Inventory ManagementA Case Study in Ultratech Cement
Inventory ManagementA Case Study in Ultratech Cement
Inventory ManagementA Case Study in Ultratech Cement
technique for stock control models. The customary interview with the key personnel in the stores,
technique for stock administration is how much purchase, production and inventory department of the
valuable in nowadays the creator tells about it he is company. The record analysis was obtained from the
likewise saying that the conventional strategy is not a annual reports, schedules, store, ledgers, budgets and
cost lessening. It is so much costly. In any case, the purchase orders. The best known and most
dealing with the stock is most vital work for any fundamental inventory decision model EOQ and chi-
assembling unit. square test is taken for the analysis.
Delaunay C, Sahin E (2007) His review explains a
bunch of work has been done yet now on the off 5. DATA ANAYLSIS & HYPOTHESIS
chance that we need to proceed we should have great TESTING
permeability upon this field of research. That is the The data in table 1, 2, 3 show the usage rate of
reason we are centered around casing work for a ULTRATECH CEMENT Company’s raw material
comprehensive survey on the issue of production (clay ash, lime stone and bauxite). The data were used
network administration with stock errors. The creator the economic order quantity (EOQ) formula. The
said that their point in this work is additionally to expected frequency was determined at 5% confidence
introduce an essential basis that permits a level and 4 degree of freedom, see table 1, 2 & 3.
qualification between the distinctive kind of dealing CALCULATION OF EOQ:
with the stock. Clay Ash:
Asfaque Ahmed (October 12, 2004) He said that the
vast majority of the assembling organization sellers Yea Total orderin carryin EOQ
have arranging and planning item which expect either r Deman g cost g cost
d
endless generation limit with regards to computing 201 14000 42 2 588000 766.8115
amounts of crude material and work in advance 3
prerequisites or unending amounts of crude material 201 16500 55 1.55 117096.7 1082.11
and WIP material for ascertaining creation limit. 4
There are numerous issues with this approach and 201 15000 38 1.75 651428.5 807.11
how to maintain a strategic distance from these by 5 7
ensuring that the item you are purchasing surely 201 14000 40 1.5 746667 864.098
considers limited amounts of required materials and in 6
addition limited limits of work focuses in your 201 12000 38 3 304000 551.36
assembling offices. 7
Silver, Edward A (dec22, 2002) his research makes
an attempt in setting of a mainstream of things for
which the supposition fundamental the EOQ Lime Stone
determination holds sensibly well. However as is as
Yea Total orderin carryin EOQ
often as possible the trade out practices there is a total r Deman g cost g cost
requirement are the presence of spending plan to be d
designated among the supply of the things and A 201 15000 40 1.25 960000 979.79
buying generation office having the ability to handle 3 5
at most a specific number of recharging every year. In 201 13500 41 2 553500 743.97
4 5
view of the requirement, the individual renewal
201 13500 36 1.5 648000 804.98
amounts can't be chosen freely. 5
201 12500 37 1.75 528571.4 727.02
3. RESEARCH HYPOTHESIS 6 2 9
The following hypothesis was tested in this research 201 13500 35 1.25 756000 869.48
work. 7 2
H0: ULTRATECH CEMENT manufacturing industry
does not make use of economic order quantity [EOQ] Bauxite
optimization model to evaluate their inventory.
H1: ULTRATECH CEMENT manufacturing industry Total orderin carryin EOQ
makes use of economic order quantity [EOQ] Deman g cost g cost
Yea d
optimization model to evaluate their inventory r
201 11500 36.5 1.5 559667 748.10
4. RESEARCH METHODOLOGY 3 8
This study was conducted by using primary and 201 11000 37 2.5 325600 570.6
4
secondary data with the time period of 5 years (2013-
201 11200 36.5 1.7 467200 683.52
2017). The sources of data includes personal 5
13
International Journal of Advanced Information in Engineering Technology (IJAIET) ISSN: 2454-6933
201 17000 37 1 1258000 1121.6 quantity (EOQ) optimization model to evaluate their
6 0 inventory using lime stone as parameter for
201 18000 39 2.57 510545.4 714.52
7 5 measurement
2013 767 814.8 2285 2.8043 2013 748 814.8 4462 5.4761
2014 1082 814.8 71396 87.6239 2014 571 814.8 59438 72.9479
INTERPRTATION: X2 = 226.7142
Using Clay ash as parameter, table 1 depicts the X2
calculated value of 178.8816 which of course is the INTERPRETATION:
lower when compared with table value of chi-square Using Bauxite as parameter, table 3 depicts the X2
(X2) of 9.488. The null hypothesis was thus accepted calculated value of 226.7142 which of course is the
ultratech cement company does not make use of lower when compared with table value of chi-square
economic order quantity (EOQ) optimization using (X2) of 9.488. The null hypothesis was thus accepted
soda ash component as a parameter for measurement. ultratech cement company does not make use to
evaluate their inventory using bauxite as parameter for
Table 2: Lime Stone measurement.
FINDINGS & RECOMMENDATION:
YEARS 0 (O- (0-E)2/E The findings as presented above in all the three cases
(EOQ) E E)2
show that we should reject the alternative hypothesis
2013 980 814.8 27291 and accept the null hypothesis. The study analysis
33.4941 shows that the company operates a policy of making
2014 744 814.8 6.1524
order on quarterly basis within a period of one year
5013 provided, every one week stock has to be verified and
inform to the store department. The study observed
2015 805 814.8 96 0.1178 that the company adopts the EOQ model in placing
order for its raw materials. It also observes that there
2016 727 814.8 7709 9.4612 is a positive correlation between sales and inventory
usages. The study concludes that inventory usage
2017 869 814.8 54 0.0662 depends on sales which means when sales increases,
inventory usages should increase.
Therefore, inventory management is a must for the
continuity and survival of any goal focused
manufacturing organization.
X2 = 49.2917 First, the material will be ordered by reaching the
minimum stock level, material management unit
INTERPRETATION: should also pay attention to sales growth over the
years.
Using lime stone as parameter, table2, depicts the X2 Secondly, in the analysis we also mentioned that there
calculated value 49.2917 which of the course is lower was a negative relationship between the inventory and
when compared with table value of chi-square (X2) of sales and inventory cost and production cost. This
9.488. Company does not make use of economic order
14
International Journal of Advanced Information in Engineering Technology (IJAIET) ISSN: 2454-6933
REFERENCE: