JAATVEDAS CONSTRUCTION COMPANY

Maintenance Check List of Passanger Hoist: Month-


Make- Model- Sl. No- Project Name:
Week -1 Week -2 Week -3 Week -4 Week -5
S.No. Description Of maintenance Remark
Dt: Dt: Dt: Dt: Dt:
1 Inspection and Lubrication of all Main Roller,Guide Rollers,Brakes ,
Motor,Gear Box Etc
2 Checking Of oil Level and Changing/fill up as required.
3 Checking of Mast bolts, tie fastner/bolt,clamps,switches etc.
4 Checking of Brake arrangement & releasing function,motor liners etc.
5 Ckecking of working of all safety features i.e. Limits,Safety device.
6 Checking of all Electrical Pannels, cabels,connections,fixtures etc
7 Checking tightness of anchor fastners and joints,guide rollers,coster
8 Checking of cabin
9 Check satbility of base ,Mast and Anchor.
10
Clean and lubricate with grease the Rack and pinion and machanical devices
11 Spares required /suggested if any
Remarks:-
Operator/Service person

P&M Incharge .
√= Check & Acceptable to work. # Original - History File.
×= Not Check /Faulty (Inform PNM incharge & write in remark) # CC- HO/Plant office.

JCC Civil Site Incharge PLL InCharge


JAATVEDAS CONSTRUCTION COMPANY
Maintenance Check List of Material Lift: Month-
Make- Model- Sl. No- Project Name:

Week -1 Week -2 Week -3 Week -4 Week -5


S.No. Description Of maintenance Remark
Dt: Dt: Dt: Dt: Dt:
Inspection and Lubrication of all Main Roller,Guide Rollers,Brakes ,Motor,Gear
1 Box Etc
2 Checking of Mast bolts, tie fastner/bolt,clamps,switches etc.
3 Checking of Brake arrangement & releasing function,motor liners etc.
4 Ckecking of working of all safety features i.e. Limits,Safety device.
5 Checking of all Electrical Pannels, cabels,connections,fixtures etc
6 Checking tightness of anchor fastners and joints,guide rollers,coster
7 Checking of Wire rope,Pulleys etc.
8 Check satbility of base ,Mast and Anchor.

9 Clean and lubricate with grease the Rack and pinion and machanical devices

10 Spares required /suggested if any

Remarks:-

Operator/Service person

P&M Incharge .
√= Check & Acceptable to work. # Original - History File.
×= Not Check /Faulty (Inform PNM incharge & write in remark) # CC- HO/Plant office.

JCC Civil Site Incharge PLL InCharge