EXCAVATIONS
EXCAVATIONS TO 1000mm DEPTH MIN. OF LOAD
1
BEARING BOTTOMS\ WITH SIDES KEPT PLUMB
STRAIGHT,BOTTOMS LEVEL AND RAMMED
E
2 SOLID.STEPPED BOTTOMS NOT MORE THAN TWO
1,58
0
23
0 11 BRICK COURSES AT ANY STEP .BACKFILL MATERIAL
0 3 4 AROUND FOUNDATIONS TO COMPLY
69
F
7,96
6
5
23
TO 90% MOD ASHTO DENSITY. REINFORCED TO
0
4,80
0
6
0
7,50
STRUCTURAL ENGINEER'S DETAIL ON DAMP PROOF
G
12
N
5,96
7
0
MEMBRANE
1
4,80
1,58
8
0
5,73
0
9
23
1
W15
FOOTINGS
W15 272
10
2,944
Mee ng Room 6,91
B
46
Tiles 2
5
7,39
A 2,025 FFP 02 9
REINFORCED CONCRETE FOOTINGS TO
230
115
13
804
Nexus Zigzag carpet
ENGINEER'S DETAILS. ON 50mm THICK RIVER SAND
8
58 tiles laid in tesselated direction
900
14
W1 3,234
115
D2
D6 230
15 BLINDING ON 150mm HARDCORE MATERIAL.
895
8,010 24,274
W1 Male 30mm 1 : 3 CEMENT / SAND SCREED ON 100mm
16
D2
115
21
D3 450
Ablu on
6,070
5
W1 Tiles CONCRETE SLAB
11
1,795
D2 FFP 03 8,010
23,814
DOUBLE 450
VOLUME 2,670
115
B
10,000
D4 Tiles 1,450
W1
1,790
D2 W9
D4 230
115
Lounge W9
D4
BRICK WALLS. INTERNAL DOORS TO HAVE PRECAST
1,790
W3 Female Carpet
Memorabilia
C Ablu on Carpet
230
Store D3 FFP 10
FFP 11 W19 CONCRETE LINTOLS
3,700
Tiles
FFP 04 Tiles Wai ng Area colour hardener to screed,Nutmeg,Yellow,
Terracotta,Ochre & light grey colours D11
D2 Tiles
Informa on office A
2,140
D2
D2 FFP 01
D2 Carpet
D
Gypoc 2700mm high impact
230
resistant wall system ultrasteel
colour hardener to screed,Nutmeg,Yellow, 769 stud drywall. FFP 12
FFP 05 Terracotta,Ochre & light grey colours
12
D12 D11
1 8,010
W1 4
2
20 21,809
W1 FFP 16 5 19
450
1,31
W1 6 18
7,500
W1 8
7
16
17
7,960
8 15
230 115 W20 9 14
Tiles Tiles 8,010 D11
895 115 10 13
895 115 D4 11
12
FFP 15 21,579 FFP 14
895 115
895 D3 450
250
4,270 2,680 2,670
404
13 WATERPROOFING
W9 1,450
REVISIONS
B
3,334 FFP 17 Storage
7,604 Tiles 230
NOTE: Alphabetical revisions prior to revision zero
1 FFP 13
i.e. "0" 'issued for construction' followed by numbered
6,66
W9
7,39
5
375 MICRO BRICK EMBOSSED BLACK 'CONSOL' DPC
230
9 W19 revisions.
2 W10
C COMPLYING WITH SABS 952.LAPPED 150mm AT
14 17 JOINTS AND JUNCTIONS. 250 MICRO GUNPLAS USB
Rev.no. Date Initials Description
3 4
15 5 GREEN WATERPROOF MEMBRANE LAID
1,15
D
18
6 LOOSE OF SAND BED WITH GUNPLAS PRESSURE
,913
85
7 SENSITIVE TAPE JOINTING.
9
W9
8
9
16 18 10
CONCRETE ELEMENT
9,33
19 29
1
8,00
9
1,267 ALL CONCRETE MIXES SHALL BE AS DESIGNED
1,083
28
11,530
668 230
L AND SPECIFIED BY THE STRUCTURAL ENGINEER.
20
17
4,332
27
770
W14
26 621
11,300
44
230
3,249
7
1,18
310
21
1
W16
REFERENCES
4,930
W18
W14
30 18
10,000
22
W18
8,000
Open Plan L R.C. FOOTINGS TO ENGINEER'S DETAILS.
1
9,33
19 Carpet
0
1
15
FFP 06
Training Centre
M 2 150mm R.C. FLOOR SLAB TO ENGINEER'S
Carpet
colour hardener to screed,Nutmeg,Yellow,
Terracotta,Ochre & light grey colours D3 DETAILS
23
FFP 07
37
super transit floor tiles.
230
4,828
3
W16
,360
W5
Stairs D1
PLASTICS BRICKGRIP DPC".
37
770
,590
W18
FFP 09
21
230
1
20
4 ONE LAYER OF 250 MICRON " CONSOL
W18 1,267
PLASTICS GUNPLUS USB GREEN".
2
19
1,083
24
3
18
668
4
17
11,300
5
16
29
6
4,332
5
7
14
53
8
13
1,2
9
12
621 11,220
COMPRESIVE STRENTH TO ENGINEER'S DETAIL
10
11
3,249
22 W16 310
28 IN CLASS II MORTAR.
15
1,08
,171
310
3
27
13
,161
Store D4
26 LOTI OR APPROVED TYPE FACE BRICK ,
25
35
10
6
1
,1 FFP 08
93
BRICK ON EDGE SILLS.
5,04
3,24
W18
9
23 W16
0
PLASTERED BRICKWORK INTERNALLY.
0
1,02
7
36
23
6
W18 8 WALL STRUCTURE CONSISTING OF 2 No.
7,50
0 115mm BRICK LEAVES PLASTERED AND
24 1,08
,000 PAINTED ON ONE SIDE.
E
10
3
35
1 0
23
1,02
0
9 60mm THICK DOUBLE ZIG-ZAG Client
INTERLOCKING PRECAST CONCRETE PAVING
3,24
F
9
A
BLOCKS.
25
23
G
0
36
6
Project Architect
11 COLOMET FINISH CORRUGATED IRON ROOF
B
E-MAIL : motopiek@archiplan.co.ls
Project
14 COMPACTED EARTH TO FALL 1 : 50 MIN 150mm
THICKNESS
Drawing
N
GENERAL
ARRANGEMENT FIRST
FLOOR PLAN
Scale
1 : 100
AS BUILT NOTE
50mm on original drawing