Assignment Problems PDF
Assignment Problems PDF
ASSIGNMENT PROBLEM
OUTLINE
Session 2.1: Introduction
Session 2.2: Solution of Minimization Assignment Problem
Session 2.3: Solution of Maximization Assignment Problem
OBJECTIVES
By the end of this unit you should be able to:
1. Identify and explain an Assignment Problem.
2. Solve Minimization and Maximization Assignment Problems.
Note: In order to achieve these objectives, you need to spend a maximum of two (2)
hours working through the sessions.
61
SESSION 3.1: INTRODUCTION
In its most general form, the assignment problem is as follows:
There are a number of agents and a number of tasks. Any agent can be assigned to
perform any task, incurring some cost that may vary depending on the agent-task
assignment. It is required to perform all tasks by assigning exactly one agent to each task
in such a way that the total cost of the assignment is minimized.
In the classical assignment problem, the goal is to find an optimal assignment of agents to
tasks without assigning an agent more than once and ensuring that all tasks are
completed. The objective might be to minimize the total time to complete a set of tasks,
or to maximize skill ratings, or to minimize the cost of the assignments. A feature of the
assignment problem particular is that only one machine is assigned to one and only one
job.
Illustration: A certain machine shop has n machines denoted by M1, M2, M3 …, Mn. A
group of n different jobs(J1, J2, J3, …, Jn) is to be assigned to these machines. For each
job the machining cost depends on the machine to which it is assigned. Each machine can
work only on one job. The problem is to assign the jobs to the machines, which will
minimize the total cost of machining.
62
In essence, the solution procedure is to subtract a sufficiently large cost from the various
rows or columns in such a way that an optimal assignment is found by inspection. We
initiate the algorithm by examining each row (column) of the cost matrix to identify the
smallest element. This quantity is then subtracted from all the elements in that row
(column). This produces a cost matrix containing at least one zero element in each
row(column). Now try to make a feasible assignment using the cells with zero costs. If it
is possible then we have an optimal assignment.
Examining the rows first, a reduced cost matrix can be obtained by subtracting:
i. Seven(7) from the first row.
ii. Three(3) from the second row.
iii. One(1) from the third row.
iv. Three(3) from the fourth row.
From the above table a feasible assignment using only the cells with zero costs is
M1 J4
M2 J1
M3 J3
M4 J2
Hence this is an optimal solution..
In general, it may not always be possible to find a feasible assignment using cells with
zero costs.
63
To illustrate this consider the following assignment problem
J1 J2 J3 J4
M1 10 9 7 8
M2 5 8 7 7
M3 5 4 6 5
M4 2 3 4 5
The solution is as follows.
First, the minimum element in each row is subtracted from all the elements in that row.
This gives the following reduced-cost matrix.
J1 J2 J3 J4
M1 3 2 0 1
M2 0 3 2 2
M3 1 0 2 1
M4 0 1 2 3
Since both the machines M2 and M4 have a zero cost corresponding to job J1 only, a
feasible assignment using only cells with zero costs is not possible. To get additional
zeros subtract the minimum element in the fourth column from all the elements in that
column. The result is shown in the table below.
J1 J2 J3 J4
M1 3 2 0 0
M2 0 3 2 1
M3 1 0 2 0
M4 0 1 2 2
Only three jobs can be assigned using the zero cells, so a feasible assignment is still not
possible. In such cases, the procedure draws a minimum number of lines through some
selected rows and columns in such a way that all the cells with zero costs are covered by
these lines. The minimum number of lines needed is equal to the maximum number of
jobs that can be assigned using the zero cells.
64
In the current example, this can be done with three lines as follows.
J1 J2 J3 J4
M1 3 2 0 0
M2 0 3 2 1
M3 1 0 2 0
M4 0 1 2 2
Now select the smallest element, which is not covered by the lines. In the current
example, it is 1. Subtract this number from all the elements, which are not covered. Then
add this number to all those covered elements that are at the intersection of two lines.
This gives the following reduced cost matrix.
J1 J2 J3 J4
M1 4 2 0 0
M2 0 2 1 0
M3 2 0 2 0
M4 0 0 1 1
65
SESSION 3.3: SOLUTION OF MAXIMIZATION ASSIGNMENT PROBLEM
The following example will be used to illustrate the maximization algorithm. The figures
relate to contribution and it is required to maximize contribution
W X Y Z
M1 25 18 23 14
M2 38 15 53 23
M3 15 17 41 30
M4 26 28 36 29
Step 1: Reduce each column by the largest figure in that column and ignore the resulting
minus sign. The result is shown in the table below.
W X Y Z
M1 13 10 30 16
M2 0 13 0 7
M3 23 11 12 0
M4 12 0 17 1
Step 2: Reduce each row by the smallest figure in that row. The result is shown in the
table below.
W X Y Z
M1 3 0 20 6
M2 0 13 0 7
M3 23 11 12 0
M4 12 0 17 1
66
Step 3: Cover zeros by the minimum possible number of lines
W X Y Z
M1 3 0 20 6
M2 0 13 0 7
M3 23 11 12 0
M4 12 0 17 1
Step 4: If the number of lines equals the number of assignments to be made go to step 6.
If less as in the current example , select the smallest element which is not covered by the
lines. In the current example, it is 3. Subtract this number from all the elements which are
not covered. Then add this number to all those covered elements that are at the
intersection of two lines. This gives the following reduced cost matrix
W X Y Z
M1 0 0 17 6
M2 0 16 0 10
M3 20 11 9 0
M4 9 0 14 1
Step 5: A feasible assignment is now possible and an optimal solution is assigned.
M1 Z
M2X
M3 W
M4 Y
Step 6: Calculate the contribution to be gained from the assignments.
M1 Z $30
M2X$28
M3 W$25
M4 Y$53
Total= $136
67
SELF ASSESSMENT QUESTIONS
QUESTION 1
A company employs service engineers based at various locations throughout the country
to service and repair their equipment installed in customers’ premises. Four requests for
service have been received and the company finds that four engineers are available. The
distances each of the engineers is from the various customers is given in the table below.
J1 J2 J3 J4
M1 25 18 23 14
M2 38 15 53 23
M3 15 17 41 30
M4 26 28 36 29
The company wishes to assign engineers to customers to minimize the total distance to be
traveled. Show how this could be done.
QUESTION 2
A foreman has four fitters and has been asked to deal with five jobs. The times for each
job are estimated as follows.
FITTERS
JOB F1 F2 F3 F4
1 6 12 20 12
2 22 18 15 20
3 12 16 18 15
4 16 8 12 20
5 18 14 10 17
Allocate the men to the jobs so as to minimize the total time taken. Identify the job,
which will not be dealt with.
68
QUESTION 3
A company has four salesmen who have to visit four clients. The profit records from
previous visits are shown in the table below.
SALESMEN
CUSTOMERS A B C D
1 $6 $12 $20 $12
2 $22 $18 $15 $20
3 $12 $16 $18 $15
4 $16 $8 $12 $20
Show how the salesmen would be assigned to the clients so as to maximize profit.
QUESTION 4
A group of four boys and girls are planning on a day picnic. The extent of mutual
happiness between boy i and girl j when they are together is given in the matrix below
(data obtained from their previous dating experience).
GIRL
BOY 1 2 3 4
1 11 1 5 8
2 9 9 8 1
3 10 3 5 10
4 1 13 12 11
The problem is to decide the proper matching between the boys and the girls during the
picnic, which will maximize the sum of all the mutual happiness of all the couples.
Formulate this as an assignment problem and solve.
QUESTION 5
A batch of four jobs can be assigned to five different machines. The set-up time for each
job on various machines is given by the following table.
69
MACHINE
JOB 1 2 3 4 5
1 10 11 4 2 8
4 7 11 10 14 12
3 5 6 9 12 14
4 13 15 11 10 7
Find the optimal assignment of jobs to machines, which will minimize the total set-up
time
70
UNIT 4
NETWORK ANALYSIS
OUTLINE
Session 4.1: Introduction
Session 4.2: Critical path analysis CPM limitations
Session 4.3: Terminologies
Session 4.4: Notations for drawing network diagrams
Session 4.5: Constructing network diagrams
Session 4.6: Activity on node (AON) diagrams
Session 4.7: Critical path
Session 4.8: Early times
Session 4.9: Late times
Session 4.10: Float
Session 4.11: Project time reduction
Session 4.12: Activity on arc (AOA) diagrams
OBJECTIVES
By the end of this unit you should be able to:
3. Distinguish between AOA and AON notations
4. Draw network diagrams using AON and AOA notations.
5. Calculate normal project completion time and cost
6. Calculate and explain floats, early and late times of activities
7. Explain crashing and calculate crash cost of an activity
8. Distinguish between CPM and PERT
Note: In order to achieve these objectives, you need to spend a minimum of four (4)
hours and a maximum of six (6) hours working through the sessions.
71
SESSION 4.1: INTRODUCTION
This is a tool for organizing and planning large-scale projects, which consists of a list of
smaller tasks that need to be completed at various stages in order for the project to
progress and to be completed on time. Network analysis is a generic term for a family of
related techniques developed to aid management to plan and control projects. These
techniques show the interrelationship of the various jobs or tasks, which make up the
overall project and clearly identify the critical parts of the project. They can provide
planning and control information on the time, cost and resource aspects of a project.
Network analysis is likely to be of most value where projects are:
1. Complex. That is, they contain many related and interdependent activities.
2. Large, that is many types of facilities (high capital investment, many
personnel, etc) are involved.
3. Where restrictions exists. That is where projects have to be completed within
stipulated time or cost limits, or where some or all of the resources are limited.
Such projects might be for example:
1. The construction of a transport link;
2. Preparing a dinner party (organizing a wedding)
3. Launching a new product. Etc.
Each of these projects involves a large number of activities, which all need to be
completed in a certain order before the whole project is finished. Some activities can be
performed simultaneously, whilst others can only be tackled once other activities have
finished. For example if you are planning a building, clearly the plastering of the internal
walls can be undertaken at the same time as the grounds or landscaped. However, the
walls cannot be built until the foundations are laid.
Here we can see a natural precedence relation between the activities and as each
activity can only be completed in a certain time scale, the project manager faces the
dilemma of carrying out all the activities in the best time and at reasonable cost so that
the project completes on time and meets the budget constraints.
Businesses are constantly working on projects and from your own experience, you will
know that management of these projects is very important. There are a number of
72
methods that can be used to successfully manage a project, but we will be focusing on
one particular aspect - time: extremely important to all businesses we acknowledge.
An unexpected delay or similar time crisis can put a business under a lot of pressure. So,
how can you plan your time and identify where delays could occur, leaving you to make
decisions to compensate for such situations? A useful tool to use would be the Critical
Path Analysis(CPA)
Critical Path Analysis can be defined as the logical sequencing of a series of events
necessary for a successful research project in such a manner that the most efficient route
to some culmination point can be calculated. Consequently, the critical path technique
has a multitude of uses: (a) As an aid in time management, (b) as a provider of ongoing
data for assessing progress, and (c) to give the researcher or program planner
considerable information for decision-making.
The critical path analysis is a tool that illustrates the individual tasks of a project
highlighting the expected starting and finishing tasks of each. More precisely, the
critical path analysis can be used to:
Estimate the minimum/maximum time that tasks will be started and completed
Estimate the minimum time that the whole project will take to complete
Identify if resources are not being used effectively
Make aware any tasks that could create a possible delay
Sequence logically of activities that must be made
Ultimately, the critical path analysis will suggest which tasks are critical to keep on time
anticipating that the delay in any one of the tasks will delay the whole project.
The critical path analysis is hard to explain in more detail without the use of diagrams,
and so the working example in the following section will make it all clearer.
73
Illustration
Jubilant Limited have decided to carry out some research to ultimately create a selling
strategy for their new product. They have decided to create a questionnaire, which they
will issue to the public personally. In addition, they will use a mail shot to send out a
similar survey to get the opinions of those that live outside of the area.
Each task (A - F) has been given an expected completion time (in weeks). Time is crucial
for Jubilant Limited and so the Manager has requested a Critical Path Analysis of the
project
Task Description Order/Logic Time
A Plan Primary Research To be completed first 1 wks
B Prepare Mail Shot (Postal Survey) Start when A is complete 3 wks
C Prepare Questionnaire Start when A is complete 2 wks
D Send and Wait for Mail Shot Start when B is complete 3 wks
Replies
E Issue Questionnaire Start when C is complete 3 wks
F Compile and Analyze Results Start when D & E is complete 2 wks
G Plan Selling Campaign Start when D, E & F is 2 wks
complete
Now, take a good look at the diagram below. Each circle (Node) will be used to enter
specific data. The numbers currently in the nodes (1 - 7) are only there to make
following the diagram easier - nothing more. The arrows represent the tasks and each is
given their respective completion times.
Before we move on, look at the above table again and ensure that you understand what is
being said by linking it back to the diagram. Basically, all tasks cannot start until the
74
previous task has been completed. This is not true for tasks B and C which can start at
the same time - this is the only tricky area.
Each of these projects involves a large number of activities, which all need to completed
in a certain order before the whole project is finished. Some activities can be performed
simultaneously, whilst others can only be tackled once other activities have finished. For
example if you are planning a building, clearly the plastering of the internal walls can be
undertaken at the same time as the grounds or landscaped. However, the walls cannot be
built until the foundations are laid. Here we can see a natural precedence relation between
the activities, and as each activity can only be completed in a certain time scale, the
project manager faces the dilemma of carrying out all the activities in the best time and at
reasonable cost so that the project completes on time and meets the budget constraints.
For each activity, there is a set of activities called predecessors of the activity that must
be completed before the activity begins. We need a list of all the activities that make up
the project. The project is considered complete when all the activities have been
completed
CPM was developed for complex but fairly routine projects with minimal uncertainty in
the project completion times. For less routine projects there is more uncertainty in the
completion times, and this uncertainty limits the usefulness of the deterministic CPM
model. An alternative to CPM is the PERT project planning model, which allows a
range of durations to be specified for each activity. CPM is a deterministic method that
uses a fixed time estimate for each activity. While CPM is easy to understand and use, it
does not consider the time variations that can have a great impact on the completion time
of a complex project.
75
SESSION 4.3: TERMINOLOGIES
1. Activity: This is a task or job of work, which takes or consumes time and
resources. For example, “Build a wall”, Dig foundations for a building”, “Verify the
names of debtors in a sales ledger’, etc.
An activity is represented in a network by an arrow as shown . The tail of the
arrow indicates where the task begins, and the head where the task ends. The arrow
points from left to right and it is not drawn to scale.
2. Event: This is a point in time and indicates the “start” or “finish” of an activity or
activities. An event is represented in a network by a circle or node as shown
3. Dummy activity: This is an activity, which does not consume time or resources. It is
used to merely show clear, logical dependencies between activities so as not to violets the
rules for drawing networks. It is represented in a network by dotted arrow thus.
4. Network: This is the combination of activities, dummy activities and events in
logical sequence according to the rules for drawing networks. Thus a small network
might appear as shown below.
Use of rectangles
4 6 10
B
5 1 11
0 4 4
A 11 3 14
D
0 0 4 11 0 14
4 7 11
C
4 0 11
76
Use of circles
ACTIVITY NAME
LST LCT
FLOAT
shown.
Activity Description
Note: In a project, an activity is a task that must be performed and an event is a milestone
marking the completion of one or more activities. Before an activity can begin, all of its
77
predecessor activities must be completed. Project network models represent activities and
milestones by arcs and nodes.
There are two main notations used in network diagrams. The first is arrow diagram
notation where each activity is represented by an arrow (or a line) joining two circles (or
nodes). The nodes represent transitions between activities, which are referred to as
events. The duration of the activity is written against the arrow representing the activity.
This type of representation is called Activity on Arc (AOA). The diagram below shows
activity A in an arrow diagram. The duration of A being 4 days. The nodes are numbered
beginning from the “start” node and then move from left to right.
A
4
The second notation is the Activity on Node (AON) diagram notation. Here each activity
is represented by a circle (or node) and the arcs(lines) represent the events which are the
transitions between activities. The duration of the activity is written against the arrow
emerging from its node (circle). The diagram below shows activity A in AON notation,
which has two successors, B and C. The name of the activity is written in the node(circle)
in this case.
AA
78
The following rules are used when drawing network diagrams:
i. Node 1 represents the ‘start” of the project. An arc or arcs should lead from
node 1 to represent such activity that has no predecessor. A network has only
one “start” node.
ii. A node (called the “finish” node) representing the completion of the project
should be included in the network. A network has only one “finish” node.
iii. Number the nodes in the network so that the node representing the completion
of an activity always has a larger number than the node representing the
beginning of an activity. (There may be more than one numbering scheme)
iv. An activity should not be represented by more than one arc in the network
v. Two nodes can be connected by at most one arc. That is activities should not
share the same “start” node (tail event) and “finish” node (head event).
vi. Every activity must have one preceding event (tail event) and one succeeding
event(head event).
Note that
1. Many activities may use the same “start” node (tail event).
Start node
79
2. Many activities may use the same “finish” node (head event)
Finish node
Illustrations - 1
(1). Suppose activity A is a predecessor of activity B, then we have:
AOA
A B
AON
A B
80
Illustrations - 2
2. Suppose activity A and B must be completed before
activity C can begin and that A and B do not start
at the same time but are performed simultaneously
AOA
AON
1 A
C A
3 4
C
B
2 B
Illustrations - 3
3. Suppose activity A is a predecessor of activities B and C.
( B and C start from the same ‘start’ node).
AOA
AON
B 3 B
A
1 2
A
C
C
4
81
SESSION 4.5: CONSTRUCTING NETWORK DIAGRAMS
The first stage in constructing a network diagram for a project is to consult with the
technical experts and summarise the information that they provide in a table, as in the
following simple example.
The predecessors impose constraints on the project: C cannot begin until A has been
completed, whereas D cannot begin until both A and B have been completed.
There are two types of network that we can draw for this project:
1. Activity-on-arrow (AOA)
The Dummy Activity (shown by the dotted line) is needed in the AOA network to show
the predecessors correctly, i.e. that D depends on both A and B, but C depends only on
A. AOA networks often need several dummy activities. AON networks do not need
dummy activities.
82
2. Activity-on-node (AON)
Which type of network is better? Students often find AON networks a little
easier to draw, and this can seem like a big advantage when doing it for the first
time. However, some of the more advanced types of network analysis are best
done using an AOA network. Every well educated student should be able to
draw and analyse either, so that they are never thrown into confusion if they
come across the one they haven’t learnt to use. For people in employment, if
your boss has a preference, then that’s the one to use.
A - 4
B A 6
C A 7
D B, C 3
Step 1: Since activity A does not have any predecessor, it uses the first node as shown
83
Activity Preceding activity Duration
A - 4
A B A 6
C A 7
D B, C 3
Note 1: Node 1 represents the ‘start” of the project. An arc or arcs should lead from node
1 to represent such activity that has no predecessor. A network has only one “start” node.
A - 4
A B A 6
C A 7
D B, C 3
84
Step 3: From activities B and C, move to activity D
A - 4
D
A B A 6
C A 7
D B, C 3
Certain activities are critical to the on-line completion of the project. For example, if you
are planning a dinner party and spend all your time setting the table and forget to put the
main dish in the oven, the dinner will be late. This also means that other activities have
float or slack time (time to spare) available such as laying the table
85
SESSION 4.8: EARLY TIMES
The Early Start Time (EST) is the earliest time at which the event corresponding to node i
can occur Calculations begin from the ‘start’ node and move to the ‘finish’ node. At each
node a number is computed representing the Earliest Start Time (EST).
Note:
1. Let ESTi be the earliest start time of event i. If i=1 is the start event time of event i,
then EST i 0
. That is, the EST of the first activity in any network diagram is zero (0)
2. Let D be the duration of activity i. Then the Early Times calculations are obtained
i
3. ECTi ESTi Di . That is the ECT of any activity is equal to its EST plus its duration.
86
EARLY TIMES
4 6 10
B
11 3 14
0 4 4
A D
4 7 11
C
Note:
1. LCTFinishNode ECTFinishNode . That is LCT of the last activity in a network diagram is
3. LSTi LSTi Di . That is the LST of any activity is equal to its LCT minus its
duration.
87
The computations are shown in the diagram below.
Late Times
4 6 10
B
5 1 11
11 3 14
0 4 4
A D
11 0 14
0 0 4
4 7 11
C
4 0 11
88
Example 1
Activity Preceding activity Duration
A None 1
B A 2
C A 3
D B 4
E C 1
F D,E 2
1 2 3
B
3 4 7
1 0 3
D
3 0 7
Activity Preceding Duration
activity
0 1 1 A None 1
7 2 9
B A 2
A F
C A 3
0 0 1 7 0 9
D B 4
E C 1
F D,E 2
4 1 5
1 3 4
E
C
6 1 7
3 3 6
89
EXAMPLE 2
Activity Preceding activity Duration
A - 8
B - 12
C A 9
D A 13
E B,C 9
F D,E 12
Solution
0 8 8 8 13 21
A D
0 0 8
13 5 26
0 0 0 8 9 17
26 12 38
O C F
0 0 0 8 0 17 26 0 38
0 12 12 17 9 26
B E
5 5 17 17 0 26
90
SESSION 4.11: PROJECT TIME REDUCTION
One important aspect of project management is looking at ways of reducing the overall
project time at an acceptable cost. Reducing or shortening the duration of an activity is
known as crushing in the CPM terminology. The normal duration of a project incurs a
given cost and by employing more labour, working overtime, more equipment, etc, the
duration could be reduced but at the expense of higher costs. Since some ways of
reducing the project duration will be cheaper than others, network time/cost analysis
seeks to find the cheapest way of reducing the overall duration. A common feature of
many projects is a penalty clause for delayed completion and or bonus for earlier
completion. Thus, project managers take these into consideration whenever undertaking
any project.
We use a network technique known as Critical Path Method (CPM) to enable us to look
at the order of activities in a project and to plan the time involved. CPM can be thought
of as an application of graph theory. The main objectives of CPM are:
i. To locate the critical activities.
ii. To allocate the time of the other activities to obtain the most efficient use of
labour and resources.
iii. To consider ways of reducing the total project time by speeding up the
activities on the critical path while monitoring the overall project to ensure
that the critical activities remain critical.
There may be more than one critical path in a network and it is possible for the critical
path to run through a dummy activity. The critical calculation involves two phases:
91
2. Normal Cost: The cost associated with a normal time estimate for an activity.
Often, the normal time estimate is set at the point where resources are used in the
most efficient manner.
3. Crash Cost: The cost associated with the minimum possible time for an activity.
Crash costs, because of extra wages, overtime premiums, extra facility costs, are
always higher than the normal cost.
4. Crash Duration/Time: The minimum time that an activity is planned to take. The
minimum time is invariably brought about by the application of extra resources,
for example, more labour or machinery.
5. Cost Slope: This is the average cost of shortening an activity by one time
unit(day, week, month as appropriate). The cost slope is generally assumed to be
linear and is calculated as follows:
Cost slope = Crash cost – Normal cost = Increase in cost= 640 – 480= $40/day
Normal time – Crash time Decrease in time 12 - 8
92
Illustration 2: The table below shows the data for a simple
project
Activity Preceding Normal Crash Normal cost Crash Cost
activity time time cost slope
A None 4 3 360 460 60
B None 8 5 300 510 70
C A 5 3 170 270 50
D A 9 7 220 300 40
E B,C 5 3 200 360 80
0 4 4 4 9 13
A D
0 0 4
5 1 14
0 0 0 4 5 9
14 0 14
START C FINISH
0 0 0 4 0 9 14 0 14
0 8 8 9 5 14
B E
1 1 9 9 0 14
93
Note:
1. Only critical activities are crashed in order to reduce the project duration.
2. An activity cannot be crashed beyond its crash duration
Illustration.
Crashing:-Example 1
Activity Pre Normal Crash Normal Crash
activity time time cost cost
94
0 4 4 4 9 13
A D
0 0 4
5 1 14
0 0 0 4 5 9
14 2 16
O C F
0 0 0 4 0 9 14 0 16
0 8 8 9 5 14
B E
1 1 9 9 0 14
D A 9 7 220 300
Now suppose we want to crash the project by 5 days(that is finish the project in 11 days
instead of the 16 days), what will be the cost of the project within this time?
95
1. The normal project completion time is 16 days(LCT = 16)
2. The cost of completing the project in 16 days is $1450.00
(360+300+170+220+200+200)
3. Crashing is done as follows;
i. Crash activity C by 2 days = $50 *2= $100.00
ii. Crash activity F by 1 day = $50*1 = $50.00
iii. Crash activity E by 2 days = $80*2=$160.00
iv. Total cost of crashing =$310.00(100+50+160)
v. Total cost of completing the project in 11 days =$1780.00(Normal cost
of project + cost of crashing by 5 days). That is 1450 + 310
The dummy activity (shown by the dotted line) is needed in the AOA network to show
the predecessors correctly, i.e. that D depends on both A and B, but C depends only on
A. AOA networks often need several dummy activities. AON networks do not need
dummy activities.
96
1. Critical Activities
An activity is said to be critical if its duration cannot be extended without delaying the
completion of the project.
The duration of the project is determined by the longest path - D cannot begin until A has
been completed. The critical activities are those which lie on a longest path through the
network - here A and D are critical. Any extension or delay in a critical activity will
make such a path longer still, thereby delaying completion of the project. A longest path
through a network is called a critical path. On the diagram the critical path is shown in
red.
2. Floats
97
Any activity that is not a critical activity can be extended or delayed by a certain amount
without delaying the completion of the project. For example, activity C should start after
4 months and be finished after 6 months. However, the finish could be delayed by 2
months, i.e. until the end of month 8, without affecting the completion time of the project
as a whole. We say that activity C has a total float of 2 weeks.The Total Float of an
activity is the amount of time by which it may be extended or delayed without delaying
completion of the project, assuming no extension or delay in any other activity. A critical
activity can be defined as one which has a total float of zero.
There are two other types of float that are sometimes used. To understand these, suppose
the durations are changed in the example above. The critical path is now A-C of duration
8 months, B now has a total float of 2 and D has a total float of 1.
The Free Float of an activity takes into consideration the effect on subsequent activities
of a delay. If B is delayed by 2 months it removes the spare time that was available for
D, since if D was now also delayed by 1 the total project duration would extend to 9
months. However, B can be delayed by 1 month without reducing the spare time for any
subsequent activity. Therefore, B has a free float of 1 month. D also has a free float of
The Independent Float of an activity is calculated assuming the worst circumstances, i.e.
the activity's predecessors finish at their latest times and we want subsequent activities to
begin at their earliest times. If this is possible, and there is still time to spare, then this is
called independent float. The free float of 1 month for B is also an independent float.
However, assuming the worst scenario in which B is delayed by 2 months then D cannot
be delayed at all. Hence D has an independent float of 0.
98
Example 2.
A None 1
B A 2
C A 3
D B 4
E C 1
F D,E 2
Network diagram-AOA
3
3
B 3
D
2
4
0 A 7
1 1 F 9
2 6
0 5
1 1 7 2 9
E
C
3 5 1
4
6
99
EXAMPLE 2
EXAMPLE 3
100
SESSION 4.13: PROGRAM EVALUATION AND REVIEW
TECHNIQUE(PERT)
The Program Evaluation and Review Technique commonly abbreviated PERT is a model
for project management invented by United States Department of Defense's US Navy
Special Projects Office in 1958 as part of the Polaris mobile submarine-launched ballistic
missile project. This project was a direct response to the Sputnik crisis.
PERT is basically a method for analyzing the tasks involved in completing a given
project, especially the time needed to complete each task, and identifying the minimum
time needed to complete the total project. It was able to incorporate uncertainty in the
sense that it was possible to schedule a project not knowing precisely the details and
durations of all the activities. It is more of an event-oriented technique rather than start-
and completion-oriented. This technique is used more in R&D-type projects where Cost
is not a major factor but Time is.
The Program Evaluation and Review Technique (PERT) is a network model that allows
for randomness in activity completion times. It has the potential to reduce both the time
and cost required to complete a project.
PERT originally was an activity on arc network, in which the activities are represented
on the lines and milestones on the nodes. Over time, some people began to use PERT as
an activity on node network. For this discussion, we will use the original form of activity
on node.
Optimistic time - generally the shortest time in which the activity can be
completed. It is common practice to specify optimistic times to be three standard
deviations from the mean so that there is approximately a 1% chance that the
activity will be completed within the optimistic time.
101
Most likely time - the completion time having the highest probability. Note that
this time is different from the expected time.
Pessimistic time - the longest time that an activity might require. Three standard
deviations from the mean is commonly used for the pessimistic time.
PERT assumes a beta probability distribution for the time estimates. For a beta
distribution, the expected time for each activity can be approximated using the following
weighted average:
To calculate the variance for each activity completion time, if three standard deviation
times were selected for the optimistic and pessimistic times, then there are six standard
deviations between them, so the variance is given by:
[ ( Pessimistic - Optimistic ) / 6 ]2
102
4.13.2: Limitations
The activity time estimates are somewhat subjective and depend on judgement. In
cases where there is little experience in performing an activity, the numbers may
be only a guess. In other cases, if the person or group performing the activity
estimates the time there may be bias in the estimate.
Even if the activity times are well-estimated, PERT assumes a beta distribution
for these time estimates, but the actual distribution may be different.
Even if the beta distribution assumption holds, PERT assumes that the probability
distribution of the project completion time is the same as the that of the critical
path. Because other paths can become the critical path if their associated activities
are delayed, PERT consistently underestimates the expected project completion
time.
The underestimation of the project completion time due to alternate paths becoming
critical is perhaps the most serious of these issues. To overcome this limitation, Monte
Carlo simulations can be performed on the network to eliminate this optimistic bias in the
expected project completion time.
4.13.3: Terminology
A PERT event: is a point that marks the start or completion of one (or more) tasks.
It consumes no time, and uses no resources.
A PERT event that marks the completion of one (or more) tasks is not “reached”
until all of the activities leading to that event have been completed.
A predecessor event: an event (or events) that immediately precedes some other
event without any other events intervening. It may be the consequence of more
than one activity.
103
A successor event: an event (or events) that immediately follows some other event
without any other events intervening. It may be the consequence of more than one
activity.
A PERT activity: is the actual performance of a task. It consumes time, it requires
resources (such as labour, materials, space, machinery), and it can be understood
as representing the time, effort, and resources required to move from one event to
another. A PERT activity cannot be completed until the event preceding it has
occurred.
Optimistic time (O): the minimum possible time required to accomplish a task,
assuming everything proceeds better than is normally expected
Pessimistic time (P): the maximum possible time required to accomplish a task,
assuming everything goes wrong (but excluding major catastrophes).
Most likely time (M): the best estimate of the time required to accomplish a task,
assuming everything proceeds as normal.
Expected time (TE): the best estimate of the time required to accomplish a task,
assuming everything proceeds as normal (the implication being that the expected
time is the average time the task would require if the task were repeated on a
number of occasions over an extended period of time).
TE = (O + 4M + P) ÷ 6
Critical Path: the longest pathway taken from the initial event to the terminal
event. It determines the total calendar time required for the project; and, therefore,
any time delays along the critical path will delay the reaching of the terminal
event by at least the same amount.
Lead time: the time by which a predecessor event must be completed in order to
allow sufficient time for the activities that must elapse before a specific PERT
event is reached to be completed.
Lag time: the earliest time by which a successor event can follow a specific PERT
event.
Slack: the slack of an event is a measure of the excess time and resources
available in achieving this event. Positive slack would indicate ahead of schedule;
104
negative slack would indicate behind schedule; and zero slack would indicate on
schedule
Illustrative Example
Time estimates
Activity Predecessors a m b
A - 10 22 28
B A 4 4 10
C A 4 6 14
D B 1 2 3
E C,D 1 5 9
F C,D 7 8 9
G E,F 2 2 2
105
1. Calculate the expected time for each activity. This is given as follows:
a 4m b
E (t ) . Use the expected times to draw the network diagram
6
2. Determine the critical path. Using the expected times, a critical path is
calculated in the same manner as in the single time estimate
3. Calculate the variance( 2) for the activity time: Specifically, this is the
variance associated with each E(t) and is computed using the formula below:
2
2b a
6
4. Determine the probability of completing the project on a given date. A
valuable feature of using three time estimates is that it enables the analyst to
assess the effect of uncertainty on project completion time. The mechanics of
deriving the probability are as follows:
i. Sum the variance values associated with each activity.
ii. Substitute this figure along with the project due date and the project expected
D E (t )
completion time into the transformation formula. This formula is: z
2
cc
Where:
D = Desired completion date for the project
E(t) = Expected completion date for the project
2cc = Sum of variances along the critical path.
iii. Calculate the value of Z, which is the number of standard deviations the project
date is from the expected completion time.
iv. Using the value of Z, find the probability of meeting the project due date(using a
table of normal probabilities)
106
Time estimates Expected Time Activity Variance
a 4m b b a
2
E (t ) 2
Activity Predecessor 6 6
s a m b
A - 10 22 28 21 9
B A 4 4 10 5 1
C A 4 6 14 7 2
2
9
D B 1 2 3 2 1
9
E C,D 1 5 9 5 7
1
9
F C,D 7 8 9 8 1
9
G E,F 2 2 2 2 0
Since there are two critical paths in the network(the above example), we must decide
which variances to use in arriving at the probability of meeting the project due date. A
conservative approach dictates using the path with the largest variance since this would
focus management’s attention on the activities most likely to exhibit broad variations. On
this basis, the variances associated activities A, C, F, and G would be used to find the
probability of completion. Thus:
2 2 1
9 2 0 11.89
9 9
107
Suppose management asks for the probability of completing the project in 35 weeks, then
D = 35. The expected completion time was found to be 38. Substituting these values in Z,
we have:
D E (t ) 35 38
z 0.87
2
11.89
cc
Using a table of normal probabilities, we see that a Z value of –0.87 yields a probability
of 0.19, which means that the project manager has only 19% chance of completing the
project in 35 weeks.
108
QUESTION 2
The table below shows data for a simple project.
Activity Preceding Normal Normal Crash Crash
activity duration cost duration cost
A - 3 1200 2 1500
B - 2 1250 1 1300
C A 6 1000 4 1800
D A 5 1500 3 2800
E C, D 5 1800 4 3000
F B ,D 3 500 1 1000
G F 2 500 1 1000
i. Draw a Network diagram for the project using (a) Activity on arc notation
(AOA) and (b) activity on node notation (AON)
ii. Find the critical path.
i. Find the normal duration time of the project.
ii. Find the cost associated with the normal duration time.
iii. Find the shortest possible completion time of the project.
vi. Find the cost associated with the shortest possible completion time
QUESTION 3
The table below gives data for a simple project
Activity Preceding Normal Normal Crash Crash
activity duration cost duration cost
A - 4 25 3 37
B A 4 16 4 16
C - 5 35 2 75
D A,C 8 49 7 95
E B,C 8 60 4 130
F D ,E 6 41 3 76
G E ,F 5 23 3 45
H G 4 40 3 65
i. Calculate and state the critical path(s) and the cost of completion in the
normal time
109
ii. Calculate and state the critical path(s) and the cost of completion in the crash
time
iii. Calculate and state the minimum cost of completion and associated critical
path(s).
QUESTION 4
The table below gives data for a simple project
Activity Preceding Normal Normal Crash Crash
activity duration cost duration cost
A - 8 100 6 200
B - 4 150 2 350
C A 2 50 1 90
D A 10 100 5 400
E B 5 100 1 200
F C,E 3 80 1 100
i. Draw a Network diagram for the project using activity on node notation (AON)
ii. Find the critical path.
iii. Find the normal duration time of the project.
iv. Find the cost associated with the normal duration time.
v. Find the shortest possible completion time of the project.
vi. Find the cost associated with the shortest possible completion.
QUESTION 5
The Ressembler Group is looking at the possible test launch of a new type of picture
frame called ’Dale’. The main activities have been identified. Times estimated in weeks
and costs estimated in dollars are shown below.
110
.Activity Preceding NORMAL CRASH
Activity Time Cost ($) Time (weeks) Cost ($)
(weeks)
A - 4 10,000 2 11,000
B A 3 6,000 2 9,000
C A 2 4,000 1 6,000
D B 5 14,000 3 18,000
E B, C 1 9,000 1 9,000
F C 3 7,000 2 8,000
G E,F 4 13,000 2 25,000
H D,E 4 11,000 1 18,000
I H, G 6 20,000 5 29,000
(a)Draw the network for this project.(Use AOA notation)
i. State the critical path and critical activities
ii. Find the normal project time.
iii. Find the normal project cost.
(b). The project director decides to shorten the project duration by three (3) weeks.
i. What activities should be crushed?
ii. What will be the total cost of the project in this time?
QUESTION 6
A manufacturing concern has received a special order for a number of units of a special
product that consists of two components parts: X and Y. The product is a nonstandard
item that the firm has never produced before, and scheduling personnel have decided that
the application of CPM is warranted. A team of manufacturing engineers has prepared the
following table.
Activity Description Predecessors Expected Time(days)
A Plan production - 5
B Procure materials for part X A 14
C Manufacture part X B 9
D Procure materials for part Y A 15
E Manufacture part Y D 10
F Assemble parts X and Y C, E 4
G Inspect assemblies F 2
H Completed G 0
i. Construct a graphic representation of the data above
111
ii. Identify the critical path
iii. What is the length of time to complete the project?
iv. Find the floats
v. Find the possible number of days by which the project duration can be
reduced and state the activities that need to be reduced.
QUESTION 7
The following represents a project that should be scheduled using PERT
Activity Immediate predecessor(s) Time(Days)
a m b
A - 1 3 5
B A 1 2 3
C A 1 2 7
D A 2 3 4
E B 3 4 11
F C,D 3 4 5
G D,E 1 4 6
H F,G 2 4 5
a. Draw the network diagram
b. What is the critical path?
c. What is the expected project completion time?
d. What is the probability of completing the project within 16 days?
112
QUESTION 8
The table below represents a plan for a project
Job No. Immediate predecessor(s) Time(Days)
a m b
1 - 2 3 4
2 1 1 2 3
3 1 4 5 12
4 1 3 4 11
5 2 1 3 5
6 3 1 2 5
7 4 1 8 9
8 5,6 2 4 6
9 8 2 4 2
10 7 3 4 5
11 9 ,10 5 7 8
a. construct an appropriate network diagram
b. Indicate the critical path
c. What is the expected completion time for the project?
113
UNIT 5
INVENTORY CONTROL
OUTLINE
Session 5.1: Introduction to inventory control
Session 5.2: Types of Inventory
Session 5.3: Terminologies
Session 5.4: The Functions of Inventory
Session 5.5: Inventory Policies
Session 5.6: Inventory Models/Systems
Session 5.7: Economic Order Quantity (EOQ) model
OBJECTIVES
By the end of the unit you should be able to:
1. Explain the rationale for inventory control
2. identify types of inventory
3. Explain the inventory policies
4. Use the inventory models to calculate order quantity
114
SESSION 5.1: INTRODUCTION TO INVENTORY CONTROL
Inventory refers to idle goods or materials held by an organization for use sometime in
the future. Items carried in inventory include raw materials, purchased parts, components
subassemblies, work – in-process, fished goods, and supplies. Some reasons why
organizations maintain inventory are the difficulties in predicting sales levels, production
times, demand and usage needs exactly. Thus, inventory serves as a buffer against
uncertain and fluctuating usage and keeps a supply of items available in case the items
are needed by the organizations or its customers. Even though inventory serves an
important and essential role, the expense associated with financing and maintaining
inventories is a substantial part of the cost of doing business. In large organizations, the
cost associated with inventory can run into millions of dollars.
Good inventory management is essential to the success of most organizations if not all.
The reasons are that:
1. Inventory represents money. In other words money is tied up in inventory.
2. Inventory has a very great impact on the daily operations of organizations,
whether manufacturing or trading organizations.
Manufacturing organizations need stock of raw materials that will be converted to
finished goods and this should not be in short supply at any point in time. Trading
organizations need inventory of finished goods to meet the demands of their customers.
115
processes productive. They exist because the need and timing for maintenance
and repair of some equipment are unknown.
iv. Finished goods Inventory: They are completed/finished products awaiting
shipment. Finished goods may be inventoried because future customers,
demands are unknown.
116
SESSION 5.5: INVENTORY POLICIES
An organisation’s stockholding policy is guided by a series of rules, which determine
when certain decisions concerning the holding of stocks should be made. the rules help
managers to answer two important questions:
1. How much should be ordered when the inventory is replenished?
2. When should the inventory be replenished?
This series of rules is known as Inventory Policy.
i. Re-order Level Policy: If the decision concerning replenishment is based on
the level of inventory held, it is known as Re-order Level Policy. A
predetermined re-order level is set for each item. When the stock level falls to
the re-order level, a replenishment order is issued. Fixed quantities are ordered
at variable intervals. The replenishment order quantity is invariably the
Economic Order quantity. This policy m, has three control levels:
a. Reorder level: It is a definite action level. It is calculated so that if the
worst anticipated position occurs, stock would be replenished. This level is
given as Maximum usage multiplied by Maximum lead time.
b. Minimum level: This level is calculated so that management will be
warned when demand is above average and accordingly buffer stock is
being used. The Minimum level is given as Re-order level minus Average
usage for average lead time.
c. Maximum level: It is calculated so that management will be warned when
demand is the minimum anticipated and consequently the stock level is
likely to rise above the maximum intended. The Maximum level is given
as Re-order level plus Economic Order quantity minus Minimum
anticipated usage in lead time.
ii. Periodic Review Policy: This is also called the constant cycle system. The
stock levels for all parts are reviewed at fixed intervals for example, every
fortnight. The quantity of the replenishment order is not a previously
calculated EOQ, but is based upon the likely demand until the next review, the
present stock level and the lead time. Variable quantities are ordered at fixed
intervals.
117
Example
The following data relate to a particular stock item.
Normal usage is 110 per day
Minimum usage is 50 per day
Maximum usage is 140 per day
Lead time is 25 to 30 days
Economic Order Quantity is 5,000
Using the data above, calculate the various control levels
Solution:
i. Re-order level = Maximum usage x Maximum lead time = 140 x 30 = 4,200 units
ii. Minimum level = Re-order level - Average usage for average lead time.
= 4,200 –(110 x 27.5) = 1,175 units.
iii. Maximum level = Re-order level + Economic Order quantity - Minimum anticipated
usage in lead time = 4,200 + 5,000 – (50 x 25) = 7,950 units.
We will now consider deterministic inventory models in which we assume that the rate of
demand fort the item is constant or nearly constant. Later we will consider probabilistic
inventory models in which the demand for the item fluctuates and can be described only
in probabilistic terms
118
5.6.1: Economic Order Quantity (EOQ) Model
The Economic Order Quantity(EOQ) model is applicable when the demand for an item
has a constant, or nearly constant, rate and when the entire quantity ordered arrives in the
inventory at one point in time. The constant demand rate assumption means that the
same number of units is taken form inventory each period of time such as 5 units every
day, 25 units every week, 100 units every 4 week period, and so on.
Is the calculated quantity Q*(Qopt) which minimizes the balance of costs between
inventory holding cost and re-order cost. For small values of Q*, more frequent ordering
will be necessary and hence costs will be high, while large values of Q* will increase the
quantity in store and therefore increase the storage cost. The problem is to determine the
value of Q* that minimizes the sum of the order cost and storage cost.
Assumptions.
i. Demand is known, constant and independent
ii. Lead time is known and constant
iii. Quantity discount is not possible.
iv. Receipt of inventory is instantaneous and complete. In other words, the
inventory from an order arrives in one batch at one time.
v. The only variable costs are the cost of setting up or placing order (setup cost)
and the cost of holding or storing inventory over time (holding or carrying
cost)
vi. Stock outs (shortages) can be completely avoided if orders are placed at the
right time.
With these assumptions, it is apparent that the significant costs are demand cost,
setup(ordering) cost, and holding(carrying)cost. Thus, if we minimize the setup and
holding costs, we will be minimizing total cost, which is the objective of most inventory
models.
119
If the cost of placing order is C, the total order cost is simply the number of orders made
multiplied by C. If D is the demand over a specified time period, then the number of
orders made is D/Q , and the order cost is C x D/Q, and demand cost is DC
To calculate the storage/inventory cost it is assumed that the cost of holding one unit in
stock foe a specified time period is known. This cost is represented by H. As the amount
in stock varies, the average stock level is Q/2. Hence, the storage cost is H x Q/2.
The total cost (TC) =Annual purchase + Annual ordering cost + Annual holding cost
DS Q
= DC + + H
Q 2
Illustration: Imagine that you work for Ghana Computers, and you have been asked to
decide on the optimum order quantity. You were told that the demand is fairly constant at
5000 units per annum, and it costs $14.40 to place an order. You are also told that the
storage cost of holding one unit of computer per annum is $10.
In order to investigate how inventory cost vary with order size, you decide to work out
the order and storage cost for different order quantities as shown below.
Order Quantity Order cost(C0) =CD/Q Storage cost(Cs) = HQ/2 Total cost= C0 + Cs
20 14.4*5000/20=3600 10*20/2=100 3600+100=3700
40 1800 200 2000
60 1200 300 1500
80 900 400 1300
100 720 500 1220
120 600 600 1200
140 512.3 700 1214.3
160 450 800 1250
180 400 900 1300
200 360 1000 1360
120
From the table, it is apparent that an order quantity of 120 gives the lowest total cost at
$12000 per annum.
= D x S = DS
Q Q
ii. Annual Holding Cost = Average Inventory Level x Holding cost per unit per annum
= Q x H = QH
2 2
2 DS
Q*
H
Alternatively we use the fact that at the optimum, Setup cost = holding cost
DS = QH
Q 2
121
Using this formula for the above illustration, we have the following:
iv. Expected time between orders(T) = Number of working days per annum
Expected number of orders
Simple inventory models assume that receipt of an order is instantaneous. In other words,
they assume that:
i. a firm will place order when the inventory level for that particular item
reaches zero, and,
ii. it will receive the ordered items immediately.
‘When to order decision’ is expressed in terms of a re-order point (level)- that is the
inventory level at which an order should be placed. We make use of the following
formulae:
ROP = Demand per day x Lead time for an order in days
= d x T
Example 1: Electronic Assemblier Inc. has a demand for 8000 VCR’s per year. The firm
operates a 250-day working year. On average, delivery of an order takes 3 working days.
Calculate the re-order point.
Solution:
Demand per day (d) = Demand per year(D) = 8000 = 32units = d
No. of working days in year 250
122
ROP = Demand per day x Lead time for a order in days
= Annual demand x Lead time for an order in days
No. of working days in a year
= d x T
ROP = 32 x 3 = 96units.
Thus, when inventory drops to 96 units, an order should be placed. The order will arrive
3 days latter, just as the firm’s stock is depleted
Example 2: Find the Economic Order Quantity and the Re-order point given the
following.
Annual demand = 1000 units
Ordering cost = $5 per order
Lead time = 5days
Holding cost = $1.25 per unit per year
Cost per unit = $12.50
Number of days in a year = 365 days
Solution:
a. Q* = √ (2DS) = √ 2(1000)(5) = 89.4 units
H 1.25
= 13,7 units
= $12.61
Example 3: Sharp Inc; a company that markets painless hypodermic needles to hospitals
would like to reduce its inventory cost by determining the optimal number of hyperdemic
needles to obtain per order. The annual demand is 1000 units, the setup cost or ordering
cost is $10 per order, and the holding cost per unit per year is $0.50. Calculate:
a. The optimal number of units per order (EOQ).
123
b. The number of orders (N).
c. The expected time between orders (T).
d. The ROP. (Assume a 250 – day working year).
Solution:
d. Q* = √ (2DS) = √ 2(100)(10) = 200 units
H 0.50
= d x T = 4 x 50 = 200 units.
Thus, when inventory drops to 200 units, an order should be placed. The order will arrive
50 days latter, just as the firm’s stock is depleted
124
ii. When units are produced and sold simultaneously.
Differentiating with respect to Q and setting the equation equal to zero we obtain
2 DS
Q* p
d
H 1
p
Where:
Q*p = Optimum quantity
Q = Number of units per day
H = Holding cost per unit per year.
p = Daily production rate.
d = Daily demand rate or usage rate.
t = length of the production run in days.
The following terminologies are relevant in the derivation of the Production Order
Quantity.
i. Annual Inventory Cost = Average inventory level x Holding cost per unit per year.
ii. Annual Inventory Level = Maximum inventory level
2
iii. Maximum Inventory Level = Total production during the production run minus total
used during the production run = pt – dt
Q Q
Maximum Inventory level = p d
p P
125
d
Q Q
p
d
Q1
p
MaxInventoryLevel
HoldingCostPerUnitPerAnum.
2
Q d
1 H
2 p
QH d
1
2 p
DS
vi. Setup cost
Q
Note: An alternative way to obtain Q*p is to equate setup cost to Holding cost and solve
for Q(call this Q* )
Example 1: Nathan Manufacturing Inc. makes and sells specially hubcaps for the retail
automobile market. Nathan’s forecast for its hubcaps is 100 units for the following year,
with an average daily demand of 4 units. The company produces 8 units per day but uses
4 units per day. The setup cost (ordering cost) is $10 per order and the holding cost per
unit per year is $0.50.
Given the above information, calculate the optimum number of units to produce. (Take
working days in a year to be 250 days).
126
Solution:
Annual Demand(D) = 1000 units
Setup cost(S) = $10
Holding cost(H) = $0.50 per unit per year
Daily production rate(p) = 8 units daily
Daily demand rate(d) = 4 units daily
2 DS 2 1000 10
Q* p 283 hubcaps
d 4
H 1 0. 5 1
p 8
Total cost(TC) = Setup cost + Holding cost + Product cost = DS/Q + QH/2 + PD
As can be seen, the normal price of the item is $5.00. When 501 – 1000 units are ordered
at one time, the price per unit drops to $4.80, when the quantity ordered at one time is
127
between 1001 and 1500 the price drops further to $4.75 and when the quantity ordered at
one time is between 1501 and 2000 the price drops further to $4.50
The overall objective of any inventory control model is to minimize total cost. The
question is: ‘what order quantity will minimize total cost given the discount prices’?
The procedure is as follows:
1. For each discount, calculate a value for the optimal order size Q* using the equation
Q* = √ 2DS
IP
2. For any discount, if the order quantity is too low to qualify for the discount, adjust the
order quantity upward to the lowest quantity that will qualify for the discount.
3. Using the total cost equation, TC = DS/Q + QH/2 + PD , compute a total cost for
every Q* determined in steps one and two. If you have to adjust Q* upward because it is
below the allowable quantity, be sure to use the adjusted value for Q*.
4. Select the Q* that has the lowest cost as computed in step three. This is the quantity
that will minimize the total cost.
Example 1
Koh’s discount store stocks toy race cars. Recently, the store has been given a quantity
discount schedule for these cars. The quantity discount schedule is shown in the table
below.
128
2 1000 – 1999 4 4.80
3 2000 and more 5 4.75
Furthermore, the ordering cost is $49.00 per order, annual demand is 5000 race cars, and
inventory carrying charge as a percentage of cost, I, is 20%. What order quantity will
minimize the total inventory cost?
Solution:
The first step is to compute Q* for every discount This is done as follows.
D = 5000
S = 49.00
I = 20% = 0.2
P1 = 5, P2 = 4.80, P3 = 4.75,
2 500 49
Q *1 700
0.2 5
2 500 49
Q*2 714
0.2 4.8
2 500 49
Q*3 718
0.2 4.75
The second step is to adjust upward those values of Q* that are below the allowable
discount range. The adjustments are done as follows:
Since Q*1 is between 0 and 999, it will not be adjusted.
Because Q*2 is below the allowable range of 1000 to 1999, it must be adjusted to
1000.
Because Q*3 is below the allowable range of 2000, it must be adjusted to 2000.
129
Q*2 = 1000 (Adjusted)
Q*3 = 2000 (Adjusted)
He third step is to use the total cost equation and compute a cost for each order quantity..
This is shown in the table below.
Discount Unit price Order Production Ordering Holding Total cost
number quantity cost(PD) cost(DS/Q*) cost(HQ/2) (4)+(5)+(6)
(1) (2) (3) (4) (5) (6) (7)
1 5.00 700 25000 350 350 25700
2 4.80 1000 24000 245 480 24725
3 4.75 2000 23750 122.5 950 24822.5
The fourth step is to select that order quantity with the lowest cost. The order quantity of
1000 toy cars will minimize the total inventory cost.
Example 2
Problem 1. Zinc Ltd. offers a 7% discount on orders of 400 rolls or more, a 10%
discount for 900 rolls or more, a 12% discount for 1000 rolls or more, and a 15%
discount for 2000 rolls or more her regular customer, Mike who operates a wholesale
shop. The unit price is $3.20 and the setup cost is $20. Inventory carrying charge as a
percentage of cost, I, is 25%. What order quantity will minimize the total inventory cost?
Solution:
Discount Number Discount quantity Discount (%) Discount Price ( & )
1 Less 400 - 3.20
2 400 or more 7 3.20*.93 =2.976
3 900 or more 10 3.20*.90 = 2.88
4 2000 or more 15 3.20*.90 = 2.72
130
Q3* = ( 2*1092*20) / (.25*2.88) = 246.31 Not feasible. Q3* = 900
Q4* = ( 2*1092*20) / (.25*2.72) = 253.45 Not feasible. Q4* = 2000
Comparing the total cost for orders for 234, 400, 900, and 2000, the lowest total cost is
$3453. Therefore, Nick should order 400 rolls at a time.
131
Question 3
Consider the data in the table below.
Discount number Discount quantity Discount (%) Discount price($)
1 0 –500 0 5.00
2 501-1000 4 5.00*96%=4.80
3 1001 -1500 5 5.00*95%= 4.75
4 1501 - 2000 10 5.00*90%= 4.50
Setup cost is $20. Inventory carrying charge as a percentage of cost, I, is 25%. What
order quantity will minimize the total inventory cost?
Question 4
Joe De Ltd. offers a quantity discount of 7% discount on orders of 400 rolls or more, a
10% discount for 900 rolls or more, a 12% discount for 1000 rolls or more, and a 15%
discount for 2000 rolls or more her regular customer, Mark Tee who operates a wholesale
shop. The unit price of the item is $3.20 and the setup cost is $20. Mark Tee’s annual
demand is 1092 and inventory carrying charge as a percentage of cost, I, is 25%.
Calculate the order quantity that will minimize inventory cost
132
UNIT 6
OUTLINE
SESSION 6.1: Introduction
OBJECTIVES
133
SESSION 6.1: INTRODUCTION
A body of knowledge about waiting lines, often called queuing theory is an important
part of operations and a valuable tool for operations managers. Waiting lines may take
the form of cars waiting for repair at a shop, customers waiting at a bank to be served,
etc.
In many retail stores and banks, management has tried to reduce the frustration of
customers by somehow increasing the speed of the checkout and cashier lines. Although
most grocery stores seem to have retained the multiple line/multiple checkout system,
many banks, credit unions, and fast food providers have gone in recent years to a queuing
system where customers wait for the next available cashier. The frustrations of "getting in
a slow line" are removed because that one slow transaction does not affect the throughput
of the remaining customers.
Walmart and McDonald's are other examples of companies which open up additional
lines when there are more than about three people in line. In fact, Walmart has roaming
clerks now who can total up your purchases and leave you with a number which the
cashier enters to complete the financial aspect of your sale. Disney is another company
where they face thousands of people a day. One method to ameliorate the problem has
been to use queuing theory. It has been proved that throughput improves and customer
satisfaction increases when queues are used instead of separate lines. Queues are also
used extensively in computing---web servers and print servers are now common. Banks
of 800 service phone numbers are a final example I will cite.
Queuing theory leads one directly to the Poisson Distribution, named after the famous
French mathematician Simeon Denis Poisson (1781-1840) who first studied it in 1837.
He applied it to such morbid results as the probability of death in the Prussian army
resulting from the kick of a horse and suicides among women and children. As hinted
above, operations research has applied it to model random arrival times.
134
Components of the Queuing
Phenomenon
Servicing System
Servers
The Poisson distribution is the continuous limit of the discrete binomial distribution. It
depends on the following four assumptions:
1. It is possible to divide the time interval of interest into many small subintervals
(like an hour into seconds).
2. The probability of an occurrence remains constant thoughout the large time
interval (random).
3. The probability of two or more occurrences in a subinterval is small enough to be
ignored.
4. Occurrences are independent.
Clearly, bank arrivals might have problems with assumption number four where payday,
lunch hour, and car pooling may affect independence. However, the Poisson Distribution
finds applicability in a surprisingly large variety of situations. The equation for the
Poisson Distribution is: P(x) = µx · e-µ ÷ x!. The number e in the equation above is the
base of the natural logarithms or approximately 2.71828182845904523...
135
Illustration of the Poisson Distribution
Example 1: On average there are three babies born a day with hairy backs. Find the
probability that in one day two babies are born hairy. Find the probability that in one day
no babies are born hairy.
Example 2: Suppose a bank knows that on average 60 customers arrive between 10 A.M.
and 11 A.M. daily. Thus 1 customer arrives per minute. Find the probability that exactly
two customers arrive in a given one-minute time interval between 10 and 11 A.M.
1. Arrivals or inputs into the system: The input source that generates arrivals
or customers for a service has three major characteristics:
a. The size of the source population The population sizes are considered
either unlimited(essentially infinite) or limited(finite). When the number
of customers or arrivals on one hand at any moment is just a small portion
of all potential arrivals, the arrival population is considered unlimited or
infinite. It could also be considered as a queue in which virtually
unlimited number people or items could request the services. Examples of
unlimited populations include cars arriving at highway car toll booth,
shoppers arriving at a supermarket, and students arriving to register for
classes at a large university. A queue in which there are only a limited
number of potential users of the service is termed finite or limited
136
Population Sources
Population Source
Finite Infinite
ex
P(x)= X =0, 1, 2, …
x!
Where:
P(x) = probability of x arrivals
X= number of arrivals per unit of time
= average arrival rate
e = 2.7183
137
Customer Arrival
Customer Arrival
Rate
Constant Variable
138
Degree of Patience
No Way! No Way!
BALK RENEG
2. Queue discipline or the waiting line itself: The waiting line itself is the
second component of a queuing system. The length of a line can be ether
limited or unlimited. A queue is limited when it cannot, either by law or
because of physical restrictions, increase to an infinite length. A barbershop,
for example, will have only a limited number of waiting chairs. Queuing
models are treated in this module under an assumption of unlimited queue
length. A queue is unlimited when its size is unrestricted, as in the case of toll
booth serving arriving automobiles. A second waiting-line characteristics
deals with queue discipline. This refers to the rule by which customers in the
line are to receive service. Most systems use a queue discipline known as
first-in, first-out (FIFO-a queuing discipline where the first customers in
line receive first service) rule. In a hospital emergency room or an express
checkout line at a supermarket, however, various assigned priorities may pre-
empt FIFO. Patients who are critically injured will move ahead in treatment
priority over patients with broken fingers
3. The service facility: The third part of any queuing system is the service
facility. Two basic properties are important.
139
a. The configuration of the service system: Service systems are usually
classified in terms of their number of channels(for example, number of
servers) and number of phases(for example, number of service stops that
must be made). A single-channel queuing system with one server, is
typified by the drive-in bank with only one open teller. If on the other
hand, the bank has several tellers on duty, with each customer waiting in
one common line for the first available teller on duty, then we would have
multiple-channel queuing system. Most banks today are multichannel
service systems, as are most large shops, airline ticket counters, and post
offices. In a single-phase system, the customer receives service from only
one station and then exits the system. A fast food restaurant in which the
person who takes your order also brings your food and takes your money
is a single-phase system. So is a driver’s license agency in which the
person taking your application also grades your test and collects your
license fee. However, say, the restaurant requires you to place order at one
station, pay at a second station, and pick up your food at a third station. In
this case, it is multiphase system. Likewise, if the driver’s license agency
is large or busy, you will probably have to wait in one line to complete
your application(the first service stop), queue again to have your test
graded and finally go to a third counter to pay your fee. To help you relate
the concepts of channels and phases, see the chart below.
Line Structures
Single
Multiphase
Phase
One-person
Single Channel Car wash
barber shop
140
b. The pattern of service times: Service patterns are like arrival patterns in
that they may be either constant or random. If service time is constant, it
takes the same amount of time to take care of each customer. This is the
case in a machine-performed service operation such as an automatic car
was. More often, service times are randomly distributed. In many cases,
we can assume that random service times are described by negative
exponential probability distribution..
141
No. of No. of Service time Population Queue
Model Name channels Phases pattern size discipline
Single-Channel
A (M/M/1) Single Poisson Exponential Unlimited FIFO
Multichannel
B (M/M/S) Multi Poisson Exponential Unlimited FIFO
Constant
service
C (M/D/1) Single Poisson Constant Unlimited FIFO
Limited
D population Single Poisson Exponential Limited FIFO
142
(1). Ls = Average number of units(customers) in the system
(2). Ws = Average time a unit(customer) spends in the system
1
(waiting time plus service time)
2
(3). Lq = Average number of units in the queue
( )
(4). Wq = Average time a unit spends waiting in the queue
( )
(5). P0 = Probability of 0 units in the system (that is the service unit is idle) 1
(6). = Utilization factor for the system
Pn>k =Probability of more than k units in the system, where K is the number of
k 1
units in the system
Example 1
Jones, the mechanic at Golden Muffler Shop, is able to install new mufflers at an average
rate of 3 per hour(or about 1 every 20 minutes), according to a negative exponential
distribution. Customers seeking this service arrive at the shop on the average of 2 per
hour, following a Poisson distribution. They are served on a first-in, first-out basis and
come from a very large population of possible buyers.
From the description above, we deduce the operating characteristics of Golden Muffler’s
queuing system
= Mean number of arrivals per time period = 2 cars arriving per hour
= Mean number of people or items served per time period = 3 cars serviced per hour
143
2
Ls = Average number of units(cars) in the system 2
32
Ws = Average time a unit(car) spends in the system (waiting time plus service time)
1
1
1
3 2
2 22 4
Lq = Average number of cars in the queue
( ) 3(3 2) 3
2 2
Wq = Average time a car spends waiting in the queue
( ) 3(3 2) 3
P0 = Probability of 0 units in the system (that is the service unit is idle) 1
2
= Utilization factor for the system =66.7% of time the mechanic is busy
3
k+1
Pn>k = Probability of more than k units in the system, where =
K is the number of units in the system
k Pn>k =(2/3)k+1 Comments
0 0.667 Note that this is equal to 1-P0 = 1-0.33 = 0.667
1 0.444
2 0.296
3 0.198 This implies that there is 19.9% chance that more than 3 cars are in the system
4 0.132
5 0.088
6 0.058
7 0.039
144
Model B: Multiple-Channel Model
This is a system in which two or more servers or channels are available to handle arriving
customers. We still assume that customers awaiting service from one single line and then
proceed to the first available server. Multi-channel, single-phase waiting line are found in
many banks today: a common line is formed and the customer at the head of the line
proceeds to the first free teller(Appendix).
The multi-channel system presented in Appendix again assumes that arrivals follow a
Poisson Probability distribution and that service times are exponentially distributed.
Service is first-come, first-served, and all servers are assumed to perform at the same
rate. Other assumptions listed for the single-channel model also apply.
145
6. Train your servers to be friendly. Never underestimate the power of a friendly
server. Greeting the customer by name, or providing other special attention, can
go a long way toward overcoming the negative feeling of a long wait.
7. Modify customer arrival behavior. Encourage customers to come during the
slack periods. Inform customers of times when they usually would not have to
wait. Also tell them when the peak periods are.
8. Adopt a long-term perspective getting rid of the queues. Develop plans for
alternative ways to serve your customers. Where appropriate, develop plans for
automating or speeding up the process in some manner.
QUESTION 1
There is only 1 copying machine in the student hostel of the polytechnic. Students arrive
at the rate of 40 per hour(according to a Poisson distribution). Copying takes an average
rate of 40 seconds or 90 per hour(according to an exponential distribution). Compute the
following:
a. The percentage of time that the machine is used.
b. The average length of the queue.
c. The average number of students in the system
d. The average time spent waiting in the queue
e. The average time in the system
QUESTION 2
Sam, a vertenary doctor, is running a rabies-vaccination clinic for dogs in the local grade
school. Sam can “shoot” a dog every 3 minutes. It is estimated that the dogs will arrive
independently and randomly throughout the day at a rate of 1 dog every 6 minutes
according to a Poisson distribution. Also assume that Sam’s shooting times are
exponentially distributed. Compute the following:
146
i. The probability the Sam is idle.
ii. The proportion of time that Sam is busy
iii. The average number of dogs being vaccinated and waiting to be vaccinated
iv. The average number of dogs waiting to be vaccinated
v. The average time a dog waits before getting vaccinated
vi. The average amount of time a dog spends waiting in line and being vaccinated
QUESTION 3
Calls arrive at John DeBruzzi’s hotel switchboard at a rate of 2 per minute. The average
time to handle each is 20 seconds. There is only 1 switchboard operator at the current
time. The Poisson and exponential distributions appear to be relevant in this situation
a. What is the probability that the operator is busy?
b. What is the average time that a caller must wait before reaching the
operator?
c. What is the average number of calls waiting to be answered?
QUESTION 4
The Charles Leitle Electronics Company retains a service crew to repair machine
breakdowns that occur on average of 3 per day(approximately Poisson in nature). The
crew can service an average of 8 machines per day, with time distribution that resembles
the exponential distribution
i. What is the utilization rate of this service?
ii. What is the average downtime for a broken machine?
iii. How many machines are waiting to be serviced at any given time?
iv. What is the probability that:
a. more than one machine is in the system
b. more than two are broken and waiting to be repaired or being serviced?
c. More than three are broken and waiting to be repaired or being serviced?
d. More that four are broken and waiting to be repaired or being serviced?
147
QUESTION 5
Gab Moss manages a large Mongomery, Alabama, movie theatre complex called Cinema
I, II, III, and IV. Each of the four auditorium plays a different film: the schedule staggers
starting times to avoid the large crowds that would occur if all 4 movies started at the
same time. The theatre has a single ticket booth and a cashier who can maintain an
average service rate of 280 patrons per hour. Service times are assumed to follow an
exponential distribution. Arrivals on a normally active day are Poisson-distributed and
average 210 per hour.
In order to determine the efficiency of the current ticket operation, Gab wishes to
examine several queue –operating characteristics.
i. Find the average number of moviegoers waiting to purchase a ticket
ii. What percentage of the time is the cashier busy?
iii. What is the average time that a customer spends in the system?
iv. What is the average time spent waiting in line to get the ticket window?
v. What is the probability that there are more than two people in the system,
more than 3, more than 4?
QUESTION 6
The cafeteria line in the university student center is a self-serve facility in which in which
students select the items they want and then form a single line to pay the cashier.
Students arrive at a rate of about 4 per minute according to a Poisson distributing. The
single cashier takes about 12 seconds per customer, following an exponential distribution
a. What is the probability that there are more than 2 students in the system?
More than 3 students, more than 4?
b. What is the probability that the system is empty?
c. How long will the average student have to wait before reaching the
cashier?
d. What is the average number in the system?
e. If a second cashier is added and works at the same pace, how will the
operating characteristics computed in parts (b), (c), (d), and (e)
148
change?(Assume customers wait in a single line and go to the first
available cashier).
QUESTION 7
The administrator at a large hospital emergency room faces the problem of providing
treatment for patients who arrive at different rates during the day. There are 4 doctors
available to treat patients when needed. If not needed, they can be assigned other
responsibilities(such as doing lab tests, reports, X-rays diagnoses) or else rescheduled to
work at other hours.
It is important to provide quick and responsive treatment, and the administrator feels that,
on the average, patients should not have to sit in the waiting area more than 5 minutes
before being see by a doctor. Patients are treated on a first-come, first served basis, and
see the first available doctor after waiting in the queue. The arrival pattern for a typical
day is as follows:
Time Arrival rate
9am – 3pm 6 patients/hour
3pm – 8pm 4 patients/hour
8pm - midnight 12 patients/hour
Arrivals follow a Poisson distribution, and treatment times, 12 minutes on the average,
follow the exponential pattern.
How many doctors should be on duty during each period to maintain the level of patient
care expected?
QUESTION 8
Two technicians, working as a team, monitor a group of 5 computers that run an
automated manufacturing facility. It takes an average of 15 minutes (exponentially
distributed) to adjust a computer that develops a problem. Computers run for an average
of 85 minutes(Poisson-distributed) without requiring adjustments. Determine the
following:
a. The average number of computers waiting for adjustments
b. The average number being adjusted
c. The average number of computers not in working order.
149
QUESTION 9
1. What is a waiting line problem? What are the components in a waiting –
line system?
2. Briefly describe three situations in which the FIFO discipline rule is not
applicable in queuing analysis
3. Provide 4 examples of four situations in which there is limited , or finite
waiting line
4. Most banks have changed from having a line in front of each teller to a
situation whereby one line feeds all tellers. Which system is better? Why?
150
SIMULATION
1. Introduction
Simulation analysis is a natural and logical extension to the analytical and mathematical
models inherent in operations research. There are many situations which cannot be
represented mathematically due to the stochastic nature of the problem, the complexity of
problem formulation, or the interactions needed to adequately describe the problem under
study. For many situations defying the mathematical formulation, simulation is the only tool
Typical business examples are: most queuing systems other than the very simplest, inventory
circumstances
digital computer, which involves certain types of mathematical and logical relationships
necessary to describe the behaviour and nature of a complex real world system over
151
SIMULATION METHODOLOGY
Problem efinition
Problem definition for purposes of simulation differs little from problem definition
for any other tool of analysis. Essentially, it entails specifying the objectives and
identifying the objectives and identifying the relevant controllable and uncontrollable
variables of the system to be studied. Consider the example of a fish market. The
objective of the market’s owner is the maximization of profit on sales of fish. The
relevant controllable variable (that is, under the control of the decision maker) is the
ordering rule; the relevant uncontrollable variables are the daily demand levels for
fish and the amount of fish sold. Other possible objectives could also be specified,
such as to maximize profit from the sale of lobsters or to maximize sales revenue.
programming or queuing theory is the fact that a simulation model must be custom
built for each problem situation. A linear programming model, in contrast, can be
used in a variety of situations with only a restatement of the values for the objective
function and constraint equations. There are simulation languages that make the
model building easier, however. The unique nature of each simulation model means
that the procedures for building and executing a model represent a synthesis of
various approaches to simulation and are guidelines rather than rigid rules.
152
Specification of Variables and Parameters
the real system should be fixed (called parameters) and which should be allowed to
vary throughout the simulation run (called variables). In the fish market, the
variables are the amount of fish ordered, the amount demanded, and the amount sold;
the parameters are the cost of the fish and the selling price of the fish. In most
simulations, the focus is on the status of the variables at different points in time, such
Decision rules (or operating rules) are sets of conditions under which the behaviour
of the simulation model is observed. These rules are either directly or indirectly the
focus of most simulation studies. In many simulations, decision rules are priority
rules (for example, which customer to serve first, which job to process first). In
certain situations these can be quite involved, taking into account a large number of
variables in the system. For example, an inventory ordering rule could be stated in
such a way that the amount to order would depend on the amount in inventory, the
amount previously ordered but not received, the amount backordered, and the desired
safety stock.
153
derived from observing the relative frequencies of some event such as arrivals in a
In a simulation model, time can be advanced by one of two methods: (1) fixed-time
increment method, uniform clock time increments (such as minutes, hours, or days)
are specified, and the simulation proceeds by fixed intervals from one time period to
the next. At each point in clock time, the system is scanned to determine if any events
are to occur. If they are, the events are simulated, and time is advanced; if they are
required to initiate the next event. Which method is most appropriate? Experience
suggests that the fixed –time increment is desirable when events of interest occur with
regularity or when the number of events is large, with several commonly occurring in
the same time period. The variable-time increment method is generally desirable,
taking less computer run time when there are relatively few events occurring within a
considerable amount of time. It ignores time intervals where nothing happens and
immediately advances to the next point when some event does take place.
154
Specifying Values of Variables and Parameters
be given an initial starting values. The value of parameter stays constant, how-ever, it
simulation. This is because the model is biased by the set of initial starting values
until the model has settled down to a steady state. To cope with this problem, analysts
have followed various approaches such as (1) discarding data generated during the
early parts of the run, (2) selecting starting conditions that reduce the duration of the
warm-up period, or (3) selecting starting conditions that eliminate bias. To employ
any of these alternatives, however, the analyst must have some idea of the range of
output data expected. Therefore, in one sense, the analyst biases results. On the other
hand, one of the unique features of simulation is that it allows judgment to enter into
the design and analysis of the simulation; so if the analyst has some information that
The length of the simulation run (run length or run time) depends on the purpose of
the simulation. Perhaps the most common approach is to continue the simulation until
it has achieved equilibrium. In the fish market example, this would mean that
155
simulated fish sales correspond to their historical relative frequencies. Another
approach is to run the simulation for a set period, such as a month, a year, or a
decade, and see if the conditions at the end of the period appear reasonable. A third
approach is to set run length so that a sufficiently large sample is gathered for
Evaluating Results
The types of conclusions that can be drawn from a simulation depend, of course, on
the degree to which the model reflects the real system, but they also depend on the
design of the simulation in a statistical sense. Indeed, many analysts view simulation
as a form of hypothesizing, with each simulation run providing one or more pieces of
sample data that are amenable to formal analysis through inferential statistical
In most situations, the analyst has other information available with which to compare
the simulation results: past operating data from the real system, operating data from
the performance of similar systems, and the analyst’s own intuitive understanding of
the real system’s operation. Admittedly, however, information obtained from these
sources is probably not sufficient to validate the conclusions derived from the
simulation. Thus, the only true test of simulation is how well the real system performs
156
Validation
In this context, validation refers to testing the computer program to ensure that the
valid translation of the flowchart model and whether the simulation adequately
represents the real system. Errors may arise in the program from mistakes in the
coding or from mistakes in logic. Mistakes in coding are usually easily found because
the program is most likely not executed by the computer. Mistakes in logic, however,
present more challenge. In these cases, the program runs but fails to yield correct
results.
To deal with this problem, the analyst has three alternatives: (1) have the program
print out all calculations and verify these calculations by separate computation, (2)
simulate present conditions and compare the results with the existing system, or (3)
pick some point in the simulation run and compare its output to the answer obtained
from solving a relevant mathematical model of the situation at that point. Even
though the first two approaches have obvious drawbacks, they are more likely to be
employed than the third, because if we had a relevant mathematical model in mind,
we would probably be able to solve the problem without the aid of simulation.
Any realistic business problem contains probabilistic or random features. For example,
arrivals at a store may average 60 per day, but the actual arrival pattern is likely variable,
157
in a corporate planning exercise forecasts of the daily sales will obviously vary according
Because models must behave like the real systems under observation, the models must
contain these probabilistic elements. When a system contains elements that exhibit
The daily demand for tire at AA Auto Tire over the past 200 days is shown in the table
below.
158
Demand for tire 0 1 2 3 4 5
Frequency 10 20 40 60 40 30
Assuming that past arrival rates will hold in the future, we can convert this demand to a
probability distribution by dividing each demand frequency by the total demand. The
1 2 3 4 5
must assign a set of number to represent each possible outcome. These are referred to as
If for example, there is a 5% chance that demand for tires will be 0 units per day, then we
total of 100 two-digit numbers are used in the simulation we could assign a demand of 0
159
units to the first 5 random numbers:01 02 03 04 and 05. Then a simulated demand
of 0 units would be created every time one of the numbers 01 to 05 was drawn.
Random numbers are then generated to. For example if the following random numbers
are generated; 42, 85, …, 42 is in the interval 36 to 65 which represents daily demand of
3 tires. Again, 85 is in the interval 66 to 85 which also represents daily demand of 4 tires.
Definition 4: A random number is a series of digits, say two, from 01, 02,… 99, 00, that
have been selected by a random process- a process where each number has an equal
160
SOLVED PROBLEMS
Problem 1
The daily demand for tire at AA Auto Tire over the past 200 days is shown in the table
below.
Frequency 10 20 40 60 40 30
Simulate the daily demand for tire for a period of 10 days. Use the random numbers 52,
Solution
1 2 3 4 5
161
Step 2. Use the random numbers generated to simulate.
1 52 3
2 37 3
3 82 4
4 69 4
5 98 5
6 96 5
7 33 2
8 50 3
9 88 5
10 90 5
Total = 39
162
Problem 2
Simulate the selection of 10 voters for an opinion poll if overall 25% vote for party X,
30% for part T, 40% for party Z with the remaining abstaining. Use the random numbers:
Solution
X 0.25 0.25 01 – 25
Y 0.30 0.55 26 – 55
Z 0.40 0.95 56 – 95
1 31 Y
2 24 X
3 65 Z
4 05 X
5 84 Z
6 62 Z
7 32 Y
8 12 X
9 00 Abstains
10 18 X
163
Problem 3
A wholesaler stocks an item for which demand is uncertain. He wishes to assess two re-
reorder level of 15 units, to see which is most economical over a 10 day period.
4 0.10
5 0.15
6 0.25
7 0.30
8 0.20
Carrying costs $15.00 per unit per day. Ordering costs $50.00 per order. Loss of good-
will for each unit out of stock is 430.00. Lead time is 3 days. Opening stack is 17 units.
41 92 05 44 66 07 00 00 14 62 20 07 95 05 79 95 64 26 06 48
Note: The reorder level is physical stock plus any replenishment orders outstanding.
164
Solution
4 0.10 0.10 01 – 10
7 0.30 0.80 51 – 80
2 11 8 3 $45.00 $45.00
3 3 4 $30.00 $30.00
5 9 7 2 $30.00 $30.00
6 2 4 $60.00 $60.00
8 11 4 7 $105.00 $105.00
9 7 5 2 $30.00 $30.00
165
Opening Closing Order Carrying stock out Total
1 17 5 12 $180.00 $180.00
3 8 8
4 5 $150.00 $150.00
6 3 8 $150.00 $150.00
7 7 $210.00 $210.00
9 4 4
10 6 $180.00 $180.00
166
Problem 4
The number of ships docking at any given night at Tema habour ranges from 0 to 5. The
A study by the dock superintendent reveals that the number of ships unloading also tends
to vary day to day. The table below provides information on the daily unloading rate.\
The principle of loading at the habour is on a first –in, first-out basis (FIFO). Any ship
not unloaded on the day of arrival must wait until the following day. He decides that
before requesting for additional crews, he should conduct a simulation study of arrivals,
unloading and delays. Conduct a 15-day simulation to find out the following:
167
b. Average nightly arrivals.
Solution
1 2 3 4 5 6 7
2 0 06 0 0 63 0*1
3 0 50 3 3 28 3
4 0 88 4 4 02 1
5 3 53 3 6 74 4
6 2 30 1 3 35 3
7 0 10 0 0 24 0*2
8 0 47 3 3 03 1
9 2 99 5 7 29 3
10 4 37 2 6 60 3
11 3 66 3 6 74 4
12 2 97 5 7 85 4
13 3 65 2 5 90 4
14 1 32 2 3 73 3*3
15 0 00 5 5 59 3
20 41 39
a. Average number of ships delayed till the next day = 20 delays/15 days
168
b. Average nightly arrivals = 41 arrivals/15 days
Comments:
Column 2: Contains number of ships delayed from the previous day. This is obtained by
Column 3: Contains random numbers. These are used to select the number of nightly
arrivals.
Column 4: Contains the number of ships that arrive in the night.. It is determined from
column 3.
Column 5: Contains the total number of ships that are to be unloaded. Determined as
Column 6: Contains random numbers. Used to select the number of ships to be unloaded
NOTE:
NOTE 1( 0*1 ) = Three (3) ships are to be unloaded on day 2. However there were no
NOTE 3 (3*3) = This time, four (4) ships were to be unloaded but because only 3 were in
169
Problem 5
homeowners and install for them. The owner Jerry Higgins likes the idea of having a
large supply on hand to meet any customer demand. However, he also recognizes that it
is expensive to do so. He examines hot water sales over the past 50 weeks and noted the
following:
b. What is the average number of sales per wee over the 20-week period?
c. Using analytic nonsimulation technique, what is the expected number of sales per
week.?
170
Solution:
4 0.12 01 – 12
5 0.10 13 – 22
6 0.18 23 – 40
7 0.24 41 – 64
8 0.16 65 – 80
9 0.14 81 – 94
10 0.06 95 – 00
1 10 4 11 08 4
2 24 6 12 48 7
3 03 4 13 66 8
4 32 6 14 97 10
5 23 6 15 03 4
6 59 7 16 96 10
7 95 10 17 46 7
8 34 6 18 74 8
9 34 6 19 77 8
10 51 7 20 44 7
171
a. with a supply of 8 heaters Higgins will stock out 3 times during the 20 week
= 135/20
= 6.86 heaters
With a longer time simulation, these two approaches will lead to even closer results.
Problem 6
A rural clinic receives a delivery of fresh plasma once each week from a central blood
bank. The supply varies according to demand from other clinics and hospitals in the
region but ranges between four and nine pints of the most widely used blood type, type
O. The number of patients per week requiring this blood varies from 0 to 4, and each
patient may need from 1 to 4 pints. Given the following delivery quantities, patient
distribution, and demand per patient, what will be the number of pints of blood that will
be in excess or short for a six-week period. Use simulation to derive your answer.
172
Delivery quantities Patient information Demand per patient
Pints per Probability Patients per Probability Demand probability
week
week requiring
blood
4 0.15 0 0.25 1 0.40
8 0.15 4 0.05
9 0.10
At the end of the sixth week, there were 14 pints of blood on hand.
173
Exercises
Exercises 1
probabilities 0.5, 0.3, or 0.2 respectively. The following random numbers have been
generated: 13, 14, 02, 18, 31, 19, 32, 85, 31, and 94. Use the numbers to generate the
number of breakdowns for 10 consecutive days. What proportion of these days had at
least 1 breakdown?
Answer: 0, 0, 0, 0, 0, 0, 0, 2, 0, 2
Exercises 2
Marissa grocery store has noted the following figures with regard to the number of people
who arrive at the store’s three check-out stand and the time it takes to check them out..
0 0.3 1 0.1
1 0.5 2 0.3
2 0.2 3 0.4
4 0.2
Simulate the utilization of the check-out stands over 5 minutes using the following
random numbers: 07 60 77 49 76 95 51 16
174
Exercises 3
Kate More sells papers at a newspaper stand for $0.35. The papers cost her $0.25 giving
her a $0.10 profit on each paper she sells. From past experience Kate knows that:
Assuming that Kate believes the cost of a lost sale to be $0.05, and any unsold paper
costs her $0.25. Simulate her profit outlook over 5 days if she orders 200 papers for each
of the 5 days. Use the random numbers 52, 06, 50, 88, 53
Average = $12.50
Exercises 4
The number of cars arriving at XX cars wash during the last 200 hours of operation is
observed to be the following.
Number of cars arriving Frequency
3 or less 0
4 20
5 30
6 50
7 60
8 40
9 or more 0
Total 200
175
a. Set up a probability and cumulative probability distribution for the variable of car
arrivals.
c. Simulate 15 hours of car arrivals and compute the average number of arrivals per
50 27 45 81 66
Answer.
Exercises5
The time between arrivals of the drive-through window of XX fast food restaurant
follows the distribution given below. The service time distribution is also given.
176
Time between arrivals Probability Service time Probability
1 0.2 1 0.3
2 0.3 2 0.5
3 0.3 3 0.2
4 0.2
a. Use the random numbers provided to simulate the activity of the first five arrivals.
Assume that the window opens at 11.00 am and that the first arrival occurs
Answer
1 11.01 3 11.04
2 11.04 2 11.06
3 11.06 2 11.08
4 11.07 1 11.09
Exercises 6
Tira Thompson owns and operates one of the largest Mercedes-Benz auto dealerships in
Washington DC. In the past 36 months, his sales have ranged from a low of 6 new cars to
a high of 12 new cars as reflected in the table below. Mr. Thompson believes that sales
will continue during the next 24 months at about the same historical rates, and that
delivery will also continue to follow the following pace.
177
Sales of new cars/month Frequency
6 3
7 4
8 6
9 12
10 9
11 1
12 1
Mr. Thompson’s current policy is to order 14 cars at a time (2 full truckloads, with 7
autos on each truck) and to place a new order whenever the stock on hand reaches 12
autos. What are the results of this policy when simulated over the next 2 years?
Answer:
The average demand is 8.75
The average lead time is 1.86
The average end inventory is 6.56
The average cost sales is 4.04
The daily demand for books at AA Bookshop for the past 200 days is shown in the table
below.
Demand for books 0 1 2 3 4 5
Frequency 10 20 40 60 40 30
178
UNIT 8
OBJECTIVES
By the end of the unit, you should be able to:
1. Identify and formulate Linear Programming Problems.
2. Solve Linear Programming Problems using the simplex method.
3. Identify and explain the status resources from the optimum simplex tableau.
4. Identify and explain dual (shadow) prices from the optimum simplex tableau.
Note: In order to achieve these objectives, you need to spend a minimum of four (4)
hours and a maximum of six (6) hours working through the sessions.
179
SESSION 8.1: INTRODUCTION
The simplex method is the general procedure for solving LP problems. It was developed
by George Dantzig in 1947.The simplex method is an algorithm.
The Simplex algorithm is a method (or computational procedure) for determining basic
feasible solutions to a system of equations and testing the solutions for optimality.
To develop a general solution method, the LP problem must be put in a common format,
which we will call the standard form. The properties of this form are as follows:
i. All the constraints are equations.
ii. All the variables are nonnegative.
iii. The objective function may be maximization or minimization.
180
Now consider the constraint
3X1 + 2X2 –X3 6
Since the left side is not smaller than the right side, subtract a surplus
variable S2 0 from the left hand side to obtain the equation
3X1 + 2X2 –X3 – S2 = 6
ii. The right side of an equation can always be made nonnegative by multiplying
both sides of the equation by –1(negative one).
For example,
3X1 + 2X2 –X3 = -6 is mathematically equivalent to
-3X1 -2X2 +X3 = 6
iii. The direction of an inequality is reversed when both sides are multiplied by –1
(negative one)
For example, whereas 2<4, -2> -4. Thus, the inequality
5X1 + 2X2 –X3 -6 can be replaced by
-5X1 - 2X2 +X3 6
181
Procedure:
1. Initialization step:
a. Express the objective function in the standard form and convert the inequalities to
equations by adding slack variables.
Z -5X1-3X2 = 0
6X1 + 2X2 + S1 =36
5X1 + 5X2 + S2= 40
2X1 + 4X2 + S3 =28
b. Express the constraint equations in matrix form
x1
6 2 1 0 0 x 2 36
5 5 0 1 0 S 40
1
2 4 0 0 1 S 2 28
S 3
d. Read the first initial basic feasible solution. Select the original variables to be the
initial non-basic variables (set equal to zero) and the slack variables to be the
initial basic variables.
That is:X1= 0 and X2 = 0. Hence S1= 36, S2 = 40 and S3 = 28
182
2. Iteration step:
a. Determine the entering basic variable by selecting a variable with the negative
coefficient having the largest absolute value. That column becomes the pivot
column. In this case, the number is –5, and X1 becomes the pivot column.
b. Determine the leaving basic variable using the minimum ratio test. This is done
by using each coefficient in the pivot column to divide the elements of the
constants. The row with the smallest ratio (called pivot row) determines the
variable to leave the basis. The process of selecting the variable to be included
and the variable to be excluded is called change of basis.. In the current example,
36 36 40 28
is the smallest ratio . So row one(1) is the pivot row. Since
6 6 5 2
the unit vector with one(1) in the first row appears under S1, S1 leaves the basis.
c. Determine the new basic feasible solution by pivoting.. Pivoting involves
converting the pivot element to one(1) and all the other elements in the pivot
column to zero(0).The pivot number/element is the number at the intersection of
the column of the variable entering the basis(i.e. the element at the intersection of
the pivot row and the pivot column) In this case the number is 6 This is done
using Gaussian elimination method. As follows:
i. Multiply the pivot row by the reciprocal of the pivot element. In this
1
case, multiply by .
6
ii. Having reduced the pivot element to one(1), clear the pivot column as
follows:
183
Add 5 times row 2 to row 1
Subtract 5 times row 2 from row 3
Subtract 2 times row 1 from row 4
3. Optimization step:
The current basic feasible solution is optimal if and only if every coefficient in equation
1(the objective function) is non-negative. If it is then stop, otherwise go to the iteration
step to obtain the next basic feasible solution
184
Converting the pivot element (10/3) to one and all the other elements in the pivot column
to zero(0) as follows:
i. Multiply the pivot row by the reciprocal of the pivot element. In this case,
3
multiply by
10
ii. Having reduced the pivot element to one(1), clear the pivot column as
follows:
Add 4/3 times row 3 to row 1
Subtract 1-3 times row 3 from row 2
Subtract 10/3 times row 3 from row 4
Since there are no negatives indicators left in the first row(objective function), this is the
optimal solution. The maximum value of Z is read from the constant column. In this case,
it is 34.
185
There are no slacks in the two constraints, indicating that the first two inputs are all used
up. However, 6 units of the third input remain unused.
EXAMPLE 2:
Maximize: Z = 3XE+2XI
Subject to:
XE+2XI 6
2XE+2XI 8
-XE+XI 1
XI 2
XE, XI 0
Procedure:
1. Initialization step:
i. Express the objective function in the standard form and convert the
inequalities to equations by adding slack variables.
Z - 3XE-2XI + 0S1+ 0S2+ 0S3+ 0S4=0
XE+2XI + S1 +0S2+ 0S3+ 0S4 =6
2XE+2XI+ 0S1 + S2 + 0S3+ 0S4 = 8
-XE+XI + 0S1 + 0S2+ S3+ 0S4 =1
XI + 0S1+ 0S2+ 0S3+ S4 = 2
xE
1 2 1 0 0 0 x I 6
2 1 0 1 0 0 S1 8
1 1 0 0 1 0 S 2 1
0 1 0 0 0 1 S 3 2
S 4
186
iii. Set up an initial Simplex Tableau composed of the coefficient matrix of the
constraint equations and the column vector of the constant set above a row of
the indicators which are the coefficients of the objective function in the
standard form and a zero coefficient for each slack variable.
iv. Read the first initial basic feasible solution. Select the original variables to be
the initial non-basic variables (set equal to zero) and the slack variables to be
the initial basic variables.
That is: XE= 0 and XI = 0. Hence S1= 6, S2 = 8, S3 = 1 and S4= 2
2. Iteration step:
i. Determine the entering basic variable by selecting a variable with the
negative coefficient having the largest absolute value. That column
becomes the pivot column. In this case, the number is –3, and XE
becomes the pivot column.
ii. Determine the leaving basic variable using the minimum ratio test.
This is done by using each coefficient in the pivot column to divide the
elements of the constants. The row with the smallest ratio (called pivot
row) determines the variable to leave the basis. The process of
selecting the variable to be included and the variable to be excluded is
called change of basis. In the current example, 8/2 is the smallest ratio
187
(8/2< 6/1). So row one(1) is the pivot row. Since the unit vector with
one(1) in the first row appears under S1, S1 leaves the basis.
iii. Determine the new basic feasible solution by pivoting.. Pivoting
involves converting the pivot element to one (1) and all the other
elements in the pivot column to zero (0). The pivot number/element is
the number at the intersection of the column of the variable entering
the basis (i.e. the element at the intersection of the pivot row and the
pivot column) In this case the number is 2 This is done using
Gaussian elimination method. As follows:
i. Multiply the pivot row by the reciprocal of the pivot element. In this
case, multiply by 1/2.
ii. Having reduced the pivot element to one(1), clear the pivot column as
follows:
Add 3 times row 3 to row 1
Subtract row 3 from row 2
Add row 3 to row 4
Maintain row 5
188
Basic Equation/ Coefficient of
Variables Row Z XE XI S1 S2 S3 S4 Constant
Z 1 1 0 –½ 0 3/2 0 0 12
S1 2 0 0 3/2 1 –½ 0 0 2
S2 .3 0 1 ½ 0 ½ 0 0 4
S3 4 0 0 3/2 0 ½ 1 0 5
S4 5 0 1 0 0 0 1 2
The second feasible solution can be read from the second tableau by setting X I =0 and
S2 =0 and we will be left with an identity matrix which gives XE =4, S1 = 2 S3 = 5 and S4
= 2.
3. Optimization step:
The current basic feasible solution is optimal if and only if every coefficient in equation
1(the objective function) is non-negative. If it is then stop, otherwise go to the iteration
step to obtain the next basic feasible solution
Since there is a negative coefficient in equation 1 (the objective function), we continue
the iteration. The only negative indicator is –½. So XI is introduced into the basis and it
becomes the pivot column. Dividing the constants’ column by the pivot column shows
that the smallest ratio is in the second row. Thus, 3/2 becomes the new pivot element (i.e.
the number at the intersection of the pivot row and pivot column)
Converting the pivot element (3/2) to one and all the other elements in the pivot column
to zero (0) as follows:
i. Multiply the pivot row by the reciprocal of the pivot element. In this
case, multiply by 2/3
189
Basic Equation/ Coefficient of
Variables Row Z XE XI S1 S2 S3 S4 Constant
Z 1 1 0 –½ 0 3/2 0 0 12
S1 2 0 0 1 2/3 –1/3 0 0 2/(3/2)=4/3
S2 .3 0 1 ½ 0 ½ 0 0 4/ (½ )=8
S3 4 0 0 3/2 0 ½ 1 0 5/(3/2)=10/3
S4 5 0 1 0 0 0 1 2/1=2
ii. Having reduced the pivot element to one(1), clear the pivot column as
follows:
Add ½ times row 2 to row 1
Subtract ½ times row 2 from row 3
Subtract 3 times row 2 from row 4
Subtract row 2 from row 5
The third feasible solution can be read from the tableau. Setting S1 = 0, S2 = 0, we have an
identity matrix which gives XE = 10/3, XI = 4/3, S3 = 3 and S4 = 2/3
Since there are no negatives indicators left in the first row(objective function), this is the
optimal solution. The maximum value of Z is read from the constant column. In this case,
it is 12 2/3
190
SESSION 8.4: INTERPRETING THE SIMPLEX TABLEAU
Illustration
Maximize Z=3X1+2X2
Subject to: X1+2X2 6( raw material A)
2X1+2X2 8( raw material B)
X1+X2 1( raw material C)
X1 2( raw material D)
X1, X2 0
191
8.4.2: Status of the resources:
A constraint is classified as scarce or abundant depending respectively on whether or not
the optimum solution consumes (uses) the entire available amount of the associated
resources. This can be deduced from the final(optimal) simplex tableau by observing the
values of the slack variables.
i. A positive slack means that the resource is used completely, which means it is
abundant
ii. A zero slack indicates that the entire amount of resource is consumed (used)
by the activities of the model.
For the above example, we have the following:
RESOURCE SLACK STATUS
192