Safe Work Method Statement
Safe Work Method Statement
L)
MAA - KNPC
PROJECT CA-4079
SAFE WORK METHOD STATEMENT
No Job Name SWMS Ref. No Rev
1 Scaffold work AM/CA4079/SWMS - 01 0
2 Vessel Isolation , Desludging & Cleaning AM/CA4079/SWMS - 02 0
3 Removal of Rafter/ Roof plate of tank. AM/CA4079/SWMS - 03 0
4 Tank Top Shell Erection AM/CA4079/SWMS - 04 0
Internal Sand/Abrasive blasting & Painting
5 AM/CA4079/SWMS - 05 0
Vessel/Tank
6 Tank Isolation , Desludging & Cleaning AM/CA4079/SWMS - 06 0
7 Erection of Rafter/ Roof plate of tank. AM/CA4079/SWMS - 07 0
8 Tank Top Shell removal AM/CA4079/SWMS - 08 0
9 Installation of nozzle on tank AM/CA4079/SWMS - 09 0
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall,Safety helmet, Safety boots, safety glasses, hand Other safety / Emergency Equipment required; H2S Monitor, fire
gloves, safety harness and lanyard. extinguishers ,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the
work crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name: -Vessel Isolation , Desludging & Cleaning Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -2
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall,Safety helmet, Safety boots, safety glasses, safety harness and Other safety / Emergency Equipment required; H2S
lanyard. Monitor, fire extinguishers ,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
Page 7 of 176
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
A) Use Hand Gloves.
B) Use proper hand tools.
C) Use gasket for
A) Hand injury. spading. D)
4) Isolation of Vessel.
B) Danger of gas leak. Use correct thickness of spade.
E) Use gas monitor.
F) Breathing apparatus.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
Page 8 of 176
SAFE WORK METHOD STATEMENT
Date:
Job Name: -Removal of Roof plate of tank. Division/Section: MAINTENANCE Doc. No:AM/CA4079/SWMS -3
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall,Safety helmet, Safety boots, safety glasses, safety harness and Other safety / Emergency Equipment required; H2S
lanyard. Monitor, fire extinguishers,water hose ,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
4) Slinging to hold the rafter beams/roof plates. Hand injury to rigger/slinger Use of hand gloves by rigger/slinger.
A) Ensure that the sling wire/ soft belt properly tight with
rafter beam.
B) Checking of slings, belts and D-shackle.
A) Fall of Rafter beams due to improper slinging.
C) Use tag line to control
B) Beams hitting
movement of rafter. D) Keep non -
workers and scaffolding due to un-controlled swinging.
6) Lifting and removal of rafter/roof plates. essential people out of lift area and post warning signs for
safe lifting.
C) Crane tipping due to load exceeding lifting capacity.
E) Check load chart of Crane and ensure that the load is
within SWL for the boom length and lifting radius (by crane
operator).
A) Use hand gloves and keep body parts out of pinch area
during removal of slings and placing rafter beam on
7) Placing the Rafter beam/plates on ground and stacking. Injury to workers.
ground.
B) Barricade the area.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety supervisor
shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work crew and
implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name: -Tank Top Shell Erection Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -4
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall,Safety helmet, Safety boots, safety glasses, safety harness and Other safety / Emergency Equipment required; H2S Monitor, fire extinguishers,water hose ,first
lanyard. aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
4) Slinging to hold erection material Hand injury to rigger/slinger Use of hand gloves by rigger/slinger.
A) Ensure that the sling wire/ soft belt properly tight with Erection material.
A) Fall of Erection material.
B) Check load chart of Crane and ensure that the load is within SWL for
B) Erection material hitting workers and
the boom length and lifting radius (by crane operator).
scaffolding due to un-controlled swinging.
5) Erection and fit up. C) Use tag line to control
movement of Erection material. D)
C) Crane tipping due to load exceeding lifting capacity.
Keep non - essential people out of lift area and post warning signs for safe lifting.
A) Assign fire-watch and spray water in the area below the welding location to quench the sparks.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety supervisor shall always analyze and identify
any other HSE related issues related to the specific job requirements, document it , educate the work crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Job Name: -Internal Sand/Abrasive blasting & Painting Date:
Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -5
Vessel/Tank 15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Safety helmet, Safety boots, safety glasses, safety harness, Other safety / Emergency Equipment required; H2S
Sandblasting Helmet & breathing mask. Monitor, fire extinguishers & water hose, first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Ensure the vessel is isolated.
B) Gas te
A) Exposure to toxic gases.
B) Lack of visibility. C) Adequate lighting.
C) Poor communication.
2) Entry to Vessel / Tank internally.
D) Entry to non isolated D) Stand by person.
vessel / Tank E) Poor
Ventilation E) Adequate ventilation by
providing pneumatic fan
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
A) Ensure all air hoses of gritblasting helmet are in god
A) Breathing trouble due to no Fresh air condition.
B) Falling injury due to Darkness B) Proper Ventilation is provided
C) Injury due to loosing the control of blasting C) Installation of exhaust fan
hose. D) Use dead man handle for
D) Unrelated gritblasting nozzle. E)
3) Grit blasting persons and properties exposed to blasting. Replace breathing air filter as required.
F) Proper Shielding of properties providing warning sign
E) Getting injury by blasting medium. board and isolation of the location.
G) Ensure a
couplings connected are tied up by metal wire.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safe
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the wo
crew and implement the recommendations as required.
RK METHOD STATEMENT
Doc. No: AM/CA4079/SWMS -5
C) Adequate lighting.
D) Stand by person.
E) Adequate ventilation by
providing pneumatic fan
Recommendation to Eliminate/Reduce Hazard
A) Ensure all air hoses of gritblasting helmet are in god
condition.
B) Proper Ventilation is provided.
been identified. However, concerned site supervisor / Foreman along with the safety
related issues related to the specific job requirements, document it , educate the work
SAFE WORK METHOD STATEMENT
Date:
Job Name: -Tank Isolation , Desludging & Cleaning Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -6
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Basic Personal Protective Equipment Required: - Safety helmet, Safety boots, safety glasses & safety harness, Other safety / Emergency Equipment as required; H2S Monitor,
breathing apparatus . fire extinguishers & water hose, first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
F) Breathing apparatus.
Page 18 of 176
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety supervisor
shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work crew and implement
the recommendations as required.
Page 19 of 176
SAFE WORK METHOD STATEMENT
Date:
Job Name: - Erection of Rafter/ Roof plate of tank. Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, safety harness, Other safety / Emergency Equipment required; H2S
& face shield Monitor, fire extinguishers & water hose,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
4) Slinging to hold the rafter beams/roof plates. Hand injury to rigger/slinger Use of hand gloves by rigger/slinger.
A) Ensure that the sling wire/ soft belt properly tight wit
Erection material.
A) Fall of lifted material. B) Check load chart of Crane and
B) Erection material hitting workers and that the load is within SWL for the boom length and lift
scaffolding due to uncontrolled swinging. radius.(by crane operator)
5) Erection
C) Crane tipping due C) Use ta
to load exceeding lifting capacity. control movement of Erection material.
D) Keep non - esse
people out of lift area and post warning signs for safe l
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazar
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the wor
and implement the recommendations as required.
RK METHOD STATEMENT
Doc. No: AM/CA4079/SWMS -7
A) Ensure that the sling wire/ soft belt properly tight with
Erection material.
B) Check load chart of Crane and ensure
that the load is within SWL for the boom length and lifting
radius.(by crane operator)
C) Use tag line to
control movement of Erection material.
D) Keep non - essential
people out of lift area and post warning signs for safe lifting.
Recommendation to Eliminate/Reduce Hazard
been identified. However, concerned site supervisor / Foreman along with the safety
elated issues related to the specific job requirements, document it , educate the work crew
SAFE WORK METHOD STATEMENT
Date:
Job Name: -Tank Top Shell removal Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -8
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, safety harness, & face Other safety / Emergency Equipment required; H2S Monitor,
shield fire extinguishers & water hose,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Loss of stability due to ground condition and wind. A) Check crane is in level ground.
B) B) Check ground condition and use
3) Positioning / using of crane
Crane boom hitting Scaffold. / Tank Shell spreader mat.
C) Check wind speed and direction.
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
4) Slinging to hold shell plate. Hand injury to rigger/slinger Use of hand gloves by rigger/slinger.
A) Ensure that the sling wire/ soft belt properly tight with rafter
beam. B)
A) Fall of shell plate due to improper slinging. Checking of slings, belts and D-shackle.
B) Beams hitting C) Use tag line to control movement of rafter.
workers and scaffolding due to un-controlled swinging. D) Keep non - essential people out of lift area and post
6) Lifting and removal of shell plate.
C) Crane warning signs for safe lifting.
tipping due to load exceeding lifting capacity. E) Check load chart of Crane and ensure that
the load is within SWL for the boom length and lifting radius (by
crane operator).
A) Use hand gloves and keep body parts out of pinch area
during removal of slings and placing rafter beam on ground.
7) Placing the shell plate on ground and stacking. Injury to workers.
B) Barricade
the area.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety supervisor shall
always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work crew and implement the
recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name: -Installation of nozzle on tank Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -9
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, safety Other safety / Emergency Equipment required; H2S
harness, & face shield Monitor, fire extinguishers & water hose,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Nozzle falling down from position. C) Use welding helmet and gloves.
B) D) Check condition of
6) Fit up of nozzle and reinforcement pad by tack Fire/spark injury during tack welding for fit up. welding cables and lay them away from sparks.
welding. C) Electric shock to people E) Ground welding
from electrical welding equipment. machine.
F) Keep fire extinguishers accessible.
G) Remove all flammable & combustible
material from the work area and below.
H) Assign fire-watch and spray
water in the area below the cutting to quench the sparks
and hot slag.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name: -Oil Recovery & Supplying Cutter Stock for Willacy Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -10
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
F) Breathing apparatus.
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
10) Supplying cutter stock for Willacy A) Accidental rupture of under ground pipe line A) Excavate with caution
B) Manhole might B) Stay clear of manhole.
A) Excavation to place penn & Cutter stock tank be under sludge pressure. May Fly loose. C) Dig a pit around
B) Open Manhole C) Sludge may come out under high pressure manhole to contain sludge.
C) Sludge supply D) Dilute
with oil so that sludge thins out and can be sucked into Willacy
Recovery Tank.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety supervisor shall always analyze and
identify any other HSE related issues related to the specific job requirements, document it , educate the work crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name: -External Grit blasting & Painting Vessel/Tank Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -11
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Safety helmet, Safety boots, safety glasses, safety harness, blasting suit & face Other safety / Emergency Equipment required; H2S Monitor,
shield. fire extinguishers & water hose, first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety supervisor shall
always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work crew and implement the
recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name: -Erection of oil spreader supporting structure Division/Section: MAINTENANCE Doc.No:AM/CA4079/SWMS -12
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, safety Other safety / Emergency Equipment required; H2S
harness, & face shield Monitor, fire extinguishers & water hose,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
3) Slinging to hold shifting material Hand injury to rigger/slinger Use of hand gloves by rigger/slinger.
A) Use hand gloves.
B) Use proper illumination.
C) Use Ventilation.
D) Use proper hand tools for rolling pipes
4) Rolling the pipe supports from out side to inside to be in Worker injury.
E) Pipes to be rolled on
position for lifting up
3" or 4" Dia pipes
F) Proper communication with workers while rolling
pipes.
G) Keep body out of pinch area.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the
safety supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it ,
educate the work crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name: -Hot Tapping on existing Tank Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -13
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, safety Other safety / Emergency Equipment required; H2S
harness, & face shield Monitor, fire extinguishers & water hose,first aid kit.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the saf
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the wo
crew and implement the recommendations as required.
RK METHOD STATEMENT
Doc. No: AM/CA4079/SWMS -13
A) Ensure oil level is three feet above hot tapping area of the
tank.
B) Ensure thickness survey is carried out and thickness is
acceptable.
C) Hot tapping
location is marked and identified by authorized personnel.
D) Provide
fire extinguishers.
E) Enclose area with fire blanket.
been identified. However, concerned site supervisor / Foreman along with the safety
related issues related to the specific job requirements, document it , educate the work
SAFE WORK METHOD STATEMENT
Date:
Job Name: - Removal of compression rings of tank. Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, safety Other safety / Emergency Equipment required; H2S Mo
harness, & face shield extinguishers & water hose,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Ensure that the sling wire/ soft belt properly tight with
compression rings.
A) Fall of compression rings due to improper slinging.
B) Checking of slings, belts and D-shackle.
B)
C) Use tag line to control movement of compres
Beams hitting workers and scaffolding due to un-
ring.
7) Lifting and removal of compression rings. controlled swinging.
D) Keep non - essential people out of lift area an
C) Crane tipping due to load
warning signs for safe lifting.
exceeding lifting capacity.
E) Check load chart of Crane and ensure that
is within SWL for the boom length and lifting radius (by cra
operator).
A) Use hand gloves and keep body parts out of pinch area
8) Placing the compression rings on ground and removal of slings and placing compression rings on ground
Injury to workers.
stacking. B) Barricade
area.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the wo
and implement the recommendations as required.
ORK METHOD STATEMENT
Doc. No: AM/CA4079/SWMS -14
A) Assign fire-watch and spray water in the area below the welding
location to quench the sparks.
B) Provide fire extinguishers near the welding
location. C)
Welding crew to use face shield and apron.
D) Lay welding cable away from sharp edges.
E) Use grinding machine safety guard, safety goggles
hand gloves etc.
F) Remove all flammable/combustible material from nearby
areas.
A) Assign fire-watch and spray water in the area below the cutting
location to quench the sparks.
B) Provide fire extinguishers near the cutting
location and Oxy-Acetylene cylinders.
C) Lay Oxygen and Acetylene hoses
away from sharp edges and cutting splatter.
D) Cutting crew to use face
shield and apron.
E) Remove all combustible / flammable material from
work area.
F) Ensure that the slings are in tension.
A) Ensure that the sling wire/ soft belt properly tight with
compression rings.
B) Checking of slings, belts and D-shackle.
C) Use tag line to control movement of compression
ring.
D) Keep non - essential people out of lift area and post
warning signs for safe lifting.
E) Check load chart of Crane and ensure that the load
is within SWL for the boom length and lifting radius (by crane
operator).
A) Use hand gloves and keep body parts out of pinch area during
removal of slings and placing compression rings on ground.
B) Barricade the
area.
e been identified. However, concerned site supervisor / Foreman along with the safety
related issues related to the specific job requirements, document it , educate the work crew
SAFE WORK METHOD STATEMENT
Date:
Job Name: -Erection of compression rings of tank. Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -15
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, safety Other safety / Emergency Equipment required; H2S Mon
harness, & face shield fire extinguishers & water hose,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Loss of stability due to ground condition and wind. A) Check crane is on level ground.
B) Check ground condition and use
B) Crane boom hitting Scaffold. / Tank Shell. spreader mat.
C) Overloading of crane. C) Check wind speed and direction.
3) Positioning and using of crane D) Assign a signal man.
E) Outrigger to be fully extended.
F) Ensure that load
within SWL of crane and valid third party inspection certifica
A) Ensure that the sling wire/ soft belt properly tight with
Erection material.
A) Fall of lifted material.
B) Check load chart of Crane and ensure that the loa
B) Erection
within SWL for the boom length and lifting radius (by crane
material hitting workers and scaffolding due to
operator).
5) Erection of compression rings. uncontrolled swinging.
C) Use tag line to control movem
C) Crane tipping due to load
compression rings.
exceeding lifting capacity.
D) Keep non - essential people out of lift area
post warning signs for safe lifting.
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the saf
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the w
crew and implement the recommendations as required.
ORK METHOD STATEMENT
Doc. No: AM/CA4079/SWMS -15
A) Ensure that the sling wire/ soft belt properly tight with
Erection material.
B) Check load chart of Crane and ensure that the load is
within SWL for the boom length and lifting radius (by crane
operator).
C) Use tag line to control movement
compression rings.
D) Keep non - essential people out of lift area and
post warning signs for safe lifting.
Recommendation to Eliminate/Reduce Hazard
e been identified. However, concerned site supervisor / Foreman along with the safety
E related issues related to the specific job requirements, document it , educate the work
SAFE WORK METHOD STATEMENT
Date:
Job Name: - Removal of bottom plate of tank Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -16
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
D) Use breathing
apparatus, if it is required.
E) Use of fire
extinguishers.
A) Fire hazards. F) Use double
B) Exposure to toxic gas leak. insulated electrical cable or pnuematic machine.
4) Drill holes on damage bottom plate.
C) Hazards due to drilling G)
machine. No loose cloths, chains, bracelets to be used by worker while
grinding.
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
A) Use hand gloves and keep body parts out of pinch area
during removal and placing bottom plate on ground.
B) Barricade the
8) Manually shifting bottom plates outside tank and
Injury to workers. area.
stacking.
C) Ensure proper lifting
practices and good communication between workers.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name: -Erection of bottom plate of tank. Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -17
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Loss of stability due to ground condition and wind. A)Check crane is on level ground.
B)Check ground condition and use spreader
B) Crane boom hitting Tank Shell. mat. C)
C) Overloading of crane. Check wind speed and direction.
2) Positioning and using of crane to unload new
D) Assign a signal man.
bottom plate outside the tank.
E) Outrigger to be fully extended.
F) Ensure that load is within
SWL of crane and valid third party inspection certificate.
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
A) Use of hand gloves and keep body parts out of pinch area.
3) Placing new plate on the removed section using A) Hand injury.
B)
chain block from outside the tank. B) Chain block failure.
Use approved chain block with certificate.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name: - Hydrostatic testing on vessels. Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -18
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, safety Other safety / Emergency Equipment required; H2S
harness, & face shield Monitor, fire extinguishers & water hose,first aid kit.
Page 67 of 176
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
A) Keep all top (vent) nozzle open.
B) Ensure filling of water is from bottom
A) Worker injury nozzles.
due to whipping of hose. C) Continuous monitoring of level of water.
B) D) No sharp bend in the
3) Filling of water.
Spillage of water. hose of water filling.
E) Proper end
connection and positive lock for hose.
Page 68 of 176
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
A) Open vent valves slowly and keep body parts out away
from vent while depressurizing.
A) Worker injury.
B) Keep all non essential people
7) Depressurizing of vessel by opening vent. B) Vessel damage due to
out of work area.
vacuum.
C) Continuous monitoring of pressure gauge.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
Page 69 of 176
SAFE WORK METHOD STATEMENT
Date:
Job Name: -Erection of oil spreader pipes Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -19
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, Other safety / Emergency Equipment required; H2S Monitor, fire
safety harness, & face shield extinguishers & water hose,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Check crane is in level
B) Check ground condition and
A) Loss of stability due to ground condition and use spreader mat.
wind. C) Check wind speed and
B) Crane boom hitting Tank Shell direction.
2) Positioning / using of crane for shifting pipes to
D) Use professional
C.O.D.
rigger.
E) Ensure outrigger is fully
extended.
F) Use of professional rigger
3) Slinging to hold shifting material Hand injury to rigger/slinger Use of hand gloves by rigger/slinger.
A) Use hand gloves.
B) Use proper illumination.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name: -Removal of oil spreader pipes Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -20
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, Other safety / Emergency Equipment required; H2S Monitor, fire
safety harness, & face shield extinguishers & water hose,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Use of hand gloves and keep body parts out of pinch area.
A) Hand injury.
2) Holding the existing pipe by using chain block. B) Use
B) Chain block failure.
approved chain block with certificate.
A) Ensure that the sling wire/soft belt properly tight with support
A) Worker injury material.
B) Use two tag line to control the movement of dismantled
B) Fall of dismantled centre rings. material top end side.
C) Keep non-essential people out of lift area.
C) D)
3) Dismantle of centre rings. Dismantled material hitting workers and Utilize a professional rigger.
scaffolding due to un-controlled swinging E) Use proper
D) Chain block illumination.
failure. F) Identify location for hooking
chain block and pulley.
E) Buckling of existing roof structure. G) Use approved chain block with
certificate.
A) Use hand gloves and keep body parts out of pinch area during
removal of slings and placing pipes on ground.
9) Placing the dismantled pipes on ground. Injury to workers.
B) Barricade the area.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the
work crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name: -Hot Tapping on live pipe line. Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -21
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
equipment.
G) Keep fingers out of pinch
area.
A) Use hand gloves
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name: - Box up using crane & man basket. Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -22
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall,Safety helmet, Safety boots, safety glasses, safety Other safety / Emergency Equipment required; H2S
harness and lanyard. Monitor, fire extinguishers ,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Hand injury. A) Ensure that all tools and foreign material are removed fr
B) the vessel/tank.
2) close the manways/clean out door.
Danger of gas leak. B) Ensure all perso
are outside vessel
Page 80 of 176
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
A) Hand injury. A) Inspect the vessel & ensure it is free of unwanted mater
B) & all workers have come out of the vessel.
Chance of persons to get entrapped or tools & B) Use Gas Monitor.
5) Bolting for Box up
unwanted left over materials to be inside C) Use Hand
C) Danger of gas leaking. gloves.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the saf
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the w
crew and implement the recommendations as required.
Page 81 of 176
RK METHOD STATEMENT
A) Ensure that all tools and foreign material are removed from
the vessel/tank.
B) Ensure all persons
are outside vessel
Page 82 of 176
Recommendation to Eliminate/Reduce Hazard
been identified. However, concerned site supervisor / Foreman along with the safety
E related issues related to the specific job requirements, document it , educate the work
Page 83 of 176
SAFE WORK METHOD STATEMENT
Job Name:- Replacement of valves at different Date:
Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -23
elevation 15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, Other safety / Emergency Equipment required; H2S
safety harness, Ear plug - if noise level is high, face shield Monitor, fire extinguishers & water hose,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
F) Use breathing
apparatus.
A) Loss of stability of crane due to ground condition B) Check ground condition and use spreader mat.
and wind. C) Check wind
B) speed and direction.
Falling of valve. D) Assign a professional
rigger.
C) Hand injury. E) Outrigger to be fully
6) Removal of valve using crane
extended.
F) Ensure that load is
within SWL of crane and valid third party inspection
certificate.
G) Use two tag line to control the
movement of valve.
H) Use hand gloves.
A) Check crane is on level ground.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the
safety supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it ,
educate the work crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name: - Repair of foam pourer Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -24
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, Other safety / Emergency Equipment required; H2S
safety harness, face shield, Ear plug - if noise level is high. Monitor, fire extinguishers & water hose,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Loss of stability due to ground condition and A) Check ground condition and use spreader beam and
wind. mat.
B) Crane boom hitting Scaffold. B) Check wind speed and direction.
C)
2) Positioning of Crane for removal of foam pourer Use professional rigger.
D) Check load chart of crane and ensure
that the load is within SWL for the boom length and lifting
radius ( by crane operator) and valid third party certificate.
A) Use Gas Monitor.
B) Use air mask.
A) Danger of gas leaking. C) Use hand gloves
B) D) Use Brass hammer.
Hand injury E) Use proper hand
C) tools.
Chance of Fire due to hammering spark. F) Use tested sling wires for
3) Debolting of foam pourer using manbasket manbasket for safe work load & tag line to control the
D) Manbasket failure. movement of basket.
G) Safety harness to be hooked to
E) the hook of crane.
Falling of worker. H) Use rubber tyre around manbasket.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the
safety supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it ,
educate the work crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Job Name:- Replacement of above ground pipe Date:
Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -25
line 15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, safety Other safety / Emergency Equipment required; H2S
harness, face shield, Ear plug - if noise level is high. Monitor, fire extinguishers & water hose,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area B) Ensure gas test is carried out.
C) Ensure positive
isolation.
A) Use Hand Gloves
A) Hand injury.
B) Use multigas monitor.
B) Exposure to toxic gases.
2) Cold cut and remove existing pipe. C) Ensure the system is isolated.
D) Keep vacuum tanker.
C) Oil spill.
A) use safety glasses,face shield and gloves.
F) Remove all
flammable/combustible material.
A) Position crane on a suitable location on a level &
solid/hard ground.
B) Fully extend outriggers and place spreader
mats under outrigger jacks.
C) Assign a professional rigger.
A) Crane losing stability due to ground condition or
D) Keep non - essential people out of lift area
load.
and post warning signs for safe lifting.
B) Crane boom, or lifted load hitting people.
4) Position pipe ends together using crane. E) Check load chart of
C) Hand
Crane and ensure that the load is within SWL for the
injury while positioning.
boom length and lifting radius (by crane operator).
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the
safety supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it ,
educate the work crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name:- Replacement of under ground line Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -26
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, safety Other safety / Emergency Equipment required; H2S
harness, face shield, Ear plug - if noise level is high. Monitor, fire extinguishers & water hose,first aid kit.
B) Ensure proper
sloping, shoring and access to the trench.
A) Lack of fresh air.
2) Inspection of the trench and road crossing C) Barricade the
B) Collapse of excavated area.
area.
D) Keep all equipment
and vehicle away from the edge of excavation.
A) Use Hand Gloves
8) Wrap the welded area Hand injury. Keep fingers out of pinch points.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the
safety supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it ,
educate the work crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name: - Cold cutting of pipes Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -27
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, face Other safety / Emergency Equipment required; H2S Monitor,
shield, Ear plug - if noise level is high. fire extinguishers & first aid kit.
C) Oil spillage
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the
work crew and implement the recommendations as required.
o: AM/CA4079/SWMS -27
r (Al-Magwa)
minate/Reduce Hazard
or spading.
orrect thickness of spade.
S gas monitor.
hat line is thoroughly drained.
ed.
hand gloves.
cuum tanker.
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, face Other safety / Emergency Equipment required; H2S
shield, Ear plug - if noise level is high. Monitor, fire extinguishers & first aid kit.
A) Injury to worker.
A) Use hand gloves.
B) Fire Hazard.
B) Use approved type of
lighters. C)
C) Eye
4) Lighting the torch with lighter and set the gas for Keep fire extinguisher near cutting area.
injury
cutting pressure. D) Use cutting goggles.
E) Use flash back
D) Flash back of flame
arrestor.
A) Provide fire extinguishers near the cutting location and
Oxy-Acetylene cylinders.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the
safety supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it ,
educate the work crew and implement the recommendations as required.
AM/CA4079/SWMS -28
er (Al-Magwa)
minate/Reduce Hazard
ve all combustible /
rea.
E) Work area must be
nket to prevent sparks and
us monitoring of % of LEL
d and gloves.
mmediate area.
y from grinder.
bustible material.
must be covered completely
ks from spreading.
G) Continous
n the surrounding area.
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety Other safety / Emergency Equipment required; H2S Monitor,
glasses, , Ear plug - if noise level is high. fire extinguishers
A) Loss of stability due to ground condition and A)Check crane is on level ground.
wind. B)Check ground condition and use spreader mat.
B) Crane boom hitting C) Check wind
structure. C) speed and direction. D)
Overloading of crane. Assign a signal man.
2) Placement of crane and flatbelt/stackbody. D) Flatbelt collison with crane E) Outrigger to be fully extended.
F) Ensure that load is within SWL of crane and
valid third party inspection certificate.
G) Flatbelt/stackbody should be placed at safe
distance.
A) Hand injury. A) Use hand gloves.
B) Falling of material. B) Use proper sling wires and belt with certificate.
C) Injury to C) Use a professional rigger.
workers. D) Ensure that both ends of the
D) Material slipping from pipes tied by rope for safe mevement.
3) Loading of pipes to flatbelt/stackbody. flatbelt/stackbody. E) Barricade the area.Keep unwanted people
from loading area.
F) Pipes should be tied with belt
on the flatbelt/stackbody. .
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the
safety supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it ,
educate the work crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name:- Removal & Fixing of trays inside vessels. Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, safety Other safety / Emergency Equipment required; Multi g
harness, face shield & welding safety gear detector, H2S Monitor, fire extinguisher, water hose & firs
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the wo
and implement the recommendations as required.
ORK METHOD STATEMENT
C) Adequate lighting.
D)
Stand by person & use life line if necessary.
E) Adequate ventilation by
providing pneumatic fan
Recommendation to Eliminate/Reduce Hazard
e been identified. However, concerned site supervisor / Foreman along with the safety
elated issues related to the specific job requirements, document it , educate the work crew
SAFE WORK METHOD STATEMENT
Job Name:- Removal & Installation of PSV & Date:
Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -31
Emergency Hatch in tank 15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
B) F) Ensure
Check that load
ground is within
condition andSWL of crane and
use spreader mat.valid third
party inspection certificate. C) Check wind speed and
A) Loss of stability due to ground condition and wind. direction.
D) Assign a
B) Worker injury. professional rigger and use tag line to control movement of
shifting material.
C) E) Outrigger to be fully extended.
5) Installation by bolting of new PSV using crane and
Hand injury.
also open the isolation valve. Applicable to breather
F) Ensure that load is within SWL of crane and valid third
valves.
D) Fire hazards. party inspection certificate.
G) Use hand gloves.
E) Gas
leaking. H) Use brass hammer.
Note: - General hazards related to the subject only have been identified. However, concerned siteJ) supervisor
Use multigas /monitor
Foremanand breathing apparatus.
along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name:- Fiber glass removal and application Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -32
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, safety Other safety / Emergency Equipment required; H2S
harness, Sandblasting Helmet & face shield. Monitor, fire extinguishers & water hose, first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Ensure the vessel is isolated.
B) Gas
test.
A) Exposure to toxic gases.
C) Adequate
B) Lack of visibility.
lighting.
2) Entry to Vessel / Tank internally. C) Poor communication.
D) Stand by person.
D) Entry to non isolated vessel / Tank
E) Poor Ventilation
E)
Adequate
A) ventilation
Use proper by providing pneumatic fan
hand tools.
B) Use hand
A) Hand injury. gloves.
B) C) Use safety
3) Removal of fiber glass by hand tools. Eye injury. goggles.
C) Breathing trouble. D) Adequate ventilation by
D) providing pneumatic fan.
Noise due to hammering.
E) Use dust mask & ear plug.
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
A) Use hand gloves.
B)
A) Hand injury. Ensure power supply is properly earthed.
4) Removal of fiber glass / caulking compound by using
B) Electrical shock. C) Keep cables out of sharp edges.
jack hammer
C) Ear injury. D) Use of ear muff.
A) Breathing trouble due to air contamination. A) Ensure all air hoses of blasting helmet are in good
B) condition.
Injury due to loosing the control of blasting hose. B) Use deadman handle for
C) Unrelated blasting nozzle. C) Replace
persons and properties exposed to blasting. breathing air filter as required.
6) Abrasive blasting D) Getting D) Proper shielding of properties
injury by blasting medium. providing warning sign board and isolation of the location.
E) Ensure all couplings
connected are tied up by metal wire.
F) Using blasting suit.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name:- Erection of preflash column. Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -33
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, safety Other safety / Emergency Equipment required; H2S Monitor,
harness, & face shield fire extinguishers & water hose,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Loss of stability due to ground condition and wind. A) Check crane is on level ground.
B) Check ground condition and use spreader
B) Crane boom hitting Scaffold. / Tank Shell. mat. C) Check
C) Overloading of crane. wind speed and direction.
3) Positioning and using of crane D) Assign a signal man.
E) Outrigger to be fully extended.
F) Ensure that load is within SWL of
crane and valid third party inspection certificate.
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
4) Slinging to hold the plates/angles. Hand injury to rigger/slinger Use of hand gloves by rigger/slinger.
A) Ensure that the sling wire/ soft belt properly tight with Erection
material. B)
A) Fall of lifted material.
Check load chart of Crane and ensure that the load is within SWL
B) Erection material hitting
for the boom length and lifting radius.(by crane operator)
workers and scaffolding due to uncontrolled swinging.
5) Installation of metal angles using crane.
C) Crane
C) Use tag line to control movement of Erection material.
tipping due to load exceeding lifting capacity.
D) Keep
non - essential people out of lift area and post warning signs for
safe lifting.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Job Name: - Abrasive blasting & Painting for Date:
Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -34
pipeline 15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, Other safety / Emergency Equipment required; H2S
Deadman handle, blasting suit, painter coverall, painting mask, Ear plug - if noise level is high. Monitor, fire extinguishers , first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Breathing trouble due to air contamination. A) Ensure all air hoses of blasting helmet are in good
condition.
B) Injury due to loosing the control of blasting hose. B) Use deadman handle
C) for blasting nozzle. C)
Unrelated persons and properties exposed to Replace breathing air filter as required.
2) Abrasive blasting blasting. D) Proper shielding of
D) Getting injury by blasting medium. properties providing warning sign board and isolation of
the location. E) Ensure
all couplings connected are tied up by metal wire.
F)
Using blasting suit.
A) Use the suitable cleaning
hand tools like shovel, wheel barrow,plastic brooms.
3) Removal of used Abrasives.
A) Injury due to improper handling of tools. B) Dumping of
used abrasives at one location.
C) Use dust mask.
A) Proper breathing apparatus as recommended by paint
manufacturer.
B) Adequate ventilation.
C) Fire
extinguisher.
D) Removal of source of ignition.
A) Breathing trouble due to air contamination by
E) Use proper coverall and
spray paint.
eye protection.
B) Fire Hazard.
4) Painting F) Refer and follow instruction of Material Safety Data
C) Exposure to paint material
Sheet.
D) Unrelated persons and
G) Storage/mixing of paint at controlled temperature
properties exposed to painting material.
as recommended by manufacturer.
H) Proper shielding of properties providing
warning sign board and isolation of the location.
I) Ensure that there is
no hot work in nearby area.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the
safety supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it ,
educate the work crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Job Name: - Abrasive blasting & Painting for water Date:
Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -35
tank stand/steel structure. 15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, Other safety / Emergency Equipment required; H2S
Deadman handle, blasting suit, painter coverall, painting mask, Ear plug - if noise level is high. Monitor, fire extinguishers , first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the
safety supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it ,
educate the work crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name: - Hydrostatic testing on tank / vessel. Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -36
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Basic Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses & Other safety / Emergency Equipment as required; H2S
safety harness. Monitor, fire extinguishers & first aid kit.
A) Open vent valves slowly and keep body parts out away
A) Worker injury.
from vent while depressurizing.
7) Depressurizing of tank by opening vent. B) Tank damage due to
B) Keep all non essential people out of work
vacuum.
area.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, Other safety / Emergency Equipment required; H2S
Deadman handle, blasting suit, painting mask, Ear plug - if noise level is high. Monitor, fire extinguishers , first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Breathing trouble due to air contamination. A) Ensure all air hoses of blasting helmet are in good
condition.
B) Injury due to loosing the control of blasting hose. B) Use deadman handle
C) forblasting nozzle.
Unrelated persons and properties exposed to C) Replace
blasting. breathing air filter as required.
D) Getting injury by blasting medium.
2) Abrasive blasting
D) Proper shielding of properties providing
warning sign board and isolation of the location.
E) Ensure all couplings connected are
tied up by metal wire.
F) Using blasting suit.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the
safety supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it ,
educate the work crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Job Name: - Internal Abrasive blasting & coating for Date:
Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -38
pipes 15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, Deadman Other safety / Emergency Equipment required; H2S Monitor,
handle, blasting suit, painter coverall, painting mask, Ear plug - if noise level is high. fire extinguishers , first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Breathing trouble due to air contamination. A) Ensure all air hoses of blasting helmet are in good condition.
B)
Injury due to loosing the control of blasting hose. B) Replace breathing air filter as required.
C) Unrelated
persons and properties exposed to blasting.
2) Abrasive blasting D) Getting
injury by blasting medium. C) Ensure all couplings connected
are tied up by metal wire & chicago clips.
D) Using blasting suit.
r (Al-Magwa)
minate/Reduce Hazard
nting mask
Fire extinguisher.
D) Use proper coverall
hand gloves.
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Basic Personal Protective Equipment Required: - Coverall,Safety helmet, Safety boots, safety glasses & Other safety / Emergency Equipment as required; H2S
safety harness, breathing apparatus . Monitor, fire extinguishers & first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Hand injury.
4) Clean man hole area and bottom area. B) Gas Hazard. C) Use air mask, if required.
A) Loss of stability due to ground condition and wind. A) Check crane is on level ground.
B) Check ground condition and use spreader
B) Crane boom hitting flare stack. mat. C)
Check wind speed and direction.
D) Assign a signal man.
5) Positioning and using of crane
E) Outrigger to be fully extended.
F) Ensure that load is within
SWL of crane and valid third party inspection certificate.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, safety Other safety / Emergency Equipment required; H2S
harness, & face shield Monitor, fire extinguishers & water hose,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name:- Tank Shell Erection Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -41
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall,Safety helmet, Safety boots, safety glasses, safety harness Other safety / Emergency Equipment required; H2S
and lanyard. Monitor, fire extinguishers,water hose ,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Loss of stability due to ground condition and wind. A) Check crane is in level
B) B) Check ground condition and use spreader
3) Positioning / using of crane
Crane boom hitting Scaffold. / Tank Shell mat. C)
Check wind speed and direction
4) Slinging to hold erection material Hand injury to rigger/slinger Use of hand gloves by rigger/slinger.
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
A) Ensure that the sling wire/ soft belt properly tight with
A) Fall of Erection material. Erection material.
B) Erection material hitting workers B) Check load chart of Crane
and scaffolding due to un-controlled swinging or due to and ensure that the load is within SWL for the boom
heavy wind. length.Check wind speed and direction
C) Loss of stability of crane due to C)
5) Erection and fit up of shell plate.Cutting / removal of
ground condition and wind. Shell plate size should be max 5m to avoid the plate to get
obstructing structure
D) While Lifting the shell bend & hit scaffold
plate might bend & hit the scaffold D) Inspect scaffold before starting the job.
E) Improper E) Use stiffner for the
Scaffold modification shell plate while lifting
F) Bending of Shell plate while lifting F) Once the shell plate is released,
no person is allowed on the scaffold.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name:- Tank Shell removal Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -42
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, safety Other safety / Emergency Equipment required; H2S
harness, & face shield Monitor, fire extinguishers & water hose,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Loss of stability due to ground condition and wind. A) Check crane is in level ground.
3) Positioning / using of crane B) Check ground condition and use
B) Crane boom hitting Scaffold. / Tank Shell spreader mat.
4) Slinging to hold shell plate. Hand injury to rigger/slinger Use of hand gloves by rigger/slinger.
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
A) Fire Hazard A) Assign fire-watch and spray water in the area below the
B) Burn injury due to cutting sparks. cutting location to quench the sparks.
5) Oxy - Acetylene cutting of plates.
C) Damage to oxygen and Acetylene B) Provide fire extinguishers near
hoses. D) Fall of cut struc the cutting location and Oxy-Acetylene
A) Use hand gloves and keep body parts out of pinch area
during removal of slings and placing rafter beam on ground.
7) Placing the shell plate on ground and stacking. Injury to workers.
B) Barricade the area.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Job Name: - Loading/Unloading of pipes using Date:
Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -43
forklift 15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, Ear Other safety / Emergency Equipment required; H2S
plug - if noise level is high. Monitor, fire extinguishers
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit if required.
A) Falling of material.
B) Injury to workers. A) Use a professional forklift operator.
C) Material B) Barricade the area.Keep
slipping from forklift unwanted people from loading area.
4) Unloading of pipes to flatbelt/stackbody. D) Material slipping from
flatbelt/stackbody. C) Use a professional forklift operator.
D) Pipes should be tied with belt on
the flatbelt/stackbody.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the
safety supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it ,
educate the work crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name: -Excavation Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -44
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
A) Lack of fresh air A) Ensure that gas test is carried out,especially for oygen.
B) Collaspe of B)
excavation Ensure that excavation is side sloped, shielded and shored
C) Hazards prevent caveins.
due to underground pipes/cables C) Ensure that excavated mud is kept 0.5 mtrs aw
from edges.
D) Ensure that there is ladder access or steps fo
2) Manual Excavation
access.
E) Ensure that there is
underground pipes or cables.
F) No I.C engine
should be used inside trenches.
G) Barricade the area.
A) Lack of fresh air A) Ensure that gas test is carried out,especially for oygen.
B) Collaspe of B)
excavation Ensure that excavation is side sloped, shielded and shored
C) Hazards prevent caveins.
due to underground pipes/cables C) Ensure that excavated mud is kept 0.5 mtrs aw
D) Fire hazards from edges.
D) Ensure that there is ladder access or steps for
access.
3) Excavation using jack hammer.
E) Ensure that there is
underground pipes or cables.
F) No I.C engine
should be used inside trenches.
G) Keep fire extinguisher near excavation area.
H) Barricade the
area.
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safe
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the wo
crew and implement the recommendations as required.
RK METHOD STATEMENT
Doc. No: AM/CA4079/SWMS -44
been identified. However, concerned site supervisor / Foreman along with the safety
related issues related to the specific job requirements, document it , educate the work
SAFE WORK METHOD STATEMENT
Date:
Job Name: - Removal of spade & box up. Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -45
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall,Safety helmet, Safety boots, safety glasses, safety harness Other safety / Emergency Equipment required; H2S
and lanyard. Monitor, fire extinguishers ,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Hand injury. A) Ensure that all tools and foreign material are removed
B) from the vessel/tank.
2) close the manways/clean out door.
Danger of gas leak. B) Ensure a
persons are outside vessel
A) Hand injury.
A) Use Hand Gloves.
B)
4) Removal of spade B) Use prop
Danger of gas leak.
hand tools.
A) Chance of persons to get entrapped or tools & A) Inspect the vessel & ensure it is free of unwanted
unwanted left over materials to be inside materials & all workers have come out of the vessel. B) U
5) Hot bolting for Box up
B) Danger of gas leaking. Gas Monitor.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the saf
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the w
crew and implement the recommendations as required.
been identified. However, concerned site supervisor / Foreman along with the safety
E related issues related to the specific job requirements, document it , educate the work
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
A) Hand injury
A) Use Gas Monitor.
3) Debolting of the valve flange joints B) Chance of Fire due to
B) Use hand gloves
hammering spark.
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
A) Loss of stability of crane due to ground condition A) Check crane is on level ground.
and wind. B)
4) Removal & lifting of flange using crane
B) Check ground condition and use spreader mat.
Falling of flange.
A) Fire Hazard A) Assign fire-watch and spray water in the area below the
B) Burn injury due to cutting sparks. cutting location to quench the sparks.
5) Oxy - Acetylene cutting of flange
C) Damage to oxygen and B) Provide fire extinguishers near the
Acetylene hoses. D) Fall of cut flang cutting location and Oxy-Acetylene
A) Fire Hazard
A) Assign fire-watch and spray water in the area below the
B) Burn injury due to welding
welding location to quench the sparks.
spark
6) Welding of new flange B) Provide
C) Injury due to grinding
fire extinguishers near the welding location.
C) Provide ad
D) Formation
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name:- Fixing of anode & pipes inside vessels. Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -47
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
A) Hand injury
A) Use Gas Monitor.
4) Bolting of the valve flange joints B) Chance of Fire due to hammering
B) Use hand gloves
spark.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name: - Isolation / Spading of lines Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -48
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall,Safety helmet, Safety boots, safety glasses, Other safety / Emergency Equipment required; H2S
safety harness, Ear plug - if noise level is high. Monitor, fire extinguishers ,first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the
safety supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it ,
educate the work crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name:- Repair of tank shell. Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -49
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
A) Fire Hazard
A) Assign fire-watch in the area
B) Burn injury due to grinding.
B) Provide fire extinguishers near the cutting location.
4) Cutting of plates by grinding.
C) Cutting crew
C) Damage to grinding cables.
to use
A) Fire Hazard A) Assign fire-watch and spray water in the area below the
B) Burn injury due to cutting sparks. cutting location to quench the sparks.
5) Cutting by oxy-acetylene cutting set.
C) Damage to oxygen and Acetylene B) Provide fire extinguishers near the
hoses. cutting location and Oxy-Acetylene
A) Use hand gloves and keep body parts out of pinch area
during removal and placing bottom plate on ground.
6) Manually shifting shell plates and stacking. Injury to workers.
B) Barricade the area.
A) Fire Hazard
A)
B) Burn injury due to welding spark
7)Fit up and welding. Provide fire extinguishers near the welding location.
C) Injury due to grinding
B) Welding crew to use
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Job Name: - Loading/Unloading of materials on Date:
Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -63
half lorry 15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, Other safety / Emergency Equipment required; H2S
Ear plug - if noise level is high. Monitor, fire extinguishers
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit if required.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the
safety supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it ,
educate the work crew and implement the recommendations as required.
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Personal Protective Equipment Required: - Coverall, Safety helmet, Safety boots, safety glasses, safety Other safety / Emergency Equipment required; H2S
harness, blasting Helmet & face shield. Monitor, fire extinguishers & water hose, first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
A) Hand injury.
B) A) Use proper hand tools.
3) Removal of cement lining by hand tools. Eye injury. B) Use hand
C) Bre gloves.
Sequence of basic steps Potential Accidents or Hazards Recommendation to Eliminate/Reduce Hazard
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the safety
supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it , educate the work
crew and implement the recommendations as required.
SAFE WORK METHOD STATEMENT
Date:
Job Name: - Maintenance of flare stack Division/Section: MAINTENANCE Doc. No: AM/CA4079/SWMS -39A
15/04/2018
Job Location : - MAA Completed By: Site Engineer Reviewed By:- Safety Engineer (Al-Magwa)
Basic Personal Protective Equipment Required: - Coverall,Safety helmet, Safety boots, safety Other safety / Emergency Equipment as required; H2S
glasses & safety harness. Monitor, fire extinguishers & first aid kit.
1) Job preparation Performing unauthorized jobs in hazardous area Obtain work permit. Ensure gas test is carried out.
B) Hand injury C) Use proper hand tools and keep it awy from edges.
Note: - General hazards related to the subject only have been identified. However, concerned site supervisor / Foreman along with the
safety supervisor shall always analyze and identify any other HSE related issues related to the specific job requirements, document it ,
educate the work crew and implement the recommendations as required.