Eq 3
Eq 3
Eq 3
A. Clearing
B. Deforming works
C. Stripping
D. None of these
E. Cleaning
A. Strength limit
B. Maximum strength
C. Safety factor
D. Deflection
E. Proportional limit
A. Cantilever beam
B. Continuous beam
C. Intermediate beam
D. Overhanging beam
E. Grade Beam
A. Tee
B. Crowfoot
C. Wye
D. Elbow
E. 1/4 vent
A. Mat/Raft Foundation
B. Grillage Foundation
C. Shallow Foundation
D. Combined Foundation
E. Bench Foundation
A. Retaining Wall
B. Shoring Wall
C. Buttress Wall
D. Foundation Wall
A. Well Foundation
B. Pile Foundation
C. Foundations
D. Caisson's Foundation
E. Bench Foundation
8. Concrete must be placed in position properly compacted within WHAT minutes after adding water,
then cement setting will start?
A. 45 To 60 Minutes
B. 30 To 60 Minutes
C. 15 To 30 Minutes
D. 10 To 20 Minutes
E. 60 Minutes To 2 Hours
A. Girder
B. Floor Joist
C. Tailpiece
D. Ledger Strip
E. Hedger
10. In concealed construction, a material or member which fills or seals the open.
A. Draftstop
B. Firestop
C. Tailpiece
D. Backpan
E. Insulation
A. A beam joist or rafter supporting one end of a header at the edge of the opening in the floor or roof
frame.
B. A short transverse joist that supports the end of the cut-off joist at stairwell holes.
C. A wood strip nailed to the lower side of a girder to provide a bearing surface for joist.
12. In lockset, this is the safest door lock recommended for main entry doors.
A. Mortise Lockset
B. Unit Lockset
C. Cylinder Lockset
D. Rim Lockset
E. Lock
13. A type of glass used in constructing vision door which must be shutter proof to be accident free.
Discuss.
A. Laminated Glass
B. Wire Glass
C. Pattern Glass
D. Glass Block
E. Tempered Glass
14. In a building frame, a structural element that is shorter than usual, as a stud above a door opening or
below a window sill is
A. Wood Stud
B. Stirrup
C. Scarf joint
D. Plastic hose
E. Cripple stud
15. An incomplete form of peeling where the paint cracks into the large segments, the edges of which
breakaway from the surface while the center remains attached. Usually due to repeated application of
new coats over old coats.
A. Blistering
B. Alligatoring
C. Chalking
D. Deadening
16. The placing of concrete using pneumatic pressure of dry mix concrete or mortars
A. Shotcrete
B. Pneumatic Placement
C. Buggy
D. Spading
A. Asintada
B. Rebokada
C. Balangkas
D. Barakilan
E. Asolehos
A. Platsuela
B. Guililan
C. Batidora
D. Espolon
E. Baniera
19. Vernacular term for cabinet hinge
A. Lastilyas
B. Palitada
C. Suban
D. Espolon
20. Diagonal bracing in pairs between adjacent floor joist to prevent the joist from twisting.
A. Fire brick
B. Stirrup
C. Cross bridging
D. Cleat
21. STANDARD WIDTH OF A SEAT WITHOUT DIVIDING ARMS FOR PLACES OF ASSEMBLY
23. The responsible for advocating the fair and sustainable development, welfare and cultural
expression of society's habitat in terms of space forms and historical context.
A. Consulting Architect
B. Architect
C. Architect-of-record
D. Architect-in-charge
24. Refers to the practice of architecture by a duly-registered juridical person i.e. an architecture firm,
company, partnership, corporation or association consisting of two (20 or more natural persons duly
registered and licensed individually (as natural persons) to practice the profession of architecture by his/
her country of origin/birth.
A. Organization
C. Firm
D. Consulting architects
25. Refers to the firm of an individual Architect practicing and delivering architectural services, duly
registered with the DTI, Board and the Commission
A. Technological Professionals
B. Allied Technical
C. Firm
D. Sole proprietorship
E. None of these
26. Non-architect professionals registered and licensed by the Commission such as engineers, interior
designers, environmental planners, landscape architects and the like who are engaged in the planning
and design of the various components of buildings and their environs.
A. Allied Technical
B. Architectural Entity
C. Technological Professionals
D. Association
27. A sole proprietorship, a partnership, a corporation or an association registered with proper
government agencies, specially the DTI, SEc and the PRC.
A. Professional Firm
B. Architectural Corporation
C. Architectural Firm
D. Allied Technical
28. You decided to have architectural firm a sole proprietorship, to what commission you should
registered?
A. Mayor's office
B. DTI
C. SEC
D. GPPB
E. DILG
29. Which may generally refer to companies, partnerships or corporations registered with the:
A. Board/PRC
B. DTI
C. SEC
D. DILG
E. None of these
30. Architecture Partnership duly registered with the SEC and then with the:
A. DTI
B. BOARD of Architecture
C. Commission
D. Mayor's
C. Commission
D. Board
32. Who is directly and professionally responsible and liable for the construction supervision of the
project?
A. Architect-of record
B. Architect-in-charge
C. Consulting Architect
D. Architect
E. Project Manager