Project : Gedung Kantor di Pontianak

Location : -

Elevation :

Test No : S3

Depth (m) C C+F LF TF FR %


(kg/cm2) (kg/cm2) (kg/cm2) (kg/cm)
0.00 0.00 0.00 0.00 0.00 0.00
0.20 0.00 0.00 0.00 0.00 0.00
0.40 0.00 0.00 0.00 0.00 0.00
0.60 0.00 0.00 0.00 0.00 0.00
0.80 0.00 0.00 0.00 0.00 0.00
1.00 0.00 0.00 0.00 0.00 0.00
1.20 0.00 1.00 0.05 1.00 10.00
1.40 0.50 1.00 0.05 2.00 10.00
1.60 0.50 1.00 0.05 3.00 10.00
1.80 0.50 1.00 0.05 4.00 10.00
2.00 0.50 1.00 0.05 5.00 10.00
2.20 0.50 1.00 0.05 6.00 10.00
2.40 1.00 1.50 0.05 7.00 5.00
2.60 1.00 1.50 0.05 8.00 5.00
2.80 1.00 1.50 0.05 9.00 5.00
3.00 1.00 1.50 0.05 10.00 5.00
3.20 1.00 2.00 0.10 12.00 10.00
3.40 1.00 2.00 0.10 14.00 10.00
3.60 1.00 2.00 0.10 16.00 10.00
3.80 1.00 2.00 0.10 18.00 10.00
4.00 1.00 2.00 0.10 20.00 10.00
4.20 1.00 2.00 0.10 22.00 10.00
4.40 1.00 2.00 0.10 24.00 10.00
4.60 1.00 2.00 0.10 26.00 10.00
4.80 1.50 2.00 0.05 27.00 3.33
6.00 1.50 2.00 0.05 28.00 3.33
5.20 1.50 2.00 0.05 29.00 3.33
5.40 1.50 3.00 0.15 32.00 10.00
5.60 1.50 3.00 0.15 35.00 10.00
5.80 1.50 3.00 0.15 38.00 10.00
6.00 2.00 3.00 0.10 40.00 5.00
6.20 2.00 3.00 0.10 42.00 5.00
6.40 2.00 3.00 0.10 44.00 5.00
6.60 2.00 3.00 0.10 46.00 5.00
6.80 2.00 4.00 0.20 50.00 10.00
7.00 2.50 4.00 0.15 53.00 6.00
7.20 2.50 4.00 0.15 56.00 6.00
7.40 2.50 4.00 0.15 59.00 6.00
7.60 2.50 4.00 0.15 62.00 6.00
7.80 2.50 4.00 0.15 65.00 6.00
8.00 2.50 4.00 0.15 68.00 6.00
8.20 2.00 4.00 0.20 72.00 10.00
8.40 2.00 4.00 0.20 76.00 10.00
8.60 2.00 4.00 0.20 80.00 10.00
8.80 2.00 4.00 0.20 84.00 10.00
9.00 3.00 4.00 0.10 86.00 3.33
9.20 3.00 5.00 0.20 90.00 6.67
9.40 3.00 5.00 0.20 94.00 6.67
9.60 3.00 5.00 0.20 98.00 6.67
9.80 3.00 5.00 0.20 102.00 6.67
10.00 3.00 5.00 0.20 106.00 6.67
10.20 3.00 5.00 0.20 110.00 6.67
10.40 3.00 5.00 0.20 114.00 6.67
10.60 3.00 5.00 0.20 118.00 6.67
10.80 3.00 5.00 0.20 122.00 6.57
11.00 3.50 5.00 0.15 125.00 4.29
11.20 3.50 5.00 0.15 128.00 4.29
11.40 4.00 6.00 0.20 132.00 5.00
11.60 4.00 6.00 0.20 136.00 5.00
11.80 4.00 6.00 0.20 140.00 5.00
12.00 4.00 6.00 0.20 144.00 5.00
12.20 4.00 6.00 0.20 148.00 5.00
12.40 5.00 8.00 0.30 154.00 6.00
12.60 5.00 8.00 0.30 160.00 6.00
12.80 5.00 8.00 0.30 166.00 6.00
13.00 5.00 8.00 0.30 172.00 6.00
13.20 5.00 8.00 0.30 178.00 6.00
13.40 5.00 8.00 0.30 184.00 6.00
13.60 5.00 8.00 0.30 190.00 6.00
13.80 5.00 8.00 0.30 196.00 6.00
14.00 5.00 8.00 0.30 202.00 6.00
14.20 5.00 8.00 0.30 208.00 6.00
14.40 5.00 8.00 0.30 214.00 6.00
14.60 6.00 10.00 0.40 222.00 8.67
14.80 6.00 10.00 0.40 230.00 6.67
15.00 6.00 10.00 0.40 238.00 6.67
22.80 14.00 20.00 0.60 629.00 4.29
23.00 14.00 20.00 0.60 641.00 4.29
23.20 14.00 20.00 0.60 653.00 4.29
23.40 14.00 20.00 0.60 665.00 4.29
23.60 14.00 20.00 0.60 677.00 4.29
23.80 15.00 22.00 0.70 691.00 4.67
24.00 15.00 22.00 0.70 705.00 4.67 535.10
24.20 15.00 22.00 0.70 719.00 4.67
24.40 15.00 22.00 0.70 733.00 4.67
24.60 15.00 22.00 0.70 747.00 4.67
24.80 15.00 22.00 0.70 761.00 4.67
26.00 15.00 22.00 0.70 775.00 4.67
25.20 15.00 22.00 0.70 789.00 4.67
25.40 15.00 22.00 0.70 603.00 4.67
25.60 16.00 22.00 0.60 815.00 3.75
25.80 16.00 22.00 0.60 827.00 3.75
26.00 16.00 22.00 0.60 839.00 3.75
26.20 16.00 22.00 0.60 851.00 3.75
26.40 16.00 22.00 0.60 863.00 3.75
26.60 16.00 22.00 0.60 875.00 3.75
26.80 16.00 22.00 0.60 887.00 3.75
27.00 18.00 25.00 0.70 901.00 3.89
27.20 18.00 25.00 0.70 915.00 3.89
27.40 18.00 25.00 0.70 929.00 3.89
27.60 20.00 28.00 0.80 945.00 4.00
27.80 20.00 28.00 0.80 961.00 4.00
28.00 20.00 28.00 0.80 977.00 4.00
28.20 20.00 28.00 0.80 993.00 4.00
28.40
28.60
28.80
29.00
29.20
29.40
29.60
29.80
30.00
Proyek : Pembangunan Gedung Perkuliahan IAIN Pontianak

Location : Kampus IAIN Pontianak, Jl. WR Supratman

Elevation :

Test No : S2

Kedalaman Perlawanan Jumlah Hambatan JHL Rasio


Konus (PK) Perlawanan Lekat Gesekan
(JP) (HL=(JP- (FR=HL/P
PK)/10 K)
m kg/cm2 kg/cm2 kg/cm2 kg/cm %
0.00 0.00 0.00 0.00 0.00 0.00
0.20 10.00 14.00 0.40 8.00 4.00
0.40 7.00 10.00 0.30 14.00 4.29
0.60 3.00 5.00 0.20 18.00 6.67
0.80 3.00 5.00 0.20 22.00 6.67
1.00 4.00 6.00 0.20 26.00 5.00
1.20 4.00 6.00 0.20 30.00 5.00
1.40 5.00 7.00 0.20 34.00 4.00
1.60 6.00 8.00 0.20 38.00 3.33
1.80 6.00 8.00 0.20 42.00 3.33
2.00 6.00 8.00 0.20 46.00 3.33
2.20 6.00 8.00 0.20 50.00 3.33
2.40 6.00 8.00 0.20 54.00 3.33
2.60 6.00 8.00 0.20 58.00 3.33
2.80 6.00 8.00 0.20 62.00 3.33
3.00 6.00 8.00 0.20 66.00 3.33
3.20 6.00 8.00 0.20 70.00 3.33
3.40 6.00 9.00 0.30 76.00 5.00
3.60 6.00 9.00 0.30 82.00 5.00
3.80 6.00 8.00 0.20 86.00 3.33
4.00 6.00 8.00 0.20 90.00 3.33
4.20 5.00 8.00 0.30 96.00 6.00
4.40 4.00 7.00 0.30 102.00 7.50
4.60 5.00 7.00 0.20 106.00 4.00
4.80 6.00 8.00 0.20 110.00 3.33
5.00 5.00 8.00 0.30 116.00 6.00
5.20 5.00 8.00 0.30 122.00 6.00
5.40 5.00 8.00 0.30 128.00 6.00
5.60 4.00 7.00 0.30 134.00 7.50
5.80 4.00 7.00 0.30 140.00 7.50
6.00 6.00 9.00 0.30 146.00 5.00
6.20 7.00 10.00 0.30 152.00 4.29
6.40 6.00 9.00 0.30 158.00 5.00
6.60 6.00 9.00 0.30 164.00 5.00
6.80 6.00 10.00 0.40 172.00 6.67
7.00 8.00 11.00 0.30 178.00 3.75
7.20 7.00 10.00 0.30 184.00 4.29
7.40 5.00 8.00 0.30 190.00 6.00
7.60 5.00 8.00 0.30 196.00 6.00
7.80 5.00 8.00 0.30 202.00 6.00
8.00 4.00 7.00 0.30 208.00 7.50
8.20 4.00 7.00 0.30 214.00 7.50
8.40 4.00 7.00 0.30 220.00 7.50
8.60 4.00 6.00 0.20 224.00 5.00
Proyek : Pembangunan Gedung Perkuliahan IAIN Pontianak

Location : Kampus IAIN Pontianak, Jl. WR Supratman

Elevation :

Test No : S2

Kedalaman Perlawanan Jumlah Hambatan JHL Rasio


Konus (PK) Perlawanan Lekat Gesekan
(JP) (HL=(JP- (FR=HL/P
PK)/10 K)
m kg/cm2 kg/cm2 kg/cm2 kg/cm %
8.80 4.00 6.00 0.20 228.00 5.00
9.00 4.00 6.00 0.20 232.00 5.00
9.20 4.00 6.00 0.20 236.00 5.00
9.40 4.00 6.00 0.20 240.00 5.00
9.60 4.00 6.00 0.20 244.00 5.00
9.80 5.00 7.00 0.20 248.00 4.00
10.00 6.00 8.00 0.20 252.00 3.33
10.20 4.00 7.00 0.30 258.00 7.50
10.40 5.00 7.00 0.20 262.00 4.00
10.60 5.00 6.00 0.10 264.00 2.00
10.80 7.00 8.00 0.10 266.00 1.43
11.00 6.00 8.00 0.20 270.00 3.33
11.20 6.00 8.00 0.20 274.00 3.33
11.40 6.00 8.00 0.20 278.00 3.33
11.60 6.00 8.00 0.20 282.00 3.33
11.80 6.00 8.00 0.20 286.00 3.33
12.00 6.00 9.00 0.30 292.00 5.00
12.20 6.00 9.00 0.30 298.00 5.00
12.40 5.00 8.00 0.30 304.00 6.00
12.60 7.00 10.00 0.30 310.00 4.29
12.80 8.00 11.00 0.30 316.00 3.75
13.00 7.00 10.00 0.30 32.00 4.29
13.20 5.00 8.00 0.30 328.00 6.00
13.40 7.00 10.00 0.30 334.00 4.29
13.60 7.00 10.00 0.30 340.00 4.29
13.80 7.00 10.00 0.30 346.00 4.29
14.00 7.00 11.00 0.40 354.00 5.71
14.20 8.00 12.00 0.40 362.00 5.00
14.40 8.00 14.00 0.60 374.00 7.50
14.60 8.00 14.00 0.60 386.00 7.50
14.80 10.00 16.00 0.60 398.00 6.00
15.00 8.00 15.00 0.70 412.00 8.75
15.20 10.00 15.00 0.50 422.00 5.00
15.40 10.00 14.00 0.40 430.00 4.00
15.60 12.00 15.00 0.30 436.00 2.50
15.80 14.00 18.00 0.40 444.00 2.86
16.00 12.00 16.00 0.40 452.00 3.33
16.20 12.00 16.00 0.40 460.00 3.33
16.40 12.00 15.00 0.30 466.00 2.50
16.60 12.00 15.00 0.30 472.00 2.50
16.80 12.00 15.00 0.30 478.00 2.50
17.00 12.00 15.00 0.30 484.00 2.50
17.20 10.00 14.00 0.40 492.00 4.00
17.40 12.00 16.00 0.40 500.00 3.33
Proyek : Pembangunan Gedung Perkuliahan IAIN Pontianak

Location : Kampus IAIN Pontianak, Jl. WR Supratman

Elevation :

Test No : S2

Kedalaman Perlawanan Jumlah Hambatan JHL Rasio


Konus (PK) Perlawanan Lekat Gesekan
(JP) (HL=(JP- (FR=HL/P
PK)/10 K)
m kg/cm2 kg/cm2 kg/cm2 kg/cm %
17.60 14.00 18.00 0.40 508.00 2.86
17.80 16.00 22.00 0.60 520.00 3.75
18.00 16.00 22.00 0.60 532.00 3.75
18.20 18.00 25.00 0.70 546.00 3.89
18.40 15.00 25.00 1.00 566.00 6.67
18.60 14.00 24.00 1.00 586.00 7.14
18.80 12.00 22.00 1.00 606.00 8.33
19.00 12.00 20.00 0.80 622.00 6.67
19.20 12.00 20.00 0.80 638.00 6.67
19.40 16.00 22.00 0.60 650.00 3.75
19.60 15.00 22.00 0.70 664.00 4.67
19.80 15.00 24.00 0.90 682.00 6.00
20.00 15.00 24.00 0.90 700.00 6.00
20.20 16.00 26.00 1.00 720.00 6.25
20.40 14.00 22.00 0.80 736.00 5.71
20.60 12.00 20.00 0.80 752.00 6.67
20.80 10.00 16.00 0.60 764.00 6.00
21.00 12.00 15.00 0.30 770.00 2.50
21.20 15.00 18.00 0.30 776.00 2.00
21.40 12.00 16.00 0.40 784.00 3.33
21.60 12.00 16.00 0.40 792.00 3.33
21.80 16.00 20.00 0.40 800.00 2.50
22.00 20.00 30.00 1.00 820.00 5.00
22.20 18.00 28.00 1.00 840.00 5.56
22.40 18.00 28.00 1.00 860.00 5.56
22.60 16.00 25.00 0.90 878.00 5.63
22.80 16.00 24.00 0.80 894.00 5.00
23.00 14.00 22.00 0.80 910.00 5.71
23.20 12.00 20.00 0.80 926.00 6.67
23.40 17.00 25.00 0.80 942.00 4.71
23.60 25.00 38.00 1.30 968.00 5.20
23.80 20.00 32.00 1.20 992.00 6.00
24.00 18.00 28.00 1.00 1012.00 5.56
24.20 28.00 36.00 0.80 1028.00 2.86
24.40 35.00 45.00 1.00 1048.00 2.86
24.60 28.00 40.00 1.20 1072.00 4.29
24.80 25.00 38.00 1.30 1098.00 5.20
25.00 25.00 40.00 1.50 1128.00 6.00
25.20 30.00 45.00 1.50 1158.00 5.00
25.40 40.00 60.00 2.00 1198.00 5.00
25.60 40.00 60.00 2.00 1238.00 5.00
25.80 50.00 70.00 2.00 1278.00 4.00
26.00 40.00 60.00 2.00 1318.00 5.00
26.20 35.00 50.00 1.50 1348.00 4.29
Proyek : Pembangunan Gedung Perkuliahan IAIN Pontianak

Location : Kampus IAIN Pontianak, Jl. WR Supratman

Elevation :

Test No : S2

Kedalaman Perlawanan Jumlah Hambatan JHL Rasio


Konus (PK) Perlawanan Lekat Gesekan
(JP) (HL=(JP- (FR=HL/P
PK)/10 K)
m kg/cm2 kg/cm2 kg/cm2 kg/cm %
26.40 50.00 75.00 2.50 1398.00 5.00
26.60 70.00 100.00 3.00 1458.00 4.29
26.80 55.00 80.00 2.50 1508.00 4.55
27.00 50.00 65.00 1.50 1538.00 3.00
27.20 60.00 80.00 2.00 1578.00 3.33
27.40 75.00 100.00 2.50 1628.00 3.33
27.60 75.00 100.00 2.50 1638.00 3.33
27.80 75.00 110.00 3.50 1650.00 4.67
28.00 75.00 115.00 4.00 1685.00 5.33
28.20 80.00 115.00 3.50 1700.00 4.38
28.40 80.00 120.00 4.00 1710.00 5.00
28.60 80.00 120.00 4.00 1725.00 5.00
28.80 80.00 120.00 4.00 1745.00 5.00
29.00 80.00 125.00 4.50 1775.00 5.63
29.20 85.00 125.00 4.00 1790.00 4.71
29.40 85.00 125.00 4.00 1810.00 4.71
29.60 85.00 130.00 4.50 1830.00 5.29
29.80 90.00 130.00 4.00 1850.00 4.44
30.00 90.00 140.00 5.00 1875.00 5.56
PERHITUNGAN PONDASI

P = Tahanan Ujung + Tahanan Lekat

P =(A x qc )/SF1 + (Q x JHP)/SF2

Dimana :
P = Daya dukung tiang pancang ijin (kg)
qc = tegangan konus tanah keras (kg/cm2)
A = Luas penampang tiang pancang (cm2)
Q = Keliling penampang tiang (cm1)
JHL = Jumlah hambatan lekat
SF = Safety factor ; 3 dan 5

Input nilai
1. Ukuran Tiang pancang Pondasi jika bentuk segi empat
p = 25 cm Luas = 625 cm2
l = 25 cm Keliling = 100 cm
t = 28 m
2. Qc = tegangan konus tanah = 75 kg/cm2 ----> lihat hasil sondir
3. JHP = jumlah hambatan pelekat = 1685 kg/cm ----> pada kedalaman
28 m
Daya Dukung Tiang Pancang
P = A x qc + Q x JHL
3 5
P = 625 cm2 x 75 kg/cm2 + 100 cm x 1685 kg/cm
3 5
= 15,625.00 kg + 33,700.00 kg
= 49,325.00 kg 34,527.50

Berat Beban yang dipikul 1 kolom


misal : 325 ton

Jumlah Tiang Pancang Tunggal


n = beban seluruh lantai yang harus dipikul 1 kolom
daya dukung tiang pancang
n = 325,000 kg
49,325 kg
= 6.589 buah
= 7 buah

Efisiensi Kelompok Tiang Pancang cara praktis


D = 25 cm 325,000
=
s = 2.5 D = 63 cm 34,527.50
m = 3 baris
n = 3 kolom = 9.41278691
Ɵ = arc tan D/s = 22 = 10 titik

Eg = 1- Ɵ ( n - 1) m + ( m - 1) n
90 m n
= 1- 21.801 (### - 1) 3+ ( 3- 1) 3
90 x 3 x 3
= 1- 21.801 (### + 6)
810
= 1- 21.801 x 0
= 1- 0.323
= 0.677

Daya Dukung satu tiang pancang berkelompok


Pk = P x Eg
= 49,325 kg x 0.7
= 33393.822 kg

Jumlah Tiang Pancang Berkelompok


n = beban seluruh lantai yang harus dipikul 1 kolom
daya dukung tiang pancang
n = 325000 kg
33393.822 kg
= 9.7323 buah
= 10 buah