Hazard Mapping: Location: New Building Fourth Floor-Rm 16
Hazard Mapping: Location: New Building Fourth Floor-Rm 16
Hazard Mapping: Location: New Building Fourth Floor-Rm 16
DEPARTMENT OF EDUCATION
Region IV-A CALABARZON
SCHOOLS DIVISION OF BIÑAN CITY
HAZARD MAPPING
VULNERABILITY
HAZARDS OBSERVED RISK CAPACITY RECOMMENDATION
Highly Vulnerable Vulnerable Less Vulnerable
Broken window Cuts and wounds / To be fix
Busted plugs/ light bulbs/ Fix and change bulb
Electrical facilities Electricution / To be fix
Exposed electrical wires To be fix
Broken door knobs Prone to lost of property / Replacement
Recommendation for maintena
No ramps for elevated school buildings Inaccesibility to PWD / and improvement of the facili
MARICEL G. GARCIA
SDRRMC Coordinator
Date: 7-Feb-19
To be fix
and change bulb
To be fix
To be fix
End of School Year
Replacement School Administration, Teachers, April 2019. To be
Students, Parents and other included in the
dation for maintenance Stakeholders Brigada Eskwela
ovement of the facility Plan
Repair
Noted By
APRIL CLAIRE P. MANLANGIT
Adviser
Republic of the Philippines
DEPARTMENT OF EDUCATION
Region IV-A CALABARZON
SCHOOLS DIVISION OF BIÑAN CITY
HAZARD MAPPING
VULNERABILITY
HAZARDS OBSERVED RISK CAPACITY RECOMMENDATIO
Highly Vulnerable Vulnerable Less Vulnerable
Warning Sign is not evident Unawareness of hazard / Fabricate a durable signage f
No posted emergency hotlines around the school Difficulty of immediate response / Fabricate a durable signage f
Garbage area Segregation Management / Alocate garbage bins with
Broken toilet bowl and / or sinks Health and Sanitation / Recommendation for mainte
improvement of the fa
Evaluated By:
APRIL CLAIRE P. MANLANGIT
Teachers Submitted to:
MARICEL G. GARCIA
SDRRMC Coordinator
Date: 7-Feb-19
Prevention/ Mitigation