Siemens Power System Simulation For Engineers® (Pss/E)
Siemens Power System Simulation For Engineers® (Pss/E)
Siemens Power System Simulation For Engineers® (Pss/E)
ENGINEERS® (PSS/E)
LAB5
MULTIPLE AC CONTINGENCY
CALCULATION REPROTS
The following steps are to guide student through this lab and assure them learning the
skills of creating Multiple ACCC reports supposed to provide:
E. Code has to be changed to 3 according to how many branches between the two
buses. Arrow Up will sort automatically below the original one.
F. To save the new sample file press on your keyboard Ctrl+S and a save network data
widow will open on the screen. Under the Case Data tab navigate to Lab5 folder and type
“sampleL5” then Click OK using the pictures below:
G. Solve the system on the toolbar shown below:
The following window will appear, make sure that you solve the system using the steps stated
below:
H. Now go to the Subsystem menu and select Area. Move “Central” to selected areas on the
right side of the box.
I. Click Apply and close.
Add Branch to sample.sld:
1. Go to the sample.sld and find bus number 153
2. Click on Bus#153
3. Once the bus selected use right click on the bus to open the list below.
4. Scroll down to Grow N levels – make sure that the number of level on the next box
will be one and hit OK.
5. An image of the adjusted slider file is provided below; it shows that the added line is
kind of hidden behind another element Zoom in.
6. Rearrange the branch to be visible.
J.
Use the three files created in the previous section to create DFAX file “area1c.dfx” and name
the ACCC reports “area1c.acc”
Area1c.sub
Area1c.mon
Area1c.con
Run Multiple ACCC reports:
The PSS®E Multiple AC Contingency reports feature can be used to perform. The multiple
allows running ACCC reports contingencies within one run and compares up to nine contingency
runs(Multiple *.acc) . This is a very powerful tool when side by side study comparisons are
needed. Computational procedures in a contingency analysis shown in the diagram below:
a- Go to Toolbar and click on Power Flow menu
b- Scroll down to Reports.
c- Under Reports click on Multiple AC Contingency run report…
g- Hit Go.
The Multiple ACCC reports display in the report window that contains 15 pages. Go to page 9
and check the changes on the Added line.
PSSE Lab # 5 Questions:
1) Print out the Multiple ACCC report “area1c.acc”?
2) After the impact of the contingencies and loads, explain how it affects area1?
3) Add transformer between Bus#152 and Bus#153, follow the same method of adding line in this lab
and name the contingency output solution “area1T.acc”. Show the ACCC report “area1T.acc”?
4) Print and compare the three contingency report area1a.acc, area1c.acc, and area1T.acc in one report?