Hoisting and Rigging Safety Manual: Infrastructure Health & Safety Association
Hoisting and Rigging Safety Manual: Infrastructure Health & Safety Association
Hoisting and Rigging Safety Manual: Infrastructure Health & Safety Association
Safety Manual
ISBN-13: 978-0-919465-70-1
TABLE of CONTENTS
Introduction 1
The information covers not only ropes and knots but hoisting equipment from cranes to chainfalls
and rigging hardware from rope clips to spreader beams. Equally important is the attention paid at
every point to correct procedures for inspection, maintenance, and operation.
Knowledge of the equipment and materials with which we work is one of the most important
factors in occupational health and safety. Each item has been designed and developed to serve a
specific purpose. Recognizing its capabilities and limitations not only improves efficiency but
minimizes hazards and helps prevent accidents.
This manual identifies the basic hazards in rigging and hoisting, explains the safeguards necessary
to control or eliminate these hazards, and spells out other essential safety requirements.
The information should be used in conjunction with the applicable regulations by contractors,
supervisors, operators, riggers, and others delivering or receiving instruction in the basics of safe
rigging and hoisting.
The Occupational Health and Safety Act is based on the “internal responsibility” concept for
management and workers. This encourages both groups to work out solutions to health and safety
problems with the guidance of the Ministry of Labour.
The Act provides us with the framework and the tools to achieve a safe and healthy workplace. It
sets out the rights and duties of all parties in the workplace. It establishes procedures for dealing
with job-site hazards and provides for enforcement of the law where compliance has not been
achieved voluntarily.
Over the years the Act has been revised to meet the changing requirements of Ontario’s
workplaces.
1
Regulations
There are various regulations under the Act for construction in particular.
The most extensive is the Construction Regulation (Ontario Regulation 213/91). There are also
special regulations for controlled products under the Workplace Hazardous Materials Information
System (WHMIS) and for designated substances such as asbestos.
Construction regulations are generally based on health and safety problems that have recurred
over the years. In many cases, the regulations have been proposed jointly by management and
labour groups as a means of controlling or eliminating problems that have historically resulted in
fatalities, lost-time injuries, and occupational diseases.
The Construction Regulation has been periodically revised over the years.
Review Ontario’s Occupational Health and Safety Act, the Construction Regulation, and other
applicable health and safety regulations to make sure that you know what to expect from others
on the job – and what others expect from you.
2
Section 1
3
Section 1
4
Elements that can Affect Hoisting Safety
– Working Load Limit (WLL) not known. Don’t assume. Know the working load limits of the
equipment being used. Never exceed these limits.
– Defective components. Examine all hardware, tackle, and slings before use. Destroy
defective components. Defective equipment that is merely discarded may be picked up and
used by someone unaware of its defects.
– Questionable equipment. Do not use equipment that is suspected to be unsafe or
unsuitable, until its suitability has been verified by a competent person.
– Hazardous wind conditions. Never carry out a hoisting or rigging operation when winds
create hazards for workers, the general public, or property. Assess load size and shape to
determine whether wind conditions may cause problems. For example, even though the
weight of the load may be within the capacity of the equipment, loads with large wind-
catching surfaces may swing or rotate out of control during the lift in high or gusting winds.
Swinging and rotating loads not only present a danger to riggers—there is the potential for
the forces to overload the hoisting equipment.
– Weather conditions. When the visibility of riggers or hoist crew is impaired by snow, fog,
rain, darkness, or dust, extra caution must be exercised. For example, operate in “all slow”,
and if necessary, the lift should be postponed. At sub-freezing temperatures, be aware that
loads are likely to be frozen to the ground or structure they are resting on. In extreme cold
conditions avoid shock-loading or impacting the hoist equipment and hardware, which may
have become brittle.
– Electrical contact. One of the most frequent killers of riggers is electrocution. An electrical
path can be created when a part of the hoist, load line, or load comes into close proximity to
an energized overhead powerline. When a crane is operating near a live powerline and the
load, hoist lines, or any other part of the hoisting operation could encroach on the minimum
permitted distance (see table on the next page), specific measures described in the
Construction Regulation must be taken. For example, constructors must have written
procedures to prevent contact whenever equipment operates within the minimum permitted
distance from a live overhead powerline. The constructor must have copies of the procedure
available for every employer on the project.
– Hoist line not plumb. The working
load limits of hoisting equipment apply
only to freely suspended loads on
plumb hoist lines. If the hoist line is not
plumb during load handling, side loads
are created which can destabilize the
equipment and cause structural failure
or tip-over, with little warning.
5
Keep the Minimum Distance from Powerlines
Minimum
Normal phase-to-phase voltage rating distance
Beware:
The wind can blow powerlines, hoist lines, or your load.
This can cause them to cross the minimum distance.
This crane boom could reach within
the minimum distance.
6
Slings
After the hoist rope, the sling is the most commonly used piece of rigging equipment. Observe the
following precautions with slings.
• Never use damaged slings. Inspect slings regularly to ensure their safety. Check wire rope slings
for kinking, wear, abrasion, broken wires, worn or cracked fittings, loose seizings and splices,
crushing, flattening, and rust or corrosion. Pay special attention to the areas around thimbles
and other fittings.
• Slings should be marked with an identification number and their maximum capacity on a flat
ferrule or permanently attached ring. Mark the capacity of the sling for a vertical load or at an
angle of 45°. Ensure that everyone is aware of how the rating system works.
• Avoid sharp bends, pinching, and crushing. Use loops and thimbles at all times. Corner pads
that prevent the sling from being sharply bent or cut can be made from split sections of large-
diameter pipe, corner saddles, padding, or blocking.
Ensure that Slings are Protected at All Sharp Corners on Heavy Items
For heavy
structural
members.
Radius of contact
should be equal to
1 rope lay.
7
• Never allow wire rope slings, or any wire rope, to lie on the ground for long periods of time or on
damp or wet surfaces, rusty steel, or near corrosive substances.
• Avoid dragging slings out from underneath loads.
• Keep wire rope slings away from flame cutting and electric welding.
• Never make slings from discarded hoist rope.
• Avoid using single-leg wire rope slings with hand-spliced eyes. The load can spin, causing the
rope to unlay and the splice to pull out. Use slings with Flemish Spliced Eyes.
NO!
SEVERE BENDING
8
If L is greater than S then sling angle is OK.
• Multi-leg slings. With slings having more than two legs and a rigid load, it is possible for some
of the legs to take practically the full load while the others merely balance it. There is no way of
knowing that each leg is carrying its fair share of the load.
As a result, when lifting rigid objects with three- or four-leg bridle slings, make sure that at least
two of the legs alone can support the total load. In other words, consider multi-leg slings used
on a rigid load as having only two legs.
When using multi-leg slings to lift loads in which one end is much heavier than the other (i.e.,
some legs simply provide balance), the tension on the most heavily loaded leg(s) is more
important than the tension on the more lightly loaded legs. In these situations, slings are selected
to support the most heavily loaded leg(s). Do not treat each leg as equally loaded (i.e., do not
divide the total weight by the number of legs.) Keep in mind that the motion of the load during
hoisting and travel can cause the weight to shift into different legs. This will result in increases
and decreases on the load of any leg.
9
• When using choker hitches, forcing the eye down towards the load increases tension in the sling,
which can result in rope damage. Use thimbles and shackles to reduce friction on the running line.
Incorrect – Cutting Correct – Use thimbles Incorrect – Shackle Correct – Shackle pin
action of in the eyes. pin bearing cannot turn.
eye splice on running
on running line can
line. work loose.
• Rig loads to prevent any parts from shifting or dislodging during the lift. Suspended loads should
be securely slung and properly balanced before they are set in motion.
• Keep the load under control at all times. Use one or more taglines to prevent uncontrolled
motion.
• Loads must be safely landed and properly blocked before being unhooked and unslung.
• Lifting beams should be plainly marked with their weight and designed working loads, and
should only be used for their intended purpose.
• Never wrap the hoist rope around the load. Attach the load to only the hook, with slings or other
rigging devices.
• The load line should be brought over the load’s centre of gravity before the lift is started.
• Keep hands away from pinch points as slack is being taken up.
• Wear gloves when handling wire rope.
• Make sure that everyone stands clear when loads are being lifted, lowered, and freed of slings.
As slings are being withdrawn, they may catch under the load and suddenly fly loose.
11
• Before making a lift, check to see that the sling is properly attached to the load.
• Never work under a suspended load.
• Never make temporary repairs to a sling. Procedures for proper repair should be established and
followed.
• Secure or remove unused sling legs of a multi-leg sling before the load is lifted.
• Never point-load a hook unless it is designed and rated for such use.
• Begin a lift by raising the load slightly to make sure that the load is free and that all sling legs are
taking the load.
• Avoid impact loading caused by sudden jerking during lifting and lowering. Take up slack on the
sling gradually. Avoid lifting or swinging the load over workers below.
• When using two or more slings on a load, ensure that they are all made from the same material.
• Prepare adequate blocking before loads are lowered. Blocking can help prevent damage to
slings.
12
Determining Load Weights
A key step in rigging is determining the weight of the load that will be hoisted.
You can obtain the load’s weight from shipping papers, design plans, catalogue data,
manufacturer’s specifications, and other dependable sources. On erection plans, the size of steel
beams is usually provided along with their weight and length. If weight information is not provided,
you will have to calculate it.
Calculating weight
You can calculate the approximate weight of a steel object using a standard weight and applying
the formulas for area and volume. The standard weight for steel is: 1 square foot of steel an inch
thick will weigh about 40 pounds.
Applying that standard weight for steel to calculate the weight of two steel plates measuring
1 1/2” x 3’ x 6’ results in the following:
2 (sheets) x 1.5” (thickness) x 3’ x 6’ (area) x 40 lb (weight per square foot, 1” thick) = 2160 pounds.
[2 x 1.5 x 3 x 6 x 40 = 2160 pounds]
WEIGHT = 40 lbs.
STEEL
13
Calculating the weight of various shapes of steel
To estimate the weight of various shapes of steel, it helps to envision the steel object as a flat
plate—visually separate the parts, or imagine flattening them into rectangles.
Angle iron has a structural shape that can be considered a bent plate. If you flattened the angle
iron, the result is a plate. For example, 5 x 3 x 1/4-inch angle iron would flatten out to
approximately a 1/4-inch plate that is 8 inches wide.
Once you have figured out the flattened size, the volume and weight can be calculated like we did
in the previous section. Since the calculations for the standard weight of steel is expressed in
square feet per inch thickness, the 8-inch width must be divided by 12 to get the fraction of a foot
that it represents. The 1/4” thickness is already expressed as a fraction of one inch. In this case,
the angle iron weighs approximately 6.67 pounds (40 lb x 8” ÷ 12” x 1/4” = 6.67). Multiply this
weight by the length (in feet) to get the total weight.
Plates are often rolled into tanks or other shapes. In order to calculate the weight of a circular or
spherical piece of steel, first you need to determine the square foot area. To determine the square
foot area, you have to figure out the circumference (the distance CIRCUMFERENCE
around the edge of the circle) and the area. To get the circumference
of a circle, multiply the diameter by 3.14.
14
Load Weight Determination
Figure 1.2
For other materials the weights are normally based on their weight per cubic foot, so you have to
determine how many cubic feet of material (the volume) you are hoisting in order to estimate the weight.
For example, suppose you have a bundle of spruce lumber to hoist and the bundle is 12 ft. long,
3’ high and 4’ wide. (Fig. 1.3) The weight per cubic foot from Table 1.2 is 28 lbs., so the weight of
this bundle is 12 x 3 x 4 x 28 = 4,032 Ibs.
The time taken to calculate the approximate weight of any object, whether steel, plates, columns,
girders, castings, bedplates, etc., is time well spent and may save a serious accident through
failure of lifting gear. The following tables of weights of various materials (Tables 1.1, 1.2, 1.3)
should enable any rigger to compute the approximate weight of a given load. When in doubt, do
not lift the load. Seek assistance from others who know, or can help determine, the load’s weight.
In hoisting and rigging applications, sometimes you will need to account for resistive forces. One
example is when hoist lines are being used over pulleys to change the direction of the hoist line.
Another example is when loads are being pulled along a surface. Pulleys and rollers on the ground
will add some resistance that must be included in load calculations.
Caution:
Though widely used because of its simplicity, this method provides an approximate value that is higher than
the actual force required. The formula is more accurate for slight inclines (1:5) than steep inclines (1:1). Table 1
shows the difference between the actual pull required and the pull calculated. This simplified method is
adequate for most applications. You may need more accurate calculations for large loads.
15
Exercise
Calculate the force of the load in the following situation. A 15-ton compressor is to be lowered 10
feet. A ramp has been built with a horizontal run of 50 feet.
Formula
F (total force) = W x H ÷ L (lift force) + .05W (horizontal force or resistance)
The slope of the ramp is 10 divided by 50 or 1/5th; so the force required is then 15 tons times 1/5th,
plus 5% of 15 tons to allow for friction.
This is equal to 3 tons plus .75 tons. Therefore the required pull is 3.75 tons.
With a winch, use its rated capacity for vertical lifting rather than its horizontal capacity so that you
maintain an adequate margin of safety.
Table 2 lists some examples of coefficients of friction. Note that some of the combinations of
materials have a considerable range of values.
16
Table 1.1 – APPROXIMATE WEIGHT PER FOOT OF LENGTH
OF ROUND STEEL BARS AND RODS
Approximate Approximate
Weight Weight
Material Material
Lbs. Per Lbs. Per
Cubic Foot Cubic Foot
17
Table 1.3 – WEIGHTS OF MATERIALS (Based on Surface Area)
Approximate Approximate
Weight Weight
Material Material
Lbs. Per Lbs. Per
Square Foot Square Foot
CEILINGS FLOORING
(Per Inch of Thickness) (Per Inch of Thickness)
Plaster board 5 Hardwood 5
Acoustic and fire resistive tile 2 Sheathing 2.5
Plaster, gypsum-sand 8 Plywood, fir 3
Plaster, light aggregate 4 Wood block, treated 4
Plaster, cement sand 12 Concrete, finish or fill 12
ROOFING Mastic base 12
Three-ply felt and gravel 5.5 Mortar base 10
Five-ply felt and gravel 6.5 Terrazzo 12.5
Three-ply felt, no gravel 3 Tile, vinyl inch 1.5
Five-ply felt, no gravel 4 Tile, linoleum 3/16 inch 1
Shingles, wood 2 Tile, cork, per 1/16 inch 0.5
Shingles, asbestos 3 Tile, rubber or asphalt 3/16 inch 2
Shingles, asphalt 2.5 Tile, ceramic or quarry 3/4 inch 11
Shingles, 1⁄4 inch slate 10 Carpeting 2
Shingles, tile 14 DECKS AND SLABS
PARTITIONS Steel roof deck 1 1/2” – 14 ga. 5
Steel partitions 4 – 16 ga. 4
Solid 2” gypsum-sand plaster 20 – 18 ga. 3
Solid 2” gypsum-light agg. plaster 12 – 20 ga. 2.5
Metal studs, metal lath, 3/4” – 22 ga. 2
plaster both sides 18 Steel cellular deck 1 1/2” – 12/12 ga. 11
Metal or wood studs, plaster – 14/14 ga. 8
board and 1/2” plaster both sides 18 – 16/16 ga. 6.5
Plaster 1/2” 4 – 18/18 ga. 5
Hollow clay tile 2 inch 13 – 20/20 ga. 3.5
3 inch 16 Steel cellular deck 3” – 12/12 ga. 12.5
4 inch 18 – 14/14 ga. 9.5
5 inch 20 – 16/16 ga. 7.5
6 inch 25 – 18/18 ga. 6
Hollow slag concrete block 4 inch 24 – 20/20 ga. 4.5
6 inch 35 Concrete, reinforced, per inch 12.5
Hollow gypsum block 3 inch 10 Concrete, gypsum, per inch 5
4 inch 13 Concrete, lightweight, per inch 5-10
5 inch 15.5 MISCELLANEOUS
6 inch 16.5 Windows, glass, frame 8
Solid gypsum block 2 inch 9.5 Skylight, glass, frame 12
3 inch 13 Corrugated asbestos 1/4 inch 3.5
MASONRY WALLS Glass, plate 1/4 inch 3.5
(Per 4 Inch of Thickness) Glass, common 1.5
Brick 40 Plastic sheet 1/4 inch 1.5
Glass brick 20 Corrugated steel sheet, galv. – 12 ga. 5.5
Hollow concrete block 30 – 14 ga. 4
Hollow slag concrete block 24 – 16 ga. 3
Hollow cinder concrete block 20 – 18 ga. 2.5
Hollow haydite block 22 – 20 ga. 2
Stone, average 55 – 22 ga. 1.5
Bearing hollow clay tile 23 Wood Joists – 16” ctrs. 2 x 12 3.5
2 x 10 3
2x8 2.5
Steel plate (per inch of thickness) 40
18
Section 2
19
Section 2
Fibre Ropes, Knots, Hitches
Fibre rope is a commonly used tool which has many applications in daily hoisting and rigging
operations.
Readily available in a wide variety of synthetic and natural fibre materials, these ropes may be used as
There are countless situations where the rigger will be required to tie a safe and reliable knot or
hitch in a fibre rope as part of the rigging operation. Fastening a hook, making eyes for slings, and
tying on a tagline are a few of these situations.
This section addresses the correct selection, inspection, and use of fibre rope for hoisting and
rigging operations. It also explains how to tie several knots and hitches.
Characteristics
The fibres in these ropes are either natural or synthetic. Natural fibre ropes should be used
cautiously for rigging since their strength is more variable than that of synthetic fibre ropes and they
are much more subject to deterioration from rot, mildew, and chemicals.
Polypropylene is the most common fibre rope used in rigging. It floats but does not absorb water.
It stretches less than other synthetic fibres such as nylon. It is affected, however, by the ultraviolet
rays in sunlight and should not be left outside for long periods. It also softens with heat and is not
recommended for work involving exposure to high heat.
Nylon fibre is remarkable for its strength. A nylon rope is considerably stronger than the same size
and construction of polypropylene rope. But nylon stretches and hence is not used much for
rigging. It is also more expensive, loses strength when wet, and has low resistance to acids.
Polyester ropes are stronger than polypropylene but not so strong as nylon. They have good
resistance to acids, alkalis, and abrasion; do not stretch as much as nylon; resist degradation from
ultraviolet rays; and don’t soften in heat.
All fibre ropes conduct electricity when wet. When dry, however, polypropylene and polyester have
much better insulating properties than nylon.
20
Inspection
Inspect fibre rope regularly and before each use. Any estimate of its capacity should be based on
the portion of rope showing the most deterioration.
Check first for external wear and cuts, variations in the size and shape of strands, discolouration,
and the elasticity or “life” remaining in the rope.
Untwist the strands without kinking or distorting them. The inside of the rope should be as bright
and clean as when it was new. Check for broken yarns, excessively loose strands and yarns, or an
accumulation of powdery dust, which indicates excessive internal wear between strands as the
rope is flexed back and forth in use.
If the inside of the rope is dirty, if strands have started to unlay, or if the rope has lost life and
elasticity, do not use it for hoisting.
Check for distortion in hardware. If thimbles are loose in the eyes, seize the eye to tighten the
thimble (Figure 2.1). Ensure that all splices are in good condition and all tucks are done up (Figure
2.2).
21
Working Load Limit
The maximum force that you should load a component is the working load limit (WLL). The WLL
incorporates a safety factor (SF). The SF provides additional protection above the manufacturer’s
design factor (DF). The design factor is the safety factor to which the manufacturer builds. The SF
and DF do not provide added capacity. You must never exceed the WLL.
Let’s calculate the WLL of a chain or gin wheel rated at 1000 pounds with a manufacturer’s DF of 3.
In this example, the chain or gin wheel has a stamped capacity of 1000 pounds, but, in compliance
with the Construction Regulation, it can safely lift a maximum capacity of 600 pounds.
The manufacturer’s DF provides a layer of safety that has been determined by the manufacturer.
The SF, if greater than the DF, adds an additional layer of safety to meet the requirements of users
and regulators. Together, these added layers of safety provide protection above the MBS to
account for reduced capacity due to
If you notice rope that is defective or damaged, cut it up to prevent it from being used for hoisting.
Note: Section 172 (1) (d) of the Construction Regulation requires a minimum SF of 5.
For more critical lifts that could risk life, limb, or property, a SF of 10 to 15 may
be necessary.
In this example, to meet the WLL you must use a rope with an MBS of 1,250 to hoist or lower
a WL of 250 pounds. See manufacturers’ specifications to select the appropriate type of rope.
Similar to synthetic slings, you should only use clearly identified rope for hoisting. Identify all
new rope by attaching a strong label showing the manufacturer’s information.
22
Care
• To unwind a new coil of fibre rope, lay it flat with the inside end closest to the floor. Pull the inside
end up through the coil and unwind counterclockwise.
• After use, recoil the rope clockwise. Keep looping the rope over your left arm until only about 15
feet remain. Start about a foot from the top of the coil and wrap the rope about six times around
the loops. Then use your left hand to pull the bight back through the loops and tie with a couple
of half-hitches to keep the loops from uncoiling ( Figure 2.5).
Figure 2.5
• Remove kinks carefully. Never try to pull them straight. This will severely damage the rope and
reduce its strength.
• When a fibre rope is cut, the ends must be bound or whipped to keep the strands from
untwisting. Figure 2.6 shows the right way to do this.
Figure 2.6
23
Storage
• Store fibre ropes in a dry cool room with good air circulation – temperature 10-21°C (50-70°F)
humidity 40-60%.
• Hang fibre ropes in loose coils on large diameter wooden pegs well above the floor (Figure 2.7).
Figure 2.7
• Protect fibre ropes from weather, dampness, and sunlight. Keep them away from exhaust gases,
chemical fumes, boilers, radiators, steam pipes, and other heat sources.
• Let fibre ropes dry before storing them. Moisture hastens rot and causes rope to kink easily. Let
a frozen rope thaw completely before you handle it. Otherwise fibres can break. Let wet or frozen
rope dry naturally.
• Wash dirty ropes in clean cool water and hang to dry.
Use
• Never overload a rope. Apply the design factor of 5 (10 for ropes used to support or hoist
personnel). Then make further allowances for the rope’s age and condition.
• Never drag a rope along the ground. Abrasive action will wear, cut, and fill the outside surfaces
with grit.
• Never drag a rope over rough or sharp edges or across itself. Use softeners to protect rope at
the sharp comers and edges of a load.
• Avoid all but straight line pulls with fibre rope. Bends interfere with stress distribution in fibres.
• Always use thimbles in rope eyes. Thimbles cut down on wear and stress.
• Keep sling angles at more than 45°. Lower angles can dramatically increase the load on each
leg (Figure 2.8). The same is true with wire rope slings.
24
• Never use fibre rope near welding or flame cutting. Sparks and molten metal can cut through the
rope or set it on fire.
• Keep fibre rope away from high heat. Don’t leave it unnecessarily exposed to strong sunlight,
which weakens and degrades the rope.
• Never couple left-lay rope to right-lay.
• When coupling wire and fibre ropes, always use metal thimbles in both eyes to keep the wire
rope from cutting the fibre rope.
• Make sure that fibre rope used with tackle is the right size for the sheaves. Sheaves should have
diameters at least six – preferably ten – times greater than the rope diameter.
Figure 2.8
25
Knots
Wherever practical, avoid tying knots in rope. Knots, bends, and hitches reduce rope strength
considerably. Just how much depends on the knot and how it is applied. Use a spliced end with a
hook or other standard rigging hardware such as slings and shackles to attach ropes to loads.
In some cases, however, knots are more practical and efficient than other rigging methods, as for
lifting and lowering tools or light material.
For knot tying, a rope is considered to have three parts (Figure 2.9).
Bight
End
Standing Part
Figure 2.9
The end is where you tie the knot. The standing part is inactive. The bight is in between.
Following the right sequence is essential in tying knots. Equally important is the direction the end
is to take and whether it goes over, under, or around other parts of the rope.
There are overhand loops, underhand loops, and turns (Figure 2.10).
Figure 2.10
WARNING – When tying knots, always follow the directions over and under precisely. If one part
of the rope must go under another, do it that way. Otherwise an entirely different knot – or no knot
at all – will result.
Once knots are tied, they should be drawn up slowly and carefully to make sure that sections
tighten evenly and stay in proper position.
26
Bowline
Never jams or slips when properly tied. A universal knot if properly tied and untied. Two interlocking
bowlines can be used to join two ropes together. Single bowlines can be used for hoisting or hitching
directly around a ring.
Used to tie a bowline in the middle of a line or to make a set of double-leg spreaders for lifting pipe.
Bowline
27
Pipe Hitch
Running Bowline
The running bowline is mainly used for hanging objects
with ropes of different diameters. The weight of the
object determines the tension necessary for the knot to
grip.
Running Bowline
28
Figure-Eight Knot
This knot is generally tied at the end of a rope to temporarily prevent the strands from unlaying.
The figure-eight knot can be tied simply and quickly and will not jam as easily as the overhand knot.
It is also larger, stronger, and does not injure the rope fibres. The figure-eight knot is useful in
preventing the end of a rope from slipping through a block or an eye.
To tie the figure-eight knot, make an underhand loop (1). Bring the end around and over the
standing part (2). Pass the end under and then through the loop (3). Draw up tight (4).
29
Section 3
䡲 Wire Rope
䡲 Sling Configurations
䡲 Sling Angles
䡲 Centre of Gravity
䡲 Sling WLLs
䡲 Sling Types
䡲 Rigging Hardware
䡲 Hoisting Tips
30
Section 3
The rigger must be able to rig the load to ensure its stability when lifted. This requires a knowledge
of safe sling configurations and the use of related hardware such as shackles, eyebolts, and wire
rope clips.
Determining the working load limits of the rigging equipment as well as the weight of the load is a
fundamental requirement of safe rigging practice.
Do not use any equipment that is suspected to be unsafe or unsuitable until its suitability has been
verified by a competent person.
The working load limits of all hoisting equipment and rigging hardware are based on almost ideal
conditions seldom achieved in the field. It is therefore important to recognize the factors such as
wear, improper sling angles, point loading, and centre of gravity that can affect the rated working
load limits of equipment and hardware.
This section describes the selection and safe use of various types of slings and different kinds of
rigging hardware. Subjects include factors that can reduce capacity, inspection for signs of wear,
calculating safe sling angles, and requirements for slings and hardware under the Regulations for
Construction Projects.
Wire Rope
Selection
Proper rope selection will protect workers, the public, and property from harm and will get the job
done well. An experienced rigger will be familiar with hoisting hazards and will have the best
knowledge base for selecting the most appropriate rope for a specific lift. Some of the main
aspects to consider are strength, diameter, grade, and the type of construction.
31
• compatible with the sheaves and drum of the crane
• lubricated to prevent corrosion and wear.
4. The rope must not be spliced.
5. The rope must have its end connections securely fastened and kept with at least three full turns
on the drum.
6. Rotation-resistant wire rope must not be used as cable for boom hoist reeving and pendants, or
where an inner wire or strand is damaged or broken.
A properly selected rope will
• withstand repeated bending without failure of the wire strands from fatigue
• resist abrasion
• withstand distortion and crushing
• resist rotation
• resist corrosion.
Types of Construction
The number of wires in a rope is an important factor in determining a rope’s characteristics. But
the arrangement of the wires in the strand is also important.
Basic Types
The four basic constructions are illustrated in Figure 1 :
1. Ordinary – all wires are the same size.
2. Warrington – outer wires are alternately larger and smaller.
3. Filler – small wires fill spaces between larger wires.
4. Seale – wires of outer layer are larger diameter than wires of inner layer.
On ropes of Ordinary construction the strands are built in layers. The basic seven-wire strand
consists of six wires laid around a central wire. A nineteen-wire strand is constructed by adding a
layer of twelve wires over a seven-wire strand. Adding a third layer of eighteen wires results in a
37-wire strand.
In this type of construction the wires in each layer have different lay lengths. This means that the
wires in adjacent layers contact each other at an angle. When the rope is loaded the wires rub
against each other with a sawing action. This causes eventual failure of the wires at these points.
32
BASIC WIRE ROPE CONSTRUCTIONS
Figure 1
33
Wire Rope Inspection
It is essential to have a well-planned program of regular inspection carried out by an experienced
inspector.
All wire rope in continuous service should be checked daily during normal operation and inspected
on a weekly basis. A complete and thorough inspection of all ropes in use must be made at least
once a month. Rope idle for a month or more should be given a thorough inspection before it is
returned to service.
A record of each rope should include date of installation, size, construction, length, extent of
service and any defects found.
The inspector will decide whether the rope must be removed from service. His decision will be
based on:
Broken Wires
Occasional wire breaks are normal for most ropes and are not critical provided they are at well
spaced intervals. Note the area and watch carefully for any further wire breaks. Broken wire ends
should be removed as soon as possible by bending the broken ends back and forth with a pair of
pliers. This way broken ends will be left tucked between the strands.
Construction regulations under The Occupational Health and Safety Act establish criteria for
retiring a rope based on the number of wire breaks.
Enlarged
view of
single strand
Figure 2
34
Snagged wires resulting from drum crushing
With no more than 2 layers on drum, With more than 2 layers on drum, there is danger
use any kind of rope. of crushing. Use larger rope or IWRC rope.
35
Rope Stretch
All steel ropes will stretch during initial periods of use. Called “constructional stretch”, this condition
is permanent. It results when wires in the strands and strands in the rope seat themselves under
load. Rope stretch can be recognized by increased lay length. Six-strand ropes will stretch about
six inches per 100 feet of rope while eight-strand ropes stretch approximately 10 inches per 100
feet. Rope stretched by more than this amount must be replaced.
Corrosion
Corrosion is a very dangerous condition because it can develop inside the rope without being seen.
Internal rusting will accelerate wear due to increased abrasion as wires rub against one another.
When pitting is observed, consider replacing the rope. Noticeable rusting and broken wires near
attachments are also causes for replacement. Corrosion can be minimized by keeping the rope
well lubricated.
HIGH STRANDING
Figure 4
36
Bird Caging
Bird caging is caused by the rope being twisted or by a sudden release of an overload (Figure 5 ).
The rope, or the affected section, must be replaced.
BIRD CAGING
Figure 5
37
Kinks
Kinking is caused by Ioops that have been drawn too tightly as a result of improper handling (Figure
6). Kinks are permanent and will require that the rope, or damaged section, be taken out of service.
Core Protrusion
Core protrusion can be caused by shock loads and/or torsional imbalance (Figure 7). This condition
requires that the rope be taken out of service.
Electrical Contact
Rope subjected to electrical contact will have wires that are fused, discoloured or annealed and
must be removed from service.
These ropes show the severe damage resulting from the use of kinked ropes.
Local wear, distortion, misplaced wires, and early failure are inevitable.
ROPE KINKS
Figure 6
Protrusion of IWRC
from shock loading
CORE PROTRUSION
Figure 7
38
Figure 8 illustrates examples of rope damage, while Table 6 identifies likely causes of typical faults.
Two parallel paths of broken wires indicate bending Wire fractures at the strand or core interface, as distinct
through an undersize groove in the sheath. from crown fractures, caused by failure of core support.
39
Rapid appearance of many broken wires.
A single strand removed from a wire rope subjected
to “strand nicking”. This condition is the result of
adjacent strands rubbing against one another and is
usually caused by core failure due to continued
operation of a rope under high tensile load. The
ultimate result will be individual wire breaks in the
Wear and damage on one side of rope. valleys of the strands.
TABLE 6
FAULT POSSIBLE CAUSE FAULT POSSIBLE CAUSE
Accelerated Wear Severe abrasion from being dragged over the Broken Wires or Improper alignment.
ground or obstructions. Undue Wear on Damaged sheaves and drums.
Rope wires too small for application or wrong One Side of Rope
construction or grade.
Poorly aligned sheaves.
Large fleet angle.
Worm sheaves with improper groove size or Broken Wires Near Rope vibration.
shape. Fittings
Sheaves, rollers and fairleads having rough wear
surfaces.
Stiff or seized sheave bearings. Burns Sheave groove too small.
High bearing and contact pressures. Sheaves too heavy.
Sheave bearings seized.
Rope dragged over obstacle.
Rapid Appearance Rope is not flexible enough. Rope Core Charred Excessive heat.
of Broken Wires Sheaves, rollers, drums too small in diameter.
Overload and shock load.
Excessive rope vibration. Corrugation and Rollers too soft.
Rope speed too high. Excessive Wear Sheave and drum material too soft.
Kinks that have formed and been straightened
out.
Crushing and flattening of the rope. Distortion of Lay Rope improperly cut.
Reverse bends. Core failure.
Sheave wobble. Sheave grooves too big.
Rope Broken Off Overload, shock load. Rope Chatters Rollers too small.
Square Kink.
Broken or cracked sheave flange.
Strand Break Overload, shock load. Rope Unlays Swivel fittings on Lang Lay ropes.
Local wear. Rope dragging against stationary object.
Slack in 1 or more strands.
Crushing and Nicking Rope struck or hit during handling.
Excessive Wear Kinks or bends in rope due to improper handling Bird Cage Sudden release of load.
in Spots in service or during installation.
Vibration of rope on drums or sheaves.
Crushing and Overload, shock load. Strand Nicking Core failure due to continued operation under high
Flattening Uneven spooling. load.
Cross winding.
Too much rope on drum.
Loose bearing on drum.
Faulty clutches.
Rope dragged over obstacle.
40
Procedures and Precautions with Wire Rope
• Ensure that the right size and construction of rope is used for the job.
• Inspect and lubricate rope regularly according to manufacturer’s guidelines.
• Never overload the rope. Minimize shock loading. To ensure there is no slack in the rope, start
the load carefully, applying power smoothly and steadily.
• Take special precautions and/or use a larger size rope whenever
- the exact weight of the load is unknown
- there is a possibility of shock loading
- conditions are abnormal or severe
- there are hazards to personnel.
• Use softeners to protect rope from corners and sharp edges.
• Avoid dragging rope out from under loads or over obstacles.
• Do not drop rope from heights.
• Store all unused rope in a clean, dry place.
• Never use wire rope that has been cut, kinked, or crushed.
• Ensure that rope ends are properly seized.
• Use thimbles in eye fittings at all times.
• Prevent loops in slack lines from being pulled tight and kinking. If a loop forms, don’t pull it out
— unfold it. Once a wire rope is kinked, damage is permanent. A weak spot will remain no matter
how well the kink is straightened out.
• Check for abnormal line whip and vibration.
• Avoid reverse bends.
• Ensure that drums and sheaves are the right diameter for the rope being used.
• Ensure that sheaves are aligned and that fleet angle is correct.
• Sheaves with deeply worn or scored grooves, cracked or broken rims, and worn or damaged
bearings must be replaced.
• Ensure that rope spools properly on the drum. Never wind more than the correct amount of rope
on any drum. Never let the rope cross-wind.
41
Slings
General
Slings are often severely worn and abused in construction. Damage is caused by:
• failure to provide blocking or softeners between slings and load, thereby allowing sharp edges
or comers of the load to cut or abrade the slings
• pulling slings out from under loads, leading to abrasion and kinking
• shock loading that increases the stress on slings that may already be overloaded
• traffic running over slings, especially tracked equipment.
Because of these and other conditions, as well as errors in calculating loads and estimating sling
angles, it is strongly recommended that working load limits be based on a design factor of at least
5:1.
For the same reasons, slings must be carefully inspected before each use.
Sling Angles
The rated capacity of any sling depends on its size, its
configuration, and the angles formed by its legs with the
horizontal.
Sling Configurations
Slings are not only made of various material such as
wire rope and nylon web. They also come in various
configurations for different purposes. Common
configurations are explained on the following pages.
Figure 9
42
Sling Configurations
The term “sling” covers a wide variety of configurations for fibre ropes, wire ropes, chains and
webs. Correct application of slings commonly used in construction will be explained here because
improper application can be dangerous.
The Single Vertical Hitch (Figure 10) supports a load by a single vertical part or leg of the sling.
The total weight of the load is carried by a single leg, the sling angle is 90° (sling angle is measured
from the horizontal) and the weight of the load can equal the working load limit of the sling and
fittings. End fittings can vary but thimbles should be used in the eyes. The eye splices on wire
ropes should be Mechanical-Flemish Splices for best security.
The single vertical hitch must not be used for lifting loose material, lengthy material or anything
difficult to balance. This hitch provides absolutely no control over the load because it permits
rotation. Use single vertical hitches on items equipped with lifting eyebolts or shackles.
Bridle Hitch (Figs 11, 13.). Two, three or four single hitches can be used together to form a bridle
hitch for hoisting an object with the necessary lifting lugs or attachments. Used with a wide
assortment of end fittings, bridle hitches provide excellent load stability when the load is
distributed equally among the legs, the hook is directly over the load’s centre of gravity and the
load is raised level. To distribute the load equally it may be necessary to adjust the leg lengths with
turnbuckles. Proper use of a bridle hitch requires that sling angles be carefully measured to ensure
that individual legs are not overloaded.
Figure 11
43
Because the load may not be distributed evenly when a four-leg sling lifts a rigid load, assume that
the load is carried by two of the legs only and “rate” the four-leg sling as a two-leg sling.
The Single Basket Hitch (Figure 14) is used to support a load by attaching one end of the sling to
the hook, then passing the other end under the load and attaching it to the hook. Ensure that the
load does not turn or slide along the rope during a lift.
44
The Double Basket Hitch (Figure 15) consists of two single basket hitches placed under the
load. On smooth surfaces the legs will tend to draw together as the load is lifted. To counter this,
brace the hitch against a change in contour, or other reliable means, to prevent the slings from
slipping. You must keep the legs far enough apart to provide balance, but not so far apart that they
create angles below 60 degrees from the horizontal. On smooth surfaces, a Double Wrap Basket
Hitch may be a better choice.
RIGHT To prevent
legs from To prevent
slipping slippage keep
angle 60°
or more.
60° or more
The Double Wrap Basket Hitch (Figure 16) is a basket hitch wrapped completely around the load
and compressing it rather than merely supporting it, as does the ordinary basket hitch. The double
wrap basket hitch can be used in pairs like the double basket hitch. This method is excellent for
handling loose material, pipe, rod or smooth cylindrical loads because the sling is in full 360°
contact with the load and tends to draw it together.
This hitch
compresses
the load and
prevents it
from slipping
out of the
slings. Pair of Double Wrap Basket Hitches
45
The Single Choker Hitch (Figure 17) forms a noose in the rope. It does not provide full 360°
contact with the load, however, and therefore should not be used to lift loads difficult to balance
or loosely bundled. Choker hitches are useful for turning loads and for resisting a load that wants
to turn.
Not recommended
when loads are long.
NOTE: Choker hitches are not suited to long loads or loose bundles.
Chokers do not provide full support for loose loads – material can fall out.
46
Using a choker hitch with two legs (Figure 18) provides stability for longer loads. Like the single
choker, this configuration does not completely grip the load. You must lift the load horizontally with
slings of even length to prevent the load from sliding out. You should lift loosely-bundled loads with
a Double Wrap Choker Hitch.
Figure 18
A Double Wrap Choker Hitch (Figure 19) is formed by wrapping the sling completely around the
load and hooking it into the vertical part of the sling. This hitch is in full 360° contact with the load
and tends to draw it tightly together. It can be used either singly on short, easily balanced loads
or in pairs on longer loads.
This hitch
compresses the
load and prevents
it from slipping
out of the sling.
Endless Slings or Grommet Slings (Figure 20) are useful for a variety of applications. Endless
chain slings are manufactured by attaching the ends of a length of chain with a welded or
mechanical link. Endless web slings are sewn. An endless wire rope sling is made from one
continuous strand wrapped onto itself to form a six-strand rope with a strand core. The end is
tucked into the body at the point where the strand was first laid onto itself. These slings can be
used in a number of configurations, as vertical hitches, basket hitches, choker hitches and
combinations of these basic arrangements. They are very flexible but tend to wear more rapidly
than other slings because they are not normally equipped with fittings and thus are deformed when
bent over hooks or choked.
47
NOTE: Ensure that the splice is always clear
of the hooks and load.
Endless or
Grommet
Sling in
Vertical Hitch
Conffiguration
Load
Endless Sling
in Choker
Hitch
Configuration
Braided Slings (Figure 21) are usually fabricated from six to eight small-diameter ropes braided
together to form a single rope that provides a large bearing surface, tremendous strength, and
flexibility in every direction. They are easy to handle and almost impossible to kink. The braided
sling can be used in all the standard configurations and combinations but is especially useful for
basket hitches where low bearing pressure is desirable or where the bend is extremely sharp.
BRAIDED SLINGS
Figure 21
48
Sling Angles
The total weight that you can pick up with a set of slings is reduced when the slings are used at
angles (formed the with horizontal). For instance, two slings used to lift 1000 pounds will have a 500-
pound force on each sling (or leg) at a sling angle of 90 degrees (see Figure 22b). The force on each
leg increases as the angle goes down. At 30 degrees the force will be 1000 pounds on each leg!
Keep sling angles greater than 45 degrees whenever possible. Using any sling at an angle lower than
30 degrees is extremely hazardous. In such cases, an error of 5 degrees in estimating the sling can
be very dangerous. The sharp increase in loading at low angles is clearly shown in Figure 22a.
Low sling angles also create large, compressive forces on the load that may cause buckling—
especially in longer flexible loads.
Figure 22a
Figure 22b
49
Some load tables list sling angles as low as 15° but the use of any sling at an angle less than 30°
is extremely dangerous. Not only are the loads in each leg high at these low angles but an error in
measurement as little as 5° can affect the load in the sling drastically. For example, the data in
Figure 23 illustrates the effect of a 5° error in angle measurement on the sling load. Notice that
there is a 50% error in the assumed load at the 15° sling angle.
Figure 23
50
Centre of Gravity
It is always important to rig the load so that it is stable. The load’s centre of gravity must be directly
under the main hook and below the lowest sling attachment point before the load is lifted (Figure 24).
Unstable
hook is not above
C of G. Load will shift
until C of G is
below hook
Unstable
C of G is above Stable – Hook
lift points. is above center
of gravity.
Centre of gravity is the point around which an object’s weight is evenly balanced. The entire weight
may be considered concentrated at this point. A suspended object will always move until its centre
of gravity is directly below its suspension point. To make a level or stable lift, the crane or hook
block must be directly above this point before the load is lifted. Thus a load which is slung above
and through the centre of gravity will not topple or slide out of the slings (Figure 25).
51
Load in
this leg
is critical
Unstable Stable
The load can topple because the Attachments are
attachments are below the C of G. above the C of G.
If an object is symmetrical in shape and uniform in composition, its centre of gravity will lie at its
geometric centre. The centre of gravity of an oddly shaped object, however, can be difficult to
locate. One way to estimate its location is to guess where the centre of gravity lies, rig the load
accordingly, signal for a trial lift, and then watch the movement of the suspended load. The centre
of gravity will seek to move, within the constraints of your rigging, toward the line drawn vertically
from the hook to the ground (just like a plumb bob). Adjust the sling suspension for the best
balance and stability.
The centre of gravity always seeks out the lowest point toward the ground. For this reason, the
sling attachment points on your load should be located above the centre of gravity whenever
practical. If the sling attachment points lie below the centre of gravity, your load could flip over or
topple.
When the centre of gravity is closer to one sling leg than to the other, the closest sling leg bears a
greater share of the weight.
When a load tilts after it is lifted, the tension increases in one sling leg and decreases on the other
sling leg. If your load tilts, land the load and rig it again to equalize the load on each leg.
52
Working Load Limits
Knowledge of working load limits (WLLs) is essential to the use of ropes, slings, and rigging
hardware. As indicated in previous sections, the working load limit should be stamped, pressed,
printed, tagged, or otherwise indicated on all rigging equipment.
Examples:
53
Sling Angle and WLL
In rigging tables, sling capacities are related to set angles of 90 degrees, 60 degrees, 45 degrees,
and 30 degrees. Measuring angles in the field can be difficult; however, you can determine three
of them with readily available tools. When a 90-degree angle is formed at the crane hook, you can
measure this with a square. It forms two 45-degree angles at the load (see Figure 26).
A 60-degree angle can also be easily identified (see Figure 27). With a two-leg bridal hitch, a 60-
degree angle is formed when the distance between the attachment points on the load equals the
length of the sling leg.
When L = S,
sling angle is 60°
54
Estimating Sling WLLs
Because it is difficult to remember all load, size, and sling angle combinations provided in tables,
some general rules can be used to estimate working load limits for common sling configurations.
Each rule is based on the working load limit of a single vertical hitch of a given size and material
and on the ratio H/L.
H is the vertical distance from the saddle of the hook to the top of the load. L is the distance,
measured along the sling, from the saddle of the hook to the top of the load (Figure 28).
If you cannot measure the entire length of the sling, measure along the sling from the top of the
load to a convenient point and call this distance I. From this point measure down to the load and
call this distance h. The ratio h/l will be the same as the ratio H/L (Figure 28).
The ratio of height (H) to length of the sling (L) provides the reduction in capacity due to the sling
angle. This gives you the value of the reduced capacity of a single vertical hitch. If there are more
than two slings and the load is shared equally by all legs, you can increase this reduced capacity.
The capacity is increased (multiplied) by the number of legs (see 3- and 4-leg hitches on the next
page).
H/L h/l
Figure 28
H/L or h/l will apply equally to the following rules for different sling configurations. The efficiencies
of end fittings must also be considered to determine the capacity of the sling assembly.
REMEMBER: the smaller the sling angle, the lower the working load limit.
55
Bridle Hitches (2-Leg) (Figure 29)
The formula for the WLL of a two-leg bridal hitch is:
WLL (of two-leg hitch) = WLL (of single vertical hitch) x H/L x 2
Three-leg hitches are less susceptible to unequal distribution since the load can tilt and equalize
the loads in each leg. However, lifting an irregularly shaped, rigid load with a three-leg hitch may
develop unequal loads in the sling legs. To be safe, use the formula for a two-leg bridle hitch
under such circumstances.
Note: With 3- and 4-leg bridal hitches, the load can be carried by only two legs while the third
and fourth legs simply balance the load. Therefore, in these situations you should be cautious
and use the formula for a 2-leg configuration.
56
CAUTION
Three- and four-leg bridal hitches are susceptible to unequal weight distribution, which leads
to only two slings taking the full load while the other leg(s) simply balance the load. It is best to
presume this will happen and set up the slings based on a two-leg bridal hitch.
Remember that the rated capacity of a multi-leg sling is based on the assumption that all legs are
used. If this is not the case, de-rate the sling assembly accordingly and hook all unused legs to
the crane hook so they will not become snagged during the lift.
57
Double Basket Hitch
DETERMINING CAPACITY
OF SINGLE CHOKER HITCH
Endless and Grommet Slings
Although grommet slings support a load with two legs, their working load limit is usually taken as
1.5 times the working load limit of a single vertical hitch. This reduction allows for capacity lost
because of sharp bends at the hook or shackle.
58
Two-Leg Choker Hitches
With two-leg choker hitches there are two reductions to consider:
A choker angle less than 45 degrees (formed by the choker) is not recommended due to
extreme loading of the sling. If the angle does go below 45 degrees, use caution because it can
slip tighter during the lift. Apply the following formula: WLL = WLL (of single vertical hitch) x A/B
When you calculate both reductions together, the WLL is calculated as follows:
WLL = WLL (of single vertical hitch) x H/L x 2 x 3/4.
All wire rope slings should be made of improved plow steel with independent wire rope cores to
reduce the risk of crushing. Manufacturers will assist in selecting the rope construction for a given
application.
It is recommended that all eyes in wire rope slings be equipped with thimbles, be formed with
the Flemish Splice and be secured by swaged or pressed mechanical sleeves or fittings. With
the exception of socketed connections, this is the only method that produces an eye as strong as
the rope itself, with reserve strength should the mechanical sleeve or fitting fail or loosen.
The capacity of a wire rope sling can be greatly affected by being bent sharply around pins, hooks
or parts of a load. The wire rope industry uses the term “D/d ratio” to express the severity of bend.
“D” is the diameter of curvature that the rope or sling is subjected to and “d” is the diameter of the
rope.
To prevent
slippage,
keep angle
60° or more.
60° or more
60
Working Load Limit (WLL): Tons of 2000 lbs
UNI-LOC® 6-strand Wire Rope Slings
- 6 x 19, 6 x 26, 6 x 25 and 6 x 36 IWRC -
Design Factor = 5
Vertical Choker 2 Sling Bridle, or single Basket Hitch
Weight of
one 10 ft
long Std
Nom. Loop Sling
Rope w/o any
Dia. hardware
Inch 60˚ 45˚ 30˚ approx. lbs
1/4 0.65 0.48 1.1 0.91 0.65 1.6
3/8 1.4 1.1 2.5 2.0 1.4 3.5
1/2 2.5 1.9 4.4 3.6 2.5 6.8
5/8 3.9 2.9 6.8 5.5 3.9 10.9
3/4 5.6 4.1 9.7 7.9 5.6 16.5
7/8 7.6 5.6 13 11 7.6 23.5
1 9.8 7.2 17 14 9.8 32.5
1-1/8 12 9.1 21 17 12 41.0
1-1/4 15 11 26 21 15 53.5
1-3/8 18 13 31 25 18 68.5
1-1/2 21 16 37 30 21 85.0
1-3/4 28 21 49 40 28 130.0
2 37 28 63 52 37 178.0
2-1/4 44 35 77 63 44 243.0
2-1/2 54 42 94 77 54 315.0
61
Chain Slings
Chain slings are suited to applications requiring flexibility and resistance to abrasion, cutting and
high temperatures.
Alloy steel chain grade 80 is marked with an 8, 80, or 800; grade 100 is marked with a 10, 100, or
1000. Alloy steel chain is the only type which can be used for overhead lifting.
As with all slings and associated hardware, chain slings must have a design factor of 5. In North
America, chain manufacturers usually give working load limits based on a design factor of 3.5 or
4. Always check with manufacturers to determine the design factor on which their working load
limits are based.
If the design factor is less than 5, calculate the working load limit of the chain by multiplying the
catalogue working load limit by the manufacturer’s design factor and dividing by 5.
CATALOGUE WLL x MANUFACTURER’S D.F. = WLL (based on design factor of 5)
5
This chain sling must be de-rated to 9,100 Ibs. for construction applications.
Wherever they bear on sharp edges, chain slings should be padded to prevent links from being
bent and to protect the load. Never tie a knot in a chain sling to shorten the reach. Slings can be
supplied with grab hooks or shortening clutches for such applications.
Inspect chain slings for inner link wear and wear on the outside of the link barrels (Figure 33).
Manufacturers publish tables of allowable wear for various link sizes. Many companies will also
supply wear gauges to indicate when a sling must be retired or links replaced. Gauges or tables
from a particular manufacturer should only be used on that brand of chain since exact dimensions
of a given nominal size can vary from one manufacturer to another.
Wear
Extreme Wear at Bearing Surfaces
A competent worker should check chain slings for nicks and gouges that may cause stress
concentrations and weaken links (Figure 34). If nicks or gouges are deep or large in area, or reduce
link size below allowable wear, remove the chain from service. Any repairs must be done according
to manufacturers’ specifications.
62
The depth of all chips, cuts, etc., must
not exceed that allowed by manufacturer.
Working Load Limit (WLL): LBS Working Load Limit (WLL): LBS
RIGGER’S CHOICE Chain Slings®
RIGGER’S CHOICE® Chain Slings
- Grade 80 Overhead Lifting Chain - - Grade 80 Overhead Lifting Chain -
Design Factor = 4 Design Factor = 4
Vertical Choker 2 Sling Bridle, or single Basket Hitch 2-leg Adjustable Bridle (ADOS- 3 & 4-leg Bridle Sling (TOS/QOS)
Weight of
one 10ft
long chain
leg with
Nom. Link and Nom.
Chain Hook Chain
Dia. (SOS) Dia.
inch 60˚ 45˚ 30˚ approx lbs inch 60˚ 45˚ 30˚ 60˚ 45˚ 30˚
9/32 3,500 2,800 6,100 4,900 3,500 9.5 9/32 6,100 4,900 3,500 9,100 7,400 5,200
3/8 7,100 5,680 12,300 10,000 7,100 20.0 3/8 12,300 10,000 7,100 18,400 15,100 10,600
1/2 12,000 9,600 20,800 17,000 12,000 36.7 1/2 20,800 17,000 12,000 31,200 25,500 18,000
5/8 18,100 14,480 31,300 25,600 18,100 53.5 5/8 31,300 25,600 18,100 47,000 38,500 27,100
3/4 28,300 22,640 49,000 40,000 28,300 89.0 3/4 49,000 40,000 28,300 73,500 60,000 42,400
For Design Factor 5:1 for Construction sites multiply values by .80. For Design Factor 5:1 for Construction sites multiply values by .80.
Remove alloy lifting chain from service if you detect:
For Choker Bridle For Double Basket
Cuts,
Sling, multiply Hitch multiply above
cracks,
values by 3/4. values by 2. Links
gouged, Links
burned, or which are which are
corroded bent twisted
Wear of more
than 10%
Links which are Check master links and hooks. Hooks must be
stretched or close removed if opened up or twisted. Slings with
NOTES: 1) Values for Chokers valid only if A is greater than 30˚. up and get longer no, or unreadable tags must be discarded. Do
2) Do not use Chain if exposed to temperatures over 260˚ C (500˚ F).
NOT try to repair the sling yourself.
3) Remove chain from service if links are bent or stretched (more than
5%) or hooks are bent open (latches don’t close anymore). NOTES: 1) Do not use Chain if exposed to temperatures over 260˚ C (500˚ F).
4) Do NOT knot chain to shorten it. Use proper chain shorteners. 2) Do NOT knot chain to shorten it. Use proper chain shorteners.
5) Do NOT try to repair the chain yourself. Consult Unirope 3) Do NOT try to repair the chain yourself.
6) In regular intervals have chain inspected, proof-loaded, and re-certified. 4) In regular intervals have chain inspected, proof-loaded, and re-certified.
63
Synthetic Web Slings
Web slings are available in two materials – nylon and polyester (Dacron). Nylon is resistant to many
alkalis whereas polyester is resistant to many acids. Consult the manufacturer before using web
slings in a chemical environment. Nylon slings are more common but polyester slings are often
recommended where headroom is limited since they stretch only half as much as nylon slings.
– Their relative softness and width create much less tendency to mar or scratch finely machined,
highly polished or painted surfaces and less tendency to crush fragile objects than fibre rope,
wire rope or chain slings (Figure 35).
– Because of their flexibility, they tend to mold themselves to the shape of the load (Figure 36).
– They do not rust and thus will not stain ornamental precast concrete or stone.
– They are non-sparking and can be used safely in explosive atmospheres.
– They minimize twisting and spinning during lifting.
– Their light weight permits ease of rigging, their softness precludes hand cuts, and the danger of
harm from a free-swinging sling is minimal.
– They are elastic and stretch under load more than either wire rope or chain and can thus absorb
heavy shocks and cushion loads. In cases where sling stretching must be minimized, a sling of
larger load capacity or a polyester sling should be used.
64
Endless or Grommet Slings – both ends of one piece of webbing lapped and sewn to form a
continuous piece. They can be used as vertical hitches, bridle hitches, in choker arrangements or
as basket hitches. Because load contact points can be shifted with every lift, wear is evenly
distributed and sling life extended (Figure 37).
Standard Eye-and-Eye – webbing assembled and sewn to form a flat body sling with an eye at
each end and eye openings in the same plane as the sling body. The eyes may be either full web
width or tapered by being folded and sewn narrower than the webbing width (Figure 38).
TAPERED EYES
Twisted Eye – an eye-and-eye with twisted terminations at both ends. The eye openings are at 90°
to the plane of the sling body. This configuration is available with either full-width or tapered eyes
(Figure 39).
65
TWISTED EYE SLINGS
Figure 39
In place of sewn eyes, web slings are available with metal end fittings. The most common are
triangle and choker hardware. Combination hardware consists of a triangle for one end of the sling
and a triangle/rectangle (choker attachment) for the other end. With this arrangement, choker and
basket as well as straight hitches may be rigged. Such attachments help reduce wear in the sling
eyes and thus lengthen sling life (Figure 40).
Choker Sling
66
Despite their inherent toughness, synthetic web slings can be cut by repeated use around sharp-
cornered objects and abraded by continually hoisting rough-surfaced loads.
Protective devices offered by most sling manufacturers can minimize these effects.
– Buffer strips of leather, nylon, or other materials sewn on the body of the sling protect against
wear (Figure 41A). Leather pads are most resistant to wear and cutting, but are subject to
weathering and deterioration. They are not recommended in lengths over six feet because their
stretch characteristics differ from those of webbing. On the other hand, nylon web wear pads
are more resistant to weathering, oils, grease and most alkalis. Moreover they stretch in the
same ratio as the sling body.
– Edge guards consist of strips of webbing or leather sewn around each edge of the sling (Figure
41B). This is necessary whenever sling edges are subject to damage.
– Sleeve or sliding tube wear pads are available for slings used to handle material with sharp
edges. The pads are positioned on the sling where required, will not move when the sling
stretches, adjust to the load and cover both sides of the sling (Figure 41C).
A – REGULAR. This is the type that is sewn on to give B – EDGE GUARD. A strip of webbing or leather is sewn
fixed protection at expected wear points. They can around each end of the sling. This is necessary for
be sewn anywhere on the sling, at any length on certain applications where the sling edges are
one side or on both sides. subject to damage.
WEB SLING
Figure 41
– Reinforcing strips sewn into the sling eyes double or triple the eye thickness and greatly
increase sling life and safety.
– Coatings provide added resistance to abrasion and chemicals as well as a better grip on
slippery loads. Coatings can be brightly coloured for safety or load rating.
– Cotton-faced nylon webbing affords protection for hoisting granite and other rough-surfaced
material.
The rated capacity of synthetic web slings is based on the tensile strength of the webbing, a design
factor of 5 and the fabrication efficiency. Fabrication efficiency accounts for loss of strength in the
webbing after it is stitched and otherwise modified during manufacture. Fabrication efficiency is
typically 80 to 85% for single-ply slings but will be lower for multi-ply slings and very wide slings.
Although manufacturers provide tables for bridle and basket configurations, these should be used
with extreme caution. At low sling angles one edge of the web will be overloaded and the sling will
tend to tear (Figure 42).
67
If the sling angle is too low,
the web can tear here.
Slings with aluminum fittings should never be used in acid or alkali environments. Nylon and
polyester slings must not be used at temperatures above 194°F (90°C).
Inspect synthetic web slings regularly. Damage is usually easy to detect. Cuts, holes, tears, frays,
broken stitching, worn eyes and worn or distorted fittings, and burns from acid, caustics or heat
are immediately evident and signal the need for replacement. Do not attempt repairs yourself.
Heat or Acid Burns Abraided web, faded colour NO knots in any sling
(UV degradation)
Cuts
Snags & Punctures
Crushed webbing
Damaged Eye
Sling Handling
Wrong
Right
Right Wrong
Wrong
For handling loads that would damage the mesh, or for handling loads that the mesh would
damage, the slings can be coated with rubber or plastic.
Note that there is no reduction in working load limit for the choker hitch. This is because the hinge
action of the mesh prevents any bending of individual wire spirals. Check the manufacturer’s rating
for the WLL of the specific sling you are using.
69
Fibre Rope Slings
Fibre rope slings are preferred for some applications because they are pliant, grip the load well and
do not mar its surface. They should be used only on light loads, however, and must never be used
on objects that have sharp edges capable of cutting the rope or in applications where the sling will
be exposed to high temperatures, severe abrasion or acids.
The choice of rope type and size will depend on the application, the weight to be lifted and the
sling angle. Before lifting any load with a fibre rope sling, be sure to inspect the sling carefully. Fibre
slings, especially manila, deteriorate far more rapidly than wire rope slings and their actual strength
is very difficult to estimate.
Like other slings, fibre rope slings should be inspected regularly. Look for external wear and
cutting, internal wear between strands, and deterioration of fibres.
Open up the rope by untwisting the strands but take care not to kink them. The inside of the rope
should be as bright and clean as when it was new. Check for broken or loose yarns and strands.
An accumulation of powder-like dust indicates excessive internal wear between strands as the
rope is flexed back and forth during use.
70
Rigging Hardware
Know what hardware to use, how to use it, and how its working load limits (WLL) compare with the
rope or chain used with it.
All fittings must be of adequate strength for the application. Only forged alloy steel load-rated hardware
should be used for overhead lifting. Load-rated hardware is stamped with its WLL (Figure 44).
Inspect hardware regularly and before each lift. Telltale signs include:
– wear
– cracks
– severe corrosion
– deformation/bends
– mismatched parts
– obvious damage.
Hoisting Hooks
• Should be equipped with safety catches (except for sorting or grab hooks).
• Should be forged alloy steel with WLL stamped or marked on the saddle.
• Should be loaded at the middle of the hook. Applying the load to the tip will load the hook
eccentrically and reduce the safe working load considerably.
• Should be inspected regularly and often. Look for wear, cracks, corrosion, and twisting –
especially at the tip – and check throat for signs of opening up (Figure 45).
71
Safety Tip
Whenever two or more ropes are to be placed over a hook, use a shackle to reduce wear and tear
on thimble eyes.
When using U-bolt clips, make sure you have the right type of clip. Forged alloy clips are
recommended. Always make certain that U-bolt clips are attached correctly. The U-section must
be in contact with the dead end of the rope. Tighten and retighten nuts as required by the
manufacturer.
To determine the number of clips and the torque required for specific diameters of rope, refer to
Figure 46. For step-by-step instructions on attaching clips, refer to Figure 47.
Clip Length of
& rope
rope Minimum to turn Required
size No. of back Torque
inch clips in inches in Ft.Lbs
3/16 2 3-3/4 7.5
1/4 2 4-3/4 15
5/16 2 5-1/4 30
3/8 2 6-1/2 45
7/16 3 7 65
1/2 3 11-1/2 65
9/16 3 12 95
5/8 3 12 95
3/4 4 18 130
7/8 4 19 225
1 5 26 225
1-1/8 6 34 225
1-1/4 7 44 360
1-3/8 7 44 360
1-1/2 8 54 360
Reprinted with permission from UNIROPE Ltd.
Figure 46
72
STEP 1
STEP 2
STEP 3
STEP 4
Apply
Tension
STEP 5
Apply
Tension
Figure 47
73
Swivels
• Reduce bending loads on rigging attachments by allowing the load to orient itself freely.
• Should be used instead of shackles in situations where the shackle may twist and become
eccentrically loaded.
Shackles
• Available in various types (Figure 49).
• For hoisting, should be manufactured of forged alloy steel.
• Do not replace shackle pins with bolts (Figure 50). Pins are designed and manufactured to
match shackle capacity.
• Check for wear, distortion, and opening up (Figure 51). Check crown regularly for wear. Discard
shackles noticeably worn at the crown.
• Do not use a shackle where it will be pulled or loaded at an angle. This severely reduces its
capacity and opens up the legs (Figure 52).
• Do not use screw pin shackles if the pin can roll under load and unscrew (Figure 53).
74
Never replace a shackle pin
with a bolt
Screw pin anchor shackle Round pin anchor shackle Safety type anchor shackle
Figure 49 Figure 50
Figure 51
Packings Hook Don’t use a screw pin shackle if the pin can roll
under load and unscrew.
Figure 52 Figure 53
75
Eye Bolts
• For hoisting, use eye or ring bolts of forged alloy steel.
• Use bolts with shoulders or collars. Shoulderless bolts are fine for vertical loading but can bend
and lose considerable capacity under angle loading (Figure 54). Even with shoulders, eye and
ring bolts lose some capacity when loaded on an angle.
• Make sure that bolts are at right angles to hole, make contact with working
surface, and have nuts property torqued (Figure 55).
• Pack bolts with washers when necessary to ensure firm, uniform contact with
working surface (Figure 55).
• Make sure that tapped holes for screw bolts are deep enough for uniform grip
(Figure 55).
• Apply loads to the plane of the eye, never in the other direction (Figure 55). This
is particularly important with bridle slings, which always develop an angular
pull in eye bolts unless a spreader bar is used.
• Never insert the point of a hook in an eye bolt. Use a shackle instead (Figure 55).
Swivel Eye Bolt
• Do not reeve a sling through a pair of bolts. Attach a separate sling to each bolt.
Correct Incorrect
Shoulderless eye and ring bolts are If shoulderless eye and ring bolts are pulled at an
designed for vertical loads only. angle as shown, they will either bend or break.
Results In
Figure 54
WRONG
RIGHT
Use Swivel
Right Hoist Rings
Wrong where
possible
76
Reprinted with permission from UNIROPE Ltd.
Correct for Shoulder Type Eye & Ring Bolts
Providing loads are reduced to account for angular loading.
Incorrect
Pack with
washers to
ensure that
shoulder is
firmly in
contact
with
surface.
RESULT
Incorrect
Figure 55
Snatch Blocks
• A single or multi-sheave block that opens on one side so a rope can be slipped
over the sheave rather than threaded through the block (Figure 56).
• Available with hook, shackle, eye, and swivel end fittings.
• Normally used when it’s necessary to change the direction of pull on a line.
Stress on the snatch block varies tremendously with the angle between the lead
and load lines. With both lines parallel, 1000 pounds on the lead line results in
2000 pounds on the block, hook, and anchorage. As the angle between the lines
increases, the stress is reduced (Figure 57).
• To determine the load on block, hook, and anchorage, multiply the pull on the
lead line or the weight of the load being lifted by a suitable factor from the table
in Figure 19.33 and add 10% for sheave friction.
When Open
Figure 56
77
2000 POUNDS 1840 POUNDS
1000 POUNDS
1000 POUNDS
Figure 57
10° 1.99
20° 1.97
30° 1.93
40° 1.87
45° 1.84
50° 1.81
60° 1.73
70° 1.64
80° 1.53
90° 1.41
100° 1.29
110° 1.15
120° 1.00
130° .84
135° .76
140° .68
150° .52
160° .35
170° .17
180° .00
78
Turnbuckles
• Can be supplied with eye end fittings, hook end fittings, jaw end fittings, stub end fittings, and
any combination of these (Figure 58).
• Rated loads are based on the outside diameter of the threaded portion of the end fitting and on
the type of end fitting. Jaw, eye, and stub types are rated equally; hook types are rated lower.
• Should be weldless alloy steel.
• When turnbuckles are exposed to vibration, lock frames to end fittings. This will prevent turning
and loosening. Use wire or manufacturer-supplied lock nuts to prevent turning (Figure 59).
• When tightening a turnbuckle, do not apply, more torque than you would to a bolt of equal size.
• Inspect turnbuckles frequently for cracks in end fittings (especially at the neck of the shank),
deformed end fittings, deformed and bent rods and bodies, cracks and bends around the
internally threaded portion, and signs of thread damage.
Figure 58
Figure 59
79
Table 8 gives the working load limits for turnbuckles based on the diameter of the shank.
Note how the use of hook end fittings reduces capacity.
Table 8
Turnbuckle Types and Capacities
WLL
Size with WLL Available
& Jaw or with Take-Up
Thread Eye Hook sizes
dia. lbs lbs inch
1/4 500 400 4
5/16 800 700 4-1/2
3/8 1,200 1,000 6
1/2 2,200 1,500 6,9,12
5/8 3,500 2,250 6,9,12
3/4 5,200 3,000 6,9,12,18
7/8 7,200 4,000 12,18
1 10,000 5,000 6,12,18,24
1-1/4 15,200 6,500 12,18,24
1-1/2 21,400 7,500 12,18,24
Reprinted with permission from UNIROPE Ltd.
Figure 60 shows the areas of a turnbuckle that require special attention during inspection.
INSPECTION AREAS
Figure 60
80
Spreader and Equalizer Beams
Spreader beams are usually used to support long loads during lifts. They eliminate the hazard of
the load tipping, sliding, or bending as well as the possibility of low sling angles and the tendency
of the slings to crush the load.
Equalizer beams are used to equalize the load in sling legs and to keep equal loads on dual hoist
lines when making tandem lifts.
Spreader and equalizer beams are both normally fabricated to suit a specific application. If a beam
is to be used which has not been designed for the application, make sure that it has adequate
width, depth, length, and material.
The capacity of beams with multiple attachment points depends on the distance between the
points. For example, if the distance between attachment points is doubled, the capacity of the
beam is cut in half.
81
Hoisting Tips
• Never wrap a wire rope sling completely around a hook. The tight radius will damage the sling.
• Make sure the load is balanced in the hook. Eccentric loading can reduce capacity dangerously
(Figure 61).
Point Loading
• Never point-load a hook unless it is designed and rated for such use. Point-loading can cut
capacity by more than half.
• Never wrap the crane hoist rope around the load. Attach the load to the crane hook by slings or
other rigging devices.
• Avoid bending wire rope slings near attached fittings or at eye sections.
82
Section 4
83
Section 4
Rigging Tools and Devices
The Regulations for Construction Projects require that an inspection and maintenance program be
implemented to ensure that rigging equipment is kept in safe condition. Procedures must ensure
that inspection and maintenance have not only been carried out but have been duly recorded.
Rigging operations often involve the use of various tools and devices such as jacks, rollers, hoists,
and winches. Each has its own unique features, uses, and requirements for safe operation and
maintenance.
The construction regulations also require that the manufacturer’s operating instructions for such
tools and devices be available on site. The rigger must read and follow all of these instructions to
operate and maintain the equipment properly. The rigger must also read any warning information
which may be stamped, printed, tagged, or attached to the rigging device.
This section identifies some of the commonly used rigging tools and devices and explains
procedures for their safe operation and maintenance. For more detailed information, see the Jacks
and Rollers chapter in Specialized Rigging (DS035).
84
Jacks
While there are a great many types of jacks, the ratchet jack and heavy duty hydraulic jack are the
two types most commonly used in construction.
Ratchet jacks are usually limited to capacities under 20 tons because of the physical effort required
to raise such a load. They do, however, have a much longer travel than hydraulic jacks and can
therefore lift loads higher without having to re-block. Most ratchet jacks have a foot lift or “toe” near
the base to lift loads which are close to the ground. Lifts can be made from the “head” or the “toe”
of the jack. These jacks are often called toe jacks or track jacks (Figure 1).
Head
Lifts can be
made from the
head or the toe
Toe
RATCHET JACK
Figure 1
Do not use extensions or “cheaters” on the handles supplied with ratchet jacks. If cheaters are
necessary the jack is overloaded.
Hydraulic jacks are very popular in construction because they are quite compact and can lift very
heavy loads. They are readily available in capacities ranging from a few tons to 100 tons. Some
specialty units have capacities up to 1,000 tons. Lift heights are usually limited to approximately 8
inches or less but some can go as high as 36 inches (Figure 2).
85
Hydraulic jacks are also available in low profile models that can be positioned under a load close
to the ground (Figure 3). Also known as “button jacks”, these are useful for lifting a load high
enough to get a regular jack in place.
External Pump
“BUTTON” JACK
Figure 3
Like ratchet jacks, hydraulic jacks are available with toe lifts (Figure 4).
The pumps powering hydraulic jacks may be contained in the jacks or be separate external power
units. Separate units may be hand-operated or electrically powered, but the self-contained pumps
are always hand-operated.
With all types of hydraulic jacks it is critical that no further force be applied after the ram has run
its full travel. The resultant high pressure in the hydraulic fluid can damage the seals and, in the
case of external power units, burst the hoses.
Most external power units are equipped, however, with pressure relief valves. At the factory one
valve will be set at the absolute maximum pressure while another will be adjustable to lower
settings by the user. Make sure you are familiar with the operation of this safety feature.
Most hydraulic jacks can be fitted with a gauge on the housing or at the pump to monitor hydraulic
pressure. When used with a given jack, the gauges can be calibrated to measure the approximate
load on the unit.
86
Hoses connecting pumps to jacks require careful attention. Make sure they are free of kinks and
cracks. Check the couplings, especially at the crimp. This area is prone to cracking and is often the
weak link in the hose assembly. Threads should also be checked for damage, wear, cross-threading
and tightness. Remember that these hoses have to withstand pressures up to 10,000 psi.
Don’t use hoses that are unnecessarily long. Shorter hoses will leave the area less congested and
reduce the chance of accidental damage.
The handles on jacks or hand-operated pump units are designed so that the rated capacity and
pressure can be obtained with little physical effort. Don’t use extensions or “cheaters” on the
handles. Again, if the load can’t be raised with the handle supplied the jack is overloaded.
Jacks should only be used in a true vertical position for lifting. Otherwise side-loading can cause
the piston to rub against the housing. If this happens, the piston will be scored and allow fluid to
leak at the seal which may cause the jack to slip.
Be extremely careful when using hydraulic jacks in welding areas or around corrosive chemicals.
Sparks or acids can cause pitting on the ram or damage hoses.
Hydraulic jacks are generally not equipped with check valves. But check valves can be installed in
the hoses of an external pump and are recommended. Alternatively, some hydraulic jacks have
retaining nuts that can be screwed against the housing to hold the load for a short time.
Jacks should never be used for long-term support of a load. Blocking is much more stable and
safe. Whenever possible, the load should be progressively blocked as jacking proceeds. This will
allow for the unexpected.
Always jack loads one end at a time. Never jack loads one side at a time as this will be far less
stable than jacking the ends.
If it is necessary to work or even reach under a load on jacks, place safety blocking under the load
as a precaution.
Make sure timbers used for blocking or cribbing are long enough to distribute the load over a large
enough area and provide sufficient stability. Crib height should not exceed the length of timbers
used.
All jacks should be thoroughly inspected periodically, depending on how they are used. For regular
use at one location they should be inspected every six months or more frequently if the lifts
approach capacity. Jacks sent out for special jobs should be inspected when received and when
returned. Jacks subjected to high loads or shock should be inspected immediately.
Because jack bases are relatively small, care must be taken to ensure that the floor or ground can
withstand the high pressures often associated with jacking operations. Blocking or matting under
the jacks will distribute the load over a greater area and reduce bearing pressure.
87
Jacks – Inspection
Whether ratchet or hydraulic, all jacks should be inspected before each shift or use. Check for:
Remember: When using jacks, always try to block as you go. Never use jacks for long-term
support. Block properly instead.
Incorrect
88
Rollers
Rollers can be used for moving loads horizontally or on slight inclines, provided the surface is firm
and even. Rollers may be aluminum or steel round stock, heavy steel pipe, or a manufactured
caster unit (Figure 5).
CASTER-TYPE ROLLER
Figure 5
Cylinder rollers are useful for short distances or where the load will have to negotiate corners. The
rollers can be placed on angles to swing the ends of the load, allowing turns in tight areas (Figure 6).
CYLINDER-TYPE ROLLERS
Figure 6
Cylinder rollers should be round, true and smooth to minimize the force required to move the load.
Caster rollers can be supplied in a number of configurations for flat surfaces, tracks, I-beams or
channels. They create very little friction and allow heavy loads to be moved with little force. In fact,
the rigger may sometimes require more friction to provide an extra measure of control.
The most important aspect in rolling is control of the load. Make sure that all equipment including
slings and hardware is sufficient to handle the loads that will be developed at each stage of the
operation. Always attach a second means of restraint such as a tirfor or winch to the load to allow
for the unexpected. The possibility of shock loads should be considered when sizing winches or
tirfors for back-up protection.
Check the condition of floors or ground before using rollers. Bearing pressure can be reduced by
using more rollers and large steel or aluminum plate to distribute the load. Make sure the joints in
the plates or skids are staggered. It is often necessary to assess the structure supporting floors.
Temporary shoring may be necessary.
89
Inclined Planes
The method used to calculate the required pull up an incline is only approximate. Though widely
used because of its simplicity, the method yields values higher than the actual force required. The
formula is more accurate for slight inclines (1:5) than steep inclines (1:1). Table 1 shows the
difference between the actual pull required and the pull calculated with friction of 5%.
TABLE 1
For most applications the simplified method is adequate because the value used for friction is itself
only approximate.
Table 2 lists some examples of approximate coefficients of friction. Note that some of the
combinations of materials have a considerable range of values.
TABLE 2
90
Lever-Operated Hoists or Come-Alongs
Come-alongs are a very portable means of lifting or pulling loads short distances. They can be
used vertically, horizontally or on an angle. Otherwise all points covered in the section on chain
hoists apply equally to come-alongs.
A come-along that requires the use of a cheater or the help of another worker to move a load is
inadequate for the job. Use a come-along with a larger capacity.
CHAIN HOISTS
Chain hoists are useful because the load can be stopped and kept stationary at any point. Because
of their slow rate of travel, chain hoists also allow precise vertical placement.
Chain hoists should be rigged so that there is a straight line between the upper and lower hooks.
They are intended for use in a vertical or near vertical position only. If rigged at an angle, the upper
hook can be damaged at the shank and the throat may open up. If the gear housing is resting
against an object while under load it can be damaged or broken (Figure 10).
91
Before using the hoist, inspect the chain for nicks, gouges, twists, and wear. Check the chain guide
for wear. Hooks should be measured for signs of opening up. Ensure that the hooks swivel freely
and are equipped with safety catches. If the hoist has been subjected to shock loads or dropped,
it should be inspected thoroughly before being put back in service. Check the load brake by raising
the load a couple of inches off the ground and watching for creep.
If the hoist chain requires replacement, follow the manufacturer’s recommendations. Different
manufacturers use different pitches for their load chain. Chain intended for one brand of hoist will not
mesh properly with the lift wheel of another brand and the hoist will not operate properly, if at all.
The load chain on chain hoists is case-hardened to reduce surface wear and is unsuitable for any
other use. Load chain will stretch 3% before failing, whereas Grade 8 alloy chain will stretch at least
15%. Load chains are too brittle for any other application. Any load chain removed from a hoist
should be destroyed by cutting it into short pieces. Never try to repair a load chain yourself.
Welding will destroy the heat treatment of the chain entirely.
Figure 10
WRONG RIGHT
92
Grip Action Hoists or Tirfors
Grip-action hoists, commonly known by the trade name Tirfor, are useful for long lifts or pulls since
they act on a continuous length of wire rope. Like the come-along, they can be used in any
orientation. The tirfor can draw rope through the unit, as a come-along draws chain, or pull itself
along a fixed rope, as on a swingstage (Figure 11).
TIRFOR APPLICATIONS
Figure 11
Tirfors are available with capacities ranging from 3/4 to 31⁄2 tons. The rope can be reeved through
a block system to gain mechanical advantage and increase the capacity of the unit.
Tirfors are operated by two levers – one for forward motion, the other for reverse. The levers
operate two jaws which alternately grip and draw the rope through the unit. Figure 12 illustrates
the action of the jaws on the rope. A third lever releases both jaws to allow rope to be installed,
tensioned, or disengaged.
93
Tirfors can be fitted with hydraulic rams to operate the levers. Up to four units can be operated
simultaneously from a single hydraulic power supply (Figure 13).
Another type of grip-action hoist uses discs to clamp and drive the rope in a continuous motion
(Figure 14). These are available with electric, air, or hydraulic motors. Disc type hoists provide
greater rope speed but less capacity than the jaw type.
Tirfor ropes are specifically designed for the clamping and pulling forces applied to them. The
ropes are galvanized and unlubricated and have very tight diameter tolerance. No other rope
should ever be used on tirfors.
Handle tirfor rope carefully to ensure that it does not kink. Kinked rope will jam in the mechanism
and prevent the rope from passing through the hoist. Ropes must be kept free from dirt and oil to
ensure smooth, safe operation.
Like chain falls and come-alongs tirfors should be tested under load to ensure that the unit
functions properly in both directions and that there is no slippage.
94
Electric Wire Rope Hoists, Electric Chain Hoists, Pendant Cranes
Electric wire rope and electric chain hoists may be suspended from a fixed point or a trolley. The
trolley may be motorized but very often the hoist is moved by tugging gently on the pendant. These
units can only move along a fixed straight line (beam).
Pendant cranes, on the other hand, trolley along a bridge (east-west) which travels on rails (north-
south). Pendant cranes have greater capacity than the other hoists and usually have two or more
parts of line.
Apart from these differences, the devices are quite similar in operating procedures and
precautions. Hoist operators must adhere to the following points.
• Know and never exceed the working load limit of the hoisting equipment.
• Ensure that controls work properly without excessive play, delay or effort.
• Check pendant control cable for cuts, kinking, or signs of wear.
• Check hoist cables for fraying, kinking, crushing, and twisting between the cable and the drum.
• Look at the hoist drum for proper alignment and stacking of the cable.
• Inspect the hook for cracks, bending, or distortion, and the safety latch for proper operation.
• Don’t try to lengthen or repair the load chain or rope.
• Read and follow manufacturer’s instructions and all instructions and warnings on the hoist.
• Position the hoist directly over the load.
• After the hook is placed in the lifting ring, apply slight pressure to the hoist to ensure that the
lifting ring is seated in the bottom of the hook and that the hook is properly aligned.
• Between lifts, check whether the rope is properly seated on the drum.
• Ensure that the intended path of travel is clear of people and obstructions and that the intended
destination is ready to receive the load.
• Check brakes for excessive drift.
• Ensure proper clearance for movement.
• Position yourself on the pendant side of the hoist to get maximum clearance from the load and
to prevent entanglement of cables.
• Avoid sudden starts, stops, or reverses.
• Raise the load only high enough to avoid obstructions.
• Do not hoist loads over workers; wait until the area is vacated.
• Be alert for any variation in hoist operation and any possible malfunction.
• Do not leave a load suspended in the air. If a short delay is unavoidable, lock the controls.
• Do not allow unqualified personnel to operate hoists.
• Never operate hoist to extreme limits of chain or rope.
• Avoid sharp contact between two hoists, between hoist and end post, and between hooks and
hoist body.
• Never use the hoist rope or chain as a sling.
• Never use chain or rope as a ground for welding or touch a live welding electrode to the chain
or rope.
• Avoid swinging the load or hook when travelling the hoist.
• Pull in a straight line so that neither hoist body, load chain nor rope is angled around anything.
Some hoists are equipped with limit switches. Generally these devices stop the wind automatically
at its maximum allowable up position, down position and travel limits (if rail-mounted). Check limit
switches daily for correct operation.
95
Whenever the operator does not have a clear view of the load and its intended path of travel, a
signaller must direct operations. Signals for pendant cranes differ from those for mobile and tower
cranes since machine movements are different (Figure 15). Make sure that everyone involved
knows the signals required for pendant cranes.
STOP.
Arm extended, palm DOG EVERYTHING.
down, move hand Clasp hands in front
right and left. of body.
MOVE SLOWLY.
Use one hand to give
any motion signal and
place other hand
motionless in front of HOIST.
hand, giving the With forearm vertical,
motion signal. (HOIST forefinger pointing up,
SLOWLY SHOWN AS move hand in small
EXAMPLE). horizontal circles.
MULTIPLE
TROLLEYS.
LOWER. Hold up one finger for
With arm extended block marked “1”,
downward, fore–finger and two fingers for
pointing down, move block marked “2”.
hand in small Regular signals
horizontal circles. follow.
TRAVEL.
Arm extended TROLLEY TRAVEL.
forward, hands open Palm up, fingers
and slightly raised, closed, thumb
making pushing pointing in direction
motion in direction of of motion, jerk hand
travel. horizontally.
Figure 15
96
Winches
Base-mounted winches, or tuggers, are a compact, versatile tool for many hoisting and rigging
operations (for more detailed information, see the Tuggers chapter in Specialized Rigging—DS035).
They are particularly useful in areas not accessible to mobile cranes or where there is not enough
headroom for a crane to operate. Figure 16 shows a tugger and snatch block arrangement for
hoisting. Make sure that the rope leaves the drum at a downward angle and that the loose end is
securely anchored.
Figure 16
The forces on snatch blocks and their anchorage points depend on the angle by which the direction
of pull is changed. The diagrams below indicate how snatch block loads vary with rope angle.
1000 POUNDS
1000 POUNDS
Wire rope used on tuggers should have an independent wire rope core to resist crushing as it is
compressed by successive layers of rope on the drum.
97
Anchorage Points
Hoists, winches, tirfors, and other rigging devices require secure anchorage points. Anchors may
be overhead, in the floor, or at lateral points in walls or other structures. The arrangement may
involve columns, beams, beam clamps, welded lugs, slings, or block and tackle. Whatever the
method, riggers must be certain of the loads involved and the anchorage required.
Load on Structure
The following examples illustrate how to calculate the load on the structure in two typical
applications.
98
Columns
Columns are generally not designed to withstand significant lateral forces. Anchorage points
should be placed at the base, near a connection to a beam or other lateral support (Figure 1).
Because the member is already in compression, the effect of a small deflection is amplified and the
column could buckle.
Beams
Load beams near column or other vertical support points to minimize bending (Figure 2). If the
beam is an I section, it may be necessary to weld stiffeners to the web to withstand the additional
shear force applied (Figure 3).
99
Beam Clamps
Beam clamps provide a very secure anchorage point if used correctly. They are commonly
available with capacities up to 12 tons and have various jaw widths. Figure 5 shows different types.
The jaws are usually designed for a range of flange widths. For example, one clamp might fit
flanges 41⁄2” to 9” wide. Clamps should never be used on flanges outside the range specified as
they will not afford sufficient grip on the member.
BEAM CLAMPS
Figure 5
Most beam clamps are designed for use at 90° to the flange. For applications requiring an angle
loading, make sure that the clamp is designed for it and that the beam can withstand it (Figure 6).
LOAD LOAD
IN LINE LOADING
Figure 6
Be particularly careful that the load does not deform the flange. This is most likely to occur with
light sections where the flange is wide and thin.
Manufacturers are required to mark beam clamps with working load limits. But the ratings apply
only to the clamps. The capacity of the beam must be evaluated separately.
100
Slings
Slings are a common method of anchoring equipment to a structure. The double wrap basket hitch
is the preferred method since the load in the sling is shared on two legs and the double wrap
distributes the load on the member. It is also less prone to slippage than a single choker or single
basket hitch. Make sure that the sling is long enough to avoid sharp angles in the legs (Figure 7).
The use of softeners will protect the member and the sling from damage and increase the radius
of bending in the sling. Figure 8 shows how strength diminishes as wire rope is bent around smaller
and smaller diameters.
101
Welded Lugs
Lugs welded to a beam or column must be compatible with the member in metallic composition.
The appropriate welding rod must also be used. The lug should be welded on the centre line of the
flange, in line with the web (Figure 9). Keep loading in line with the lug. Avoid side loading.
Whatever the method of attachment, it is important to realize that the structure is usually not
designed for the additional loads applied. The only way to be sure is through evaluation by a
structural engineer.
102
Section 5
䡲 Responsibilities
䡲 Basic Types and Configurations
䡲 Hazards in Crane Operating Areas
䡲 Working near Powerlines
䡲 Factors Affecting Crane Capacity
䡲 Setup Summary
䡲 Machine Selection
䡲 Signalling
103
Section 5
Introduction to Crane Operations
Crane operation carries with it a greater potential for disaster than nearly any other activity on a
construction project. Crane accidents are often the most costly construction accidents when
measured either in lives or in dollars. All personnel involved in crane operations must understand
their jobs, their responsibilities, and their part in the overall safety of each lift.
Preparation begins with a clear definition of responsibilities. No single set of guidelines can cover
every detail of the many different types of crane operations. But this section spells out primary
responsibilities for the major parties involved – owners, operators, site supervision, and workers.
Responsibilities entail knowledge. Riggers must be trained and experienced. They must know how to:
• establish weights
• judge distances, heights, and clearances
• select tackle and hardware suitable to the load
• rig the load safely.
Signallers must be competent and capable of directing the crane and load to ensure safe, efficient
operation. Knowledge of the hand signals for hoisting is a must, as it is for operators.
The crane operator is generally responsible for the safety of the operation as soon as the load is
lifted clear of the ground. Whenever there is reasonable cause to believe that the lift may be
dangerous or unsafe, the operator must refuse to proceed until the concern has been reported to
the supervisor, any hazard has been corrected, and safe conditions have been confirmed.
This section includes information of use to riggers, operators, and others involved either directly
or indirectly in crane operations. The information covers major responsibilities, hazards and
safeguards in crane operating areas, factors that affect crane capacity, pinch points and other
hazards around equipment, considerations for safe setup, requirements for providing signallers,
and the international hand signals for hoisting.
104
Responsibilities
Crane Owner
The crane owner must ensure that
• safe, suitable equipment is provided to meet the requirements of the job
• operators are capable and aware of their responsibilities
• maintenance, repair, transport, assembly, and other personnel are trained and experienced to
handle their specific jobs
• training and upgrading are provided for all personnel
• responsibilities and authority are clearly designated for each crew
• a thorough equipment maintenance and inspection program is in operation, including logbooks
and other required documentation
• client and site supervision are capable and aware of their responsibilities
• equipment is maintained and inspected in accordance with manufacturer’s requirements and
applicable regulations.
Operator
The operator is generally responsible for the safety of the crane operation as soon as the load is
lifted. Operators must know:
• the particular model of crane they operate, its characteristics, functions, and limitations
• the information in the crane’s operating manual
• the crane’s load chart, including all notes and warnings, and how to calculate or determine the
crane’s actual net capacity in every possible configuration
• proper inspection and maintenance procedures to be followed in accordance with the guidelines
of manufacturer and owner
• any site conditions that may affect crane operation, including the presence of overhead
powerlines
• basic load rigging procedures.
• inform the owner, in writing, of any problems with the machine, preferably in the machine’s
logbook
• record in the logbook all inspection, maintenance, and work done on the crane in the field
• check that the site is properly prepared for crane operation
• review plans and requirements with site supervision
• find out the load and rigging weight and where the load is to be placed.
105
[Although operators are NOT responsible for determining load weights, they become responsible
if they do so or if they lift the load without checking the weight with site supervision.]
Site Supervision
Site supervision (foreman, rigger foreman, lead hand of the trade involved, etc.) has overall
responsibility for the lift and must therefore plan all phases of the operation. Specifically, site
supervisors must:
106
Basic Types and Configurations
The evolution of the mobile crane has led to many types and designs to satisfy both the general
as well as the specific needs of construction and industrial operations. This manual is concerned
with mobile cranes used for construction purposes as well as industrial applications.
The basic operational characteristics of all mobile cranes are essentially the same. They include:
Within the broad category of mobile cranes there have evolved the following basic types and
configurations:
• Boom Trucks
• Industrial Cranes
• Carrier-Mounted Lattice Boom Cranes
• Crawler-Mounted Lattice Boom Cranes
• Carrier-Mounted Telescopic Boom Cranes
• Crawler-Mounted Telescopic Boom Cranes
• Rough Terrain Cranes
• Mobile Tower Cranes
• Heavy Lift Mobile Cranes.
107
Boom Trucks
TELESCOPING BOOM
Boom sections are usually Base or Heel Section
telescoped either manually
or hydraulically.
Turret or Pedestal
KNUCKLE BOOM
The boom articulates (folds) under hydraulic Hydraulic Cylinders
pressure and may or may not be equipped
with a powered drum and wire rope.
Swing Circle
Turret or Pedestal
Stabilizers
108
Industrial Cranes
Boom
Elevating or Partial or 360° Swing
Lift Cylinders
Fixed Boom
Partial or 360° Swing
Carry Deck
Carry Deck
109
Carrier-Mounted Lattice Boom Cranes
Load Block or
Main Hook
Block
Bridle
Live Mast
Jib
Backhitch Gantry
110
Carrier-Mounted Lattice Boom Cranes (continued)
Bridle
Live Mast
Boom Stops
Outrigger
Cylinder Boom Pendants
(Jack, Ram)
Equalizer,
Bridle, Outer Bail, or
Outrigger Pad, Floating Harness
Front Bumper Outrigger Float, Pontoon
Counterweight Beam
Backhitch
Lattice Members
Outrigger Jack
Lattices or
Lacings
Main Chord Outrigger Box
Diagonal
The square frame at Pin Connection Lug
each end of a boom
insert is commonly
referred to as the
picture frame.
111
Crawler-Mounted Lattice Boom Cranes
Inner Bail
Backhitch
Upperworks or superstructure
Gantry refers to the entire crane
structure above the
swing circle.
Boom Hoist Rope
Idler Roller
Tread Sprocket
Track Rollers, Traction Shaft Side Frame or Drive Sprocket
Support Rollers
112
Carrier-Mounted Telescopic Boom Cranes
#3 Power Telescoping
Section or Planed Section
Center Pin, Center of Rotation, Axis of Rotation Boom Foot Pins, Hinge Pins
Telescopic Jib
Jib Pendant
Boom Extension
Auxiliary or Whip Line
Deflection Sheave
Auxiliary Hook &
Headache Ball
113
Carrier-Mounted Telescopic Boom Cranes (continued)
114
Carrier-Mounted Telescopic Boom Cranes (continued)
On full power
hydraulic booms
the end section
(tip or fly) extends
through its full
range as the
whole boom
extends.
FULL POWER BOOMS
PINNED BOOMS
These sections
extend and retract
under power through
their full range.
115
Crawler-Mounted Telescopic Boom Cranes
Boom Extension
Main Hoist
Auxiliary Hoist
Counterweight
Side Frame
Swing Circle
116
Rough Terrain Cranes
FIXED CAB
Counterweight
Swing Circle
Operator’s Cab (Fixed)
Outrigger Beam
117
Rough Terrain Cranes (continued)
ROTATING CAB
Boom Extension in
Stowed Position
Main Winch
Boom Hoist or Lify Cylinders
Auxiliary Winch
Counterweight
Operator’s Cab Rotates with Upperworks
Outrigger Box
Pads, Floats, Pontoons Outrigger Beam
Engine
Cantilever Type
Outriggers
118
Rough Terrain Cranes (continued)
Boom Extension
in Stowed
Position
119
Heavy Lift Mobile Cranes
Pendants Equalizer or
Bridle
Boom Hoist Reeving
Mast
Equalizer or Bridle
Boom Hoist
Reeving
Mast Counterweight
Counterweight
Pendants
Boom
Counterweight
120
Tower Cranes
Stewing ring
FIXED TOWER
FIXED TOWER
121
Hazards in Crane Operating Areas
Over 50% of all mobile crane accidents are the result of mistakes made when the crane was being
set up.
All of these accidents can be prevented by following the manufacturer’s recommendations for
assembly and dismantling, by using the correct components, and by observing the precautions
outlined in this section.
Use the checklist on the next page for reviewing the factors to consider in planning for crane and
hoisting operations.
122
PRE-JOB CHECKLIST
Whoever requires that a crane be used-project engineer, site superintendent, foreperson,
building owner, contractor, architect, or consultant – is as responsible for its safe operation as
the operator.
If a working area has not been adequately prepared for the crane, the operation will be unsafe,
regardless of machine capacity or operator skill. Consider the following factors.
• Can the machine get onto the site? Is the access road adequately graded and compacted?
Is the access ramp too steep?
• Will the machine have to travel over buried pipes, sewers, mains, etc., that might be
crushed?
• Is there room for the crane to maneuver in its designated position on site? Is there room to
erect or extend the boom? Can trucks hauling boom sections get into position and be
unloaded safely? Is there enough room and timber blocking to store boom sections
properly?
• Will an area be designated and roped off for use by the erection crew? Will it be large enough
for components to be stacked, handled, and assembled without endangering other site
personnel?
• Has the crane’s position been identified for every lift? What will the maximum operating
radius be? Will there be at least two feet of clearance between the counterweight and
nearest object? What obstacles or other hazards might be posed by existing buildings or
structures?
• Are operating areas graded, compacted, and levelled? Are they away from shoring
locations, excavations, slopes, trenches, embankments, etc., which could subside under
machine weight and vibration? Are operating areas over cellars, buried pipes, mains, etc.,
that may collapse?
• Will clearance and visibility be problems where other cranes, hoists, or equipment will be
operating? Will operators have a clear view of other equipment to avoid collisions and keep
hoisting ropes and loads from fouling? Will operators be provided with direct communication
to warn one another of impending danger? Will the overall lifting program be laid out,
controlled, and prioritized by one person in contact with all operators and each rigging
crew?
• Will crane operating areas be away from public traffic and access? Will signallers and
warning signs be provided when crane operations may overlap with public areas? Has
police cooperation been arranged to provide traffic and pedestrian control?
• Have operators been warned and have provisions been made to keep cranes from working
within a boom’s length of powerlines without
a) shutting off power
b) having the powerlines insulated, or
c) providing signallers to warn the operator when any part of the crane or load nears the
limits of approach specified by the Regulations for Construction Projects?
123
Mark the location of all underground services that could be crushed
by the weight of the crane.
124
Danger Areas
No unauthorized
personnel in
swing area
during operation
Between counterweight
and carrier
Machinery deck
125
Working Near Powerlines
High voltage electrocution is the largest single cause OPERATORS
of fatalities associated with cranes. All can be Before setting up to operate, look up. If
prevented. The power company or utility may there are powerlines, advise your
consider (if given advance notification) shutting down supervisor. The presence of overhead
the line temporarily or moving the line. If it is not powerlines may require a written work
possible to have the line moved or the power shut off procedure.
the following procedures should be enforced by the
project supervisor and strictly followed by all
operators. SITE SUPERVISION
Where a crane, hoist line, or load can
1. KEEP YOUR DISTANCE. Surrounding every live cross into the minimum distance to an
powerline is an area where an electric arc is overhead powerline, the constructor
capable of jumping from the powerline to a must have written procedures in place to
conductor of electricity. So you must keep all of prevent the crane, hoistline, or load from
your equipment and its load at least the minimum encroaching on the minimum distance.
permitted distance away from the powerline (see
page 6 for distances). If there is a chance for any
part of the hoisting operation to encroach on that
distance, protective measures must be taken to
prevent this encroachment. You must take these
measures unless you have controlled the hazard by
de-energizing or moving the lines, or by re-routing
the electricity around the work.
2. Treat all powerlines as live until reliable information assures you that the lines are de-energized.
126
Working near Powerlines (continued)
3. Identify the voltage of the service by checking markings on the utility pole and calling the utility.
When equipment or its load can encroach on the minimum permitted distance from a powerline,
the constructor must have written procedures in place to prevent the equipment or its load from
encroaching on the minimum distance.
4. Have powerlines moved, insulated, de-energized, or follow the precautions in the Construction
Regulation. Insulating or “rubberizing” powerlines offers some protection in case of brush
contact in some circumstances. Your local utility may provide this service.
5. Place enough warning devices (such as signs) near the hazard so that the equipment operator
can always see at least one of them. The operator must be able to see them under all possible
environmental conditions (e.g., night, rain, fog). Signs must be specific about the hazard. They
should state, for example, “Danger! Electrical powerlines overhead.” CSAO recommends that
you include the voltage on the sign.
Taglines
will
conduct
electricity
127
Working near Powerlines (continued)
10. Exercise caution when working near overhead lines having long spans as they tend to swing
laterally in the wind and accidental contact could occur.
11. Exercise caution when travelling the crane as uneven ground can cause the boom to weave
or bob into the lines.
12. Ensure that whenever cranes must repeatedly travel beneath powerlines a route is plainly
marked and “rider poles” are erected on each side of the crossing approach to ensure that
the crane structure is lowered to a safe height.
128
Working near Powerlines (continued)
129
Working near Powerlines (continued)
BAILOUT PROCEDURE
If the operator decides to leave the machine, he must jump clear. He must never step down
allowing part of his body to be in contact with the ground while any other part is touching the
machine.
Because of the hazardous voltage differential in the ground, the operator should jump with his feet
together, maintain balance and shuffle voltage slowly across the affected area. Do not take large
steps because it is possible for one foot to be in a high voltage area, and the other to be in a lower
voltage area. The difference between the two can kill.
130
Working Near Transmitters
When operating near radio, TV or microwave transmitters the crane boom and load can become
electrically charged. The boom acts like an antenna and becomes “hot”. The charge is not
electrically dangerous when compared with the effect of contacting electricity but it can cause
burns to personnel handling loads. The greatest danger to personnel exists when they “jump” from
the effect of this shock and fall or trip.
Grounding the crane will not likely have any effect. The only real solution is to insert a synthetic
web sling between the crane’s load block and the load. This will isolate the riggers from the crane
and protect them from burns. The crane operator will not be affected when in the machine but
should wear rubber gloves when getting on and off the crane.
131
Factors Affecting Crane Capacity
Capacities and other information included in the load charts for cranes are based on almost perfect
conditions seldom achieved under actual operation.
It is vital to know not only how to determine capacity correctly from the chart but also to recognize
the factors that can reduce a crane’s capacity below the chart ratings.
132
Poor Machine Condition
Load chart ratings apply only to cranes maintained in condition as good as new and as stipulated
by the manufacturer. The boom is one of the more critical elements of the crane and must be in
perfect condition at all times.
Sway
Check for
hydraulic
leaks.
Droop
Boom must be
straight and
not twisted.
Dents can reduce
boom strength
considerably.
Check condition
of all boom hoist
ropes and
If a chord is even slightly damaged or bent, sheaves.
don’t use it. Don’t try to repair it. Chords are
so vital to the strength of the boom that it is
not practical to attempt repairs.
133
Boom Angle
Boom
Angle
Boom
Angle
134
Load Radius
The capacities listed in the load chart also depend on and vary with the crane’s load radius.
The load radius is the horizontal distance measured from the center of rotation of the crane (center
pin) to the load hook (center of gravity of the load) while the boom is loaded.
Unloaded Radius
Loaded Radius
Because of boom and machine deflection and pendant stretch, expect the load radius to increase
when the load is lifted off the ground. Expect even larger increases in radius when the crane is “on
rubber” because of tire deflection.
135
Boom Angle Indicators and Critical Lifts
Boom angle indicators are required on all mobile cranes but they must not be relied on for accuracy
during critical lifts because:
• They can give as much as a 2° reading error in boom angle which can substantially affect the
gross capacity reading on the load chart.
• The indicators are mounted on the base section of the boom and may not register the deflection
of the extended sections under heavy load particularly if the wear pads are worn excessively.
Consequently the boom angle may actually be lower than the indicator reads.
For these reasons, using boom angle indicator readings during critical lifts can be misleading. Rely
on load radius (where possible) or if the boom angle must be used (for example when lifting from
a jib) assume the correct reading to be lower than what the indicator actually says.
Boom deflection
at tip
Increase in
load radius
136
Importance of Quadrants
The leverage and capacity of a crane change during rotation of the upperworks. Leverage and
capacity are also affected by the location of the tipping axis. For these reasons the crane’s stability
can change during operation.
To provide uniform stability, regardless of the position of the upperworks relative to the carrier, the
crane’s capacity is adjusted by the manufacturer according to the quadrant of operation.
As the crane
swings from
“over the rear”…
Tipping Axis
Tipping Axis
Tipping Axis
137
Sweep Area
The sweep area is the total area that the crane boom can swing over.
The sweep area is divided into operating areas called quadrants of operation. The crane’s capacity
is then based on the quadrants.
Sweep Area
138
Division of Sweep Area into Quadrants
The crane is said to be in a particular quadrant of operation when the load hook is located over
that portion of the sweep area.
Crane’s Quadrant
of Operation = “Over the Rear”
“Over the Front”
(Because the load
hook is above that
portion of the
sweep area.)
139
Improper Use of Outriggers
The load chart ratings of carrier-mounted and rough terrain
mobile cranes apply to three base configurations:
• “On Outriggers”
• “On Tires”
• Partially Extended Outriggers
“On Outriggers”
Full chart ratings apply only when:
• all outrigger beams are fully extended, and
• all tires are clear of the ground.
“On Tires”
141
Soft Footing
On soft ground or on
backfilled material, timber
or steel mats must be
used to prevent the crane
from sinking or setting.
142
Crane Not Level
A crane is
dead level
when the
hoist rope
is in line
with the
center line
of the
boom.
Being level is critical to the capacity of a crane. If out Similar information can be obtained from
of level, there is possible capacity loss. The table the manufacturers for all cranes.
below demonstrates this relationship for a particular Machines that are used on barges are
crane. provided with “list charts” that identify
crane capacity with barge list (expressed
as degrees). Capacity loss due to barge
Boom Chart Capacity Lost When
Crane Out of Level By
list is the same as capacity loss due to
Length
and an out-of-level condition on ground.
Lift Radius 1° 2° 3°
143
Crane Not Level (continued)
Boom Topples
Caution: A boom at maximum elevation (minimum radius) on the low side cannot be swung over
to the high side without risking collapse of the boom over the cab.
144
Sideloading
• Sideloading • Sideloading
occurs when the occurs when a load
crane is not level. is dragged or pulled
sideways.
145
Sideloading (continued)
• Sideloading occurs
whenever a load is
swung rapidly or when
the swing brake is
applied suddenly.
146
Increase of Load Radius
Load chart ratings apply only when the hoist line is vertical at all times and the load is freely
suspended during the lift. If the line is not vertical, regardless of the reasons, capacity is lost. In
addition to the examples relating to sideloading (see previous pages), the following conditions
produce non-vertical hoist lines which result in increased load radius and reduced capacity.
147
Increase of Load Radius (continued)
• Swinging a load from “over the end” to “over the side” will
increase lean. This is especially noticeable when operating
“on tires”. Since tilt acts to increase load radius, it must be
compensated for when swinging the load. Swing slowly.
Change boom angle (raise or lower boom) while swinging to
maintain a constant radius and prevent inswing or outswing
of load.
148
Rapid Swing Rate
Load chart ratings apply only when the load is vertically in line with the boom tip at all times. Rapid
swing rates make this an impossible condition to meet.
Therefore, load chart capacities do not allow for fast swings. The swing rate must be adjusted to
keep the load directly below the boom tip at all times.
佣 佣 佣
(1) When the swing is started the load (2) Rapid swinging of a load causes it (3) When the crane’s swing is stopped,
will lag behind the boom tip causing to drift away from the machine the load will keep going causing
sideloading and reducing capacity. increasing the load radius and sideloading and reducing capacity.
reducing capacity; the load will also
lag behind the boom tip causing
sideloading.
149
Rapid Swing Rate (continued)
• Moving the dead weight of the boom at the start of a swing or trying to stop it at the end of a
swing causes the boom to sideload itself.
• The centrifugal force of the boom during a high speed swing creates a high forward tipping load.
• At high boom angles, the boom can collapse over the back of the machine if the boom is
accelerated or decelerated rapidly.
150
Impact Loading and Rapid Acceleration
or Deceleration of Load
Load chart capacities do not allow for sudden starting or stopping of the load, impact loading or
sudden machine movements.
The following situations create such conditions and reduce crane capacity below the chart ratings.
• Sudden release
of a load causes
the boom to
recoil and
perhaps topple.
151
Impact Loading and Rapid Acceleration
or Deceleration of Load (continued)
Load stops
152
Duty Cycle Operations
Full load chart ratings may not apply when cranes are used in high speed production operations
(duty cycle operations) such as concrete placing, steel erection, draglining, clam, magnet or
grapple work.
The manufacturer will either specify in the load chart that lift crane ratings be reduced by a
percentage (usually 20%) for duty cycle operations or will supply a separate load chart for such
operations.
The capacity reduction is recommended because the speed of these operations produces
increases in crane loads from sideload, swing-out and impact as well as higher temperatures in
critical components such as brakes, clutches, pumps and motors.
153
High Wind Speeds
Almost all crane manufacturers specify in the load chart that chart ratings must be reduced under
windy conditions, and they may also recommend a shut-down wind velocity. In almost all cases,
when the wind speed exceeds 30 mph, it is advisable to stop operations.
Wind affects both the crane and the load, reducing the rated capacity of the crane. Never make a
full capacity lift if it is windy. Use a great deal of discretion even when lifting under moderate wind
conditions of 20 mph.
It is advisable to avoid handling loads that present large wind-catching surfaces. The result could
be loss of control of the load and crane even though the weight of the load is within the normal
capacity of the crane.
A 20 mph wind exerts a force of only 11⁄8 Ib/ft2 on a flat-surfaced load (the force on a 4 ft. by 8 ft.
sheet of plywood = 36 Ibs.) so only loads having very large sail areas would require crane capacity
derating. At 30 mph, however, the wind exerts a force of 2.53 lb/ft2 of flat surface area (equals 80
Ibs. on a sheet of 4 ft. by 8 ft. plywood). This wind force on the load at 30 mph is enough to cause
non-vertical hoist lines and loads that are very difficult to control.
Boom strength
is most affected
when the
wind is from
the side.
154
Setup Summary
A crane is properly set up for lifting when the following conditions are met.
Crane is level.
All outrigger beams are extended as prescribed by manufacturer.
The hook is
directly above
the load’s C of G.
Rigging is
correct.
Crane is set
up level on
Load weight firm, stable
is known. ground or
blocking.
155
Machine Selection
One basic requirement for any crane safety program is making sure that the right machine is
selected for the job. If crane characteristics do not match job requirements, unsafe conditions are
created before any work is done. Job site personnel are forced to “make do” and improvise in a
rush – a surefire recipe for accidents
CHECKPOINTS
No machine should be selected to do any lifting on a specific job until its size and
characteristics are considered against:
• the weights, dimensions, and lift radii of the heaviest and largest loads
• the maximum lift height, the maximum lift radius, and the weight of the loads that must be
handled at each
• the number and frequency of lifts to be made
• how long the crane will be required on site
• the type of lifting to be done (for example, is precision placement of loads important?)
• the type of carrier required (this depends on ground conditions and machine capacity in its
various operating quadrants: capacity is normally greatest over the rear, less over the side,
and non-existent over the front)
• whether loads will have to be walked or carried
• whether loads will have to be suspended for lengthy periods
• the site conditions, including the ground where the machine will be set up, access roads and
ramps it must travel, space for erection, and any obstacles that might impede access or
operation service availability and unit cost
• the cost of operations such as erection, dismantling, on- and off-site transport, and altering
boom length.
156
RESULTS
The selected machine should:
• be able to make all of its lifts in its standard configuration (that means having the capacity
and boom length to do all known tasks, with jib, extra counterweight, and special reeving
held in reserve for any unexpected problems)
• have at least a 5% working margin with respect to the load capacity of every lift
• be highly mobile and capable of being routed with a minimum amount of tearing down
• have enough clearance between load and boom and adequate head room between the load
and whatever rigging is required to make the lift.
157
Those responsible for equipment selection must ensure that the crane is going to be safe and
reliable for as long as it will be used, and under all anticipated conditions to which it will be
exposed during operation.
Certain equipment considerations and requirements apply to all cranes. These requirements can
be specified in purchase orders and rental agreements. Machines should be rented only from
reputable suppliers. Note that all cranes of the same model number may not have the same
capacity rating. The correct rating should be determined from the manufacturer through the serial
number.
Any changes in counterweight and boom inserts made by the owner should be checked. After such
changes, capacities and other data in the load chart may no longer apply.
Signalling
Signalling is an important part of crane operation,
but is often not treated with the respect it
deserves. Signallers must be used whenever:
• the operator cannot see the load
Telephone or “hardline”
• the operator cannot see the load’s landing area communications are
best but…
• the operator cannot see the path of travel of the
load or of the crane
• the operator is far enough away from the load to
make the judgment of distance difficult
• the crane is working within a boom’s length of
the approach limits to powerlines or electrical
equipment.
158