project : mauda super thermal power project (2x500mw)
loa no : cs-9561-572-2-sc-noa-5349 dated:05.08.09
400kv switchyard package
general arrangement, bill of materials and schematics for
relay and protection panel for 400kv tie bay
wardha line#ii - tie - khaperkheda line#i diameter
bay- 408
circuit 400kv tie bay protection panel
panel 408r
ga yn1m301602-abn rev02
ntpc drawing no: 9561-572-pve-b-377 ,rev:02
ntpc limited
A Govt. of India Enterprise
(Formerly National Thermal Power Corporation Ltd.)
LOA NO : CS95615722SCNOA5349 DATED:05.08.09
PROJECT : MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
abb ref:4200206690 protection & substation automation
1 2 3 4 5 6
\\10.140.44.167\kavitha\Divakar\400KV NTPC MAUDA SS\DRAWING\Updated testing observation\01.wardha LINE#2TIEKHAPERKHEDA LINE#1\3.Tie protection panel\1.Dwg\rev.01\
000_Title
001 02 INDEX SHEET
002 02 FRONT VIEW408R
003 02 LEGEND OF 408R
A
004 02 SIDE VIEW
005 02 FOUNDATION DETAILS
006 02 CUBICLE DETAILS
007 02 INTERNAL VIEW OF 408R
008 02 LEGEND FOR 408R
12/20/2010 11:50
B
ABB LTD.
C
This document must not be copied without our written permission and the contents there of must not be imparted
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
Design checked by
400kV TIE RELAY PANEL DIVAKAR DOLA
GENERAL ARRANGEMENT SALE ORDER NO:4200206690
Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
Drawing checked by INDEX SHEET
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P 001
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
UASE 2010 15
YN1M301602ABN 02 Cont.
002
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
800
408R
D01
D05
D09
D09.01
D13 WARDHA
LINE#2
D17
D17.01
B
D21 KHAPERKHEDA
LINE#1
2200
D25
195/86BTMA/86B 195/86ATMA/86A
50LBB1TX
PB/86A
195R
195Y
195B
86A
80A
D29
SPARE PB/86B
295B
295Y
295R
86B
80B
ABB LTD.
D33
C
D37
1 3 4 6
D37.01
7
=408R
8 R1 Y1 B1 N1
1MYN266015001
This document must not be copied without our written permission and the contents there of must not be imparted
9 R2 Y2 B2 N2 1 3 4 6 7
1 2 4 5 7 9 R2 Y2 B2 N2
8 R1 Y1 B1 N1
1 2 4 5 7
D41
1 3 4 6
D41.01
7
=408R
8 R1 Y1 B1 N1
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
1MYN266015001
9 R2 Y2 B2 N2 1 3 4 6 7
1 2 4 5 7 9 R2 Y2 B2 N2
8 R1 Y1 B1 N1
1 2 4 5 7
15
BASE FRAME 100
ANTI VIBRATION PAD
GLASS DOOR ALL DIMENSIONS IN mm D
Design checked by
400kV TIE RELAY PANEL DIVAKAR DOLA GENERAL ARRANGEMENT SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P FRONT VIEW430R 002
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602ABN 02 Cont.
003
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
=408R TIE PROTECTION PANEL
D09.01 ENERGY METER FOR WARDHA LINE#2
A
D17.01 ENERGY METER FOR KHAPERKHEDA LINE#1
86A D25.101.101 LATCH RELAY. RXMVB4
TMA/86A D25.101.113 RESISTOR UNIT FOR RXMVB4 TRIP RELAY, RXTMA
195/86A D25.101.313 TRIP COIL SUPERVISION RELAY, TSR
PB/86A D21.101.119 PUSH BUTTON MODULE FOR TRIP RELAY
C
This document must not be copied without our written permission and the contents there of must not be imparted
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
Design checked by
400kV TIE RELAY PANEL DIVAKAR DOLA GENERAL ARRANGEMENT SALE ORDER NO:4200206690
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
Drawing checked by LEGEND OF 408R Rev Sheet
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P 003
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602ABN 02 Cont.
004
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
800
A
INTERPANEL SLOT
PROTECTIVE DOOR
B
FRONT
2200
REAR
ABB LTD.
REAR COVER
C
This document must not be copied without our written permission and the contents there of must not be imparted
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
ANTIVIBRATION PAD
15 BASE FRAME BASE FRAME
100
ALL DIMENSIONS ARE IN mm D
Design checked by
400kV TIE RELAY PANEL DIVAKAR DOLA GENERAL ARRANGEMENT SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P SIDE VIEW 004
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602ABN 02 Cont.
005
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
REAR A
800
735
25
37.5
337
B
800
750
725
675
375
80
25
ABB LTD.
675
62.5
C
This document must not be copied without our written permission and the contents there of must not be imparted
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
FRONT NOTES:
1) ALL DIMENSIONS ARE IN mm
2) 6 NOS. 16mm DIA HOLES FOR GROUTING BOLT
Design checked by
400kV TIE RELAY PANEL DIVAKAR DOLA GENERAL ARRANGEMENT SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P FOUNDATION DETAILS 005
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602ABN 02 Cont.
006
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
Cubicle Type VSG800(800(W) x 800(D) x 2200 + 100(BASE FRAME) + 15(ANTIVIBRATION PAD) (H))
Degree of protection IP54
Thickness of material 3 mm FOR SWING FRAME , REAR PLANE ANGLES, GLAND PLATES, BASE FRAME,
2 mm FOR PROTECTIVE DOOR, REAR PANEL AND KICK PLATES. A
Paint : Exterior For Ends of the end panel : Colour Blue, Shade : RAL5012, Texture Finish
For Front & Rear : Colour Grey, Shade : RAL9002, Texture Finish
: Interior Colour Grey, Shade : RAL9002, Texture Finish
: Base Frame Black glossy
: Thickness 6080 microns for powder coating
Earth bar Tinned Copper Strip 50x6mm
Bottom Plate and Gland Plate Bottom plate with one opening size 675mm x 600mm
Two gland plate size 625mm X 340mm for fixing cable glands
B
Terminal Blocks Disconnecting Type :CT, PT, DC incoming, AC incoming,
NonDisConnecting Type :Earthing, Trip, InterPanel, General,
20% spare terminal blocks
Ferrules White Sleeve with Nos. marked in black letters. All wires
directly connected to TRIP COILS will have red ferrule.
Cubicle Illumination & Heating 50W Heater & Compact Flourescent lamp
D
Weight of Panel : 250KG (APPROXIMATELY)
Design checked by
400kV TIE RELAY PANEL DIVAKAR DOLA GENERAL ARRANGEMENT SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P CUBICLE DETAILS 006
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602ABN 02 Cont.
007
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
F01 F02
B01
X13:0108
CUSTOMER CABLE A
B05
A01.03 MCB.01
ABB CABLE A01.05 1 2
B09
1 2 1 2 1 2 1 2 1 2
12 11
13 11 13 11 12 11 13 11 13 11
14
14 14 14 14 14
22 21
22 21 22 21 22 21 22 21 22 21
3 4
3 4 3 4 3 4 3 4 3 4
CUSTOMER CABLE
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
B13
LK03
FS04
LK06
FS01
FS02
FS03
FS05
FS06
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
ABB CABLE
B17
B
2230
2230
B21
B25
B29
ABB LTD.
B33
CUSTOMER CABLE
X03:0108 X04:0195 C
B37
ABB CABLE
This document must not be copied without our written permission and the contents there of must not be imparted
X01:0118 X02:0120
B41
CUSTOMER CABLE
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
250mm
B37
2 1
NOTE : ALL DIMENSIONS IN mm
PLANEC PLANEB PLANEA
INTERNAL VIEW FOR INFORMATION ONLY
(MAY ALTER DURING MANUFACTURING) X01,X02,X03 DISCONNECTING TYPE OF TBs
X13 DISCONNECTING TYPE OF TBs
X04 NONDISCONNECTING TYPE OF TBs
D
Design checked by
400kV TIE RELAY PANEL DIVAKAR DOLA GENERAL ARRANGEMENT SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P INTERNAL VIEW OF 408R 007
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602ABN 02 Cont.
008
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
=408RB37 SPACE HEATER
=408RMCB.01 MCB, 2POLE, 16A AC
=408RMCB02 MCB, 2POLE, 16A DC
=408RMCB03 MCB, 2POLE, 10A DC
=408RMCB04 MCB, 2POLE, 6A DC
=408RMCB05 MCB, 2POLE, 16A DC
=408RMCB06 MCB, 2POLE, 10A DC
=408RMCB07 MCB, 2POLE, 6A DC
=408RFS01 FUSE, 2A
=408RFS02 FUSE, 2A
=408RFS03 FUSE, 2A
=408RLK03 LINK, 15A
=408RFS04 FUSE, 2A B
=408RFS05 FUSE, 2A
=408RFS06 FUSE, 2A
=408RLK06 LINK, 15A
ABB LTD.
C
This document must not be copied without our written permission and the contents there of must not be imparted
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
Design checked by
400kV TIE RELAY PANEL DIVAKAR DOLA GENERAL ARRANGEMENT SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
2010 52
02 REVISED AS PER TESTING OBSERVATION DD
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P LEGEND FOR 408R 008
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602ABN 02 Cont.
Indx_00
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
\\10.140.44.167\kavitha\Divakar\400KV NTPC MAUDA SS\DRAWING\Updated testing observation\01.wardha LINE#2TIEKHAPERKHEDA LINE#1\3.Tie protection panel\1.Dwg\rev.01\
Indx_00 02 INDEX SHEET
01 02 LIST OF SYMBOLS
02 02 PROTECTION SINGLE LINE DIAGRAM
03 02 TRIP LOGIC DIAGRAM TIE A
04 02 DC DISTRIBUTION CIRCUIT DC#1
05 02 DC DISTRIBUTION CIRCUIT DC#2
06 02 AC DISTRIBUTION
07 02 CT CIRCUIT (THREE LINE DIAGRAM) TIE BAY
08 02 THREE LINE DIAGRAM TIE BAY
09 02 THREE LINE DIAGRAM TIE BAY
10 02 METERING CIRCUIT FOR WARDHA LINE#2 BAY
11 02 METERING CIRCUIT FOR KHAPERKHEDA LINE#1 BAY
12 02 GRA 3PH MASTER TRIP RELAY CIRCUIT
13 02 GRB 3PH MASTER TRIP RELAY CIRCUIT
13_1 02 LBB RETRIP CIRCUIT
14 02 BREAKER TRIP COIL1 CIRCUIT
15 02 BREAKER TRIP COIL2 CIRCUITS
16 02 BREAKER CLOSING CIRCUITS
12/20/2010 11:50
17 02 INTERPANEL CIRCUITS
18 02 INPUTS TO BCU
B
19 02 LBB INTIATION CIRCUIT3PH TRIPS
20 02 SPARE TBs
ABB LTD.
C
This document must not be copied without our written permission and the contents there of must not be imparted
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P Indx_00
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
UASE 2010 15
YN1M301602CBN 02 Cont.
01
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
TERMINAL BLOCK DESIGNATION FOR
EXTERNAL WIRING TERMINAL BLOCKS SYMBOL LIST
ISOLATOR TERMINAL
RELAY COIL
MARSHALLING KIOSK TB
REVERSE FLAG
TERMINAL BLOCK DESIGNATION FOR PLCC TERMINALS
INTERPANEL BUS WIRING
X12 PT CIRCUITS
PUSH BUTTON ON CONTACT
X13 DC/AC INCOMING CIRCUITS C
NO CONTACT
X14 CONTROL CIRCUITS
This document must not be copied without our written permission and the contents there of must not be imparted
NC CONTACT
CURRENT TRANSFORMER
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA CIRCUIT DIAGRAM SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P LIST OF SYMBOLS 01
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602CBN 02 Cont.
02
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
400kV MAIN BUS I
400kV MAIN BUS II
40789 40989
40789E 40989E
LOW Z RET6701
REC670
87 BB 50 50
CORE2 M2 LBB LINE#1 CVTVOLTAGE I/P CORE2 87 BB LBB
II
BCU
50TLBB1 TIE
M2 II
BUS1 VOLTAGE
REB6701 REB6701
BUS#1 CVT VOLTAGE I/P
BUS2 VOLTAGE
BUS#2 CVT VOLTAGE I/P
CORE1 50 CORE1 50
87 BB LBB LINE2 VOLTAGE 87 BB LBB
LINE#1 CVTVOLTAGE I/P
P1 P1
SPARE LINE#2 CVTVOLTAGE I/P
M1 I M1 I
40789AE 40989AE
40789A 40989A
B
08
SPARE
SPARE
P2
P2
P1
P1
40889A 40889B
CORE4
CORE5
CORE2
CORE1
CORE3
CORE5
CORE1
CORE4
CORE2
CORE3
40789L 40989L
4852
40889BE
40889AE
40789LE 40989LE
408CTA
408CTB
P2 P2 P2
CORE5 CORE5
CORE4 RET6702 CORE4
87TT HIGH Z 409CTL
407CTL II CORE3
CORE3
CORE2 CORE2
RET6701
CORE1 87TT CORE1
I LOW Z
** ** P1 P1 ** **
EM EM EM EM EM
M EM M C
C C
TO BCU TO BCU
This document must not be copied without our written permission and the contents there of must not be imparted
407WT 409WT
46L DR,FL DR,FL 46L
7SA522 WINDING3B WINDING3B 7SA522
21L2 97 59L2 67N,51 WINDING3A
407LA 409LA WINDING3A
51,67N 59L2 97 21L2
WINDING2
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
WINDING2
WINDING1
407CVT 409CVT WINDING1
46L 46L
REL670 REL670
DR DR
FL 79 25 25 79 FL
LINE#II LINE#I
** NTPC SCOPE OF SUPPLY
** NTPC SCOPE OF SUPPLY
D
BAY : 407 WARDHA LINE#II BAY : 408 TIE BAY : 409 KHAPERKHEDA LINE#1
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA CIRCUIT DIAGRAM SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P PROTECTION SINGLE LINE DIAGRAM 02
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602CBN 02 Cont.
03
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
3PH MASTER TRIP RELAY
3PH MASTER TRIP RELAY
3PH MASTER TRIP RELAY
3PH MASTER TRIP RELAY
CLOSE/OPEN COMMAND
TO TIE BAY ISOLATORS
GROUPA 3 PH MASTER
GROUPB 3 PH MASTER
BREAKER FAIL PROTN
BREAKER FAIL PROTN
TO TIE CB TRIP COIL2
TO TIE CB TRIP COIL1
GROUPB, LINE#1 CB
GROUPA, LINE#2 CB
GROUPB, LINE#2 CB
GROUPA, LINE#1 CB
BREAKERS
TIE CB50TLBB2
TIE CB50TLBB1
CLOSE TIE CB
PROTECTION FUNCTION
TRIP RELAY
TRIP RELAY
OUTPUT
B
GROUP
Remark
3 Ph TP TP TP TP B BUILT IN REC670 (TIE BCU)
BREAKER FAIL PROTECTION TIE CB50TLBB1
BREAKER FAIL PROTECTION TIE CB50TLBB2 3 Ph TP TP TP TP B BUILT IN RET6701 (TEED1 PROTECTION)LINE#1
BREAKER TROUBLES, REC670 REC670
LINE#2 BAY GRPA/GRPB PROTN FUNCTION. /LBB1/LBB2PROTN OPTD TP TP
LINE#1 BAY GRPA/GRPB PROTN FUNCTION./LBB1/LBB2 PROTN OPTD TP TP
SINGLE PHASE TRIP FM LINE#2 BAY TP TP C
SINGLE PHASE TRIP FM LINE#1 BAY TP TP
This document must not be copied without our written permission and the contents there of must not be imparted
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
* GROUPA/GROUPB PROTN OF LINE#2 & LINE#1 BAY
NOT FROM MASTER TRIP RELAYS, TRIP IS FROM INDIVIDUAL PROTN FUNCTION
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA CIRCUIT DIAGRAM SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P TRIP LOGIC DIAGRAM TIE 03
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602CBN 02 Cont.
04
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
=408R
=407RA
MCB02 MCB03 10A
A
X13 X13
J1
J1 J3 K1
220V DC SUPPLY1 /Sh:14.D4
01 01 1 2 1 2 TO TC1 CKT
J4
FROM SH:003 J2 K2
/Sh:14.D4
02 02 3 4 3 4
D25.155.301 80A
YN1M301602CBL
13 14 TSR IN74053001A 13 14
X03
/Sh:04.C3
02
MCB04 6A
K101
/Sh:12.A3
1 2
TO 3PH GRA TRIP RELAY CKT
K102
/Sh:12.A5 B
3 4
13 14
/Sh:17.B3
21 22
=408R
D25.155.301 80A C
TSR IN74053001A
COMPONENT
11 (220V) (POST CL) 21
This document must not be copied without our written permission and the contents there of must not be imparted
/Sh:04.B3
12 (110V) (PRE CL/DC SUP.) 13
16 15
/Sh:17.A3
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
17
26 25
27
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA CIRCUIT DIAGRAM SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P DC DISTRIBUTION CIRCUIT DC#1 04
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602CBN 02 Cont.
05
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
=408R
=409RB
MCB05 MCB06 10A
X13 X13 J11 J13
K3
/Sh:15.D5 A
220V DC SUPPLY2 1 05 1 2 1 2
J12 J14 TO TC2 CKT
FROM SH:006 K4
/Sh:15.D5
2 06 3 4 3 4
13 14
B
/Sh:17.C3
21 22
=408R
This document must not be copied without our written permission and the contents there of must not be imparted
D29.155.301 80B
TSR IN74053001A
11 (220V) (POST CL) 21
/Sh:05.B3
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
COMPONENT
12 (110V) (PRE CL/DC SUP.) 13
16 15
/Sh:17.B3
17
26 25
27
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA CIRCUIT DIAGRAM SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P DC DISTRIBUTION CIRCUIT DC#2 05
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602CBN 02 Cont.
06
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
=409RB =408R
1PH 230V AC 07 07 07
X13
SUPPLY, 50HZ H2
08 08 08
16A MCB.01
3
B
4
2
H23 H24
1 2 1 2
A01.05 B37
H27
1 2 1 2
A01.03
1 2
15A, 230V AC
3
C
This document must not be copied without our written permission and the contents there of must not be imparted
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA CIRCUIT DIAGRAM SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P AC DISTRIBUTION 06
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602CBN 02 Cont.
07
1MYN691003102(A3) REV:00 1 2 3 4 5 6
This document must not be copied without our written permission and the contents there of must not be imparted
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
PATH:
01
02
Rev
1MYN691003102(A3) REV:00
Revision
1
FROM WARDHA LINE#2 BAY
1
R1
B1
Y1
REVISED AS PER CUSTOMER COMMENTS
REVISED AS PER TESTING OBSERVATION
40889A
40889AE
DD
DD
P2 P2 P2
Y B
Appd Year Week
2010 41
2010 52
2
2
400KV TIE RELAY PANEL
REF: YN1M301602CBP, SH.039
TO TIE LBB2(50TLBB2) PROTN
TO TEED1 DIFF. PROTN. (87TT1)
R Y B
Y B
3
3
4S4R TB44 TB416
MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER
ADOPTED RATIO:2000/1A
4S1R TB41 TB419
CLASS: PS
Vk>= 4000/2000/1000V 4S1Y TB46
Rct<=: 10/5/2.5 Ohms
Im= 30/60/120mA at Vk 4S1B TB411
REF: YN1M301602CBP, SH.012
Drawn by
KAVITHA
TO TEED2 DIFF. PROTN. (87TT2)
R Y B
DIVAKAR DOLA
408CTA
Design checked by
Drawing checked by
Y B
GOPALAKRISHNAN.P
3S4R TB34 TB316 D310
4
D310
4
3S4Y TB39 TB317 D330 D330
CORE3
3S4B TB314 TB318 D350 D350
CTR: 20001000500/1A
ADOPTED RATIO:2000/1A 3S1R TB31 TB319 D370 D370
CLASS: 0.2
BURDEN:20VA 3S1Y TB36
CIRCUIT DIAGRAM
3S1B TB311
TO LINE#1 409BCU CKT.
REF: YN1M301602CBH, SH.083
R Y B
Y B
SASE
Iss by Dept Year Week
R Y B
YN1M301602CBN
Y3
R3
B3
SALE ORDER NO:4200206690
/Sh:08.C1
/Sh:08.C1
/Sh:08.C1
6
6
02
Rev
08
07
Cont.
Sheet
C
B
D
A
This document must not be copied without our written permission and the contents there of must not be imparted
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
PATH:
01
02
Rev
1MYN691003102(A3) REV:00
Revision
1
1
/Sh:07.C6
/Sh:07.C6
/Sh:07.B6
REVISED AS PER CUSTOMER COMMENTS
REVISED AS PER TESTING OBSERVATION
R3
Y3
B3
Y B
DD
DD
1S3R TB13 TB116
Appd Year Week
2010 41
2010 52
1S3Y TB17 TB117
2
2
CORE1
CTR: 20001000500/1A 1S3B TB111 TB118
ADOPTED RATIO:2000/1A
SPARE
R Y B
P1 P1 P1
P1 P1 P1
400KV TIE RELAY PANEL
40852
P1 P1 P1
3
R Y B
3
MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER
1S1R TB11 TB119 D170
1S1Y TB15
CORE1
1S1B TB19
CTR: 20001000/1A
ADOPTED RATIO:2000/1A 1S3R TB13 TB116 D110
CLASS: PS
TIE BCU
Drawn by
D130
KAVITHA
Rct<=: 10/5 Ohms
1S3B TB111 TB118 D150
Im= 30/60mA at Vk
DIVAKAR DOLA
TO TIE LBB1 PROTN
Design checked by
Drawing checked by
GOPALAKRISHNAN.P
REF:YN1M301602CBH, SH.048
R Y B
R Y B
4
4
2S1R TB21 TB219
2S1Y TB25
CORE2
408CTB 2S1B TB29
CTR: 20001000/1A
CIRCUIT DIAGRAM
ADOPTED RATIO:2000/1A 2S3R TB23 TB216
SPARE
CLASS: PS
Vk>= 2000/1000V 2S3Y TB27 TB217
Rct<=: 10/5 Ohms
2S3B TB211 TB218
Im= 30/60mA at Vk
THREE LINE DIAGRAM TIE BAY
R Y B
SASE
R Y B
Iss by Dept Year Week
2010 15
5
R Y B
REF:YN1M301602CBH, SH.047
YN1M301602CBN
TO BCU CKT OF 408(Tie) & 407(Line#2)
SALE ORDER NO:4200206690
R4
Y4
B4
/Sh:09.C2
/Sh:09.C2
6
/Sh:09.B2
6
02
Rev
09
08
Cont.
Sheet
C
B
D
A
This document must not be copied without our written permission and the contents there of must not be imparted
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
PATH:
01
02
Rev
1MYN691003102(A3) REV:00
Revision
1
1
REVISED AS PER CUSTOMER COMMENTS
REVISED AS PER TESTING OBSERVATION
DD
DD
Appd Year Week
2010 41
2010 52
/Sh:08.C6
/Sh:08.C6
/Sh:08.C6
2
2
Y4
B4
R4
R Y B
400KV TIE RELAY PANEL
4S1R TB41 TB419
3
A650
TO TEED2 DIFF. PROTECTION
R Y B
REF:YN1M301602CBL, SH.010
MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER
R Y B
408CTB
Drawn by
KAVITHA
5S1Y TB56
CORE5
5S1B TB511
DIVAKAR DOLA
CTR: 20001000500/1A
Design checked by
Drawing checked by
ADOPTED RATIO:2000/1A 5S4R TB54 TB516 A210
GOPALAKRISHNAN.P
CLASS: PS
Vk>= 4000/2000/1000V 5S4Y TB59 TB517 A230
Rct<=: 10/5/2.5 Ohms
5S4B TB514 TB518 A250
Im= 30/60/120mA at Vk
4
4
REF:YN1M301602CBL, SH.039
TO TEED1 DIFF. PROTECTION
R Y B
40889BE
CIRCUIT DIAGRAM
THREE LINE DIAGRAM TIE BAY
SASE
40889B
Iss by Dept Year Week
2010 15
Y7
R7
B7
5
TO LINE#1 BAY
YN1M301602CBN
SALE ORDER NO:4200206690
6
6
02
Rev
10
09
Cont.
Sheet
C
B
D
A
1 2 3 4 5 6
=408R
D09.01
ENERGY METER 3PH, 4WIRE
ELSTER A
CURRENT VOLTAGE
M1 L1 M2 L2 M3 L3 R Y B N
7E71A
7E51A
7E31A
7E11A
7D51B
7D11A
7D11B
7D31A
7D31B
7D51A
1 3 4 6 7 9 R2 Y2 B2 N2
IMP
D37.01
1 2 4 5 7 8 R1 Y1 B1 N1 =DUMMY PANEL
=407/408C
20 01 11 11
FROM X01 X01 7D32 X01 X01
7D31
407CTL
21 02 12 12
CORE3
X01 X01 7D52 X01 X01
SH.010 7D51
22 03 13 13
X01 X01 X01 X01
7D71
REF:YN1M301602CBH
23 04 14 14 C
TO METERING
7E11 7E12
1 2
01 13 13
X02 FS02 X02 X02
7E31 7E32
FROM 407 LINE#2 CVT,
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
1 2
02 14 14
CORE3A
X02 FS03 X02 X02
REF:YN1M301602CBH, SH.011 7E51 7E52
1 2
03 15 15
X02 LK03 X02 X02
7E71 7E72
04 1 2 16 16
OWNER SUPPLIED METERS
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA CIRCUIT DIAGRAM SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P METERING CKT.OF WARDHA LINE#2 BAY 10
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602CBN 02 Cont.
11
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
=408R
D17.01
ENERGY METER 3PH, 4WIRE
ELSTER
A
CURRENT VOLTAGE
M1 L1 M2 L2 M3 L3 R Y B N
9E71A
9E51A
9E11A
9E31A
9D11A
9D11B
9D31A
9D31B
9D51A
9D51B
1 3 4 6 7 9 R2 Y2 B2 N2
IMP
D41.01
=DUMMY PANEL B
1 2 4 5 7 8 R1 Y1 B1 N1
=409C
11 05 15 15
FROM
X01 X01 9D32 X01 X01
409CTL 9D31
CORE3 12 06 16 16
SH.017 X01 X01 9D52 X01 X01
9D51
13 07 17 17
X01 X01 X01 X01
REF:YN1M301602CBH 9D71 TO METERING
14 08 18 18
C
X02 FS04 X02 X02
9E11 9E21
1 2
This document must not be copied without our written permission and the contents there of must not be imparted
06 17 17
X02 FS05 X02 X02
9E31 9E41
FROM 409 LINE#1 CVT, 1 2
07 18 18
CORE3A
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
09 1 2 20 20
OWNER SUPPLIED METERS
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA CIRCUIT DIAGRAM SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P METERING CKT.OF KHAPERKHEDA LINE#1 BAY 11
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602CBN 02 Cont.
12
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
=408R
/Sh:04.B5
/Sh:04.B5
=407/408C
K102
K101
X04 X04
86A RESET FROM BCU
SH:065 425 03
X04 X04
INRK711004AM
YN1M301602CBH 426 04 D25.101.113
D25.101.119 RXTMA
D25.101.101
=4RBB3 K104 211
RXMVB4 86A K105 K105
INRK711004AM
16 /Sh:12.B6 26 212 11 21
20X04 X04
12 22
K105
LBB1/LBB2 TRIP FROM BAY407
15 05
13 23 =408R
(LINE#2 BAY) SH.0178
20X04 X04 K103 111 122 14 24
121 K105
16 06
195/86A
13
/Sh:14.B3 TSR IN74053001A
=409RB X04 313 314
LINE#1 BAY /Sh:15.A3 16 15
SH:059 425 426 /Sh:17.C3
X04 X04 17
K102
K101
/Sh:15.B3
DWG REF: YN1M301602CBP 423 424
104 12 26 25
K103
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
/Sh:13_1.B3
/Sh:13_1.B4
27
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA CIRCUIT DIAGRAM SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P GRA 3PH MASTER TRIP RELAY CIRCUIT 12
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602CBN 02 Cont.
13
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
=407/408C =408R
X04 X04
/Sh:05.B5
/Sh:05.B5
86B RESET FROM 427 17
TIE BCU
SH:065
A
K202
K201
REF:YN1M301602CBH X04 X04
D29.101.113
428 18
D29.101.119 RXTMA
D29.101.101
=4RBB3 K204
211
RXMVB4 86B K205
INRK711004AM
K205
LBB1/LBB2 TRIP FROM
BAY 407 (LINE#2 BAY) SH.0178 13 23
20X04 X04 K203 121 111 122 K205 14 24
K202
18 20
TRIP BUS
223 224
=407RB /Sh:19.B3
225 226
X04 X04 /Sh:16.A3
227 228
GROUPB TRIP FROM
105 23
LINE#1 (407) BAY /Sh:19.C3
X04 X04 317 318
106 24 /Sh:14.B3
DWG REF: YN1M301602CBL SH:059 315 316
/Sh:14.B3
=409RB 313 314
/Sh:14.B3
X04 X04 311 312
GROUPB TRIP FROM /Sh:15.B3
105 25 427 428
LINE#2 (409) BAY
/Sh:15.B3
X04 X04 425 426
/Sh:15.B3
DWG REF: YN1M301602CBP SH:059 106 26 423 424 C
X04
SPARE
END
27
END
X04
This document must not be copied without our written permission and the contents there of must not be imparted
K202
K201
28
=408R
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
D29.101.313 195/86B
D29.101.119
TSR IN74053001A
PB UNIT
11 (220V) (POST CL) 21 IN53963001AC
/Sh:13.B3 15 25
12 (110V) (PRE CL/DC SUP.) 13
16 /Sh:13.A3
16 15 26
17 17 27
26 25
/Sh:17.D3 18 D
27 28
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA CIRCUIT DIAGRAM SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P GRB 3PH MASTER TRIP RELAY CIRCUIT 13
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602CBN 02 Cont.
13_1
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
=408R =408R
/Sh:12.C3
/Sh:12.C5
=407/408C
INRK216263AS
D25.125.101
K102
K101
RXMS 50LBB1TX
/Sh:13_1.B3
11 21
X04 X04
FROM TIE BCU
/Sh:14.B3
SH.065 437 01 12 13
D25.125.101
X04 X04 K151
TIE 50LBB1 /Sh:14.C3
14 15
RE TRIP 438 02 11 21
/Sh:13_1.B5 /Sh:14.C3
B
16 17
/Sh:15.B3
DRG:YN1M301602CBH 22 23
/Sh:15.B3
24 25
=407RA /Sh:15.C3
26 27
X04
FROM TEED1 PROTN.
54
50LBB2 RETRIP CIRUIT
SH.042
END
END
55
K101
K102
DRG:YN1M301602CBL
C
This document must not be copied without our written permission and the contents there of must not be imparted
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA CIRCUIT DIAGRAM SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P LBB RETRIP CIRCUIT 13_1
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602CBN 02 Cont.
14
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
=408R
=408 52
31 3
K12T X2
32 10
TO TC1 & POST A
K13T CLOSE SUPERVISION
33 11
K14T
D25.101.101 34 12 REF:1HYB9024733
X04 YN1M301602CBP
D25.143.113 195B 12 13
(110V) (PRE CL/DC SUP.)
TSR IN74053001A =408 52 98
/Sh:14.B1 K15T X04
11 (220V) (POST CL) 21 X2
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
/Sh:14.D2
12 (110V)
D25.143.107 195Y 35 13
(PRE CL/DC SUP.) 13 K16T
TSR IN74053001A
16 15 TO TC1 & PRE
/Sh:18.B3 11 (220V) (POST CL) 21 36 14
17 K17T X04 CLOSE SUPERVISION
12 13
(110V) (PRE CL/DC SUP.)
37 15
26 25 D25.143.113 195B
/Sh:14.C1
27 TSR IN74053001A X04 X1
K1
/Sh:04.A5
11 (220V) (POST CL) 21 38 3 220V DC
X04
12 13 K2 SUPPLY1
(110V) (PRE CL/DC SUP.) /Sh:04.A5 D
39 4
/Sh:14.C1 REF:1HYB9024733
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA CIRCUIT DIAGRAM SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P BREAKER TRIP COIL1 CIRCUIT 14
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602CBN 02 Cont.
15
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
=408R =408 52
K21T X1
X04
CLOSE SUPERVISION
46 5
X2
TO TC2 & POST
K22T X04
47 27 A
K23T X04
D25.101.101 48 28
427 /Sh:12.C4 428 K24T X04
D25.101.101 49 29
27 /Sh:15.B1 100
X04 SH.058 C
D29.143.107 295Y
TSR IN74053001A 101 YN1M301602CBP
X04
This document must not be copied without our written permission and the contents there of must not be imparted
11 (220V) (POST CL) 21
D29.143.113 295B =408 52 102
12 13
TSR IN74053001A (110V) (PRE CL/DC SUP.)
K25T X04 X2
11 (220V) (POST CL) 21 /Sh:15.C1
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
/Sh:15.D2 50 20
K26T
12 (110V) (PRE CL/DC SUP.) 13
D29.143.113 295B 51 21 TO TC2 & PRE
16 15 TSR IN74053001A K27T X04
/Sh:18.C3 CLOSE SUPERVISION
17 52
11 (220V) (POST CL) 21 22
26 25 12 13
(110V) (PRE CL/DC SUP.) X1
K3 K3 X04
27
/Sh:15.C1
/Sh:05.A5 5
53 220V DC
K4 K4 X04 SUPPLY2
/Sh:05.A5
54 6 REF:1HYB9024733 D
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA CIRCUIT DIAGRAM SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P BREAKER TRIP COIL2 CIRCUITS 15
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602CBN 02 Cont.
16
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
A
=408R =407/408C
D29.101.101 D25.101.101
X04 X04
K109 K108A K107
227 228 227 228 TO CB CLOSING CKT.
/Sh:13.B4 /Sh:12.C4 59 486
SH.069
K109 X04 YN1M301602CBH
60 487
D29.101.319
X04 K110 K111 X04 B
61 11 21 62 =408R
/Sh:16.C5
63 12 /Sh:16.C5 13 64
73 26 /Sh:16.C5 27 74
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA CIRCUIT DIAGRAM SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P BREAKER CLOSING CIRCUITS 16
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602CBN 02 Cont.
17
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
=408R =407/408C
K124
X04 X04 A
COMMON
75 341
K124
D25.155.301
15
16 17 K125 X04 X04
DC SUPPLY1 FAIL
/Sh:04.C3 76 342
D29.155.301
15
16 17 K126 X04 X04
/Sh:05.D2 DC SUPPLY2 FAIL
77 343
MCB02
K127 X04 X04
22 21 DC1 MCBs TRIP/OPEN
/Sh:04.A3 78 344
B
MCB03
22 /Sh:04.A5 21
MCB04
TO 408BCU
22 /Sh:04.B5 21
MCB05
K128 X04 X04
22 21 DC2 MCBs TRIP/OPEN
/Sh:05.A2 79 345
MCB06
22 /Sh:05.A4 21
MCB07 C
22 /Sh:05.B4 21
This document must not be copied without our written permission and the contents there of must not be imparted
D25.101.313
15
16 K129 X04 X04
17
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
TIE 3PH GRA TRIP UNIT FAULTY
/Sh:12.C6 80 346
D29.101.313
25
26 K130 X04 X04
27
/Sh:13.D4 TIE 3PH GRB TRIP UNIT FAULTY
81 347
DWG REF: YN1M301602CBH SH: 056
D
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA CIRCUIT DIAGRAM SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P INTERPANEL CIRCUITS 17
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602CBN 02 Cont.
18
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
=408R =407/408C
D25.143.101
15
16 17 K132 X04 X04
CB TC1 RPH FAULTY
/Sh:14.B1 83 322
D25.143.107
15
16 17 K133 X04 X04
CB TC1 YPH FAULTY
/Sh:14.C1 84 323
D25.143.113
15 B
16 17 K134 X04 X04
CB TC1 BPH FAULTY
/Sh:14.D1 85 324
D25.101.101 **
TO 408BCU
K135 X04 X04
86A RESET
117 /Sh:12.B4 118 86 325
D29.143.101
15
16 17 K136 X04 X04
CB TC1 RPH FAULTY
/Sh:15.B1 87 326
D29.143.107
15
16 17 K137 X04 X04
CB TC1 YPH FAULTY
/Sh:15.C1 88 327
C
D29.143.113
15
X04 X04
This document must not be copied without our written permission and the contents there of must not be imparted
16 17 K138
CB TC1 BPH FAULTY
/Sh:15.D1 89 328
D29.101.101 **
X04 X04
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
K139
86B RESET
117 /Sh:13.B4 118 90 329
DWG REF; YN1M301602CBH SH: 054
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA CIRCUIT DIAGRAM SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P INPUTS TO BCU 18
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602CBN 02 Cont.
19
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
=408R =407/408C
91 369
3PH TRIP TIE BAY 50LBB1 INITIATION
GRA & GRB SH.059
D25.101.101 K141 X04
TO 408BCU
MASTER TRIP RELAYS 225 /Sh:12.C4 226 92 370
K141
DRG:YN1M301602CBH
B
D29.101.101
225 /Sh:13.B4 226
=409RA
3PH TRIP 93 45
TO 50LBB2 INTIATION CKT.
GRA & GRB D25.101.101 K143 X04 X04
SH.041
317 /Sh:12.C4 318 94 46
MASTER TRIP RELAYS
K143
D29.101.101
DRG:YN1M301602CBP
317 /Sh:13.B4 318
C
This document must not be copied without our written permission and the contents there of must not be imparted
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA CIRCUIT DIAGRAM SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P LBB INTIATION CIRCUIT3PH TRIPS 19
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602CBN 02 Cont.
20
1MYN691003102(A3) REV:00 1 2 3 4 5 6
1 2 3 4 5 6
=408R
A
X01 X02 X03 X04 X04 X13
09 05 05 15 58 03
X04
X01 X02 X03 X04 X13
16
10 10 06 95 04
X04
X02
29
11
X04
X02
30
12
X04
40
X04
41 B
X04
42
X04
43
X04
44
X04
45
X04
55
X04
56
C
X04
This document must not be copied without our written permission and the contents there of must not be imparted
57
to a third party nor be used for any unauthorised purpose. Contravention wiil be prosecuted.
Design checked by
400KV TIE RELAY PANEL DIVAKAR DOLA CIRCUIT DIAGRAM SALE ORDER NO:4200206690
Drawing checked by Rev Sheet
02 REVISED AS PER TESTING OBSERVATION DD 2010 52
WARDHA LINE#2TIEKHAPERKHEDA LINE#1 DIAMETER GOPALAKRISHNAN.P SPARE TBs 20
PATH:
01 REVISED AS PER CUSTOMER COMMENTS 2010 41
Rev Revision
DD
Appd Year Week MAUDA SUPER THERMAL POWER PROJECT (2X500MW)
Drawn by
KAVITHA
Iss by Dept Year Week
SASE 2010 15
YN1M301602CBN 02 Cont.
1MYN691003102(A3) REV:00 1 2 3 4 5 6