PANEL ID: PROJECT SUMMART LOCATION: DUBAI, UNITED ARAB EMIRATES T +971 04 388 1616
RATING - AMPS PVC/ CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
XLPE/
CIRCUIT/ FAULT ECC
FEEDER SP/ DUTY SIZE REMARKS
TP MAX LV/HV
DB NO. ACB MCCB MCB KA SWA/ 2/4 2/3/4C 1C mm² R - PH Y - PH B - PH TOTAL KW DEMAND 1- PH 3- PH 3- PH CT
PVC 1C mm² mm² KW KW KW LOAD (KW) (1) (2) (3) (4)
OUTGOING
HT-MDB-01 4P 2500A SET @ 0.85 50 XLPE DEWA CABLES 392.97 381.54 400.81 1175.33 1
HT-MDB-02 4P 2500A SET @ 0.85 50 XLPE DEWA CABLES 448.71 425.27 503.69 1377.68 1
HT-MDB-03 4P 2500A SET @ 0.85 50 XLPE DEWA CABLES 303.33 303.33 303.33 910.00 1
HT-MDB-04 4P 2500A SET @ 0.85 50 XLPE DEWA CABLES 316.67 316.67 316.67 890.00 1
HT-MDB-05 4P 2500A SET @ 0.85 50 XLPE DEWA CABLES 348.76 348.76 348.76 1031.27 1
HT-MDB-06 4P 2500A SET @ 0.85 50 XLPE DEWA CABLES 400.93 400.93 400.93 1202.80 1
HT-MDB-07 4P 2500A SET @ 0.85 50 XLPE DEWA CABLES 385.37 385.37 385.37 1171.10 1
HT-MDB-08 4P 2500A SET @ 0.85 50 XLPE DEWA CABLES 316.67 316.67 316.67 950.00
HT-MDB-09 4P 2500A SET @ 0.85 50 XLPE DEWA CABLES 193.33 193.33 193.33 580.00
HT-MDB-10 4P 2500A SET @ 0.85 50 XLPE DEWA CABLES 319.03 319.03 319.03 942.10
TOTAL CONNECTED LOAD PER PHASE 3425.78 3390.91 3488.60 10230.28 0.00
MAX. DEMAND (3 PH) 00 KW AT 0.00 DIVERSITY TOTAL CONNECTED LOAD (3PH) 10230.28 KW
REV: A Type of Meter (Rating of Incomer):
DATE: 14/12/2014 (1) Upto 60 A (2) Upto 100 A (3) 125 - 160 A
(1 phase) (3 phase) (4) LV CT . . . . .. / . . . . . A / HV CT. . . . / . . . . A
DETAILS OF CONNECTED LOAD/MAX DEMAND
MAIN DISTRIBUTION BOARD
PROJECT: HOLIDAY INN &STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants PO Box 26739, Dubai - UAE
PANEL ID: HI-B01-MDB-01 LOCATION: DUBAI, UNITED ARAB EMIRATES T +971 04 388 1616
PVC/
RATING - AMPS CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
XLPE/
CIRCUIT/ SP/ FAULT ECC
FEEDER DUTY SIZE LV/HV REMARKS
TP SWA/ 2/4 2/3/4C R - PH Y - PH B - PH 1- PH 3- PH 3- PH
DB NO. ACB MCCB MCB KA 1C mm² TOTAL KW CT
PVC 1C mm² mm² KW KW KW (1) (2) (3)
(4)
INCOMER 4P 2500A SET @ 0.85 50 XLPE DEWA CABLES 392.97 381.54 400.81 1175.33
OUTGOING
HI-GF-SMDB-BAR/NIGHT CLUB TP 400A 35 XLPE 4CX185 1Cx95 62.73 62.73 62.73 188.20
OUTGOING
HT-LGF-DB-CM-01 TP 63A 35 XLPE
HT-LGF-DB-CM-02-Ball room TP 63A 35 XLPE
HT-LGF-DB-CM-03 - Ball room TP 40A 35 XLPE
HT-L02-DB-PT TP 40A 35 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4Cx120 1Cx70 21.56 20.16 21.68 63.40
REMARKS
DETAILS OF CONNECTED LOAD/MAX DEMAND
SUB MAIN DISTRIBUTION BOARD
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: NAKHEEL
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants PO Box 26739, Dubai - UAE
PANEL ID: HI-LGF-SMDB-Kitchen LOCATION: DUBAI, UNITED ARAB EMIRATES T +971 04 388 1616
PVC/
RATING - AMPS CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
XLPE/
CIRCUIT/ SP/ FAULT ECC
FEEDER DUTY SIZE LV/HV REMARKS
TP SWA/ 2/4 2/3/4C R - PH Y - PH B - PH 1- PH 3- PH 3- PH
DB NO. ACB MCCB MCB KA 1C mm² TOTAL KW CT
PVC 1C mm² mm² KW KW KW (1) (2) (3)
(4)
INCOMER TP 300A 25 XLPE 4CX185 1Cx95 49.81 50.18 47.83 147.83
OUTGOING
Hood type dishwasher TP 40A 25 XLPE 4CX10 1Cx10 4.00 4.00 4.00 12.00
Isolator(Located on Eq B.34.11) TP 40A 25 XLPE 4CX10 1Cx10 5.43 5.43 5.43 16.30
Isolator for Eq B.34.34 TP 40A 25 XLPE 4CX10 1Cx10 4.00 4.00 4.00 12.00
Refer Not E in
Kitchen Equipment Isolator TP 40A 25 XLPE 4CX10 1Cx10 2.73 2.73 2.73 8.20 the SLD
Refer Not F in
Kitchen Equipment Isolator TP 20A 25 XLPE 4CX4 1Cx4 0.73 0.73 0.73 2.20 the SLD
Refer Not G in
Kitchen Equipment Isolator TP 32A 25 XLPE 4CX6 1Cx6 1.33 1.33 1.33 4.00 the SLD
Refer Not D in
Kitchen Equipment Isolator TP 63A 25 XLPE 4CX16 1Cx16 8.00 8.00 8.00 24.00 the SLD
Isolator for B.36.17 TP 40A 25 XLPE 4CX10 1Cx10 4.00 4.00 4.00 12.00
CCT ECC
MCB WIRE
RATING OF RATING OF WIRE
SL. NO. CIR NO. RTG. IN SIZE ROOM/AREA
INCOMER ELCB SIZE
AMPS mm2 mm2
1 R1 20 4 4 Bread warmer
2 Y1 20 4 4 Bottle coolers
40A 4P B1 20 4 4 Microwave
30mA ELCB 3
1 4 R2 20 4 4 Bread warmer
5 Y2 20 4 4 Blender
6 B2 Space
7 R3 20 4 4 Multi -tier chilled display
8 Y3 20 4 4 Vending machine
40A 4P 9 B3 20 4 4 Microwave
30mA ELCB
2 10 R4 Space
63A 11 Y4 20 4 4 Vending machine
4P 12 B4 20 4 4 Microwave
ISOLATOR 13 R5 Space
14 Y5 20 4 4 Ice machine
40A 4P 15 B5 20 4 4 Conveyor toaster
30mA ELCB R6 20 4 4
3 16 Insect control unit
17 Y6 20 4 4 UV knife sanitizer
18 B6 20 4 4 PC
19 R7 Space
20 Y7 20 4 4 Pork Kitchen / Dish wash
40A 4P 21 B7 Space
100mA
ELCB 4 22 R8 Space
23 Y8 20 4 4 Pork Kitchen / Dish wash
24 B8 Space
LTG.=LIGHTING,EX. FAN = EXHAUST FAN, S/O=SOCKET OUTLET,SH. S/O = SHAVER SOCKET OUTLET, W/H = WATER HEATER, H/D = HAND DRYER, D/W=DI
FCU=FAN COIL UNIT, CCU = COOKER CONTROL UNIT, W = WINDOW TYPE A/C & S = SPLIT TYPE A/C
25 R9 20 4 4
26 Y9 20 4 4
40A 4P 27 B9 20 4 4
30mA ELCB
5 28 R10 20 4 4
29 Y10 20 4 4
30 B10 20 4 4
31 R11 20 4 4
32 Y11 20 4 4
40A 4P 33 B11 20 4 4
30mA ELCB
6 34 R12 20 4 4
63A 35 Y12 20 4 4
4P 36 B12 20 4 4
ISOLATOR 37 R13 20 4 4
38 Y13 20 4 4
40A 4P
30mA ELCB
7
40A 4P 39 B13 20 4 4
30mA ELCB
7 40 R14 20 4 4
41 Y14 20 4 4
42 B14 20 4 4
43 R15 20 4 4
44 Y15 20 4 4
40A 4P 45 B15 20 4 4
30mA ELCB
8 46 R16 20 4 4
47 Y16 20 4 4
48 B16 20 4 4
LTG.=LIGHTING,EX. FAN = EXHAUST FAN, S/O=SOCKET OUTLET,SH. S/O = SHAVER SOCKET OUTLET, W/H = WATER HEATER, H/D = HAND DRYER, D/W=DI
FCU=FAN COIL UNIT, CCU = COOKER CONTROL UNIT, W = WINDOW TYPE A/C & S = SPLIT TYPE A/C
DISTRIBUTION BOARD LOAD SCHEDULE
LOCATION: DUBAI, UNITED ARAB EMIRATES
INCOMING CABLE : 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 CU/PVC-ECC
CONNECTED LOADS/POINTS
1
2
1
1
1
1
1
1
1
1
2
1
3
3
1
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
LOAD PER PHASE (KW) = 7.30 10.10 8.60
CCT ECC
MCB WIRE
RATING OF RATING OF WIRE
SL. NO. CIR NO. RTG. IN SIZE ROOM/AREA
INCOMER ELCB SIZE
AMPS mm2 mm2
LTG.=LIGHTING,EX. FAN = EXHAUST FAN, S/O=SOCKET OUTLET,SH. S/O = SHAVER SOCKET OUTLET, W/H = WATER HEATER, H/D = HAND DRYER, D/W=DI
FCU=FAN COIL UNIT, CCU = COOKER CONTROL UNIT, W = WINDOW TYPE A/C & S = SPLIT TYPE A/C
25 R9 20 4 4 Staff Dining area
26 Y9 20 4 4 Pump Room
40A 4P 27 B9 20 4 4 Corridor
100mA
ELCB 5 28 R10 20 4 4 Staff Dining area
29 Y10 20 4 4 Kitchen Corridor
30 B10 20 4 4 Corridor
31 R11 20 4 4 Staff Dining Area
32 Y11 20 4 4 Veg / Fruit Prep.
40A 4P 33 B11 20 4 4 Poultry Prep.
100mA
ELCB 6 34 R12 20 4 4 Staff Dining Area
80A 35 Y12 20 4 4 Dry Storage
4P 36 B12 20 4 4 Corridor
ISOLATOR 37 R13 20 4 4 Meat Prep.
38 Y13 20 4 4 Chefs Office
40A 4P
100mA
ELCB 7
40A 4P 39 B13 20 4 4 Hot Kitchen
100mA
ELCB 7 40 R14 20 4 4 Hot Kitchen
41 Y14 20 4 4 Utensil Store
42 B14 20 4 4 Fish Prep.
43 R15 20 4 4 Hot Kitchen
44 Y15 20 4 4 Utensil Wash
40A 4P 45 B15 20 4 4 Beverage Storage
100mA
46 R16 20 4 4 Corridor
ELCB 8
47 Y16 20 4 4 Back Corridor
48 B16 20 4 4 Cold Kitchen
LTG.=LIGHTING,EX. FAN = EXHAUST FAN, S/O=SOCKET OUTLET,SH. S/O = SHAVER SOCKET OUTLET, W/H = WATER HEATER, H/D = HAND DRYER, D/W=DI
FCU=FAN COIL UNIT, CCU = COOKER CONTROL UNIT, W = WINDOW TYPE A/C & S = SPLIT TYPE A/C
DISTRIBUTION BOARD LOAD SCHEDULE
LOCATION: DUBAI, UNITED ARAB EMIRATES
INCOMING CABLE : 4C 25mm2 XLPE/SWA/PVC + 1C 16mm2 CU/PVC-ECC
CONNECTED LOADS/POINTS
15
12
9
15
6
7
17
9
16
12
11
12
18
21
14
6
2
4
2
1
1
1
2
2
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
LOAD PER PHASE (KW)
100 1.50
100 1.20
100 0.90
100 1.50
100 0.60
100 0.70
100 1.70
100 0.90
100 1.60
100 1.20
100 1.10
100 1.20
100 1.80
100 2.10
100 1.40
55 0.33
55 0.00
55 0.00
200 0.40
200 0.80
200 0.40
0.00
0.00
0.00
350 0.35
350 0.35
350 0.35
350 0.70
350 0.70
350 0.35
350 0.70
350 0.35
350 0.35
350 0.35
350 0.35
350 0.35
350 0.35
350 0.35
350 0.35
350 0.35
350 0.35
350 0.35
350 0.35
350 0.35
350 0.35
350 0.70
350 0.35
350 0.35
LOAD PER PHASE (KW) = 12.28 9.85 9.00
PANEL ID: HI-GF-SMDB-BAR/ NIGHT CLUB LOCATION: DUBAI, UNITED ARAB EMIRATES T +971 04 388 1616
RATING - AMPS PVC/ CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
XLPE/
CIRCUIT/ SP/ FAULT ECC
FEEDER DUTY SIZE LV/HV REMARKS
DB NO. TP KA SWA/ 2/4 2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
ACB MCCB MCB TOTAL KW CT
PVC 1C mm² mm² KW KW KW (1) (2) (3) (4)
INCOMER TP 300A N/A 35 XLPE 4CX185 1Cx95 62.73 62.73 62.73 78.20
OUTGOING
HT-L00-DB-PP-ADD TP 160A 35 XLPE 4CX70 1Cx35 10.00 10.00 10.00 10.00
HT-L00-DB-LL-ADD TP 40A 35 XLPE 4CX10 1Cx10 15.00 15.00 15.00 15.00
HT-L00-ISO-S1 TP 40A 35 XLPE 4CX16 1Cx16 15.00 15.00 15.00 15.00 30mA ELCB
HT-L00-ISO-S2 TP 40A 35 XLPE 4CX16 1Cx16 15.00 15.00 15.00 15.00 30mA ELCB
HT-L00-ISO-SLT-1A TP 32A 35 XLPE 4Cx6 1Cx6 4.30 4.30 4.30 12.90 300mA ELCB
HT-L00-ISO-SLT-1B TP 32A 35 XLPE 4Cx6 1Cx6 3.43 3.43 3.43 10.3 300mA ELCB
OUTGOING
HT-LMZ-DB-CM-01 TP 63A 35 XLPE
HT-LMZ-DB-CM-02 TP 63A 35 XLPE
HT-LMZ-DB-CM-03 TP 40A 35 XLPE
HT-L02-DB-PT TP 40A 35 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX185 1Cx95 21.56 20.16 21.68 63.40
REMARKS
DISTRIBU
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES
DB REF : HI-LMZn-DB-CM
FED FROM: HI-LMZ-SMDB-CM
CCT ECC
MCB WIRE
RATING OF RATING OF WIRE
SL. NO. CIR NO. RTG. IN SIZE ROOM/AREA
INCOMER ELCB SIZE
AMPS mm2 mm2
LTG.=LIGHTING,EX. FAN = EXHAUST FAN, S/O=SOCKET OUTLET,SH. S/O = SHAVER SOCKET OUTLET, W/H = WATER HEATER, H/D = HAND DRYER, D/W=DISH W
FCU=FAN COIL UNIT, CCU = COOKER CONTROL UNIT, W = WINDOW TYPE A/C & S = SPLIT TYPE A/C
25 R9 20 4 4 MEP Plant
26 Y9 20 4 4 MEP Plant
40A 4P 27 B9 20 4 4 Elec Room / Tel Room
100mA
ELCB 5 28 R10 20 4 4 MEP Plant
29 Y10 20 4 4 Lobby/Corridor
30 B10 20 4 4 Corridor
31 R11 20 4 4 MEP Plant
32 Y11 20 4 4 Service Lift Lobby
40A 4P 33 B11 20 4 4 Corridor
100mA
ELCB 6 34 R12 20 4 4 MEP Plant
40A 4P
100mA
ELCB 6
80A 35 Y12 20 4 4 MEP Plant
4P 36 B12 20 4 4 MEP Plant
ISOLATOR 37 R13 20 4 4 MEP Plant
38 Y13 20 4 4 MEP Plant
40A 4P 39 B13 20 4 4 MEP Plant
100mA
ELCB 7 40 R14 20 4 4 MEP Plant
41 Y14 20 4 4 MEP Plant
42 B14 20 4 4 MEP Plant
43 R15 20 4 4 MEP Plant
44 Y15 20 4 4 MEP Plant
40A 4P 45 B15 20 4 4 MEP Plant
100mA
ELCB 8 46 R16 20 4 4 Corridor
47 Y16 20 4 4 MEP Plant
48 B16 20 4 4 MEP Plant
LTG.=LIGHTING,EX. FAN = EXHAUST FAN, S/O=SOCKET OUTLET,SH. S/O = SHAVER SOCKET OUTLET, W/H = WATER HEATER, H/D = HAND DRYER, D/W=DISH W
FCU=FAN COIL UNIT, CCU = COOKER CONTROL UNIT, W = WINDOW TYPE A/C & S = SPLIT TYPE A/C
DISTRIBUTION BOARD LOAD SCHEDULE
LOCATION: DUBAI, UNITED ARAB EMIRATES
INCOMING CABLE : 4C 25mm2 XLPE/SWA/PVC + 1C 16mm2 CU/PVC-ECC
CONNECTED LOADS/POINTS
15
15
13
15
14
10
30
30
30
30
24
24
24
16
10
24
2
3
3
2
2
1
1
2
2
2
2
1
2
1
1
1
1
1
1
1
2
1
1
1
LOAD PER PHASE (KW) =
70 1.05
70 1.05
70 0.91
70 1.05
70 0.98
70 0.70
70 0.00
70 0.00
70 0.56
70 0.00
70 0.00
60 0.00
70 2.10
70 2.10
70 2.10
70 2.10
70 0.00
70 0.00
30 0.72
30 0.72
30 0.72
30 0.48
30 0.30
30 0.72
200/400 0.40
200 0.60
200 0.60
200 0.40
200 0.40
200 0.20
350 0.35
350 0.70
350 0.70
350 0.70
350 0.70
350 0.35
350 0.70
350 0.35
350 0.35
350 0.35
350 0.35
350 0.35
350 0.35
350 0.35
350 0.70
350 0.35
350 0.35
350 0.35
LOAD PER PHASE (KW) = 11.10 8.95 9.31
PANEL ID: HI-L01-SMDB-GR-01 LOCATION: DUBAI, UNITED ARAB EMIRATES T +971 04 388 1616
PVC/
RATING - AMPS CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
XLPE/
CIRCUIT/ SP/ FAULT ECC
FEEDER DUTY SIZE LV/HV REMARKS
TP SWA/ 2/4 2/3/4C R - PH Y - PH B - PH 1- PH 3- PH 3- PH
DB NO. ACB MCCB MCB KA 1C mm² TOTAL KW CT
PVC 1C mm² mm² KW KW KW (1) (2) (3)
(4)
INCOMER TP 250A N/A 35 XLPE 4CX150 1CX70 28.67 28.67 46.87 104.20
OUTGOING
HT-L01-DB-GR-01 SP 40A 25 XLPE 2CX10 1Cx10 4.50 0.00 0.00 4.50
HT-L01-DB-GR-02 SP 40A 25 XLPE 2CX10 1Cx10 0.00 4.50 0.00 4.50
HT-L01-DB-GR-03 SP 40A 25 XLPE 2CX10 1Cx10 0.00 0.00 4.50 4.50
HT-L01-DB-GR-04 SP 40A 25 XLPE 2CX10 1Cx10 4.50 0.00 0.00 4.50
HT-L01-DB-GR-05 SP 40A 25 XLPE 2CX10 1Cx10 0.00 4.50 0.00 4.50
HT-L01-DB-GR-06 SP 40A 25 XLPE 2CX10 1Cx10 0.00 0.00 4.50 4.50
HT-L01-DB-GR-07 SP 40A 25 XLPE 2CX10 1Cx10 4.50 0.00 0.00 4.50
HT-L01-DB-GR-08 SP 40A 25 XLPE 2CX10 1Cx10 0.00 4.50 0.00 4.50
HT-L01-DB-GR-09 SP 40A 25 XLPE 2CX10 1Cx10 0.00 0.00 4.50 4.50
HT-L01-DB-GR-10 SP 40A 25 XLPE 2CX10 1Cx10 4.50 0.00 0.00 4.50
HT-L01-DB-GR-11 SP 40A 25 XLPE 2CX10 1Cx10 0.00 4.50 0.00 4.50
HT-L01-DB-GR-12 SP 40A 25 XLPE 2CX10 1Cx10 0.00 0.00 4.50 4.50
HT-L01-DB-GR-13 SP 40A 25 XLPE 2CX10 1Cx10 4.50 0.00 0.00 4.50
HT-L01-DB-GR-14 SP 40A 25 XLPE 2CX10 1Cx10 0.00 4.50 0.00 4.50
HT-L01-DB-GR-15 SP 40A 25 XLPE 2CX10 1Cx10 0.00 0.00 4.50 4.50
HT-L01-DB-GR-16 SP 40A 25 XLPE 2CX10 1Cx10 4.50 0.00 0.00 4.50
HT-L01-DB-GR-17 SP 40A 25 XLPE 2CX10 1Cx10 0.00 4.50 0.00 4.50
HT-L01-DB-GR-18 SP 40A 25 XLPE 2CX10 1Cx10 0.00 0.00 4.50 4.50
HT-L01-DB-GR-19 SP 40A 25 XLPE 2CX10 1Cx10 0.00 0.00 4.50 4.50
HT-L01-DB-GR-20 SP 40A 25 XLPE 2CX10 1Cx10 0.00 0.00 6.50 6.50
HT-L01-DB-Suite SP 63A 25 XLPE 2CX16 1Cx16 0.00 0.00 7.20 7.20
Spare TP 40A 25 1.67 1.67 1.67 5.00
Space
PANEL ID: HI-L01-SMDB-GR-02 LOCATION: DUBAI, UNITED ARAB EMIRATES T +971 04 388 1616
PVC/
RATING - AMPS CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
XLPE/
CIRCUIT/ SP/ FAULT ECC
FEEDER DUTY SIZE LV/HV REMARKS
TP SWA/ 2/4 2/3/4C R - PH Y - PH B - PH 1- PH 3- PH 3- PH
DB NO. ACB MCCB MCB KA 1C mm² TOTAL KW CT
PVC 1C mm² mm² KW KW KW (1) (2) (3)
(4)
INCOMER TP 100A N/A 35 XLPE 4CX35 1CX16 17.33 12.33 12.83 42.50
OUTGOING
HT-L01-DB-GR-21 SP 40A 25 XLPE 2CX10 1Cx10 4.50 0.00 0.00 4.50
HT-L01-DB-GR-22 SP 40A 25 XLPE 2CX10 1Cx10 0.00 4.50 0.00 4.50
HT-L01-DB-GR-23 SP 40A 25 XLPE 2CX10 1Cx10 0.00 0.00 4.50 4.50
HT-L01-DB-GR-24 SP 40A 25 XLPE 2CX10 1Cx10 4.50 0.00 0.00 4.50
HT-L01-DB-GR-25 SP 40A 25 XLPE 2CX10 1Cx10 0.00 4.50 0.00 4.50
HT-L01-LDB-CS SP 40A 25 XLPE 2CX10 1Cx10 5.00 5.00
HT-L01-PDB-CS SP 40A 25 XLPE 2CX10 1Cx10 5.00 5.00
Spare TP 40A 25 3.33 3.33 3.33 10.00
Space
OUTGOING
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX70 1CX35 23.33 28.33 28.33 80.00
REMARKS
power allowances
only.
GR LOAD
DD 4.00
KR 3.90
JSA 4.60
JSB 4.60
S 5.57
CCT ECC
MCB WIRE
RATING OF RATING OF WIRE
SL. NO. CIR NO. RTG. IN SIZE ROOM/AREA
INCOMER ELCB SIZE
AMPS mm2 mm2
LTG.=LIGHTING,EX. FAN = EXHAUST FAN, S/O=SOCKET OUTLET,SH. S/O = SHAVER SOCKET OUTLET, W/H = WATER HEATER, H/D = HAND DRYER, D/W=DISH W
FCU=FAN COIL UNIT, CCU = COOKER CONTROL UNIT, W = WINDOW TYPE A/C & S = SPLIT TYPE A/C
DISTRIBUTION BOARD LOAD SCHEDULE
LOCATION: DUBAI, UNITED ARAB EMIRATES
INCOMING CABLE : 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 CU/PVC-ECC
CONNECTED LOADS/POINTS
2
1
1
1
1
1
1
LOAD PER PHASE (KW) =
500 0.50
500 0.50
500 FINAL CIRCUIT TO BE
0.50 PROVIDED BY
500 0.50 OPERATOR
500 0.50
500 0.50
200 0.40
500 0.50
500 0.50
500 0.50
500 0.50
0.50
1.17
3500 1.17
1.17
1.17 FINAL CIRCUIT TO BE
3500 1.17 PROVIDED BY
1.17 OPERATOR
1.00
3000 1.00
1.00
350 0.35
350 0.35
350 0.35
LOAD PER PHASE (KW) = 5.58 5.68 5.68
OUTGOING
HT-L02-DB-GR-01 SP 40A 25 XLPE
HT-L02-DB-GR-02 SP 40A 25 XLPE
HT-L02-DB-GR-03 SP 40A 25 XLPE
HT-L02-DB-GR-04 SP 40A 25 XLPE
HT-L02-DB-GR-05 SP 40A 25 XLPE
HT-L02-DB-GR-06 SP 40A 25 XLPE
HT-L02-DB-GR-07 SP 40A 25 XLPE
HT-L02-DB-GR-08 SP 40A 25 XLPE
HT-L02-DB-GR-09 SP 40A 25 XLPE
HT-L02-DB-GR-10 SP 40A 25 XLPE
HT-L02-DB-GR-11 SP 40A 25 XLPE
HT-L02-DB-GR-12 SP 40A 25 XLPE
HT-L02-DB-GR-13 SP 40A 25 XLPE
HT-L02-DB-GR-14 SP 40A 25 XLPE
HT-L02-DB-GR-15 SP 40A 25 XLPE
HT-L02-DB-GR-16 SP 40A 25 XLPE
HT-L02-DB-GR-17 SP 40A 25 XLPE
HT-L02-DB-GR-18 SP 40A 25 XLPE
HT-L02-DB-GR-19 SP 40A 25 XLPE
HT-L02-DB-GR-20 SP 40A 25 XLPE
HT-L02-DB-Suite SP 63A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX150 1CX70 35.87 35.17 35.87 106.90
REMARKS
DETAILS OF CONNECTED LOAD
MAIN DISTRIBUTION
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: HI-L02-SMDB-GR-02 LOCATION:
FED FROM: HI-B01-MDB-01
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HT-L02-DB-GR-21 SP 40A 25 XLPE
HT-L02-DB-GR-22 SP 40A 25 XLPE
HT-L02-DB-GR-23 SP 40A 25 XLPE
HT-L02-DB-GR-24 SP 40A 25 XLPE
HT-L02-DB-GR-25 SP 40A 25 XLPE
HT-L02-DB-GR-26 SP 40A 25 XLPE
HT-L02-DB-GR-27 SP 40A 25 XLPE
HT-L02-DB-GR-28 SP 40A 25 XLPE
HT-L02-DB-GR-29 SP 40A 25 XLPE
HT-L02-DB-GR-30 SP 40A 25 XLPE
HT-L02-DB-GR-31 SP 40A 25 XLPE
HT-L02-DB-GR-32 SP 40A 25 XLPE
HT-L02-DB-GR-33 SP 40A 25 XLPE
HT-L02-DB-GR-34 SP 40A 25 XLPE
HT-L02-DB-GR-35 SP 40A 25 XLPE
HT-L02-DB-GR-36 SP 40A 25 XLPE
HT-L02-DB-CM-01 TP 63A 35 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX95 1CX50 35.57 31.07 31.07 97.70
REMARKS
DISTRIBUT
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES
DB REF : HI-L02-DB-CM-01
FED FROM: HI-L02-SMDB-GR02
CCT ECC
MCB WIRE
RATING OF RATING OF WIRE
SL. NO. CIR NO. RTG. IN SIZE ROOM/AREA
INCOMER ELCB SIZE
AMPS mm2 mm2
LTG.=LIGHTING,EX. FAN = EXHAUST FAN, S/O=SOCKET OUTLET,SH. S/O = SHAVER SOCKET OUTLET, W/H = WATER HEATER, H/D = HAND DRYER, D/W=DISH W
FCU=FAN COIL UNIT, CCU = COOKER CONTROL UNIT, W = WINDOW TYPE A/C & S = SPLIT TYPE A/C
40A 4P 25 R9 10 2.5 2.5 Lift shaft -level 19 - level 27
100mA 26 Y9 10 2.5 2.5 Lift shaft -level 19 - level 27
ELCB 6 27 B9 Space
28 R10 20 4 4 Corridor , Apt Lift Lobby - Level 19
29 Y10 20 4 4 Corridor , Store - Level 19
Elec. Rm , Tel, Rm ,Service Lift Lobby - Level
40A 4P B10 20 4 4 19
30
30mA ELCB
7 31 R11 20 4 4 Corridor , Apt Lift Lobby - Level 20
40A 32 Y11 20 4 4 Corridor , Store - Level 20
40A 4P
30mA ELCB
7
LTG.=LIGHTING,EX. FAN = EXHAUST FAN, S/O=SOCKET OUTLET,SH. S/O = SHAVER SOCKET OUTLET, W/H = WATER HEATER, H/D = HAND DRYER, D/W=DISH W
FCU=FAN COIL UNIT, CCU = COOKER CONTROL UNIT, W = WINDOW TYPE A/C & S = SPLIT TYPE A/C
DISTRIBUTION BOARD LOAD SCHEDULE
LOCATION: DUBAI, UNITED ARAB EMIRATES
INCOMING CABLE : 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 CU/PVC-ECC
CONNECTED LOADS/POINTS
15
45
45
15
45
4/5/1
5
22
15
45
45
15
45
4/5/1
9
22
18
18
18
18
12
12
12
8
3
3
3
3
4
1
1
1
1
1
1
2
1
1
1
2
20 0.30
10 0.45
10 0.45
20 0.30
10 0.45
80/60/55 0.68
80 0.40
10 0.22
0.00
20 0.30
10 0.45
10 0.45
20 0.30
10 0.45
80/60/55 0.68
80 0.72
10 0.22
0.00
70 1.26
70 1.26
70 1.26
70 1.26
30 0.36
30 0.36
30 0.36
30 0.24
0.00
200/400 0.60
200/400 0.60
200/400
0.80
200/400 0.60
200/400 0.60
200/400
0.80
250 0.00
250 0.00
250 0.00
250 0.00
250 0.00
250 0.80
250 0.25
250 0.50
250 0.25
250 0.25
250 0.25
250 0.50
0.00
0.00
0.00
0.00
0.00
0.00
LOAD PER PHASE (KW) = 6.90 6.05 7.02
OUTGOING
HT-L02-DB-GR-37 SP 40A 25 XLPE
HT-L02-DB-GR-38 SP 40A 25 XLPE
HT-L02-DB-GR-39 SP 40A 25 XLPE
HT-L02-DB-GR-40 SP 40A 25 XLPE
HT-L02-DB-GR-41 SP 40A 25 XLPE
HT-L02-DB-GR-42 SP 40A 25 XLPE
HT-L02-DB-GR-43 SP 40A 25 XLPE
HT-L02-DB-GR-44 SP 40A 25 XLPE
HT-L02-DB-GR-45 SP 40A 25 XLPE
HT-L02-DB-GR-46 SP 40A 25 XLPE
HT-L02-DB-GR-47 SP 40A 25 XLPE
HT-L02-DB-GR-48 SP 40A 25 XLPE
HT-L02-DB-GR-49 SP 40A 25 XLPE
HT-L02-DB-GR-50 SP 40A 25 XLPE
HT-L02-DB-GR-51 SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX70 1CX35 24.17 24.17 24.17 72.50
REMARKS
DETAILS OF CONNECTED LOAD
MAIN DISTRIBUTION
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: HI-L03-SMDB-GR-01 LOCATION:
FED FROM: HI-B01-MDB-01
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HI-L03-DB-GR-01 SP 40A 25 XLPE
HI-L03-DB-GR-02 SP 40A 25 XLPE
HI-L03-DB-GR-03 SP 40A 25 XLPE
HI-L03-DB-GR-04 SP 40A 25 XLPE
HI-L03-DB-GR-05 SP 40A 25 XLPE
HI-L03-DB-GR-06 SP 40A 25 XLPE
HI-L03-DB-GR-07 SP 40A 25 XLPE
HI-L03-DB-GR-08 SP 40A 25 XLPE
HI-L03-DB-GR-09 SP 40A 25 XLPE
HI-L03-DB-GR-10 SP 40A 25 XLPE
HI-L03-DB-GR-11 SP 40A 25 XLPE
HI-L03-DB-GR-12 SP 40A 25 XLPE
HI-L03-DB-GR-13 SP 40A 25 XLPE
HI-L03-DB-GR-14 SP 40A 25 XLPE
HI-L03-DB-GR-15 SP 40A 25 XLPE
HI-L03-DB-GR-16 SP 40A 25 XLPE
HI-L03-DB-GR-17 SP 40A 25 XLPE
HI-L03-DB-GR-18 SP 40A 25 XLPE
HI-L03-DB-GR-19 SP 40A 25 XLPE
HI-L03-DB-GR-20 SP 40A 25 XLPE
HI-L03-DB-Suite SP 63A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX150 1CX70 35.87 35.17 35.87 106.90
REMARKS
DETAILS OF CONNECTED LOAD
MAIN DISTRIBUTION
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: HI-L03-SMDB-GR-02 LOCATION:
FED FROM: HI-B01-MDB-01
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HI-L03-DB-GR-21 SP 40A 25 XLPE
HI-L03-DB-GR-22 SP 40A 25 XLPE
HI-L03-DB-GR-23 SP 40A 25 XLPE
HI-L03-DB-GR-24 SP 40A 25 XLPE
HI-L03-DB-GR-25 SP 40A 25 XLPE
HI-L03-DB-GR-26 SP 40A 25 XLPE
HI-L03-DB-GR-27 SP 40A 25 XLPE
HI-L03-DB-GR-28 SP 40A 25 XLPE
HI-L03-DB-GR-29 SP 40A 25 XLPE
HI-L03-DB-GR-30 SP 40A 25 XLPE
HI-L03-DB-GR-31 SP 40A 25 XLPE
HI-L03-DB-GR-32 SP 40A 25 XLPE
HI-L03-DB-GR-33 SP 40A 25 XLPE
HI-L03-DB-GR-34 SP 40A 25 XLPE
HI-L03-DB-GR-35 SP 40A 25 XLPE
HI-L03-DB-GR-36 SP 40A 25 XLPE
HI-L03-DB-CM-01 TP 63A 35 XLPE
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX95 1CX50 33.90 29.40 29.40 92.70
REMARKS
DISTRIBUT
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES
DB REF : HI-L03-DB-CM-01
FED FROM: HI-L03-SMDB-GR02
CCT ECC
MCB WIRE
RATING OF RATING OF WIRE
SL. NO. CIR NO. RTG. IN SIZE ROOM/AREA
INCOMER ELCB SIZE
AMPS mm2 mm2
LTG.=LIGHTING,EX. FAN = EXHAUST FAN, S/O=SOCKET OUTLET,SH. S/O = SHAVER SOCKET OUTLET, W/H = WATER HEATER, H/D = HAND DRYER, D/W=DISH W
FCU=FAN COIL UNIT, CCU = COOKER CONTROL UNIT, W = WINDOW TYPE A/C & S = SPLIT TYPE A/C
40A 4P 25 R9 10 2.5 2.5 Lift shaft -level 19 - level 27
100mA 26 Y9 10 2.5 2.5 Lift shaft -level 19 - level 27
ELCB 6 27 B9 Space
28 R10 20 4 4 Corridor , Apt Lift Lobby - Level 19
29 Y10 20 4 4 Corridor , Store - Level 19
Elec. Rm , Tel, Rm ,Service Lift Lobby - Level
40A 4P B10 20 4 4 19
30
30mA ELCB
7 31 R11 20 4 4 Corridor , Apt Lift Lobby - Level 20
40A 32 Y11 20 4 4 Corridor , Store - Level 20
40A 4P
30mA ELCB
7
LTG.=LIGHTING,EX. FAN = EXHAUST FAN, S/O=SOCKET OUTLET,SH. S/O = SHAVER SOCKET OUTLET, W/H = WATER HEATER, H/D = HAND DRYER, D/W=DISH W
FCU=FAN COIL UNIT, CCU = COOKER CONTROL UNIT, W = WINDOW TYPE A/C & S = SPLIT TYPE A/C
DISTRIBUTION BOARD LOAD SCHEDULE
LOCATION: DUBAI, UNITED ARAB EMIRATES
INCOMING CABLE : 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 CU/PVC-ECC
CONNECTED LOADS/POINTS
15
45
45
15
45
4/5/1
5
22
15
45
45
15
45
4/5/1
9
22
18
18
18
18
12
12
12
8
3
3
3
3
4
1
1
1
1
1
1
2
1
1
1
2
20 0.30
10 0.45
10 0.45
20 0.30
10 0.45
80/60/55 0.68
80 0.40
10 0.22
0.00
20 0.30
10 0.45
10 0.45
20 0.30
10 0.45
80/60/55 0.68
80 0.72
10 0.22
0.00
70 1.26
70 1.26
70 1.26
70 1.26
30 0.36
30 0.36
30 0.36
30 0.24
0.00
200/400 0.60
200/400 0.60
200/400
0.80
200/400 0.60
200/400 0.60
200/400
0.80
250 0.00
250 0.00
250 0.00
250 0.00
250 0.00
250 0.80
250 0.25
250 0.50
250 0.25
250 0.25
250 0.25
250 0.50
0.00
0.00
0.00
0.00
0.00
0.00
LOAD PER PHASE (KW) = 6.90 6.05 7.02
OUTGOING
HI-L03-DB-GR-37 SP 40A 25 XLPE
HI-L03-DB-GR-38 SP 40A 25 XLPE
HI-L03-DB-GR-39 SP 40A 25 XLPE
HI-L03-DB-GR-40 SP 40A 25 XLPE
HI-L03-DB-GR-41 SP 40A 25 XLPE
HI-L03-DB-GR-42 SP 40A 25 XLPE
HI-L03-DB-GR-43 SP 40A 25 XLPE
HI-L03-DB-GR-44 SP 40A 25 XLPE
HI-L03-DB-GR-45 SP 40A 25 XLPE
HI-L03-DB-GR-46 SP 40A 25 XLPE
HI-L03-DB-GR-47 SP 40A 25 XLPE
HI-L03-DB-GR-48 SP 40A 25 XLPE
HI-L03-DB-GR-49 SP 40A 25 XLPE
HI-L03-DB-GR-50 SP 40A 25 XLPE
HI-L03-DB-GR-51 SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX70 1CX35 24.17 24.17 24.17 72.50
REMARKS
DETAILS OF CONNECTED LOAD/MAX DEMAND
MAIN DISTRIBUTION BOARD
PROJECT: HOLIDAY INN &STAYBRIDGE SUITES OWNER: HOLIDAY INN &STAYBRIDGE SUITES
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants PO Box 26739, Dubai - UAE
PANEL ID: HI-B01-MDB-02 LOCATION: DUBAI, UNITED ARAB EMIRATES T +971 04 388 1616
PVC/
RATING - AMPS CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
XLPE/
CIRCUIT/ SP/ FAULT ECC
FEEDER DUTY SIZE LV/HV REMARKS
TP SWA/ 2/4 2/3/4C R - PH Y - PH B - PH 1- PH 3- PH 3- PH
DB NO. ACB MCCB MCB KA 1C mm² TOTAL KW CT
PVC 1C mm² mm² KW KW KW (1) (2) (3)
(4)
INCOMER 4P 2500A SET @ 0.85 50 XLPE DEWA CABLES 448.71 425.27 503.69 1377.68
OUTGOING
PANEL ID: HI-B01-SMDB-KIT LOCATION: DUBAI, UNITED ARAB EMIRATES T +971 04 388 1616
RATING - AMPS PVC/ CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
XLPE/
CIRCUIT/ SP/ FAULT ECC
FEEDER DUTY SIZE LV/HV REMARKS
DB NO. TP KA SWA/ 2/4 2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
ACB MCCB MCB TOTAL KW CT
PVC 1C mm² mm² KW KW KW (1) (2) (3) (4)
INCOMER TP 300A N/A 35 XLPE 4CX185 1Cx95 95.11 89.67 95.29 281.75
OUTGOING
HT-B01-DB-KT-01 TP 125A 25 XLPE 4CX50 1Cx25 21.53 18.18 20.13 59.85
HT-B01-DB-KT-02 TP 160A 25 XLPE 4CX70 1Cx35 24.28 25.95 26.65 76.88
HT-B01-DB-LP-KT TP 40A 25 XLPE 4CX10 1Cx10 5.80 5.44 5.41 18.32
HT-L00-DB-RS TP 100A 25 XLPE 4CX35 1Cx16 13.57 10.17 13.17 36.90
UPRIGHT STEAMER CABINET TP 63A 25 XLPE 4CX16 1Cx16 9.00 9.00 9.00 27.00 30mA ELCB
(BQ-29)
HOOD-TYPE DISHWASHER, 30-
40 RACKS/HOUR CAPACITY TP 40A 25 XLPE 4CX10 1CX10 4.00 4.00 4.00 12.00 30mA ELCB
(DW-07)
AUTOMATIC CONVEYOR
DISHWASHER, 120-140 TP 80A 25 XLPE 4CX25 1Cx16 11.27 11.27 11.27 33.80 30mA ELCB
RACKS/HOUR CAPACITY (DW
-16)
OUTGOING
HI-L04-DB-GR-01 SP 40A 25 XLPE
HI-L04-DB-GR-02 SP 40A 25 XLPE
HI-L04-DB-GR-03 SP 40A 25 XLPE
HI-L04-DB-GR-04 SP 40A 25 XLPE
HI-L04-DB-GR-05 SP 40A 25 XLPE
HI-L04-DB-GR-06 SP 40A 25 XLPE
HI-L04-DB-GR-07 SP 40A 25 XLPE
HI-L04-DB-GR-08 SP 40A 25 XLPE
HI-L04-DB-GR-09 SP 40A 25 XLPE
HI-L04-DB-GR-10 SP 40A 25 XLPE
HI-L04-DB-GR-11 SP 40A 25 XLPE
HI-L04-DB-GR-12 SP 40A 25 XLPE
HI-L04-DB-GR-13 SP 40A 25 XLPE
HI-L04-DB-GR-14 SP 40A 25 XLPE
HI-L04-DB-GR-15 SP 40A 25 XLPE
HI-L04-DB-GR-16 SP 40A 25 XLPE
HI-L04-DB-GR-17 SP 40A 25 XLPE
HI-L04-DB-GR-18 SP 40A 25 XLPE
HI-L04-DB-GR-19 SP 40A 25 XLPE
HI-L04-DB-GR-20 SP 40A 25 XLPE
HI-L04-DB-Suite SP 63A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX150 1CX70 28.67 28.67 46.87 104.20
REMARKS
KR DDR JS s KR DDR
L2 20 11 7 2 14 4
L3 22 12 8 2 1 16 4
JS
2 20
2 22
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: HI-L04-SMDB-GR-02 LOCATION:
FED FROM: HI-B01-MDB-01
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HI-L04-DB-GR-21 SP 40A 25 XLPE
HI-L04-DB-GR-22 SP 40A 25 XLPE
HI-L04-DB-GR-23 SP 40A 25 XLPE
HI-L04-DB-GR-24 SP 40A 25 XLPE
HI-L04-DB-GR-25 SP 40A 25 XLPE
HI-L04-DB-GR-26 SP 40A 25 XLPE
HI-L04-DB-GR-27 SP 40A 25 XLPE
HI-L04-DB-GR-28 SP 40A 25 XLPE
HI-L04-DB-GR-29 SP 40A 25 XLPE
HI-L04-DB-GR-30 SP 40A 25 XLPE
HI-L04-DB-GR-31 SP 40A 25 XLPE
HI-L04-DB-GR-32 SP 40A 25 XLPE
HI-L04-DB-GR-33 SP 40A 25 XLPE
HI-L04-DB-GR-34 SP 40A 25 XLPE
HI-L04-DB-GR-35 SP 40A 25 XLPE
HI-L04-DB-GR-36 SP 40A 25 XLPE
HI-L03-DB-CM-01 TP 63A 35 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX95 1CX50 35.57 31.07 31.07 97.70
REMARKS
KR DDR JS s KR DDR
L2 20 11 7 2 14 4
L3 22 12 8 2 1 16 4
JS
2 20
2 22
DISTRIBUT
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES
DB REF : HI-L04-DB-CM-01
FED FROM: HI-L04-SMDB-GR-02
CCT ECC
MCB WIRE
RATING OF RATING OF WIRE
SL. NO. CIR NO. RTG. IN SIZE ROOM/AREA
INCOMER ELCB SIZE
AMPS mm2 mm2
LTG.=LIGHTING,EX. FAN = EXHAUST FAN, S/O=SOCKET OUTLET,SH. S/O = SHAVER SOCKET OUTLET, W/H = WATER HEATER, H/D = HAND DRYER, D/W=DISH W
FCU=FAN COIL UNIT, CCU = COOKER CONTROL UNIT, W = WINDOW TYPE A/C & S = SPLIT TYPE A/C
40A 4P 25 R9 10 2.5 2.5 Lift shaft -level 19 - level 27
100mA 26 Y9 10 2.5 2.5 Lift shaft -level 19 - level 27
ELCB 6 27 B9 Space
28 R10 20 4 4 Corridor , Apt Lift Lobby - Level 19
29 Y10 20 4 4 Corridor , Store - Level 19
Elec. Rm , Tel, Rm ,Service Lift Lobby - Level
40A 4P B10 20 4 4 19
30
30mA ELCB
7 31 R11 20 4 4 Corridor , Apt Lift Lobby - Level 20
40A 32 Y11 20 4 4 Corridor , Store - Level 20
40A 4P
30mA ELCB
7
LTG.=LIGHTING,EX. FAN = EXHAUST FAN, S/O=SOCKET OUTLET,SH. S/O = SHAVER SOCKET OUTLET, W/H = WATER HEATER, H/D = HAND DRYER, D/W=DISH W
FCU=FAN COIL UNIT, CCU = COOKER CONTROL UNIT, W = WINDOW TYPE A/C & S = SPLIT TYPE A/C
DISTRIBUTION BOARD LOAD SCHEDULE
LOCATION: DUBAI, UNITED ARAB EMIRATES
INCOMING CABLE : 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 CU/PVC-ECC
CONNECTED LOADS/POINTS
15
45
45
15
45
4/5/1
5
22
15
45
45
15
45
4/5/1
9
22
18
18
18
18
12
12
12
8
3
3
3
3
4
1
1
1
1
1
1
2
1
1
1
2
20 0.30
10 0.45
10 0.45
20 0.30
10 0.45
80/60/55 0.68
80 0.40
10 0.22
0.00
20 0.30
10 0.45
10 0.45
20 0.30
10 0.45
80/60/55 0.68
80 0.72
10 0.22
0.00
70 1.26
70 1.26
70 1.26
70 1.26
30 0.36
30 0.36
30 0.36
30 0.24
0.00
200/400 0.60
200/400 0.60
200/400
0.80
200/400 0.60
200/400 0.60
200/400
0.80
250 0.00
250 0.00
250 0.00
250 0.00
250 0.00
250 0.80
250 0.25
250 0.50
250 0.25
250 0.25
250 0.25
250 0.50
0.00
0.00
0.00
0.00
0.00
0.00
LOAD PER PHASE (KW) = 6.90 6.05 7.02
OUTGOING
HI-L04-DB-GR-37 SP 40A 25 XLPE
HI-L04-DB-GR-38 SP 40A 25 XLPE
HI-L04-DB-GR-39 SP 40A 25 XLPE
HI-L04-DB-GR-40 SP 40A 25 XLPE
HI-L04-DB-GR-41 SP 40A 25 XLPE
HI-L04-DB-GR-42 SP 40A 25 XLPE
HI-L04-DB-GR-43 SP 40A 25 XLPE
HI-L04-DB-GR-44 SP 40A 25 XLPE
HI-L04-DB-GR-45 SP 40A 25 XLPE
HI-L04-DB-GR-46 SP 40A 25 XLPE
HI-L04-DB-GR-47 SP 40A 25 XLPE
HI-L04-DB-GR-48 SP 40A 25 XLPE
HI-L04-DB-GR-49 SP 40A 25 XLPE
HI-L04-DB-GR-50 SP 40A 25 XLPE
HI-L04-DB-GR-51 SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX70 1CX35 24.17 24.17 24.17 72.50
REMARKS
KR DDR JS s KR DDR
L2 20 11 7 2 14 4
L3 22 12 8 2 1 16 4
JS
2 20
2 22
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: HI-L05-SMDB-GR-01 LOCATION:
FED FROM: HI-B01-MDB-02
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HI-L05-DB-GR-01 SP 40A 25 XLPE
HI-L05-DB-GR-02 SP 40A 25 XLPE
HI-L05-DB-GR-03 SP 40A 25 XLPE
HI-L05-DB-GR-04 SP 40A 25 XLPE
HI-L05-DB-GR-05 SP 40A 25 XLPE
HI-L05-DB-GR-06 SP 40A 25 XLPE
HI-L05-DB-GR-07 SP 40A 25 XLPE
HI-L05-DB-GR-08 SP 40A 25 XLPE
HI-L05-DB-GR-09 SP 40A 25 XLPE
HI-L05-DB-GR-10 SP 40A 25 XLPE
HI-L05-DB-GR-11 SP 40A 25 XLPE
HI-L05-DB-GR-12 SP 40A 25 XLPE
HI-L05-DB-GR-13 SP 40A 25 XLPE
HI-L05-DB-GR-14 SP 40A 25 XLPE
HI-L05-DB-GR-15 SP 40A 25 XLPE
HI-L05-DB-GR-16 SP 40A 25 XLPE
HI-L05-DB-GR-17 SP 40A 25 XLPE
HI-L05-DB-GR-18 SP 40A 25 XLPE
HI-L05-DB-GR-19 SP 40A 25 XLPE
HI-L05-DB-GR-20 SP 40A 25 XLPE
HI-L05-DB-Suite SP 63A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX150 1CX70 28.67 28.67 46.87 104.20
REMARKS
KR DDR JS s KR DDR
L2 20 11 7 2 14 4
L3 22 12 8 2 1 16 4
JS
2 20
2 22
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: HI-L05-SMDB-GR-02 LOCATION:
FED FROM: HI-B01-MDB-01
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HI-L05-DB-GR-21 SP 40A 25 XLPE
HI-L05-DB-GR-22 SP 40A 25 XLPE
HI-L05-DB-GR-23 SP 40A 25 XLPE
HI-L05-DB-GR-24 SP 40A 25 XLPE
HI-L05-DB-GR-25 SP 40A 25 XLPE
HI-L05-DB-GR-26 SP 40A 25 XLPE
HI-L05-DB-GR-27 SP 40A 25 XLPE
HI-L05-DB-GR-28 SP 40A 25 XLPE
HI-L05-DB-GR-29 SP 40A 25 XLPE
HI-L05-DB-GR-30 SP 40A 25 XLPE
HI-L05-DB-GR-31 SP 40A 25 XLPE
HI-L05-DB-GR-32 SP 40A 25 XLPE
HI-L05-DB-GR-33 SP 40A 25 XLPE
HI-L05-DB-GR-34 SP 40A 25 XLPE
HI-L05-DB-GR-35 SP 40A 25 XLPE
HI-L05-DB-GR-36 SP 40A 25 XLPE
HI-L05-DB-CM-01 TP 63A 35 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX95 1CX50 35.57 31.07 31.07 97.70
REMARKS
KR DDR JS s KR DDR
L2 20 11 7 2 14 4
L3 22 12 8 2 1 16 4
JS
2 20
2 22
DISTRIBUT
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES
DB REF : HI-L05-DB-CM-01
FED FROM: HI-L05-SMDB-GR-02
CCT ECC
MCB WIRE
RATING OF RATING OF WIRE
SL. NO. CIR NO. RTG. IN SIZE ROOM/AREA
INCOMER ELCB SIZE
AMPS mm2 mm2
LTG.=LIGHTING,EX. FAN = EXHAUST FAN, S/O=SOCKET OUTLET,SH. S/O = SHAVER SOCKET OUTLET, W/H = WATER HEATER, H/D = HAND DRYER, D/W=DISH W
FCU=FAN COIL UNIT, CCU = COOKER CONTROL UNIT, W = WINDOW TYPE A/C & S = SPLIT TYPE A/C
40A 4P 25 R9 10 2.5 2.5 Lift shaft -level 19 - level 27
100mA 26 Y9 10 2.5 2.5 Lift shaft -level 19 - level 27
ELCB 6 27 B9 Space
28 R10 20 4 4 Corridor , Apt Lift Lobby - Level 19
29 Y10 20 4 4 Corridor , Store - Level 19
Elec. Rm , Tel, Rm ,Service Lift Lobby - Level
40A 4P B10 20 4 4 19
30
30mA ELCB
7 31 R11 20 4 4 Corridor , Apt Lift Lobby - Level 20
40A 32 Y11 20 4 4 Corridor , Store - Level 20
40A 4P
30mA ELCB
7
LTG.=LIGHTING,EX. FAN = EXHAUST FAN, S/O=SOCKET OUTLET,SH. S/O = SHAVER SOCKET OUTLET, W/H = WATER HEATER, H/D = HAND DRYER, D/W=DISH W
FCU=FAN COIL UNIT, CCU = COOKER CONTROL UNIT, W = WINDOW TYPE A/C & S = SPLIT TYPE A/C
DISTRIBUTION BOARD LOAD SCHEDULE
LOCATION: DUBAI, UNITED ARAB EMIRATES
INCOMING CABLE : 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 CU/PVC-ECC
CONNECTED LOADS/POINTS
15
45
45
15
45
4/5/1
5
22
15
45
45
15
45
4/5/1
9
22
18
18
18
18
12
12
12
8
3
3
3
3
4
1
1
1
1
1
1
2
1
1
1
2
20 0.30
10 0.45
10 0.45
20 0.30
10 0.45
80/60/55 0.68
80 0.40
10 0.22
0.00
20 0.30
10 0.45
10 0.45
20 0.30
10 0.45
80/60/55 0.68
80 0.72
10 0.22
0.00
70 1.26
70 1.26
70 1.26
70 1.26
30 0.36
30 0.36
30 0.36
30 0.24
0.00
200/400 0.60
200/400 0.60
200/400
0.80
200/400 0.60
200/400 0.60
200/400
0.80
250 0.00
250 0.00
250 0.00
250 0.00
250 0.00
250 0.80
250 0.25
250 0.50
250 0.25
250 0.25
250 0.25
250 0.50
0.00
0.00
0.00
0.00
0.00
0.00
LOAD PER PHASE (KW) = 6.90 6.05 7.02
OUTGOING
HI-L05-DB-GR-37 SP 40A 25 XLPE
HI-L05-DB-GR-38 SP 40A 25 XLPE
HI-L05-DB-GR-39 SP 40A 25 XLPE
HI-L05-DB-GR-40 SP 40A 25 XLPE
HI-L05-DB-GR-41 SP 40A 25 XLPE
HI-L05-DB-GR-42 SP 40A 25 XLPE
HI-L05-DB-GR-43 SP 40A 25 XLPE
HI-L05-DB-GR-44 SP 40A 25 XLPE
HI-L05-DB-GR-45 SP 40A 25 XLPE
HI-L05-DB-GR-46 SP 40A 25 XLPE
HI-L05-DB-GR-47 SP 40A 25 XLPE
HI-L05-DB-GR-48 SP 40A 25 XLPE
HI-L05-DB-GR-49 SP 40A 25 XLPE
HI-L05-DB-GR-50 SP 40A 25 XLPE
HI-L05-DB-GR-51 SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX70 1CX35 24.17 24.17 24.17 72.50
REMARKS
KR DDR JS s KR DDR
L2 20 11 7 2 14 4
L3 22 12 8 2 1 16 4
JS
2 20
2 22
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: HI-L06-SMDB-GR-01 LOCATION:
FED FROM: HI-B01-MDB-02
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HI-L06-DB-GR-01 SP 40A 25 XLPE
HI-L06-DB-GR-02 SP 40A 25 XLPE
HI-L06-DB-GR-03 SP 40A 25 XLPE
HI-L06-DB-GR-04 SP 40A 25 XLPE
HI-L06-DB-GR-05 SP 40A 25 XLPE
HI-L06-DB-GR-06 SP 40A 25 XLPE
HI-L06-DB-GR-07 SP 40A 25 XLPE
HI-L06-DB-GR-08 SP 40A 25 XLPE
HI-L06-DB-GR-09 SP 40A 25 XLPE
HI-L06-DB-GR-10 SP 40A 25 XLPE
HI-L06-DB-GR-11 SP 40A 25 XLPE
HI-L06-DB-GR-12 SP 40A 25 XLPE
HI-L06-DB-GR-13 SP 40A 25 XLPE
HI-L06-DB-GR-14 SP 40A 25 XLPE
HI-L06-DB-GR-15 SP 40A 25 XLPE
HI-L06-DB-GR-16 SP 40A 25 XLPE
HI-L06-DB-GR-17 SP 40A 25 XLPE
HI-L06-DB-GR-18 SP 40A 25 XLPE
HI-L06-DB-GR-19 SP 40A 25 XLPE
HI-L06-DB-GR-20 SP 40A 25 XLPE
HI-L06-DB-Suite SP 63A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX150 1CX70 28.67 28.67 46.87 104.20
REMARKS
KR DDR JS s KR DDR
L2 20 11 7 2 14 4
L3 22 12 8 2 1 16 4
JS
2 20
2 22
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: HI-L06-SMDB-GR-02 LOCATION:
FED FROM: HI-B01-MDB-01
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HI-L06-DB-GR-21 SP 40A 25 XLPE
HI-L06-DB-GR-22 SP 40A 25 XLPE
HI-L06-DB-GR-23 SP 40A 25 XLPE
HI-L06-DB-GR-24 SP 40A 25 XLPE
HI-L06-DB-GR-25 SP 40A 25 XLPE
HI-L06-DB-GR-26 SP 40A 25 XLPE
HI-L06-DB-GR-27 SP 40A 25 XLPE
HI-L06-DB-GR-28 SP 40A 25 XLPE
HI-L06-DB-GR-29 SP 40A 25 XLPE
HI-L06-DB-GR-30 SP 40A 25 XLPE
HI-L06-DB-GR-31 SP 40A 25 XLPE
HI-L06-DB-GR-32 SP 40A 25 XLPE
HI-L06-DB-GR-33 SP 40A 25 XLPE
HI-L06-DB-GR-34 SP 40A 25 XLPE
HI-L06-DB-GR-35 SP 40A 25 XLPE
HI-L06-DB-GR-36 SP 40A 25 XLPE
HI-L05-DB-CM-01 TP 63A 35 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX95 1CX50 35.57 31.07 31.07 97.70
REMARKS
KR DDR JS s KR DDR
L2 20 11 7 2 14 4
L3 22 12 8 2 1 16 4
JS
2 20
2 22
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: HI-L06-SMDB-GR-03 LOCATION:
FED FROM: HI-B01-MDB-01
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HI-L06-DB-GR-37 SP 40A 25 XLPE
HI-L06-DB-GR-38 SP 40A 25 XLPE
HI-L06-DB-GR-39 SP 40A 25 XLPE
HI-L06-DB-GR-40 SP 40A 25 XLPE
HI-L06-DB-GR-41 SP 40A 25 XLPE
HI-L06-DB-GR-42 SP 40A 25 XLPE
HI-L06-DB-GR-43 SP 40A 25 XLPE
HI-L06-DB-GR-44 SP 40A 25 XLPE
HI-L06-DB-GR-45 SP 40A 25 XLPE
HI-L06-DB-GR-46 SP 40A 25 XLPE
HI-L06-DB-GR-47 SP 40A 25 XLPE
HI-L06-DB-GR-48 SP 40A 25 XLPE
HI-L06-DB-GR-49 SP 40A 25 XLPE
HI-L06-DB-GR-50 SP 40A 25 XLPE
HI-L06-DB-GR-51 SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX70 1CX35 24.17 24.17 24.17 72.50
REMARKS
KR DDR JS s KR DDR
L2 20 11 7 2 14 4
L3 22 12 8 2 1 16 4
JS
2 20
2 22
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: HI-L07-SMDB-GR-01 LOCATION:
FED FROM: HI-B01-MDB-02
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HI-L07-DB-GR-01 SP 40A 25 XLPE
HI-L07-DB-GR-02 SP 40A 25 XLPE
HI-L07-DB-GR-03 SP 40A 25 XLPE
HI-L07-DB-GR-04 SP 40A 25 XLPE
HI-L07-DB-GR-05 SP 40A 25 XLPE
HI-L07-DB-GR-06 SP 40A 25 XLPE
HI-L07-DB-GR-07 SP 40A 25 XLPE
HI-L07-DB-GR-08 SP 40A 25 XLPE
HI-L07-DB-GR-09 SP 40A 25 XLPE
HI-L07-DB-GR-10 SP 40A 25 XLPE
HI-L07-DB-GR-11 SP 40A 25 XLPE
HI-L07-DB-GR-12 SP 40A 25 XLPE
HI-L07-DB-GR-13 SP 40A 25 XLPE
HI-L07-DB-GR-14 SP 40A 25 XLPE
HI-L07-DB-GR-15 SP 40A 25 XLPE
HI-L07-DB-GR-16 SP 40A 25 XLPE
HI-L07-DB-GR-17 SP 40A 25 XLPE
HI-L07-DB-GR-18 SP 40A 25 XLPE
HI-L07-DB-GR-19 SP 40A 25 XLPE
HI-L07-DB-GR-20 SP 40A 25 XLPE
HI-L07-DB-Suite SP 63A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX150 1CX70 28.67 28.67 46.87 104.20
REMARKS
KR DDR JS s KR DDR
L2 20 11 7 2 14 4
L3 22 12 8 2 1 16 4
JS
2 20
2 22
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: HI-L07-SMDB-GR-02 LOCATION:
FED FROM: HI-B01-MDB-01
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HI-L07-DB-GR-21 SP 40A 25 XLPE
HI-L07-DB-GR-22 SP 40A 25 XLPE
HI-L07-DB-GR-23 SP 40A 25 XLPE
HI-L07-DB-GR-24 SP 40A 25 XLPE
HI-L07-DB-GR-25 SP 40A 25 XLPE
HI-L07-DB-GR-26 SP 40A 25 XLPE
HI-L07-DB-GR-27 SP 40A 25 XLPE
HI-L07-DB-GR-28 SP 40A 25 XLPE
HI-L07-DB-GR-29 SP 40A 25 XLPE
HI-L07-DB-GR-30 SP 40A 25 XLPE
HI-L07-DB-GR-31 SP 40A 25 XLPE
HI-L07-DB-GR-32 SP 40A 25 XLPE
HI-L07-DB-GR-33 SP 40A 25 XLPE
HI-L07-DB-GR-34 SP 40A 25 XLPE
HI-L07-DB-GR-35 SP 40A 25 XLPE
HI-L07-DB-GR-36 SP 40A 25 XLPE
HI-L05-DB-CM-01 TP 63A 35 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX95 1CX50 35.57 31.07 31.07 97.70
REMARKS
KR DDR JS s KR DDR
L2 20 11 7 2 14 4
L3 22 12 8 2 1 16 4
JS
2 20
2 22
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: HI-L07-SMDB-GR-03 LOCATION:
FED FROM: HI-B01-MDB-01
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HI-L07-DB-GR-37 SP 40A 25 XLPE
HI-L07-DB-GR-38 SP 40A 25 XLPE
HI-L07-DB-GR-39 SP 40A 25 XLPE
HI-L07-DB-GR-40 SP 40A 25 XLPE
HI-L07-DB-GR-41 SP 40A 25 XLPE
HI-L07-DB-GR-42 SP 40A 25 XLPE
HI-L07-DB-GR-43 SP 40A 25 XLPE
HI-L07-DB-GR-44 SP 40A 25 XLPE
HI-L07-DB-GR-45 SP 40A 25 XLPE
HI-L07-DB-GR-46 SP 40A 25 XLPE
HI-L07-DB-GR-47 SP 40A 25 XLPE
HI-L07-DB-GR-48 SP 40A 25 XLPE
HI-L07-DB-GR-49 SP 40A 25 XLPE
HI-L07-DB-GR-50 SP 40A 25 XLPE
HI-L07-DB-GR-51 SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX70 1CX35 24.17 24.17 24.17 72.50
REMARKS
KR DDR JS s KR DDR
L2 20 11 7 2 14 4
L3 22 12 8 2 1 16 4
JS
2 20
2 22
DETAILS OF CONNECTED LOAD/MAX DEMAND
MAIN DISTRIBUTION BOARD
PROJECT: HOLIDAY INN &STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants PO Box 26739, Dubai - UAE
PANEL ID: HI-BOI-MDB-03 LOCATION: DUBAI, UNITED ARAB EMIRATES T +971 04 388 1616
PVC/
RATING - AMPS CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
XLPE/
CIRCUIT/ FAULT ECC
SP/ DUTY LOAD STANDBY
FEEDER DUTY SIZE LV/HV REMARKS
TP SWA/ 2/4 2/3/4C R - PH Y - PH B - PH (kW) LOAD (kW) 1- PH 3- PH 3- PH
DB NO. ACB MCCB MCB KA 1C mm² TOTAL KW CT
PVC 1C mm² mm² KW KW KW (1) (2) (3) (4)
INCOMER 1 TP 630A 50 XLPE BY DEWA 303.33 303.33 303.33 910.00 840.00 70 1 CTs Check Meter
OUTGOING
CHILLER-01 TP 800A 50 XLPE 2X4CX300 2x1Cx150 116.67 116.67 116.67 350.00 350.00 0.00 WITH VFD
CHILLER-02 TP 800A 50 XLPE 2X4CX300 2x1Cx150 116.67 116.67 116.67 350.00 350.00 0.00 WITH VFD
HI-RF-MCC-CHWP-01 TP 630A 50 XLPE 4CX300 1Cx150 70.00 70.00 70.00 210.00 140.00 70.00
TOTAL CONNECTED LOAD PER PHASE 303.33 303.33 303.33 910.00 840.00 70.00
MAX. DEMAND (3 PH) 819 KW DIVERSITY 0.90 TOTAL CONNECTED LOAD (3PH) 910.00 KW
REV: Type of Meter (Rating of Incomer):
DATE: (1) Upto 60 A (2) Upto 100 A (3) 125 - 160 A
(1 phase) (3 phase) (4) LV CT . . . . .. / . . . . . A / HV CT. . . . / . . . . A
DETAILS OF CONNECTED L
MAIN DISTRIBUT
PROJECT: OWNER:
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HT-RF-MCC-CHWP-01 LOCATION:
FED FROM: HT-BO1-MDB-03
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
CHWTP-RF-01 (Duty) TP 125A 35 XLPE
CHWTP-RF-02 (Duty) TP 125A 35 XLPE
CHWTP-RF-03 (Stand By) TP 125A 35 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC TCL DUTY STANDBY
SIZE
2/3/4C R - PH Y - PH B - PH (kW) LOAD (kW) 1- PH 3- PH
1C mm² TOTAL KW
mm² KW KW KW (1) (2)
NNECTED LOAD PER PHASE 70.00 70.00 70.00 210.00 140.00 70.00
TOTAL CONNECTED LOAD (3PH)
LV/HV REMARKS
3- PH
CT
(3) (4)
ELE INTERLOCK TO
BE PROVIDED,
VFD (100mA
ELCB)
ELE INTERLOCK TO
BE PROVIDED,
VFD (100mA
ELCB)
210.00 KW
97 KW
DETAILS OF CONNECTED LOAD/MAX DEMAND
MAIN DISTRIBUTION BOARD
PROJECT: HOLIDAY INN &STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants PO Box 26739, Dubai - UAE
PANEL ID: HI-BOI-MDB-04 LOCATION: DUBAI, UNITED ARAB EMIRATES T +971 04 388 1616
PVC/
RATING - AMPS CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
XLPE/
CIRCUIT/ FAULT ECC
SP/ DUTY LOAD STANDBY
FEEDER DUTY SIZE LV/HV REMARKS
TP SWA/ 2/4 2/3/4C R - PH Y - PH B - PH (kW) LOAD (kW) 1- PH 3- PH 3- PH
DB NO. ACB MCCB MCB KA 1C mm² TOTAL KW CT
PVC 1C mm² mm² KW KW KW (1) (2) (3) (4)
INCOMER 1 TP 630A 50 XLPE BY DEWA 316.67 316.67 316.67 890.00 880.00 70 1 CTs Check Meter
OUTGOING
CHILLER-03 TP 800A 50 XLPE 2X4CX300 2x1Cx150 123.33 123.33 123.33 370.00 370.00 0.00 WITH VFD
CHILLER-04 TP 800A 50 XLPE 2X4CX300 2x1Cx150 123.33 123.33 123.33 370.00 370.00 0.00 WITH VFD
HI-RF-MCC-CHWP-01 TP 350A 50 XLPE 4CX300 1Cx150 70.00 70.00 70.00 150.00 140.00 70.00
TOTAL CONNECTED LOAD PER PHASE 316.67 316.67 316.67 890.00 880.00 70.00
MAX. DEMAND (3 PH) 801 KW DIVERSITY 0.90 TOTAL CONNECTED LOAD (3PH) 890.00 KW
REV: Type of Meter (Rating of Incomer):
DATE: (1) Upto 60 A (2) Upto 100 A (3) 125 - 160 A
(1 phase) (3 phase) (4) LV CT . . . . .. / . . . . . A / HV CT. . . . / . . . . A
DETAILS OF CONNECTED L
MAIN DISTRIBUT
PROJECT: OWNER:
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HT-RF-MCC-CHWP-01 LOCATION:
FED FROM: HT-BO1-MDB-03
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
CHWTP-RF-01 (Duty) TP 125A 35 XLPE
CHWTP-RF-02 (Duty) TP 125A 35 XLPE
CHWTP-RF-03 (Stand By) TP 125A 35 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC TCL DUTY STANDBY
SIZE
2/3/4C R - PH Y - PH B - PH (kW) LOAD (kW) 1- PH 3- PH
1C mm² TOTAL KW
mm² KW KW KW (1) (2)
NNECTED LOAD PER PHASE 70.00 70.00 70.00 210.00 140.00 70.00
TOTAL CONNECTED LOAD (3PH)
LV/HV REMARKS
3- PH
CT
(3) (4)
ELE INTERLOCK TO
BE PROVIDED,
VFD (100mA
ELCB)
ELE INTERLOCK TO
BE PROVIDED,
VFD (100mA
ELCB)
210.00 KW
97 KW
DETAILS OF CONNECTED
MAIN DISTRIBUT
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: NAKHEEL
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HT-B01-MDB-05 LOCATION:
FED FROM: TRANSFORMER - 5
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HT-B01-SMDB-MECH TP 350A 50 XLPE
HI-LGF-MCC-01 TP 63A 50 XLPE
HI-LMZ-MCC-01 TP 225A 50 XLPE
HI-RF-MCC-01-NF TP 63A 50 XLPE
HI-LGF-MCC-01 TP 40A 50 XLPE
HI-RF-MCC-LIFTS TP 250A 50 XLPE
HI-B01-EMDB-01
SPARE TP 630A 50
AHF TP 160A 50
TVSS TP 100A 50
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC DUTY LOAD STANDBY
SIZE
2/3/4C R - PH Y - PH B - PH (kW) LOAD (kW) 1- PH 3- PH
1C mm² TOTAL KW
mm² KW KW KW (1) (2)
LV/HV REMARKS
3- PH
CT
(3) (4)
LV INTEGRAL KWHR
1 2400/5 A
350kVAR CAP.
BANK
Active Harmonic
Filter
1031.27 KW
DETAILS OF CONNECTED LOAD/MAX DEMAND
SUB MAIN DISTRIBUTION BOARD
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: NAKHEEL
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants PO Box 26739, Dubai - UAE
PANEL ID: HT-B01-SMDB-MECH LOCATION: DUBAI, UNITED ARAB EMIRATES T +971 04 388 1616
PVC/
RATING - AMPS CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
XLPE/
CIRCUIT/ FAULT ECC
SP/ DUTY LOAD STANDBY
FEEDER DUTY SIZE LV/HV REMARKS
TP SWA/ 2/4 2/3/4C R - PH Y - PH B - PH (kW) LOAD (kW) 1- PH 3- PH 3- PH
DB NO. ACB MCCB MCB KA 1C mm² TOTAL KW CT
PVC 1C mm² mm² KW KW KW (1) (2) (3) (4)
INCOMER TP 350A 35 XLPE 4CX240 1Cx120 52.48 52.48 52.48 157.43 52.46 0.00
OUTGOING
HT-BO1-MCC-01 TP 125A 35 XLPE 4CX50 1Cx25 17.50 17.50 17.50 52.50 0
HT-BO2-MCC-01 TP 250A 35 XLPE 4CX150 1Cx70 34.97 34.97 34.97 104.92 52.46
TOTAL CONNECTED LOAD PER PHASE 52.48 52.48 52.48 157.43 52.46 0.00
MAX. DEMAND (3 PH) 133.81 KW AT 0.85 DIVERSITY TOTAL CONNECTED LOAD (3PH) 157.43 KW
REV: Type of Meter (Rating of Incomer):
DATE: (1) Upto 60 A (2) Upto 100 A (3) 125 - 160 A
DETAILS OF CONNECTED LOAD/
MAIN DISTRIBUTION B
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HI-BO1-MCC-01 LOCATION:
FED FROM: HI-B01-SMDB-Mech
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX50 1Cx25 17.50 17.50 17.50 52.50
REMARKS
DOL (100mA
ELCB)
DOL (100mA
ELCB)
DOL (100mA
ELCB)
DOL (100mA
ELCB)
DOL (100mA
ELCB)
DOL (100mA
ELCB)
DOL (100mA
ELCB)
DOL (100mA
ELCB)
DETAILS OF CONNECT
MAIN DISTR
PROJECT: OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HT-L04-MCC-FP LOCATION:
FED FROM: HT-L04-SMDB-MECH
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
EAF-B2-01 (Duty) TP 32A 35 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC DUTY LOAD STANDBY
SIZE
2/3/4C R - PH Y - PH B - PH (kW) LOAD (kW) 1- PH 3- PH
1C mm² TOTAL KW
mm² KW KW KW (1) (2)
NNECTED LOAD PER PHASE 34.97 34.97 34.97 104.92 52.46 52.46
TOTAL CONNECTED LOAD (3PH)
Meter (Rating of Incomer): STAND BY LOAD (3 PH)
(1) Upto 60 A (2) Upto 100 A (3) 125 - 160 A
(3 phase) (4) LV CT . . . . .. / . . . . . A / HV CT. . . . / . . . . A
PO Box 26739, Dubai - UAE
T +971 04 388 1616
F +971 04 380 6161
LV/HV REMARKS
3- PH
CT
(3) (4)
ELE INTERLOCK TO BE
PROVIDED, VFD
(100mA ELCB)
ELE INTERLOCK TO BE
PROVIDED, VFD
(100mA ELCB)
ELE INTERLOCK TO BE
PROVIDED, VFD
(100mA ELCB)
ELE INTERLOCK TO BE
PROVIDED, VFD
(100mA ELCB)
104.92 KW
13.00 KW
DETAILS OF CONNECTED LOAD/MA
MAIN DISTRIBUTION BOA
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HI-LMZ-MCC-01 LOCATION:
FED FROM: HI-B01-SMDB-Mech
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX95 1Cx50 32.28 32.28 32.28 96.84
REMARKS
DOL (100mA
ELCB)
DOL (100mA
ELCB)
DOL (100mA
ELCB)
DOL (100mA
ELCB)
DETAILS OF CONNECTED LOAD/MA
MAIN DISTRIBUTION BOA
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HI-RF-MCC-01 LOCATION:
FED FROM: HI-B01-SMDB-Mech
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
FAHU-HIH-RF-01 (Supply) TP 40A 25.0 XLPE
FAHU-HIH-RF-01 (return) TP 40A 25.0 XLPE
FAHU-HIH-RF-01 APT (Supply) TP 40A 25.0 XLPE
FAHU-HIH-RF-01 APT (return) TP 40A 25.0 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX16 1Cx16 6.00 6.00 6.00 18.00
REMARKS
DETAILS OF CONNECTED LOAD/MA
MAIN DISTRIBUTION BOA
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HI-LGF-MCC-01 LOCATION:
FED FROM: HI-B01-SMDB-Mech
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
MAHU-GF-01 TP 32A 25.0 XLPE
MAHU-GF-02 TP 16A 25.0 XLPE
MAHU-GF-03 TP 16A 25.0 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX16 1Cx16 5.00 5.00 5.00 15.00
REMARKS
DETAILS OF CONNECTED LOAD/MA
SUB MAIN DISTRIBUTION B
PROJECT: OWNER: NAKHEEL
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HI-RF-MCC-LIFTS LOCATION:
FED FROM: HT-B00-MDB-5
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HI-RF-LIFT-1 TP 32A 35 XLPE
HI-RF-LIFT-2 TP 32A 35 XLPE
HI-RF-LIFT-3 TP 32A 35 XLPE
HI-RF-LIFT-4 TP 32A 35 XLPE
HI-RF-LIFT-5 TP 32A 35 XLPE
HI-LGF-DB-LMR ROOM SP 40A 35 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4Cx120 1Cx70 19.17 20.57 20.57 53.00
REMARKS
DETAILS OF CONNECTED
MAIN DISTRIBUT
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: NAKHEEL
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: HI-B01-EMDB-1 LOCATION:
FED FROM: MDB - 5 / GENERATOR -01
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HT-LRF-EMCC-1 TP 350A 50 XLPE
HI-B01-ESMDB-CM1 TP 160A 50 XLPE
HI-B01-ESMDB-CM2 TP 63A 50 XLPE
HI-B01-ESMDB-UPS TP 150A 50 XLPE
HI-LGF-ESMDB-Kitchen TP 300A 50 XLPE
AHF TP 160A 50
SPACE
TOTAL CONNECTED LOAD PER PHASE
MAX. DEMAND (3 PH) 73.80 KW AT 0.90 DIVERSITY
REV: Type of Meter (Rating of Incomer):
DATE: (1) Upto 60 A
(1 phase)
DETAILS OF CONNECTED LOAD/MAX DEMAND
MAIN DISTRIBUTION BOARD
OWNER: NAKHEEL
CONSULTANT: WME Consultants
DUBAI, UNITED ARAB EMIRATES
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC DUTY LOAD STANDBY
SIZE
2/3/4C R - PH Y - PH B - PH (kW) LOAD (kW) 1- PH 3- PH
1C mm² TOTAL KW
mm² KW KW KW (1) (2)
NNECTED LOAD PER PHASE 144.67 144.67 144.67 419.00 82.00 82.00
TOTAL CONNECTED LOAD (3PH)
Meter (Rating of Incomer):
(1) Upto 60 A (2) Upto 100 A (3) 125 - 160 A
(3 phase) (4) LV CT . . . . .. / . . . . . A / HV CT. . . . / . . . . A
PO Box 26739, Dubai - UAE
T +971 04 388 1616
F +971 04 380 6161
LV/HV REMARKS
3- PH
(3) CT Diverity Factor
(4) Carried over
1 1050
ATS
350kVAR CAP.
BANK
Active Harmonic
Filter
419.00 KW
Breaker Cable size (4C) CPC Cable Size (3C) Cable Size (2C)
12A 4CX2.5 1CX2.5 3CX2.5 2CX2.5 INCOMING CABLE : 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 CU/PVC-ECC
16A 4CX4 1CX4 3CX4 2CX4 INCOMING CABLE : 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 CU/PVC-ECC
20A 4CX4 1CX4 3CX4 2CX4 INCOMING CABLE : 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 CU/PVC-ECC
32A 4CX6 1Cx6 3CX6 2CX6 INCOMING CABLE : 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 CU/PVC-ECC
40A 4CX10 1Cx10 3CX10 2CX10 INCOMING CABLE : 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 CU/PVC-ECC
63A 4CX16 1Cx16 3CX16 2CX16 INCOMING CABLE : 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 CU/PVC-ECC
80A 4CX25 1Cx16 3CX25 2CX25 INCOMING CABLE : 4C 25mm2 XLPE/SWA/PVC + 1C 16mm2 CU/PVC-ECC
100A 4CX35 1Cx16 3CX35 2CX35 INCOMING CABLE : 4C 35mm2 XLPE/SWA/PVC + 1C 16mm2 CU/PVC-ECC
125A 4CX50 1Cx25 3CX50 2CX50 INCOMING CABLE : 4C 50mm2 XLPE/SWA/PVC + 1C 25mm2 CU/PVC-ECC
150A 4CX70 1Cx35 3CX70 2CX70 INCOMING CABLE : 4C 70mm2 XLPE/SWA/PVC + 1C 35mm2 CU/PVC-ECC
160A 4CX70 1Cx35 3CX70 2CX70 INCOMING CABLE : 4C 70mm2 XLPE/SWA/PVC + 1C 35mm2 CU/PVC-ECC
200A 4CX95 1Cx50 3CX95 2CX95 INCOMING CABLE : 4C 95mm2 XLPE/SWA/PVC + 1C 50mm2 CU/PVC-ECC
225A 4CX120 1Cx70 3CX120 2CX120 INCOMING CABLE : 4C 120mm2 XLPE/SWA/PVC + 1C 70mm2 CU/PVC-ECC
250A 4CX150 1Cx70 3CX150 2CX150 INCOMING CABLE : 4C 150mm2 XLPE/SWA/PVC + 1C 70mm2 CU/PVC-ECC
300A 4CX185 1Cx95 3CX185 2CX185 INCOMING CABLE : 4C 185mm2 XLPE/SWA/PVC + 1C 95mm2 CU/PVC-ECC
350A 4CX240 1Cx120 3CX240 2CX240 INCOMING CABLE : 4C 240mm2 XLPE/SWA/PVC + 1C 120mm2 CU/PVC-ECC
400A 4CX300 1Cx150 3CX300 2CX300 INCOMING CABLE : 4C 300mm2 XLPE/SWA/PVC + 1C 150mm2 CU/PVC-ECC
630A 2X4CX185 2X1Cx95 2X3CX185
800A 2X4CX300 2x1Cx150 2X3CX300
1000A 3X4CX240 3x1Cx120 3X3CX240
1200A 3X4CX300 3x1Cx150 3X3CX300
1600A 4X4CX300 4x1Cx150 4X3CX300
2500A 11X1CX630 2x1Cx300
DETAILS OF CONNECTED
MAIN DISTRIBU
PROJECT: OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HT-LRF-EMCC-1 LOCATION:
FED FROM: HT-B01-EMDB-1
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SPF-RF-01 (Duty) TP 32A 35 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC DUTY LOAD STANDBY
SIZE
2/3/4C R - PH Y - PH B - PH (kW) LOAD (kW) 1- PH 3- PH
1C mm² TOTAL KW
mm² KW KW KW (1) (2)
NNECTED LOAD PER PHASE 54.67 54.67 54.67 164.00 82.00 82.00
TOTAL CONNECTED LOAD (3PH)
Meter (Rating of Incomer): STAND BY LOAD (3 PH)
(1) Upto 60 A (2) Upto 100 A (3) 125 - 160 A
(3 phase) (4) LV CT . . . . .. / . . . . . A / HV CT. . . . / . . . . A
PO Box 26739, Dubai - UAE
T +971 04 388 1616
F +971 04 380 6161
LV/HV REMARKS
3- PH
CT
(3) (4)
ELE INTERLOCK TO BE
PROVIDED, VFD
(100mA ELCB)
ELE INTERLOCK TO BE
PROVIDED, VFD
(100mA ELCB)
ELE INTERLOCK TO BE
PROVIDED, VFD
(100mA ELCB)
ELE INTERLOCK TO BE
PROVIDED, VFD
(100mA ELCB)
ELE INTERLOCK TO BE
PROVIDED, VFD
(100mA ELCB)
ELE INTERLOCK TO BE
PROVIDED, VFD
(100mA ELCB)
ELE INTERLOCK TO BE
PROVIDED, VFD
(100mA ELCB)
ELE INTERLOCK TO BE
PROVIDED, VFD
(100mA ELCB)
164.00 KW
13.00 KW
DETAILS OF CONNECTED LOAD/MA
SUB MAIN DISTRIBUTION B
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: NAKHEEL
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HI-B01-ESMDB-CM LOCATION:
FED FROM: HI-B01-EMDB
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HT-B02-EDB-CM-01 TP 40A 25 XLPE
HT-B01-EDB-CM-01 TP 40A 25 XLPE
HT-LGF-EDB-CM-01 TP 40A 25 XLPE
HT-LMZ-EDB-CM-01 TP 32A 25 XLPE
HT-L01-EDB-CM-01 TP 40A 25 XLPE
HT-L04-EDB-CM-01 TP 40A 25 XLPE
HT-L38-EDB-CM-01 TP 40A 25 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX70 1Cx35 23.33 23.33 23.33 70.00
REMARKS
Central Battery
Panel
DETAILS OF CONNECTED LOAD/MA
SUB MAIN DISTRIBUTION B
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: NAKHEEL
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HI-B01-ESMDB-CM2 LOCATION:
FED FROM: HI-B01-EMDB-1
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HT-LXX-ISO-GSM TP 63A 25 XLPE
HT-B2-EDB-ET TP 32A 35 XLPE
HT-B2-EDB-MTR TP 32A 35 XLPE
HT-B2-ESMDB-DU TP 63A 35 XLPE
Iso. for ODU Unit TP 32A 35 XLPE
Iso. for ODU Unit TP 32A 35 XLPE
Iso. for ODU Unit TP 32A 35 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
2X4CX300 2x1Cx150 28.37 28.37 28.37 85.10
REMARKS
Etisalat
DU
DETAILS OF CONNECTED LOAD/MA
SUB MAIN DISTRIBUTION B
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: NAKHEEL
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HI-B01-ESMDB-UPS system LOCATION:
FED FROM: HI-B01-EMDB
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HT-B01-UDB-1-IT/SECURITY TP 32A 25 XLPE
HT-B01-UDB-2-IT/SECURITY TP 32A 25 XLPE
HT-LGF-UDB-3-IT/SECURITY TP 32A 25 XLPE
HT-L03-UDB-3-IT/SECURITY TP 32A 25 XLPE
HT-L05-UDB-3-IT/SECURITY TP 32A 25 XLPE
Iso. for ODU Unit TP 32A 35 XLPE
Iso. for ODU Unit TP 32A 35 XLPE
Iso. for ODU Unit TP 32A 35 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX70 1Cx35 26.67 26.67 26.67 65.00
REMARKS
DISTRIBUTIO
PROJECT: Nakheel Mall Hotel LOCATION: DUBAI, UNITED ARAB EMIR
DB REF : HT-B01-EDB-SR-CM2 INCOMING CABLE : 4C 95mm2 XLPE/S
FED FROM: HT-B1-USMDB-SR-01
CCT ECC
MCB WIRE
RATING OF RATING OF WIRE
SL. NO. CIR NO. RTG. IN SIZE ROOM/AREA
INCOMER ELCB SIZE
AMPS mm2 mm2 LTG EX. FAN
1 R1 32 6 6 IT Hub Rack 1
2 Y1 32 6 6 IT Hub Rack 2
40A 4P B1 32 6 6 IT Hub Rack 3
30mA ELCB 3
1 4 R2 32 6 6 IT Hub Rack 4
5 Y2 32 6 6 IT Hub Rack 5
6 B2 32 6 6 IT Hub Rack 6
7 R3 32 6 6 IT Hub Rack 7
8 Y3 32 6 6 IT Hub Rack 8
40A 4P 9 B3 32 6 6 IT Hub Rack 9
30mA ELCB
1 10 R4 32 6 6 IT Hub Rack 10
200A 11 Y4 32 6 6 IT Hub Rack 11
4P 12 B4 32 6 6 IT Hub Rack 12
ISOLATOR 13 R5 32 6 6 IT Hub Rack 13
14 Y5 32 6 6 IT Hub Rack 14
40A 4P 15 B5 32 6 6 IT Hub Rack 15
30mA ELCB
1 16 R6 32 6 6 IT Hub Rack 16
17 Y6 Space
18 B6 Space
LTG.=LIGHTING,EX. FAN = EXHAUST FAN, S/O=SOCKET OUTLET,SH. S/O = SHAVER SOCKET OUTLET, W/H = WATER HEATER, H/D = HAND DRYER, D/W=DISH W
FCU=FAN COIL UNIT, CCU = COOKER CONTROL UNIT, W = WINDOW TYPE A/C & S = SPLIT TYPE A/C
DISTRIBUTION BOARD LOAD SCHEDULE
N: DUBAI, UNITED ARAB EMIRATES
G CABLE : 4C 95mm2 XLPE/SWA/PVC + 1C 50mm2 CU/PVC-ECC
WATTS/ UNIT
20A 32A 32A
13A 13A
SHAVER DP+C/ DP+C/ FCU D/W H/D SCU TP+N+E ISOL. MISC. R
SSO TSSO U U IND.
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
REMARKS
Y B
0.00 0.00
0.00 KW
T +971 04 388 1616
DETAILS OF CONNECTED
MAIN DISTRIBU
PROJECT: OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HT-LMZ-EMCC-1 LOCATION:
FED FROM: HT-B01-EMDB-1
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SEF-MZ-01 (Duty) TP 40A 35 XLPE
SEF-MZ-02 (standby) TP 40A 35 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC DUTY LOAD STANDBY
SIZE
2/3/4C R - PH Y - PH B - PH (kW) LOAD (kW) 1- PH 3- PH
1C mm² TOTAL KW
mm² KW KW KW (1) (2)
NNECTED LOAD PER PHASE 20.00 20.00 20.00 60.00 30.00 30.00
TOTAL CONNECTED LOAD (3PH)
Meter (Rating of Incomer): STAND BY LOAD (3 PH)
(1) Upto 60 A (2) Upto 100 A (3) 125 - 160 A
(3 phase) (4) LV CT . . . . .. / . . . . . A / HV CT. . . . / . . . . A
PO Box 26739, Dubai - UAE
T +971 04 388 1616
F +971 04 380 6161
LV/HV REMARKS
3- PH
CT
(3) (4)
ELE INTERLOCK TO BE
PROVIDED, VFD
(100mA ELCB)
ELE INTERLOCK TO BE
PROVIDED, VFD
(100mA ELCB)
60.00 KW
13.00 KW
DETAILS OF CONNECTED LOAD/MAX DEMAND
MAIN DISTRIBUTION BOARD
PROJECT: HOLIDAY INN &STAYBRIDGE SUITES OWNER: HOLIDAY INN &STAYBRIDGE SUITES
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants PO Box 26739, Dubai - UAE
PANEL ID: SB-MDB-06 LOCATION: DUBAI, UNITED ARAB EMIRATES T +971 04 388 1616
PVC/
RATING - AMPS CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
XLPE/
CIRCUIT/ SP/ FAULT ECC
FEEDER DUTY SIZE LV/HV REMARKS
TP SWA/ 2/4 2/3/4C R - PH Y - PH B - PH 1- PH 3- PH 3- PH
DB NO. ACB MCCB MCB KA 1C mm² TOTAL KW CT
PVC 1C mm² mm² KW KW KW (1) (2) (3)
(4)
INCOMER 4P 2500A SET @ 0.85 50 XLPE DEWA CABLES 400.93 400.93 400.93 1202.80
OUTGOING
OUTGOING
SB-LGF-DB-AP- ST TP 40A 25 XLPE
SB-LGF-DB-AP- 1BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 1BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 1BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 1BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 2BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 2BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 2BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 2BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 2BHK TP 40A 25 XLPE
SB-LGF-DB-CS SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX120 1CX70 30.77 30.77 30.77 92.30
REMARKS
DETAILS OF CONNECTED LOAD
MAIN DISTRIBUTION
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-GF-SMDB-AP-1 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-LGF-DB-AP- 1BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 1BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 1BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 1BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 1BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 1BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 1BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 1BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 1BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 1BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 1BHK TP 40A 25 XLPE
SB-LGF-DB-AP- 1BHK TP 40A 25 XLPE
SB-LGF-DB-CM TP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX150 1CX70 33.80 33.80 33.80 101.40
REMARKS
DETAILS OF CONNECTED LOAD
MAIN DISTRIBUTION
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-LMz-SMDB-AP-1 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-LMZ-DB-AP- ST TP 40A 25 XLPE
SB-LMZ-DB-AP- ST TP 40A 26 XLPE
SB-LMZ-DB-AP- ST TP 40A 27 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 25 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 25 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 25 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 25 XLPE
SB-LMZ-DB-AP- 2BHK TP 40A 25 XLPE
SB-LMZ-DB-AP- 2BHK TP 40A 25 XLPE
SB-LMZ-DB-AP- 2BHK TP 40A 25 XLPE
SB-LMZ-DB-AP- 2BHK TP 40A 25 XLPE
SB-LMZ-DB-AP- 2BHK TP 40A 25 XLPE
SB-LMZ-DB-AP- 2BHK TP 40A 25 XLPE
SB-LMZ-DB-CS SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX185 1CX95 38.50 38.50 38.50 115.50
REMARKS
DETAILS OF CONNECTED LOAD
MAIN DISTRIBUTION
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-LMz-SMDB-AP-2 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-LMZ-DB-AP- 1BHK TP 40A 25 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 25 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 25 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 25 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 26 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 27 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 28 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 29 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 30 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 31 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 32 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 33 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 34 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 35 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 36 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 37 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 38 XLPE
SB-LMZ-DB-AP- 1BHK TP 40A 39 XLPE
SB-LMZ-DB-AP- 2BHK TP 40A 25 XLPE
SB-LMZ-DB-CS SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX185 1CX95 50.60 50.60 50.60 151.80
REMARKS
DETAILS OF CONNECTED LOAD
MAIN DISTRIBUTION
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-L01-SMDB-AP-1 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-L01-DB-AP- ST TP 40A 25 XLPE
SB-L01-DB-AP- ST TP 40A 26 XLPE
SB-L01-DB-AP- ST TP 40A 27 XLPE
SB-L01-DB-AP- 1BHK TP 40A 25 XLPE
SB-L01-DB-AP- 1BHK TP 40A 25 XLPE
SB-L01-DB-AP- 1BHK TP 40A 25 XLPE
SB-L01-DB-AP- 1BHK TP 40A 25 XLPE
SB-L01-DB-AP- 2BHK TP 40A 25 XLPE
SB-L01-DB-AP- 2BHK TP 40A 25 XLPE
SB-L01-DB-AP- 2BHK TP 40A 25 XLPE
SB-L01-DB-AP- 2BHK TP 40A 25 XLPE
SB-L01-DB-AP- 2BHK TP 40A 25 XLPE
SB-L01-DB-AP- 2BHK TP 40A 25 XLPE
SB-L01-DB-AP- 2BHK TP 40A 25 XLPE
SB-L01-DB-AP- 2BHK TP 40A 25 XLPE
SB-L01-DB-CS SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX185 1CX95 45.30 45.30 45.30 135.90
REMARKS
DETAILS OF CONNECTED LOAD
MAIN DISTRIBUTION
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-L01-SMDB-AP-2 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-L01-DB-AP- 1BHK TP 40A 25 XLPE
SB-L01-DB-AP- 1BHK TP 40A 25 XLPE
SB-L01-DB-AP- 1BHK TP 40A 25 XLPE
SB-L01-DB-AP- 1BHK TP 40A 25 XLPE
SB-L01-DB-AP- 1BHK TP 40A 26 XLPE
SB-L01-DB-AP- 1BHK TP 40A 27 XLPE
SB-L01-DB-AP- 1BHK TP 40A 28 XLPE
SB-L01-DB-AP- 1BHK TP 40A 29 XLPE
SB-L01-DB-AP- 2BHK TP 40A 25 XLPE
SB-L01-DB-AP- 2BHK TP 40A 25 XLPE
SB-L01-DB-AP- 2BHK TP 40A 25 XLPE
SB-L01-DB-CS SP 40A 25 XLPE
Spare TP 40A 25
OF CONNECTED LOAD/MAX DEMAND
MAIN DISTRIBUTION BOARD
OWNER: ISHAQ (DUBAI) L.L.C
CONSULTANT: WME Consultants PO Box 26739, Dubai - UAE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX185 1CX95 31.40 31.40 31.40 94.20
REMARKS
DETAILS OF CONNECTED LOAD
MAIN DISTRIBUTION
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-L01-SMDB-AP-03 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-L01-DB-AP- 1BHK TP 40A 25 XLPE
SB-L01-DB-AP- 1BHK TP 40A 25 XLPE
SB-L01-DB-AP- 1BHK TP 40A 25 XLPE
SB-L01-DB-AP- 1BHK TP 40A 25 XLPE
SB-L01-DB-AP- 1BHK TP 40A 26 XLPE
SB-L01-DB-AP- 1BHK TP 40A 27 XLPE
SB-L01-DB-AP- 1BHK TP 40A 28 XLPE
SB-L01-DB-AP- 1BHK TP 40A 29 XLPE
SB-L01-DB-AP- 1BHK TP 40A 25 XLPE
SB-L01-DB-AP- 1BHK TP 40A 25 XLPE
SB-L01-DB-AP- 1BHK TP 40A 25 XLPE
SB-L01-DB-AP- 1BHK TP 40A 25 XLPE
SB-L01-DB-AP- 1BHK TP 40A 25 XLPE
SB-L01-DB-AP- 1BHK TP 40A 25 XLPE
SB-L01-DB-CS SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX150 1CX70 38.60 38.60 38.60 115.80
REMARKS
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-L02-SMDB-AP-1 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-L02-DB-AP- ST TP 40A 25 XLPE
SB-L02-DB-AP- ST TP 40A 26 XLPE
SB-L02-DB-AP- ST TP 40A 27 XLPE
SB-L02-DB-AP- 1BHK TP 40A 25 XLPE
SB-L02-DB-AP- 1BHK TP 40A 25 XLPE
SB-L02-DB-AP- 1BHK TP 40A 25 XLPE
SB-L02-DB-AP- 1BHK TP 40A 25 XLPE
SB-L02-DB-AP- 2BHK TP 40A 25 XLPE
SB-L02-DB-AP- 2BHK TP 40A 25 XLPE
SB-L02-DB-AP- 2BHK TP 40A 25 XLPE
SB-L02-DB-AP- 2BHK TP 40A 25 XLPE
SB-L02-DB-AP- 2BHK TP 40A 25 XLPE
SB-L02-DB-AP- 2BHK TP 40A 25 XLPE
SB-L02-DB-AP- 2BHK TP 40A 25 XLPE
SB-L02-DB-AP- 2BHK TP 40A 25 XLPE
SB-L02-DB-CS SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX185 1CX95 45.30 45.30 45.30 135.90
REMARKS
KR DDR JS s KR
L2 20 11 7 2 14
L3 22 12 8 2 1 16
DDR JS
4 2 20
4 2 22
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-L01-SMDB-AP-2 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-L02-DB-AP- 1BHK TP 40A 25 XLPE
SB-L02-DB-AP- 1BHK TP 40A 25 XLPE
SB-L02-DB-AP- 1BHK TP 40A 25 XLPE
SB-L02-DB-AP- 1BHK TP 40A 25 XLPE
SB-L02-DB-AP- 1BHK TP 40A 26 XLPE
SB-L02-DB-AP- 1BHK TP 40A 27 XLPE
SB-L02-DB-AP- 1BHK TP 40A 28 XLPE
SB-L02-DB-AP- 1BHK TP 40A 29 XLPE
SB-L02-DB-AP- 2BHK TP 40A 25 XLPE
SB-L02-DB-AP- 2BHK TP 40A 25 XLPE
SB-L02-DB-AP- 2BHK TP 40A 25 XLPE
SB-L02-DB-CS SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX185 1CX95 31.40 31.40 31.40 94.20
REMARKS
L2 20 11 7 2 14
4 2 20
DETAILS OF CONNECTED LOAD
MAIN DISTRIBUTION
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-L02-SMDB-AP-03 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-L02-DB-AP- 1BHK TP 40A 25 XLPE
SB-L02-DB-AP- 1BHK TP 40A 25 XLPE
SB-L02-DB-AP- 1BHK TP 40A 25 XLPE
SB-L02-DB-AP- 1BHK TP 40A 25 XLPE
SB-L02-DB-AP- 1BHK TP 40A 26 XLPE
SB-L02-DB-AP- 1BHK TP 40A 27 XLPE
SB-L02-DB-AP- 1BHK TP 40A 28 XLPE
SB-L02-DB-AP- 1BHK TP 40A 29 XLPE
SB-L02-DB-AP- 1BHK TP 40A 25 XLPE
SB-L02-DB-AP- 1BHK TP 40A 25 XLPE
SB-L02-DB-AP- 1BHK TP 40A 25 XLPE
SB-L02-DB-AP- 1BHK TP 40A 25 XLPE
SB-L02-DB-AP- 1BHK TP 40A 25 XLPE
SB-L02-DB-AP- 1BHK TP 40A 25 XLPE
SB-L02-DB-CS SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX150 1CX70 38.60 38.60 38.60 115.80
REMARKS
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN &STAYBRIDGE SUITES OWNER: HOLIDAY INN &STAYBRIDGE SU
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-MDB-07 LOCATION:
FED FROM: TR-07
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
DEWA CABLES 385.37 385.37 385.37 1171.10
1409.87
PO Box 26739, Dubai - UAE
T +971 04 388 1616
F +971 04 380 6161
REMARKS
DF
17.5
45.2
350kVAR
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-L03-SMDB-AP-1 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-L03-DB-AP- ST TP 40A 25 XLPE
SB-L03-DB-AP- ST TP 40A 26 XLPE
SB-L03-DB-AP- ST TP 40A 27 XLPE
SB-L03-DB-AP- 1BHK TP 40A 25 XLPE
SB-L03-DB-AP- 1BHK TP 40A 25 XLPE
SB-L03-DB-AP- 1BHK TP 40A 25 XLPE
SB-L03-DB-AP- 1BHK TP 40A 25 XLPE
SB-L03-DB-AP- 2BHK TP 40A 25 XLPE
SB-L03-DB-AP- 2BHK TP 40A 25 XLPE
SB-L03-DB-AP- 2BHK TP 40A 25 XLPE
SB-L03-DB-AP- 2BHK TP 40A 25 XLPE
SB-L03-DB-AP- 2BHK TP 40A 25 XLPE
SB-L03-DB-AP- 2BHK TP 40A 25 XLPE
SB-L03-DB-AP- 2BHK TP 40A 25 XLPE
SB-L03-DB-AP- 2BHK TP 40A 25 XLPE
SB-L03-DB-CS SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX185 1CX95 45.30 45.30 45.30 135.90
REMARKS
KR DDR JS s KR
L2 20 11 7 2 14
L3 22 12 8 2 1 16
DDR JS
4 2 20
4 2 22
DETAILS OF CONNECTED LOAD
MAIN DISTRIBUTION
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-L03-SMDB-AP-2 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-L03-DB-AP- 1BHK TP 40A 25 XLPE
SB-L03-DB-AP- 1BHK TP 40A 25 XLPE
SB-L03-DB-AP- 1BHK TP 40A 25 XLPE
SB-L03-DB-AP- 1BHK TP 40A 25 XLPE
SB-L03-DB-AP- 1BHK TP 40A 26 XLPE
SB-L03-DB-AP- 1BHK TP 40A 27 XLPE
SB-L03-DB-AP- 1BHK TP 40A 28 XLPE
SB-L03-DB-AP- 1BHK TP 40A 29 XLPE
SB-L03-DB-AP- 1BHK TP 40A 30 XLPE
SB-L03-DB-AP- 1BHK TP 40A 31 XLPE
SB-L03-DB-AP- 1BHK TP 40A 32 XLPE
SB-L03-DB-AP- 1BHK TP 40A 33 XLPE
SB-L03-DB-AP- 1BHK TP 40A 34 XLPE
SB-L03-DB-AP- 1BHK TP 40A 35 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX185 1CX95 45.27 45.27 45.27 140.80
REMARKS
power
allowances only.
power
allowances only.
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-L04-SMDB-AP-1 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-L04-DB-AP- ST TP 40A 25 XLPE
SB-L04-DB-AP- ST TP 40A 26 XLPE
SB-L04-DB-AP- ST TP 40A 27 XLPE
SB-L04-DB-AP- 1BHK TP 40A 25 XLPE
SB-L04-DB-AP- 1BHK TP 40A 25 XLPE
SB-L04-DB-AP- 1BHK TP 40A 25 XLPE
SB-L04-DB-AP- 1BHK TP 40A 25 XLPE
SB-L04-DB-AP- 2BHK TP 40A 25 XLPE
SB-L04-DB-AP- 2BHK TP 40A 25 XLPE
SB-L04-DB-AP- 2BHK TP 40A 25 XLPE
SB-L04-DB-AP- 2BHK TP 40A 25 XLPE
SB-L04-DB-AP- 2BHK TP 40A 25 XLPE
SB-L04-DB-AP- 2BHK TP 40A 25 XLPE
SB-L04-DB-AP- 2BHK TP 40A 25 XLPE
SB-L04-DB-AP- 2BHK TP 40A 25 XLPE
SB-L04-DB-CS SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX185 1CX95 45.30 45.30 45.30 135.90
REMARKS
KR DDR JS s KR
L2 20 11 7 2 14
L3 22 12 8 2 1 16
DDR JS
4 2 20
4 2 22
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-L04-SMDB-AP-2 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-L04-DB-AP- 1BHK TP 40A 25 XLPE
SB-L04-DB-AP- 1BHK TP 40A 25 XLPE
SB-L04-DB-AP- 1BHK TP 40A 25 XLPE
SB-L04-DB-AP- 1BHK TP 40A 25 XLPE
SB-L04-DB-AP- 1BHK TP 40A 26 XLPE
SB-L04-DB-AP- 1BHK TP 40A 27 XLPE
SB-L04-DB-AP- 1BHK TP 40A 28 XLPE
SB-L04-DB-AP- 1BHK TP 40A 29 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX95 1CX50 24.20 24.20 24.20 82.60
REMARKS
L2 20 11 7 2 14
power
allowances only.
4 2 20
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-L05-SMDB-AP-1 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-L05-DB-AP- ST TP 40A 25 XLPE
SB-L05-DB-AP- ST TP 40A 26 XLPE
SB-L05-DB-AP- ST TP 40A 27 XLPE
SB-L05-DB-AP- 1BHK TP 40A 25 XLPE
SB-L05-DB-AP- 1BHK TP 40A 25 XLPE
SB-L05-DB-AP- 1BHK TP 40A 25 XLPE
SB-L05-DB-AP- 1BHK TP 40A 25 XLPE
SB-L05-DB-AP- 2BHK TP 40A 25 XLPE
SB-L05-DB-AP- 2BHK TP 40A 25 XLPE
SB-L05-DB-AP- 2BHK TP 40A 25 XLPE
SB-L05-DB-AP- 2BHK TP 40A 25 XLPE
SB-L05-DB-AP- 2BHK TP 40A 25 XLPE
SB-L05-DB-AP- 2BHK TP 40A 25 XLPE
SB-L05-DB-AP- 2BHK TP 40A 25 XLPE
SB-L05-DB-AP- 2BHK TP 40A 25 XLPE
SB-L05-DB-CS SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX185 1CX95 45.30 45.30 45.30 135.90
REMARKS
KR DDR JS s KR
L2 20 11 7 2 14
L3 22 12 8 2 1 16
DDR JS
4 2 20
4 2 22
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-L05-SMDB-AP-2 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-L05-DB-AP- 1BHK TP 40A 25 XLPE
SB-L05-DB-AP- 1BHK TP 40A 25 XLPE
SB-L05-DB-AP- 1BHK TP 40A 25 XLPE
SB-L05-DB-AP- 1BHK TP 40A 25 XLPE
SB-L05-DB-AP- 1BHK TP 40A 26 XLPE
SB-L05-DB-AP- 1BHK TP 40A 27 XLPE
SB-L05-DB-AP- 1BHK TP 40A 28 XLPE
SB-L05-DB-AP- 1BHK TP 40A 29 XLPE
SB-L05-DB-AP- 1BHK TP 40A 29 XLPE
SB-L05-DB-AP- 1BHK TP 40A 29 XLPE
SB-L05-DB-CS SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX120 1CX70 29.00 29.00 29.00 87.00
REMARKS
L2 20 11 7 2 14
4 2 20
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-L06-SMDB-AP-1 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-L06-DB-AP- ST TP 40A 25 XLPE
SB-L06-DB-AP- ST TP 40A 26 XLPE
SB-L06-DB-AP- ST TP 40A 27 XLPE
SB-L06-DB-AP- 1BHK TP 40A 25 XLPE
SB-L06-DB-AP- 1BHK TP 40A 25 XLPE
SB-L06-DB-AP- 1BHK TP 40A 25 XLPE
SB-L06-DB-AP- 1BHK TP 40A 25 XLPE
SB-L06-DB-AP- 2BHK TP 40A 25 XLPE
SB-L06-DB-AP- 2BHK TP 40A 25 XLPE
SB-L06-DB-AP- 2BHK TP 40A 25 XLPE
SB-L06-DB-AP- 2BHK TP 40A 25 XLPE
SB-L06-DB-AP- 2BHK TP 40A 25 XLPE
SB-L06-DB-AP- 2BHK TP 40A 25 XLPE
SB-L06-DB-AP- 2BHK TP 40A 25 XLPE
SB-L06-DB-AP- 2BHK TP 40A 25 XLPE
SB-L06-DB-CS SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX185 1CX95 45.30 45.30 45.30 135.90
REMARKS
KR DDR JS s KR
L2 20 11 7 2 14
L3 22 12 8 2 1 16
DDR JS
4 2 20
4 2 22
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-L06-SMDB-AP-2 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-L06-DB-AP- 1BHK TP 40A 25 XLPE
SB-L06-DB-AP- 1BHK TP 40A 25 XLPE
SB-L06-DB-AP- 1BHK TP 40A 25 XLPE
SB-L06-DB-AP- 1BHK TP 40A 25 XLPE
SB-L06-DB-AP- 1BHK TP 40A 26 XLPE
SB-L06-DB-AP- 1BHK TP 40A 27 XLPE
SB-L06-DB-AP- 1BHK TP 40A 28 XLPE
SB-L06-DB-AP- 1BHK TP 40A 29 XLPE
SB-L06-DB-AP- 1BHK TP 40A 29 XLPE
SB-L06-DB-AP- 1BHK TP 40A 29 XLPE
SB-L06-DB-CS SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX120 1CX70 29.00 29.00 29.00 87.00
REMARKS
L2 20 11 7 2 14
4 2 20
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-L06-SMDB-AP-1 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-L07-DB-AP- ST TP 40A 25 XLPE
SB-L07-DB-AP- ST TP 40A 26 XLPE
SB-L07-DB-AP- ST TP 40A 27 XLPE
SB-L07-DB-AP- 1BHK TP 40A 25 XLPE
SB-L07-DB-AP- 1BHK TP 40A 25 XLPE
SB-L07-DB-AP- 1BHK TP 40A 25 XLPE
SB-L07-DB-AP- 1BHK TP 40A 25 XLPE
SB-L07-DB-AP- 2BHK TP 40A 25 XLPE
SB-L07-DB-AP- 2BHK TP 40A 25 XLPE
SB-L07-DB-AP- 2BHK TP 40A 25 XLPE
SB-L07-DB-AP- 2BHK TP 40A 25 XLPE
SB-L07-DB-AP- 2BHK TP 40A 25 XLPE
SB-L07-DB-AP- 2BHK TP 40A 25 XLPE
SB-L07-DB-AP- 2BHK TP 40A 25 XLPE
SB-L07-DB-AP- 2BHK TP 40A 25 XLPE
SB-L07-DB-CS SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX185 1CX95 45.30 45.30 45.30 135.90
REMARKS
KR DDR JS s KR
L2 20 11 7 2 14
L3 22 12 8 2 1 16
DDR JS
4 2 20
4 2 22
DETAILS OF CONNECTED LOAD/M
MAIN DISTRIBUTION BO
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: SB-L07-SMDB-AP-2 LOCATION:
FED FROM: SB-B01-MDB-06
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-L07-DB-AP- 1BHK TP 40A 25 XLPE
SB-L07-DB-AP- 1BHK TP 40A 25 XLPE
SB-L07-DB-AP- 1BHK TP 40A 25 XLPE
SB-L07-DB-AP- 1BHK TP 40A 25 XLPE
SB-L07-DB-AP- 1BHK TP 40A 26 XLPE
SB-L07-DB-AP- 1BHK TP 40A 27 XLPE
SB-L07-DB-AP- 1BHK TP 40A 28 XLPE
SB-L07-DB-AP- 1BHK TP 40A 29 XLPE
SB-L07-DB-AP- 1BHK TP 40A 29 XLPE
SB-L07-DB-AP- 1BHK TP 40A 29 XLPE
SB-L07-DB-CS SP 40A 25 XLPE
Spare TP 40A 25
Space
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX120 1CX70 29.00 29.00 29.00 87.00
REMARKS
L2 20 11 7 2 14
4 2 20
DETAILS OF CONNECTED LOAD/MAX DEMAND
MAIN DISTRIBUTION BOARD
PROJECT: HOLIDAY INN &STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants PO Box 26739, Dubai - UAE
PANEL ID: SB-BOI-MDB-08 LOCATION: DUBAI, UNITED ARAB EMIRATES T +971 04 388 1616
PVC/
RATING - AMPS CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
XLPE/
CIRCUIT/ FAULT ECC
SP/ DUTY LOAD STANDBY
FEEDER DUTY SIZE LV/HV REMARKS
TP SWA/ 2/4 2/3/4C R - PH Y - PH B - PH (kW) LOAD (kW) 1- PH 3- PH 3- PH
DB NO. ACB MCCB MCB KA 1C mm² TOTAL KW CT
PVC 1C mm² mm² KW KW KW (1) (2) (3) (4)
INCOMER 1 4P 2500A 50 XLPE BY DEWA 316.67 316.67 316.67 950.00 880.00 70 1 CTs Check Meter
OUTGOING
CHILLER-01 TP 800A 50 XLPE 2X4CX300 2x1Cx150 123.33 123.33 123.33 370.00 370.00 0.00 WITH VFD
CHILLER-02 TP 800A 50 XLPE 2X4CX300 2x1Cx150 123.33 123.33 123.33 370.00 370.00 0.00 WITH VFD
HI-RF-MCC-CHWP-01 TP 630A 50 XLPE 4CX300 1Cx150 70.00 70.00 70.00 210.00 140.00 70.00
TOTAL CONNECTED LOAD PER PHASE 316.67 316.67 316.67 950.00 880.00 70.00
MAX. DEMAND (3 PH) 855 KW DIVERSITY 0.90 TOTAL CONNECTED LOAD (3PH) 950.00 KW
REV: Type of Meter (Rating of Incomer):
DATE: (1) Upto 60 A (2) Upto 100 A (3) 125 - 160 A
(1 phase) (3 phase) (4) LV CT . . . . .. / . . . . . A / HV CT. . . . / . . . . A
DETAILS OF CONNECTED L
MAIN DISTRIBUT
PROJECT: OWNER:
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: SB-RF-MCC-CHWP-01 LOCATION:
FED FROM: HT-BO1-MDB-03
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
CHWTP-RF-01 (Duty) TP 125A 35 XLPE
CHWTP-RF-02 (Duty) TP 125A 35 XLPE
CHWTP-RF-03 (Stand By) TP 125A 35 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC TCL DUTY STANDBY
SIZE
2/3/4C R - PH Y - PH B - PH (kW) LOAD (kW) 1- PH 3- PH
1C mm² TOTAL KW
mm² KW KW KW (1) (2)
NNECTED LOAD PER PHASE 70.00 70.00 70.00 210.00 140.00 70.00
TOTAL CONNECTED LOAD (3PH)
LV/HV REMARKS
3- PH
CT
(3) (4)
ELE INTERLOCK TO
BE PROVIDED,
VFD (100mA
ELCB)
ELE INTERLOCK TO
BE PROVIDED,
VFD (100mA
ELCB)
210.00 KW
97 KW
DETAILS OF CONNECTED LOAD/MAX DEMAND
MAIN DISTRIBUTION BOARD
PROJECT: HOLIDAY INN &STAYBRIDGE SUITES OWNER: ISHAQ (DUBAI) L.L.C
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants PO Box 26739, Dubai - UAE
PANEL ID: HI-BOI-MDB-04 LOCATION: DUBAI, UNITED ARAB EMIRATES T +971 04 388 1616
PVC/
RATING - AMPS CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
XLPE/
CIRCUIT/ FAULT ECC
SP/ DUTY LOAD STANDBY
FEEDER DUTY SIZE LV/HV REMARKS
TP SWA/ 2/4 2/3/4C R - PH Y - PH B - PH (kW) LOAD (kW) 1- PH 3- PH 3- PH
DB NO. ACB MCCB MCB KA 1C mm² TOTAL KW CT
PVC 1C mm² mm² KW KW KW (1) (2) (3) (4)
INCOMER 1 4P 2500A 50 XLPE BY DEWA 193.33 193.33 193.33 580.00 510.00 70 1 CTs Check Meter
OUTGOING
CHILLER-03 TP 800A 50 XLPE 2X4CX300 2x1Cx150 123.33 123.33 123.33 370.00 370.00 0.00 WITH VFD
HI-RF-MCC-CHWP-01 TP 630A 50 XLPE 4CX300 1Cx150 70.00 70.00 70.00 210.00 140.00 70.00
TOTAL CONNECTED LOAD PER PHASE 193.33 193.33 193.33 580.00 510.00 70.00
MAX. DEMAND (3 PH) 522 KW DIVERSITY 0.90 TOTAL CONNECTED LOAD (3PH) 580.00 KW
REV: Type of Meter (Rating of Incomer):
DATE: (1) Upto 60 A (2) Upto 100 A (3) 125 - 160 A
(1 phase) (3 phase) (4) LV CT . . . . .. / . . . . . A / HV CT. . . . / . . . . A
DETAILS OF CONNECTED L
MAIN DISTRIBUT
PROJECT: OWNER:
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: SB-RF-MCC-CHWP-01 LOCATION:
FED FROM: HT-BO1-MDB-03
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
CHWTP-RF-01 (Duty) TP 125A 35 XLPE
CHWTP-RF-02 (Duty) TP 125A 35 XLPE
CHWTP-RF-03 (Stand By) TP 125A 35 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC TCL DUTY STANDBY
SIZE
2/3/4C R - PH Y - PH B - PH (kW) LOAD (kW) 1- PH 3- PH
1C mm² TOTAL KW
mm² KW KW KW (1) (2)
NNECTED LOAD PER PHASE 70.00 70.00 70.00 210.00 140.00 70.00
TOTAL CONNECTED LOAD (3PH)
LV/HV REMARKS
3- PH
CT
(3) (4)
ELE INTERLOCK TO
BE PROVIDED,
VFD (100mA
ELCB)
ELE INTERLOCK TO
BE PROVIDED,
VFD (100mA
ELCB)
210.00 KW
97 KW
DETAILS OF CONNECTED
MAIN DISTRIBUT
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: NAKHEEL
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HI-B01-MDB-10 LOCATION:
FED FROM: TRANSFORMER - 10
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-RF-MCC-01-NF
HI-RF-MCC-LIFTS TP 250A
HT-LGF-SMDB-Landscape TP 100A 35 XLPE
SB-B01-EMDB-01
PROVISION-1
PROVISION-2
PROVISION-3
SPARE TP 630A 50
AHF TP 160A 50
TVSS TP 100A 50
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC DUTY LOAD STANDBY
SIZE
2/3/4C R - PH Y - PH B - PH (kW) LOAD (kW) 1- PH 3- PH
1C mm² TOTAL KW
mm² KW KW KW (1) (2)
LV/HV REMARKS
3- PH
CT
(3) (4)
LV INTEGRAL KWHR
1 2400/5 A
350kVAR CAP.
BANK
Active Harmonic
Filter
942.10 KW
DETAILS OF CONNECTED LOAD/MA
SUB MAIN DISTRIBUTION B
PROJECT: OWNER: NAKHEEL
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: SB-RF-MCC-LIFTS LOCATION:
FED FROM: HT-B00-MDB-10
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
SB-RF-LIFT-1 TP 32A 35 XLPE
SB-RF-LIFT-2 TP 32A 35 XLPE
SB-RF-LIFT-3 TP 32A 35 XLPE
SB-RF-LIFT-4 TP 32A 35 XLPE
SB-RF-LIFT-5 TP 32A 35 XLPE
HI-LGF-DB-LMR ROOM SP 40A 35 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4Cx120 1Cx70 19.17 20.57 20.57 53.00
REMARKS
DETAILS OF CONNECTED LOAD/MA
SUB MAIN DISTRIBUTION B
PROJECT: OWNER: NAKHEEL
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HT-LGF-SMDB-Landscape LOCATION:
FED FROM: HT-B00-MDB-10
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
Landscape TP 100A 35 XLPE
HI-LGF-DB-Landscape TP 40A 35 XLPE
HT-L03-DB-L-LS TP 40A 35 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4Cx120 1Cx70 21.07 21.69 21.69 64.45
REMARKS
DETAILS OF CONNECTED
MAIN DISTRIBUT
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: NAKHEEL
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: HI-B01-EMDB-2 LOCATION:
FED FROM: MDB - 10 / GENERATOR -02
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HI-LGF-EMCC-1 CP TP 200A 50 XLPE
HI-LGF-EMCC-2 CP TP 200A 50 XLPE
HI-LGF-EMCC-3 CP TP 100A 50 XLPE
HI-LGF-EMCC-4 CP TP 400A 50 XLPE
HI-LMZ-EMCC-1 TP 150A 50 XLPE
SB-LRF-EMCC-1 TP 350A 50 XLPE
SB-B01-ESMDB-CM1 TP 160A 50 XLPE
SB-B01-ESMDB-CM2 TP 225A 50 XLPE
SB-B01-ESMDB-UPS system TP 150A 50 XLPE
HI-B01-ESMDB-Kitchen TP 300A 50 XLPE
AHF TP 160A 50
SPACE
TOTAL CONNECTED LOAD PER PHASE
MAX. DEMAND (3 PH) 100.80 KW AT 0.90 DIVERSITY
REV: Type of Meter (Rating of Incomer):
DATE: (1) Upto 60 A
(1 phase)
DETAILS OF CONNECTED LOAD/MAX DEMAND
MAIN DISTRIBUTION BOARD
OWNER: NAKHEEL
CONSULTANT: WME Consultants
DUBAI, UNITED ARAB EMIRATES
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC DUTY LOAD STANDBY
SIZE
2/3/4C R - PH Y - PH B - PH (kW) LOAD (kW) 1- PH 3- PH
1C mm² TOTAL KW
mm² KW KW KW (1) (2)
NNECTED LOAD PER PHASE 193.03 193.03 193.03 564.10 112.00 112.00
TOTAL CONNECTED LOAD (3PH)
Meter (Rating of Incomer):
(1) Upto 60 A (2) Upto 100 A (3) 125 - 160 A
(3 phase) (4) LV CT . . . . .. / . . . . . A / HV CT. . . . / . . . . A
PO Box 26739, Dubai - UAE
T +971 04 388 1616
F +971 04 380 6161
LV/HV REMARKS
3- PH
(3) CT Diverity Factor
(4) Carried over
1 1050
ATS
350kVAR CAP.
BANK
Active Harmonic
Filter
564.10 KW
DETAILS OF CONNECTED LOAD/
MAIN DISTRIBUTION B
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER:
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: HI-LGF--EMCC-1 CP LOCATION:
FED FROM: HT-B0-EMDB-12
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX70 1Cx35 26.00 26.00 26.00 78.00
REMARKS
VFD (100mA
ELCB)
VFD (100mA
ELCB)
VFD (100mA
ELCB)
DETAILS OF CONNECTED LOAD/MA
MAIN DISTRIBUTION BOA
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER:
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: HI-LGF-EMCC-2 CP LOCATION:
FED FROM: HT-B0-EMDB-1
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX95 1Cx50 26.00 26.00 26.00 78.00
REMARKS
VFD (100mA
ELCB)
VFD (100mA
ELCB)
VFD (100mA
ELCB)
DETAILS OF CONNECTED LOAD/MA
MAIN DISTRIBUTION BOA
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER:
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: HI-LGF-EMCC-3 CP LOCATION:
FED FROM: HT-B0-EMDB-1
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX35 1Cx16 13.33 13.33 13.33 40.00
REMARKS
VFD (100mA
ELCB)
VFD (100mA
ELCB)
DETAILS OF CONNECTED LOAD/MA
MAIN DISTRIBUTION BOA
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER:
PLANNED COMPLETION DATE: TBC CONSULTANT: WME Consultants
PANEL ID: HI-LGF-EMCC-4 CP LOCATION:
FED FROM: HT-B0-EMDB-1
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX300 1Cx150 60.33 60.33 60.33 181.00
REMARKS
VFD (100mA
ELCB)
VFD (100mA
ELCB)
VFD (100mA
ELCB)
VFD (100mA
ELCB)
VFD (100mA
ELCB)
VFD (100mA
ELCB)
VFD (100mA
ELCB)
VFD (100mA
ELCB)
DETAILS OF CONNECTED LOAD/MA
SUB MAIN DISTRIBUTION B
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: NAKHEEL
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HI-B01-ESMDB-CM LOCATION:
FED FROM: HI-B01-EMDB
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HT-B01-EDB-CM-01 TP 40A 25 XLPE
HT-LGF-EDB-CM-01 TP 40A 25 XLPE
HT-LMZ-EDB-CM-01 TP 32A 25 XLPE
HT-L01-EDB-CM-01 TP 40A 25 XLPE
HT-L04-EDB-CM-01 TP 40A 25 XLPE
HT-L38-EDB-CM-01 TP 40A 25 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX70 1Cx35 23.33 23.33 23.33 70.00
REMARKS
Central Battery
Panel
DETAILS OF CONNECTED LOAD/MA
SUB MAIN DISTRIBUTION B
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: NAKHEEL
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HI-B01-ESMDB-CM2 LOCATION:
FED FROM: HI-B01-EMDB-1
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HT-LXX-ISO-GSM TP 63A 25 XLPE
HT-B2-EDB-ET TP 32A 35 XLPE
HT-B2-EDB-MTR TP 32A 35 XLPE
HT-B2-ESMDB-DU TP 63A 35 XLPE
Iso. for ODU Unit TP 32A 35 XLPE
Iso. for ODU Unit TP 32A 35 XLPE
Iso. for ODU Unit TP 32A 35 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX70 1Cx70 28.37 28.37 28.37 85.10
REMARKS
Etisalat
DU
DETAILS OF CONNECTED LOAD/MA
SUB MAIN DISTRIBUTION B
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: NAKHEEL
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HI-B01-ESMDB-UPS system LOCATION:
FED FROM: HI-B01-EMDB
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HT-B01-UDB-1-IT/SECURITY TP 32A 25 XLPE
HT-B01-UDB-2-IT/SECURITY TP 32A 25 XLPE
HT-LGF-UDB-3-IT/SECURITY TP 32A 25 XLPE
HT-L03-UDB-3-IT/SECURITY TP 32A 25 XLPE
HT-L05-UDB-3-IT/SECURITY TP 32A 25 XLPE
Iso. for ODU Unit TP 32A 35 XLPE
Iso. for ODU Unit TP 32A 35 XLPE
Iso. for ODU Unit TP 32A 35 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
4CX70 1Cx35 26.67 26.67 26.67 65.00
REMARKS
DISTRIBUTIO
PROJECT: Nakheel Mall Hotel LOCATION: DUBAI, UNITED ARAB EMIR
DB REF : HT-B01-EDB-SR-CM2 INCOMING CABLE : 4C 95mm2 XLPE/S
FED FROM: HT-B1-USMDB-SR-01
CCT ECC
MCB WIRE
RATING OF RATING OF WIRE
SL. NO. CIR NO. RTG. IN SIZE ROOM/AREA
INCOMER ELCB SIZE
AMPS mm2 mm2 LTG EX. FAN
1 R1 32 6 6 IT Hub Rack 1
2 Y1 32 6 6 IT Hub Rack 2
40A 4P B1 32 6 6 IT Hub Rack 3
30mA ELCB 3
1 4 R2 32 6 6 IT Hub Rack 4
5 Y2 32 6 6 IT Hub Rack 5
6 B2 32 6 6 IT Hub Rack 6
7 R3 32 6 6 IT Hub Rack 7
8 Y3 32 6 6 IT Hub Rack 8
40A 4P 9 B3 32 6 6 IT Hub Rack 9
30mA ELCB
1 10 R4 32 6 6 IT Hub Rack 10
200A 11 Y4 32 6 6 IT Hub Rack 11
4P 12 B4 32 6 6 IT Hub Rack 12
ISOLATOR 13 R5 32 6 6 IT Hub Rack 13
14 Y5 32 6 6 IT Hub Rack 14
40A 4P 15 B5 32 6 6 IT Hub Rack 15
30mA ELCB
1 16 R6 32 6 6 IT Hub Rack 16
17 Y6 Space
18 B6 Space
LTG.=LIGHTING,EX. FAN = EXHAUST FAN, S/O=SOCKET OUTLET,SH. S/O = SHAVER SOCKET OUTLET, W/H = WATER HEATER, H/D = HAND DRYER, D/W=DISH W
FCU=FAN COIL UNIT, CCU = COOKER CONTROL UNIT, W = WINDOW TYPE A/C & S = SPLIT TYPE A/C
DISTRIBUTION BOARD LOAD SCHEDULE
N: DUBAI, UNITED ARAB EMIRATES
G CABLE : 4C 95mm2 XLPE/SWA/PVC + 1C 50mm2 CU/PVC-ECC
WATTS/ UNIT
20A 32A 32A
13A 13A
SHAVER DP+C/ DP+C/ FCU D/W H/D SCU TP+N+E ISOL. MISC. R
SSO TSSO U U IND.
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
1 Stand By
REMARKS
Y B
0.00 0.00
0.00 KW
T +971 04 388 1616
DETAILS OF CONNECTED LOAD/MA
SUB MAIN DISTRIBUTION B
PROJECT: HOLIDAY INN & STAYBRIDGE SUITES OWNER: NAKHEEL
PLANNED COMPLETION DATE: MMM YYYY CONSULTANT: WME Consultants
PANEL ID: HI-B01-ESMDB-UPS system LOCATION:
FED FROM: HI-B01-EMDB
PVC/
RATING - AMPS CABLE SIZE
XLPE/
CIRCUIT/ FAULT
SP/
FEEDER DUTY
TP SWA/ 2/4
DB NO. ACB MCCB MCB KA
PVC 1C mm²
OUTGOING
HT-L28-ISO-GSM TP 63A 25 XLPE
HT-L28-JP-01 TP 63A 35 XLPE
HT-L28-FRP-01 TP 350A 35 XLPE
HT-L28-EMCC-01 TP 125A 25 XLPE
CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE & NO. OF kWh METERS
ECC
SIZE LV/HV
2/3/4C 1C mm² R - PH Y - PH B - PH 1- PH 3- PH 3- PH
TOTAL KW CT
mm² KW KW KW (1) (2) (3) (4)
2X4CX300 2x1Cx150 84.60 84.60 84.60 253.80
REMARKS
ELS+ALARM
ELS+ALARM