Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Why Intelligent Coiled Tubing?: © 2010 Baker Hughes Incorporated. All Rights Reserved. 4

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Why Intelligent Coiled Tubing?

•Allowed deployment of entire 313 metre


interval in one run.
•Accurate depth control of the perforating
assembly.
•Concerns over sanding and rig time if
wireline deployed.
•Only the first run on wireline would be
underbalanced.
•Concerns over the reliability of tractors in
this high debris environment.
•Projected 7 days to perforate this interval
with wireline.
•It took less than 60 hours on coil.
12/8/2013 © 2010 Baker Hughes Incorporated. All Rights Reserved.
4

You might also like