THE SITE AREA OF BUS TERMINAL AT VADODARA IS 22,325 SQMT AND BUILT-UP AREA IS 1.8
TIMES THE SITE AREA (40,150 SQMT) AS IT ALSO INCORPORATES SHOPPING MALL. IT IS
INAUGURATED IN 14TH OF FEBRURY, 2014 BY OUR PRIME-MINISTER SHREE NARENDRA MADI.
RIGHT NOW, THE TERMINUS ALREADY HANDLES OVER 800 BUSES AND AS MANY AS 28,000 TO
35,000 PASSENGERS DAILY.
IT IS BUILT UNDER A PUBLIC-PRIVATE PARTNERSHIP BETWEEN THE GUJARAT STATE ROAD
TRANSPORT CORPORATION (GSRTC) AND REALTY FIRM CUBE CONSTRUCTION.
THE TERMINAL HAS 4 ACCESSES : 1st IS BUS ENTRY, 2nd IS BUS EXIT, 3rd IS PUBLIC ENTRY
DIRECTLY TO THE TERMINAL, AND 4th IS THROUGH THE SHOPPING AREA.
THE SITE IS WEST FACING AND THE ROAD WIDTH IS 18m PEOPLE AS WELL AS BUSSES ACCESSES
THROUGH.
RAILWAY STATION IS LOCATED JUST OPPOSITE THE ACCESS ROAD (0.2km) AND AIRPORT IS
5.2km AWAY FROM THE BUS TERMINUS.
17
11 16
15
14
13
11
12
8
9
7 10
6 5
18
4
19
3
4 3 2
5 4 2
4 3
THE SET-BACK AREA IS USED AS SERVICE GALLERY AND THERE ARE 3 CHECK THE GUARDS & THE FIRE FIGHTING
KITCHEN, D.G., ELECTIC PANEL, STORE, CREW TOILET & POINT : 2 IN THE BOTH SWEEPERS WORK SYSTEM IS PROVIDED
POTABLE WATER FACILITATES THERE. THERE ARE 2 END OF CORRIDORE CONTINOUSLY IN THE AFTER EVERY 12m IN
D.G.s OF 630 kWa & 250 kWa AND 2 BORES FOR SAPERATING MALL & WHOLE BUILDING. THE BUILDING ON EACH
WATER SUPPLY. BUS STATION AND 1 IS FLOOR.
IN THE ENTRANCE OF
MALL.
THERE ARE 3 SPOT OF THERE IS A CHART TO THE BUS STAND IS FRINDLY TO PHISICALLY CHELLENGED A CAFETERIA WITH THE
POTABLE WATER ADDRESS PUBLIC WHERE PEOPLE AS PROVIDED RAMPS. HOWEVER THE SITTING FOR 15 PEOPLE
SERVICE : 1 FOR THE THEY WANT TO GO. IT IS DOREMETRY AND 1st CLASS WAITTING HALL AND IS THERE FOR SERVE
CREW AND 2 FOR IN PURE GUJRATI. GUEST ROOM CAN’T BE ACCESSIBLE TO THEM AS THEY PEOPLE 24x7.
PUBLIC. R.O.PLANT IS ARE PROVIDED ON 2nd AND 3rd LEVEL.
PROVIDED ON THE TOP
OF BUILDING.
BUILDING IS BASED THE OPENINGS ARE COVERED WITH FERROCEMENT STRUCTURE AND A BEAM IS GRANITE ON
UPON R.C.C. FRAME PROVIDED THROUGH PLATEFORMS TO STOP THE TYRE OF BUSES. STAIRCASES.
STRUCTURE. THE
PATHWAYS ARE
COVERED WITH
FERROCEMENT
STRUTURE.
ITS FAÇADE SHOWS
BANIYAN TREE AS THE
MEANING OF NAME OF
CITY IS INCRESE IN
EVERY FIELD. BUS INTERFACE IS THERE IS PLYWOOD AND ALUMINIUM FALSE CEILING AT THE SEMI-OPEN SPACES
PURELY & SIMPLY WHOLE BUILDING HOLDING THE LIGHTING SYSTEM IN LIKE PATHWAYS HAVE
CONCRETE CEMENTED IT. ANTI-SKID TILES.
PAVEMENT.
ADMINISTRATIVE DEPT. ATTRIUM FALSE CEILING THERE IS PROVISION OF GLASS FAÇADE AT THE TRADITIONAL GUJRAT
IS AT B-1 LEVEL AND PATTERN IS SO THAT IT 400 TWO-WHEELERS & FRONT. THEME AT THE
MADE UP OF DO NOT STOP NATURAL 275 FOUR-WHEELERS. ENTRANCE OF MALL.
ALUMINIUM GLASS LIGHT TO COME IN.
PARTITION.
MRIDUL BHANDARI (B.ARCH | V – YR. / X – SEM.)
THESIS TOPIC : INTER-STATE BUS TERMINUS FOR UDAIPUR CITY
BUDDHA INSTITUTE OF ARCHITECTURE & TOWN PLANNING
10
UDAIPUR (313001), RAJASTHAN
LIVE CASE STUDY – I | CENTRAL BUS STATION, VADODARA | CONCLUSION
CENTRAL BUS STATION OF VADODARA IS NEWLY INNOGRATED ABOUT AN YEAR AGO AND WELL MANAGED BY GSRTC & CUBE
CONSTRUCTION ENGINEERING LTD AT PUBLIC PRIVATE PARTNERSHIP FOR 31 YEAR BOND.
THE PROJECT LAYOUT AND DESIGN WITH BLEND OF BUS TERMINAL AND COMMERCIAL FACILITIES IS COMPLETELY INNOVATIVE AND
ACCOMMODATES HIGHEST LEVEL OF COMFORT AND CONVENIENCE FOR PUBLIC.
THE BUS STATION PROJECT WILL SHORTLY INTRODUCE AT AHMEDABAD WITH THE SAME COMPANY AT PPP MODEL.
THE COMPANY IS AIMED TO PROVIDE THE HIGHEST/ LATEST STANDARD OF PASSENGER COMFORT AT BUS TERMINAL AND ALSO TO
PROVIDE INNOVATIVE STRUCTURE WITH INTERNATIONAL QUALITY STANDARD AT AFFORDABLE PRICES FOR COMMERCIAL OUT LETS.
THE BUILDING IS FRIENDLY FOR PHYSICALLY CHELLANGED PEOPLE. THE DOREMETRY, GUEST ROOMS AND 1st CLASS WAITLING HALL
ARE NOT ACCESSIBLE TO PHYSICALLY CHELLENGED PEOPLE AS
THERE ARE FIRE EXTENGUISHERS AND SPRINKLRES AT SEVERAL THEY ARE ON DIFFERENT LEVELS.
POINTS FOR FIRE FIGHTING.
THE ADMINISTRATIVE AREA WHICH IS ON B-1 FLOOR IS POORLY
THERE IS A MALL AREA CONNECTED WITH THE BUS STATION SO CONSTUCTED WITH ALUMINIUM GLASS WORK AND IS NOT
THE PEOPLE WHO HAVE TO WAIT CAN UTILIZE THEIR TIME IN THE VENTILATED AT ALL.
MALL.
THE CAMPUS DON’T HAVE FUEL FILLING STATION IN IT.
THE BUILDING HAVE SECURITY CHECK POINT AT 3 PLACES FOR