CALCULATION OF
1. DESIGN DATA
1 DATA :
SERVICE : GAS
2 DESIGN CONDITION
DESIGN CODE : ASME B31.8 2012 ED. & ASME SECTION VIII,
DIV.1 2010, ADDENDA 2011
DESIGN PRESSURE:
EXTERNAL : N/A
DESIGN TEMPERATURE:
INTERNAL : 300° F
EXTERNAL : N/A
LONG. : Seamless
4 JOINT EFFICIENCY
5 MATERIAL CONSTRUCTIONS
E factor, E =1
OD Pipe, D = 16 Inch
tr = PD / 2SEFT
= 0,20 Inch
td = tr + CA
= 0,197 + 0,1181
= 0,315 Inch
d = 12.5 % X tu
= 12,5 % X 0,5
= 0,063 Inch
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
tmin = td + d
= 0,378 Inch
tu = 0,500 Inch
Use Pipe SA 106 Gr.B - 16" Sch.40 Thickness Major Barel would be SAFE
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
E factor, E =1
OD Pipe, D = 16 Inch
tr = (HPXD) / (2XSXEXFXT)
= 0,217 Inch
td = tr + CA
= 0,217 + 0,1181
= 0,335 Inch
d = 12.5% X tu
= 12,5 % X 0,5
= 0,0625 Inch
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
tmin = td + d
= 0,397 Inch
tu = 0,500 Inch
Use Pipe SA 106 Gr.B - 16" Sch.40 Thickness Major Barel would be SAFE
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
E factor, E =1
OD Pipe, D = 12 Inch
tr = PD / 2SEFT
= 0,148 Inch
td = tr + CA
= 0,148 + 0.1181
= 0,266 Inch
d = 12.5 % X tu
= 12,5 % X 0,406
= 0,051 Inch
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
tmin = td + d
= 0,317 Inch
tu = 0,406 Inch
Use Pipe SA 106 Gr.B - 12" Sch.40 Thickness Minor Barel would be SAFE
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
E factor, E =1
OD Pipe, D = 12 Inch
tr = (HPXD) / (2XSXEXFXT)
= 0,163 Inch
td = tr + CA
= 0,163 +0,1181
= 0,281 Inch
d = 12,5 % X tu
= 12,5 % X 0,406
= 0,051 Inch
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
tmin = td + d
= 0,331 Inch
tu = 0,406 Inch
Use Pipe SA 106 Gr.B - 12" Sch.40 Thickness Minor Barel would be SAFE
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
E factor, E =1
OD Pipe, D = 3 Inch
tr = PD / 2SEFT
= 0,037 Inch
td = tr + CA
= 0,037 + 0,1181
= 0,155 Inch
d = 12.5 % X tu
= 12,5 % X 0,197
= 0,025 Inch
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
tmin = td + d
= 0,180 Inch
tu = 0,197 Inch
Use Pipe SA 106 Gr.B - 3" Sch.40 Thickness 3” pipe would be SAFE
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
E factor, E =1
OD Pipe, D = 3 Inch
Mill Tolerance, M = 13 %
tr = HPXD) / (2XSXEXFXT)
= 0,041 Inch
td = tr + CA
= 0,041 + 0,1181
= 0,159 Inch
d = 12.5 % X tu
= 12,5 % X 0,197
= 0,025 Inch
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
tmin = td + d
= 0,183 Inch
tu = 0,197 Inch
Use Pipe SA 106 Gr.B - 3" Sch.40 Thickness 3” pipe would be SAFE
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
E factor, E =1
OD Pipe, D = 2 Inch
tr = PD / 2SEFT
= 0,025 Inch
td = tr + CA
= 0,025 + 0,1181
= 0,143 Inch
d = 12.5 % X tu
= 12,5 % X 0,218
= 0,027 Inch
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
tmin = td + d
= 0,170 Inch
tu = 0,218 Inch
Use Pipe SA 106 Gr.B - 2" Sch.80 Thickness 2” pipe would be SAFE
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
E factor, E =1
OD Pipe, D = 2 Inch
tr = HPXD) / (2XSXEXFXT)
= 0,027 Inch
td = tr + CA
= 0,027 + 0,1181
= 0,145 Inch
d = 12.5 % X tu
= 12,5 % X 0,218
= 0,027 Inch
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
tmin = td + d
= 0,172 Inch
tu = 0,218 Inch
Use Pipe SA 106 Gr.B - 2" Sch.80 Thickness 2” pipe would be SAFE
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
E factor, E =1
OD Pipe, D = 1 Inch
tr = PD / 2SEFT
= 0,012 Inch
td = tr + CA
= 0,012 + 0,1181
= 0,130 Inch
d = 12.5 % X tu
= 12,5 % X 0,179
= 0,022 Inch
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
tmin = td + d
= 0,153 Inch
tu = 0,179 Inch
Use Pipe SA 106 Gr.B - 1" Sch.80 Thickness 1” pipe would be SAFE
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
E factor, E =1
OD Pipe, D = 1 Inch
tr = HPXD) / (2XSXEXFXT)
= 0,027 Inch
td = tr + CA
= 0,027 + 0,1181
= 0,145 Inch
d = 12.5 % X tu
= 12,5 % X 0,179
= 0,022 Inch
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
tmin = td + d
= 0,168 Inch
tu = 0,179 Inch
Use Pipe SA 106 Gr.B - 1" Sch.80 Thickness 1” pipe would be SAFE
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
3.11 CLOSURE
As Per ASME B31.8 para 831.373 - Closure Head, Closure head such as flat, Ellipsoidal (other than in
para 831.372), spherical or conical head are allowed for use under this code. Such item may be designed
in accordance with Section VIII, Div. I.
As per ASME Sec VIII, Div I para UG - 34 (c) (1), Circular blind flange of any of the flange standard
listed in table U - 3 and further limited in UG - 44 SHALL BE ACCEPTED for diameter and pressure -
temperature rating in the respective standard when the blind flange is of the type shown in Figure UG - 34
Sketches (j) and (k) Based on ASME Sec. VIII Div I para UG - 44, standard covering flange and fitting is
ASME B16.5 and based on pressure temperature rating we used Blind flange SA 105 16" rating 300#.
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
ASME
ASME DESIGN
SIZE RATING
NOZZLE FLANGE PRESSURE REMARK
NPS MAWP
TO BE WELD (Psi)
(Psi)
N1 16" 300# 655 600 ACCEPTABLE
APPLICABILITY HEAT
NO DESCRIPTION TREATMENT
YES/NO REQUIREMENT
If either materials in welds between dissimilar
1 NO NO
material requires stress relieving
2 Welded joint over 1 1/4 in nominal thickness NO NO
Welded in carbon steels having a carbon content:
3 in excess of 0.32 % or carbon equivalent (C + 1/4Mn) NO NO
in excess of 0.65 %
= 1.1X 600
= 660 Psi