
covers used in the construction of a sanitary plumbing and drainage system shall be
of a design and construction complying with the Singapore Standards or other
acceptable Standards prescribed in the Code of Practice on Sewerage and Sanitary
Works. Separate approval from the Water Reclamation (Network) Department (PUB)
for their use is not required. However, the Water Reclamation (Network) Department
(PUB) may require valid certificates/test reports to be submitted for verification.
The sanitary ware, pipes and fittings, manhole/inspection chamber frames and covers
shall be clearly embossed or permanently marked with the brand name/trade mark,
the country of origin and the Standards which the product conforms to at a
conspicuous position so that they can be clearly identified.
The sanitary ware, pipes and fittings, manhole/inspection chamber frames and covers
for use in sanitary works/sewerage works may be listed in the "Product Listing Scheme
(PLS)" administered by the PSB Singapore. The PLS directory can be viewed at PSB
Singapore’s website at URL Address: http://www.tuv-sud- psb.sg/sg-en/resource-
centre/certificate-finder/product-listing-scheme.
For A & A works that involves new provision and installation of grease trap and new
sanitary plumbing and drainage system in an existing premises/building (which
originally has no sanitary facilities), the Owner/Occupier/contractor shall submit an on
line application Form F to the Water Reclamation (Network) Department for approval
of the proposed works. The layout/detailed plan showing the proposed sanitary works
shall be submitted together with the application.
Exemption:
Page 14 of 25
For minor sanitary works such as the repair, removal or replacement of WCs/floor
traps and defective/corroded sanitary piping or any addition to existing sanitary
facilities or sanitary appliances in an existing premises/building, submissions of plans
and notification for commencement and completion of the works are not required.
For further information, please contact our officers at 6731 3302, 6731 3730 or 6731
3340.
For provision of temporary toilet/sanitary facilities at trade fairs, after the organiser has
obtained the NEA's trade fair permit, the plumber / operator / contractor shall submit
an online application Form I attaching the detailed plans showing the proposed
connection of the temporary toilets/ sanitary facilities to public sewers/holding tanks to
the Water Reclamation (Network) Department for approval.
For info on General Requirements for Temporary Sanitary Facilities for Trade Fairs please
refer to Annex 3. You can also contact our officers at 6731 3254 or 6731 3306.
Refer to Annex 4 for info on General Requirements for Temporary Sanitary Facilities
for Construction Site.
For further information, please contact our officers at 6731 3582, 6731 3254 or 6731
3306.
Page 15 of 25
Annex 1
Request for Services Plans
2. QP shall provide the following information when requesting for service plans
3. QP need not apply for infrastructure plans for additions and alterations to
existing developments which do not involve an increase in the existing building
coverage area.
4. QP can apply for infrastructure plans online by clicking on the button at the
bottom, subjected to the terms and conditions (Annex 1.1). Click here for the
user guide. Please call PUB Building Plan Unit hotline 6731 3512 if you need
any clarification/assistance or email (pub_bpu@pub.gov.sg). Please call hotline
only during office hours between 9am to 5pm. Applications for SIP/DIP will be
processed within 7 working days and emailed to the email address provided.
5. Upon receipt of infrastructure plans, QP shall conduct site surveys to verify the
alignments and invert levels of the public sewers/pumping mains/sewer
connections and drainage reserves/common drains/water mains.
Page 16 of 25
6. For DC submission, QP shall use the Receipt No. BPU-XXXXXXX as
Reference No. and the date QP received SIP/DIP from PUB officer as the Date
of SIP/DIP.
Annex 1.1
Prices
All prices are in Singapore Dollars and subjected to 7% Goods & Services
Tax unless stated otherwise.
Purchase Policy
The shopper is advised to check to ensure that their request is correct
before confirming the order and making payment. Cancellation of orders will
not be entertained once the order is confirmed and payment has been made.
Terms of Payment
Payment can be via credit card, debit card.
You shall be responsible for all transactions effected through this Site regardless
of whether such transactions were made with or without your authority.
Refund Policy
PUB has a no-cancellation order policy. We also have the right to refuse any
requests for refunds without cause or explanation. We shall not be held liable for any
reason if it does not receive the Customer's refund request, whether on-line or via e-
mail.
Page 17 of 25
• any representations or warranties as to the accuracy, completeness,
reliability, timeliness, currency, quality or fitness for any particular purpose
of the Contents of this Site; and
PUB shall not be liable to you or any third party for any damage or loss
whatsoever, including but not limited to direct, indirect, punitive, special or
consequential damages, loss of income, revenue or profits, lost or damaged data,
or damage to your computer, software, modem, telephone or other property, arising
directly or indirectly from:
• any delay or interruption in the transmission of the Contents on this Site, the
provision of services on this Site, the execution of any requires or delivery of
any Contents whether caused by delay or interruption in transmission over
the internet or otherwise; or
• any decision made or action taken by you or any third party in reliance
upon the Contents,
For Enquiries
1. For all enquiries, please contact our hotline: 67313512 during office hours or
send your query to our email pub_bpu@pub.gov.sg
3. The requested service plans will be sent to the applicant via email
Page 18 of 25
Annex 2
Project Reference:
Project Title:
Test Method: *(a) water test method as specified in the Code of Practice on Sewerage and
Sanitary Works, or
*(b) water test method as specified in Clause 13.3 of BS EN 1610:1998.
(* to delete if not applicable)
Inspection
chamber/manhole
Page 19 of 25
Result of Air Tests on Sanitary Plumbing System
Project Reference:
Project Title:
Test Method: Air test method as specified in Clause NG 3.1 of BS EN 12056‐2‐2000 Test Results: as tabulated below.
Block No Storey Level: Unit No: Date of 1st 1st Test Result (If found leak
(eg 1st Floor, test of (Leak/No at 1st Test)
2nd Floor) (eg. #02-01, sanitary Leak) Date of final
#03-01, etc) discharge (To specify retest which
pipes/stacks, the points of shows no leak
ventilating leak detected) in the sanitary
pipes/stacks, discharge
WCs, floor pipes/stacks,
traps, etc, at ventilating
the unit pipes/stacks,
WCs, floor
traps, etc, at
the unit
Example 1
102
Page 20 of 25
Annex 3
1. All used water discharged from the Trade Fair operation must be collected and
disposed of via the temporary sanitary facilities to an approved sewerage system. No
used water shall be discharged into drains, soil and surrounding environment.
3. The used water from the Trade Fair operations shall be either collected in holding
tank(s) and be disposed of by tankering by a NEA’s Licensed Waste Collector (LWC)
or be discharged into the existing public sewers if available via a pumped system or
other means subject to the site condition and approval of WRN(PUB).
4. Where public sewer is available at or near the trade fair site, the temporary
sanitary facilities shall be connected to the public sewer. The sewer connection
works shall be carried out in compliance with the detailed plans/drawings approved
by PUB, the Code of Practice on Sewerage and Sanitary Works, Sewerage and
Drainage Act and the Sewerage and Drainage (Sanitary Works) Regulations.
5. All used water discharge points at the inspection chambers or manholes shall be
properly protected and adequately covered up to ensure that safety is not
compromised. Where connections are made into inspection chambers/manholes,
metal cover plates of sufficient strength to withstand human weight and equipped with
holes for used water discharge pipe entry shall be provided to temporarily replace the
existing inspection chamber / manhole cover. In addition, connections into the
inspection chambers/manholes should be adequately barricaded. To address foul
smell concerns, additional measures must be taken to seal up all gaps at the
inspection chamber / manhole to ensure that no foul smell leaks out from the sewerage
system.
7. If holding tank is proposed for collection and disposal of used water, the holding
tank shall be designed and constructed in accordance with the below general
requirements for holding tank.
(a) The holding tank shall be made of reinforced concrete (RC), steel or
GRP and provided either under or above ground.
(b) The design calculation on the capacity of all holding tank(s) shall be based
on the parameters given in the Code of Practice on Sewerage and Sanitary
Works and the flow rates of the water fittings given in the Code of Practice
for Water Services. In addition, if disposal of used water is by tankering by
LWC, the total capacity of holding tank(s) incorporated in the design shall
be at least 10m3.
Page 21 of 25
[For information, above ground portable holding tanks of various capacities
can be rented from contractors or some LWCs]
(c) For any pumped system installed, the pumping mechanism shall be
automated to start up the pump based on a preset water level in the holding
tank(s) to ensure there is no used water overflow. The pumped system shall
consist of at least two pumps – one duty pump and one standby pump. Each of
the duty and standby pumps shall be sized to handle the full capacity discharge
from the holding tank. The standby pump shall be configured to start
automatically in the event of the failure of the duty pump. The pump should be
housed in a pump sump of 2 ft x 2.5 ft x 3 ft deep as a guide or sufficient to
house both the duty and standby pumps.
(d) All holding tank(s) installed including pump sumps should be equipped with
SMS alarm based level sensor system having both a high level and overflow level
alarms. The pump sumps shall also be considered as holding tanks.
i) High level alarm. Used water in the holding tank(s) shall be removed
by a LWC or discharged into/leading into the public sewerage system
prior to level reaching high level alarm set-point. When, “High level” is
reached, the alarm system shall send a “High level” alarm via SMS to
alert at least 2 senior management staff, appointed by the
owner/operator, who must take immediate actions that are necessary to
prevent used water from overflowing.
The high level set-point shall be set at a level that allows sufficient response
time for owner/operator to take remedial actions to prevent used water
overflow. The format of the SMS shall indicate the following:
Page 22 of 25
iii) As part of the submission for PUB(WRN) approval, the names and
mobile phone numbers of the two senior management staff responsible
for receiving the alarm SMS shall be provided.
8. All parts of the temporary sanitary facilities design for Trade Fairs such as used
water pipes, fittings, supports, tanks, pumps, level sensor system M&E equipment
shall not be installed inside the drains.
9. PUB regularly carries out audit checks on temporary sanitary facilities at Trade
Fairs. Owners/operators are required to produce at the site immediately on demand
the following documents during audits: -
• Preventive and Breakdown maintenance records of all M&E equipment.
• Licensed Waste Collector disposal receipts (where applicable)
• PUB(WRN) approval letter for temporary sanitary facilities.
10. Following PUB(WRN)’s approval, if there would be any proposed change in the site
condition / access to the holding tank, types of activities or increase in the number of users
which may result in an increase of the used water discharging to the temporary sanitary
facilities, the owner/operator shall consult PUB(WRN) for approval before making such
changes. In a such case, the owner/operator shall review and upgrade/amend the
temporary sanitary facilities including the holding tank to ensure the pipe size and holding
capacity are adequate to meet the used water discharge volume/flow rate and incorporate
any additional requirements as imposed by PUB(WRN). Amended design for the
temporary sanitary facilities shall be resubmitted to PUB(WRN) for approval. Approval
from PUB(WRN) on the design of the temporary sanitary facilities must be obtained prior
to commencement of Trade Fair Operation.
Page 23 of 25
Annex 4
1. All used water discharged from temporary toilets, sanitary appliances and
washing facilities at the construction site must be collected and disposed of via the
temporary sanitary facilities. No used water shall be discharged into drains, soil and
surrounding environment.
2. Approval from PUB (WRN) on the design of the temporary sanitary facilities must
be obtained prior to its construction and operation at the construction site. The design
shall be in accordance with the General Requirements for temporary sanitary
facilities for Construction Site. The design submission to PUB (WRN) shall include
the detailed design and layout plans of the temporary sanitary facilities and NEA's
Clearance Certificate on Environmental Health.
3. The used water from the temporary toilets, sanitary appliances and washing
facilities shall be either collected in holding tank(s) and be disposed of by tankering by
a NEA’s Licensed Waste Collector (LWC) or be discharged into the existing public
sewers if available via a pumped system or other means subject to the site condition
and approval of WRN (PUB). In addition, the following requirements shall be complied
with:
(a) If holding tank is proposed for collection and disposal of used water, the
holding tank shall be made of reinforced concrete (RC), steel or GRP. All
holding tanks (includes pump sump) shall be below ground level.
(b) The design calculation on the capacity of all holding tank(s) shall be based
on the parameters given in the Code of Practice on Sewerage and Sanitary
Works and the number of staff & workers residing at the construction site. In
addition, if disposal of used water is by tankering by LWC, the total capacity of
holding tank(s) incorporated in the design shall be at least 10m3.
(c) For any pumped system installed, the pumping mechanism shall be
automated to start up the pump based on a preset water level in the holding
tank(s) to ensure there is no used water overflow. The pumped system shall
consist of at least two pumps – one duty pump and one standby pump. Each of
the duty and standby pumps shall be sized to handle the full capacity discharge
from the holding tank. The standby pump shall be configured to start
automatically in the event of the failure of the duty pump. The pump should be
housed in a pump sump of 2 ft x 2.5 ft x 3 ft deep as a guide or sufficient to
house both the duty and standby pumps.
(d) All holding tank(s) installed including pump sumps should be equipped with
SMS alarm based level sensor system having both a high level and overflow level
alarms. The pump sumps shall also be considered as holding tanks.
i) High level alarm. Used water in the holding tank(s) shall be removed by a
LWC or discharged into/leading into the public sewerage system prior to level
reaching high level alarm set-point.
Page 24 of 25
When, “High level” is reached, the alarm system shall send a “High level”
alarm via SMS to alert at least 2 Senior Management staff, appointed by
the Builder/Contractor, who must take immediate actions that are necessary
to prevent used water from overflowing. The high level setpoint shall be set
at a level that allows sufficient response time for Builder/Contractor to take
remedial actions to prevent used water overflow. The format of the SMS shall
indicate the following: -
ii) Overflow alarm. “Overflow level” is a level at which overflow is most likely
to occur/have occurred. This float switch shall be located above the “High
level” float switch and slightly below the overflow level of the holding tank.
When activated, the alarm system shall send “Overflow level” alarms via
SMS to alert at least 2 Senior Management staff of the Builder/ Contractor
who owns and maintains the system and also to PUB (Tel: - 96663700).
The format of the SMS shall be the same as that for the “High level” as
mentioned above.
iii) As part of the submission for PUB (WRN) approval, the names and mobile
phone numbers of the two Senior Management staff responsible for
receiving the alarm SMS shall be provided.
5. All parts of the temporary sanitary facilities design for the construction site such as
used water pipes, fittings, supports, tanks, pumps, level sensor system M&E
equipment shall not be installed inside the drains.
Page 25 of 25
7. Where public sewer is available at or near the construction site, the temporary
sanitary facilities shall be connected to the public sewer. The sewer connection works
shall be carried out in compliance with the detailed plans/drawings approved by PUB,
the Code of Practice on Sewerage and Sanitary Works, Sewerage and Drainage Act
and the Sewerage and Drainage (Sanitary Works) Regulations.
9. Following PUB (WRN)’s approval, if there would be any proposed change in the site
condition / access to the holding tank, types of activities or increase in the number of
users which may result in an increase of the used water discharging to the temporary
sanitary facilities, the Builder/Contractor shall consult PUB (WRN) for approval before
making any such changes. In such a case, the Builder/Contractor shall review and
upgrade/amend the temporary sanitary facilities including the holding tank to ensure
the pipe size and holding capacity are adequate to meet the used water discharge
volume/flow rate and incorporate any additional requirements as imposed by
PUB(WRN). Amended design for the temporary sanitary facilities shall be resubmitted
to PUB (WRN) for approval. Approval from PUB (WRN) on the design of the temporary
sanitary facilities must be obtained prior to putting the temporary sanitary facilities into
use or operation.
10. The Builder/Contractor shall take note that failure to obtain an approval from PUB
(WRN) on the design of the temporary sanitary facilities prior to its construction, use or
operation or the construction/installation of temporary sanitary facilities not in
accordance with the approved design is a violation of Section 11 of the Sewerage and
Drainage Act (SDA). In addition, failure to comply with any condition stated in PUB
(WRN)’s approval letter is also an offence under Section 63(b) of the SDA. Offenders
are liable for enforcement actions.
Mailing address:
PUB [Water Reclamation (Network)
Department] 40 Scotts Road #14-01
Environment Building
Singapore 228231
Page 26 of 25