China Jiangsu International Namibia LTD and J. Schneiders Builders CC
China Jiangsu International Namibia LTD and J. Schneiders Builders CC
China Jiangsu International Namibia LTD and J. Schneiders Builders CC
PLANTIFF
and
CORAM: HENNING, AJ
JUDGMENT
HENNING, AJ:
-2-
[1] These are exceptions in which the plaintiff seeks to have the
cause
second defendant,
a period,
price.
(AD), at 602 D.
-4-
referred to above.
“13. At the time when the plaintiff and the first defendant
plaintiff.
1984.”
contract price.”
that it has not paid the balance of the contract price and
of Namibia Ltd, 2008 (1) NR 290. At page 299 E-F the Court
_______________________
¹Lees Export and Export (Pty) Ltd v Zimbabwe Banking Corporation Ltd 1999 (4)
and control what it does; the very ego and centre of its
the company”.
personally liable.
[7] The second defendant’s counsel contended that the debt was
2006, that section 64 has not been properly pleaded, and that
the Court may direct, and the Court may give such
liability.”
been added.
and denied”.
circumstances permissible.
provides:
substance”.
he relies”.
-11-
[12] Herbstein and Van Winsen, The Civil Practice of the High
conclusion, is defective”.
In Neugebauer & Co. Ltd v Bodeker & Co. (SA), 1925 A D 316
[13] “In law context is everything,” Lord Steyn said in the House of
should
_______________________
Ltd v Cohen and other related cases [2000] 4 All SA 221 (W)
-13-
and which are denied. The plea may deny each and
or
manner,
manner,
manner,
-16-
___________________________
HENNING, AJ